Fairfax County’s
Public Facilities Manual (PFM)
Update to the Providence District Council
May 9, 2018
1
Today’s Presentation
• The Land Development Process.
• What is the PFM?
• How is the PFM changing?
• Actions to Date.
2
Land Development Process
The PFM is
used during
these 4
segments of
the process.
What is the PFM?
• Technical guidelines for site development design.
• Fairfax County Codes (e.g., Subdivision and Zoning Ordinance) are
the regulations (the why) that inform these guidelines (the how).
4
What is the PFM?
Design guide that meets the
language of the law and
provides flexibility to allow for
engineering judgment during
design process
5
Guidelines Document
• Variations may be approved when:
• Strict application of a standard cannot
be met, or new/creative designs are
proposed; and
• Variations meet the intent of the
provisions, and a statement of
justification is provided.
6
Why Update the PFM?
Fairfax First Initiative: to improve speed, consistency,
and predictability of the land development review
process.
7
Who is Involved?
• Consultant hired to perform gap
analysis.
• Teams of subject-matter experts to
annotate chapters.
• County, Industry & Citizen
stakeholders to provide input.
• Engineering Standard Review
Committee (ESRC) recommends
approval of annotated chapters.
8
How is the PFM Changing?
PFM “Flex” Project themes compiled from
an assessment of the current PFM.
• Clear
• Interactive
• Adaptable
• Urban
• Innovative
9
Project Theme: Clear
Recommendations:
• Remove outdated/extraneous text and redundancies.
• Remove outdated provisions and plates.
• Add indented outline.
10
Project Theme: Interactive
Recommendations:
• Incorporate information by reference to other codes as the
source of regulation.
• Add internal and external hyperlinks.
• Update and relocate definitions.
11
Project Theme: Adaptable
Recommendations:
• Minimize mandatory requirements by changing “shall” to
“should”, where appropriate.
• Allow Director of Land Development Services to
waive/modify provisions based on certain criteria.
12
Project Theme: Urban
Recommendations:
• Update the PFM to align with Virginia Department of
Transportation (VDOT) standards.
• Consistency between VDOT Road Design Manual and PFM.
13
Project Theme: Innovative
Recommendations:
• Allow the use of emerging technology to address specific
challenges in land development.
• Expand the use of urban and innovative practices.
14
Actions to Date
• Hosted 96 stakeholder meetings.
• First round of PFM edits completed.
• ESRC recommended approval of
eight chapters.
• Developed the PFM Flex Project
Website.
15
PFM Recap
• A guidelines document for development projects.
• “Flex” Project to improve speed, consistency, and
predictability.
• Stakeholder Committees, Consultant, and Subject-matter
experts involved.
• Project Themes: Clear, Interactive, Adaptable, Urban,
Innovative.
16
Next Steps & Schedule
Amendment Development Process:
• Prioritize recommendations & prepare
prioritization schedule.
Estimated completion of Prioritizations:
• End of 2nd Quarter 2018.
17
Next Steps & Schedule
Amendment Vetting Process:
• Stakeholder & ESRC review to finalize amendments;
estimated completion end of 3rd Quarter 2018.
Public Hearing Process:
• Public hearings with Planning Commission & Board of
Supervisors over 3-6 months following amendment
vetting.
18
Contact:
PFM Flex Project email:
LDSFlexiblePFM@fairfaxcounty.gov
Access the PFM Flex Project Website:
https://www.fairfaxcounty.gov/landdevelopment/public-
facilities-manual-flexibility-project
19
Supplemental Information
• The following slides are included as supplemental information.
20
Stakeholder Engagement Process – County
Information for the Existing & Future State Comes from:
• County Advisory Committees: Technical, Policy, Innovative,
Steering.
• Additional County Outreach: Land Use Aides, Site
Development & Inspection Division Inspectors & Tech
Forum, Building Division, Customer & Technical Support
Center, Fairfax First Blog.
21
Stakeholder Engagement Process – Industry
Information for the Existing & Future State Comes from:
• External Stakeholder Committee: Industry representatives.
• Industry Partners: Engineering Standard Review Committee
(ESRC), Northern Virginia Building Industry
Association/NAIOP, Engineers & Surveyors Institute.
22
Stakeholder Engagement Process – Citizens
Information for the Existing & Future State Comes from:
• Public Outreach:
• PFM Flex Project Website:
• A feedback form, meeting minutes, PowerPoint
presentations, draft PFM Chapters, ESRC schedule.
• zMOD Citizen Advisory Group, Providence District
Council, future public hearings.
23

