NATIONAL THERMAL
POWER CORPORATION
BADARPUR
INDUSTRIAL TRAINING
ADITYA SHEKHAR
B.TECH 4th YEAR (ELECTRICAL AND ELECTRONICS ENGINEERING),VIET
INTRODUCTION
NTPC Limited is the largest thermal power generating company
of India. A public sector company, it was incorporated in the
year 1975 to accelerate power development in the country as a
wholly owned company of the Government of India. At present,
Government of India holds 89.5% of the total equity shares of
the company and the balance 10.5% is held by FIIs, Domestic
Banks, Public and other. Within a span of 32 years, NTPC has
emerged as a truly national power company, with power
generating facilities in all the major regions of the country.
BACKGROUND
 BADARPUR THERMAL POWER STATION was established on 1973 and it was the part of Central
Government.
 On 01/04/1978 is was given to NTPC.
 Since then operating performance of NTPC has been considerably above the national average.
 Badarpur thermal power station started with a single 95 mw unit.
 There were 2 more units (95 MW each) installed in next 2 consecutive years.
 Now it has total five units with total capacity of 720 MW. Ownership of BTPS was transferred to NTPC
with effect from 01.06.2006
 The power is supplied to a 220 KV network that is a part of the northern grid.
 The ten circuits through which the power is evacuated from the plant are:
o 1. Mehrauli
o 2. Okhla
o 3. Ballabgarh
o 4. Indraprastha
o 5. UP (Noida)
o 6. Jaipur
Installed Capacity
PRINCIPLE OF STEAM POWER PLANT
GENERATION
The working principle of a steam plant is based upon the
Rankine cycle. Generally steam is taken as the working
medium due to its ability to be stable and that it’s readily stable.
The flow of steam in the plant can be very easily be understood
by the flow diagram of the plant. A graph plotted between the
temperature and the entropy would indicate the technical
details of the working by the Rankine cycle.
Plant Flow Diagram(Modified Rankine Cycle)
AB- Heating of feed water (i.e. sensible heat addition)
BC- Evaporation of water in boiler (i.e. latent heat addition)
CD- Superheating of steam (i.e. heat addition)
DE- Isentropic expansion of steam in HP turbine
EF- Reheating of steam in Reheaters
FH- Isentropic expansion of steam in IP and LP turbine
VARIOUS IMPORTANT PARTS OF BTPS
1.BOILER
2.TURBINES
3.COOLING WATER PUMP
4.CONDENSER
5.DEAREATOR
6.REHEATER
7.AIR PREHEATER
8.PRECIPITATOR
9.ECONOMISER
10.COOLING TOWER
11.TRANSMISSION LINES(3PHASE)
12.UNIT TRANSFORMERS(3 PHASE)
13.ELECTRIC GENERATORS(3 PHASE)
14.CONDENSATE EXTRACTION PUMP
15. Steam governor valve
16. FEED HEATER
17.COAL CONVEYOR
18.COAL HOPPER
19.FORCED DRAUGHT FAN
20.FLUE GAS
1.Boiler
Boiler is a rectangular furnace about 50 feet on
side and 130 feet tall. theirs walls are made of high
pressure steel tubes about 2.3 inches in diameter
which circulates DM water to be converted into
steam. The thermal radiation heats water and
changes to steam. Steam is sent to the turbine .The
efficiency and technology of boiler vary according
to the operational pressures.
1. Operational pressure>221 KSC---%n=42.45%---
--super critical boiler
2. 175KSC <Operational pressure<221 KSC---
%n=38.42%----- critical boiler
3. Operational pressure<175KSC---%n=38%-----
sub critical boiler
The turbine generator consists of a series of steam
turbines interconnected to each other and
generators on a common shaft.
2.Turbines
3.Cooling water pumps
It pumps the water from the cooling tower which
goes to the condenser.
4.Condenser
The steam coming out from the Low Pressure
Turbine (a little above its boiling pump) is
brought into thermal contact with cold water
(pumped in from the cooling tower) in the
condenser, where it condenses rapidly back
into water, creating near Vacuum-like
conditions inside the condenser chest.
5.Deareator
A deareator is a device for air removal and
used to remove dissolved gases (an alternate
would be the use of water treatment
chemicals) from boiler feed water to make it
noncorrosive.
6.Reheater
Reheater is a heater which is used to raise
the temperature of steam which has fallen
from the intermediate pressure turbine.
7.Air preheater
The purpose of the air preheater is to recover
the heat from the boiler flue gas which
increases the thermal efficiency of the boiler
by reducing the useful heat lost in the flue
gas.
8.Precipitator
An Electrostatic precipitator (ESP) is a particulate
device that removes particles from a flowing gas
(such as air) using the force of an induced
electrostatic charge.
ELECTRICAL MAINTENANCE DEPARTMENT – I (EMD-I)
It includes:
 Motors
 High Tension/Low Tension Switchgear
