Multi-Carrier Modulation
Dr. Ahmad Gomaa
Assistant Professor
Electronics and Communications department
Faculty of Engineering, Cairo University
http://scholar.cu.edu.eg/gomaa
Contact: aarg_2010@yahoo.com
Outline
• Single carrier (SC) modulation
• Shortcomings of SC systems
• Multi-Carrier modulation (MCM)
– Main idea
– Implementation using IFFT and FFT
– MCM in multi-path fading– MCM in multi-path fading
– OFDM parameters
– Bit-Interleaved Coded OFDM
– PAPR
– Subcarrier loading
– OFDM under RF impairments (CFO, PN, IQI, Doppler)
– Single-Carrier Frequency-Division Multiple-Access (SC-
FDMA)
Single Carrier (SC) Modulation
• Bits are modulated according to M-QAM or M-
PSK
• Modulated symbols are passed through a pulse
shaping filter (e.g., Square-Root Raised Cosineshaping filter (e.g., Square-Root Raised Cosine
(SRRC) filter)
• Output is up-converted to the carrier frequency
(fc)
Single Carrier Modulation
M-QAM
(or M-PSK)
bits
Pulse Shaping filter
π/2
Pulse Shaping filter
Pulse shaping filter specifies
 symbol rate & signal shape in frequency-domain
Single Carrier (SC) Modulation
• Transmitted signal passes through multi-path
channel
• Inter-Symbol Interference (ISI) occurs due to
the channelthe channel
• The receiver has to apply equalizers to extract
the modulated symbols
• Complex equalizers and not even optimal!
Multi-path channel
Transmitter Receiver
Reflecting object
(car, building, ….)
Reflecting object
(car, building, ….)
Channel impulse response
Multi-path channel
• Multi-path channel causes inter-symbol
interference (ISI)
• Need equalizers at the receiver to reverse the
channel effect
• Baseband model• Baseband model
][][][][
0
nzknxkhny
L
k
 
Channel
h
x[n]
z[n]
y[n]
Modulated
QAM symbols
Receiver noise
Received samples
Convolution between x[n] and h
Multi-path channel
• y[n] is not only function of x[n] but also
function of previous symbols {x[n-1], x[n-2], ….
x[n-L]}
• These previous symbols act as interference on• These previous symbols act as interference on
the current symbol x[n]
• Need to extract x[n] from y[n]
• This is done using equalizers
Equalizers
Channel
h
x[n]
z[n]
y[n]
Modulated
QAM symbols
Equalizer
w
][ˆ nx
M


Noise
M
k
nwnznwnhnx
knykwnwnynx
][][][][][
][][][][][ˆ
[n]beshould
0






If w[n] is designed to make h[n]*w[n] = δ[n], then we force the ISI = 0
 Zero-Forcing equalizer  effect on noise?
Equalizers
1)()(
][][][


fWfH
nnwnh 
Channel impulse response
Channel frequency response
Time-domain
Channel impulse response
n
f
Time-domain
To
Frequency-domain
As channel length (rms delay spread) increases, frequency-selectivity increases
One-tap channel has flat frequency response
h(n)
H(f)
Dip frequencies
Shortcomings of SC systems
• For W(f) H(f) = 1, W(f) will have large magnitude at dip
frequencies
• W(f) will enhance the noise at these dip frequencies
• When looking in time-domain, these enhanced noise will
impact the whole time-domain  all symbols are impacted byimpact the whole time-domain  all symbols are impacted by
noise enhancement
• ZF equalizer  Noise enhancement  Poor performance! 
Solution? (Multi-Carrier Modulation)
Multi-Carrier Modulation - Main Idea
• If we can divide H(f) into N subbands (subchannels or subcarriers), each of
small BW
• Then, channel is approx FLAT over each band
• We equalize every subcarrier alone by dividing by the channel gain at this
subcarrier
• We transmit 1 QAM symbol over every• We transmit 1 QAM symbol over every
subcarrier
• In receiver, we divide received signal
into N subcarriers, divide every subcarrier
by channel gain at this subcarrier to detect
QAM symbol at this subcarrier
• Equalizer design is much easier  No convolution
• Only QAM symbols at dip frequencies will suffer  No effect on other
QAM symbols as they are transmitted on other subcarriers
……
Subcarrier (channel approx flat)
f
Multi-Carrier Modulation - Main Idea
• For QAM symbol to be transmitted over a small BW symbol
duration has to be large  small data rate?
• Every symbol will have small symbol rate but we transmit N symbols
in parallel  Effective rate is high!
5us
cos(w1t)
Example
1us
SerialtoParallel
Bit rate = 1 bit / 1us
= 1Mbps
.
.
. cos(w5t)
Example
Bit rate = 5 bits / T
= 5 bits / 5us
= 1 Mbps
T
• In general, we have QAM symbol (which is complex a+jb) rather
than just BPSK symbols (which are real as in the previous example)
• To modulate Xk = ak+jbk over subcarrier k, we need exp(jwkt) and
rather than just cos(jwkt) 
Multi-Carrier Modulation - Main Idea
 tjX kk exp
• So, we can write the total output as
 
durationSymbolTotal
0,exp)(
1

 
T
TttjXtx
N
k
kk 
k k kXk = ak+jbk  QAM symbol
• How to choose wk’s?
• To easily separate these N subcarriers at the receiver, we need
them to be orthogonal, i.e.,
Multi-Carrier Modulation - Main Idea
     


T
t
llkk dttjXtjX
0
0expexp 
• To satisfy this, we can show that
Nkk
T
k ,.....,2,1,
2



Ttt
T
k
jXtx
N
k
k 





 
0,
2
exp)(
1

• In digital domain, set t = n Ts
MCM – Implementation with IFFT
s
s
N
k
sks
T
T
nTnTT
T
kn
jXnTx 





 
00,
2
exp)(
1

This equation can be effectively implemented usingThis equation can be effectively implemented using
Inverse Fast Fourier Transform (IFFT)
N-point
IFFT
{X1,X2,….XN} {x(0), x(1),…. x(N-1)}
Nn
N
kn
jXnx
N
k
k 





 
0,
2
exp)(
1

• For x(nTs) = x(n), we need
• We choose the sampling time (Ts) to be total symbol time (T ) over
number of subcarriers (N)
MCM – Implementation with IFFT
N
T
T
T
T
N s
s

number of subcarriers (N)
• Since we choose the subcarrier frequencies as:
• Then, subcarrier bandwidth is the difference between any two
subcarriers which is:
Nkk
T
k ,.....,2,1,
2



T
fBWSubcarrier kk 1
22
1




 




• Hence, the total BW of the system is
MCM – Implementation with IFFT
sTT
N
fN
BWsubcarrierssubcarrierofNumberBWT
1
otal


