H  Dangi, FMS  1 Aggregate Planning Lecture No 5     Hamendra Dangi  hkdangi@fms.edu 9968316938
H  Dangi, FMS  2 Session Break Up Aggregate Planning Master Production Schedule
H  Dangi, FMS  3 Long range Intermediate range Short range Now 2 months 1 Year Planning Horizon Aggregate planning: Intermediate-range capacity planning, usually covering 2 to 12 months.
H  Dangi, FMS  4 Economic, competitive, and political  conditions Corporate strategies and policies Aggregate demand forecasts Establishes operations and capacity strategies Business Plan Establishes operations capacity Aggregate plan Establishes schedules for specific products Master schedule Planning Sequence Figure 13.1
H  Dangi, FMS  5 Aggregate Planning Begin with forecast of aggregate demand      Forecast intermediate range     General plan to meet demand by setting Output levels Employment Finished goods inventory level       Production plan is the output of aggregate planning       Update plan periodically – rolling planning horizon always c   overs the next 12 – 18 months
H  Dangi, FMS  6 Aggregate Planning Inputs Costs Inventory carrying Back orders Hiring/firing Overtime Inventory  changes Subcontracting Resources Workforce Facilities Demand forecast Policies Subcontracting Overtime Inventory levels Back orders
H  Dangi, FMS  7 Aggregate Planning Strategies Maintain a level workforce Maintain a steady output rate Match demand period by period Use a combination of decision variables
H  Dangi, FMS  8 Basic Strategies Level capacity strategy:  Maintaining a steady rate of regular-time output while meeting variations in demand by a combination of options. Chase demand strategy:  Matching capacity to demand; the planned output for a period is set at the expected demand for that period.
H  Dangi, FMS  9 Chase Approach Advantages Investment in inventory is low Labor utilization in high Disadvantages The cost of adjusting output rates and/or workforce levels
H  Dangi, FMS  10 Level Approach Advantages Stable output rates and workforce Disadvantages Greater inventory costs Increased overtime and idle time Resource utilizations vary over time
H  Dangi, FMS  11 Cumulative output/demand Cumulative production Cumulative demand 6 7 1 2 3 4 5 8 9 10 Cumulative Graph
H  Dangi, FMS  12 Average inventory Beginning Inventory + Ending Inventory = 2 Average Inventory
H  Dangi, FMS  13 Example  In a textile firm , a worker is capable of tailoring 3 garments per day. Assume time taken for each garment is same  Given  Hiring Cost : Rs 3000 Layoff Cost : Rs 4000 Current employee strength: 40
H  Dangi, FMS  14 Aggregate demands for next four month is given in the following table : Month 		Jun        July     Aug    Sep Demand                3170   3000    2900   2660  Working Days       24        23        23       24 Based on given information generate production plan following varying workforce strategy
H  Dangi, FMS  15 Production Plan
H  Dangi, FMS  16 Example ; Varying the Size of Inventory  Aggregate Demand for product X for next four month is given below  Demand      5000    4600    5200   4800 W.Days       23         24        22       23 Given : Opening Stock = 500 units               Inventory holding cost = Rs 40              Worker productivity = 20 units /day  		  Worker  strength = 10              Shortage Cost : Rs 30/Units  Generate production plan with varying inventory levels
H  Dangi, FMS  17 Production Plan
H  Dangi, FMS  18 Planners for a company that makes several models of skateboards are about to prepare the aggregate plan that will cover six periods. Theyhave assembled the following information:  They now want to evaluate a plan that calls for a steady rate of regular-time output, mainly using inventory to absorb the uneven demand but allowing some backlog. Overtime and subcontracting are not used because they want steady output. They intend to start with zero inventory on hand in the first period. Prepare an aggregate plan and determine its cost using the preceding information. Assume a level output rate of 300 units (skateboards) per period with regular time (i.e., 1,800÷6 = 300). Note that the planned ending inventory is zero. There are 15 workers, and each can produce 20 skateboards per period.  18 http://www.baskent.edu.tr/~kilter Example
H  Dangi, FMS  19
H  Dangi, FMS  20 20 http://www.baskent.edu.tr/~kilter
H  Dangi, FMS  21 21 http://www.baskent.edu.tr/~kilter Example After reviewing the plan developed in the preceding example, planners have decided to develop an alternative plan. They have learned that one person is about to retire from the company. Rather than replace that person, they would like to stay with the smaller workforce and use overtime to make up for the lost output. The reduced regular-time output is 280 units per period. The maximum amount of overtime output per period is 40 units. Develop a plan and compare it to the previous one.
H  Dangi, FMS  22 22 http://www.baskent.edu.tr/~kilter
H  Dangi, FMS  23 23 http://www.baskent.edu.tr/~kilter Aggregate Planning in Services ,[object Object]
Demand for service can be difficult to predict.
Capacity availability can be difficult to predict.
Labor flexibility can be an advantage in services. ,[object Object]
Evaluating the impact of new orders.
Providing delivery dates for orders.
Dealing with problems:Evaluating the impact of production delays or late deliveries of purchased goods. Revising the master schedule when necessary because of insufficient supplies or capacity. Bringing instances of insufficient capacity to the attention of production and marketing personnel so that they can participate in resolving conflicts.
H  Dangi, FMS  25 25 http://www.baskent.edu.tr/~kilter The Master Scheduling Process
H  Dangi, FMS  26 Weekly forecast requirements for industrial pumps.  Eight-week schedule showing forecasts, customer orders, and beginning inventory 26 http://www.baskent.edu.tr/~kilter

