CONSTRUCTION AND
WORKING PRINCIPLE
OF 1 PHASE
TRANSFORMER
CONSTRUCTION OF
TRANSFORMER :
 The Transformer mainly consist of Core and Windings
(Coils).
 With Increase in the Capacity, it also need other parts such
as –
1.Transformer Tank
2.Terminal Bushings
3. Conservator
4. Breather
5. Explosion Vent
6. Buchholz relay
MAGNETIC CORE
 Mangnetic Core may be either Square or Rectangular
in size
 Vertical portion on which coils (windings) are wound is
called ‘Limb” while the top & bottom horizontal portion is
called ‘Roke’.
 The core is made up of Laminations to minimize losses.
 Generally L- shaped or I- shaped laminations are used
as shown in figure
AUXILLARY DEVICES OF SINGLE
PHASE TRANSFORMER
2. TYPES OF WINDINGS :-
 As we disscussed earlier, the windings are
seperately wound on each Limbs.
 In this method the losses are higher hence to
avoid this the two coils are wound on both the limits
adjecently, the structure is called “Cylindrical
concentric”.
SANDWICH COILS
 The other type of coil which is very commonly
used is sandwich coils .
 Each high voltage coil is lies between the two low
voltage coils i.e two low voltage coils sandwiching
the high voltage coil, it reduces leakage flux.
3. TRANSFORMER TANK :-
 In Large size transformer, while transformer
assembly is placed in Fabricated sheet metal tank
& immersed in oil .
 Oil is used for insulation as well as cooling .
 The heat generated in the winding & the core is
carried by the oil to the external surface of the tank.
4. TERMINAL BUSHINGS :-
 The leads of the transformer brought out from the
tank are insulated from it with the help of porcelain
bushings .
5. CONSERVATOR :-
 In transformer provision of some space above the oil
level is always essential to take up the expansion and
contraction of the oil with changes of temperature in
service .
 When transformer becomes warm, the oil expands and
air at the top of the oil expelled .
When it cools, oil contracts and outside air is drawn into
the tansformer. This process is known as breathing of
transformer .
6. BREATHER :-
 the dispalcement of air above the oil level in the
conservator during the breathing process of the
transformer takes place through the aparatus known as
Breather.
 It conatains a drying agent such as silica gel or calcium
chloride which extracts the moisture from the air.
 The breather also cleans the air by removing the dust
particles present in it. Thus only dry & clean air is
allowed to come in contact with the oil in the tansformer.
7. BUCHHOLZ REALY :-
 It is a protective device mounted in the pipeline
connecting the main tank to the conservator.
 Due to excessive heat developed during the fault
condition, the oil in the tank gets decompased &
different types of gases are liberated.
 These gases operate the Buchholz realy which in the
initial condition gives alarm to the operator.
 If fault is severe then this relay trips off the main circuit
breaker .
EXPLOSION VENT :-
 It is the bent up pipe fitted on the upper surface of the
tank is known as explsion vent or relief valve.
It provided with a diaphragm made out of glass sheet,
aluminium foil or a bakelite sheet.
 In the event of the fault conditon, it the exessive
pressure is developed inside the tank due to liberated
gases, the diaphrag in the explosion vent bursts and
releases the pressure, thus avoiding damage to the
transformer.
WORKING PRINCIPLE OF 1
PHASE TANSFORMER
 Transformer is static device which transforms electrical
power from one circuit to another circuit with desire
change in volatage and current and without change in
the frequency also there is no any electrical connection
between two circuits.
 Transformer works on the principle fo Mutual Induction
i.e when two coils is changed uniformely the an emf gets
induced in the other coil, this e.m.f can drive a current, if
closed path is provided .
 Any one of the two coils is connected to a source
of alternating voltage & the other coil (winding) is
connected to load.
i. The winding which is connected to
source(supply) is called primary winding (p)
ii. The winding which is connected to load is called
secondary winding(s).
SYMBOLIC REPRESENTATION
OF SINGLE PHASE
TRANSFORMER
When A.C (alternating) voltage or supply is given to the primary
winding, it circulates a current which produces an alternating
flux(Ø) which completes its path through common magnetic iron.
This flux links with the secondary windings(s) as flux is
alternating, according to Faradays law of electromagnetic
induction, mutually induced emf gets developed in the secondary
winding .
Now if load is connected to secondary winding this e.m.f drives a
current through it.
Hence without any electrical cotact between the two windigs an
electrical energy gets transferred from primary winding to the
secondary winding.
Construction and working principle of 1 phase transformer

