More Related Content Similar to New UI for Cost Center Planning (20) New UI for Cost Center Planning1. New UI for Cost Center Planning
with SAP ECC 6.0 EhP6
August, 2012
2. © 2012 SAP AG. All rights reserved. 2
Legal disclaimer
This presentation is not subject to your license agreement or any other agreement
with SAP. SAP has no obligation to pursue any course of business outlined in this
presentation or to develop or release any functionality mentioned in this
presentation. This presentation and SAP's strategy and possible future
developments are subject to change and may be changed by SAP at any time for
any reason without notice. This document is provided without a warranty of any
kind, either express or implied, including but not limited to, the implied warranties of
merchantability, fitness for a particular purpose, or non-infringement. SAP assumes
no responsibility for errors or omissions in this document, except if such damages
were caused by SAP intentionally or grossly negligent.
3. New UI for Cost Center Planning
Motivation
Benefits
Cost Center Primary Cost Planning: The Role Model
Other Renovated Planning Applications
Implementation
Summary
4. © 2012 SAP AG. All rights reserved. 4
Typical Customer Situation Today
Type of Solution Advantages Disadvantages
Excel native Total flexibility Coordination difficult
No integration
High effort
Planning tool Modeling capabilities Low integration
High TCO
Planning in ERP Integration in ERP Not flexible
No Excel, No Web UI
5. © 2012 SAP AG. All rights reserved. 5
Customer Requirements
Results of Customer Engagement Initiative
Flexible configuration of user interface
Directly integrated in ERP
– Data integration (no replication, no redundant data)
– Authority checks, Locking, Master data checks, …
Planning table should be similar to reporting layout, but with input enabled columns
– Many rows, many columns needed (several years, several versions, several projects, …)
– Formulas needed (e.g. actual/plan comparison)
Excel as optional frontend
6. © 2012 SAP AG. All rights reserved. 6
New UI for Cost Center Planning
Our New Solution Brings Together All Advantages
Flexible UI
Modeling capabilities
ERP integration
7. New UI for Cost Center Planning
Motivation
Benefits
Cost Center Primary Cost Planning: The Role Model
Other Renovated Planning Applications
Implementation
Summary
8. © 2012 SAP AG. All rights reserved. 8
Get rid of separate planning systems
Get rid of Excel sheets flying around
You have all in one single system
Integration to Master Data and Customizing
Integration into ERP Processes
ERP System
Benefit 1: Reduced TCO
Database
BW Planning EngineTransactional Logic
Web Dynpro Analysis Office (Excel)SAPGUI
9. © 2012 SAP AG. All rights reserved. 9
Benefit 2: High End User Acceptance
Web Dynpro based UI
10. © 2012 SAP AG. All rights reserved. 10
Benefit 2: High End User Acceptance
Excel based Analysis Office Client
11. © 2012 SAP AG. All rights reserved. 11
Benefit 3: Adaptable to Business Needs
Leverages the Modeling Capabilities of the BW Planning Technology
Query Designer
Planning Modeler
Leverages the UI Modeling Capabilities of the UI Clients
Floorplan Manager for Web Dynpro
Analysis Office for Excel
12. New UI for Cost Center Planning
Motivation
Benefits
Cost Center Primary Cost Planning: The Role Model
Other Renovated Planning Applications
Implementation
Summary
13. Cost Center Primary Cost Planning
Web and Excel Frontend
Manual Data Entry
Year and Period Planning
Data Integration / Locking
Customizing Integration
List and Hierarchy Display
Hierarchy: Disaggregation
Planning Functions
Excel Formulas
Architecture and Adaptability
Query Adaptations
14. © 2012 SAP AG. All rights reserved. 14
Web and Excel Frontend
Both frontends use the same backend planning model
Same planning queries and same planning functions
All features described in the following are available in both frontends
Web Dynpro Analysis Office
15. © 2012 SAP AG. All rights reserved. 15
Manual Data Entry
Change
Amounts
Copy and
adapt lines
Enter new lines
16. © 2012 SAP AG. All rights reserved. 16
Year and Period Planning
Aggregate periods
to year
Change year
value
Analog distribution
to periods
Change period
values
Aggregate periods
to year
17. © 2012 SAP AG. All rights reserved. 17
Data Integration / Locking
New planning
applications use
same tables
same locking
concept
as ERP planning
transactions
18. © 2012 SAP AG. All rights reserved. 18
Customizing Integration
Cells not
editable
ERP Customizing is interpreted, e.g.
Cost center locked for planning
Validity date of cost center
Version locked for a certain year
Etc.
