3
Why we will change?
Production
•Production is the process of combining units
of inputs (man-made and human resources) to
create output
Fabric
(Cutting)
Thread Machinery Manpower
(Workers)
Output
4
1000pcs 200 Cones 35 Machines 40 persons (40x
10) = 400hrs 200 pcs
5
Production
What is SMV ?
• Meaning of the Abbreviation- Standard Minute Value
• It should be expressed always in Minutes
• Time taken by a standard operator to complete any give operation/s
with pre-defined conditions
• BSI 100= 100% performance operator is the standard operator
• SMV = Basic Time + Allowance
Observe Time X Rating
• Basic Time =
Standard Rating
6
How to Calculate SMV?
• We Can Calculate SMV By 03 Way.
• PMTS can be used as a method analysis technique
There are common versions. (Time study).
• MTM1,2,3 [Established in 1940(350codes), 1965 (39 codes),1970 (10
codes)
• GSD (General Sewing Data) Established in 1971- specially designed for
the needle trade work. (36 codes)
7
WHAT IS TARGET?
• Production Target refers to the number of units or the quantity of output
the business is expected to produce in the next financial period.
• Production target defines how much to produce?
• The production target is fixed during the preparation of the production
budget when the man, material, method, money are decided.
• This production target helps the organisation follow a routine production
process and adjust their master schedules when necessary to achieve the
desired target.
8
How to Calculate Target?
TOTAL MANPOWER X WORKING HOURS X 60
• TARGET = X EXPECTED EFFI.%
SMV
(TTL.MP=80) X (WH=10) X 60
TARGET = X 65%
(SMV= 35.80)
9
48000
TARGET = X 65%
35.80
TARGET = 1340.78 X 65%
TARGET = 871.50 PCS.
10
How to Calculate Target?
• Efficiency is the quality of being able to do a task successfully, without
wasting time or energy.
• The comparison of what is actually produced or performed with what
can be achieved with the same consumption of resources (money,
time, labor, etc.). It is an important factor in determination of
productivity. See also effectiveness.
11
WHAT IS EFFICIENCY?
• Production output from the line (Pcs),
• Standard Minute Value (SMV) for garment,
• Total number of operators / Helpers in the line,
• Total working hours.
How to Calculate Efficiency
12
How to Calculate Efficiency
Line Output SMV of the Garment
Total number of Operators /
Helpers
Total Working Hours 60
Total produced Minutes
100
Total Worked Minutes
100
13
WR-254 (4UDBWBY)
800pcs 22.02 minutes
40 10 60
100
800 x 22.02
40 x 10 x 60
100
14
17616 mins
24,000 mins
100
73.40%
Efficiency
15
Reasons for Poor Efficiency
• Not following Individual Targets of Operators / Helpers
• Poor Recording Systems (Not recording WIP / Input / Output)
• Excessive Working Hours without productivity (Extra Overtime)
• Non productive Times (Machine Breakdown / No Input)
• Improper Planning (Not prepare well for next style change)
• Bottlenecks (Due to poor balancing)
• Not follow Bundling Serial Systems
• Operators / Helpers doing non – value added operations / Processes
• Poor cooperation with other departments (Cutting / Store)
• Operator Skills
• Absenteeism
16
Not following Individual Targets of Operators /
Helpers
• Without not knowing the hourly
achievement how can you achieve
daily target
• Not possible to identify where the
problem is
• Finally you can not make decisions
17
Follow Operator Individual Targets Closely
• Record every hour production from the beginning, of style not after
one day
• If you found less than the requirement ask for reasons
• If Operator give any reasons (Good or Bad) check it right or wrong
• If right necessary to give a solution
• If wrong explain them that answer is wrong
• Don’t misbehave or use rough language with them
18
Poor Recording Systems (Not recording WIP / Input /
Output)
Date Front Part Output Back Part Output Total Output
1/4/16 2500 2200 1200
2/4/16 3200 2800 1700
3/4/16 4000 3300 2500
4/4/16 4900 4000 3200
5/4/16 5500 4500 4000
19
500
400
300
600
500
400
200
150
100
Front Back Belt
300 250 200 100 75 60
20
Excessive Working Hours without productivity (Excess
OT)
Hour 1 2 3 4 5 6 7 8 9 10 11 12 13
Output 50 70 75 80 80 85 83 80 85 85 ?? ?? ??
Up to 10 Hours Total Production =773pcs
Up to 13 Hours Total Production = 850pcs
Up to 10 Hours Average Production / Hr =77pcs
Up to 10 Hours Average Production / Hr =65pcs
21
Non productive Times (Machine Breakdown / No
Input)
22
Improper Planning (Not prepare well for next style
change)
• If you have clear details about Input / Output / WIP you know that
when will be finish current style
• Then you can assume when you need new input
23
Bottlenecks