MCM – Waveform in time-domain
Nn
N
kn
jXnx
N
k
k 





 
0,
2
exp)(
1

Time-domain signal = weighted summation of sinusoidal signals of
frequencies {k/N, k=1,2,…,N}
Total symbol duration = T
nTs
0
N-1
Freq = 2/N
Freq= 1/N
Multiplied by X1
Multiplied
by X2
Every subcarrier carries
One QAM symbol
Total symbol duration = T
Ts
MCM – Waveform in frequency-domain
Signal in Frequency domain
Subcarrier spacing = 1/T
At the peak of any subcarrier,
contributions from all other subcarriers = zeros  Orthogonal
• From the previous figure, we clearly notice the subcarriers are
orthogonal to each other
• This system is called OFDM (Orthogonal Frequency Division
Multiplexing) where orthogonal frequency comes from the fact that
the subcarriers are orthogonal to each other
• In the receiver, how to recover Xk from x(n) ?
• Exploit that the subcarriers are orthogonal as follows:
MCM – Subcarriers orthogonality
• Exploit that the subcarriers are orthogonal as follows:
• We multiply x(n) by the conjugate of the kth subcarrier and run the
summation.
• This will null out all subcarriers except for the kth one, it will give NXk
• We divide by N to get Xk
Nk
N
kn
jnx
N
X
N
n
k 





 


1,
2
exp)(
1ˆ
1
0

• This previous equation is exactly what FFT
(Fast Fourier Transform) does
• So, in Tx we run IFFT and in Rx we run FFT
MCM – IFFT/FFT implementation
QAM
mod
bits
SerialtoParallel
N-pointIFFT
ParalleltoSerial
QAM
demod
 kXˆ kX
bits
ParalleltoSerial
N N
SerialtoParallel
N-pointFFT
N N
• This works great if channel is AWGN with no
multipath, i.e., channel is flat with no frequency
selectively
• Even the single-carrier case works great with flat
channel (no multi-path) without the headache of
MCM in multipath fading
channel (no multi-path) without the headache of
FFT and IFFT
• Now, what if there’s multi-path channel?
MCM in multipath fading
• Consider a multipath channel with only 2 paths:
A direct path with zero delay and another path
with some delay
• Focus on the subcarriers 1/N and 2/N
• In the next page, the solid curves are the two• In the next page, the solid curves are the two
subcarriers of the direct path (no delay)
• The dashed curve is the delayed version due to
the delayed path
• We plot only the delayed path of subcarrier 2/N
to avoid crowding
MCM in multipath fading
Now, to get X1, we multiply the whole received signal by the blue signal and integrate (sum)
This will cancel out the solid red signal BUT not the dashed red because it’s not a COMPLETE
Sinusoidal.
So, we will have inter-carrier interference (ICI) from X2 and other subcarriers on X1
MCM in multipath fading
 So, multi-path fading  ICI in OFDM
 How to solve that?
 Solution is to make the dashed sinusoidal a COMPLETE wave, i.e., Solution is to make the dashed sinusoidal a COMPLETE wave, i.e.,
have an integer number of periods in the integration (summation) time
 This is done using Cyclic prefix, i.e., copy the last portion of the total
OFDM symbol and put it before the beginning of the OFDM symbol
MCM in multipath fading
Copy
MCM in multipath fading
Now, the delayed version of subcarrier 2 will have an integer number of periods4
within the OFDM symbol duration (summation interval), so it will be cancelled out
when we multiply the received signal by subcarrier 1 and integrate  No ICI
MCM in multipath fading
• How to choose the length of cyclic extension?
• It should be chosen such that it’s greater than
effective channel length
• Cyclic extension converts the linear convolution
between Tx signal and channel into Cyclic Convolutionbetween Tx signal and channel into Cyclic Convolution
• Cyclic convolution in time-domain is equivalent to
multiplication of FFTs in Frequency-domain
• FFT of transmitted signal is simply the QAM symbols
(Xk)
• FFT of the channel is the channel frequency response
MCM in multipath fading
tzthtxty


getweFFTTaking
)()()()(
signalReceived
Circular convolution
Thanks to Cyclic extension!
Nk
H
Y
X
NkZHXY
k
k
k
kkkk


1,ˆ
knowledge,channelAssuming
1,
Here, equalizer is ONLY 1-tap and it’s Maximum Likelihood (ML)  Optimal
 ML minimizes error rate
MCM – Cyclic Extension
Cyc.
Exten
IFFT output
(N samples)
Cyc.
Exten
IFFT output
(N samples)
OFDM symbol OFDM symbol
…..
time
OFDM symbol
1
OFDM symbol
2
• Cyclic extension  Prevents multipath channel from
introducing ICI after taking FFT at the receiver
• Cyclic extension is also called Cyclic Prefix
• Does it have another function ?
• When OFDM signal passes through multi-path channel, every
symbol will leak into its successor (the symbol coming after it)
• To prevent inter-symbol interference (where symbol here
refers to OFDM symbol), we need to have Guard Interval
between OFDM symbols
• Thanks to its position lying between successive OFDM
symbols, Cyclic Extension acts also as Guard Interval
MCM – Cyclic Extension [Guard Interval]
symbols, Cyclic Extension acts also as Guard Interval
IFFT output
(N samples)
IFFT output
(N samples)
time
OFDM symbol 1 OFDM symbol 2
Leakage of
OFDM symbol 1
Does NOT reach
OFDM symbol 2
MCM – Pilot and Guard subcarriers
Nused  Number of used subcarriersZEROS ZEROS
OFDM parameters
Parameter Definition Notes
Ts Sampling time Ts = 1/B = 1/bandwidth (seconds)
Tcp
Guard interval length
(Cyclic Prefix length)
Tcp = NcpTs > Effective channel length
(seconds)
T IFFT output length T = NTs = 1/Δf (seconds)
Ttot OFDM symbol length Ttot = T+Tcp= (N+Ncp)Ts (seconds)Ttot OFDM symbol length Ttot = T+Tcp= (N+Ncp)Ts (seconds)
Δf
Subcarriers frequency spacing =
frequency of 1st subcarrier
Δf = 1/T = B/N (Hz)
B OFDM bandwidth B = 1/Ts = N Δf (Hz)
N
Number of subcarriers
(IFFT size) = # samples in IFFT output
N = B/Δf = T/Ts
Bused Occupied OFDM bandwidth Bused = Nused Δf(Hz)
Nused Number of used subcarriers
OFDM parameters (Cnt’d)
Parameter Definition Notes
Bguard Guard subcarriers bandwidth B = Bguard + Bused (Hz)
Nguard Number of guard subcarriers N = Nguard + Nused
Ncp # samples in cyclic prefix Ncp = Tcp/Ts
f Sampling rate f = 1/T = N Δf (Hz)fs Sampling rate fs = 1/Ts = N Δf (Hz)
How to choose T = 1 /Δf ?
lengthchannel
1
αbandwidthCoherence
subcarrieroverchannelFlatbandwidthCoherence
)efficiencyr(rate/poweoverheadCPReasonable4
al
CP
f
TT