 Coal handling plant
MOTORS
AC MOTORS
 Squirrel cage motor
 Wound motor
 Slip ring induction motor
In modern thermal power plant three phase squirrel cage induction
motors are used but sometime double wound motor is used when
we need high starting torque e.g. in ball mill.
SWITCH GEAR
 Switchgear is one that makes or breaks the electrical circuit.
 It is a switching device that opens & closes a circuit that
defined as apparatus used for switching, Lon rolling &
protecting the electrical circuit & equipments.
 The switchgear equipment is essentially concerned with
switching & interrupting currents either under normal or
abnormal operating conditions.
 The tubular switch with ordinary fuse is simplest form of
switchgear & is used to control & protect& other
equipments in homes, offices etc.
 For circuits of higher ratings, a High Rupturing Capacity
(H.R.C) fuse in condition with a switch may serve the
purpose of controlling & protecting the circuit.
COAL HANDLING
The fuel used in the thermal power plants in the boiler
furnace is coal. Coal undergoes various processes like
separation, crushing, etc and is then finally moved to the
furnace in the form of pulverised coal.
Coal: It is a mixture of organic chemicals and mineral materials
produced by natural process of growth and decay. The
chemical properties of any coal depend upon the proportions of
different chemicals components present in it. There are four
types of coal:
1. Peat
2. Lignite
3. Bituminous Coal
4. Anthracite
ELECTRICAL MAINTENANCE DEPARTMENT –II
(EMD-II)
It includes:
 Generators
 Transformers
 Switch yard
GENERATORS
 The generator works on the principle of electromagnetic
induction. There are two components stator and rotor. The
rotor is the moving part and the stator is the stationary
part. The rotor, which has a field winding, is given
a excitation through a set of 3000rpm to give the required
frequency of HZ. The rotor is cooled by Hydrogen gas,
which is locally manufactured by the plant and has high
heat carrying capacity of low density. If oxygen and
hydrogen get mixed then they will form very high explosive
and to prevent their combining in any way there is seal oil
system. The stator cooling is done by de-mineralized (DM)
water through hollow conductors. Water is fed by one end
by Teflon tube. A boiler and a turbine are coupled to
electric generators. Steam from the boiler is fed to the
turbine through the connecting pipe. Steam drives the
turbine rotor. The turbine rotor drives the generator rotor
which turns the electromagnet within the coil of wire
conductors.
 Carbon dioxide is provided from the top and oil is provided
from bottom to the generator. With the help of carbon
dioxide the oil is drained out to the oil tank.
RATINGS OF THE GENERATORS USED
 Turbo generator 100MW
 TURBO GENERATOR 210 MW
 The 100 MW generator generates 10.75 KV and 210 MW generates
15.75 KV. The voltage is stepped up to 220 KV with the help of
generator transformer and is connected to the grid.
 The voltage is stepped down to 6.6 KV with the help of UNIT
AUXILLARY TRANSFORMER (UAT) and this voltage is used to drive
the HT motors. The voltage is further stepped down to 415 V and
then to 220 V and this voltage is used to drive Lt Motors.
TRANSFORMERS
It is a static machine which increases or decreases the AC voltage
without changing the frequency of the supply.
It is a device that:
 Transfer electric power from one circuit to another.
 It accomplishes this by electromagnetic induction.
 In this the two electric circuits are in mutual inductive influence
of each other.
 WORKING PRINCIPLE:
It works on FARADAY’S LAW OF ELECTROMAGNETIC
INDUCTION (self or mutual induction depending on the type of
transformer).
MAIN PARTS OF TRANSFORMER
1. Secondary Winding
2. Primary Winding.
3. Oil Level
4. Conservator
5. Breather
6. Drain Cock
7. Cooling Tubes.
8. Transformer Oil.
9. Earth Point
10. Explosion Vent
11. Temperature Gauge.
12. Buchholz Relay
13. Secondary Terminal
14. Primary Terminal
SWITCH YARD
As we know that electrical energy can’t be stored like cells, so what we generate should be consumed
instantaneously. But as the load is not constants therefore we generate electricity according to need i.e. the
generation depends upon load. The yard is the places from where the electricity is send outside. It has
both outdoor and indoor equipments.
OUTDOOR EQUIPMENTS
 BUS BAR.
 LIGHTENING ARRESTER
 WAVE TRAP
 BREAKER
 CAPACITATIVE VOLTAGE TRANSFORMER
 EARTHING ROD
 CURRENT TRANSFORMER.
 POTENTIAL TRANSFORMER
 LIGHTENING MASK
INDOOR EQUIPMENTS
 RELAYS.
 CONTROL PANELS
 CIRCUIT BREAKERS
THANK YOU

