ABOUT NTPC
• NTPC , the largest power Company in India, was setup in 1975 to
accelerate power development in the country.
• NTPC has installed capacity of 29,394 MW.
• It has 15 coal based power stations (23,395 MW).
• 7 gas based power stations (3,955 MW).
• 4 power stations in Joint Ventures (1,794 MW).
• Today NTPC contributes more than 3 / 5th of the total power
generation in India.
ABOUT NTPC DADRI
• It has energy generating capacity by –
-coal based thermal plant is 1820 MW .
-gas based thermal plant is 817 MW.
• It has 6 units of coal based thermal plant .
-4 units are of 210 MW & 2 units are of 490 MW
capacity.
• It has 6 units of gas based thermal plant .
-4 units are of 130 MW & 2 units are of 154 MW
capacity.
• Grand Total capacity is 2637 MW.
SOURCES
• COAL SOURCE
- Piparwara mines , Jharkhand
• WATER SOURCE
- Upper Ganga Canal, Mat Branch
• GAS SOURCE
- HBJ Pipe line
OPERATION OF THERMAL POWER
PLANT
OPERATION MECHANISM
• The coal is brought and crushed to powder. This is feed to boiler for producing
heat .
• In Boiler the water is converted to steam.
• In super heater the moisture content is removed from the steam and that steam is
called super heated steam.
• The superheated steam rotates the shaft of the High pressure turbine.
• The exhausted steam is sent to preheater and the steam then rotates the
intermediate pressure (IP) turbine.
• The steam from the IP Turbine is then feed to low pressure turbine.
• The turbine shaft is connected to the Generator, which produceselectric Power.
• The power generated is then transmitted .
MAIN AND AUXILIARY EQUIPMENT
• Coal handling plant
• Pulverizing plant
• Boiler
• Ash handling plant
• Turbine
• Condenser
• Cooling tower and pounds
• Feed water heater
• Economizer
• Superheater and Reheater
• Air preheater
COAL HANDLING PLANT
Raw coal wagon – Coal is brought to the site through a wagon
as per the requirement.
Wagon tippler – The coal is unloaded from the wagon and is
transported to crusher and for storage place through
conveyor.
Junction tower - JTs are used where the conveyor has any
angular deviation.
Primary crusher – The raw coal is crushed into fine pieces of
45mm grit. Primary crusher is also called Rotatory breaker
since the coal is crushed by rotating plate.
The stone and
unwanted coal are
rejected
Secondary crusher – The fine pieces of coal is
crushed into powder . (25 mm grit).
Junction Tower
Mill Bunker – The 25 mm grit coal is crushed
into very fine powder for feeding the boiler .
We will have a spare bunker for each boiler.
Boiler
Stack & Reclaimer – It
is used to store the
powdered coal for
emergency purpose.
Atmospheric air
–Through FD
fan
PULVERISING PLANT
In modern thermal power plant, coal is
pulverized i.e. ground to dust like size and
carried to the furnace in a stream of hot air.
Pulverizing is a means of exposing a large
surface area to the action of oxygen and
consequently helping combustion .
BOILER
• A boiler or steam generator is a
closed vessel to which water
under pressure, is converted
into steam.
• It is one of the major
components of a thermal power
plant.
• Always designed to absorb
maximum amount of heat
released in the process of
combustion.
SUPER HEATER
• A device which moves last traces of moisture.
• It helps in reduction in requirement of steam
quantity.
• Steam being dry reduces the mechanical
resistance of turbine.
• No corrosion at the Turbine blades.
ECONOMISER AND AIR PRE-HEATER
• They are such devices which recover the heat from the flue
gases on their way to chimney and raise the temperature of
feed water.
• Economiser raises boiler efficiency.
• Air Pre-heaters recover the heat from the flue gases
leaving the economiser and heat the incoming air
required for combustion.
CONDENSER
• Which condenses the steam at the exhaust of turbine.
• It creates a very low pressure at the exhaust of turbine,
this helps in converting heat energy of steam into
mechanical energy in the prime mover.
• The condensed steam can be used as feed water to the
boiler.
PRIME MOVER (TURBINE)
• A steam turbine is a mechanical device that extracts thermal energy
from pressurized steam, and converts it into mechanical energy.
• About 86% of all electric generation in the world is by use of steam
turbines.
• It has almost completely replaced the reciprocating piston steam
engine.
• In a thermal power plant generally 3 turbines are used to increase
the efficiency.
• High Pressure Turbine(HPT): The superheated steam is directly fed
to this turbine to rotate it.
• Intermediate Pressure Turbine (IPT) : The output from the HPT is
reheated in a reheater and used to rotate IPT.
• Low Pressure Turbine (LPT) : The Exhausted steam from the IPT is
directly fed to rotate the shaft of LPT
• All the turbines are connected to a single shaft which is connected to
the generator.
GENERATOR
• The Synchronus Generator is used to generate power by
connecting the shaft of the Turbine to the shaft of the
generator which create the magnetic flux producing Emf.
• The generated voltage will generally 33 KV to 11 KV max.
• the generated Voltage is stepped up by connecting Step
up transformer and is also used for auxilliary purpose.
COOLING TOWER
• Remove heat from the water
discharged from the condenser so
that the water can be discharged
to the river or re circulated and
reused.
• Air can be circulated in the
cooling towers through natural
draft and mechanical draft.
SWITCHYARD
A switchyard is a part of an electrical generation, transmission
system. Switchyard transform voltage from high to low’ or the
reverse, or perform any of several other important functions.
CONTINUE…
OUTDOOR EQUIPMENTS
• BUS BAR
• LIGHTENING ARRESTER
• BREAKER
• CAPACITIVE VOLTAGE TRANSFORMER
• EARTHING ROD
• CURRENT TRANSFORMER
• POTENTIAL TRANSFORMER
INDOOR EQUIPMENTS
• RELAYS
• CONTROL PANNEL
• CIRCUIT BREAKERS
Types of cooling
Types of cooling
1. Oil Natural Air Natural (ONAN)
 oil and air flows naturally.
2. Oil Natural Air Forced (ONAF)
 As natural air is not so efficient to
cool down the oil and bring it to safe
limits.
 So air is forced on the radiating fins
with help of fans installed below the
radiator fins.
3. Oil Forced Air forced (OFAF)
 With further increase in load, more
heat is generated which necessitates
forced cooling of oil.
Cooling of Transformer
• The oil helps cool the
transformer.
• To improve cooling of large
power transformers, the oil-filled
tank may have radiators through
which the oil circulates by
natural convection.
• Very large or high-power
transformers may have cooling
fans.
• oil pumps and even oil-to-water
heat exchangers.
• Large and high-voltage
transformers undergo prolonged
drying processes, using electrical
sell-heating.
UTILISATION OF SECONDARY RAW
MATERIAL (ASH)
• Construction of embankments and fills.
• Construction of road in sub-base.
• Manufacture of cement.
• Manufacture of bricks/blocks.
• Agriculture as soil amendment/source of essential plant
nutrients.
thermal power plant at NTPC

