Operational Excellence  and  Cost Reduction  Through  Lean & Lean-Sigma ADVANCED MANUFACTURING CONSULTANCY SDN. BHD.
 
 
 
 
 
 
 
The Profitability Dilemma Operating Cost Operating Cost Selling Price Selling Price Increase Price Bigger Profit Bigger Profit Reduced Operating Cost Business as Usual Current Necessity Cost  +  Profit  = Price Price -  Cost  =  Profit
FAST TRACK APPROACH TO ACHIEVE YOUR TARGET Immediate solutions are available to help you survive the economic crisis facing the world. The Clock is ticking………!
The objective of world-class manufacturing systems is to eliminate or reduce  “waste” (non value added activities) in order  to: Increase Throughput Rate at which company generates money through sales Reduce Excess Inventory Investment in Raw Material & other variable cost Reduce Operating Expense Fixed Expenses turning Raw Material into Finished Goods
THE METHODOLOGIES
Is your  $$$ Wasted? Lean Kills Waste! Waste & Value Motion 14% Overprocessing 8% Rework & Repair 10% Transportation 12% Waiting 18% Overproduction &  Excess Inventory 22% Adding Value 6% Unutilised Human  Resources 10%
 
 
The term "Sigma" is often used as a scale for levels of "goodness" or quality. Using this scale, "Six Sigma" equates to 3.4 defects per one million opportunities (DPMO) in manufacturing and other processes
LEAN-SIGMA   methodologies to achieve  ZERO DEFECTS .  Achieve “bulls eye” results always with these proven methodologies FAST TRACK APPROACH TO ACHIEVE YOUR TARGET
The Theory of Constraints is a focused and proven approach of identifying what  limits (constraints) a system from achieving it’s profit goals or continuously  achieving higher goals and exploiting/improving these constraints in order  to  achieve quantum gains
Jack Welch  (former CEO of GE) told the audience at a conference that his top 6 focus areas for 2009 were:- a)        Keeping costs in-line b)        Preparing for the worst-case scenario c)         Cash is King d)        Leadership has to communicate like hell e)        Love your best people  f)         Buy or bury your competitors  As you know Lean & Six Sigma is a proven methodology for achieving the first 3.  GE increased it bottom line by $10 billion using Six Sigma, DuPont $2.4 billion, Honeywell $2 billion, Motorola $2.2 billion, and Bank of America cut cycles times in half.  There are no better methodologies to cut wasteful and non-value add costs permanently.
 
 
Let us work on your productivity issues and get the results you need.  Consulting fees is charged only if results are achieved!  You only need to pay travel & living expense of consultants if agreed results are not achieved
Competency from Operators right up to Operations Directors in: LEAN  THEORY OF CONSTRAINTS LEAN-SIX SIGMA
Hands-On knowledge transfer for Operators right up to Operations Directors in: LEAN  THEORY OF CONSTRAINTS LEAN-SIX SIGMA
30%  Class Room Lectures 20% Coaching & Mentoring On Real Projects 50% Hands On Simulations &/Or Hands-On Shop-Floor Activities
CULTURE PHILOSOPHY TECHNOLOGY Lean Principles 8 Waste Value  vs Non Value Added Value Stream map Flow Takt Time Just In Time Kanban System Visual Systems Standardized Work TPM Quick Setups Error Proofing Kaizen Competent, flexible  and motivated employees who operate in a continuous improvement culture  THE LEAN TRIANGLE WE PROVIDE HOLISTIC SOLUTIONS TOWARDS CREATING A LEAN CULTURE
CULTURE PHILOSOPHY TECHNOLOGY Flow Just In Time Visual Systems Standardized Work Kaizen PRETEND  LEAN
Assessments & Opportunity identification Diagnostics to identify Waste Factory Audit and scoring Engaged with client in Projects and cost saving initiatives  Supplier Lean initiatives – speeding time to respond  Lean Tools Training Lean Master Certification Program Lean-Sigma training Change management training Public Seminars Executive Boot-camps  Identifying System Constraints & Bottlenecks Increasing bottleneck Capacities with Low Cost or No Cost Solutions
Advanced Manufacturing Consultancy Sdn. Bhd. Company Number: 650118D Founded in 2001in Malaysia www.amckaizen.com Pricipal Consultants: J. Ramesh Victor (Lean Master USA) PS Rajj (Lean Master USA) JR VICTOR PS RAJJ Consultants with combined industry exposure of  more than 35 years and have travelled  internationally to provide Consulting & Training
 