More Related Content

What's hot

DonnerCompany
DonnerCompanyDonnerCompany
DonnerCompany
Lauren Russell
 
Proctor and gamble case study 2005
Proctor and gamble case study 2005Proctor and gamble case study 2005
Proctor and gamble case study 2005
PiyushHirwani
 
Barilla
BarillaBarilla
Tata case
Tata caseTata case
Tata case
Akshay Borhade
 
Thomas Green Case Study Presentation.
Thomas Green Case Study Presentation.Thomas Green Case Study Presentation.
Thomas Green Case Study Presentation.
Mimansha Bahadur
 
Case Study On Asian Paints.pdf
Case Study On Asian Paints.pdfCase Study On Asian Paints.pdf
Case Study On Asian Paints.pdf
SiluSubudhi
 
Crown Cork & Seal in 1989 Case study
  Crown Cork & Seal in 1989   Case study  Crown Cork & Seal in 1989   Case study
Crown Cork & Seal in 1989 Case study
AJAL A J
 
Kanpur Confectioneries Case Analysis
Kanpur Confectioneries Case AnalysisKanpur Confectioneries Case Analysis
Kanpur Confectioneries Case Analysis
Jayant Kushwaha
 
HUL vs P&G
HUL vs P&GHUL vs P&G
HUL vs P&G
Saurabh Barnwal
 
Carolinas healthcare system
Carolinas healthcare system Carolinas healthcare system
Carolinas healthcare system
Sanmeet Dhokay
 
D.Light Design Case Study Ananlysis
D.Light Design Case Study AnanlysisD.Light Design Case Study Ananlysis
D.Light Design Case Study Ananlysis
Cherry Malhotra
 
American Connector Company
American Connector CompanyAmerican Connector Company
American Connector Company
Subhradeep Mitra
 
Colgate vs P&G
Colgate vs P&GColgate vs P&G
Colgate vs P&G
Jeevan Rathod
 
Case Study of Subhiksha
Case Study of SubhikshaCase Study of Subhiksha
Case Study of Subhiksha
Anunay Anand
 
Henry Tam and the MGI Team
Henry Tam and the MGI TeamHenry Tam and the MGI Team
Henry Tam and the MGI Team
Bodhisattwa Dasgupta
 
Case Study of HP:CSO
Case Study of HP:CSO Case Study of HP:CSO
Case Study of HP:CSO
Akhilesh Upadhyay
 
Sports Obermeyer
Sports ObermeyerSports Obermeyer
Sports Obermeyer
saurabh kumar
 
What is the right supply chain for your product .ali aslam
What is the right supply chain for your product .ali aslamWhat is the right supply chain for your product .ali aslam
What is the right supply chain for your product .ali aslam
ALIrajpoot9
 
Arrow electronics case b2 b
Arrow electronics case b2 bArrow electronics case b2 b
Arrow electronics case b2 b
Abhijeet Kumar
 
Group assignment pn g organization 2005
Group assignment pn g organization 2005Group assignment pn g organization 2005
Group assignment pn g organization 2005
Mita Hadi
 

What's hot (20)

DonnerCompany
DonnerCompanyDonnerCompany
DonnerCompany
 
Proctor and gamble case study 2005
Proctor and gamble case study 2005Proctor and gamble case study 2005
Proctor and gamble case study 2005
 
Barilla
BarillaBarilla
Barilla
 
Tata case
Tata caseTata case
Tata case
 
Thomas Green Case Study Presentation.
Thomas Green Case Study Presentation.Thomas Green Case Study Presentation.
Thomas Green Case Study Presentation.
 
