Presentation from Pauleen Lane, Group Manager National Infrastructure at the Planning Inspectorate, at 4th Annual Nationally Significant Infrastructure Projects Forum 2016.
Presentation from Pauleen Lane, Group Manager National Infrastructure at the Planning Inspectorate, at 4th Annual Nationally Significant Infrastructure Projects Forum 2016.
Enhancement Projects: Improving Successful Implementation in MinnesotaRPO America
During the 2016 National Regional Transportation Conference, Annette Fiedler, Southwest Regional Development Commission, Katie Caskey, Minnesota DOT, and Ronda Allis, Minnesota DOT, gave a presentation together. This presentation discussed improvements to the information collected in the letter of intent that local governments complete to apply for the Transportation Alternatives Program in one area of Minnesota.
Fairfax County Zoning Ordinance Modernization ProjectFairfax County
zmod is Fairfax County's initiative to modernize its zoning ordinance that was first established 40 years ago. The effort supports the county's plan to grow and diversify the economy, and it will update our zoning laws to be more flexible, agile and forward thinking.
Manual Project in Public Sector including the stages of initiation, preparation of PC-I,PC-2, Public Private Partnerships, Different modes of Public Private Partnerships, Appraisal including the Risk Assessment, Monitoring and Control and Closure stage of the project.
The Orange County Developer's Forum held on December 13, 2017, provided an update on the progress made with the recommendations provided by the Regulatory Streamlining Task Force.
How to Obtain the Best Consulting Support for your Radio System Upgrade or Re...Black & Veatch
U.S. cities and counties strive to improve mission critical communications, but selecting a land mobile radio system or a new Long-Term Evolution (LTE) system that is cost-competitive and meets current and future operational requirements can be a formidable task. This presentation provides five essential RFP development tips.
Impact of RERA in India on Real Estate Project Management Service Rudresh K V
RERA once implemented in India, in a few months from now, will change the entire ecosystem of construction Industry. Project Manager will have significant role and responsibility to comply to guidelines. This presentation will focus on how to gear up on skill sets and focused actions points to be taken by Project Manager
Presentation slides provided by Robert Holloway from Stantec on 10 May 2022 at the North West Branch Conference in Manchester on the Warrington Western Link project.
Our pre application offer at Croydon CouncilPAS_Team
"How we manage to provide a comprehensive, proportionate and good value service." A presentation taken from a Planning Advisory Service (PAS) event on Pre-application.
Merrifield Nursery Emergency Gravity Sewer ReplacementFairfax County
During a routine Closed-Circuit Television (CCTV) Camera inspection by Wastewater Collection Division (WCD), it was found that 45 linear feet of 8-inch asbestos reinforced concrete pipe (RCP) between MH-292 to MH-291 was within imminent danger of failing. The bottom of the RCP was missing within the 45 linear feet of repair and the pipe was on the verge of surcharging. After an immediate pre-construction meeting with Merrifield Nursery, it was agreed to work from 6pm-10am everyday of the week to avoid disruption and potentially placing patrons at risk during the biggest time of the year for Merrifield Garden Center. The contractor mobilized to the site and began the 20-foot excavation to replace 45 linear feet of broken gravity sewer. The project started on March 14th, 2022 and was substantially complete on March 23, 2022.
The Sully Basins Stormwater Pond Retrofits project was substantially completed on April 19, 2022. The project is located within the Cub Run watershed. The project consisted of repair and enhancement of multiple stormwater basins, 0326DP, 0964DP and 1484DP. The project also included construction of new stone cascades, stone weir basin structures and the construction of wetlands with high and low marsh areas. The project will facilitate improved sediment removal and improve downstream water quality using forebays and micro pools. Aquatic and natural habitat were also added within the three basins.
More Related Content
Similar to Fairfax County's Public Facilities Manual (PFM): Update to the Providence District Council - May 9, 2018
Enhancement Projects: Improving Successful Implementation in MinnesotaRPO America
During the 2016 National Regional Transportation Conference, Annette Fiedler, Southwest Regional Development Commission, Katie Caskey, Minnesota DOT, and Ronda Allis, Minnesota DOT, gave a presentation together. This presentation discussed improvements to the information collected in the letter of intent that local governments complete to apply for the Transportation Alternatives Program in one area of Minnesota.