More Related Content

What's hot

What's hot (20)

Single phase im-lecture_10_1
Single phase im-lecture_10_1Single phase im-lecture_10_1
Single phase im-lecture_10_1
 
Ee 791 drives lab maual
Ee 791 drives lab maualEe 791 drives lab maual
Ee 791 drives lab maual
 
Alternator
AlternatorAlternator
Alternator
 
Power factor improvement
Power factor improvement Power factor improvement
Power factor improvement
 
No-load & blocked rotor test, Equivalent circuit, Phasor diagram
No-load & blocked rotor test, Equivalent circuit, Phasor diagramNo-load & blocked rotor test, Equivalent circuit, Phasor diagram
No-load & blocked rotor test, Equivalent circuit, Phasor diagram
 
induction generator final.pptx
induction generator final.pptxinduction generator final.pptx
induction generator final.pptx
 
Protective relays
Protective relaysProtective relays
Protective relays
 
Alternator protection
Alternator protectionAlternator protection
Alternator protection
 
MMF for Airgap and Tooth
MMF for Airgap and ToothMMF for Airgap and Tooth
MMF for Airgap and Tooth
 
Power factor
Power factorPower factor
Power factor
 
Three phase transformer
Three phase transformer Three phase transformer
Three phase transformer
 
Synchronous machines
Synchronous machinesSynchronous machines
Synchronous machines
 
IDEAL AND PRACTICAL TRANSFORMER, EQUIVALENT CIRCUIT OF TRANSFORMER|DAY5|BASIC...
IDEAL AND PRACTICAL TRANSFORMER, EQUIVALENT CIRCUIT OF TRANSFORMER|DAY5|BASIC...IDEAL AND PRACTICAL TRANSFORMER, EQUIVALENT CIRCUIT OF TRANSFORMER|DAY5|BASIC...
IDEAL AND PRACTICAL TRANSFORMER, EQUIVALENT CIRCUIT OF TRANSFORMER|DAY5|BASIC...
 
Synchronous generator
Synchronous generatorSynchronous generator
Synchronous generator
 
Dc machines (Generator & Motor)
Dc machines (Generator & Motor)Dc machines (Generator & Motor)
Dc machines (Generator & Motor)
 
Transformer
Transformer Transformer
Transformer
 
Current Transformer and Potential Transformer
Current Transformer and Potential TransformerCurrent Transformer and Potential Transformer
Current Transformer and Potential Transformer
 
Presentation on DC Machines
Presentation on DC MachinesPresentation on DC Machines
Presentation on DC Machines
 
open circuit and short circuit test on transformer
open circuit and short circuit test on transformeropen circuit and short circuit test on transformer
open circuit and short circuit test on transformer
 
Power electronics Phase Controlled Rectifiers - SCR
Power electronics   Phase Controlled Rectifiers - SCRPower electronics   Phase Controlled Rectifiers - SCR
Power electronics Phase Controlled Rectifiers - SCR
 

Similar to Construction and working principle of 1 phase transformer

Similar to Construction and working principle of 1 phase transformer (20)

Presentation of transformer ppt
Presentation of transformer pptPresentation of transformer ppt
Presentation of transformer ppt
 
Presentationontransformer 210320080239
Presentationontransformer 210320080239Presentationontransformer 210320080239
Presentationontransformer 210320080239
 
Transformers
TransformersTransformers
Transformers
 
transformers
transformerstransformers
transformers
 
Training report trw
Training report trwTraining report trw
Training report trw
 
Presentation about transformer and its types
Presentation about transformer and its types Presentation about transformer and its types
Presentation about transformer and its types
 