•Bottleneck is a stage in a process that causes the entire process to
slow down or stop.
24
Practical Example
Pocket Seam
Attach – 500pcs
Pocket Overlock
– 500pcs
Pocket Bag
Topstitch – 400pcs
Pocket Attach –
200pcs
• Operator Problem??
• Machine Problem??
• Capacity Problem??
• Defectives??
Or What
• Motivate / Change
Operator
• Change Machine??
• Check Actual Capacity??
• Change the method with
the help of WSE??
25
Not follow Bundling Serial Systems
• If you are not following Bundling Systems
• If Front / Back Parts follow different bundles then can not do
assembly
• Unable to get exact qty’s
• Directly affecting to operator performance as they need to
search for bundles
• Increasing non productive time
• Excessive backlogs due to bundle mistakes
• Affecting Line Cleanliness / arrangements
• Create Unpleasant working environment
26
How We are Doing - Bargain
27
28
How Others are Doing
29
30
31
Operators / Helpers doing non – value added Operations
• What is Non Value Added Operations
• Any process doing by operator / helper and do not allocate SMV in
Operation Breakdown
• Therefore these processes not considering when calculate efficiency
• But those operator / helper working hours added to total working hours
of production line
• Increase Product Cost (Buyer did not pay for extra work)
• What are the Non Value Added Operations
• Matching Parts (Such as Pockets / Front & Back Parts) / Belts)
• Tacking Parts to body (Such as Belt / Belt Loop)
• Excess Markings (Other than the required markings)
• Thread Cutting
• Any other Operator / Helper process which is not included in layout 32
Matching No Serial in Parts (Bargain & Zazu)
33
Knee Marks - Bargain
34
Tack Waist Belt & Loop to Body (909 & Bargain)
35
What we can do to STOP Non Value Adding Operations
• Follow Bundle / Number Serial - No Need Match parts or Tack Parts
to Body
• Remove Excess Markings
• Ask your self actually this is required or not / Check with WSE & Quality
Controller for any other methods or remove marks completely
• Reduce Marking area and It will help to increase production pcs
• Keep Active all Auto Thread Cutting Devises (Wiper / UBT)
• Reduce no of Helper Process as much as you can to increase Efficiency
36
Bundle & No Serial Follow up
37
Reduce Marking Area
38
Reduce Marking Area
Not Clear / Excess
Markings / Not Good
Method = Low Output
Clear & Clean/ Less
Markings / Good Method
= High Output
39
Poor cooperation with other Departments (Cutting / Store)
• Keep good communication channel with Cutting / Stores
• Usually follow up Input figures (Qty) with Input man
• Create a friendly relationship with other departments
40
Work Smarter
41
Operator Skills
• Skill - an ability to do an activity or job well
• Low Skill Caused
• Low Output / Target
• Poor Quality
• Balancing Problems
• Train Low Skill Operators to do other processes with help of WSE
• Train Experienced Helpers to operate machine even a small process
• Change Operators among various operations specially when having new
lay out
• Motivate your team for greater results 42
Absenteeism
• Does Absenteeism Really affecting Efficiency??
• Day Output 300pcs / Workers – 40 x 10hrs = 300/400 x 100 = 75%
• Theoretically it does not
• Day Output 250pcs / Workers – 33x 10hrs = 250/330 x 100 = 75%
• But if you don’t have skilled operators Efficiency will go down because
they are unable to achieve hourly / daily target
• And if you work more hours to recover target still affecting to
Efficiency
• Day Output 250pcs / Workers – 33x 13hrs = 250/429 x 100 = 58%
43
Motivate Your Team
• Meet with your team at least once a week
• Explain goals / targets / Absenteeism
• Hear their difficulties and try hard to solve them
• When new style starts, must have a meeting and explain what
the mistakes we did in previous style, and how to overcome
them in new style
• Well behave with the employees (Need to add more details)
44
Be a Leader
45
46
Team Work
47
Proper Team Work
Zero Feeding Time
New Style Input Previous Style Output
48
Our Factory Actual Situation
Hour 1 2 3 4 5 6 7 8 9 10 11 12 13
Output 20 20 20 20 20 20 20 20 20 20
• Previous Style Last Output = 600pcs / 10Hr
= 60pcs / Hr
• Next Day Output Balance = 200pcs
• How Many Hours Need to Complete = 200/60 = 3.33Hrs
49
Continued…
• New Style Input = 8.00am (25/04/2016)
• New Style Output = 10.00am (26/04/2016)
• Line Feeding Time = 12Hrs
50
• Study the Sample of New Style
• Prepare Input /Pattern Boards / Threads In Advance
• Prepare machinery quickly with the help of Mechanic
• If one machine finish previous style input new style
How Can we reduced Line Feeding Time
51
52
53
THANKS TO ALL…