More Related Content

What's hot

Ntpc dadri thermal power plant & switchyard
Ntpc dadri thermal power plant & switchyardNtpc dadri thermal power plant & switchyard
Ntpc dadri thermal power plant & switchyard
I.E.T. lucknow
 
Project Report on Industrial Summer Training at NTPC Simhadri
 Project Report on Industrial Summer Training at NTPC Simhadri Project Report on Industrial Summer Training at NTPC Simhadri
Project Report on Industrial Summer Training at NTPC Simhadri
Ashish Uppu
 
CONTROL AND INSTRUMENTATION OF POWER PLANT
CONTROL AND INSTRUMENTATION OF POWER PLANTCONTROL AND INSTRUMENTATION OF POWER PLANT
CONTROL AND INSTRUMENTATION OF POWER PLANTSubarna Poddar
 
The cost of power generation
The cost of power generationThe cost of power generation
The cost of power generation
Parthasarothi Sikder
 
THERMAL POWER PLANT (COAL TO POWER)
THERMAL POWER PLANT (COAL TO POWER)THERMAL POWER PLANT (COAL TO POWER)
THERMAL POWER PLANT (COAL TO POWER)
Baibhav Saha
 
CSTPS training REPORT
CSTPS training REPORTCSTPS training REPORT
CSTPS training REPORT
Uday Wankar
 
NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
Tejasvi Anant
 
Steam power plants
Steam power plantsSteam power plants
Steam power plants
Akhil Syamalan
 
Ntpc dadri
Ntpc dadriNtpc dadri
Ntpc dadri
Ishant Gautam.
 