Case Study On Asian Paints.pdf
Case Study On Asian Paints.pdfCase Study On Asian Paints.pdf
Case Study On Asian Paints.pdf
 
Crown Cork & Seal in 1989 Case study
  Crown Cork & Seal in 1989   Case study  Crown Cork & Seal in 1989   Case study
Crown Cork & Seal in 1989 Case study
 
Kanpur Confectioneries Case Analysis
Kanpur Confectioneries Case AnalysisKanpur Confectioneries Case Analysis
Kanpur Confectioneries Case Analysis
 
HUL vs P&G
HUL vs P&GHUL vs P&G
HUL vs P&G
 
Carolinas healthcare system
Carolinas healthcare system Carolinas healthcare system
Carolinas healthcare system
 
D.Light Design Case Study Ananlysis
D.Light Design Case Study AnanlysisD.Light Design Case Study Ananlysis
D.Light Design Case Study Ananlysis
 
American Connector Company
American Connector CompanyAmerican Connector Company
American Connector Company
 
Colgate vs P&G
Colgate vs P&GColgate vs P&G
Colgate vs P&G
 
Case Study of Subhiksha
Case Study of SubhikshaCase Study of Subhiksha
Case Study of Subhiksha
 
Henry Tam and the MGI Team
Henry Tam and the MGI TeamHenry Tam and the MGI Team
Henry Tam and the MGI Team
 
Case Study of HP:CSO
Case Study of HP:CSO Case Study of HP:CSO
Case Study of HP:CSO
 
Sports Obermeyer
Sports ObermeyerSports Obermeyer
Sports Obermeyer
 
What is the right supply chain for your product .ali aslam
What is the right supply chain for your product .ali aslamWhat is the right supply chain for your product .ali aslam
What is the right supply chain for your product .ali aslam
 
Arrow electronics case b2 b
Arrow electronics case b2 bArrow electronics case b2 b
Arrow electronics case b2 b
 
Group assignment pn g organization 2005
Group assignment pn g organization 2005Group assignment pn g organization 2005
Group assignment pn g organization 2005
 

Similar to Om5

Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
Kinshook Chaturvedi
 
Aggregate Production Planning (APP)
Aggregate Production Planning (APP)Aggregate Production Planning (APP)
Aggregate Production Planning (APP)
Kelly Lipiec
 
Opm101 chapter13 000
Opm101 chapter13 000Opm101 chapter13 000
Opm101 chapter13 000
Abhimanyu Jayakanth
 
Aggregate Production Planning
Aggregate Production PlanningAggregate Production Planning
Aggregate Production Planning
3abooodi
 
aggregateplanningreport-121002061533-phpapp02.pdf
aggregateplanningreport-121002061533-phpapp02.pdfaggregateplanningreport-121002061533-phpapp02.pdf
aggregateplanningreport-121002061533-phpapp02.pdf
ChunWan
 
Industrial Engineering & Operation Research Lecture Notes
Industrial Engineering & Operation Research Lecture NotesIndustrial Engineering & Operation Research Lecture Notes
Industrial Engineering & Operation Research Lecture Notes
FellowBuddy.com
 
Session 4
Session 4Session 4
Aggrigate planning copy
Aggrigate planning   copyAggrigate planning   copy
Aggrigate planning copy
DinEsh Manickam
 
Aggregate Planning
Aggregate  PlanningAggregate  Planning
Aggregate Planning
ahmad bassiouny
 
9©iStockphotoThinkstockPlanning for Material and Reso.docx
9©iStockphotoThinkstockPlanning for Material and Reso.docx9©iStockphotoThinkstockPlanning for Material and Reso.docx
9©iStockphotoThinkstockPlanning for Material and Reso.docx
blondellchancy
 
9©iStockphotoThinkstockPlanning for Material and Reso.docx
9©iStockphotoThinkstockPlanning for Material and Reso.docx9©iStockphotoThinkstockPlanning for Material and Reso.docx
9©iStockphotoThinkstockPlanning for Material and Reso.docx
priestmanmable
 