More Related Content

What's hot

Ntpc badarpur summer training
Ntpc badarpur summer trainingNtpc badarpur summer training
Ntpc badarpur summer training
Anubhav Ghosh
 
Ranjan NTPC KAHALGAON ppt
Ranjan  NTPC KAHALGAON pptRanjan  NTPC KAHALGAON ppt
Ranjan NTPC KAHALGAON ppt
Ranjan kumar
 
NTPC Singrauli
NTPC SingrauliNTPC Singrauli
NTPC Singrauli
Vinay Vishwakarma
 
Ntpc unchahar summer or vocational training ppt
Ntpc unchahar summer or vocational training pptNtpc unchahar summer or vocational training ppt
Ntpc unchahar summer or vocational training ppt
aryan5808
 
NTPC DADRI.
NTPC DADRI.NTPC DADRI.
NTPC DADRI.
Ankit Kumar
 
KBUNL - NTPC KANTI MUZAFFARPUR BIHAR
KBUNL - NTPC KANTI MUZAFFARPUR BIHARKBUNL - NTPC KANTI MUZAFFARPUR BIHAR
KBUNL - NTPC KANTI MUZAFFARPUR BIHAR
VIMAL VAIBHAV
 
Overview of Thermal Power Plant
Overview of Thermal Power PlantOverview of Thermal Power Plant
Overview of Thermal Power Plant
sadhanasweety28
 
SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)
SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)
SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)
guru nanak institute of technology
 
thermal power station
thermal power stationthermal power station
thermal power station
Hari Ohm Singh
 
Thermal power plant term project
Thermal power plant term projectThermal power plant term project
Thermal power plant term project
Engr Mohammad Asim Khan
 
NTPC faridabad nd badarpur
NTPC faridabad nd badarpurNTPC faridabad nd badarpur
NTPC faridabad nd badarpur
Shrey Dhasmana
 
V.T ppt
V.T pptV.T ppt
V.T ppt
Aditi Tiwari
 
(Keshav) report file on kali sindh thermal power project, jhalawar
(Keshav) report file on kali sindh thermal power project, jhalawar(Keshav) report file on kali sindh thermal power project, jhalawar
(Keshav) report file on kali sindh thermal power project, jhalawar
Keshav Meena
 
NTPC
NTPCNTPC
OBRA THERMAL POWER PLANT
OBRA THERMAL POWER PLANTOBRA THERMAL POWER PLANT
OBRA THERMAL POWER PLANT
Faraz Khan
 
Ntpc training ppt
Ntpc training pptNtpc training ppt
Ntpc training ppt
Ambuj Kumar Singh
 
2x600MW Kalishindh Super Thermal Jhalawar (Rajasthan)
2x600MW Kalishindh Super Thermal Jhalawar (Rajasthan) 2x600MW Kalishindh Super Thermal Jhalawar (Rajasthan)
2x600MW Kalishindh Super Thermal Jhalawar (Rajasthan)
Ministry of New & Renewable Energy, Govt of India
 
power station in bangladesh
power station in bangladeshpower station in bangladesh
power station in bangladesh
jubaraj baidya
 
Hardware Implementation of Steam Power Plant
Hardware Implementation of Steam Power PlantHardware Implementation of Steam Power Plant
Hardware Implementation of Steam Power Plant
IJERDJOURNAL
 
project -2
project -2project -2
project -2
Vivek Kushwaha
 

What's hot (20)

Ntpc badarpur summer training
Ntpc badarpur summer trainingNtpc badarpur summer training
Ntpc badarpur summer training
 
Ranjan NTPC KAHALGAON ppt
Ranjan  NTPC KAHALGAON pptRanjan  NTPC KAHALGAON ppt
Ranjan NTPC KAHALGAON ppt
 
NTPC Singrauli
NTPC SingrauliNTPC Singrauli
NTPC Singrauli
 
Ntpc unchahar summer or vocational training ppt
Ntpc unchahar summer or vocational training pptNtpc unchahar summer or vocational training ppt
Ntpc unchahar summer or vocational training ppt
 
NTPC DADRI.
NTPC DADRI.NTPC DADRI.
NTPC DADRI.
 
