1. PROJECT COST IS NEAR ABOUT 200
CRORE
2. NINE TOWER
(RESIDENTIALBUILDING,HOSPITAL)
3. EACH TOWER HAVE G+18 FLOOR
CPWD &NATIONAL BUILDING CODE
 ISI 456-2000
 Area is bounded by GI sheet
 A temporary layout by the help of lime
within area
Help of JCB machine at the required
depth(1300mm from ground surface)
Levelling of excavated soil surface
• 100mm thickness
• Grade M10(1:4:8)
• Use of machine mixing
• Placing as well as leveling
• Concrete (M40, grade)
• Steel (Fe 500 grade)
• Water
( used for curing , mixing , soil
compaction, grouting)
Column layout on pcc by the help of total
station According to drawing
This foundation are used in following
cases-
1. When the bearing strength of soil is very
low
2. Characteristics of soil changeable
3. Soil strata should be loose like as
marchland
4. Avoiding the differential settlement of
building
It is more economical and simple as
• THE MAIN BAR & DISTRIBUTION BAR HAVE
30MM DIA AT BOTTOM NET.
• AS THE PROCESS FOR TOP NET & FOR
SEPRATION THESE NET CHAIRS ARE USED
• CHAIR IS THE STEEL BAR THAT USED TO
SEPRATED THE TOP AND BOTTOM NET.
• FIXED THE COLUMN REINFORCEMENT AT THE
POSITION OF COLUMNS AND BOUNDED BY THE
24GAUGE WIRE.
• COLUMN HAVE 16 NOS. @ 30MM DIA.
• LAP LENGTH OF COLUMN 50D OF BAR.
• (IN CASE OF USED DIFFERENT DIA OF BAR LAP
LENGTH IS PROVIDED ACCORDING TO GREATER
DIA OF BAR.)
• VERTICAL TIESE PROVIDED 10MMØ @150MM
C/C.
• AFTER MIXING THE CONCRETE FROM
CONCRETE PLANT , IT SOULD PLACED ON SITE
WITH HELP OF PIPE LINE.
• FOR COMPACTING USED NEEDLE VIBRATOR
1MIN. AT A PLACE .
• GENERALLY VIBRATOR HAVE 4000CYCLE/MIN.
• DIA OF VIBRATOR NEEDLE HAVE 60MM.
• Layout of column
• Reinforcement (according to drawing)
• Shuttering
• Checking of shuttering in inclination with help of
plumb-bob
• Testing of material at site(cube test, slump test)
• Concreting
• Needle vibrator used max 1 min. in a place
Slump test used to check the workability of
concrete .
Slump test have some appratus-
1. mould-
Bottom dia 20cm & upper dia 10cm
Height 30cm
2. tamping rod
16mm dia & length 60cm
In slump test material have filled in 4 layer.
th
• CUBE USED TO CHECK THE COMPRESSIVE
STRENGTH OF CONCRETE
• SIZE OF CUBE 15CM ×15CM ×15CM
• AFTER 28 DAYS CURING OF CUBE, FIXED IN
THE COMPRESSION MACHINE AND CHECK THE
COMPRESSIVE STRENGTH.
• SUTERING OF SLAB AND BEAM DONE AT
SAME LEVAL.
• GENERALLY SUTTERING HAVE USED OF –
PLYWOOD , STEEL PLATE, MATELIC PROP.
 PROVIDED 8MMØ @150MM C/C IN SLAB.
 PROVIDED 3NOS.20MMØ IN TENSION ZONE &
2NOS. IN COMPRESSION ZONE IN BEAM.
 PROVIDED EXTRA REINFORCEMENT AT EACH END
OF SPAN TO RESIST THE SHEAR FORCE.(3NOS.
16MMØ @ LENGTH L/7)
 PROVIDED VERTICAL STRRIPS AT 150MM C/C IN
BEAM.
 AFTER REINFORCEMENT USED THE CONCRETING
PROCESS.
• Lap length 47 time of main bar dia.
• Column cover 40mm
• 1/3 bars to be overlapped at one location
• Tie bars dia.- 12mm
• Spacing at beam column connection joint-
100m c/c
• Column will not be cast much than 2m height.
Multi story building construction training report anshul
Multi story building construction training report anshul

More Related Content

What's hot

Internship review (Civil Engineering)
Internship review (Civil Engineering)Internship review (Civil Engineering)
Internship review (Civil Engineering)
Syeda Nusrath Fathima
 
