SlideShare a Scribd company logo
A Fairfax County, VA, publication
Department of Public Works and Environmental Services
Working for You!
Project Management Program
Program Development Update
July 14, 2016
Project Management Program
Land Development Services
Agenda
• Why Project Management?
• Project Work Plan (DRAFT)
• Communication Plan (DRAFT)
• Next Steps
• Questions/Discussion
2
Project Management Program
Land Development Services
Why Project Management?
• Gartner Study
In 2015 Gartner was hired to perform an evaluation of the
County’s regulatory services. One of the recommendations that
came out of the evaluation was to expand Project Management
functions and philosophy to improve service delivery.
• What is Project Management?
Is the application of knowledge, skills, and techniques to project
activities in order to meet stakeholder needs and expectations
from a project.
3
Project Management Program
Land Development Services
Why Project Management?
• Objective of Project Management
Program
-To facilitate an environment of mutual cooperation that results in
a cohesive, predictable and efficient development process to
meet stakeholder’s needs and expectations from a project.
-Establish a baseline schedule that includes all facets of the
development program. All stakeholders will be accountable for
the schedule.
4
Project Management Program
Land Development Services
Why Project Management?
Project Manager Time Horizon
5
Zoning
Entitlements
Planning
Commission /
BOS Approval
Site Review Building Review Construction Occupancy
Bond Release /
Close-Out
The role of these project manager positions spans the full project time
horizon from project inception through construction and bond release
and bridges across agencies in all phases of land development review:
zoning, site review, building review and permits.
Project Management Program
Land Development Services
Elements of the Project Work Plan-DRAFT
1. Project Scope
2. Project Requirements
3. Quality Control/Quality Assurance
4. Project Deliverables
5. Project Schedule
6. Project Risks (issues for early discussion)
7. Change Management
8. Communication Plan
6
Project Management Program
Land Development Services
Elements of the Project Work Plan-DRAFT
1. Project Scope
Detail the specifics in the work plan so the mission
is clear from the beginning.
2. Project Requirements
• Jurisdictional
• Owner/Developer
3. Quality Assurance/Quality Control
• Applicant to provide QA/QC checklist
• QA/QC Officers: Public/Private
7
Project Management Program
Land Development Services
Elements of the Project Work Plan-DRAFT
4. Project Deliverables
a) Rezoning Application
b) Traffic Impact Assessment (TIA)
c) Parking Reduction Application
d) VDOT Waivers/Modifications
e) PFM Waivers/Modifications
f) Geotech Report
g) Site Plan
h) Plats
i) Building Plans
j) Bonds
8
Project Management Program
Land Development Services
Elements of the Project Work Plan-DRAFT
5. Project Schedule
a) Overview
i. Factors that can be controlled
ii. Factors that cannot be controlled
b) Critical Items Affecting Schedule
i. Offsite Improvements
ii. TIA
iii. Parking Reductions
iv. Proffer Commitments
v. Waivers & Modifications
vi. …
9
Project Management Program
Land Development Services
Elements of the Project Work Plan-DRAFT
6. Project Risks (issues for early discussion)
a) Road Widening
b) Street Dedications
c) Parking Reduction
d) Stormwater Management/BMP
e) Site Intensity and Design
f) Pedestrian Mobility and Bicycle Facilities
g) …
10
Project Management Program
Land Development Services
Elements of the Project Work Plan-DRAFT
7. Change Management
8. Communication Plan
11
Project Management Program
Land Development Services
Communication Plan
The purpose of the Communications Plan is to guide the Project Team to
effectively share information. For communication to be effective it needs to
be timely, complete and directed to the right audience.
1. Communication Guidelines
a) Transparency among all public and private stakeholders.
i. Early communication with stakeholders is key
b) Early and open discussion of critical issues.
c) Specific issue-related meetings must focus only on set agenda subjects.
d) When setting up meetings, both public and private will endeavor to include
all relevant parties.
12
Project Management Program
Land Development Services
Communication Plan
2. Roles and Responsibilities
3. Project Team Directory
4. Methods and Technology
13
Project Management Program
Land Development Services
Communication Plan
Early Communication with Stakeholders is Key
Potential list of stakeholders (typically):
• Board of Supervisors/Planning Commission
• Owner/Contract Purchaser
• End User
• Owner Consultants
• County/State/Federal
• Adjacent Property Owners
• Community Associations
• Land Use Committees
• Citizen Associations
• Interest Groups/Authorities and Commissions
o Human Services
o Art Community
o Environmentalists
o ARB/History Commission
o Etc.…
14
Project Management Program
Land Development Services
Next Steps
Program Development
 Gartner to complete review of program Mini-Charter
 Project management core team to finalize Mini-Charter
 Develop a Project Work Plan for Implementation
 Continue evaluation of ongoing Pilot Projects
 Fully develop all components of the program for potential distribution
and use in other project management applications through all
development agencies.
15
Project Management Program
Land Development Services
Discussion
Questions/Comments?
16