Ntpc vocational training project report sipat
Ntpc vocational training project report sipatNtpc vocational training project report sipat
Ntpc vocational training project report sipat
pratikguptateddy
 
training report on thermal power plant & thermal power generation by sagar me...
training report on thermal power plant & thermal power generation by sagar me...training report on thermal power plant & thermal power generation by sagar me...
training report on thermal power plant & thermal power generation by sagar me...
Sagar Mehta
 
FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING
FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING
FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING
Om Prakash
 
Vocational training report
Vocational training reportVocational training report
Vocational training report
ATUL RAJ
 
Final reprt at ntpc vindhyanagar , singrauli
Final  reprt at ntpc vindhyanagar , singrauliFinal  reprt at ntpc vindhyanagar , singrauli
Final reprt at ntpc vindhyanagar , singrauli
Devanshu Yadav
 
Gas turbine Power-plant, NTPC Anta, Rajasthan
Gas turbine Power-plant, NTPC Anta, RajasthanGas turbine Power-plant, NTPC Anta, Rajasthan
Gas turbine Power-plant, NTPC Anta, Rajasthan
Saurabh Tiwari
 
Ppt for power plant
Ppt for power plantPpt for power plant
Ppt for power plant
ra m
 
Ntpc kahalgaon training report
Ntpc kahalgaon training reportNtpc kahalgaon training report
Ntpc kahalgaon training report
ravi kant
 
Ntpc Report
Ntpc ReportNtpc Report
Ntpc Report
Sachin Verma
 
Thermal power plant ppt
Thermal power plant pptThermal power plant ppt
Thermal power plant ppt
ayushi kesarvani
 

What's hot (20)

Ntpc dadri thermal power plant & switchyard
Ntpc dadri thermal power plant & switchyardNtpc dadri thermal power plant & switchyard
Ntpc dadri thermal power plant & switchyard
 
Project Report on Industrial Summer Training at NTPC Simhadri
 Project Report on Industrial Summer Training at NTPC Simhadri Project Report on Industrial Summer Training at NTPC Simhadri
Project Report on Industrial Summer Training at NTPC Simhadri
 
CONTROL AND INSTRUMENTATION OF POWER PLANT
CONTROL AND INSTRUMENTATION OF POWER PLANTCONTROL AND INSTRUMENTATION OF POWER PLANT
CONTROL AND INSTRUMENTATION OF POWER PLANT
 
The cost of power generation
The cost of power generationThe cost of power generation
The cost of power generation
 
ppt of ntpc dadri by emam raza khan
ppt of ntpc dadri by emam raza khan  ppt of ntpc dadri by emam raza khan
ppt of ntpc dadri by emam raza khan
 
THERMAL POWER PLANT (COAL TO POWER)
THERMAL POWER PLANT (COAL TO POWER)THERMAL POWER PLANT (COAL TO POWER)
THERMAL POWER PLANT (COAL TO POWER)
 
CSTPS training REPORT
CSTPS training REPORTCSTPS training REPORT
CSTPS training REPORT
 
NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
 
Steam power plants
Steam power plantsSteam power plants
Steam power plants
 
Ntpc dadri
Ntpc dadriNtpc dadri
Ntpc dadri
 
Ntpc vocational training project report sipat
Ntpc vocational training project report sipatNtpc vocational training project report sipat
Ntpc vocational training project report sipat
 
training report on thermal power plant & thermal power generation by sagar me...
training report on thermal power plant & thermal power generation by sagar me...training report on thermal power plant & thermal power generation by sagar me...
training report on thermal power plant & thermal power generation by sagar me...
 
FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING
FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING
FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING
 
Vocational training report
Vocational training reportVocational training report
Vocational training report
 
Final reprt at ntpc vindhyanagar , singrauli
Final  reprt at ntpc vindhyanagar , singrauliFinal  reprt at ntpc vindhyanagar , singrauli
Final reprt at ntpc vindhyanagar , singrauli
 
Gas turbine Power-plant, NTPC Anta, Rajasthan
Gas turbine Power-plant, NTPC Anta, RajasthanGas turbine Power-plant, NTPC Anta, Rajasthan
Gas turbine Power-plant, NTPC Anta, Rajasthan
 
Ppt for power plant
Ppt for power plantPpt for power plant
Ppt for power plant
 
Ntpc kahalgaon training report
Ntpc kahalgaon training reportNtpc kahalgaon training report
Ntpc kahalgaon training report
 
Ntpc Report
Ntpc ReportNtpc Report
Ntpc Report
 
Thermal power plant ppt
Thermal power plant pptThermal power plant ppt
Thermal power plant ppt
 