More Related Content

What's hot

Line balancing
Line balancingLine balancing
Line balancing
Ankur Shukla
 
How to Improve Productivity
How to Improve ProductivityHow to Improve Productivity
How to Improve Productivity
Sunjib Anwar; MBA,SCSS
 
What is Lean Six Sigma - ADDVALUE - Nilesh Arora
What is Lean Six Sigma -  ADDVALUE - Nilesh AroraWhat is Lean Six Sigma -  ADDVALUE - Nilesh Arora
What is Lean Six Sigma - ADDVALUE - Nilesh Arora
ADD VALUE CONSULTING Inc
 
Machine shop101 rev_l
Machine shop101 rev_lMachine shop101 rev_l
Machine shop101 rev_l
Jeremy Kermit
 
Seven wastes of lean operations management
Seven wastes of lean operations managementSeven wastes of lean operations management
Seven wastes of lean operations management
Hriday Bora
 
The Six Big Losses of OEE
The Six Big Losses of OEEThe Six Big Losses of OEE
The Six Big Losses of OEE
LineView Academy (was OFX Academy)
 
Session 8_OM
Session 8_OMSession 8_OM
Session 8_OM
thangv
 
Training & Development of Supervisors
Training & Development of SupervisorsTraining & Development of Supervisors
Training & Development of Supervisors
Shubham Singh
 
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
Karina Islam
 
Standard Work And One Piece Flow
Standard Work And One Piece FlowStandard Work And One Piece Flow
Standard Work And One Piece Flow
guest399e73
 
Single Minute Exchange of Dies (SMED)
Single Minute Exchange of Dies (SMED)Single Minute Exchange of Dies (SMED)
Single Minute Exchange of Dies (SMED)
Pramod A
 
Mba 505 business_processes_operations_productivity_strategy_tutorial1s
Mba 505 business_processes_operations_productivity_strategy_tutorial1sMba 505 business_processes_operations_productivity_strategy_tutorial1s
Mba 505 business_processes_operations_productivity_strategy_tutorial1s
Chainon
 
How to implement Single minute exchange of die
How to implement Single minute exchange of die How to implement Single minute exchange of die
How to implement Single minute exchange of die
Nikunj Rana
 
Just In Time & Kanban
Just In Time & KanbanJust In Time & Kanban
Just In Time & Kanban
Abhishek Sakharkar
 
7 Types of Muda
7 Types of Muda7 Types of Muda
7 Types of Muda
Joshua Paul Salazar
 
WASTE ELIMINATION
WASTE ELIMINATIONWASTE ELIMINATION
WASTE ELIMINATION
Debashish Banerjee
 
FUSION BROCHURE_ENG_Final_20160224_kvz(2)
FUSION BROCHURE_ENG_Final_20160224_kvz(2)FUSION BROCHURE_ENG_Final_20160224_kvz(2)
FUSION BROCHURE_ENG_Final_20160224_kvz(2)
Parker (菲育賢) Fairfield
 
Just in Time
Just in TimeJust in Time
Modern Terchnological Tool in aid of Lean manufacture in garment unit
Modern Terchnological Tool in aid of Lean manufacture in garment unitModern Terchnological Tool in aid of Lean manufacture in garment unit
Modern Terchnological Tool in aid of Lean manufacture in garment unit
IEI GSC
 
All in 1 IE
All in 1 IEAll in 1 IE
All in 1 IE
shakil tutul
 

What's hot (20)

Line balancing
Line balancingLine balancing
Line balancing
 
How to Improve Productivity
How to Improve ProductivityHow to Improve Productivity
How to Improve Productivity
 
What is Lean Six Sigma - ADDVALUE - Nilesh Arora
What is Lean Six Sigma -  ADDVALUE - Nilesh AroraWhat is Lean Six Sigma -  ADDVALUE - Nilesh Arora
What is Lean Six Sigma - ADDVALUE - Nilesh Arora
 
Machine shop101 rev_l
Machine shop101 rev_lMachine shop101 rev_l
Machine shop101 rev_l
 
Seven wastes of lean operations management
Seven wastes of lean operations managementSeven wastes of lean operations management
Seven wastes of lean operations management
 
The Six Big Losses of OEE
The Six Big Losses of OEEThe Six Big Losses of OEE
The Six Big Losses of OEE
 
Session 8_OM
Session 8_OMSession 8_OM
Session 8_OM
 
Training & Development of Supervisors
Training & Development of SupervisorsTraining & Development of Supervisors
Training & Development of Supervisors
 