Transformer
TransformerTransformer
Transformer
 
TRANSFORMER.pptx
TRANSFORMER.pptxTRANSFORMER.pptx
TRANSFORMER.pptx
 
Transformer Protection
Transformer Protection Transformer Protection
Transformer Protection
 
transformer ppt
transformer ppttransformer ppt
transformer ppt
 
Transformer
TransformerTransformer
Transformer
 
TRANSFORMER
TRANSFORMERTRANSFORMER
TRANSFORMER
 
Summer Training presentation on 132/33 KV sub-station Minto park, Allahabad
Summer Training presentation on 132/33 KV sub-station Minto park, AllahabadSummer Training presentation on 132/33 KV sub-station Minto park, Allahabad
Summer Training presentation on 132/33 KV sub-station Minto park, Allahabad
 
TRANSFORhsjjsjsjsjjansnsnsnsnnsnsjsjsjsjsjsjsMERS.pptx
TRANSFORhsjjsjsjsjjansnsnsnsnnsnsjsjsjsjsjsjsMERS.pptxTRANSFORhsjjsjsjsjjansnsnsnsnnsnsjsjsjsjsjsjsMERS.pptx
TRANSFORhsjjsjsjsjjansnsnsnsnnsnsjsjsjsjsjsjsMERS.pptx
 
Transformer - Detailed Presentation 50 slids
Transformer - Detailed Presentation 50 slidsTransformer - Detailed Presentation 50 slids
Transformer - Detailed Presentation 50 slids
 
Transformer Overview.pptx
Transformer Overview.pptxTransformer Overview.pptx
Transformer Overview.pptx
 
power transforer.pptx
power transforer.pptxpower transforer.pptx
power transforer.pptx
 
Transformers (ee)
Transformers (ee)Transformers (ee)
Transformers (ee)
 
HT 6.6 KV VCB OPERATION AND MAINTENANCE PPT
HT 6.6 KV VCB OPERATION AND MAINTENANCE PPTHT 6.6 KV VCB OPERATION AND MAINTENANCE PPT
HT 6.6 KV VCB OPERATION AND MAINTENANCE PPT
 
parts of transformer
parts of transformerparts of transformer
parts of transformer
 

Recently uploaded

Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
panagenda
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Victor Rentea
 

Recently uploaded (20)

[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
WSO2 Micro Integrator for Enterprise Integration in a Decentralized, Microser...
WSO2 Micro Integrator for Enterprise Integration in a Decentralized, Microser...WSO2 Micro Integrator for Enterprise Integration in a Decentralized, Microser...
WSO2 Micro Integrator for Enterprise Integration in a Decentralized, Microser...
 
Platformless Horizons for Digital Adaptability
Platformless Horizons for Digital AdaptabilityPlatformless Horizons for Digital Adaptability
Platformless Horizons for Digital Adaptability
 
JohnPollard-hybrid-app-RailsConf2024.pptx
JohnPollard-hybrid-app-RailsConf2024.pptxJohnPollard-hybrid-app-RailsConf2024.pptx
JohnPollard-hybrid-app-RailsConf2024.pptx
 
Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
 
API Governance and Monetization - The evolution of API governance
API Governance and Monetization -  The evolution of API governanceAPI Governance and Monetization -  The evolution of API governance
API Governance and Monetization - The evolution of API governance
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
 
Navigating Identity and Access Management in the Modern Enterprise
Navigating Identity and Access Management in the Modern EnterpriseNavigating Identity and Access Management in the Modern Enterprise
Navigating Identity and Access Management in the Modern Enterprise
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
 
Choreo: Empowering the Future of Enterprise Software Engineering
Choreo: Empowering the Future of Enterprise Software EngineeringChoreo: Empowering the Future of Enterprise Software Engineering
Choreo: Empowering the Future of Enterprise Software Engineering
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
Simplifying Mobile A11y Presentation.pptx
Simplifying Mobile A11y Presentation.pptxSimplifying Mobile A11y Presentation.pptx
Simplifying Mobile A11y Presentation.pptx
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 