Similar to thermal power plant at NTPC

Summer training at NTPC Badarpur ppt
Summer training at NTPC Badarpur ppt Summer training at NTPC Badarpur ppt
Summer training at NTPC Badarpur ppt
nilesh choubey
 
NTPC,Dadri Training presentation
NTPC,Dadri Training presentationNTPC,Dadri Training presentation
NTPC,Dadri Training presentation
Nitish Bhati
 
ntpc dadri
ntpc dadri ntpc dadri
ntpc dadri
Himanika Arora
 
Presentation sai,varun.
Presentation sai,varun.Presentation sai,varun.
Presentation sai,varun.
Sai Kumar
 
Ntpc unchahar summer or vocational training ppt
Ntpc unchahar summer or vocational training pptNtpc unchahar summer or vocational training ppt
Ntpc unchahar summer or vocational training ppt
aryan5808
 
adi ntpc.pptx
adi ntpc.pptxadi ntpc.pptx
adi ntpc.pptx
AdityaRaj873503
 
Ntpc ppt
Ntpc pptNtpc ppt
Ntpc ppt
Faraz Khan
 
Coal based power plant
Coal based power plantCoal based power plant
Coal based power plant
Gaurav Kaushik
 
Thermal power plant | Electrical Engineering | Notes | Source of Energy
Thermal power plant | Electrical Engineering | Notes | Source of EnergyThermal power plant | Electrical Engineering | Notes | Source of Energy
Thermal power plant | Electrical Engineering | Notes | Source of Energy
Jayant Suthar
 
KSTPS presentation.pptx
KSTPS presentation.pptxKSTPS presentation.pptx
KSTPS presentation.pptx
ParulChandna6
 
Steam plan
Steam planSteam plan
Steam plan
vhasmukh96
 
Ntpc dadri ppt by pc sharma
Ntpc dadri ppt by pc sharmaNtpc dadri ppt by pc sharma
Ntpc dadri ppt by pc sharmaPrakash Sharma
 
Ntpc training ppt
Ntpc training pptNtpc training ppt
Ntpc training ppt
Ambuj Kumar Singh
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
aman Singh
 
Presentation on thermal power plant
Presentation on thermal power plantPresentation on thermal power plant
Presentation on thermal power plantRashmi Nimje
 
suratgarh thermal power station by mk yadav
suratgarh thermal power station by mk yadavsuratgarh thermal power station by mk yadav
suratgarh thermal power station by mk yadav
mukesh yadav
 
Shoaib khan ntpc
Shoaib khan ntpcShoaib khan ntpc
Shoaib khan ntpc
MOHD SHOAIB
 
kstps training report
kstps training reportkstps training report
kstps training report
Omprakash Choudhary
 

Similar to thermal power plant at NTPC (20)

Summer training at NTPC Badarpur ppt
Summer training at NTPC Badarpur ppt Summer training at NTPC Badarpur ppt
Summer training at NTPC Badarpur ppt
 
NTPC,Dadri Training presentation
NTPC,Dadri Training presentationNTPC,Dadri Training presentation
NTPC,Dadri Training presentation
 
ntpc dadri
ntpc dadri ntpc dadri
ntpc dadri
 
Presentation sai,varun.
Presentation sai,varun.Presentation sai,varun.
Presentation sai,varun.
 
Ntpc dadri ppt
Ntpc dadri pptNtpc dadri ppt
Ntpc dadri ppt
 
Ntpc unchahar summer or vocational training ppt
Ntpc unchahar summer or vocational training pptNtpc unchahar summer or vocational training ppt
Ntpc unchahar summer or vocational training ppt
 
Ntpc2 111125042448-phpapp02
Ntpc2 111125042448-phpapp02Ntpc2 111125042448-phpapp02
Ntpc2 111125042448-phpapp02
 
adi ntpc.pptx
adi ntpc.pptxadi ntpc.pptx
adi ntpc.pptx
 
Ntpc ppt
Ntpc pptNtpc ppt
Ntpc ppt
 
Coal based power plant
Coal based power plantCoal based power plant
Coal based power plant
 
Thermal power plant | Electrical Engineering | Notes | Source of Energy
Thermal power plant | Electrical Engineering | Notes | Source of EnergyThermal power plant | Electrical Engineering | Notes | Source of Energy
Thermal power plant | Electrical Engineering | Notes | Source of Energy
 
KSTPS presentation.pptx
KSTPS presentation.pptxKSTPS presentation.pptx
KSTPS presentation.pptx
 