 
“ we find your training and coaching sessions informative, practical and professionally delivered. The choice to go wide to give the big picture before drilling down to select areas delivering highest business impact, is a strategy that serves us well…Besides an average of 30 to 40 percent improvement in set up time…, cycle time improvement from 6.5 to 4.2 days…we are also pleased to see a reduction in critical defects... SW Woo, COO Carsem M Sdn Bhd.
“  ...they have demonstrated the ability of going into problem factories, and quickly turn around their manufacturing operations. Approximately 7 people in the whole of Seagate 45,000 possessed this skill set ” Richard C. Craven B.Eng, MSc, MBA, CEng, MIMechE Seagate Supplier Lean Manager for Europe & Asia “ Utterly fantastic...without lean implementation at...we would not have met the Barracuda ATA- IV schedules”   Matt Johnen. VP Asia Materials (Seagate)
“  Lean Manufacturing in general opinion is too BIG and difficult to be achieved. But with AMC as our trainer/consultants Lean has become easily understood by  Belton candidates of all levels. Lean has become applicable in Belton” Pongyut, Director of Engineering Belton Industrial, Thailand “… .result is...very ordinary people here ( Production Supervisors, Engineers), moving on very ordinary projects ( Poka--yoke, UPH improvement, Kanban system, etc) for some VERY extra-ordinary results. I  am very pleased that so much dollars and cents has been saved with a lot of simple, sensible and stellar projects. Keep up the good work and I am so proud with all of you.”   Comment of Managing Director of Finisar to  AMC Lean Master Candidates
“  Lean Manufacturing came at the right time to save millions of dollars for us in capital avoidance…” Michael, Lean/Engineering Manager MSP, Ipoh (NSK Group) “  Lean Manufacturing is an effective tool to reduce wastage, optimize capacities &  reduce costs….AMC’s course taught us the  effectiveness of various Lean Tools….The course is very interactive and the simulation games are very interesting. The course instructors use their extensive industrial experience to elaborate important points and make participants understand the key points” Roger Goh, Vice President Beyonics Precision, Johore Bahru “ Very good projects and excellent savings, nothing should stop us from standardizing these actions across the floor  immediately ..” Innovex Thailand, VP of Quality  and Operations
AMC clients list One or more of our services have been rendered to: Malaysia General Electric, JB Komag, Pen, JB, Sarawak Eng Teknologi, Penang MMI Johore Bahru Beyonics Precision JB Wong Engineering, Kulim NSK, Malaysia MSP, Ipoh Balda Thong Fook, Ipoh Finisar Ipoh Hovid Pharmaceuticals, Ipoh Ryco Hydraulics, Kulim Crest Ultrasonic, Perai Camfil Farr, Batu Gajah Perak Community Specialist Hospital Malaysia Poly Plus, Perai Rhombus, Perai H & P, Perai Automotive Lighting, Penang Smart Modular, Perai Knowles Altum, JB Juason Plastic, Perai Balda (Mold Tool Room) Trane (Aircon) Mapa (Hutchinson Group) Rosa Pasadena (Hotel) Carsem Semiconductor PSC Casting HCM-Hygenic Corporation
AMC clients list Thailand Minebea (NMB) Innovex Belton Beyonics Compart  Fabrinet Agere  Singapore Seksun Corp Philips  (Alliance with Gemba USA) Others / global Seagate Technologies Taiwan Ambit  Nanotech  China Seksun, Suzhou MMI, Wuxi Belton, Shenzhen Belton, Wuxi Compart Magnecomp Optimal Snap On Broadway Shanghai Indonesia Philips  (Alliance with Gemba USA) One or more of our services have been rendered to:
 
WHAT NEXT? Allow us to help you: SAVE MONEY DEVELOP YOUR HUMAN CAPITAL COMPETE IN TODAYS ECONOMIC CRISIS CONTACT US:  Email:  [email_address]