Design And Construction Of Cantilevered Retaining Walls
Design And Construction Of Cantilevered Retaining WallsDesign And Construction Of Cantilevered Retaining Walls
Design And Construction Of Cantilevered Retaining Walls
Kumar Aman
 
Ground granulated blast furnace slag
Ground granulated blast furnace slagGround granulated blast furnace slag
Ground granulated blast furnace slag
Ghanashyam Prajapati
 
PRESENTATION ON SUMMER INTERNSHIP ON MULTISTOREY BUILDING CONSTRUCTION
PRESENTATION ON SUMMER INTERNSHIP ON MULTISTOREY BUILDING CONSTRUCTION PRESENTATION ON SUMMER INTERNSHIP ON MULTISTOREY BUILDING CONSTRUCTION
PRESENTATION ON SUMMER INTERNSHIP ON MULTISTOREY BUILDING CONSTRUCTION
Ved Jangid
 
Pile foundation
Pile foundationPile foundation
Pile foundation
Aamir Farhan Sheikh
 
INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING
INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING
INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING
Ram1239
 
Final ppt on staad pro
Final ppt on staad proFinal ppt on staad pro
Final ppt on staad pro
Sakina Faiz
 
Super-Structural Construction Work of a Six Storied Residential Building.
Super-Structural Construction Work of a Six Storied Residential Building.Super-Structural Construction Work of a Six Storied Residential Building.
Super-Structural Construction Work of a Six Storied Residential Building.
Shariful Haque Robin
 
Construction of residential building
Construction of residential buildingConstruction of residential building
Construction of residential building
Sumit Singh
 
Summer training report
Summer training reportSummer training report
Summer training report
Raj Vaibhav Singh
 
Concrete- types, testing & properties
Concrete- types, testing & propertiesConcrete- types, testing & properties
Concrete- types, testing & properties
lalitha moorthy
 
Sp34 str detailing
Sp34     str detailingSp34     str detailing
Sp34 str detailingMohd Danish
 
Chapter 1 PILE FOUNDATIONS
Chapter 1 PILE FOUNDATIONSChapter 1 PILE FOUNDATIONS
Chapter 1 PILE FOUNDATIONS
KHUSHBU SHAH
 
Production of concrete
Production of concreteProduction of concrete
Production of concrete
Darshil Vekaria
 
Limit state of serviceability
Limit state of serviceabilityLimit state of serviceability
Limit state of serviceability
Charul Sharma
 
Special Concreting Techniques
Special Concreting Techniques Special Concreting Techniques
Special Concreting Techniques
GAURAV. H .TANDON
 
Types of formwork
Types of formworkTypes of formwork
Types of formwork
Aglaia Connect
 
PPT on Commerical building
PPT on Commerical buildingPPT on Commerical building
PPT on Commerical building
LOKESH
 
Aggregates of Concrete
Aggregates of ConcreteAggregates of Concrete
Aggregates of Concrete
GAURAV. H .TANDON
 
PROJECT ON Construction of a multistory building POWER POINT PRESENTATION
PROJECT ON Construction of a multistory building POWER POINT PRESENTATIONPROJECT ON Construction of a multistory building POWER POINT PRESENTATION
PROJECT ON Construction of a multistory building POWER POINT PRESENTATION
ROHITASH ROJ
 

What's hot (20)

Internship review (Civil Engineering)
Internship review (Civil Engineering)Internship review (Civil Engineering)
Internship review (Civil Engineering)
 
Design And Construction Of Cantilevered Retaining Walls
Design And Construction Of Cantilevered Retaining WallsDesign And Construction Of Cantilevered Retaining Walls
Design And Construction Of Cantilevered Retaining Walls
 
Ground granulated blast furnace slag
Ground granulated blast furnace slagGround granulated blast furnace slag
Ground granulated blast furnace slag
 
PRESENTATION ON SUMMER INTERNSHIP ON MULTISTOREY BUILDING CONSTRUCTION
PRESENTATION ON SUMMER INTERNSHIP ON MULTISTOREY BUILDING CONSTRUCTION PRESENTATION ON SUMMER INTERNSHIP ON MULTISTOREY BUILDING CONSTRUCTION
PRESENTATION ON SUMMER INTERNSHIP ON MULTISTOREY BUILDING CONSTRUCTION
 
Pile foundation
Pile foundationPile foundation
Pile foundation
 
INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING
INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING
INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING
 
Final ppt on staad pro
Final ppt on staad proFinal ppt on staad pro
Final ppt on staad pro
 
Super-Structural Construction Work of a Six Storied Residential Building.
Super-Structural Construction Work of a Six Storied Residential Building.Super-Structural Construction Work of a Six Storied Residential Building.
Super-Structural Construction Work of a Six Storied Residential Building.
 