More Related Content

Viewers also liked

Potomac Meadow Water Quality Improvement July 2016
Potomac Meadow Water Quality Improvement July 2016Potomac Meadow Water Quality Improvement July 2016
Potomac Meadow Water Quality Improvement July 2016
Fairfax County
 
Gender in project design
Gender in project designGender in project design
Gender in project design
ILRI
 
Elm Street at Dolley Madison Boulevard Pedestrian Improvements
Elm Street at Dolley Madison Boulevard Pedestrian ImprovementsElm Street at Dolley Madison Boulevard Pedestrian Improvements
Elm Street at Dolley Madison Boulevard Pedestrian Improvements
Fairfax County
 
Sunset Hills Road Walkway
Sunset Hills Road WalkwaySunset Hills Road Walkway
Sunset Hills Road Walkway
Fairfax County
 
Woodglen Lake Dredging and Restoration
Woodglen Lake Dredging and RestorationWoodglen Lake Dredging and Restoration
Woodglen Lake Dredging and Restoration
Fairfax County
 
Stringfellow Park and Ride Expansion
Stringfellow Park and Ride ExpansionStringfellow Park and Ride Expansion
Stringfellow Park and Ride Expansion
Fairfax County
 
Fairfax County Park Authority, Turkeycock Run Stream Valley - Pinecrest Golf ...
Fairfax County Park Authority, Turkeycock Run Stream Valley - Pinecrest Golf ...Fairfax County Park Authority, Turkeycock Run Stream Valley - Pinecrest Golf ...
Fairfax County Park Authority, Turkeycock Run Stream Valley - Pinecrest Golf ...
Fairfax County
 
Holmes Run Weir Diversion Structure No. 417
Holmes Run Weir Diversion Structure No. 417Holmes Run Weir Diversion Structure No. 417
Holmes Run Weir Diversion Structure No. 417
Fairfax County
 
Belle View Pump Station Rehabilitation
Belle View Pump Station RehabilitationBelle View Pump Station Rehabilitation
Belle View Pump Station Rehabilitation
Fairfax County
 
Baileys Crossroads Shelter: July 20, 2016 Presentation to the Fairfax County ...
Baileys Crossroads Shelter: July 20, 2016 Presentation to the Fairfax County ...Baileys Crossroads Shelter: July 20, 2016 Presentation to the Fairfax County ...
Baileys Crossroads Shelter: July 20, 2016 Presentation to the Fairfax County ...
Fairfax County
 
Dead Run Stream Restoration Project Segments 2/3 – Final Concept Plan
Dead Run Stream Restoration Project Segments 2/3 – Final Concept PlanDead Run Stream Restoration Project Segments 2/3 – Final Concept Plan
Dead Run Stream Restoration Project Segments 2/3 – Final Concept Plan
Fairfax County
 