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
 
Standard Work And One Piece Flow
Standard Work And One Piece FlowStandard Work And One Piece Flow
Standard Work And One Piece Flow
 
Single Minute Exchange of Dies (SMED)
Single Minute Exchange of Dies (SMED)Single Minute Exchange of Dies (SMED)
Single Minute Exchange of Dies (SMED)
 
Mba 505 business_processes_operations_productivity_strategy_tutorial1s
Mba 505 business_processes_operations_productivity_strategy_tutorial1sMba 505 business_processes_operations_productivity_strategy_tutorial1s
Mba 505 business_processes_operations_productivity_strategy_tutorial1s
 
How to implement Single minute exchange of die
How to implement Single minute exchange of die How to implement Single minute exchange of die
How to implement Single minute exchange of die
 
Just In Time & Kanban
Just In Time & KanbanJust In Time & Kanban
Just In Time & Kanban
 
7 Types of Muda
7 Types of Muda7 Types of Muda
7 Types of Muda
 
WASTE ELIMINATION
WASTE ELIMINATIONWASTE ELIMINATION
WASTE ELIMINATION
 
FUSION BROCHURE_ENG_Final_20160224_kvz(2)
FUSION BROCHURE_ENG_Final_20160224_kvz(2)FUSION BROCHURE_ENG_Final_20160224_kvz(2)
FUSION BROCHURE_ENG_Final_20160224_kvz(2)
 
Just in Time
Just in TimeJust in Time
Just in Time
 
Modern Terchnological Tool in aid of Lean manufacture in garment unit
Modern Terchnological Tool in aid of Lean manufacture in garment unitModern Terchnological Tool in aid of Lean manufacture in garment unit
Modern Terchnological Tool in aid of Lean manufacture in garment unit
 
All in 1 IE
All in 1 IEAll in 1 IE
All in 1 IE
 

Similar to Olio ie training for all stuff

Standard work training
Standard work trainingStandard work training
Standard work training
dnachreiner
 
05-Chapter_5_Automated_Work_Cells_and_CIM_Systems_Final.pdf
05-Chapter_5_Automated_Work_Cells_and_CIM_Systems_Final.pdf05-Chapter_5_Automated_Work_Cells_and_CIM_Systems_Final.pdf
05-Chapter_5_Automated_Work_Cells_and_CIM_Systems_Final.pdf
RahbiMalek
 
Industrial engineeering pli
Industrial engineeering   pliIndustrial engineeering   pli
Industrial engineeering pli
Dhyey Shukla
 
CIM 15ME62 Module-3
CIM 15ME62  Module-3CIM 15ME62  Module-3
CIM 15ME62 Module-3
Dr. Bhimsen Soragaon
 
2.IE Presentation.pptx
2.IE Presentation.pptx2.IE Presentation.pptx
2.IE Presentation.pptx
Varun Mehrotra
 
Smed implementation on manufacturing stamping line
Smed implementation on manufacturing stamping lineSmed implementation on manufacturing stamping line
Smed implementation on manufacturing stamping line
DhruvShah202
 
SMED implementation on Automated Stamping Line
SMED implementation on Automated Stamping LineSMED implementation on Automated Stamping Line
SMED implementation on Automated Stamping Line
Parth Patel
 
Line balancing
Line balancing Line balancing
Line balancing
Md. Mazadul Hasan Shishir
 
Autonomous Maintenance (AM)
Autonomous Maintenance (AM)Autonomous Maintenance (AM)
Autonomous Maintenance (AM)
Pramod A
 
Operations scheduling
Operations schedulingOperations scheduling
Operations scheduling
RajThakuri
 
Report on apparel internship at orient craft limited
Report on apparel internship at orient craft limitedReport on apparel internship at orient craft limited
Report on apparel internship at orient craft limited
University of Southern California
 
Cost & management Accounting
Cost & management AccountingCost & management Accounting
Cost & management Accounting
JisjissyChandran
 
Lean and 5 s
Lean and 5 sLean and 5 s
Lean and 5 s
AnoushkaOttley
 
5 Steps to implementing Lean
5  Steps to implementing Lean5  Steps to implementing Lean
5 Steps to implementing Lean
Julian Kalac P.Eng
 
Top 6 Workforce Management Challenges
Top 6 Workforce Management ChallengesTop 6 Workforce Management Challenges
Top 6 Workforce Management Challenges
Adtech Global
 
Process Selection and Facility layout.ppt
Process Selection and Facility layout.pptProcess Selection and Facility layout.ppt
Process Selection and Facility layout.ppt
SandipanMaji3
 
Just in time and Lean systems
Just in time and Lean systemsJust in time and Lean systems
Just in time and Lean systems
Ayman Aljahdali
 