4G LTE OFDM parameters
(N)
Licensed BW 3 MHz
= B (OFDM BW)
IFFT output
length (T)
= 1 /subcarrier spacing (Δf) = 1/ 15000 = 67 us
Nused = Bused/Δf 72+1(DC) 180+1 300+1 600+1 900+1 1200+1
Nguard = N-Nused 55 75 211 423 535 847
Bused = Nused Δf
(MHz)
1.08 2.7 4.5 9 13.5 18
BW efficiency =
Bused /licensed
BW x 100 %
86 % 90 %
4G LTE spectrum
Used subcarriers
Left Guard
Subcarriers
Right Guard
Subcarriers freq
Licensed BW  Purchased spectrum
Used BW (Bused)
ZEROSZEROS
Licensed BW  Purchased spectrum
We transmit zeros on part of licensed BW  In air, it accommodates side lopes
of used subcarriers  side lopes will not get outside licensed BW 
So we do not interfere with neighboring bands
We transmit outside licensed BW but we just transmit zeros  No
interference on neighboring bands
B = fs = sampling frequency
4G LTE spectrum
Side lopes of modulated subcarriers
WiFi OFDM parameters
IFFT size (N) = 64 (52 used subcarriers + 1 DC + 11 guard subaccreirs)
IFFT output duration (T) = 1 / subcarrier spacing = 1/(312.5x103)= 3.2 us
Cyclic prefix length = Tg = 0.8us = T/4
Sample time (Ts) = 1/(20x106) = 0.05 us
Used BW (Bused)= 53 (52 + 1 DC) subcarriers x 312.5 kHz = 16.6 MHz = OBW = Occupied BW
Comments on OFDM parameters
• Cyclic prefix (CP) length in LTE > CP in WiFi, why?
• Because WiFi works in indoor environment while LTE works outdoor.
• In outdoor, channel paths can be reflected from far objects so will
come to Rx after long delay  Need longer cyclic prefix
• What if we use too long CP, much longer than channel length?
• Then, we need IFFT output length (T > 4Tcp) to be very long as well
– Channel can vary during OFDM symbol (because it’s too long in
duration)  Doppler effect  ICI See slide
– Channel can vary during OFDM symbol (because it’s too long in
duration)  Doppler effect  ICI See slide
– Large latency  receiver will need to wait too long before it can receive
OFDM symbol  OFDM detection cannot start before the whole OFDM
symbol is received  Large latency not suitable for real-time
applications (voice/video chatting, gaming, …)
• What if we use too short CP, shorter than channel length?
• Interference between successive OFDM symbols (every OFDM
symbol will leak into its successor)  ISI
• Subcarriers orthogonality will be destroyed leading to Inter-Carrier
interference (ICI)
• What about subcarriers with DEEP fading?
• What if a Narrow-Band Interference (NBI) hits
OFDM signal? (e.g., BLUETOOTH into WLAN)
MCM – Deep fading and NBI
……
Deep Fading
Narrow-band Interference (NBI)
OFDM signal
• In case of deep fading, Hk is very small, so dividing by it will amplify
the noise  Gives wrong QAM symbol after dividing by Hk
• In case of NBI, noise power seen at impacted subcarriers is high 
Gives wrong QAM symbol after dividing by Hk
MCM – Deep fading and NBI
NkZHXY kkkk  1,
Large in case of NBISmall in case of Deep fading
k
k
k
k
k
k
H
Z
X
H
Y
X
ˆˆ
ˆ  Large in deep fading
and NBI
WRONG detection
kk XX ˆ
Channel estimate
• How to solve this problem?
• Answer : Channel coding
• Channel coding: Introduce redundancy of information bits
(e.g., Repetition code, Convolutional code, Turbo code)
• Then, distribute the resulting bits over subcarriers
• If a subcarrier is hit by deep fading or NBI, we lose its bits but
Bit-Interleaved Coded OFDM
• If a subcarrier is hit by deep fading or NBI, we lose its bits but
we use the redundancy bits distributed to other subcarriers to
correctly decode information bits
Channel
Coding
Interleaver
QAM
modulation
SerialtoParallel
N-pointIFFT
N
ParalleltoSerial
Nbits
AddCyclicPrefix
• Example, Use repetition code, every information bit is
repeated 3 times
Bit-Interleaved Coded OFDM
1 0 1 1 1 1 0 0 0 1 1 1
Channel
Coding
Interleaver
1 0 1 1 0 1 1 0 1
BPSK
modulation
NBI
1 0 1 1 0 1 1 0 1
freq
NBI
Subcarrier
1
Subcarrier
4
Subcarrier
6
• Subcarriers 4-6 are hit by NBI  their data is wrongly detected
• We can still detect the original information bits after decoding
Bit-Interleaved Coded OFDM
1 0 1 1 0 1 1 0 1
NBINBI
freqAfter detection
1 0 1 00 11 00 1 0 1
1 00 1 0 11 0 1 00 1
After De-Interleaving
After Decoding (Majority Rule)
1 0 1
WRONG!
CORRECT!
• Note the importance of the Interleaver!
• It distribute code bits among subcarriers, so code bits
corresponding to any information bit are assigned to NON-
ADJACENT subcarriers, so if one is lost, others are not lost
• One possible Interleaver design: Matrix Interleaver
• Write code bits row by row in a matrix and read them out
Interleaver design
• Write code bits row by row in a matrix and read them out
column by column
c1 c2 c3 ……. c10
c11 c12 c13 ……. c20
c21 c22 c23 ……. c30
.
.
c91 c92 c93 ……. c100
{c1 c11 c21 …… c91
c2 c12 c22 …… c92
c3 c13 c23 …… c93
….….…. .…. c100}
{c1 c2 c3 …… c10
c11 c12 c13 …… c20
c21 c22 c23 …… c30
….….…. .…. c100}
c1 And c2 separated
by 10 bits!
OFDM Transmitter and Receiver
Channel
Coding
Interleaver
QAM
modulation
SerialtoParallel
N-pointIFFT
N
ParalleltoSerial
Nbits
AddCyclicPrefix
Channel
decoding
De-
Interleaver
QAM
demod
ParalleltoSerial
N-pointFFT
SerialtoParallel
Nbits
RemoveCyclicPrefix
.
.
.
.
Freq domain Channel equalization (1 tap/subcarrier)
Channel is estimated
using pilots
1
ˆ/1 H
kHˆ/1
NHˆ/1
Peak-to-Average Power Ratio
andand
Subcarrier Loading
Subcarrier Loading
• If the channel has slow variation over time (e.g., in xDSL)
• We can adapt the modulation of each subcarrier
• Subcarriers with deep fades  loaded with few bits (e.g., BPSK
or QPSK)  Low poweror QPSK)  Low power
• Subcarriers with good channel  loaded with many bits (e.g.,
64-QAM)  High power
• We can design the loading of every subcarrier to maximize
overall throughput (bit rate)  Use waterfilling technique
Subcarrier Loading
Subcarrier
With bad
Channel 
Not assigned
Any bits (not used)
Subcarrier
With good
Channel 
Assigned
many bits
(high QAM)
 Large
power
Subcarrier Loading
• Can we use adaptive loading in Single-Carrier systems?
• No because by definition adaptive loading is used in multi-
carrier systems
• This is one advantage of OFDM over Single-Carrier• This is one advantage of OFDM over Single-Carrier
Peak-to-Average Power Ratio (PAPR)
• One disadvantage of OFDM is that it has high PAPR
• This means that the peak power is much higher than the
average power
Peak power
Average power
time
OFDM symbol power
Peak-to-Average Power Ratio (PAPR)
• OFDM has high PAPR, so what?
• After generating OFDM signal, we feed it into Power Amplifier (PA) to
amplify it
• Any PA has a linear region and a saturation (non-linear) region
• To avoid saturation and generation of non-linear components, we
need to work in the linear region
• Hence, we need to push the OFDM signal such that both its peak and
average are within the linear region
• This means that most of the time (where average power lies), we will
work in low gain  Low efficiency of PA
Peak-to-Average Power Ratio (PAPR)
Output
signal
power
Non-linear (Saturation) region
Linear region
Input signal power
Most
Of time,
We work
In low
Gain region
High gain region is rarely utilized!
Peak-to-Average Power Ratio (PAPR)
• Why does OFDM have high PAPR?
• OFDM signal = Summation of N random variables
Nn
N
kn
jXnx
N
k
k 