More Related Content

Similar to Fairfax County's Public Facilities Manual (PFM): Update to the Providence District Council - May 9, 2018

Enhancement Projects: Improving Successful Implementation in Minnesota
Enhancement Projects: Improving Successful Implementation in MinnesotaEnhancement Projects: Improving Successful Implementation in Minnesota
Enhancement Projects: Improving Successful Implementation in Minnesota
RPO America
 
Fairfax County Zoning Ordinance Modernization Project
Fairfax County Zoning Ordinance Modernization ProjectFairfax County Zoning Ordinance Modernization Project
Fairfax County Zoning Ordinance Modernization Project
Fairfax County
 
FirstNet Preparation Strategies: The State Planning Process
FirstNet Preparation Strategies: The State Planning ProcessFirstNet Preparation Strategies: The State Planning Process
FirstNet Preparation Strategies: The State Planning Process
Morgan Sava
 
Presentation on manual PSDP in Pakistan.pptx
Presentation on manual PSDP in Pakistan.pptxPresentation on manual PSDP in Pakistan.pptx
Presentation on manual PSDP in Pakistan.pptx
AbdulrahmanAfabafal
 
Re-establishing the PFM as Guidelines: Update to the Land Use Aides
Re-establishing the PFM as Guidelines: Update to the Land Use AidesRe-establishing the PFM as Guidelines: Update to the Land Use Aides
Re-establishing the PFM as Guidelines: Update to the Land Use Aides
Fairfax County
 
Zoning Ordinance Modernization Project (zMOD): April 13, 2017
Zoning Ordinance Modernization Project (zMOD): April 13, 2017Zoning Ordinance Modernization Project (zMOD): April 13, 2017
Zoning Ordinance Modernization Project (zMOD): April 13, 2017
Fairfax County
 
Component 4 project iniation process.pdf
Component 4 project iniation process.pdfComponent 4 project iniation process.pdf
Component 4 project iniation process.pdf
Anatole9
 
Developer's Forum - RSTF Update Final Report
Developer's Forum - RSTF Update Final ReportDeveloper's Forum - RSTF Update Final Report
Developer's Forum - RSTF Update Final Report
Scott Skraban, MPA, CH-ERIM
 
Kick-Off Meeting Template for Project Management
Kick-Off Meeting Template for Project ManagementKick-Off Meeting Template for Project Management
Kick-Off Meeting Template for Project Management
zjcin
 
How to Obtain the Best Consulting Support for your Radio System Upgrade or Re...
How to Obtain the Best Consulting Support for your Radio System Upgrade or Re...How to Obtain the Best Consulting Support for your Radio System Upgrade or Re...
How to Obtain the Best Consulting Support for your Radio System Upgrade or Re...
Black & Veatch
 
Strategic Estate Planning
Strategic Estate PlanningStrategic Estate Planning
Strategic Estate Planning
JenniferTurner117
 
Impact of RERA in India on Real Estate Project Management Service
Impact of RERA in India on Real Estate Project Management Service Impact of RERA in India on Real Estate Project Management Service
Impact of RERA in India on Real Estate Project Management Service
Rudresh K V
 
Plan Making Reforms Consultation - September 2023 Event Series - Publish.pdf
Plan Making Reforms Consultation - September 2023 Event Series - Publish.pdfPlan Making Reforms Consultation - September 2023 Event Series - Publish.pdf
Plan Making Reforms Consultation - September 2023 Event Series - Publish.pdf
mhutttch
 
015001816.pdf
015001816.pdf015001816.pdf
015001816.pdf
EidTahir
 
Warrington Western Link, Robert Holloway
Warrington Western Link, Robert HollowayWarrington Western Link, Robert Holloway
Warrington Western Link, Robert Holloway
Association for Project Management
 
Pre-application good practice
Pre-application good practicePre-application good practice
Pre-application good practice
PAS_Team
 
lfatrainingday1slides.pdf
lfatrainingday1slides.pdflfatrainingday1slides.pdf
lfatrainingday1slides.pdf
wisdomkhwalala2
 
Our pre application offer at Croydon Council
Our pre application offer at Croydon CouncilOur pre application offer at Croydon Council
Our pre application offer at Croydon Council
PAS_Team
 