Bailey's Crossroads Community Shelter: Proposed Temporary Relocation
Bailey's Crossroads Community Shelter: Proposed Temporary RelocationBailey's Crossroads Community Shelter: Proposed Temporary Relocation
Bailey's Crossroads Community Shelter: Proposed Temporary Relocation
Fairfax County
 
Pohick Creek Restoration Project - Phase 1
Pohick Creek Restoration Project - Phase 1Pohick Creek Restoration Project - Phase 1
Pohick Creek Restoration Project - Phase 1
Fairfax County
 
Zika Virus Disease and Prevention
Zika Virus Disease and PreventionZika Virus Disease and Prevention
Zika Virus Disease and Prevention
Fairfax County
 
Diversion First Stakeholders Meeting: July 11, 2016
Diversion First Stakeholders Meeting: July 11, 2016Diversion First Stakeholders Meeting: July 11, 2016
Diversion First Stakeholders Meeting: July 11, 2016
Fairfax County
 
Wakefield Park South Stream Restoration
Wakefield Park South Stream RestorationWakefield Park South Stream Restoration
Wakefield Park South Stream Restoration
Fairfax County
 
Pop Up Uses in Fairfax County
Pop Up Uses in Fairfax CountyPop Up Uses in Fairfax County
Pop Up Uses in Fairfax County
Fairfax County
 
Bus Stop Safety and Accessibility Improvements
Bus Stop Safety and Accessibility ImprovementsBus Stop Safety and Accessibility Improvements
Bus Stop Safety and Accessibility Improvements
Fairfax County
 
Fairfax County Building Repositioning Presentation
Fairfax County Building Repositioning PresentationFairfax County Building Repositioning Presentation
Fairfax County Building Repositioning Presentation
Fairfax County
 
Lorton VRE Parking Lot Expansion
Lorton VRE Parking Lot ExpansionLorton VRE Parking Lot Expansion
Lorton VRE Parking Lot Expansion
Fairfax County
 

Viewers also liked (20)

Potomac Meadow Water Quality Improvement July 2016
Potomac Meadow Water Quality Improvement July 2016Potomac Meadow Water Quality Improvement July 2016
Potomac Meadow Water Quality Improvement July 2016
 
Gender in project design
Gender in project designGender in project design
Gender in project design
 
Elm Street at Dolley Madison Boulevard Pedestrian Improvements
Elm Street at Dolley Madison Boulevard Pedestrian ImprovementsElm Street at Dolley Madison Boulevard Pedestrian Improvements
Elm Street at Dolley Madison Boulevard Pedestrian Improvements
 
Sunset Hills Road Walkway
Sunset Hills Road WalkwaySunset Hills Road Walkway
Sunset Hills Road Walkway
 
Woodglen Lake Dredging and Restoration
Woodglen Lake Dredging and RestorationWoodglen Lake Dredging and Restoration
Woodglen Lake Dredging and Restoration
 
Stringfellow Park and Ride Expansion
Stringfellow Park and Ride ExpansionStringfellow Park and Ride Expansion
Stringfellow Park and Ride Expansion
 
Fairfax County Park Authority, Turkeycock Run Stream Valley - Pinecrest Golf ...
Fairfax County Park Authority, Turkeycock Run Stream Valley - Pinecrest Golf ...Fairfax County Park Authority, Turkeycock Run Stream Valley - Pinecrest Golf ...
Fairfax County Park Authority, Turkeycock Run Stream Valley - Pinecrest Golf ...
 
Holmes Run Weir Diversion Structure No. 417
Holmes Run Weir Diversion Structure No. 417Holmes Run Weir Diversion Structure No. 417
Holmes Run Weir Diversion Structure No. 417
 
Belle View Pump Station Rehabilitation
Belle View Pump Station RehabilitationBelle View Pump Station Rehabilitation
Belle View Pump Station Rehabilitation
 
Baileys Crossroads Shelter: July 20, 2016 Presentation to the Fairfax County ...
Baileys Crossroads Shelter: July 20, 2016 Presentation to the Fairfax County ...Baileys Crossroads Shelter: July 20, 2016 Presentation to the Fairfax County ...
Baileys Crossroads Shelter: July 20, 2016 Presentation to the Fairfax County ...
 