 
0,
2
exp)(
1

Random variable
• OFDM signal = Summation of N random variables
• Central Limit Theory  Summation of many random variables has
a Gaussian PDF regardless of PDF of every random variable
• x(n) is Gaussian distributed for large N (number of subcarriers)
• Gaussian random variables have high PAPR, why?
Peak-to-Average Power Ratio (PAPR)
Peak Power (rare!)
Average power (Most of time)
Peak power is much higher than average power for large variance
Peak power is less likely to happen than average power
• What about PAPR of Single-Carrier systems?
• It’s actually lower than OFDM! Why?
• In single-carrier (SC), transmitted signal = modulated
Peak-to-Average Power Ratio (PAPR)
• In single-carrier (SC), transmitted signal = modulated
QAM signal directly  No IFFT
• Hence, PAPR of SC = PAPR of QAM symbol
• Consider QPSK  What’s PAPR?
Peak-to-Average Power Ratio (PAPR)
PAPR of QPSK
QPSK Constellation
Inphase
Quadrature
A
A s1
s2
s s4
d1d2
d3 d4
PAPR of QPSK s3
s4
M  Number of
QAM symbols
 
dB0
PowerAverage
PowerPeak
log10dBinPAPR
1
2
2
PowerAverage
PowerPeak
PAPR
2maxmaxPowerMaximumPowerPeak
22
4
111
PowerAverage
10
2
2
22
2
4
1
2
1
2
1



  
A
A
AdP
AAd
M
P
M
i
i
i
i
i
M
i
i
M
i
i
Peak-to-Average Power Ratio (PAPR)
PAPR of SC with QPSK = 0 dB  Very good for PA efficiency
If we used OFDM with QPSK, PAPR will be much higher
In terms of PAPR, Single Carrier is better than OFDM!
Exercise: Compute PAPR of Single Carrier with 16-QAM
OFDM UNDER RF IMPAIRMENTS
OFDM under RF impairments
• Effect of Carrier Frequency Offset (CFO)
• Effect of Phase Noise (PN)
• Effect of Doppler [Not RF impairment but has
similar impact]similar impact]
• Effect of I/Q imbalance (IQI)
OFDM under CFO
• CFO means that carrier frequency of receiver local
oscillator is different from that of the transmitter
fc,Tx
fc,Rx
π/2
π/2
fc,Tx
fc,Rx
CFO,,  fff TxcRxc
CFO ≠0 due to inaccuracies
of crystal oscillators
used at Tx and Rx
OFDM under CFO
• Frequency of Crystal oscillator (XO) has manufacturing error
measured as part per million (ppm)
• ppm = error (in Hz) in every 1 million Hz (1 MHz)
• Specifications of XO tells its frequency and expected error in ppm
• Example: XO has frequency = 2 GHz with 0.1 ppm
This means we have 0.1 Hz maximum error in every 1 MHz
XO frequency = 2 GHz = 2000 MHz• XO frequency = 2 GHz = 2000 MHz
• Maximum error will be 2000*0.1 = 200 Hz
• XO frequency = 2 GHz ± 200 Hz
• We expect XO frequency to be any where in the range
2 GHz -200 Hz < XO frequency < 2 GHz + 200 Hz
• If both Tx and Rx XOs have 0.1 ppm, then maximum carrier
frequency offset (CFO) between them is when one of them is
2 GHz -200 Hz while the other is 2 GHz + 200 Hz  Δfmax= 400 Hz
OFDM under CFO
• At Rx, taking FFT of received signal is equivalent to
sampling the received signal in frequency-domain at the
locations of subcarriers as follows
Gives QAM symbol carried by red subcarrier
with ZERO contributions of other subcarriers
OFDM under CFO
• If we have CFO, then this sampling is SHIFTED
Gives QAM symbol carried by red subcarrier
with NON-ZERO contributions of other subcarriers
Inter-Carrier Interference (ICI)
OFDM under CFO
• CFO results in  Inter-Carrier Interference
• Every carrier sees interference from NEIGHBOURS
• Considering any subcarrier, it will see more interference
from close subcarriers than from far subcarriers. This isfrom close subcarriers than from far subcarriers. This is
clear from previous figure
• How to solve this problem?
• Use pilots to estimate CFO and compensate it in time-
domain BEFORE taking FFT
OFDM under CFO
 
 




kn
j
n
jnxX
fNB
T
fN
n
jnxnTjnTxnTx
fftjtxtx
N
f
s
f
sfss
RxcRxcff





















2
exp
2
exp)(
1ˆ
getweRx,@FFTngAfter taki
11
,
2
exp)(2exp)()(
,2exp)()(
1
,,
 




j
N
n
jg
XgXgX
fN
nk
jnx
N
X
N
j
fN
jnx
N
X
N
n
N
kl
llkk
f
N
n
k
n
f
k














 










 











exp
2
exp
ˆ
,
)(2
exp)(
1ˆ
2
expexp)(
1ˆ
1
0
large0
0
1
0
0








N
k
k
N
kn
jXnx
1
2
exp)(

• Effect of CFO:
1. Desired symbol is rotated by phase = πα
2. ICI from neighboring subcarriers
OFDM under CFO
Hzinspacingsubcarrier
HzinCFO



f
f

Rotation effectICI effect
• For α to be small, we need to choose XO specs
such that CFO is small compared to subcarrier
spacing
• This means that 4G LTE (subcarrier spacing =
OFDM under CFO
• This means that 4G LTE (subcarrier spacing =
15 kHz) will have tougher spec on XO than
WLAN (subcarrier spacing = 312.5 kHz)
• To compensate for CFO, we estimate α (and
hence δf) using pilots and multiply received
signal by exp(jδfTsn), n=0:N-1 BEFORE taking
FFT
OFDM under Phase Noise
• Phase Noise (PN) means that oscillator has a random
phase that changes with time
π/2
π/2
π/2
  ttf txc  2cos   ttf rxc  2cos
Tx PN
Rx PN
fc
f
Ideal XO
No PN
fc f
Practical XO
With PN
Linewidth
OFDM under Phase Noise
• Phase Noise (PN) causes energy to leak around carrier
frequency
• Good oscillators have their energy leaking in a narrow
bandwidth (they have small linewidth)bandwidth (they have small linewidth)
• PLL is much better than free-running oscillators in terms of PN
• Effect of PN on OFDM (similar to CFO):
– Inter-Carrier Interference from neighboring subcarriers
– Phase rotation of every subcarrier
OFDM under Phase Noise
   
 
  symbolOFDMoverPNAverage)(exp
1
)(exp
2
exp)(
1ˆ
)(exp)()(,)(exp)()(
1
0
0
0
1
0
















nj
N
g
XgXgnj
N
kn
jnx
N
X
nTjnTxnTxtjtxtx
N
n
kl
llk
N
n
k
sss




 
 
ssubcarrierallforsamethesit'becauseCommon
(CPE)'ErrorPhaseCommon'Called
symbolOFDMinPNAverage)(
1
,exp
over time,variationPNslowwithsoscillatorpracticalFor
samehavewillˆAll
0
1
0
avgavg0
01
0