Steering committee presentation
Steering committee presentationSteering committee presentation
Steering committee presentationBVallecillos
 

Similar to Fairfax County's Public Facilities Manual (PFM): Update to the Providence District Council - May 9, 2018 (20)

Enhancement Projects: Improving Successful Implementation in Minnesota
Enhancement Projects: Improving Successful Implementation in MinnesotaEnhancement Projects: Improving Successful Implementation in Minnesota
Enhancement Projects: Improving Successful Implementation in Minnesota
 
Fairfax County Zoning Ordinance Modernization Project
Fairfax County Zoning Ordinance Modernization ProjectFairfax County Zoning Ordinance Modernization Project
Fairfax County Zoning Ordinance Modernization Project
 
FirstNet Preparation Strategies: The State Planning Process
FirstNet Preparation Strategies: The State Planning ProcessFirstNet Preparation Strategies: The State Planning Process
FirstNet Preparation Strategies: The State Planning Process
 
Presentation on manual PSDP in Pakistan.pptx
Presentation on manual PSDP in Pakistan.pptxPresentation on manual PSDP in Pakistan.pptx
Presentation on manual PSDP in Pakistan.pptx
 
Re-establishing the PFM as Guidelines: Update to the Land Use Aides
Re-establishing the PFM as Guidelines: Update to the Land Use AidesRe-establishing the PFM as Guidelines: Update to the Land Use Aides
Re-establishing the PFM as Guidelines: Update to the Land Use Aides
 
Zoning Ordinance Modernization Project (zMOD): April 13, 2017
Zoning Ordinance Modernization Project (zMOD): April 13, 2017Zoning Ordinance Modernization Project (zMOD): April 13, 2017
Zoning Ordinance Modernization Project (zMOD): April 13, 2017
 
Component 4 project iniation process.pdf
Component 4 project iniation process.pdfComponent 4 project iniation process.pdf
Component 4 project iniation process.pdf
 
Developer's Forum - RSTF Update Final Report
Developer's Forum - RSTF Update Final ReportDeveloper's Forum - RSTF Update Final Report
Developer's Forum - RSTF Update Final Report
 
Kick-Off Meeting Template for Project Management
Kick-Off Meeting Template for Project ManagementKick-Off Meeting Template for Project Management
Kick-Off Meeting Template for Project Management
 
How to Obtain the Best Consulting Support for your Radio System Upgrade or Re...
How to Obtain the Best Consulting Support for your Radio System Upgrade or Re...How to Obtain the Best Consulting Support for your Radio System Upgrade or Re...
How to Obtain the Best Consulting Support for your Radio System Upgrade or Re...
 
Strategic Estate Planning
Strategic Estate PlanningStrategic Estate Planning
Strategic Estate Planning
 
Impact of RERA in India on Real Estate Project Management Service
Impact of RERA in India on Real Estate Project Management Service Impact of RERA in India on Real Estate Project Management Service
Impact of RERA in India on Real Estate Project Management Service
 
Plan Making Reforms Consultation - September 2023 Event Series - Publish.pdf
Plan Making Reforms Consultation - September 2023 Event Series - Publish.pdfPlan Making Reforms Consultation - September 2023 Event Series - Publish.pdf
Plan Making Reforms Consultation - September 2023 Event Series - Publish.pdf
 
015001816.pdf
015001816.pdf015001816.pdf
015001816.pdf
 
Steering committee
Steering committeeSteering committee
Steering committee
 
Warrington Western Link, Robert Holloway
Warrington Western Link, Robert HollowayWarrington Western Link, Robert Holloway
Warrington Western Link, Robert Holloway
 
Pre-application good practice
Pre-application good practicePre-application good practice
Pre-application good practice
 
lfatrainingday1slides.pdf
lfatrainingday1slides.pdflfatrainingday1slides.pdf
lfatrainingday1slides.pdf
 
Our pre application offer at Croydon Council
Our pre application offer at Croydon CouncilOur pre application offer at Croydon Council
Our pre application offer at Croydon Council
 
Steering committee presentation
Steering committee presentationSteering committee presentation
Steering committee presentation
 

More from Fairfax County

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer Replacement
Fairfax County
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS
Fairfax County
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22
Fairfax County
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Fairfax County
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19
Fairfax County
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Fairfax County
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction Progress
Fairfax County
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Fairfax County
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IV
Fairfax County
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022
Fairfax County
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick Offpptx
Fairfax County
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing Council
Fairfax County
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Fairfax County
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
Fairfax County
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap Up
Fairfax County
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Fairfax County
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Fairfax County
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction Project
Fairfax County
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Fairfax County
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual Arts
Fairfax County
 