Line balancing and its formulation
Line balancing and its formulationLine balancing and its formulation
Line balancing and its formulation
avijit biswas
 
Implémentation Méthode Single Minute Exchange of Dies(SMED)
Implémentation Méthode Single Minute Exchange of Dies(SMED)Implémentation Méthode Single Minute Exchange of Dies(SMED)
Implémentation Méthode Single Minute Exchange of Dies(SMED)
MohammedLahssaini1
 
SBS - SMED Training (Set Up Reduction)
SBS - SMED Training (Set Up Reduction)SBS - SMED Training (Set Up Reduction)
SBS - SMED Training (Set Up Reduction)
Chris Cummins
 

Similar to Olio ie training for all stuff (20)

Standard work training
Standard work trainingStandard work training
Standard work training
 
05-Chapter_5_Automated_Work_Cells_and_CIM_Systems_Final.pdf
05-Chapter_5_Automated_Work_Cells_and_CIM_Systems_Final.pdf05-Chapter_5_Automated_Work_Cells_and_CIM_Systems_Final.pdf
05-Chapter_5_Automated_Work_Cells_and_CIM_Systems_Final.pdf
 
Industrial engineeering pli
Industrial engineeering   pliIndustrial engineeering   pli
Industrial engineeering pli
 
CIM 15ME62 Module-3
CIM 15ME62  Module-3CIM 15ME62  Module-3
CIM 15ME62 Module-3
 
2.IE Presentation.pptx
2.IE Presentation.pptx2.IE Presentation.pptx
2.IE Presentation.pptx
 
Smed implementation on manufacturing stamping line
Smed implementation on manufacturing stamping lineSmed implementation on manufacturing stamping line
Smed implementation on manufacturing stamping line
 
SMED implementation on Automated Stamping Line
SMED implementation on Automated Stamping LineSMED implementation on Automated Stamping Line
SMED implementation on Automated Stamping Line
 
Line balancing
Line balancing Line balancing
Line balancing
 
Autonomous Maintenance (AM)
Autonomous Maintenance (AM)Autonomous Maintenance (AM)
Autonomous Maintenance (AM)
 
Operations scheduling
Operations schedulingOperations scheduling
Operations scheduling
 
Report on apparel internship at orient craft limited
Report on apparel internship at orient craft limitedReport on apparel internship at orient craft limited
Report on apparel internship at orient craft limited
 
Cost & management Accounting
Cost & management AccountingCost & management Accounting
Cost & management Accounting
 
Lean and 5 s
Lean and 5 sLean and 5 s
Lean and 5 s
 
5 Steps to implementing Lean
5  Steps to implementing Lean5  Steps to implementing Lean
5 Steps to implementing Lean
 
Top 6 Workforce Management Challenges
Top 6 Workforce Management ChallengesTop 6 Workforce Management Challenges
Top 6 Workforce Management Challenges
 
Process Selection and Facility layout.ppt
Process Selection and Facility layout.pptProcess Selection and Facility layout.ppt
Process Selection and Facility layout.ppt
 
Just in time and Lean systems
Just in time and Lean systemsJust in time and Lean systems
Just in time and Lean systems
 
Line balancing and its formulation
Line balancing and its formulationLine balancing and its formulation
Line balancing and its formulation
 
Implémentation Méthode Single Minute Exchange of Dies(SMED)
Implémentation Méthode Single Minute Exchange of Dies(SMED)Implémentation Méthode Single Minute Exchange of Dies(SMED)
Implémentation Méthode Single Minute Exchange of Dies(SMED)
 
SBS - SMED Training (Set Up Reduction)
SBS - SMED Training (Set Up Reduction)SBS - SMED Training (Set Up Reduction)
SBS - SMED Training (Set Up Reduction)
 

Recently uploaded

Supermarket Management System Project Report.pdf
Supermarket Management System Project Report.pdfSupermarket Management System Project Report.pdf
Supermarket Management System Project Report.pdf
Kamal Acharya
 
Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...
Prakhyath Rai
 
Introduction to Computer Networks & OSI MODEL.ppt
Introduction to Computer Networks & OSI MODEL.pptIntroduction to Computer Networks & OSI MODEL.ppt
Introduction to Computer Networks & OSI MODEL.ppt
Dwarkadas J Sanghvi College of Engineering
 
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptxSENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
b0754201
 
Software Engineering and Project Management - Software Testing + Agile Method...
Software Engineering and Project Management - Software Testing + Agile Method...Software Engineering and Project Management - Software Testing + Agile Method...
Software Engineering and Project Management - Software Testing + Agile Method...
Prakhyath Rai
 