Dead Run Stream Restoration Project Segments 2/3 – Final Concept Plan
Dead Run Stream Restoration Project Segments 2/3 – Final Concept PlanDead Run Stream Restoration Project Segments 2/3 – Final Concept Plan
Dead Run Stream Restoration Project Segments 2/3 – Final Concept Plan
 
Bailey's Crossroads Community Shelter: Proposed Temporary Relocation
Bailey's Crossroads Community Shelter: Proposed Temporary RelocationBailey's Crossroads Community Shelter: Proposed Temporary Relocation
Bailey's Crossroads Community Shelter: Proposed Temporary Relocation
 
Pohick Creek Restoration Project - Phase 1
Pohick Creek Restoration Project - Phase 1Pohick Creek Restoration Project - Phase 1
Pohick Creek Restoration Project - Phase 1
 
Zika Virus Disease and Prevention
Zika Virus Disease and PreventionZika Virus Disease and Prevention
Zika Virus Disease and Prevention
 
Diversion First Stakeholders Meeting: July 11, 2016
Diversion First Stakeholders Meeting: July 11, 2016Diversion First Stakeholders Meeting: July 11, 2016
Diversion First Stakeholders Meeting: July 11, 2016
 
Wakefield Park South Stream Restoration
Wakefield Park South Stream RestorationWakefield Park South Stream Restoration
Wakefield Park South Stream Restoration
 
Pop Up Uses in Fairfax County
Pop Up Uses in Fairfax CountyPop Up Uses in Fairfax County
Pop Up Uses in Fairfax County
 
Bus Stop Safety and Accessibility Improvements
Bus Stop Safety and Accessibility ImprovementsBus Stop Safety and Accessibility Improvements
Bus Stop Safety and Accessibility Improvements
 
Fairfax County Building Repositioning Presentation
Fairfax County Building Repositioning PresentationFairfax County Building Repositioning Presentation
Fairfax County Building Repositioning Presentation
 
Lorton VRE Parking Lot Expansion
Lorton VRE Parking Lot ExpansionLorton VRE Parking Lot Expansion
Lorton VRE Parking Lot Expansion
 

Similar to NVBIA NAIOP Update July 14, 2016

Project Initiation Document for Management of Neighbourhood Plans in Complian...
Project Initiation Document for Management of Neighbourhood Plans in Complian...Project Initiation Document for Management of Neighbourhood Plans in Complian...
Project Initiation Document for Management of Neighbourhood Plans in Complian...
Janey Lin Zhao
 
Fairfax County's Public Facilities Manual (PFM): Update to the Providence Dis...
Fairfax County's Public Facilities Manual (PFM): Update to the Providence Dis...Fairfax County's Public Facilities Manual (PFM): Update to the Providence Dis...
Fairfax County's Public Facilities Manual (PFM): Update to the Providence Dis...
Fairfax County
 
Lecture 2 30-01-2020.pdf
Lecture 2 30-01-2020.pdfLecture 2 30-01-2020.pdf
Lecture 2 30-01-2020.pdf
TanzeelShahid5
 
Warrington Western Link, Robert Holloway
Warrington Western Link, Robert HollowayWarrington Western Link, Robert Holloway
Warrington Western Link, Robert Holloway
Association for Project Management
 
Our pre application offer at Croydon Council
Our pre application offer at Croydon CouncilOur pre application offer at Croydon Council
Our pre application offer at Croydon Council
PAS_Team
 
Baltimore City Green Network Plan
Baltimore City Green Network PlanBaltimore City Green Network Plan
Baltimore City Green Network Plan
Michael Galvin
 
Project in punjab
Project in punjabProject in punjab
Project in punjab
Huma Ilyas
 