KBUNL - NTPC KANTI MUZAFFARPUR BIHAR
KBUNL - NTPC KANTI MUZAFFARPUR BIHARKBUNL - NTPC KANTI MUZAFFARPUR BIHAR
KBUNL - NTPC KANTI MUZAFFARPUR BIHAR
 
Overview of Thermal Power Plant
Overview of Thermal Power PlantOverview of Thermal Power Plant
Overview of Thermal Power Plant
 
SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)
SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)
SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)
 
thermal power station
thermal power stationthermal power station
thermal power station
 
Thermal power plant term project
Thermal power plant term projectThermal power plant term project
Thermal power plant term project
 
NTPC faridabad nd badarpur
NTPC faridabad nd badarpurNTPC faridabad nd badarpur
NTPC faridabad nd badarpur
 
V.T ppt
V.T pptV.T ppt
V.T ppt
 
(Keshav) report file on kali sindh thermal power project, jhalawar
(Keshav) report file on kali sindh thermal power project, jhalawar(Keshav) report file on kali sindh thermal power project, jhalawar
(Keshav) report file on kali sindh thermal power project, jhalawar
 
NTPC
NTPCNTPC
NTPC
 
OBRA THERMAL POWER PLANT
OBRA THERMAL POWER PLANTOBRA THERMAL POWER PLANT
OBRA THERMAL POWER PLANT
 
Ntpc training ppt
Ntpc training pptNtpc training ppt
Ntpc training ppt
 
2x600MW Kalishindh Super Thermal Jhalawar (Rajasthan)
2x600MW Kalishindh Super Thermal Jhalawar (Rajasthan) 2x600MW Kalishindh Super Thermal Jhalawar (Rajasthan)
2x600MW Kalishindh Super Thermal Jhalawar (Rajasthan)
 
power station in bangladesh
power station in bangladeshpower station in bangladesh
power station in bangladesh
 
Hardware Implementation of Steam Power Plant
Hardware Implementation of Steam Power PlantHardware Implementation of Steam Power Plant
Hardware Implementation of Steam Power Plant
 
project -2
project -2project -2
project -2
 

Viewers also liked

NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
Tejasvi Anant
 
Chp
ChpChp
Thermal Power Plant
Thermal Power PlantThermal Power Plant
Thermal Power Plant
Arnab Kumar Pal
 
Belt tension calculation
Belt tension calculationBelt tension calculation
Belt tension calculation
Kalyan Halder
 
coal handling
coal handling coal handling
coal handling
ssoniii
 
SDA Overseas 2016
SDA Overseas 2016SDA Overseas 2016
SDA Overseas 2016
Sertaç Çoğal
 
vocational training presentation on korba ntpc
 vocational training presentation on korba ntpc vocational training presentation on korba ntpc
vocational training presentation on korba ntpc
VIKASH BAGHEL
 
Chhattisgarh Mythology
Chhattisgarh MythologyChhattisgarh Mythology
Chhattisgarh Mythology
Ashwath Chadha
 
Presentation1
Presentation1Presentation1
Presentation1
Pritam Gupta
 
Industrial summer training at ntpc,badarpur
Industrial summer training at ntpc,badarpurIndustrial summer training at ntpc,badarpur
Industrial summer training at ntpc,badarpur
Madhur Sharma
 
coal handling plant
coal handling plantcoal handling plant
coal handling plant
saikrishna kandhikatla
 
Chpppt 100617141038-phpapp01
Chpppt 100617141038-phpapp01Chpppt 100617141038-phpapp01
Chpppt 100617141038-phpapp01
Aashutosh Rathore
 
Belt conveyor
Belt conveyorBelt conveyor
Belt conveyor
Ankit Narain
 
COAL HANDLING PLANT
COAL  HANDLING PLANTCOAL  HANDLING PLANT
COAL HANDLING PLANT
pulak126
 
6 weeks it on ntpc
6 weeks it on ntpc 6 weeks it on ntpc
6 weeks it on ntpc
Uttam Kumar
 
Thermal Power Plant
Thermal  Power  PlantThermal  Power  Plant
Thermal Power Plant
Sandip De
 
coal handling plant
coal handling plantcoal handling plant
coal handling plant
vikash.mech05
 
Coal handling plant
Coal handling plantCoal handling plant
Coal handling plant
Rohit Khatri
 
Ntpc
NtpcNtpc
Chp in presentation
Chp in presentationChp in presentation
Chp in presentation
rajkumar_sm
 

Viewers also liked (20)

NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
 
Chp
ChpChp
Chp
 
Thermal Power Plant
Thermal Power PlantThermal Power Plant
Thermal Power Plant
 
Belt tension calculation
Belt tension calculationBelt tension calculation
Belt tension calculation
 
coal handling
coal handling coal handling
coal handling
 
SDA Overseas 2016
SDA Overseas 2016SDA Overseas 2016
SDA Overseas 2016
 
vocational training presentation on korba ntpc
 vocational training presentation on korba ntpc vocational training presentation on korba ntpc
vocational training presentation on korba ntpc
 
Chhattisgarh Mythology
Chhattisgarh MythologyChhattisgarh Mythology
Chhattisgarh Mythology
 