Ch13 - Aggregate Planning
Ch13 - Aggregate PlanningCh13 - Aggregate Planning
Ch13 - Aggregate Planning
Pelly Sianova
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
Aastha Chopra
 
Aggregate Production Planning for a Pump Manufacturing Company: Chase Strategy
Aggregate Production Planning for a Pump Manufacturing Company: Chase StrategyAggregate Production Planning for a Pump Manufacturing Company: Chase Strategy
Aggregate Production Planning for a Pump Manufacturing Company: Chase Strategy
IRJET Journal
 
Sales & operations planning
Sales & operations planningSales & operations planning
Sales & operations planning
Shreyas Nair
 
435ch14
435ch14435ch14
435ch14
Akansha Sinha
 
Aggregrate_production_plan_operations.ppt
Aggregrate_production_plan_operations.pptAggregrate_production_plan_operations.ppt
Aggregrate_production_plan_operations.ppt
vidhiat
 
Chapter 06
Chapter 06Chapter 06
Aggregate Production Planning for a Pump Manufacturing Company: Level Strategy
Aggregate Production Planning for a Pump Manufacturing Company: Level StrategyAggregate Production Planning for a Pump Manufacturing Company: Level Strategy
Aggregate Production Planning for a Pump Manufacturing Company: Level Strategy
IRJET Journal
 
Problem 6 - Based on the data provided in the table below is t.docx
Problem 6 - Based on the data provided in the table below is t.docxProblem 6 - Based on the data provided in the table below is t.docx
Problem 6 - Based on the data provided in the table below is t.docx
dessiechisomjj4
 

Similar to Om5 (20)

Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
 
Aggregate Production Planning (APP)
Aggregate Production Planning (APP)Aggregate Production Planning (APP)
Aggregate Production Planning (APP)
 
Opm101 chapter13 000
Opm101 chapter13 000Opm101 chapter13 000
Opm101 chapter13 000
 
Aggregate Production Planning
Aggregate Production PlanningAggregate Production Planning
Aggregate Production Planning
 
aggregateplanningreport-121002061533-phpapp02.pdf
aggregateplanningreport-121002061533-phpapp02.pdfaggregateplanningreport-121002061533-phpapp02.pdf
aggregateplanningreport-121002061533-phpapp02.pdf
 
Industrial Engineering & Operation Research Lecture Notes
Industrial Engineering & Operation Research Lecture NotesIndustrial Engineering & Operation Research Lecture Notes
Industrial Engineering & Operation Research Lecture Notes
 
Session 4
Session 4Session 4
Session 4
 
Aggrigate planning copy
Aggrigate planning   copyAggrigate planning   copy
Aggrigate planning copy
 
Aggregate Planning
Aggregate  PlanningAggregate  Planning
Aggregate Planning
 
9©iStockphotoThinkstockPlanning for Material and Reso.docx
9©iStockphotoThinkstockPlanning for Material and Reso.docx9©iStockphotoThinkstockPlanning for Material and Reso.docx
9©iStockphotoThinkstockPlanning for Material and Reso.docx
 
9©iStockphotoThinkstockPlanning for Material and Reso.docx
9©iStockphotoThinkstockPlanning for Material and Reso.docx9©iStockphotoThinkstockPlanning for Material and Reso.docx
9©iStockphotoThinkstockPlanning for Material and Reso.docx
 
Ch13 - Aggregate Planning
Ch13 - Aggregate PlanningCh13 - Aggregate Planning
Ch13 - Aggregate Planning
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
 
Aggregate Production Planning for a Pump Manufacturing Company: Chase Strategy
Aggregate Production Planning for a Pump Manufacturing Company: Chase StrategyAggregate Production Planning for a Pump Manufacturing Company: Chase Strategy
Aggregate Production Planning for a Pump Manufacturing Company: Chase Strategy
 
Sales & operations planning
Sales & operations planningSales & operations planning
Sales & operations planning
 
435ch14
435ch14435ch14
435ch14
 
Aggregrate_production_plan_operations.ppt
Aggregrate_production_plan_operations.pptAggregrate_production_plan_operations.ppt
Aggregrate_production_plan_operations.ppt
 