Fairfax County Zoning Ordinance Modernization ProjectFairfax County
zmod is Fairfax County's initiative to modernize its zoning ordinance that was first established 40 years ago. The effort supports the county's plan to grow and diversify the economy, and it will update our zoning laws to be more flexible, agile and forward thinking.
Manual Project in Public Sector including the stages of initiation, preparation of PC-I,PC-2, Public Private Partnerships, Different modes of Public Private Partnerships, Appraisal including the Risk Assessment, Monitoring and Control and Closure stage of the project.
The Orange County Developer's Forum held on December 13, 2017, provided an update on the progress made with the recommendations provided by the Regulatory Streamlining Task Force.
How to Obtain the Best Consulting Support for your Radio System Upgrade or Re...Black & Veatch
U.S. cities and counties strive to improve mission critical communications, but selecting a land mobile radio system or a new Long-Term Evolution (LTE) system that is cost-competitive and meets current and future operational requirements can be a formidable task. This presentation provides five essential RFP development tips.
Impact of RERA in India on Real Estate Project Management Service Rudresh K V
RERA once implemented in India, in a few months from now, will change the entire ecosystem of construction Industry. Project Manager will have significant role and responsibility to comply to guidelines. This presentation will focus on how to gear up on skill sets and focused actions points to be taken by Project Manager
Presentation slides provided by Robert Holloway from Stantec on 10 May 2022 at the North West Branch Conference in Manchester on the Warrington Western Link project.
Our pre application offer at Croydon CouncilPAS_Team
"How we manage to provide a comprehensive, proportionate and good value service." A presentation taken from a Planning Advisory Service (PAS) event on Pre-application.
Merrifield Nursery Emergency Gravity Sewer ReplacementFairfax County
During a routine Closed-Circuit Television (CCTV) Camera inspection by Wastewater Collection Division (WCD), it was found that 45 linear feet of 8-inch asbestos reinforced concrete pipe (RCP) between MH-292 to MH-291 was within imminent danger of failing. The bottom of the RCP was missing within the 45 linear feet of repair and the pipe was on the verge of surcharging. After an immediate pre-construction meeting with Merrifield Nursery, it was agreed to work from 6pm-10am everyday of the week to avoid disruption and potentially placing patrons at risk during the biggest time of the year for Merrifield Garden Center. The contractor mobilized to the site and began the 20-foot excavation to replace 45 linear feet of broken gravity sewer. The project started on March 14th, 2022 and was substantially complete on March 23, 2022.
The Sully Basins Stormwater Pond Retrofits project was substantially completed on April 19, 2022. The project is located within the Cub Run watershed. The project consisted of repair and enhancement of multiple stormwater basins, 0326DP, 0964DP and 1484DP. The project also included construction of new stone cascades, stone weir basin structures and the construction of wetlands with high and low marsh areas. The project will facilitate improved sediment removal and improve downstream water quality using forebays and micro pools. Aquatic and natural habitat were also added within the three basins.
Clarks Crossing Road Improvements 05-13-22Fairfax County
The Clarks Crossing Road Pedestrian Access Improvement project improved the pedestrian and bicycle access along Clarks Crossing Road and was substantially completed on March 23, 2022.
This project completed the missing link between the existing sidewalk at Brookside Lane and the previously constructed sidewalk along Clarks Crossing Road. The scope of this project included construction of asphalt sidewalk, curb ramps, curb and gutter, drainage improvements along Brookside Lane and asphalt mill/overlay on Clarks Crossing and Brookside Lane.