More from Fairfax County (20)

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer Replacement
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction Progress
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IV
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick Offpptx
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing Council
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap Up
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction Project
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual Arts
 

Recently uploaded

Codes n Conventionss copy (1).paaaaaaptx
Codes n Conventionss copy (1).paaaaaaptxCodes n Conventionss copy (1).paaaaaaptx
Codes n Conventionss copy (1).paaaaaaptx
ZackSpencer3
 
01062024_First India Newspaper Jaipur.pdf
01062024_First India Newspaper Jaipur.pdf01062024_First India Newspaper Jaipur.pdf
01062024_First India Newspaper Jaipur.pdf
FIRST INDIA
 
EED - The Container Port PERFORMANCE INDEX 2023
EED - The Container Port PERFORMANCE INDEX 2023EED - The Container Port PERFORMANCE INDEX 2023
EED - The Container Port PERFORMANCE INDEX 2023
El Estrecho Digital
 
Resolutions-Key-Interventions-28-May-2024.pdf
Resolutions-Key-Interventions-28-May-2024.pdfResolutions-Key-Interventions-28-May-2024.pdf
Resolutions-Key-Interventions-28-May-2024.pdf
bhavenpr
 
AI and Covert Influence Operations: Latest Trends
AI and Covert Influence Operations: Latest TrendsAI and Covert Influence Operations: Latest Trends
AI and Covert Influence Operations: Latest Trends
CI kumparan
 
Hindustan Insider 2nd edition release now
Hindustan Insider 2nd edition release nowHindustan Insider 2nd edition release now
Hindustan Insider 2nd edition release now
hindustaninsider22
 
31052024_First India Newspaper Jaipur.pdf
31052024_First India Newspaper Jaipur.pdf31052024_First India Newspaper Jaipur.pdf
31052024_First India Newspaper Jaipur.pdf
FIRST INDIA
 
2024 is the point of certainty. Forecast of UIF experts
2024 is the point of certainty. Forecast of UIF experts2024 is the point of certainty. Forecast of UIF experts
2024 is the point of certainty. Forecast of UIF experts
olaola5673
 
03062024_First India Newspaper Jaipur.pdf
03062024_First India Newspaper Jaipur.pdf03062024_First India Newspaper Jaipur.pdf
03062024_First India Newspaper Jaipur.pdf
FIRST INDIA
 
Letter-from-ECI-to-MeiTY-21st-march-2024.pdf
Letter-from-ECI-to-MeiTY-21st-march-2024.pdfLetter-from-ECI-to-MeiTY-21st-march-2024.pdf
Letter-from-ECI-to-MeiTY-21st-march-2024.pdf
bhavenpr
 
Sharjeel-Imam-Judgement-CRLA-215-2024_29-05-2024.pdf
Sharjeel-Imam-Judgement-CRLA-215-2024_29-05-2024.pdfSharjeel-Imam-Judgement-CRLA-215-2024_29-05-2024.pdf
Sharjeel-Imam-Judgement-CRLA-215-2024_29-05-2024.pdf
bhavenpr
 
What Ukraine Has Lost During Russia’s Invasion
What Ukraine Has Lost During Russia’s InvasionWhat Ukraine Has Lost During Russia’s Invasion
What Ukraine Has Lost During Russia’s Invasion
LUMINATIVE MEDIA/PROJECT COUNSEL MEDIA GROUP
 
Preview of Court Document for Iseyin community
Preview of Court Document for Iseyin communityPreview of Court Document for Iseyin community
Preview of Court Document for Iseyin community
contact193699
 
Hogan Comes Home: an MIA WWII crewman is returned
Hogan Comes Home: an MIA WWII crewman is returnedHogan Comes Home: an MIA WWII crewman is returned
Hogan Comes Home: an MIA WWII crewman is returned
rbakerj2
 

Recently uploaded (14)

Codes n Conventionss copy (1).paaaaaaptx
Codes n Conventionss copy (1).paaaaaaptxCodes n Conventionss copy (1).paaaaaaptx
Codes n Conventionss copy (1).paaaaaaptx
 