Chapter 06
Chapter 06Chapter 06
Chapter 06
 
Aggregate Production Planning for a Pump Manufacturing Company: Level Strategy
Aggregate Production Planning for a Pump Manufacturing Company: Level StrategyAggregate Production Planning for a Pump Manufacturing Company: Level Strategy
Aggregate Production Planning for a Pump Manufacturing Company: Level Strategy
 
Problem 6 - Based on the data provided in the table below is t.docx
Problem 6 - Based on the data provided in the table below is t.docxProblem 6 - Based on the data provided in the table below is t.docx
Problem 6 - Based on the data provided in the table below is t.docx
 

More from Kinshook Chaturvedi

Working and functions_of_rbi[1]
Working and functions_of_rbi[1]Working and functions_of_rbi[1]
Working and functions_of_rbi[1]
Kinshook Chaturvedi
 
Role of idfc_in_infrastucture_finance
Role of idfc_in_infrastucture_financeRole of idfc_in_infrastucture_finance
Role of idfc_in_infrastucture_finance
Kinshook Chaturvedi
 
Mutual funds
Mutual fundsMutual funds
Mutual funds
Kinshook Chaturvedi
 
Iifcl ppt
Iifcl pptIifcl ppt
Basel ii norms.ppt
Basel ii norms.pptBasel ii norms.ppt
Basel ii norms.ppt
Kinshook Chaturvedi
 
Retail banking pres
Retail banking presRetail banking pres
Retail banking pres
Kinshook Chaturvedi
 
Presentation on lic of india
Presentation on lic of indiaPresentation on lic of india
Presentation on lic of india
Kinshook Chaturvedi
 
Mfi dfi
Mfi dfiMfi dfi
Management of np as imt
Management of np as imtManagement of np as imt
Management of np as imt
Kinshook Chaturvedi
 
Life insurance in india final raja
Life insurance in india final rajaLife insurance in india final raja
Life insurance in india final raja
Kinshook Chaturvedi
 
Financial inclusion
Financial inclusionFinancial inclusion
Financial inclusion
Kinshook Chaturvedi
 
Corporate banking v2
Corporate banking v2Corporate banking v2
Corporate banking v2
Kinshook Chaturvedi
 
Corporate banking latest
Corporate banking latestCorporate banking latest
Corporate banking latest
Kinshook Chaturvedi
 
Financial mgt exercises
Financial mgt exercisesFinancial mgt exercises
Financial mgt exercises
Kinshook Chaturvedi
 
Csac10[1].p
Csac10[1].pCsac10[1].p
Csac10[1].p
Kinshook Chaturvedi
 
Csac08[1].p
Csac08[1].pCsac08[1].p
Csac08[1].p
Kinshook Chaturvedi
 
Csac05[1].p
Csac05[1].pCsac05[1].p
Csac05[1].p
Kinshook Chaturvedi
 
Csac14[1].p
Csac14[1].pCsac14[1].p
Csac14[1].p
Kinshook Chaturvedi
 
Csac06[1].p
Csac06[1].pCsac06[1].p
Csac06[1].p
Kinshook Chaturvedi
 

More from Kinshook Chaturvedi (20)

Working and functions_of_rbi[1]
Working and functions_of_rbi[1]Working and functions_of_rbi[1]
Working and functions_of_rbi[1]
 
Role of idfc_in_infrastucture_finance
Role of idfc_in_infrastucture_financeRole of idfc_in_infrastucture_finance
Role of idfc_in_infrastucture_finance
 
Mutual funds
Mutual fundsMutual funds
Mutual funds
 
Iifcl ppt
Iifcl pptIifcl ppt
Iifcl ppt
 
Basel ii norms.ppt
Basel ii norms.pptBasel ii norms.ppt
Basel ii norms.ppt
 
Retail banking pres
Retail banking presRetail banking pres
Retail banking pres
 
Presentation on lic of india
Presentation on lic of indiaPresentation on lic of india
Presentation on lic of india
 
Mfi dfi
Mfi dfiMfi dfi
Mfi dfi
 
Management of np as imt
Management of np as imtManagement of np as imt
Management of np as imt
 
Life insurance in india final raja
Life insurance in india final rajaLife insurance in india final raja
Life insurance in india final raja
 
Financial inclusion
Financial inclusionFinancial inclusion
Financial inclusion
 
Corporate banking v2
Corporate banking v2Corporate banking v2
Corporate banking v2
 