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxFairfax County
Future wastewater flows in northern Fairfax County exceed existing system capacity
Treatment capacity is available in Noman M. Cole Jr. Pollution Control Plant in Lorton, VA
New pipes and pumps are needed to move future flows to treatment plant
NEXT STEPS
Field investigations / surveys
Finalize alignments and pump station layout
Use of open cut excavation
Use of trenchless methods
Easement acquisition needed
Develop traffic control plans
Description:
The project consists of a new, 23,000 square feet, two-story, four-bay fire station facility and associated improvements to the 3.3-acre site including storm water detention, landscaping and parking. The scope also included the demolition of the existing fire station, and a temporary fire station to house the Fire and Rescue Department during construction of the new facility. The key elements of the overall project include:
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationFairfax County
Scotts Run @ Old Meadow Road Stream Restoration was substantially completed on March 30, 2022. The Scotts Run project consisted of restoring, enhancement, and stabilizing of approximately 2,930 linear feet of eroding stream using Natural Channel Design criteria. This project included two phases: Phase I was funded by proffers from a private development and Phase II was County funded. Also included was the removal of invasive non-native plants and the installation of new plantings to stabilize the stream and floodplain.
Riverwood Community Meeting - 04-14-2022- Presentation.pptxFairfax County
The new 4-inch ductile iron force main will serve the surrounding community for the foreseeable future. Replacement of the force main will:
Reduce the level and frequency of maintenance required to keep the force main operating.
Prevent costly emergency repairs.
Provide residents with safe, reliable utility infrastructure.
Enhance the quality of life for residents.
Reduce risks to public health and the environment.
Burke Centre VRE Connector Phase IV project was substantially completed on March 7, 2022. This project enhanced the access to mass transit by creating a more direct connection from the VRE Station to the residential areas west of Premier Court. This project also connects the Oak Bluff community to the Virginia Rail Express (VRE) Burke Station and provides a multi-use shared pedestrian and bicycle trail for outdoor recreation.
Long Branch Public Meeting - FINAL - 04-11-2022Fairfax County
Overarching Project Goals:
-Achieve Long Branch Central TMDL waste load reduction requirements.
-Provide long-term stability and have low maintenance.
-Improve water quality within the Long Branch Central Watershed.
-Improve habitat and environmental health (ecological lift).
Objectives: Share our project understanding with the council and seek input on the unique opportunities and housing goals for this site that could help guide
our master planning process.
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptxFairfax County
4,800 linear feet of stream will be restored using Natural Channel Design methodologies
Pollutant reduction
1,439 lbs/total phosphorus
3,400 lbs/total nitrogen
462.1 tons of total suspended sediment
Protection of private property and public infrastructure
Increased ecological diversity with native vegetation
DEQ has awarded a SLAF grant to this project for these environmental benefits
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT Fairfax County
The Lake Barton Dredging, Restoration, and Riser Modification project was substantially completed on December 29, 2021. The project is located within the Pohick Creek watershed. The project consisted of dredging and removal of approximately 19,100 cubic yards of sediment to restore the sediment trapping capacity and improve water quality. The project also included construction of new sediment forebays, in-lake haul roads, and riser modifications (new mid-level sluice gate and cold-water intake) to facilitate future maintenance, stabilize the shoreline, and improve downstream water quality. Fish habitat was also added within the lake.
Reston Arts Community Center Feasibility - Wrap UpFairfax County
This is the last of 5 engagement meetings. We are excited to report back what we heard from you – your preferences, priorities, questions, hopes, concerns. The information we received will be used to inform the space allocations and cost estimating for discussion of the proffer by Fairfax County.
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Fairfax County
Benefits of Consolidated Facility
Building and Site Efficiencies
Operational Efficiencies
Addresses Space Deficiencies
Addresses Renovations and Capital Renewal Requirements
for WCD
Provides for a Centrally Located Site that Accommodates Program
Consolidates Integrated Services on One Centrally Located Site
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Fairfax County
This is the 4th of 5 engagement meetings. We are excited to hear from you – your preferences, priorities, questions, hopes, concerns. The information we receive today will be used to inform the space allocations and cost estimating for discussion of the proffer by Fairfax County.
Oak Marr Pump Station Rehabilitation – Construction ProjectFairfax County
Neighborhood was built in the 1980s, and the sewer infrastructure has been in operation since.
Aged pump station equipment – pumps, valves, fans, concrete, etc.