01062024_First India Newspaper Jaipur.pdf
01062024_First India Newspaper Jaipur.pdf01062024_First India Newspaper Jaipur.pdf
01062024_First India Newspaper Jaipur.pdf
 
EED - The Container Port PERFORMANCE INDEX 2023
EED - The Container Port PERFORMANCE INDEX 2023EED - The Container Port PERFORMANCE INDEX 2023
EED - The Container Port PERFORMANCE INDEX 2023
 
Resolutions-Key-Interventions-28-May-2024.pdf
Resolutions-Key-Interventions-28-May-2024.pdfResolutions-Key-Interventions-28-May-2024.pdf
Resolutions-Key-Interventions-28-May-2024.pdf
 
AI and Covert Influence Operations: Latest Trends
AI and Covert Influence Operations: Latest TrendsAI and Covert Influence Operations: Latest Trends
AI and Covert Influence Operations: Latest Trends
 
Hindustan Insider 2nd edition release now
Hindustan Insider 2nd edition release nowHindustan Insider 2nd edition release now
Hindustan Insider 2nd edition release now
 
31052024_First India Newspaper Jaipur.pdf
31052024_First India Newspaper Jaipur.pdf31052024_First India Newspaper Jaipur.pdf
31052024_First India Newspaper Jaipur.pdf
 
2024 is the point of certainty. Forecast of UIF experts
2024 is the point of certainty. Forecast of UIF experts2024 is the point of certainty. Forecast of UIF experts
2024 is the point of certainty. Forecast of UIF experts
 
03062024_First India Newspaper Jaipur.pdf
03062024_First India Newspaper Jaipur.pdf03062024_First India Newspaper Jaipur.pdf
03062024_First India Newspaper Jaipur.pdf
 
Letter-from-ECI-to-MeiTY-21st-march-2024.pdf
Letter-from-ECI-to-MeiTY-21st-march-2024.pdfLetter-from-ECI-to-MeiTY-21st-march-2024.pdf
Letter-from-ECI-to-MeiTY-21st-march-2024.pdf
 
Sharjeel-Imam-Judgement-CRLA-215-2024_29-05-2024.pdf
Sharjeel-Imam-Judgement-CRLA-215-2024_29-05-2024.pdfSharjeel-Imam-Judgement-CRLA-215-2024_29-05-2024.pdf
Sharjeel-Imam-Judgement-CRLA-215-2024_29-05-2024.pdf
 
What Ukraine Has Lost During Russia’s Invasion
What Ukraine Has Lost During Russia’s InvasionWhat Ukraine Has Lost During Russia’s Invasion
What Ukraine Has Lost During Russia’s Invasion
 
Preview of Court Document for Iseyin community
Preview of Court Document for Iseyin communityPreview of Court Document for Iseyin community
Preview of Court Document for Iseyin community
 
Hogan Comes Home: an MIA WWII crewman is returned
Hogan Comes Home: an MIA WWII crewman is returnedHogan Comes Home: an MIA WWII crewman is returned
Hogan Comes Home: an MIA WWII crewman is returned
 

Fairfax County's Public Facilities Manual (PFM): Update to the Providence District Council - May 9, 2018