Corporate banking latest
Corporate banking latestCorporate banking latest
Corporate banking latest
 
Financial mgt exercises
Financial mgt exercisesFinancial mgt exercises
Financial mgt exercises
 
Csac10[1].p
Csac10[1].pCsac10[1].p
Csac10[1].p
 
Csac08[1].p
Csac08[1].pCsac08[1].p
Csac08[1].p
 
Csac05[1].p
Csac05[1].pCsac05[1].p
Csac05[1].p
 
Csac14[1].p
Csac14[1].pCsac14[1].p
Csac14[1].p
 
Csac06[1].p
Csac06[1].pCsac06[1].p
Csac06[1].p
 
Xyber001 16 12_09 (2)
Xyber001 16 12_09 (2)Xyber001 16 12_09 (2)
Xyber001 16 12_09 (2)
 

Recently uploaded

Training my puppy and implementation in this story
Training my puppy and implementation in this storyTraining my puppy and implementation in this story
Training my puppy and implementation in this story
WilliamRodrigues148
 
Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024
Kirill Klimov
 
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta MatkaDpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta Matka
➒➌➎➏➑➐➋➑➐➐Dpboss Matka Guessing Satta Matka Kalyan Chart Indian Matka
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
marketing317746
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
Lital Barkan
 
Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431
ecamare2
 
Authentically Social by Corey Perlman - EO Puerto Rico
Authentically Social by Corey Perlman - EO Puerto RicoAuthentically Social by Corey Perlman - EO Puerto Rico
Authentically Social by Corey Perlman - EO Puerto Rico
Corey Perlman, Social Media Speaker and Consultant
 
buy old yahoo accounts buy yahoo accounts
buy old yahoo accounts buy yahoo accountsbuy old yahoo accounts buy yahoo accounts
buy old yahoo accounts buy yahoo accounts
Susan Laney
 
Mastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnapMastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnap
Norma Mushkat Gaffin
 
2022 Vintage Roman Numerals Men Rings
2022 Vintage Roman  Numerals  Men  Rings2022 Vintage Roman  Numerals  Men  Rings
2022 Vintage Roman Numerals Men Rings
aragme
 
Structural Design Process: Step-by-Step Guide for Buildings
Structural Design Process: Step-by-Step Guide for BuildingsStructural Design Process: Step-by-Step Guide for Buildings
Structural Design Process: Step-by-Step Guide for Buildings
Chandresh Chudasama
 
Building Your Employer Brand with Social Media
Building Your Employer Brand with Social MediaBuilding Your Employer Brand with Social Media
Building Your Employer Brand with Social Media
LuanWise
 
Understanding User Needs and Satisfying Them
Understanding User Needs and Satisfying ThemUnderstanding User Needs and Satisfying Them
Understanding User Needs and Satisfying Them
Aggregage
 
Chapter 7 Final business management sciences .ppt
Chapter 7 Final business management sciences .pptChapter 7 Final business management sciences .ppt
Chapter 7 Final business management sciences .ppt
ssuser567e2d
 
Industrial Tech SW: Category Renewal and Creation
Industrial Tech SW:  Category Renewal and CreationIndustrial Tech SW:  Category Renewal and Creation
Industrial Tech SW: Category Renewal and Creation
Christian Dahlen
 
Creative Web Design Company in Singapore
Creative Web Design Company in SingaporeCreative Web Design Company in Singapore
Creative Web Design Company in Singapore
techboxsqauremedia
 
Recruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media MasterclassRecruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media Masterclass
LuanWise
 
Creative Web Design Company in Singapore
Creative Web Design Company in SingaporeCreative Web Design Company in Singapore
Creative Web Design Company in Singapore
techboxsqauremedia
 
Part 2 Deep Dive: Navigating the 2024 Slowdown
Part 2 Deep Dive: Navigating the 2024 SlowdownPart 2 Deep Dive: Navigating the 2024 Slowdown
Part 2 Deep Dive: Navigating the 2024 Slowdown
jeffkluth1
 
The 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdf
The 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdfThe 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdf
The 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdf
thesiliconleaders
 

Recently uploaded (20)

Training my puppy and implementation in this story
Training my puppy and implementation in this storyTraining my puppy and implementation in this story
Training my puppy and implementation in this story
 
Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024
 
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta MatkaDpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta Matka
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
 
Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431
 
Authentically Social by Corey Perlman - EO Puerto Rico
Authentically Social by Corey Perlman - EO Puerto RicoAuthentically Social by Corey Perlman - EO Puerto Rico
Authentically Social by Corey Perlman - EO Puerto Rico
 
buy old yahoo accounts buy yahoo accounts
buy old yahoo accounts buy yahoo accountsbuy old yahoo accounts buy yahoo accounts
buy old yahoo accounts buy yahoo accounts
 
Mastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnapMastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnap
 
2022 Vintage Roman Numerals Men Rings
2022 Vintage Roman  Numerals  Men  Rings2022 Vintage Roman  Numerals  Men  Rings
2022 Vintage Roman Numerals Men Rings
 
Structural Design Process: Step-by-Step Guide for Buildings
Structural Design Process: Step-by-Step Guide for BuildingsStructural Design Process: Step-by-Step Guide for Buildings
Structural Design Process: Step-by-Step Guide for Buildings
 
Building Your Employer Brand with Social Media
Building Your Employer Brand with Social MediaBuilding Your Employer Brand with Social Media
Building Your Employer Brand with Social Media
 
Understanding User Needs and Satisfying Them
Understanding User Needs and Satisfying ThemUnderstanding User Needs and Satisfying Them
Understanding User Needs and Satisfying Them
 
Chapter 7 Final business management sciences .ppt
Chapter 7 Final business management sciences .pptChapter 7 Final business management sciences .ppt
Chapter 7 Final business management sciences .ppt
 
Industrial Tech SW: Category Renewal and Creation
Industrial Tech SW:  Category Renewal and CreationIndustrial Tech SW:  Category Renewal and Creation
Industrial Tech SW: Category Renewal and Creation
 
Creative Web Design Company in Singapore
Creative Web Design Company in SingaporeCreative Web Design Company in Singapore
Creative Web Design Company in Singapore
 
Recruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media MasterclassRecruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media Masterclass
 
Creative Web Design Company in Singapore
Creative Web Design Company in SingaporeCreative Web Design Company in Singapore
Creative Web Design Company in Singapore
 
Part 2 Deep Dive: Navigating the 2024 Slowdown
Part 2 Deep Dive: Navigating the 2024 SlowdownPart 2 Deep Dive: Navigating the 2024 Slowdown
Part 2 Deep Dive: Navigating the 2024 Slowdown
 
The 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdf
The 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdfThe 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdf
The 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdf
 