Operational Excellence & Cost Reduction Sept09

  • 1.
    Operational Excellence and Cost Reduction Through Lean & Lean-Sigma ADVANCED MANUFACTURING CONSULTANCY SDN. BHD.
  • 2.
  • 3.
  • 4.
  • 5.
  • 6.
  • 7.
  • 8.
  • 9.
    The Profitability DilemmaOperating Cost Operating Cost Selling Price Selling Price Increase Price Bigger Profit Bigger Profit Reduced Operating Cost Business as Usual Current Necessity Cost + Profit = Price Price - Cost = Profit
  • 10.
    FAST TRACK APPROACHTO ACHIEVE YOUR TARGET Immediate solutions are available to help you survive the economic crisis facing the world. The Clock is ticking………!
  • 11.
    The objective ofworld-class manufacturing systems is to eliminate or reduce “waste” (non value added activities) in order to: Increase Throughput Rate at which company generates money through sales Reduce Excess Inventory Investment in Raw Material & other variable cost Reduce Operating Expense Fixed Expenses turning Raw Material into Finished Goods
  • 12.
  • 13.
    Is your $$$ Wasted? Lean Kills Waste! Waste & Value Motion 14% Overprocessing 8% Rework & Repair 10% Transportation 12% Waiting 18% Overproduction & Excess Inventory 22% Adding Value 6% Unutilised Human Resources 10%
  • 14.
  • 15.
  • 16.
    The term "Sigma"is often used as a scale for levels of "goodness" or quality. Using this scale, "Six Sigma" equates to 3.4 defects per one million opportunities (DPMO) in manufacturing and other processes
  • 17.
    LEAN-SIGMA methodologies to achieve ZERO DEFECTS . Achieve “bulls eye” results always with these proven methodologies FAST TRACK APPROACH TO ACHIEVE YOUR TARGET
  • 18.
    The Theory ofConstraints is a focused and proven approach of identifying what limits (constraints) a system from achieving it’s profit goals or continuously achieving higher goals and exploiting/improving these constraints in order to achieve quantum gains
  • 19.
    Jack Welch (former CEO of GE) told the audience at a conference that his top 6 focus areas for 2009 were:- a)       Keeping costs in-line b)       Preparing for the worst-case scenario c)        Cash is King d)       Leadership has to communicate like hell e)       Love your best people f)        Buy or bury your competitors As you know Lean & Six Sigma is a proven methodology for achieving the first 3. GE increased it bottom line by $10 billion using Six Sigma, DuPont $2.4 billion, Honeywell $2 billion, Motorola $2.2 billion, and Bank of America cut cycles times in half. There are no better methodologies to cut wasteful and non-value add costs permanently.
  • 20.
  • 21.
  • 22.
    Let us workon your productivity issues and get the results you need. Consulting fees is charged only if results are achieved! You only need to pay travel & living expense of consultants if agreed results are not achieved
  • 23.
    Competency from Operatorsright up to Operations Directors in: LEAN THEORY OF CONSTRAINTS LEAN-SIX SIGMA
  • 24.
    Hands-On knowledge transferfor Operators right up to Operations Directors in: LEAN THEORY OF CONSTRAINTS LEAN-SIX SIGMA
  • 25.
    30% ClassRoom Lectures 20% Coaching & Mentoring On Real Projects 50% Hands On Simulations &/Or Hands-On Shop-Floor Activities
  • 26.
    CULTURE PHILOSOPHY TECHNOLOGYLean Principles 8 Waste Value vs Non Value Added Value Stream map Flow Takt Time Just In Time Kanban System Visual Systems Standardized Work TPM Quick Setups Error Proofing Kaizen Competent, flexible and motivated employees who operate in a continuous improvement culture THE LEAN TRIANGLE WE PROVIDE HOLISTIC SOLUTIONS TOWARDS CREATING A LEAN CULTURE
  • 27.
    CULTURE PHILOSOPHY TECHNOLOGYFlow Just In Time Visual Systems Standardized Work Kaizen PRETEND LEAN
  • 28.
    Assessments & Opportunityidentification Diagnostics to identify Waste Factory Audit and scoring Engaged with client in Projects and cost saving initiatives Supplier Lean initiatives – speeding time to respond Lean Tools Training Lean Master Certification Program Lean-Sigma training Change management training Public Seminars Executive Boot-camps Identifying System Constraints & Bottlenecks Increasing bottleneck Capacities with Low Cost or No Cost Solutions