Construction of residential building
Construction of residential buildingConstruction of residential building
Construction of residential building
 
Summer training report
Summer training reportSummer training report
Summer training report
 
Concrete- types, testing & properties
Concrete- types, testing & propertiesConcrete- types, testing & properties
Concrete- types, testing & properties
 
Sp34 str detailing
Sp34     str detailingSp34     str detailing
Sp34 str detailing
 
Chapter 1 PILE FOUNDATIONS
Chapter 1 PILE FOUNDATIONSChapter 1 PILE FOUNDATIONS
Chapter 1 PILE FOUNDATIONS
 
Production of concrete
Production of concreteProduction of concrete
Production of concrete
 
Limit state of serviceability
Limit state of serviceabilityLimit state of serviceability
Limit state of serviceability
 
Special Concreting Techniques
Special Concreting Techniques Special Concreting Techniques
Special Concreting Techniques
 
Types of formwork
Types of formworkTypes of formwork
Types of formwork
 
PPT on Commerical building
PPT on Commerical buildingPPT on Commerical building
PPT on Commerical building
 
Aggregates of Concrete
Aggregates of ConcreteAggregates of Concrete
Aggregates of Concrete
 
PROJECT ON Construction of a multistory building POWER POINT PRESENTATION
PROJECT ON Construction of a multistory building POWER POINT PRESENTATIONPROJECT ON Construction of a multistory building POWER POINT PRESENTATION
PROJECT ON Construction of a multistory building POWER POINT PRESENTATION
 

Similar to Multi story building construction training report anshul

Multi story building construction anshul
Multi story building construction anshulMulti story building construction anshul
Multi story building construction anshul
Anshul Shakya
 
Steps Involves in Building Construction
Steps Involves in Building ConstructionSteps Involves in Building Construction
Steps Involves in Building Construction
Adnan. Ali
 
Precast Six lane flyover project
Precast Six lane flyover projectPrecast Six lane flyover project
Precast Six lane flyover project
KriShna Sharma
 
ppt on sub structure construction.pptx
ppt on sub structure construction.pptxppt on sub structure construction.pptx
ppt on sub structure construction.pptx
RaviUraiya1
 
Construction of well foundation
Construction of well foundation Construction of well foundation
Construction of well foundation
dilip patidar
 
Soil penetration tests
Soil penetration testsSoil penetration tests
Soil penetration tests
Avinash Kumar Gupta
 
Cement Manufacturing Plant Construction
Cement Manufacturing Plant ConstructionCement Manufacturing Plant Construction
Cement Manufacturing Plant Construction
Shyam Anandjiwala
 
Requirements of pdo sp 1279 & 1282
Requirements of pdo sp 1279 & 1282Requirements of pdo sp 1279 & 1282
Requirements of pdo sp 1279 & 1282
Babu Arumugam
 
Amit pandit presentaion gautambuddha university
Amit pandit presentaion gautambuddha universityAmit pandit presentaion gautambuddha university
Amit pandit presentaion gautambuddha university
Aman Jain
 
Micropile
MicropileMicropile
Micropile
Sameer Thaiyam
 
Well Foundation
Well FoundationWell Foundation
Well Foundation
Dave Chinmyee
 
PRESENTATION ON CASTING YARD OF LUCKNOW METRO
PRESENTATION ON CASTING YARD OF LUCKNOW METRO PRESENTATION ON CASTING YARD OF LUCKNOW METRO
PRESENTATION ON CASTING YARD OF LUCKNOW METRO
Akanksha Priya
 
BEST PPT ON TRAINNING ON CONTRUCTION AT INDIAN RAILWAY (DFCC)
BEST PPT ON TRAINNING ON CONTRUCTION AT INDIAN RAILWAY (DFCC)BEST PPT ON TRAINNING ON CONTRUCTION AT INDIAN RAILWAY (DFCC)
BEST PPT ON TRAINNING ON CONTRUCTION AT INDIAN RAILWAY (DFCC)Utsav Tripathy
 