This aging equipment has the potential of causing:
Sanitary Sewer Overflows (SSO)
Sewer back-ups into homes
Environmental damages
Maintenance problems
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Fairfax County
Identify and evaluate house flooding and public safety concerns
Improve drainage conditions to convey 100-year storm if feasible
Reduce and treat stormwater runoff at the source
Improve water quality and stream protection
Use resilient & functional designs
Make improvements compatible with characteristics of neighborhood
Partner with community to develop sound, cost effective solutions that can be collaboratively implemented and maintained
Build on lessons learned to help improve site development process for infill development
Reston Arts Center Feasibility - Focus Group Visual ArtsFairfax County
These community outreach meetings are being conducted to understand community needs for a proposed arts venue in the Reston Town Center.
The proposed arts center would be a result of a proffer from Boston Properties in the next phase of Reston Town Center development (Block J).
The proffer would provide for an approximately 60,000 gross square foot facility to house a stage suitable for large-scale music and dance performances, as well as other arts-related amenities.
01062024_First India Newspaper Jaipur.pdfFIRST INDIA
Find Latest India News and Breaking News these days from India on Politics, Business, Entertainment, Technology, Sports, Lifestyle and Coronavirus News in India and the world over that you can't miss. For real time update Visit our social media handle. Read First India NewsPaper in your morning replace. Visit First India.
CLICK:- https://firstindia.co.in/
#First_India_NewsPaper
El Puerto de Algeciras continúa un año más como el más eficiente del continente europeo y vuelve a situarse en el “top ten” mundial, según el informe The Container Port Performance Index 2023 (CPPI), elaborado por el Banco Mundial y la consultora S&P Global.
El informe CPPI utiliza dos enfoques metodológicos diferentes para calcular la clasificación del índice: uno administrativo o técnico y otro estadístico, basado en análisis factorial (FA). Según los autores, esta dualidad pretende asegurar una clasificación que refleje con precisión el rendimiento real del puerto, a la vez que sea estadísticamente sólida. En esta edición del informe CPPI 2023, se han empleado los mismos enfoques metodológicos y se ha aplicado un método de agregación de clasificaciones para combinar los resultados de ambos enfoques y obtener una clasificación agregada.
‘वोटर्स विल मस्ट प्रीवेल’ (मतदाताओं को जीतना होगा) अभियान द्वारा जारी हेल्पलाइन नंबर, 4 जून को सुबह 7 बजे से दोपहर 12 बजे तक मतगणना प्रक्रिया में कहीं भी किसी भी तरह के उल्लंघन की रिपोर्ट करने के लिए खुला रहेगा।
31052024_First India Newspaper Jaipur.pdfFIRST INDIA
Find Latest India News and Breaking News these days from India on Politics, Business, Entertainment, Technology, Sports, Lifestyle and Coronavirus News in India and the world over that you can't miss. For real time update Visit our social media handle. Read First India NewsPaper in your morning replace. Visit First India.
CLICK:- https://firstindia.co.in/
#First_India_NewsPaper
03062024_First India Newspaper Jaipur.pdfFIRST INDIA
Find Latest India News and Breaking News these days from India on Politics, Business, Entertainment, Technology, Sports, Lifestyle and Coronavirus News in India and the world over that you can't miss. For real time update Visit our social media handle. Read First India NewsPaper in your morning replace. Visit First India.
CLICK:- https://firstindia.co.in/
#First_India_NewsPaper
An astonishing, first-of-its-kind, report by the NYT assessing damage in Ukraine. Even if the war ends tomorrow, in many places there will be nothing to go back to.
4. What is the PFM?
• Technical guidelines for site development design.
• Fairfax County Codes (e.g., Subdivision and Zoning Ordinance) are
the regulations (the why) that inform these guidelines (the how).
4
5. What is the PFM?
Design guide that meets the
language of the law and
provides flexibility to allow for
engineering judgment during
design process
5
6. Guidelines Document
• Variations may be approved when:
• Strict application of a standard cannot
be met, or new/creative designs are
proposed; and
• Variations meet the intent of the
provisions, and a statement of
justification is provided.
6
7. Why Update the PFM?
Fairfax First Initiative: to improve speed, consistency,
and predictability of the land development review
process.
7
8. Who is Involved?
• Consultant hired to perform gap
analysis.
• Teams of subject-matter experts to
annotate chapters.
• County, Industry & Citizen
stakeholders to provide input.
• Engineering Standard Review
Committee (ESRC) recommends
approval of annotated chapters.