Presentation1
Presentation1Presentation1
Presentation1
 
Industrial summer training at ntpc,badarpur
Industrial summer training at ntpc,badarpurIndustrial summer training at ntpc,badarpur
Industrial summer training at ntpc,badarpur
 
coal handling plant
coal handling plantcoal handling plant
coal handling plant
 
Chpppt 100617141038-phpapp01
Chpppt 100617141038-phpapp01Chpppt 100617141038-phpapp01
Chpppt 100617141038-phpapp01
 
Belt conveyor
Belt conveyorBelt conveyor
Belt conveyor
 
COAL HANDLING PLANT
COAL  HANDLING PLANTCOAL  HANDLING PLANT
COAL HANDLING PLANT
 
6 weeks it on ntpc
6 weeks it on ntpc 6 weeks it on ntpc
6 weeks it on ntpc
 
Thermal Power Plant
Thermal  Power  PlantThermal  Power  Plant
Thermal Power Plant
 
coal handling plant
coal handling plantcoal handling plant
coal handling plant
 
Coal handling plant
Coal handling plantCoal handling plant
Coal handling plant
 
Ntpc
NtpcNtpc
Ntpc
 
Chp in presentation
Chp in presentationChp in presentation
Chp in presentation
 

Similar to NTPC Badarpur Industrial Training Report

Presentation 1 (2).pptx
Presentation 1 (2).pptxPresentation 1 (2).pptx
Presentation 1 (2).pptx
NaveenJarwal1
 
Tarun Project Report On NTPC Kanti
Tarun  Project Report On NTPC KantiTarun  Project Report On NTPC Kanti
Tarun Project Report On NTPC Kanti
Tarun Kumar
 
Harsh ntpc
Harsh ntpcHarsh ntpc
Prashant report final NTPC ANTA
Prashant report final NTPC ANTAPrashant report final NTPC ANTA
Prashant report final NTPC ANTA
prashant shukla
 
Ntpc dadri thermal power plant & switchyard
Ntpc dadri thermal power plant & switchyardNtpc dadri thermal power plant & switchyard
Ntpc dadri thermal power plant & switchyard
I.E.T. lucknow
 
ABOUT NATIONAL THERMAL POWER PLANT COOPERATIO1
ABOUT NATIONAL THERMAL POWER PLANT COOPERATIO1ABOUT NATIONAL THERMAL POWER PLANT COOPERATIO1
ABOUT NATIONAL THERMAL POWER PLANT COOPERATIO1
Prashant kumar
 
Mejia Thermal power Station(Seminar)
Mejia Thermal power Station(Seminar)Mejia Thermal power Station(Seminar)
Mejia Thermal power Station(Seminar)
Debanjan Kishore Roy
 
Mejia Thermal Power Station
Mejia Thermal Power StationMejia Thermal Power Station
Mejia Thermal Power Station
sagnikchoudhury
 
Ntpc ppt complete
Ntpc ppt completeNtpc ppt complete
Ntpc ppt complete
Vikas Singh
 
Power plant technical overview report
Power plant technical overview reportPower plant technical overview report
Power plant technical overview report
ASHOKKUMARPAL1
 
Mtps ppt
Mtps pptMtps ppt
Mtps ppt
sourabhgnit
 
Ppt on power generation(thermal), transmission &amp; distribution
Ppt on power generation(thermal), transmission &amp; distributionPpt on power generation(thermal), transmission &amp; distribution
Ppt on power generation(thermal), transmission &amp; distribution
SuvamSahu2
 
MTPS Bappa main
MTPS Bappa mainMTPS Bappa main
MTPS Bappa main
Báppådìtÿâ Màîtÿ
 
Industrial Training BHEL
Industrial Training BHELIndustrial Training BHEL
Industrial Training BHEL
Lalit Kumar
 
Internship Report on thermal power station in vizag steel plant
Internship Report on thermal power station in vizag steel plantInternship Report on thermal power station in vizag steel plant
Internship Report on thermal power station in vizag steel plant
Abhishek Kumar
 
thermal Power plant.pptx
thermal Power plant.pptxthermal Power plant.pptx
thermal Power plant.pptx
SBegam1
 
Thermal Power Plant PPT
Thermal Power Plant PPTThermal Power Plant PPT
Thermal Power Plant PPT
parmod saharan
 
presentation_thermal_power.pptx
presentation_thermal_power.pptxpresentation_thermal_power.pptx
presentation_thermal_power.pptx
SumitSingh855565
 
New Presentation on TPP-3 - Copy.pptx124
New Presentation on TPP-3 - Copy.pptx124New Presentation on TPP-3 - Copy.pptx124
New Presentation on TPP-3 - Copy.pptx124
23195a0304
 
compalete file 2023 (AutoRecovered).docx
compalete file 2023 (AutoRecovered).docxcompalete file 2023 (AutoRecovered).docx
compalete file 2023 (AutoRecovered).docx
VishalSen33
 

Similar to NTPC Badarpur Industrial Training Report (20)