 




g
n
N
jg
gX
N
N
n
K
kk
n

OFDM under Phase Noise
• How to solve PN problem?
– Estimate PN samples and multiply received signal by
exp(jφ(n)), n=0:N-1 BEFORE taking FFT
– Difficult solution because PN change from sample to
sample and difficult to track
• Practical solution• Practical solution
– Use pilots to estimate average PN φavg and multiply all
subcarriers by conj(g0) = exp(jφavg) to reverse rotation
induced by PN
– This removes CPE and is called CPE compensation
– Here, we ignore ICI caused by PN
– Practical oscillators have small PN linewidth  Less
leakage  Light ICI that can be ignored
OFDM under Doppler
• High Doppler means that channel rapidly changes over
time due to Transmitter and/or Receiver movement
Received
Signal
2fd
Transmitted
signal
Time-varying
channel
fc
f fc f
Doppler frequency = fd = v fc/c
c  Speed of light = 3x108 m/s
v  Relative speed between Tx and Rx
If Tx and Rx are not moving (e.g., WiFi), No Doppler spread
Doppler increases as carrier frequency and/or velocity increases
Doppler spread
OFDM under Doppler
• 4G LTE will have mobile phones moving in high
speed
• LTE has higher Doppler than WiFi
• Doppler effect is similar to PN effect  Both• Doppler effect is similar to PN effect  Both
have energy leakage in frequency domain
• Effect of Doppler on OFDM:
–ICI and rotation of every subcarrier
OFDM under Doppler
• Coherence time = 1/Doppler frequency
• Coherence time  Time over which channel can be
considered static
• To avoid Doppler effect, make sure that OFDM
symbol duration is smaller than Coherence time
• What’s the Coherence time if fc = 2 GHz and v = 300
Km/hr?
• Coherence time = 1/fd = c/ (v fc) = 1.8 ms
• OFDM symbol duration in LTE = 67 us << 1.8 ms
• So, Doppler spread can be safely ignored in LTE
OFDM under I/Q imbalance
• I/Q imbalance (IQI) means  Inphase and Quadrature paths
have different gains and non-90 degrees phase differences
ε
1
ε
hI,tx(t) hI,rx(t)
1
π/2+θt
π/2+θr
εt εr
εt ≠ 1  Gain imbalance @ Tx
θt ≠ 0  Phase imbalance @ Tx
hI,tx(t) ≠ hQ,tx(t)  Filter imbal @ Tx
εr ≠ 1  Gain imbalance @ Rx
θr ≠ 0  Phase imbalance @ Rx
hI,rx(t) ≠ hQ,rx(t)  Filter imbal @ Rx
hQ,tx(t) hQ,rx(t)
OFDM under I/Q imbalance
• Gain and Phase imbalance  Frequency-flat (Frequency-
Independent) I/Q imbalance (FI-IQI)
• Filter imbalance  Frequency-selective (Frequency-
dependent) I/Q imbalance (FD-IQI)
• Effect of FI-IQI on baseband signal:
y(t)tytyty
x(t)txtxtx
rrIQIFI
ttIQIFI
signalRxonIQIRxofEffect)()()(
signalTxonIQITxofEffect)()()(
*
*






 
  1,
2
exp1
1,
2
exp1
*
*
rr
rr
r
tt
tt
t
j
j











 If no IQI,
ε = 1, θ = 0
α =1, β = 0
OFDM under I/Q imbalance
• FD-IQI has a similar effect except that α and β are filters
convolved with y(t) and y*(t), respectively
• Assume y(t) = exp(j2πf1t)  1 Complex sinsoid
• What’s yFI-IQI (t) ?  α exp(j2πf1t) + β exp(-j2πf1t)
Y( f ) 1
ff1
Y( f )
With IQI α
ff1
FI-IQIYFI-IQI( f )
0 0-f1
β
IQI creates an image of every subcarrier
OFDM under I/Q imbalance - Example
π/2
εt
1
cos(2πf1t) Let f1 = 1 MHz, fc = 700 MHz
Without I/Q imbalance, RF signal x(t)
Should be cos(2π(fc+f1)t), i.e.,
@ 701 MHz
x(t)
fc =700 MHz
sin (2πf1t)
x(t) = cos(2πf1t) cos(2πfct)- εt sin(2πf1t) sin(2πfct)
= (1+ εt)/2 cos(2π(fc+f1)t) + (1- εt)/2 cos(2π(fc-f1)t)
Due to IQI, we get frequency component @ fc-f1=699 MHz in
addition to the expected 701 MHz. This 699 MHz is the image
of 701 MHz around the carrier frequency fc
OFDM under I/Q imbalance - Example
If εt = 1, i.e., no I/Q imbalance, we see only 701 MHz component
and there will be no frequency component @ 699 MHz
    
ComponentImageComponentOriginal
)MHz6992cos(
2
1
)MHz7012cos(
2
1
)( 



 tttx tt




and there will be no frequency component @ 699 MHz
1
f(MHz)701
Signal analyzer Output
(no IQI)
fc=700
2
1 t
2
1 t
f(MHz)701fc=700699
Signal analyzer Output
(With IQI)
image
OFDM under I/Q imbalance
• With IQI, subcarrier k will create an image for itself
• This image interferes with subcarrier –k
• IQI causes Inter-Carrier Interference (ICI) from image
subcarriers not neighboring subcarriers as CFO, PN and
Doppler
• Signal-to-image ratio is called Image Rejection Ratio (IRR) and
is defined for a mixer as:is defined for a mixer as:
• Good mixers have high IRRs (IRR > 30 dB). IRR = ∞ if no IQI
exists
• Baseband processing is used to estimate and compensate IQI
to increase IRR to +45 dB
frequencyimage@Power
frequencyoriginal@Power
log10IRR
2
10 


OFDM under I/Q imbalance
• Phase imbalance is given in degrees, e.g., 2o
• Gain imbalance is given in dBs or % as follows:
dB
1
20Log
GainQuad
GainInphase
20LogImbalanceGain 1010 













• If ε=0.9  Gain imbalance = 0.9 dB or 5%
• If ε=1 (No imbalance)  Gain imbalance = 0 dB or 0%
• Good mixers have Gain imbalance close to 0 dB or 0%
%100
1
1
%100
GainQuadGainInphase
GainQuadGainInphase
ImbalanceGain 






-
OFDM under I/Q imbalance
• An RF mixer has Gain imbalance = 3 % and phase
imbalance = 2 degrees, what’s IRR?
• ε = 0.94 and θ = 2 *180/pi  Convert from deg to rad
 