Steam plan
Steam planSteam plan
Steam plan
 
Ntpc dadri ppt by pc sharma
Ntpc dadri ppt by pc sharmaNtpc dadri ppt by pc sharma
Ntpc dadri ppt by pc sharma
 
Ntpc training ppt
Ntpc training pptNtpc training ppt
Ntpc training ppt
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Presentation on thermal power plant
Presentation on thermal power plantPresentation on thermal power plant
Presentation on thermal power plant
 
suratgarh thermal power station by mk yadav
suratgarh thermal power station by mk yadavsuratgarh thermal power station by mk yadav
suratgarh thermal power station by mk yadav
 
Shoaib khan ntpc
Shoaib khan ntpcShoaib khan ntpc
Shoaib khan ntpc
 
kstps training report
kstps training reportkstps training report
kstps training report
 

Recently uploaded

FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
LR1709MUSIC
 
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n PrintAffordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Navpack & Print
 
What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
HumanResourceDimensi1
 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
anasabutalha2013
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
Nicola Wreford-Howard
 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
ofm712785
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Lviv Startup Club
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
Lital Barkan
 
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s DholeraTata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Avirahi City Dholera
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
seoforlegalpillers
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
dylandmeas
 
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).pptENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
zechu97
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
creerey
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
fisherameliaisabella
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Arihant Webtech Pvt. Ltd
 
Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
zoyaansari11365
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
taqyed
 
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
BBPMedia1
 
Premium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern BusinessesPremium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern Businesses
SynapseIndia
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
marketing317746
 

Recently uploaded (20)

FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
 
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n PrintAffordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n Print
 
What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
 
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s DholeraTata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
 
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).pptENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
 
Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
 
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
 
Premium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern BusinessesPremium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern Businesses
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
 