19. © 2012 SAP AG. All rights reserved. 19
List and Hierarchy Display
Planning in List
Sorting
Filtering
Add new line
Planning in Hierarchy
Grouping
Aggregation and
Disaggregation
20. © 2012 SAP AG. All rights reserved. 20
Aggregation and Disaggregation in Hierarchy
Bottom-Up
Aggregate to top levels
Top-Down:
Disaggregate down to
lower levels
Mixed
Aggregate top and
distribute down
Starting Point
21. © 2012 SAP AG. All rights reserved. 21
Planning Function: Copy
Planning
functions
on buttons
on tab change
on save
…
Customer
specific
planning
functions via
transaction
RSPLAN
22. © 2012 SAP AG. All rights reserved. 22
Planning Function: Copy
Planning
functions
on buttons
on tab change
on save
…
Customer
specific
planning
functions via
transaction
RSPLAN
23. © 2012 SAP AG. All rights reserved. 23
Planning Function: Copy
Planning
functions
on buttons
on tab change
on save
…
Customer
specific
planning
functions via
transaction
RSPLAN
24. © 2012 SAP AG. All rights reserved. 24
Planning Function: Revaluate
25. © 2012 SAP AG. All rights reserved. 25
Planning Function: Revaluate
26. © 2012 SAP AG. All rights reserved. 26
Planning Function: Revaluate
27. © 2012 SAP AG. All rights reserved. 27
Analysis Office: Excel Formulas
Formulas
Calculate input values
use additional columns
for side calculations
Macros
for advanced features
28. © 2012 SAP AG. All rights reserved. 28
ERP System
Database Layer
Table
Presentation Layer
Application Layer
Transactional
Logic
Architecture and Adaptability
InfoCube
Analysis OfficeSAP GUI Web Dynpro
Create own Analysis
Office workbooks
Adapt Web Dynpro
Application
Create own
InfoProvider
BW Planning Engine
MultiProvider
VirtualProvider
Query
Planning
Functions
Change Queries
Create own planning
functions
29. © 2012 SAP AG. All rights reserved. 29
Query Adaptations
Customers want to see
Actual values
Plan values from other years/versions
Formula columns
„Planning is like Reporting having
editable columns“
30. © 2012 SAP AG. All rights reserved. 30
Edit Query: Starting Point
31. © 2012 SAP AG. All rights reserved. 31
Edit Query: Add Other Plan Column
32. © 2012 SAP AG. All rights reserved. 32
Edit Query: Maintain Other Plan Column
33. © 2012 SAP AG. All rights reserved. 33
Edit Query: Add Formula Column
34. © 2012 SAP AG. All rights reserved. 34
Edit Query: Maintain Formula
35. © 2012 SAP AG. All rights reserved. 35
Result: Web Dynpro
Actual last
years
Formula
column
Plan last year
36. © 2012 SAP AG. All rights reserved. 36
Result: Analysis Office
Actual last
years
Formula
column
Plan last year
37. New UI for Cost Center Planning
Motivation
Benefits
Cost Center Primary Cost Planning: The Role Model
Other Renovated Planning Applications
Implementation
Summary
38. © 2012 SAP AG. All rights reserved. 38
Other Renovated Planning Applications
All renovated Financial Planning Applications are built according to the same
pattern
All features described with cost center primary cost planning are available in
all renovated financial planning applications (if applicable)
Web and Excel Frontend
Direct write-back to ERP tables
Highly adaptable via BW Query
List and hierarchy display
Planning functions
39. © 2012 SAP AG. All rights reserved. 39
Cost Center Activity Input Planning
Apply Price Enter Activity
Quantity
40. © 2012 SAP AG. All rights reserved. 40
Cost Center Activity Output Planning
Enter PricesEnter Activity
Calculate
Output
41. © 2012 SAP AG. All rights reserved. 41
Project Overall Planning
Project
hierarchy
Embedded
Charts
Plan all years
together
42. © 2012 SAP AG. All rights reserved. 42
Project Cost Element Planning
Project and
Cost Element
hierarchy
Embedded
Drill-down
Report
43. © 2012 SAP AG. All rights reserved. 43
Project Activity Input Planning
Apply Price
Enter Activity
Quantity
44. New UI for Cost Center Planning
Motivation
Benefits
Cost Center Primary Cost Planning: The Role Model
Other Renovated Planning Applications
Implementation
Summary
45. © 2012 SAP AG. All rights reserved. 45
Cost Center Planning
Cost Element Planning (Basic)
Top Down Cost Element Group Planning
Activity Input Planning
Activity Output and Price Planning
SAP Delivered Planning Applications
Project Overall Planning
Overall Planning (Basic)
Overall Planning (Additional Features)
Project Cost Element Planning
Cost Element Planning (Basic)
Cost Element Planning (Additional Features)
Cost Element Planning (Multiple Currencies)
Top Down Cost Element Group Planning
Activity Input Planning (Basic)
Secondary Order Cost Planning (Basic)
46. © 2012 SAP AG. All rights reserved. 46
Implementation / Prerequisites / Systems
Business Functions
ECC 6.0 EhP6 SP0: FIN_CO_CCMGMT
– Project Planning
ECC 6.0 EhP6 SP4: FIN_CO_CCPLAN
– Cost Center Planning
Systems
Included in software layer SAP_APPL
Runs out of the box in the ECC system
No BW system needed
Embedded BW Setup
Automated BW configuration for the
embedded deployment scenario
Easy content activation via content
bundles
No BW persistency in place, no ETL
Licenses
New planning applications with
WebDynpro are part of standard ECC
licenses
Available optional Excel frontends
– Analysis Office (license needed)
– BEx Analyzer (no license needed)
47. © 2012 SAP AG. All rights reserved. 47
NetWeaver Business Client for Desktop
NetWeaver Business Client for HTML
Starting The New Planning Frontends
Easy Access
Favorites
User Menu
Excel
Analysis Office
BEx Analyzer
48. New UI for Cost Center Planning
Motivation
Benefits
Cost Center Primary Cost Planning: The Role Model
Other Renovated Planning Applications
Implementation
Summary
49. © 2012 SAP AG. All rights reserved. 49
Summary
New Financial Planning
Fully integrated into ERP
Out-of-the-box No separate system
needed
Web and Excel UI
Highly adaptable
50. © 2012 SAP AG. All rights reserved. 50
No part of this publication may be reproduced or transmitted in any form or for any purpose
without the express permission of SAP AG. The information contained herein may be
changed without prior notice.