Day 2: Plan to Project Process
Day 2: Plan to Project ProcessDay 2: Plan to Project Process
Day 2: Plan to Project Process
NAP Global Network
 
Developer's Forum - RSTF Update Final Report
Developer's Forum - RSTF Update Final ReportDeveloper's Forum - RSTF Update Final Report
Developer's Forum - RSTF Update Final Report
Scott Skraban, MPA, CH-ERIM
 
13.2 Plan Stakeholder Engagement
13.2 Plan Stakeholder Engagement13.2 Plan Stakeholder Engagement
13.2 Plan Stakeholder Engagement
DavidMcLachlan1
 
Project management (1)
Project management (1)Project management (1)
Project management (1)
aarenneoone
 
6 sept project fiche
6 sept project fiche6 sept project fiche
6 sept project fiche
Dagný Gísladóttir
 
Presentation on manual PSDP in Pakistan.pptx
Presentation on manual PSDP in Pakistan.pptxPresentation on manual PSDP in Pakistan.pptx
Presentation on manual PSDP in Pakistan.pptx
AbdulrahmanAfabafal
 
Project Charter - Outreach Events for the Company
Project Charter - Outreach Events for the CompanyProject Charter - Outreach Events for the Company
Project Charter - Outreach Events for the CompanyTimothy Cochran
 
Impact of RERA in India on Real Estate Project Management Service
Impact of RERA in India on Real Estate Project Management Service Impact of RERA in India on Real Estate Project Management Service
Impact of RERA in India on Real Estate Project Management Service
Rudresh K V
 
Avoiding unrealistic schedules
Avoiding unrealistic schedulesAvoiding unrealistic schedules
Avoiding unrealistic schedules
Hatem Hegazi
 
The Project Brief(group)
The Project Brief(group)The Project Brief(group)
The Project Brief(group)Pinky Chan
 
Latest project background 1
Latest project background 1Latest project background 1
Latest project background 1JamesMoy7
 

Similar to NVBIA NAIOP Update July 14, 2016 (20)

Project Initiation Document for Management of Neighbourhood Plans in Complian...
Project Initiation Document for Management of Neighbourhood Plans in Complian...Project Initiation Document for Management of Neighbourhood Plans in Complian...
Project Initiation Document for Management of Neighbourhood Plans in Complian...
 
Fairfax County's Public Facilities Manual (PFM): Update to the Providence Dis...
Fairfax County's Public Facilities Manual (PFM): Update to the Providence Dis...Fairfax County's Public Facilities Manual (PFM): Update to the Providence Dis...
Fairfax County's Public Facilities Manual (PFM): Update to the Providence Dis...
 
Lecture 2 30-01-2020.pdf
Lecture 2 30-01-2020.pdfLecture 2 30-01-2020.pdf
Lecture 2 30-01-2020.pdf
 
Warrington Western Link, Robert Holloway
Warrington Western Link, Robert HollowayWarrington Western Link, Robert Holloway
Warrington Western Link, Robert Holloway
 
Our pre application offer at Croydon Council
Our pre application offer at Croydon CouncilOur pre application offer at Croydon Council
Our pre application offer at Croydon Council
 
Baltimore City Green Network Plan
Baltimore City Green Network PlanBaltimore City Green Network Plan
Baltimore City Green Network Plan
 
3.3 project fiche
3.3 project fiche3.3 project fiche
3.3 project fiche
 
Project in punjab
Project in punjabProject in punjab
Project in punjab
 
Day 2: Plan to Project Process
Day 2: Plan to Project ProcessDay 2: Plan to Project Process
Day 2: Plan to Project Process
 
Developer's Forum - RSTF Update Final Report
Developer's Forum - RSTF Update Final ReportDeveloper's Forum - RSTF Update Final Report
Developer's Forum - RSTF Update Final Report
 
13.2 Plan Stakeholder Engagement
13.2 Plan Stakeholder Engagement13.2 Plan Stakeholder Engagement
13.2 Plan Stakeholder Engagement
 
