OPERATION OF COAL HANDLING PLANT
WASTE WATER
TREATMENT
Note:
Two streams are running for
feeding of bunker of Unit # 3 & 4,
by this only we are able to feed in
bunker of unit#2 by
commissioning of Plough
discharger.
14. CONVEYOR 8ABCD STATUS / BALANCE WORK
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Conveyor 8A
Conveyor 8B
Conveyor 8C
Conveyor 8D
Completed
Balance
Sno. Conveyor
Belt
Width
(mm)
Conveyor
Length
(mtr)
Total
Weight
(MT)
Progress
(MT)
progress
(%)
Status/ Balance work
Expected
Days
Remarks
1 8A 1400 281.32 85.04 85.04 100 Completed
2 8B 1400 284.82 84.88 84.88 100 Completed
3 8C 1400 1400 152.45 0.00 0
1. 80% structural work completed,
balance work will compl after the
MPH erection.
2. Deck Sheeting & flooring Balance.
3. Drive, Chutes & conveyor will
compl. After MPH erection.
90
1. Work was under NEO
scope.
2. SEPCO has informed
NEO to stop the work.
3. SEPCO has to decide the
contractor.
4. Critical work: Require
T7 for structural work as
well as mechanical work
4 8D 1400 1400 152.45 0.00 0
1. 80% structural work completed,
balance work will compl after the
MPH erection.
2. Deck Sheeting & flooring Balance.
3. Drive, Chutes & conveyor will
compl. After MPH erection.