Mechatronics material . Mechanical engineering
Mechatronics material . Mechanical engineeringMechatronics material . Mechanical engineering
Mechatronics material . Mechanical engineering
sachin chaurasia
 
Data Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason WebinarData Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason Webinar
UReason
 
Mechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdfMechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdf
21UME003TUSHARDEB
 
P5 Working Drawings.pdf floor plan, civil
P5 Working Drawings.pdf floor plan, civilP5 Working Drawings.pdf floor plan, civil
P5 Working Drawings.pdf floor plan, civil
AnasAhmadNoor
 
Call For Paper -3rd International Conference on Artificial Intelligence Advan...
Call For Paper -3rd International Conference on Artificial Intelligence Advan...Call For Paper -3rd International Conference on Artificial Intelligence Advan...
Call For Paper -3rd International Conference on Artificial Intelligence Advan...
ijseajournal
 
smart pill dispenser is designed to improve medication adherence and safety f...
smart pill dispenser is designed to improve medication adherence and safety f...smart pill dispenser is designed to improve medication adherence and safety f...
smart pill dispenser is designed to improve medication adherence and safety f...
um7474492
 
NATURAL DEEP EUTECTIC SOLVENTS AS ANTI-FREEZING AGENT
NATURAL DEEP EUTECTIC SOLVENTS AS ANTI-FREEZING AGENTNATURAL DEEP EUTECTIC SOLVENTS AS ANTI-FREEZING AGENT
NATURAL DEEP EUTECTIC SOLVENTS AS ANTI-FREEZING AGENT
Addu25809
 
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
MadhavJungKarki
 
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
sydezfe
 
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
Gino153088
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Sinan KOZAK
 
一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理
uqyfuc
 
ITSM Integration with MuleSoft.pptx
ITSM  Integration with MuleSoft.pptxITSM  Integration with MuleSoft.pptx
ITSM Integration with MuleSoft.pptx
VANDANAMOHANGOUDA
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
ijaia
 
Transformers design and coooling methods
Transformers design and coooling methodsTransformers design and coooling methods
Transformers design and coooling methods
Roger Rozario
 

Recently uploaded (20)

Supermarket Management System Project Report.pdf
Supermarket Management System Project Report.pdfSupermarket Management System Project Report.pdf
Supermarket Management System Project Report.pdf
 
Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...
 
Introduction to Computer Networks & OSI MODEL.ppt
Introduction to Computer Networks & OSI MODEL.pptIntroduction to Computer Networks & OSI MODEL.ppt
Introduction to Computer Networks & OSI MODEL.ppt
 
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptxSENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
 
Software Engineering and Project Management - Software Testing + Agile Method...
Software Engineering and Project Management - Software Testing + Agile Method...Software Engineering and Project Management - Software Testing + Agile Method...
Software Engineering and Project Management - Software Testing + Agile Method...
 
Mechatronics material . Mechanical engineering
Mechatronics material . Mechanical engineeringMechatronics material . Mechanical engineering
Mechatronics material . Mechanical engineering
 
Data Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason WebinarData Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason Webinar
 
Mechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdfMechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdf
 
P5 Working Drawings.pdf floor plan, civil
P5 Working Drawings.pdf floor plan, civilP5 Working Drawings.pdf floor plan, civil
P5 Working Drawings.pdf floor plan, civil
 
Call For Paper -3rd International Conference on Artificial Intelligence Advan...
Call For Paper -3rd International Conference on Artificial Intelligence Advan...Call For Paper -3rd International Conference on Artificial Intelligence Advan...
Call For Paper -3rd International Conference on Artificial Intelligence Advan...
 
smart pill dispenser is designed to improve medication adherence and safety f...
smart pill dispenser is designed to improve medication adherence and safety f...smart pill dispenser is designed to improve medication adherence and safety f...
smart pill dispenser is designed to improve medication adherence and safety f...
 
NATURAL DEEP EUTECTIC SOLVENTS AS ANTI-FREEZING AGENT
NATURAL DEEP EUTECTIC SOLVENTS AS ANTI-FREEZING AGENTNATURAL DEEP EUTECTIC SOLVENTS AS ANTI-FREEZING AGENT
NATURAL DEEP EUTECTIC SOLVENTS AS ANTI-FREEZING AGENT
 
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
 
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
 
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
 
一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理
 
ITSM Integration with MuleSoft.pptx
ITSM  Integration with MuleSoft.pptxITSM  Integration with MuleSoft.pptx
ITSM Integration with MuleSoft.pptx
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
 
Transformers design and coooling methods
Transformers design and coooling methodsTransformers design and coooling methods
Transformers design and coooling methods
 