Project management (1)
Project management (1)Project management (1)
Project management (1)
 
6 sept project fiche
6 sept project fiche6 sept project fiche
6 sept project fiche
 
Presentation on manual PSDP in Pakistan.pptx
Presentation on manual PSDP in Pakistan.pptxPresentation on manual PSDP in Pakistan.pptx
Presentation on manual PSDP in Pakistan.pptx
 
Project Charter - Outreach Events for the Company
Project Charter - Outreach Events for the CompanyProject Charter - Outreach Events for the Company
Project Charter - Outreach Events for the Company
 
Impact of RERA in India on Real Estate Project Management Service
Impact of RERA in India on Real Estate Project Management Service Impact of RERA in India on Real Estate Project Management Service
Impact of RERA in India on Real Estate Project Management Service
 
Avoiding unrealistic schedules
Avoiding unrealistic schedulesAvoiding unrealistic schedules
Avoiding unrealistic schedules
 
The Project Brief(group)
The Project Brief(group)The Project Brief(group)
The Project Brief(group)
 
ICIP2G
ICIP2GICIP2G
ICIP2G
 
Latest project background 1
Latest project background 1Latest project background 1
Latest project background 1
 

More from Fairfax County

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer Replacement
Fairfax County
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS
Fairfax County
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22
Fairfax County
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Fairfax County
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19
Fairfax County
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Fairfax County
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction Progress
Fairfax County
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Fairfax County
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IV
Fairfax County
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022
Fairfax County
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick Offpptx
Fairfax County
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing Council
Fairfax County
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Fairfax County
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
Fairfax County
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap Up
Fairfax County
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Fairfax County
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Fairfax County
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction Project
Fairfax County
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Fairfax County
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual Arts
Fairfax County
 

More from Fairfax County (20)

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer Replacement
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction Progress
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IV
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick Offpptx
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing Council
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap Up
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction Project
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual Arts
 

Recently uploaded

PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptxPD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
RIDPRO11
 
Transit-Oriented Development Study Working Group Meeting
Transit-Oriented Development Study Working Group MeetingTransit-Oriented Development Study Working Group Meeting
Transit-Oriented Development Study Working Group Meeting
Cuyahoga County Planning Commission
 
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Congressional Budget Office
 
Understanding the Challenges of Street Children
Understanding the Challenges of Street ChildrenUnderstanding the Challenges of Street Children
Understanding the Challenges of Street Children
SERUDS INDIA
 
Donate to charity during this holiday season
Donate to charity during this holiday seasonDonate to charity during this holiday season
Donate to charity during this holiday season
SERUDS INDIA
 
NHAI_Under_Implementation_01-05-2024.pdf
NHAI_Under_Implementation_01-05-2024.pdfNHAI_Under_Implementation_01-05-2024.pdf
NHAI_Under_Implementation_01-05-2024.pdf
AjayVejendla3
 
2024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 372024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 37
JSchaus & Associates
 
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptxMHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
ILC- UK
 
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
850fcj96
 
ZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdfZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdf
Saeed Al Dhaheri
 
Opinions on EVs: Metro Atlanta Speaks 2023
Opinions on EVs: Metro Atlanta Speaks 2023Opinions on EVs: Metro Atlanta Speaks 2023
Opinions on EVs: Metro Atlanta Speaks 2023
ARCResearch
 
2024: The FAR - Federal Acquisition Regulations, Part 36
2024: The FAR - Federal Acquisition Regulations, Part 362024: The FAR - Federal Acquisition Regulations, Part 36
2024: The FAR - Federal Acquisition Regulations, Part 36
JSchaus & Associates
 
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
850fcj96
 
The Role of a Process Server in real estate
The Role of a Process Server in real estateThe Role of a Process Server in real estate
The Role of a Process Server in real estate
oklahomajudicialproc1
 
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdfPNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
ClaudioTebaldi2
 
Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200
GrantManagementInsti
 
2024: The FAR - Federal Acquisition Regulations, Part 38
2024: The FAR - Federal Acquisition Regulations, Part 382024: The FAR - Federal Acquisition Regulations, Part 38
2024: The FAR - Federal Acquisition Regulations, Part 38
JSchaus & Associates
 
Get Government Grants and Assistance Program
Get Government Grants and Assistance ProgramGet Government Grants and Assistance Program
Get Government Grants and Assistance Program
Get Government Grants
 
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
ehbuaw
 
State crafting: Changes and challenges for managing the public finances
State crafting: Changes and challenges for managing the public financesState crafting: Changes and challenges for managing the public finances
State crafting: Changes and challenges for managing the public finances
ResolutionFoundation
 

Recently uploaded (20)

PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptxPD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
 
Transit-Oriented Development Study Working Group Meeting
Transit-Oriented Development Study Working Group MeetingTransit-Oriented Development Study Working Group Meeting
Transit-Oriented Development Study Working Group Meeting
 
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
 
Understanding the Challenges of Street Children
Understanding the Challenges of Street ChildrenUnderstanding the Challenges of Street Children
Understanding the Challenges of Street Children
 
Donate to charity during this holiday season
Donate to charity during this holiday seasonDonate to charity during this holiday season
Donate to charity during this holiday season
 
NHAI_Under_Implementation_01-05-2024.pdf
NHAI_Under_Implementation_01-05-2024.pdfNHAI_Under_Implementation_01-05-2024.pdf
NHAI_Under_Implementation_01-05-2024.pdf
 
2024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 372024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 37
 
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptxMHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
 
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
 
ZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdfZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdf
 
Opinions on EVs: Metro Atlanta Speaks 2023
Opinions on EVs: Metro Atlanta Speaks 2023Opinions on EVs: Metro Atlanta Speaks 2023
Opinions on EVs: Metro Atlanta Speaks 2023
 
2024: The FAR - Federal Acquisition Regulations, Part 36
2024: The FAR - Federal Acquisition Regulations, Part 362024: The FAR - Federal Acquisition Regulations, Part 36
2024: The FAR - Federal Acquisition Regulations, Part 36
 
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
 
The Role of a Process Server in real estate
The Role of a Process Server in real estateThe Role of a Process Server in real estate
The Role of a Process Server in real estate
 
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdfPNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
 
Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200
 
2024: The FAR - Federal Acquisition Regulations, Part 38
2024: The FAR - Federal Acquisition Regulations, Part 382024: The FAR - Federal Acquisition Regulations, Part 38
2024: The FAR - Federal Acquisition Regulations, Part 38
 
Get Government Grants and Assistance Program
Get Government Grants and Assistance ProgramGet Government Grants and Assistance Program
Get Government Grants and Assistance Program
 
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
 
State crafting: Changes and challenges for managing the public finances
State crafting: Changes and challenges for managing the public financesState crafting: Changes and challenges for managing the public finances
State crafting: Changes and challenges for managing the public finances
 