Construction and working principle of 1 phase transformer

  • 2. CONSTRUCTION OF TRANSFORMER :  The Transformer mainly consist of Core and Windings (Coils).  With Increase in the Capacity, it also need other parts such as – 1.Transformer Tank 2.Terminal Bushings 3. Conservator 4. Breather 5. Explosion Vent 6. Buchholz relay
  • 4.  Mangnetic Core may be either Square or Rectangular in size  Vertical portion on which coils (windings) are wound is called ‘Limb” while the top & bottom horizontal portion is called ‘Roke’.  The core is made up of Laminations to minimize losses.  Generally L- shaped or I- shaped laminations are used as shown in figure
  • 5. AUXILLARY DEVICES OF SINGLE PHASE TRANSFORMER
  • 6. 2. TYPES OF WINDINGS :-  As we disscussed earlier, the windings are seperately wound on each Limbs.  In this method the losses are higher hence to avoid this the two coils are wound on both the limits adjecently, the structure is called “Cylindrical concentric”.
  • 7. SANDWICH COILS  The other type of coil which is very commonly used is sandwich coils .  Each high voltage coil is lies between the two low voltage coils i.e two low voltage coils sandwiching the high voltage coil, it reduces leakage flux.
  • 8. 3. TRANSFORMER TANK :-  In Large size transformer, while transformer assembly is placed in Fabricated sheet metal tank & immersed in oil .  Oil is used for insulation as well as cooling .  The heat generated in the winding & the core is carried by the oil to the external surface of the tank.
  • 9. 4. TERMINAL BUSHINGS :-  The leads of the transformer brought out from the tank are insulated from it with the help of porcelain bushings .
  • 10. 5. CONSERVATOR :-  In transformer provision of some space above the oil level is always essential to take up the expansion and contraction of the oil with changes of temperature in service .  When transformer becomes warm, the oil expands and air at the top of the oil expelled . When it cools, oil contracts and outside air is drawn into the tansformer. This process is known as breathing of transformer .
  • 11. 6. BREATHER :-  the dispalcement of air above the oil level in the conservator during the breathing process of the transformer takes place through the aparatus known as Breather.  It conatains a drying agent such as silica gel or calcium chloride which extracts the moisture from the air.  The breather also cleans the air by removing the dust particles present in it. Thus only dry & clean air is allowed to come in contact with the oil in the tansformer.
  • 12. 7. BUCHHOLZ REALY :-  It is a protective device mounted in the pipeline connecting the main tank to the conservator.  Due to excessive heat developed during the fault condition, the oil in the tank gets decompased & different types of gases are liberated.  These gases operate the Buchholz realy which in the initial condition gives alarm to the operator.  If fault is severe then this relay trips off the main circuit breaker .
  • 13. EXPLOSION VENT :-  It is the bent up pipe fitted on the upper surface of the tank is known as explsion vent or relief valve. It provided with a diaphragm made out of glass sheet, aluminium foil or a bakelite sheet.  In the event of the fault conditon, it the exessive pressure is developed inside the tank due to liberated gases, the diaphrag in the explosion vent bursts and releases the pressure, thus avoiding damage to the transformer.
  • 14. WORKING PRINCIPLE OF 1 PHASE TANSFORMER  Transformer is static device which transforms electrical power from one circuit to another circuit with desire change in volatage and current and without change in the frequency also there is no any electrical connection between two circuits.  Transformer works on the principle fo Mutual Induction i.e when two coils is changed uniformely the an emf gets induced in the other coil, this e.m.f can drive a current, if closed path is provided .
  • 15.  Any one of the two coils is connected to a source of alternating voltage & the other coil (winding) is connected to load. i. The winding which is connected to source(supply) is called primary winding (p) ii. The winding which is connected to load is called secondary winding(s).
  • 17. When A.C (alternating) voltage or supply is given to the primary winding, it circulates a current which produces an alternating flux(Ø) which completes its path through common magnetic iron. This flux links with the secondary windings(s) as flux is alternating, according to Faradays law of electromagnetic induction, mutually induced emf gets developed in the secondary winding . Now if load is connected to secondary winding this e.m.f drives a current through it. Hence without any electrical cotact between the two windigs an electrical energy gets transferred from primary winding to the secondary winding.