8
9. How is the PFM Changing?
PFM “Flex” Project themes compiled from
an assessment of the current PFM.
• Clear
• Interactive
• Adaptable
• Urban
• Innovative
9
10. Project Theme: Clear
Recommendations:
• Remove outdated/extraneous text and redundancies.
• Remove outdated provisions and plates.
• Add indented outline.
10
11. Project Theme: Interactive
Recommendations:
• Incorporate information by reference to other codes as the
source of regulation.
• Add internal and external hyperlinks.
• Update and relocate definitions.
11
12. Project Theme: Adaptable
Recommendations:
• Minimize mandatory requirements by changing “shall” to
“should”, where appropriate.
• Allow Director of Land Development Services to
waive/modify provisions based on certain criteria.
12
13. Project Theme: Urban
Recommendations:
• Update the PFM to align with Virginia Department of
Transportation (VDOT) standards.
• Consistency between VDOT Road Design Manual and PFM.
13
14. Project Theme: Innovative
Recommendations:
• Allow the use of emerging technology to address specific
challenges in land development.
• Expand the use of urban and innovative practices.
14
15. Actions to Date
• Hosted 96 stakeholder meetings.
• First round of PFM edits completed.
• ESRC recommended approval of
eight chapters.
• Developed the PFM Flex Project
Website.
15
16. PFM Recap
• A guidelines document for development projects.
• “Flex” Project to improve speed, consistency, and
predictability.
• Stakeholder Committees, Consultant, and Subject-matter
experts involved.
• Project Themes: Clear, Interactive, Adaptable, Urban,
Innovative.
16
17. Next Steps & Schedule
Amendment Development Process:
• Prioritize recommendations & prepare
prioritization schedule.
Estimated completion of Prioritizations:
• End of 2nd Quarter 2018.
17
18. Next Steps & Schedule
Amendment Vetting Process:
• Stakeholder & ESRC review to finalize amendments;
estimated completion end of 3rd Quarter 2018.
Public Hearing Process:
• Public hearings with Planning Commission & Board of
Supervisors over 3-6 months following amendment
vetting.
18
21. Stakeholder Engagement Process – County
Information for the Existing & Future State Comes from:
• County Advisory Committees: Technical, Policy, Innovative,
Steering.
• Additional County Outreach: Land Use Aides, Site
Development & Inspection Division Inspectors & Tech
Forum, Building Division, Customer & Technical Support
Center, Fairfax First Blog.
21
22. Stakeholder Engagement Process – Industry
Information for the Existing & Future State Comes from:
• External Stakeholder Committee: Industry representatives.
• Industry Partners: Engineering Standard Review Committee
(ESRC), Northern Virginia Building Industry
Association/NAIOP, Engineers & Surveyors Institute.
22
23. Stakeholder Engagement Process – Citizens
Information for the Existing & Future State Comes from:
• Public Outreach:
• PFM Flex Project Website:
• A feedback form, meeting minutes, PowerPoint
presentations, draft PFM Chapters, ESRC schedule.
• zMOD Citizen Advisory Group, Providence District
Council, future public hearings.
23
Editor's Notes
Concept: Starts with an idea. Establishment of a preliminary framework for the very generalized overall layout of the project. Due Diligence: Includes assessment of the viability of the project.
Planning & Zoning Review: Determining the allowable land uses and land use/building restrictions for the project. If project includes rezoning the parcel then other land use requirements are developed, e.g., proffers, building massing, layout for road/access network, compatibility with adjoining land uses.
Design: Developing the plans, details, and specifications necessary for construction of the building and site.
Review Process & Permitting: Regulatory review of the design plans (building and site) and specifications to ensure code compliance and to secure the appropriate permits, e.g., land disturbance permit, VDOT permits, environmental permits, MEP permits,
Construction & Inspection: As the building and site are being built on, site inspections are conducted to ensure compliance with code and approved plan, and to ensure health, safety and welfare of immediate and future users/occupants.
Occupancy: Continuation of inspections to ensure the health, safety, and welfare of the public after the building is occupied. Final inspections are performed prior to issuing the occupancy permit.
Renewal: As the building and site's usefulness becomes obsolete there becomes a need to redevelop or repurpose the site for economic purposes and possibly for community interests.