NVBIA NAIOP Update July 14, 2016

  • 1. A Fairfax County, VA, publication Department of Public Works and Environmental Services Working for You! Project Management Program Program Development Update July 14, 2016
  • 2. Project Management Program Land Development Services Agenda • Why Project Management? • Project Work Plan (DRAFT) • Communication Plan (DRAFT) • Next Steps • Questions/Discussion 2
  • 3. Project Management Program Land Development Services Why Project Management? • Gartner Study In 2015 Gartner was hired to perform an evaluation of the County’s regulatory services. One of the recommendations that came out of the evaluation was to expand Project Management functions and philosophy to improve service delivery. • What is Project Management? Is the application of knowledge, skills, and techniques to project activities in order to meet stakeholder needs and expectations from a project. 3
  • 4. Project Management Program Land Development Services Why Project Management? • Objective of Project Management Program -To facilitate an environment of mutual cooperation that results in a cohesive, predictable and efficient development process to meet stakeholder’s needs and expectations from a project. -Establish a baseline schedule that includes all facets of the development program. All stakeholders will be accountable for the schedule. 4
  • 5. Project Management Program Land Development Services Why Project Management? Project Manager Time Horizon 5 Zoning Entitlements Planning Commission / BOS Approval Site Review Building Review Construction Occupancy Bond Release / Close-Out The role of these project manager positions spans the full project time horizon from project inception through construction and bond release and bridges across agencies in all phases of land development review: zoning, site review, building review and permits.
  • 6. Project Management Program Land Development Services Elements of the Project Work Plan-DRAFT 1. Project Scope 2. Project Requirements 3. Quality Control/Quality Assurance 4. Project Deliverables 5. Project Schedule 6. Project Risks (issues for early discussion) 7. Change Management 8. Communication Plan 6
  • 7. Project Management Program Land Development Services Elements of the Project Work Plan-DRAFT 1. Project Scope Detail the specifics in the work plan so the mission is clear from the beginning. 2. Project Requirements • Jurisdictional • Owner/Developer 3. Quality Assurance/Quality Control • Applicant to provide QA/QC checklist • QA/QC Officers: Public/Private 7
  • 8. Project Management Program Land Development Services Elements of the Project Work Plan-DRAFT 4. Project Deliverables a) Rezoning Application b) Traffic Impact Assessment (TIA) c) Parking Reduction Application d) VDOT Waivers/Modifications e) PFM Waivers/Modifications f) Geotech Report g) Site Plan h) Plats i) Building Plans j) Bonds 8
  • 9. Project Management Program Land Development Services Elements of the Project Work Plan-DRAFT 5. Project Schedule a) Overview i. Factors that can be controlled ii. Factors that cannot be controlled b) Critical Items Affecting Schedule i. Offsite Improvements ii. TIA iii. Parking Reductions iv. Proffer Commitments v. Waivers & Modifications vi. … 9
  • 10. Project Management Program Land Development Services Elements of the Project Work Plan-DRAFT 6. Project Risks (issues for early discussion) a) Road Widening b) Street Dedications c) Parking Reduction d) Stormwater Management/BMP e) Site Intensity and Design f) Pedestrian Mobility and Bicycle Facilities g) … 10
  • 11. Project Management Program Land Development Services Elements of the Project Work Plan-DRAFT 7. Change Management 8. Communication Plan 11
  • 12. Project Management Program Land Development Services Communication Plan The purpose of the Communications Plan is to guide the Project Team to effectively share information. For communication to be effective it needs to be timely, complete and directed to the right audience. 1. Communication Guidelines a) Transparency among all public and private stakeholders. i. Early communication with stakeholders is key b) Early and open discussion of critical issues. c) Specific issue-related meetings must focus only on set agenda subjects. d) When setting up meetings, both public and private will endeavor to include all relevant parties. 12
  • 13. Project Management Program Land Development Services Communication Plan 2. Roles and Responsibilities 3. Project Team Directory 4. Methods and Technology 13
  • 14. Project Management Program Land Development Services Communication Plan Early Communication with Stakeholders is Key Potential list of stakeholders (typically): • Board of Supervisors/Planning Commission • Owner/Contract Purchaser • End User • Owner Consultants • County/State/Federal • Adjacent Property Owners • Community Associations • Land Use Committees • Citizen Associations • Interest Groups/Authorities and Commissions o Human Services o Art Community o Environmentalists o ARB/History Commission o Etc.… 14
  • 15. Project Management Program Land Development Services Next Steps Program Development  Gartner to complete review of program Mini-Charter  Project management core team to finalize Mini-Charter  Develop a Project Work Plan for Implementation  Continue evaluation of ongoing Pilot Projects  Fully develop all components of the program for potential distribution and use in other project management applications through all development agencies. 15
  • 16. Project Management Program Land Development Services Discussion Questions/Comments? 16