Extending Open Cast Mine to Underground Mine Planning
Extending Open Cast Mine to Underground Mine PlanningExtending Open Cast Mine to Underground Mine Planning
Extending Open Cast Mine to Underground Mine Planning
Jasmeet Singh Saluja
 
Soil nailing
Soil nailingSoil nailing
Soil nailing
BhanuPratapSingh170
 
analysis of soil and suggested ground improvement techniques
analysis of soil and suggested ground improvement techniquesanalysis of soil and suggested ground improvement techniques
analysis of soil and suggested ground improvement techniques
Kuldeepkulshrestha2
 
Soil Properties & Testing
Soil Properties & TestingSoil Properties & Testing
Soil Properties & Testing
Mr Amol Ghogare
 
Tunnel Construction (VJTI MUMBAI)
Tunnel Construction (VJTI MUMBAI)Tunnel Construction (VJTI MUMBAI)
Tunnel Construction (VJTI MUMBAI)
Mayur Rahangdale
 
self-compacting concrete
self-compacting concrete self-compacting concrete
self-compacting concrete
Sreekutty S
 
Drilling equipments_Advanced Construction Technology (Semester-6), Civil Engi...
Drilling equipments_Advanced Construction Technology (Semester-6), Civil Engi...Drilling equipments_Advanced Construction Technology (Semester-6), Civil Engi...
Drilling equipments_Advanced Construction Technology (Semester-6), Civil Engi...
A Makwana
 

Similar to Multi story building construction training report anshul (20)

Multi story building construction anshul
Multi story building construction anshulMulti story building construction anshul
Multi story building construction anshul
 
Steps Involves in Building Construction
Steps Involves in Building ConstructionSteps Involves in Building Construction
Steps Involves in Building Construction
 
Precast Six lane flyover project
Precast Six lane flyover projectPrecast Six lane flyover project
Precast Six lane flyover project
 
ppt on sub structure construction.pptx
ppt on sub structure construction.pptxppt on sub structure construction.pptx
ppt on sub structure construction.pptx
 
Construction of well foundation
Construction of well foundation Construction of well foundation
Construction of well foundation
 
Soil penetration tests
Soil penetration testsSoil penetration tests
Soil penetration tests
 
Cement Manufacturing Plant Construction
Cement Manufacturing Plant ConstructionCement Manufacturing Plant Construction
Cement Manufacturing Plant Construction
 
Requirements of pdo sp 1279 & 1282
Requirements of pdo sp 1279 & 1282Requirements of pdo sp 1279 & 1282
Requirements of pdo sp 1279 & 1282
 
Amit pandit presentaion gautambuddha university
Amit pandit presentaion gautambuddha universityAmit pandit presentaion gautambuddha university
Amit pandit presentaion gautambuddha university
 
Micropile
MicropileMicropile
Micropile
 
Well Foundation
Well FoundationWell Foundation
Well Foundation
 
PRESENTATION ON CASTING YARD OF LUCKNOW METRO
PRESENTATION ON CASTING YARD OF LUCKNOW METRO PRESENTATION ON CASTING YARD OF LUCKNOW METRO
PRESENTATION ON CASTING YARD OF LUCKNOW METRO
 
BEST PPT ON TRAINNING ON CONTRUCTION AT INDIAN RAILWAY (DFCC)
BEST PPT ON TRAINNING ON CONTRUCTION AT INDIAN RAILWAY (DFCC)BEST PPT ON TRAINNING ON CONTRUCTION AT INDIAN RAILWAY (DFCC)
BEST PPT ON TRAINNING ON CONTRUCTION AT INDIAN RAILWAY (DFCC)
 
Extending Open Cast Mine to Underground Mine Planning
Extending Open Cast Mine to Underground Mine PlanningExtending Open Cast Mine to Underground Mine Planning
Extending Open Cast Mine to Underground Mine Planning
 
Soil nailing
Soil nailingSoil nailing
Soil nailing
 
analysis of soil and suggested ground improvement techniques
analysis of soil and suggested ground improvement techniquesanalysis of soil and suggested ground improvement techniques
analysis of soil and suggested ground improvement techniques
 
Soil Properties & Testing
Soil Properties & TestingSoil Properties & Testing
Soil Properties & Testing
 
Tunnel Construction (VJTI MUMBAI)
Tunnel Construction (VJTI MUMBAI)Tunnel Construction (VJTI MUMBAI)
Tunnel Construction (VJTI MUMBAI)
 
self-compacting concrete
self-compacting concrete self-compacting concrete
self-compacting concrete
 
Drilling equipments_Advanced Construction Technology (Semester-6), Civil Engi...
Drilling equipments_Advanced Construction Technology (Semester-6), Civil Engi...Drilling equipments_Advanced Construction Technology (Semester-6), Civil Engi...
Drilling equipments_Advanced Construction Technology (Semester-6), Civil Engi...
 