thermal power plant at NTPC

  • 1. A PRESENTATION ON SUMMER TRAINING AT – NTPC DADRI PRESENTED BY- RICHA KHATRI EN- 4TH YEAR 1029021045
  • 2. ABOUT NTPC • NTPC , the largest power Company in India, was setup in 1975 to accelerate power development in the country. • NTPC has installed capacity of 29,394 MW. • It has 15 coal based power stations (23,395 MW). • 7 gas based power stations (3,955 MW). • 4 power stations in Joint Ventures (1,794 MW). • Today NTPC contributes more than 3 / 5th of the total power generation in India.
  • 3. ABOUT NTPC DADRI • It has energy generating capacity by – -coal based thermal plant is 1820 MW . -gas based thermal plant is 817 MW. • It has 6 units of coal based thermal plant . -4 units are of 210 MW & 2 units are of 490 MW capacity. • It has 6 units of gas based thermal plant . -4 units are of 130 MW & 2 units are of 154 MW capacity. • Grand Total capacity is 2637 MW.
  • 4. SOURCES • COAL SOURCE - Piparwara mines , Jharkhand • WATER SOURCE - Upper Ganga Canal, Mat Branch • GAS SOURCE - HBJ Pipe line
  • 5. OPERATION OF THERMAL POWER PLANT
  • 6. OPERATION MECHANISM • The coal is brought and crushed to powder. This is feed to boiler for producing heat . • In Boiler the water is converted to steam. • In super heater the moisture content is removed from the steam and that steam is called super heated steam. • The superheated steam rotates the shaft of the High pressure turbine. • The exhausted steam is sent to preheater and the steam then rotates the intermediate pressure (IP) turbine. • The steam from the IP Turbine is then feed to low pressure turbine. • The turbine shaft is connected to the Generator, which produceselectric Power. • The power generated is then transmitted .
  • 7. MAIN AND AUXILIARY EQUIPMENT • Coal handling plant • Pulverizing plant • Boiler • Ash handling plant • Turbine • Condenser • Cooling tower and pounds • Feed water heater • Economizer • Superheater and Reheater • Air preheater
  • 8. COAL HANDLING PLANT Raw coal wagon – Coal is brought to the site through a wagon as per the requirement. Wagon tippler – The coal is unloaded from the wagon and is transported to crusher and for storage place through conveyor. Junction tower - JTs are used where the conveyor has any angular deviation. Primary crusher – The raw coal is crushed into fine pieces of 45mm grit. Primary crusher is also called Rotatory breaker since the coal is crushed by rotating plate. The stone and unwanted coal are rejected
  • 9. Secondary crusher – The fine pieces of coal is crushed into powder . (25 mm grit). Junction Tower Mill Bunker – The 25 mm grit coal is crushed into very fine powder for feeding the boiler . We will have a spare bunker for each boiler. Boiler Stack & Reclaimer – It is used to store the powdered coal for emergency purpose. Atmospheric air –Through FD fan
  • 10. PULVERISING PLANT In modern thermal power plant, coal is pulverized i.e. ground to dust like size and carried to the furnace in a stream of hot air. Pulverizing is a means of exposing a large surface area to the action of oxygen and consequently helping combustion .
  • 11. BOILER • A boiler or steam generator is a closed vessel to which water under pressure, is converted into steam. • It is one of the major components of a thermal power plant. • Always designed to absorb maximum amount of heat released in the process of combustion.
  • 12. SUPER HEATER • A device which moves last traces of moisture. • It helps in reduction in requirement of steam quantity. • Steam being dry reduces the mechanical resistance of turbine. • No corrosion at the Turbine blades.
  • 13. ECONOMISER AND AIR PRE-HEATER • They are such devices which recover the heat from the flue gases on their way to chimney and raise the temperature of feed water. • Economiser raises boiler efficiency. • Air Pre-heaters recover the heat from the flue gases leaving the economiser and heat the incoming air required for combustion.
  • 14. CONDENSER • Which condenses the steam at the exhaust of turbine. • It creates a very low pressure at the exhaust of turbine, this helps in converting heat energy of steam into mechanical energy in the prime mover. • The condensed steam can be used as feed water to the boiler.
  • 15. PRIME MOVER (TURBINE) • A steam turbine is a mechanical device that extracts thermal energy from pressurized steam, and converts it into mechanical energy. • About 86% of all electric generation in the world is by use of steam turbines. • It has almost completely replaced the reciprocating piston steam engine. • In a thermal power plant generally 3 turbines are used to increase the efficiency. • High Pressure Turbine(HPT): The superheated steam is directly fed to this turbine to rotate it. • Intermediate Pressure Turbine (IPT) : The output from the HPT is reheated in a reheater and used to rotate IPT. • Low Pressure Turbine (LPT) : The Exhausted steam from the IPT is directly fed to rotate the shaft of LPT • All the turbines are connected to a single shaft which is connected to the generator.
  • 16.
  • 17. GENERATOR • The Synchronus Generator is used to generate power by connecting the shaft of the Turbine to the shaft of the generator which create the magnetic flux producing Emf. • The generated voltage will generally 33 KV to 11 KV max. • the generated Voltage is stepped up by connecting Step up transformer and is also used for auxilliary purpose.
  • 18. COOLING TOWER • Remove heat from the water discharged from the condenser so that the water can be discharged to the river or re circulated and reused. • Air can be circulated in the cooling towers through natural draft and mechanical draft.
  • 19. SWITCHYARD A switchyard is a part of an electrical generation, transmission system. Switchyard transform voltage from high to low’ or the reverse, or perform any of several other important functions.
  • 20. CONTINUE… OUTDOOR EQUIPMENTS • BUS BAR • LIGHTENING ARRESTER • BREAKER • CAPACITIVE VOLTAGE TRANSFORMER • EARTHING ROD • CURRENT TRANSFORMER • POTENTIAL TRANSFORMER INDOOR EQUIPMENTS • RELAYS • CONTROL PANNEL • CIRCUIT BREAKERS
  • 21.
  • 22. Types of cooling Types of cooling 1. Oil Natural Air Natural (ONAN)  oil and air flows naturally. 2. Oil Natural Air Forced (ONAF)  As natural air is not so efficient to cool down the oil and bring it to safe limits.  So air is forced on the radiating fins with help of fans installed below the radiator fins. 3. Oil Forced Air forced (OFAF)  With further increase in load, more heat is generated which necessitates forced cooling of oil. Cooling of Transformer • The oil helps cool the transformer. • To improve cooling of large power transformers, the oil-filled tank may have radiators through which the oil circulates by natural convection. • Very large or high-power transformers may have cooling fans. • oil pumps and even oil-to-water heat exchangers. • Large and high-voltage transformers undergo prolonged drying processes, using electrical sell-heating.
  • 23. UTILISATION OF SECONDARY RAW MATERIAL (ASH) • Construction of embankments and fills. • Construction of road in sub-base. • Manufacture of cement. • Manufacture of bricks/blocks. • Agriculture as soil amendment/source of essential plant nutrients.