  • 1. Fairfax County’s Public Facilities Manual (PFM) Update to the Providence District Council May 9, 2018 1
  • 2. Today’s Presentation • The Land Development Process. • What is the PFM? • How is the PFM changing? • Actions to Date. 2
  • 3. Land Development Process The PFM is used during these 4 segments of the process.
  • 4. What is the PFM? • Technical guidelines for site development design. • Fairfax County Codes (e.g., Subdivision and Zoning Ordinance) are the regulations (the why) that inform these guidelines (the how). 4
  • 5. What is the PFM? Design guide that meets the language of the law and provides flexibility to allow for engineering judgment during design process 5
  • 6. Guidelines Document • Variations may be approved when: • Strict application of a standard cannot be met, or new/creative designs are proposed; and • Variations meet the intent of the provisions, and a statement of justification is provided. 6
  • 7. Why Update the PFM? Fairfax First Initiative: to improve speed, consistency, and predictability of the land development review process. 7
  • 8. Who is Involved? • Consultant hired to perform gap analysis. • Teams of subject-matter experts to annotate chapters. • County, Industry & Citizen stakeholders to provide input. • Engineering Standard Review Committee (ESRC) recommends approval of annotated chapters. 8
  • 9. How is the PFM Changing? PFM “Flex” Project themes compiled from an assessment of the current PFM. • Clear • Interactive • Adaptable • Urban • Innovative 9
  • 10. Project Theme: Clear Recommendations: • Remove outdated/extraneous text and redundancies. • Remove outdated provisions and plates. • Add indented outline. 10
  • 11. Project Theme: Interactive Recommendations: • Incorporate information by reference to other codes as the source of regulation. • Add internal and external hyperlinks. • Update and relocate definitions. 11
  • 12. Project Theme: Adaptable Recommendations: • Minimize mandatory requirements by changing “shall” to “should”, where appropriate. • Allow Director of Land Development Services to waive/modify provisions based on certain criteria. 12
  • 13. Project Theme: Urban Recommendations: • Update the PFM to align with Virginia Department of Transportation (VDOT) standards. • Consistency between VDOT Road Design Manual and PFM. 13
  • 14. Project Theme: Innovative Recommendations: • Allow the use of emerging technology to address specific challenges in land development. • Expand the use of urban and innovative practices. 14
  • 15. Actions to Date • Hosted 96 stakeholder meetings. • First round of PFM edits completed. • ESRC recommended approval of eight chapters. • Developed the PFM Flex Project Website. 15
  • 16. PFM Recap • A guidelines document for development projects. • “Flex” Project to improve speed, consistency, and predictability. • Stakeholder Committees, Consultant, and Subject-matter experts involved. • Project Themes: Clear, Interactive, Adaptable, Urban, Innovative. 16
  • 17. Next Steps & Schedule Amendment Development Process: • Prioritize recommendations & prepare prioritization schedule. Estimated completion of Prioritizations: • End of 2nd Quarter 2018. 17
  • 18. Next Steps & Schedule Amendment Vetting Process: • Stakeholder & ESRC review to finalize amendments; estimated completion end of 3rd Quarter 2018. Public Hearing Process: • Public hearings with Planning Commission & Board of Supervisors over 3-6 months following amendment vetting. 18
  • 19. Contact: PFM Flex Project email: LDSFlexiblePFM@fairfaxcounty.gov Access the PFM Flex Project Website: https://www.fairfaxcounty.gov/landdevelopment/public- facilities-manual-flexibility-project 19
  • 20. Supplemental Information • The following slides are included as supplemental information. 20
  • 21. Stakeholder Engagement Process – County Information for the Existing & Future State Comes from: • County Advisory Committees: Technical, Policy, Innovative, Steering. • Additional County Outreach: Land Use Aides, Site Development & Inspection Division Inspectors & Tech Forum, Building Division, Customer & Technical Support Center, Fairfax First Blog. 21
  • 22. Stakeholder Engagement Process – Industry Information for the Existing & Future State Comes from: • External Stakeholder Committee: Industry representatives. • Industry Partners: Engineering Standard Review Committee (ESRC), Northern Virginia Building Industry Association/NAIOP, Engineers & Surveyors Institute. 22
  • 23. Stakeholder Engagement Process – Citizens Information for the Existing & Future State Comes from: • Public Outreach: • PFM Flex Project Website: • A feedback form, meeting minutes, PowerPoint presentations, draft PFM Chapters, ESRC schedule. • zMOD Citizen Advisory Group, Providence District Council, future public hearings. 23

Editor's Notes

  1. Concept: Starts with an idea. Establishment of a preliminary framework for the very generalized overall layout of the project. Due Diligence: Includes assessment of the viability of the project.   Planning & Zoning Review: Determining the allowable land uses and land use/building restrictions for the project. If project includes rezoning the parcel then other land use requirements are developed, e.g., proffers, building massing, layout for road/access network, compatibility with adjoining land uses.   Design: Developing the plans, details, and specifications necessary for construction of the building and site.   Review Process & Permitting: Regulatory review of the design plans (building and site) and specifications to ensure code compliance and to secure the appropriate permits, e.g., land disturbance permit, VDOT permits, environmental permits, MEP permits, Construction & Inspection: As the building and site are being built on, site inspections are conducted to ensure compliance with code and approved plan, and to ensure health, safety and welfare of immediate and future users/occupants. Occupancy: Continuation of inspections to ensure the health, safety, and welfare of the public after the building is occupied. Final inspections are performed prior to issuing the occupancy permit. Renewal: As the building and site's usefulness becomes obsolete there becomes a need to redevelop or repurpose the site for economic purposes and possibly for community interests.