More from Anshul Shakya

Safety aspects on construction site in noida area Anshul
Safety aspects on construction site in noida area AnshulSafety aspects on construction site in noida area Anshul
Safety aspects on construction site in noida area Anshul
Anshul Shakya
 
PILE FOUNDATION PROJECT TRAINING ANSHUL
PILE FOUNDATION PROJECT TRAINING ANSHULPILE FOUNDATION PROJECT TRAINING ANSHUL
PILE FOUNDATION PROJECT TRAINING ANSHUL
Anshul Shakya
 
NDT (NON DESTRUCTIVE TESTING) OF CONCRETE STRUCTURE ANSHUL
NDT (NON DESTRUCTIVE TESTING) OF CONCRETE STRUCTURE ANSHULNDT (NON DESTRUCTIVE TESTING) OF CONCRETE STRUCTURE ANSHUL
NDT (NON DESTRUCTIVE TESTING) OF CONCRETE STRUCTURE ANSHUL
Anshul Shakya
 
ndt test (non destructive testing) for civil engg. material ANSHUL
 ndt test (non destructive testing) for  civil engg. material ANSHUL ndt test (non destructive testing) for  civil engg. material ANSHUL
ndt test (non destructive testing) for civil engg. material ANSHUL
Anshul Shakya
 
CEMENT MANUFATURING WASTE
CEMENT MANUFATURING WASTECEMENT MANUFATURING WASTE
CEMENT MANUFATURING WASTE
Anshul Shakya
 
Anshul pwd training report
Anshul pwd training reportAnshul pwd training report
Anshul pwd training reportAnshul Shakya
 
cement road construction in the rural areas
cement road construction in the rural areas cement road construction in the rural areas
cement road construction in the rural areas
Anshul Shakya
 

More from Anshul Shakya (7)

Safety aspects on construction site in noida area Anshul
Safety aspects on construction site in noida area AnshulSafety aspects on construction site in noida area Anshul
Safety aspects on construction site in noida area Anshul
 
PILE FOUNDATION PROJECT TRAINING ANSHUL
PILE FOUNDATION PROJECT TRAINING ANSHULPILE FOUNDATION PROJECT TRAINING ANSHUL
PILE FOUNDATION PROJECT TRAINING ANSHUL
 
NDT (NON DESTRUCTIVE TESTING) OF CONCRETE STRUCTURE ANSHUL
NDT (NON DESTRUCTIVE TESTING) OF CONCRETE STRUCTURE ANSHULNDT (NON DESTRUCTIVE TESTING) OF CONCRETE STRUCTURE ANSHUL
NDT (NON DESTRUCTIVE TESTING) OF CONCRETE STRUCTURE ANSHUL
 
ndt test (non destructive testing) for civil engg. material ANSHUL
 ndt test (non destructive testing) for  civil engg. material ANSHUL ndt test (non destructive testing) for  civil engg. material ANSHUL
ndt test (non destructive testing) for civil engg. material ANSHUL
 
CEMENT MANUFATURING WASTE
CEMENT MANUFATURING WASTECEMENT MANUFATURING WASTE
CEMENT MANUFATURING WASTE
 
Anshul pwd training report
Anshul pwd training reportAnshul pwd training report
Anshul pwd training report
 
cement road construction in the rural areas
cement road construction in the rural areas cement road construction in the rural areas
cement road construction in the rural areas
 

Recently uploaded

Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
PrashantGoswami42
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
ssuser9bd3ba
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
DuvanRamosGarzon1
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
Kamal Acharya
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
ShahidSultan24
 

Recently uploaded (20)

Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
 

Multi story building construction training report anshul

  • 1. DEVKARAN (1106400904) YOGESH KUMAR (1106400914) HINDUSTAN COLLEGE OF SCIENCE OF TECHNOLOGY ,FARAH ,MATHURA INDIA
  • 2.
  • 3.
  • 4. 1. PROJECT COST IS NEAR ABOUT 200 CRORE 2. NINE TOWER (RESIDENTIALBUILDING,HOSPITAL) 3. EACH TOWER HAVE G+18 FLOOR
  • 5. CPWD &NATIONAL BUILDING CODE  ISI 456-2000
  • 6.  Area is bounded by GI sheet  A temporary layout by the help of lime within area
  • 7. Help of JCB machine at the required depth(1300mm from ground surface) Levelling of excavated soil surface
  • 8. • 100mm thickness • Grade M10(1:4:8) • Use of machine mixing • Placing as well as leveling
  • 9. • Concrete (M40, grade) • Steel (Fe 500 grade) • Water ( used for curing , mixing , soil compaction, grouting)
  • 10. Column layout on pcc by the help of total station According to drawing
  • 11. This foundation are used in following cases- 1. When the bearing strength of soil is very low 2. Characteristics of soil changeable 3. Soil strata should be loose like as marchland 4. Avoiding the differential settlement of building It is more economical and simple as
  • 12. • THE MAIN BAR & DISTRIBUTION BAR HAVE 30MM DIA AT BOTTOM NET. • AS THE PROCESS FOR TOP NET & FOR SEPRATION THESE NET CHAIRS ARE USED • CHAIR IS THE STEEL BAR THAT USED TO SEPRATED THE TOP AND BOTTOM NET.
  • 13.
  • 14. • FIXED THE COLUMN REINFORCEMENT AT THE POSITION OF COLUMNS AND BOUNDED BY THE 24GAUGE WIRE. • COLUMN HAVE 16 NOS. @ 30MM DIA. • LAP LENGTH OF COLUMN 50D OF BAR. • (IN CASE OF USED DIFFERENT DIA OF BAR LAP LENGTH IS PROVIDED ACCORDING TO GREATER DIA OF BAR.) • VERTICAL TIESE PROVIDED 10MMØ @150MM C/C.
  • 15. • AFTER MIXING THE CONCRETE FROM CONCRETE PLANT , IT SOULD PLACED ON SITE WITH HELP OF PIPE LINE. • FOR COMPACTING USED NEEDLE VIBRATOR 1MIN. AT A PLACE . • GENERALLY VIBRATOR HAVE 4000CYCLE/MIN. • DIA OF VIBRATOR NEEDLE HAVE 60MM.
  • 16. • Layout of column • Reinforcement (according to drawing) • Shuttering • Checking of shuttering in inclination with help of plumb-bob • Testing of material at site(cube test, slump test) • Concreting • Needle vibrator used max 1 min. in a place
  • 17.
  • 18. Slump test used to check the workability of concrete . Slump test have some appratus- 1. mould- Bottom dia 20cm & upper dia 10cm Height 30cm 2. tamping rod 16mm dia & length 60cm In slump test material have filled in 4 layer. th
  • 19.
  • 20.
  • 21. • CUBE USED TO CHECK THE COMPRESSIVE STRENGTH OF CONCRETE • SIZE OF CUBE 15CM ×15CM ×15CM • AFTER 28 DAYS CURING OF CUBE, FIXED IN THE COMPRESSION MACHINE AND CHECK THE COMPRESSIVE STRENGTH.
  • 22.
  • 23. • SUTERING OF SLAB AND BEAM DONE AT SAME LEVAL. • GENERALLY SUTTERING HAVE USED OF – PLYWOOD , STEEL PLATE, MATELIC PROP.
  • 24.  PROVIDED 8MMØ @150MM C/C IN SLAB.  PROVIDED 3NOS.20MMØ IN TENSION ZONE & 2NOS. IN COMPRESSION ZONE IN BEAM.  PROVIDED EXTRA REINFORCEMENT AT EACH END OF SPAN TO RESIST THE SHEAR FORCE.(3NOS. 16MMØ @ LENGTH L/7)  PROVIDED VERTICAL STRRIPS AT 150MM C/C IN BEAM.  AFTER REINFORCEMENT USED THE CONCRETING PROCESS.
  • 25. • Lap length 47 time of main bar dia. • Column cover 40mm • 1/3 bars to be overlapped at one location • Tie bars dia.- 12mm • Spacing at beam column connection joint- 100m c/c • Column will not be cast much than 2m height.