Presentation 1 (2).pptx
Presentation 1 (2).pptxPresentation 1 (2).pptx
Presentation 1 (2).pptx
 
Tarun Project Report On NTPC Kanti
Tarun  Project Report On NTPC KantiTarun  Project Report On NTPC Kanti
Tarun Project Report On NTPC Kanti
 
Harsh ntpc
Harsh ntpcHarsh ntpc
Harsh ntpc
 
Prashant report final NTPC ANTA
Prashant report final NTPC ANTAPrashant report final NTPC ANTA
Prashant report final NTPC ANTA
 
Ntpc dadri thermal power plant & switchyard
Ntpc dadri thermal power plant & switchyardNtpc dadri thermal power plant & switchyard
Ntpc dadri thermal power plant & switchyard
 
ABOUT NATIONAL THERMAL POWER PLANT COOPERATIO1
ABOUT NATIONAL THERMAL POWER PLANT COOPERATIO1ABOUT NATIONAL THERMAL POWER PLANT COOPERATIO1
ABOUT NATIONAL THERMAL POWER PLANT COOPERATIO1
 
Mejia Thermal power Station(Seminar)
Mejia Thermal power Station(Seminar)Mejia Thermal power Station(Seminar)
Mejia Thermal power Station(Seminar)
 
Mejia Thermal Power Station
Mejia Thermal Power StationMejia Thermal Power Station
Mejia Thermal Power Station
 
Ntpc ppt complete
Ntpc ppt completeNtpc ppt complete
Ntpc ppt complete
 
Power plant technical overview report
Power plant technical overview reportPower plant technical overview report
Power plant technical overview report
 
Mtps ppt
Mtps pptMtps ppt
Mtps ppt
 
Ppt on power generation(thermal), transmission &amp; distribution
Ppt on power generation(thermal), transmission &amp; distributionPpt on power generation(thermal), transmission &amp; distribution
Ppt on power generation(thermal), transmission &amp; distribution
 
MTPS Bappa main
MTPS Bappa mainMTPS Bappa main
MTPS Bappa main
 
Industrial Training BHEL
Industrial Training BHELIndustrial Training BHEL
Industrial Training BHEL
 
Internship Report on thermal power station in vizag steel plant
Internship Report on thermal power station in vizag steel plantInternship Report on thermal power station in vizag steel plant
Internship Report on thermal power station in vizag steel plant
 
thermal Power plant.pptx
thermal Power plant.pptxthermal Power plant.pptx
thermal Power plant.pptx
 
Thermal Power Plant PPT
Thermal Power Plant PPTThermal Power Plant PPT
Thermal Power Plant PPT
 
presentation_thermal_power.pptx
presentation_thermal_power.pptxpresentation_thermal_power.pptx
presentation_thermal_power.pptx
 
New Presentation on TPP-3 - Copy.pptx124
New Presentation on TPP-3 - Copy.pptx124New Presentation on TPP-3 - Copy.pptx124
New Presentation on TPP-3 - Copy.pptx124
 
compalete file 2023 (AutoRecovered).docx
compalete file 2023 (AutoRecovered).docxcompalete file 2023 (AutoRecovered).docx
compalete file 2023 (AutoRecovered).docx
 

Recently uploaded

Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
awadeshbabu
 
2. Operations Strategy in a Global Environment.ppt
2. Operations Strategy in a Global Environment.ppt2. Operations Strategy in a Global Environment.ppt
2. Operations Strategy in a Global Environment.ppt
PuktoonEngr
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
gerogepatton
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
anoopmanoharan2
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
wisnuprabawa3
 
digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
drwaing
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
IJECEIAES
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
ClaraZara1
 
Wearable antenna for antenna applications
Wearable antenna for antenna applicationsWearable antenna for antenna applications
Wearable antenna for antenna applications
Madhumitha Jayaram
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
kandramariana6
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
gerogepatton
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
mahammadsalmanmech
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
IJNSA Journal
 
Series of visio cisco devices Cisco_Icons.ppt
Series of visio cisco devices Cisco_Icons.pptSeries of visio cisco devices Cisco_Icons.ppt
Series of visio cisco devices Cisco_Icons.ppt
PauloRodrigues104553
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
IJECEIAES
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
nooriasukmaningtyas
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
Victor Morales
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 

Recently uploaded (20)

Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
 
2. Operations Strategy in a Global Environment.ppt
2. Operations Strategy in a Global Environment.ppt2. Operations Strategy in a Global Environment.ppt
2. Operations Strategy in a Global Environment.ppt
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
 
digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
 
Wearable antenna for antenna applications
Wearable antenna for antenna applicationsWearable antenna for antenna applications
Wearable antenna for antenna applications
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
 