dB29log10IRR
0.01603.01
0.0160.97
2
180
2exp94.01
2
10
*











r
r
rr
r
j
j
j





IRR is the same if we used eqns of αt and βt instead of αr and βr
OFDM under Rx I/Q imbalance
Baseband received signal
Before Mixer
Baseband received signal
After IQI-impaired Mixer
1
0.5 0.5α
α
f0
f0
f0
β
β/2
Add both waveforms
To get baseband signal under IQI
Image conjugated
Baseband compensation of I/Q Imbalance
Use Calibration to estimate Gain and Phase imbalance
Calibration means sending single tone through the mixer and
using received samples to estimate ε and θ
Baseband I/Q compensation circuit
π/2+θr
1
εr
hI,rx(t)
hQ,rx(t) 1/εr 1/cos(θr) +
Single-Carrier Frequency-DivisionSingle-Carrier Frequency-Division
Multiple-Access (SC-FDMA)
Shortcomings of OFDM
• Large PAPR
• Vulnerable to RF impairments (CFO, PN, IQI)
– These impairments cause ICI which reduces effective
SNR of each subcarrier
– ICI can cause strong carriers (with good channels) to
interfere on weak carriers (with deep fading)interfere on weak carriers (with deep fading)
==causing==> low carrier to noise ratio
– Effect of these impairments on Single-Carrier does
not include inter-symbol interference (ISI) in AWGN
channel. Only symbol rotation and/or scaling but No
ISI in AWGN channel
– Hence, Single-Carrier is more robust to these
impairments than OFDM!
Shortcomings of OFDM
• RF impairments can be compensated in baseband using fairly
low-complexity methods
• Hence, we can live with RF impairments
• However, large PAPR of OFDM is a persistent problem that
impacts PA efficiency
• High PA efficiency is a key factor for long-lasting battery in• High PA efficiency is a key factor for long-lasting battery in
cell phones
• 4G LTE standard adopted Single-Carrier for Uplink where cell
phone is transmitting
• OFDM is chosen for 4G LTE downlink where eNodeB (Base
station) is transmitting
• There’s no battery constraints in base stations
Single-Carrier
• Single-carrier can be implemented using OFDM platform
but with FFT introduced before IFFT to cancel its effect
QAM
modulation
SerialtoParallel
IFFTFFT
Single-Carrier Frequency-Division
Multiple-Access (SC-FDMA)
• In 4G LTE uplink, multiple user equipments (UEs) (cell phones) can
transmit at the same time but need to be frequency-multiplexed
• This is achieved by making FFT and IFFT sizes different
• FFT size = M and IFFT size = N where M < N• FFT size = M and IFFT size = N where M < N
• User 1  Take FFT output (M entries) and assign to a part of IFFT
input and pad remaining part (N-M entries) by zeros
• User 2  Assign your FFT output to the part where User 1 put
zeros and put zeros in the part where User 1 put its data
• See next slides for Two-Users example
SC-FDMA Transmitters @ Cell phones
QAM
modulation
SerialtoParallel
N-pointIFFT
M-point
FFTM QAM
symbols
M
M
N-M zerosN-M zeros
User 1
Transmitter
AddCyclicprefix
ParalleltoSerial
N N
QAM
modulation
M-point
FFTM QAM
symbols
M
M
N-M zerosN-M zeros
User 2
Transmitter
N-pointIFFT
N
SerialtoParallel
AddCyclicprefix
ParalleltoSerial
N
SC-FDMA Receiver at eNodeB (Base station)
pointFFT
RemoveCyclicprefix
SerialtoParallel
Select U1
subcarriers
M-pointIFFT
ParalleltoSerialQAM
demod
1,
ˆ
1
UkH MM
User 1 Channel
estimate
To User 1
decoder
N-pointFFT
RemoveCyclicprefix
SerialtoParallel
N N
Select U2
subcarriers
M-pointIFFT
ParalleltoSerial
QAM
demod
Channel estimation
MM 2,
ˆ
1
UkH
User 2 Channel
estimateTo User 2
decoder
SC-FDMA
• Different users can be assigned different number of subcarrier
(M1, M2, ….)
• Subcarrier allocation  localized (adjacent) or distributed
(Interleaved) 
• eNodeB tells every user its allocation size M and location (indices)
of these subcarriers
• Difference between OFDM and SC-FDMA receivers:• Difference between OFDM and SC-FDMA receivers:
– In OFDM, we get (QAM symbol x Channel after FFT), so
division by channel is Maximum-Likelihood (ML) optimal
– In SC-FDMA, we get (FFT of QAM symbols x Channel after FFT),
so division by channel is NOT ML-optimal
• Subcarriers in OFDM carriers QAM symbols, while in SC-FDMA,
they carry FFT of QAM symbols
• Cyclic prefix is used in both OFDM and SC-FDMA to prevent ICI
and maintain orthogonality among subcarriers
SC-FDMA
• SC-FDMA PAPR depends on QAM order & subcarrier
allocation  Interleaved PAPR < Localized PAPR
• In 4G LTE, no pilots are multiplexed with data subcarriers in
order to maintain low PAPR as pilots are transmitted in
higher power than data
• Instead, pilots are transmitted alone in a separate symbol
every 6 data symbolsevery 6 data symbols
• In WiFi, OFDMA is used at both Tx and Rx. No high PA
efficiency is needed because
– Tx-Rx distance in WiFi < Tx-Rx distance in LTE
– More restrictions on output power in WiFi than in LTE because WiFi
transmits in unlicensed bands  To limit interference to others
– Hence, WiFi PA gain < LTE PA gain  No high efficiency needed in
WiFi
References (1)
1) J. A. C. Bingham, "Multicarrier modulation for data transmission: an idea whose time
has come," in IEEE Communications Magazine, vol. 28, no. 5, pp. 5-14, May 1990
2) Nee, Richard van, and Ramjee Prasad. OFDM for wireless multimedia communications.
Artech House, Inc., 2000.
3) Heiskala, Juha, and John Terry Ph D. OFDM wireless LANs: A theoretical and practical
guide. Sams, 2001.
4) Van de Beek, J-J., et al. "On channel estimation in OFDM systems." Vehicular
Technology Conference, 1995 IEEE 45th. Vol. 2. IEEE, 1995.
5) Wong, Cheong Yui, et al. "Multiuser OFDM with adaptive subcarrier, bit, and power
allocation." IEEE Journal on selected areas in communications 17.10 (1999): 1747-
1758.
allocation." IEEE Journal on selected areas in communications 17.10 (1999): 1747-
1758.
6) Rhee, Wonjong, and John M. Cioffi. "Increase in capacity of multiuser OFDM system
using dynamic subchannel allocation." Vehicular Technology Conference Proceedings,
2000. VTC 2000-Spring Tokyo. 2000 IEEE 51st. Vol. 2. IEEE, 2000.
7) Armstrong, Jean. "Peak-to-average power reduction for OFDM by repeated clipping
and frequency domain filtering." Electronics letters 38.5 (2002): 1.
8) Cimini, Leonard J., and Nelson R. Sollenberger. "Peak-to-average power ratio reduction
of an OFDM signal using partial transmit sequences." IEEE Communications letters 4.3
(2000): 86-88.
9) Pollet, Thierry, Mark Van Bladel, and Marc Moeneclaey. "BER sensitivity of OFDM
systems to carrier frequency offset and Wiener phase noise." IEEE transactions on
communications 43.2/3/4 (1995): 191-193.
References (2)