Olio ie training for all stuff

  • 2. Improving Production & Line Efficiency Training for All Stuff 2
  • 3. 3 Why we will change?
  • 4. Production •Production is the process of combining units of inputs (man-made and human resources) to create output Fabric (Cutting) Thread Machinery Manpower (Workers) Output 4
  • 5. 1000pcs 200 Cones 35 Machines 40 persons (40x 10) = 400hrs 200 pcs 5 Production
  • 6. What is SMV ? • Meaning of the Abbreviation- Standard Minute Value • It should be expressed always in Minutes • Time taken by a standard operator to complete any give operation/s with pre-defined conditions • BSI 100= 100% performance operator is the standard operator • SMV = Basic Time + Allowance Observe Time X Rating • Basic Time = Standard Rating 6
  • 7. How to Calculate SMV? • We Can Calculate SMV By 03 Way. • PMTS can be used as a method analysis technique There are common versions. (Time study). • MTM1,2,3 [Established in 1940(350codes), 1965 (39 codes),1970 (10 codes) • GSD (General Sewing Data) Established in 1971- specially designed for the needle trade work. (36 codes) 7
  • 8. WHAT IS TARGET? • Production Target refers to the number of units or the quantity of output the business is expected to produce in the next financial period. • Production target defines how much to produce? • The production target is fixed during the preparation of the production budget when the man, material, method, money are decided. • This production target helps the organisation follow a routine production process and adjust their master schedules when necessary to achieve the desired target. 8
  • 9. How to Calculate Target? TOTAL MANPOWER X WORKING HOURS X 60 • TARGET = X EXPECTED EFFI.% SMV (TTL.MP=80) X (WH=10) X 60 TARGET = X 65% (SMV= 35.80) 9
  • 10. 48000 TARGET = X 65% 35.80 TARGET = 1340.78 X 65% TARGET = 871.50 PCS. 10 How to Calculate Target?
  • 11. • Efficiency is the quality of being able to do a task successfully, without wasting time or energy. • The comparison of what is actually produced or performed with what can be achieved with the same consumption of resources (money, time, labor, etc.). It is an important factor in determination of productivity. See also effectiveness. 11 WHAT IS EFFICIENCY?
  • 12. • Production output from the line (Pcs), • Standard Minute Value (SMV) for garment, • Total number of operators / Helpers in the line, • Total working hours. How to Calculate Efficiency 12
  • 13. How to Calculate Efficiency Line Output SMV of the Garment Total number of Operators / Helpers Total Working Hours 60 Total produced Minutes 100 Total Worked Minutes 100 13
  • 14. WR-254 (4UDBWBY) 800pcs 22.02 minutes 40 10 60 100 800 x 22.02 40 x 10 x 60 100 14
  • 16. Reasons for Poor Efficiency • Not following Individual Targets of Operators / Helpers • Poor Recording Systems (Not recording WIP / Input / Output) • Excessive Working Hours without productivity (Extra Overtime) • Non productive Times (Machine Breakdown / No Input) • Improper Planning (Not prepare well for next style change) • Bottlenecks (Due to poor balancing) • Not follow Bundling Serial Systems • Operators / Helpers doing non – value added operations / Processes • Poor cooperation with other departments (Cutting / Store) • Operator Skills • Absenteeism 16
  • 17. Not following Individual Targets of Operators / Helpers • Without not knowing the hourly achievement how can you achieve daily target • Not possible to identify where the problem is • Finally you can not make decisions 17
  • 18. Follow Operator Individual Targets Closely • Record every hour production from the beginning, of style not after one day • If you found less than the requirement ask for reasons • If Operator give any reasons (Good or Bad) check it right or wrong • If right necessary to give a solution • If wrong explain them that answer is wrong • Don’t misbehave or use rough language with them 18
  • 19. Poor Recording Systems (Not recording WIP / Input / Output) Date Front Part Output Back Part Output Total Output 1/4/16 2500 2200 1200 2/4/16 3200 2800 1700 3/4/16 4000 3300 2500 4/4/16 4900 4000 3200 5/4/16 5500 4500 4000 19
  • 21. Excessive Working Hours without productivity (Excess OT) Hour 1 2 3 4 5 6 7 8 9 10 11 12 13 Output 50 70 75 80 80 85 83 80 85 85 ?? ?? ?? Up to 10 Hours Total Production =773pcs Up to 13 Hours Total Production = 850pcs Up to 10 Hours Average Production / Hr =77pcs Up to 10 Hours Average Production / Hr =65pcs 21
  • 22. Non productive Times (Machine Breakdown / No Input) 22
  • 23. Improper Planning (Not prepare well for next style change) • If you have clear details about Input / Output / WIP you know that when will be finish current style • Then you can assume when you need new input 23