Some software products marketed by SAP AG and its distributors contain proprietary
software components of other software vendors.
Microsoft, Windows, Excel, Outlook, and PowerPoint are registered trademarks of Microsoft
Corporation.
IBM, DB2, DB2 Universal Database, System i, System i5, System p, System p5, System x,
System z, System z10, System z9, z10, z9, iSeries, pSeries, xSeries, zSeries, eServer,
z/VM, z/OS, i5/OS, S/390, OS/390, OS/400, AS/400, S/390 Parallel Enterprise Server,
PowerVM, Power Architecture, POWER6+, POWER6, POWER5+, POWER5, POWER,
OpenPower, PowerPC, BatchPipes, BladeCenter, System Storage, GPFS, HACMP,
RETAIN, DB2 Connect, RACF, Redbooks, OS/2, Parallel Sysplex, MVS/ESA, AIX,
Intelligent Miner, WebSphere, Netfinity, Tivoli and Informix are trademarks or registered
trademarks of IBM Corporation.
Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.
Adobe, the Adobe logo, Acrobat, PostScript, and Reader are either trademarks or
registered trademarks of Adobe Systems Incorporated in the United States and/or other
countries.
Oracle is a registered trademark of Oracle Corporation.
UNIX, X/Open, OSF/1, and Motif are registered trademarks of the Open Group.
Citrix, ICA, Program Neighborhood, MetaFrame, WinFrame, VideoFrame, and MultiWin are
trademarks or registered trademarks of Citrix Systems, Inc.
HTML, XML, XHTML and W3C are trademarks or registered trademarks of W3C®, World
Wide Web Consortium, Massachusetts Institute of Technology.
Java is a registered trademark of Sun Microsystems, Inc.
JavaScript is a registered trademark of Sun Microsystems, Inc., used under license for
technology invented and implemented by Netscape.
SAP, R/3, SAP NetWeaver, Duet, PartnerEdge, ByDesign, SAP BusinessObjects Explorer,
StreamWork, and other SAP products and services mentioned herein as well as their
respective logos are trademarks or registered trademarks of SAP AG in Germany and other
countries.
© 2012 SAP AG. All rights reserved
Business Objects and the Business Objects logo, BusinessObjects, Crystal Reports, Crystal
Decisions, Web Intelligence, Xcelsius, and other Business Objects products and services
mentioned herein as well as their respective logos are trademarks or registered trademarks
of Business Objects Software Ltd. Business Objects is an SAP company.
Sybase and Adaptive Server, iAnywhere, Sybase 365, SQL Anywhere, and other Sybase
products and services mentioned herein as well as their respective logos are trademarks or
registered trademarks of Sybase, Inc. Sybase is an SAP company.
All other product and service names mentioned are the trademarks of their respective
companies. Data contained in this document serves informational purposes only. National
product specifications may vary.
The information in this document is proprietary to SAP. No part of this document may be
reproduced, copied, or transmitted in any form or for any purpose without the express prior
written permission of SAP AG.
This document is a preliminary version and not subject to your license agreement or any
other agreement with SAP. This document contains only intended strategies, developments,
and functionalities of the SAP® product and is not intended to be binding upon SAP to any
particular course of business, product strategy, and/or development. Please note that this
document is subject to change and may be changed by SAP at any time without notice.
SAP assumes no responsibility for errors or omissions in this document. SAP does not
warrant the accuracy or completeness of the information, text, graphics, links, or other items
contained within this material. This document is provided without a warranty of any kind,
either express or implied, including but not limited to the implied warranties of
merchantability, fitness for a particular purpose, or non-infringement.
SAP shall have no liability for damages of any kind including without limitation direct,
special, indirect, or consequential damages that may result from the use of these materials.
This limitation shall not apply in cases of intent or gross negligence.
The statutory liability for personal injury and defective products is not affected. SAP has no
control over the information that you may access through the use of hot links contained in
these materials and does not endorse your use of third-party Web pages nor provide any
warranty whatsoever relating to third-party Web pages.