Om5

  • 1. H Dangi, FMS 1 Aggregate Planning Lecture No 5 Hamendra Dangi hkdangi@fms.edu 9968316938
  • 2. H Dangi, FMS 2 Session Break Up Aggregate Planning Master Production Schedule
  • 3. H Dangi, FMS 3 Long range Intermediate range Short range Now 2 months 1 Year Planning Horizon Aggregate planning: Intermediate-range capacity planning, usually covering 2 to 12 months.
  • 4. H Dangi, FMS 4 Economic, competitive, and political conditions Corporate strategies and policies Aggregate demand forecasts Establishes operations and capacity strategies Business Plan Establishes operations capacity Aggregate plan Establishes schedules for specific products Master schedule Planning Sequence Figure 13.1
  • 5. H Dangi, FMS 5 Aggregate Planning Begin with forecast of aggregate demand Forecast intermediate range General plan to meet demand by setting Output levels Employment Finished goods inventory level Production plan is the output of aggregate planning Update plan periodically – rolling planning horizon always c overs the next 12 – 18 months
  • 6. H Dangi, FMS 6 Aggregate Planning Inputs Costs Inventory carrying Back orders Hiring/firing Overtime Inventory changes Subcontracting Resources Workforce Facilities Demand forecast Policies Subcontracting Overtime Inventory levels Back orders
  • 7. H Dangi, FMS 7 Aggregate Planning Strategies Maintain a level workforce Maintain a steady output rate Match demand period by period Use a combination of decision variables
  • 8. H Dangi, FMS 8 Basic Strategies Level capacity strategy: Maintaining a steady rate of regular-time output while meeting variations in demand by a combination of options. Chase demand strategy: Matching capacity to demand; the planned output for a period is set at the expected demand for that period.
  • 9. H Dangi, FMS 9 Chase Approach Advantages Investment in inventory is low Labor utilization in high Disadvantages The cost of adjusting output rates and/or workforce levels
  • 10. H Dangi, FMS 10 Level Approach Advantages Stable output rates and workforce Disadvantages Greater inventory costs Increased overtime and idle time Resource utilizations vary over time
  • 11. H Dangi, FMS 11 Cumulative output/demand Cumulative production Cumulative demand 6 7 1 2 3 4 5 8 9 10 Cumulative Graph
  • 12. H Dangi, FMS 12 Average inventory Beginning Inventory + Ending Inventory = 2 Average Inventory
  • 13. H Dangi, FMS 13 Example In a textile firm , a worker is capable of tailoring 3 garments per day. Assume time taken for each garment is same Given Hiring Cost : Rs 3000 Layoff Cost : Rs 4000 Current employee strength: 40
  • 14. H Dangi, FMS 14 Aggregate demands for next four month is given in the following table : Month Jun July Aug Sep Demand 3170 3000 2900 2660 Working Days 24 23 23 24 Based on given information generate production plan following varying workforce strategy
  • 15. H Dangi, FMS 15 Production Plan
  • 16. H Dangi, FMS 16 Example ; Varying the Size of Inventory Aggregate Demand for product X for next four month is given below Demand 5000 4600 5200 4800 W.Days 23 24 22 23 Given : Opening Stock = 500 units Inventory holding cost = Rs 40 Worker productivity = 20 units /day Worker strength = 10 Shortage Cost : Rs 30/Units Generate production plan with varying inventory levels
  • 17. H Dangi, FMS 17 Production Plan
  • 18. H Dangi, FMS 18 Planners for a company that makes several models of skateboards are about to prepare the aggregate plan that will cover six periods. Theyhave assembled the following information: They now want to evaluate a plan that calls for a steady rate of regular-time output, mainly using inventory to absorb the uneven demand but allowing some backlog. Overtime and subcontracting are not used because they want steady output. They intend to start with zero inventory on hand in the first period. Prepare an aggregate plan and determine its cost using the preceding information. Assume a level output rate of 300 units (skateboards) per period with regular time (i.e., 1,800÷6 = 300). Note that the planned ending inventory is zero. There are 15 workers, and each can produce 20 skateboards per period. 18 http://www.baskent.edu.tr/~kilter Example
  • 19. H Dangi, FMS 19
  • 20. H Dangi, FMS 20 20 http://www.baskent.edu.tr/~kilter
  • 21. H Dangi, FMS 21 21 http://www.baskent.edu.tr/~kilter Example After reviewing the plan developed in the preceding example, planners have decided to develop an alternative plan. They have learned that one person is about to retire from the company. Rather than replace that person, they would like to stay with the smaller workforce and use overtime to make up for the lost output. The reduced regular-time output is 280 units per period. The maximum amount of overtime output per period is 40 units. Develop a plan and compare it to the previous one.
  • 22. H Dangi, FMS 22 22 http://www.baskent.edu.tr/~kilter
  • 23.
  • 24. Demand for service can be difficult to predict.
  • 25. Capacity availability can be difficult to predict.
  • 26.
  • 27. Evaluating the impact of new orders.
  • 29. Dealing with problems:Evaluating the impact of production delays or late deliveries of purchased goods. Revising the master schedule when necessary because of insufficient supplies or capacity. Bringing instances of insufficient capacity to the attention of production and marketing personnel so that they can participate in resolving conflicts.
  • 30. H Dangi, FMS 25 25 http://www.baskent.edu.tr/~kilter The Master Scheduling Process
  • 31. H Dangi, FMS 26 Weekly forecast requirements for industrial pumps. Eight-week schedule showing forecasts, customer orders, and beginning inventory 26 http://www.baskent.edu.tr/~kilter
  • 32. H Dangi, FMS 27 27 http://www.baskent.edu.tr/~kilter Projected on-hand inventory is computed week by week until it becomes negative
  • 33. H Dangi, FMS 28 28 Determining the MPS and projected on-hand inventory
  • 34. H Dangi, FMS 29 29 Projected on-hand inventory and MPS are added to the master schedule
  • 35. H Dangi, FMS 30 Discussion on Minor Test No of Questions : 20 Weight age : 10 Marks Time : 45 Min (6.45 PM to 7.30 PM)
  • 36. H Dangi, FMS 31 Syllabus Site Selection and Facility Location Scheduling Work Measurement Scheduling Quality Management Aggregate Planning