  • 24. Bottlenecks •Bottleneck is a stage in a process that causes the entire process to slow down or stop. 24
  • 25. Practical Example Pocket Seam Attach – 500pcs Pocket Overlock – 500pcs Pocket Bag Topstitch – 400pcs Pocket Attach – 200pcs • Operator Problem?? • Machine Problem?? • Capacity Problem?? • Defectives?? Or What • Motivate / Change Operator • Change Machine?? • Check Actual Capacity?? • Change the method with the help of WSE?? 25
  • 26. Not follow Bundling Serial Systems • If you are not following Bundling Systems • If Front / Back Parts follow different bundles then can not do assembly • Unable to get exact qty’s • Directly affecting to operator performance as they need to search for bundles • Increasing non productive time • Excessive backlogs due to bundle mistakes • Affecting Line Cleanliness / arrangements • Create Unpleasant working environment 26
  • 27. How We are Doing - Bargain 27
  • 28. 28
  • 29. How Others are Doing 29
  • 30. 30
  • 31. 31
  • 32. Operators / Helpers doing non – value added Operations • What is Non Value Added Operations • Any process doing by operator / helper and do not allocate SMV in Operation Breakdown • Therefore these processes not considering when calculate efficiency • But those operator / helper working hours added to total working hours of production line • Increase Product Cost (Buyer did not pay for extra work) • What are the Non Value Added Operations • Matching Parts (Such as Pockets / Front & Back Parts) / Belts) • Tacking Parts to body (Such as Belt / Belt Loop) • Excess Markings (Other than the required markings) • Thread Cutting • Any other Operator / Helper process which is not included in layout 32
  • 33. Matching No Serial in Parts (Bargain & Zazu) 33
  • 34. Knee Marks - Bargain 34
  • 35. Tack Waist Belt & Loop to Body (909 & Bargain) 35
  • 36. What we can do to STOP Non Value Adding Operations • Follow Bundle / Number Serial - No Need Match parts or Tack Parts to Body • Remove Excess Markings • Ask your self actually this is required or not / Check with WSE & Quality Controller for any other methods or remove marks completely • Reduce Marking area and It will help to increase production pcs • Keep Active all Auto Thread Cutting Devises (Wiper / UBT) • Reduce no of Helper Process as much as you can to increase Efficiency 36
  • 37. Bundle & No Serial Follow up 37
  • 39. Reduce Marking Area Not Clear / Excess Markings / Not Good Method = Low Output Clear & Clean/ Less Markings / Good Method = High Output 39
  • 40. Poor cooperation with other Departments (Cutting / Store) • Keep good communication channel with Cutting / Stores • Usually follow up Input figures (Qty) with Input man • Create a friendly relationship with other departments 40
  • 42. Operator Skills • Skill - an ability to do an activity or job well • Low Skill Caused • Low Output / Target • Poor Quality • Balancing Problems • Train Low Skill Operators to do other processes with help of WSE • Train Experienced Helpers to operate machine even a small process • Change Operators among various operations specially when having new lay out • Motivate your team for greater results 42
  • 43. Absenteeism • Does Absenteeism Really affecting Efficiency?? • Day Output 300pcs / Workers – 40 x 10hrs = 300/400 x 100 = 75% • Theoretically it does not • Day Output 250pcs / Workers – 33x 10hrs = 250/330 x 100 = 75% • But if you don’t have skilled operators Efficiency will go down because they are unable to achieve hourly / daily target • And if you work more hours to recover target still affecting to Efficiency • Day Output 250pcs / Workers – 33x 13hrs = 250/429 x 100 = 58% 43
  • 44. Motivate Your Team • Meet with your team at least once a week • Explain goals / targets / Absenteeism • Hear their difficulties and try hard to solve them • When new style starts, must have a meeting and explain what the mistakes we did in previous style, and how to overcome them in new style • Well behave with the employees (Need to add more details) 44
  • 48. Zero Feeding Time New Style Input Previous Style Output 48
  • 49. Our Factory Actual Situation Hour 1 2 3 4 5 6 7 8 9 10 11 12 13 Output 20 20 20 20 20 20 20 20 20 20 • Previous Style Last Output = 600pcs / 10Hr = 60pcs / Hr • Next Day Output Balance = 200pcs • How Many Hours Need to Complete = 200/60 = 3.33Hrs 49
  • 50. Continued… • New Style Input = 8.00am (25/04/2016) • New Style Output = 10.00am (26/04/2016) • Line Feeding Time = 12Hrs 50
  • 51. • Study the Sample of New Style • Prepare Input /Pattern Boards / Threads In Advance • Prepare machinery quickly with the help of Mechanic • If one machine finish previous style input new style How Can we reduced Line Feeding Time 51