  • 29.
    Advanced Manufacturing ConsultancySdn. Bhd. Company Number: 650118D Founded in 2001in Malaysia www.amckaizen.com Pricipal Consultants: J. Ramesh Victor (Lean Master USA) PS Rajj (Lean Master USA) JR VICTOR PS RAJJ Consultants with combined industry exposure of more than 35 years and have travelled internationally to provide Consulting & Training
  • 30.
  • 31.
  • 32.
    “ we findyour training and coaching sessions informative, practical and professionally delivered. The choice to go wide to give the big picture before drilling down to select areas delivering highest business impact, is a strategy that serves us well…Besides an average of 30 to 40 percent improvement in set up time…, cycle time improvement from 6.5 to 4.2 days…we are also pleased to see a reduction in critical defects... SW Woo, COO Carsem M Sdn Bhd.
  • 33.
    “ ...theyhave demonstrated the ability of going into problem factories, and quickly turn around their manufacturing operations. Approximately 7 people in the whole of Seagate 45,000 possessed this skill set ” Richard C. Craven B.Eng, MSc, MBA, CEng, MIMechE Seagate Supplier Lean Manager for Europe & Asia “ Utterly fantastic...without lean implementation at...we would not have met the Barracuda ATA- IV schedules” Matt Johnen. VP Asia Materials (Seagate)
  • 34.
    “ LeanManufacturing in general opinion is too BIG and difficult to be achieved. But with AMC as our trainer/consultants Lean has become easily understood by Belton candidates of all levels. Lean has become applicable in Belton” Pongyut, Director of Engineering Belton Industrial, Thailand “… .result is...very ordinary people here ( Production Supervisors, Engineers), moving on very ordinary projects ( Poka--yoke, UPH improvement, Kanban system, etc) for some VERY extra-ordinary results. I  am very pleased that so much dollars and cents has been saved with a lot of simple, sensible and stellar projects. Keep up the good work and I am so proud with all of you.”   Comment of Managing Director of Finisar to AMC Lean Master Candidates
  • 35.
    “ LeanManufacturing came at the right time to save millions of dollars for us in capital avoidance…” Michael, Lean/Engineering Manager MSP, Ipoh (NSK Group) “ Lean Manufacturing is an effective tool to reduce wastage, optimize capacities & reduce costs….AMC’s course taught us the effectiveness of various Lean Tools….The course is very interactive and the simulation games are very interesting. The course instructors use their extensive industrial experience to elaborate important points and make participants understand the key points” Roger Goh, Vice President Beyonics Precision, Johore Bahru “ Very good projects and excellent savings, nothing should stop us from standardizing these actions across the floor immediately ..” Innovex Thailand, VP of Quality and Operations
  • 36.
    AMC clients listOne or more of our services have been rendered to: Malaysia General Electric, JB Komag, Pen, JB, Sarawak Eng Teknologi, Penang MMI Johore Bahru Beyonics Precision JB Wong Engineering, Kulim NSK, Malaysia MSP, Ipoh Balda Thong Fook, Ipoh Finisar Ipoh Hovid Pharmaceuticals, Ipoh Ryco Hydraulics, Kulim Crest Ultrasonic, Perai Camfil Farr, Batu Gajah Perak Community Specialist Hospital Malaysia Poly Plus, Perai Rhombus, Perai H & P, Perai Automotive Lighting, Penang Smart Modular, Perai Knowles Altum, JB Juason Plastic, Perai Balda (Mold Tool Room) Trane (Aircon) Mapa (Hutchinson Group) Rosa Pasadena (Hotel) Carsem Semiconductor PSC Casting HCM-Hygenic Corporation
  • 37.
    AMC clients listThailand Minebea (NMB) Innovex Belton Beyonics Compart Fabrinet Agere Singapore Seksun Corp Philips (Alliance with Gemba USA) Others / global Seagate Technologies Taiwan Ambit Nanotech China Seksun, Suzhou MMI, Wuxi Belton, Shenzhen Belton, Wuxi Compart Magnecomp Optimal Snap On Broadway Shanghai Indonesia Philips (Alliance with Gemba USA) One or more of our services have been rendered to:
  • 38.
  • 39.
    WHAT NEXT? Allowus to help you: SAVE MONEY DEVELOP YOUR HUMAN CAPITAL COMPETE IN TODAYS ECONOMIC CRISIS CONTACT US: Email: [email_address]