Series of visio cisco devices Cisco_Icons.ppt
Series of visio cisco devices Cisco_Icons.pptSeries of visio cisco devices Cisco_Icons.ppt
Series of visio cisco devices Cisco_Icons.ppt
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 

NTPC Badarpur Industrial Training Report

  • 1. NATIONAL THERMAL POWER CORPORATION BADARPUR INDUSTRIAL TRAINING ADITYA SHEKHAR B.TECH 4th YEAR (ELECTRICAL AND ELECTRONICS ENGINEERING),VIET
  • 2. INTRODUCTION NTPC Limited is the largest thermal power generating company of India. A public sector company, it was incorporated in the year 1975 to accelerate power development in the country as a wholly owned company of the Government of India. At present, Government of India holds 89.5% of the total equity shares of the company and the balance 10.5% is held by FIIs, Domestic Banks, Public and other. Within a span of 32 years, NTPC has emerged as a truly national power company, with power generating facilities in all the major regions of the country.
  • 3. BACKGROUND  BADARPUR THERMAL POWER STATION was established on 1973 and it was the part of Central Government.  On 01/04/1978 is was given to NTPC.  Since then operating performance of NTPC has been considerably above the national average.  Badarpur thermal power station started with a single 95 mw unit.  There were 2 more units (95 MW each) installed in next 2 consecutive years.  Now it has total five units with total capacity of 720 MW. Ownership of BTPS was transferred to NTPC with effect from 01.06.2006  The power is supplied to a 220 KV network that is a part of the northern grid.  The ten circuits through which the power is evacuated from the plant are: o 1. Mehrauli o 2. Okhla o 3. Ballabgarh o 4. Indraprastha o 5. UP (Noida) o 6. Jaipur
  • 5. PRINCIPLE OF STEAM POWER PLANT GENERATION The working principle of a steam plant is based upon the Rankine cycle. Generally steam is taken as the working medium due to its ability to be stable and that it’s readily stable. The flow of steam in the plant can be very easily be understood by the flow diagram of the plant. A graph plotted between the temperature and the entropy would indicate the technical details of the working by the Rankine cycle.
  • 6.
  • 7. Plant Flow Diagram(Modified Rankine Cycle) AB- Heating of feed water (i.e. sensible heat addition) BC- Evaporation of water in boiler (i.e. latent heat addition) CD- Superheating of steam (i.e. heat addition) DE- Isentropic expansion of steam in HP turbine EF- Reheating of steam in Reheaters FH- Isentropic expansion of steam in IP and LP turbine
  • 8. VARIOUS IMPORTANT PARTS OF BTPS 1.BOILER 2.TURBINES 3.COOLING WATER PUMP 4.CONDENSER 5.DEAREATOR 6.REHEATER 7.AIR PREHEATER 8.PRECIPITATOR 9.ECONOMISER 10.COOLING TOWER 11.TRANSMISSION LINES(3PHASE) 12.UNIT TRANSFORMERS(3 PHASE) 13.ELECTRIC GENERATORS(3 PHASE) 14.CONDENSATE EXTRACTION PUMP 15. Steam governor valve 16. FEED HEATER 17.COAL CONVEYOR 18.COAL HOPPER 19.FORCED DRAUGHT FAN 20.FLUE GAS
  • 9. 1.Boiler Boiler is a rectangular furnace about 50 feet on side and 130 feet tall. theirs walls are made of high pressure steel tubes about 2.3 inches in diameter which circulates DM water to be converted into steam. The thermal radiation heats water and changes to steam. Steam is sent to the turbine .The efficiency and technology of boiler vary according to the operational pressures. 1. Operational pressure>221 KSC---%n=42.45%--- --super critical boiler 2. 175KSC <Operational pressure<221 KSC--- %n=38.42%----- critical boiler 3. Operational pressure<175KSC---%n=38%----- sub critical boiler The turbine generator consists of a series of steam turbines interconnected to each other and generators on a common shaft. 2.Turbines 3.Cooling water pumps It pumps the water from the cooling tower which goes to the condenser.
  • 10. 4.Condenser The steam coming out from the Low Pressure Turbine (a little above its boiling pump) is brought into thermal contact with cold water (pumped in from the cooling tower) in the condenser, where it condenses rapidly back into water, creating near Vacuum-like conditions inside the condenser chest. 5.Deareator A deareator is a device for air removal and used to remove dissolved gases (an alternate would be the use of water treatment chemicals) from boiler feed water to make it noncorrosive.
  • 11. 6.Reheater Reheater is a heater which is used to raise the temperature of steam which has fallen from the intermediate pressure turbine. 7.Air preheater The purpose of the air preheater is to recover the heat from the boiler flue gas which increases the thermal efficiency of the boiler by reducing the useful heat lost in the flue gas. 8.Precipitator An Electrostatic precipitator (ESP) is a particulate device that removes particles from a flowing gas (such as air) using the force of an induced electrostatic charge.