10) Jang, Jiho, and Kwang Bok Lee. "Transmit power adaptation for multiuser OFDM
systems." IEEE Journal on selected areas in communications 21.2 (2003): 171-178.
11) Zhao, Yuping, and S-G. Haggman. "Intercarrier interference self-cancellation scheme
for OFDM mobile communication systems." IEEE Transactions on
Communications 49.7 (2001): 1185-1191.
12) Li, Ye, and L. J. Cimini. "Bounds on the interchannel interference of OFDM in time-
varying impairments." IEEE Transactions on Communications 49.3 (2001): 401-404.
13) Morelli, Michele, and Umberto Mengali. "A comparison of pilot-aided channel
estimation methods for OFDM systems." IEEE Transactions on signal processing 49.12
(2001): 3065-3073.
14) Jiang, Tao, and Yiyan Wu. "An overview: peak-to-average power ratio reduction14) Jiang, Tao, and Yiyan Wu. "An overview: peak-to-average power ratio reduction
techniques for OFDM signals." IEEE Transactions on broadcasting54.2 (2008): 257.
15) Bahai, Ahmad RS, Burton R. Saltzberg, and Mustafa Ergen. Multi-carrier digital
communications: theory and applications of OFDM. Springer Science & Business
Media, 2004.
16) Heiskala, Juha, and John Terry Ph D. OFDM wireless LANs: A theoretical and practical
guide. Sams, 2001.
17) Morelli, Michele, and Umberto Mengali. "An improved frequency offset estimator for
OFDM applications." Communication Theory Mini-Conference, 1999. IEEE, 1999.
18) Falconer, David, et al. "Frequency domain equalization for single-carrier broadband
wireless systems." IEEE Communications Magazine 40.4 (2002): 58-66.
19) Horlin, François, and André Bourdoux. Digital compensation for analog front-ends: a
new approach to wireless transceiver design. John Wiley & Sons, 2008.
References (3)
20) Schenk, Tim. RF imperfections in high-rate wireless systems: impact and digital
compensation. Springer Science & Business Media, 2008.
21) Holma, Harri, and Antti Toskala, eds. LTE for UMTS-OFDMA and SC-FDMA based radio
access. John Wiley & Sons, 2009.
22) Berardinelli, Gilberto, et al. "OFDMA vs. SC-FDMA: performance comparison in local
area IMT-A scenarios." IEEE Wireless Communications 15.5 (2008): 64-72.
23) Myung, Hyung G., Junsung Lim, and David J. Goodman. "Single carrier FDMA for uplink
wireless transmission." IEEE Vehicular Technology Magazine 1.3 (2006): 30-38.
24) Myung, Hyung G., Junsung Lim, and David J. Goodman. "Peak-to-average power ratio of24) Myung, Hyung G., Junsung Lim, and David J. Goodman. "Peak-to-average power ratio of
single carrier FDMA signals with pulse shaping." 2006 IEEE 17th International
Symposium on Personal, Indoor and Mobile Radio Communications. IEEE, 2006.
25) Huang, Gillian, Andrew Nix, and Simon Armour. "Decision feedback equalization in SC-
FDMA." 2008 IEEE 19th International Symposium on Personal, Indoor and Mobile Radio
Communications. IEEE, 2008.
26) Zhang, Chao, et al. "Frequency domain decision feedback equalization for uplink SC-
FDMA." IEEE transactions on broadcasting 56.2 (2010): 253-257.
27) Gomaa, Ahmad, and Naofal Al-Dhahir. "A sparsity-aware approach for NBI estimation in
MIMO-OFDM." IEEE Transactions on Wireless Communications10.6 (2011): 1854-1862.
28) Gomaa, Ahmad, and Naofal Al-Dhahir, "SC-FDMA Performance in Presence of
Oscillator Impairments: EVM and Subcarrier Mapping Impact," Global
Telecommunications Conference (GLOBECOM 2011), 2011 IEEE, Houston, TX,
USA, 2011, pp. 1-5.
29) Gomaa, Ahmad, and Naofal Al-Dhahir. "Multi-user SC-FDMA systems under IQ
imbalance: EVM and subcarrier mapping impact." Global Telecommunications
Conference (GLOBECOM 2011), 2011 IEEE. IEEE, 2011.
30) Gomaa, Ahmad, and Naofal Al-Dhahir. "Phase noise in asynchronous SC-FDMA
systems: Performance analysis and data-aided compensation." IEEE
Transactions on Vehicular Technology 63.6 (2014): 2642-2652.
31) Gomaa, Ahmad, and Louay MA Jalloul. "Data-aided I/Q imbalance estimation
References (4)
31) Gomaa, Ahmad, and Louay MA Jalloul. "Data-aided I/Q imbalance estimation
and compensation in OFDM systems." IEEE Communications Letters 18.3
(2014): 459-462.
32) Gomaa, Ahmad, and Naofal Al-Dhahir. "Blind phase noise compensation for SC-
FDMA with application to LTE-uplink." 2012 IEEE International Conference on
Communications (ICC). 2012.
33) Gomaa, Ahmad, Ayman Elezabi, and Mohamed Eissa. "A Subspace Method for
I/Q Imbalance Estimation in Low-IF Receivers." arXiv preprint
arXiv:1411.2199 (2014).
34) Gomaa, Ahmad, and Louay Jalloul. "Receiver Architecture for Frequency Offset
Correction and I/Q Imbalance Compensation in Equal Bandwidth Contiguous
Carrier Aggregation."
References (5)
35) Mokhtar, Mohamed, Ahmad Gomaa, and Naofal Al-Dhahir. "OFDM AF relaying
under I/Q imbalance: Performance analysis and baseband compensation." IEEE
Transactions on Communications 61.4 (2013): 1304-1313.
36) ElSamadouny, Ahmed, Ahmad Gomaa, and Naofal Al-Dhahir. "Likelihood-based
spectrum sensing of OFDM signals in the presence of Tx/Rx I/Q
imbalance." Global Comm. Conference (GLOBECOM), 2012 IEEE. IEEE, 2012.
37) Priyanto, Basuki E., et al. "Initial performance evaluation of DFT-spread OFDM37) Priyanto, Basuki E., et al. "Initial performance evaluation of DFT-spread OFDM
based SC-FDMA for UTRA LTE uplink." 2007 IEEE 65th Vehicular Technology
Conference-VTC2007-Spring. IEEE, 2007.
38) Raghunath, K., and A. Chockalingam. "SC-FDMA versus OFDMA: Sensitivity to
large carrier frequency and timing offsets on the uplink." Global
Telecommunications Conference, 2009. GLOBECOM 2009. IEEE. IEEE, 2009.
39) Berardinelli, Gilberto, et al. "Improving SC-FDMA performance by turbo
equalization in UTRA LTE uplink." Vehicular Technology Conference, 2008. VTC
Spring 2008. IEEE. IEEE, 2008.
40) Yoshida, Yuki, et al. "Analysis and compensation of transmitter IQ
imbalances in OFDMA and SC-FDMA systems." IEEE Trans on
Signal Processing 57.8 (2009): 3119-3129.
41) Tarighat, Alireza, Rahim Bagheri, and Ali H. Sayed. "Compensation
schemes and performance analysis of IQ imbalances in OFDM
receivers." IEEE Transactions on Signal Processing 53.8 (2005):
3257-3268.
42) Tarighat, Alireza, and Ali H. Sayed. "Joint compensation of
References (6)
42) Tarighat, Alireza, and Ali H. Sayed. "Joint compensation of
transmitter and receiver impairments in OFDM systems." IEEE
Transactions on Wireless Communications 6.1 (2007): 240-247.
43) Zou, Qiyue, Alireza Tarighat, and Ali H. Sayed. "Compensation of
phase noise in OFDM wireless systems." IEEE Transactions on
Signal Processing 55.11 (2007): 5407-5424.
Thank You!