  • 12. ELECTRICAL MAINTENANCE DEPARTMENT – I (EMD-I) It includes:  Motors  High Tension/Low Tension Switchgear  Coal handling plant
  • 13. MOTORS AC MOTORS  Squirrel cage motor  Wound motor  Slip ring induction motor In modern thermal power plant three phase squirrel cage induction motors are used but sometime double wound motor is used when we need high starting torque e.g. in ball mill.
  • 14. SWITCH GEAR  Switchgear is one that makes or breaks the electrical circuit.  It is a switching device that opens & closes a circuit that defined as apparatus used for switching, Lon rolling & protecting the electrical circuit & equipments.  The switchgear equipment is essentially concerned with switching & interrupting currents either under normal or abnormal operating conditions.  The tubular switch with ordinary fuse is simplest form of switchgear & is used to control & protect& other equipments in homes, offices etc.  For circuits of higher ratings, a High Rupturing Capacity (H.R.C) fuse in condition with a switch may serve the purpose of controlling & protecting the circuit.
  • 15. COAL HANDLING The fuel used in the thermal power plants in the boiler furnace is coal. Coal undergoes various processes like separation, crushing, etc and is then finally moved to the furnace in the form of pulverised coal. Coal: It is a mixture of organic chemicals and mineral materials produced by natural process of growth and decay. The chemical properties of any coal depend upon the proportions of different chemicals components present in it. There are four types of coal: 1. Peat 2. Lignite 3. Bituminous Coal 4. Anthracite
  • 16. ELECTRICAL MAINTENANCE DEPARTMENT –II (EMD-II) It includes:  Generators  Transformers  Switch yard
  • 17. GENERATORS  The generator works on the principle of electromagnetic induction. There are two components stator and rotor. The rotor is the moving part and the stator is the stationary part. The rotor, which has a field winding, is given a excitation through a set of 3000rpm to give the required frequency of HZ. The rotor is cooled by Hydrogen gas, which is locally manufactured by the plant and has high heat carrying capacity of low density. If oxygen and hydrogen get mixed then they will form very high explosive and to prevent their combining in any way there is seal oil system. The stator cooling is done by de-mineralized (DM) water through hollow conductors. Water is fed by one end by Teflon tube. A boiler and a turbine are coupled to electric generators. Steam from the boiler is fed to the turbine through the connecting pipe. Steam drives the turbine rotor. The turbine rotor drives the generator rotor which turns the electromagnet within the coil of wire conductors.  Carbon dioxide is provided from the top and oil is provided from bottom to the generator. With the help of carbon dioxide the oil is drained out to the oil tank.
  • 18. RATINGS OF THE GENERATORS USED  Turbo generator 100MW  TURBO GENERATOR 210 MW  The 100 MW generator generates 10.75 KV and 210 MW generates 15.75 KV. The voltage is stepped up to 220 KV with the help of generator transformer and is connected to the grid.  The voltage is stepped down to 6.6 KV with the help of UNIT AUXILLARY TRANSFORMER (UAT) and this voltage is used to drive the HT motors. The voltage is further stepped down to 415 V and then to 220 V and this voltage is used to drive Lt Motors.
  • 19. TRANSFORMERS It is a static machine which increases or decreases the AC voltage without changing the frequency of the supply. It is a device that:  Transfer electric power from one circuit to another.  It accomplishes this by electromagnetic induction.  In this the two electric circuits are in mutual inductive influence of each other.  WORKING PRINCIPLE: It works on FARADAY’S LAW OF ELECTROMAGNETIC INDUCTION (self or mutual induction depending on the type of transformer).
  • 20. MAIN PARTS OF TRANSFORMER 1. Secondary Winding 2. Primary Winding. 3. Oil Level 4. Conservator 5. Breather 6. Drain Cock 7. Cooling Tubes. 8. Transformer Oil. 9. Earth Point 10. Explosion Vent 11. Temperature Gauge. 12. Buchholz Relay 13. Secondary Terminal 14. Primary Terminal
  • 21. SWITCH YARD As we know that electrical energy can’t be stored like cells, so what we generate should be consumed instantaneously. But as the load is not constants therefore we generate electricity according to need i.e. the generation depends upon load. The yard is the places from where the electricity is send outside. It has both outdoor and indoor equipments. OUTDOOR EQUIPMENTS  BUS BAR.  LIGHTENING ARRESTER  WAVE TRAP  BREAKER  CAPACITATIVE VOLTAGE TRANSFORMER  EARTHING ROD  CURRENT TRANSFORMER.  POTENTIAL TRANSFORMER  LIGHTENING MASK INDOOR EQUIPMENTS  RELAYS.  CONTROL PANELS  CIRCUIT BREAKERS