Orthogonal Frequency Division Multiplexing (OFDM)

  • 1.
    Multi-Carrier Modulation Dr. AhmadGomaa Assistant Professor Electronics and Communications department Faculty of Engineering, Cairo University http://scholar.cu.edu.eg/gomaa Contact: aarg_2010@yahoo.com
  • 2.
    Outline • Single carrier(SC) modulation • Shortcomings of SC systems • Multi-Carrier modulation (MCM) – Main idea – Implementation using IFFT and FFT – MCM in multi-path fading– MCM in multi-path fading – OFDM parameters – Bit-Interleaved Coded OFDM – PAPR – Subcarrier loading – OFDM under RF impairments (CFO, PN, IQI, Doppler) – Single-Carrier Frequency-Division Multiple-Access (SC- FDMA)
  • 3.
    Single Carrier (SC)Modulation • Bits are modulated according to M-QAM or M- PSK • Modulated symbols are passed through a pulse shaping filter (e.g., Square-Root Raised Cosineshaping filter (e.g., Square-Root Raised Cosine (SRRC) filter) • Output is up-converted to the carrier frequency (fc)
  • 4.
    Single Carrier Modulation M-QAM (orM-PSK) bits Pulse Shaping filter π/2 Pulse Shaping filter Pulse shaping filter specifies  symbol rate & signal shape in frequency-domain
  • 5.
    Single Carrier (SC)Modulation • Transmitted signal passes through multi-path channel • Inter-Symbol Interference (ISI) occurs due to the channelthe channel • The receiver has to apply equalizers to extract the modulated symbols • Complex equalizers and not even optimal!
  • 6.
    Multi-path channel Transmitter Receiver Reflectingobject (car, building, ….) Reflecting object (car, building, ….) Channel impulse response
  • 7.
    Multi-path channel • Multi-pathchannel causes inter-symbol interference (ISI) • Need equalizers at the receiver to reverse the channel effect • Baseband model• Baseband model ][][][][ 0 nzknxkhny L k   Channel h x[n] z[n] y[n] Modulated QAM symbols Receiver noise Received samples Convolution between x[n] and h
  • 8.
    Multi-path channel • y[n]is not only function of x[n] but also function of previous symbols {x[n-1], x[n-2], …. x[n-L]} • These previous symbols act as interference on• These previous symbols act as interference on the current symbol x[n] • Need to extract x[n] from y[n] • This is done using equalizers
  • 9.
  • 10.
    Equalizers 1)()( ][][][   fWfH nnwnh  Channel impulseresponse Channel frequency response Time-domain Channel impulse response n f Time-domain To Frequency-domain As channel length (rms delay spread) increases, frequency-selectivity increases One-tap channel has flat frequency response h(n) H(f) Dip frequencies
  • 11.
    Shortcomings of SCsystems • For W(f) H(f) = 1, W(f) will have large magnitude at dip frequencies • W(f) will enhance the noise at these dip frequencies • When looking in time-domain, these enhanced noise will impact the whole time-domain  all symbols are impacted byimpact the whole time-domain  all symbols are impacted by noise enhancement • ZF equalizer  Noise enhancement  Poor performance!  Solution? (Multi-Carrier Modulation)
  • 12.
    Multi-Carrier Modulation -Main Idea • If we can divide H(f) into N subbands (subchannels or subcarriers), each of small BW • Then, channel is approx FLAT over each band • We equalize every subcarrier alone by dividing by the channel gain at this subcarrier • We transmit 1 QAM symbol over every• We transmit 1 QAM symbol over every subcarrier • In receiver, we divide received signal into N subcarriers, divide every subcarrier by channel gain at this subcarrier to detect QAM symbol at this subcarrier • Equalizer design is much easier  No convolution • Only QAM symbols at dip frequencies will suffer  No effect on other QAM symbols as they are transmitted on other subcarriers …… Subcarrier (channel approx flat) f
  • 13.
    Multi-Carrier Modulation -Main Idea • For QAM symbol to be transmitted over a small BW symbol duration has to be large  small data rate? • Every symbol will have small symbol rate but we transmit N symbols in parallel  Effective rate is high! 5us cos(w1t) Example 1us SerialtoParallel Bit rate = 1 bit / 1us = 1Mbps . . . cos(w5t) Example Bit rate = 5 bits / T = 5 bits / 5us = 1 Mbps T
  • 14.
    • In general,we have QAM symbol (which is complex a+jb) rather than just BPSK symbols (which are real as in the previous example) • To modulate Xk = ak+jbk over subcarrier k, we need exp(jwkt) and rather than just cos(jwkt)  Multi-Carrier Modulation - Main Idea  tjX kk exp • So, we can write the total output as   durationSymbolTotal 0,exp)( 1    T TttjXtx N k kk  k k kXk = ak+jbk  QAM symbol
  • 15.
    • How tochoose wk’s? • To easily separate these N subcarriers at the receiver, we need them to be orthogonal, i.e., Multi-Carrier Modulation - Main Idea         T t llkk dttjXtjX 0 0expexp  • To satisfy this, we can show that Nkk T k ,.....,2,1, 2    Ttt T k jXtx N k k         0, 2 exp)( 1 
  • 16.
    • In digitaldomain, set t = n Ts MCM – Implementation with IFFT s s N k sks T T nTnTT T kn jXnTx         00, 2 exp)( 1  This equation can be effectively implemented usingThis equation can be effectively implemented using Inverse Fast Fourier Transform (IFFT) N-point IFFT {X1,X2,….XN} {x(0), x(1),…. x(N-1)} Nn N kn jXnx N k k         0, 2 exp)( 1 
  • 17.
    • For x(nTs)= x(n), we need • We choose the sampling time (Ts) to be total symbol time (T ) over number of subcarriers (N) MCM – Implementation with IFFT N T T T T N s s  number of subcarriers (N) • Since we choose the subcarrier frequencies as: • Then, subcarrier bandwidth is the difference between any two subcarriers which is: Nkk T k ,.....,2,1, 2    T fBWSubcarrier kk 1 22 1          
  • 18.
    • Hence, thetotal BW of the system is MCM – Implementation with IFFT sTT N fN BWsubcarrierssubcarrierofNumberBWT 1 otal  
  • 19.
    MCM – Waveformin time-domain Nn N kn jXnx N k k         0, 2 exp)( 1  Time-domain signal = weighted summation of sinusoidal signals of frequencies {k/N, k=1,2,…,N} Total symbol duration = T nTs 0 N-1 Freq = 2/N Freq= 1/N Multiplied by X1 Multiplied by X2 Every subcarrier carries One QAM symbol Total symbol duration = T Ts
  • 20.
    MCM – Waveformin frequency-domain Signal in Frequency domain Subcarrier spacing = 1/T At the peak of any subcarrier, contributions from all other subcarriers = zeros  Orthogonal
  • 21.
    • From theprevious figure, we clearly notice the subcarriers are orthogonal to each other • This system is called OFDM (Orthogonal Frequency Division Multiplexing) where orthogonal frequency comes from the fact that the subcarriers are orthogonal to each other • In the receiver, how to recover Xk from x(n) ? • Exploit that the subcarriers are orthogonal as follows: MCM – Subcarriers orthogonality • Exploit that the subcarriers are orthogonal as follows: • We multiply x(n) by the conjugate of the kth subcarrier and run the summation. • This will null out all subcarriers except for the kth one, it will give NXk • We divide by N to get Xk Nk N kn jnx N X N n k           1, 2 exp)( 1ˆ 1 0 
  • 22.
    • This previousequation is exactly what FFT (Fast Fourier Transform) does • So, in Tx we run IFFT and in Rx we run FFT MCM – IFFT/FFT implementation QAM mod bits SerialtoParallel N-pointIFFT ParalleltoSerial QAM demod  kXˆ kX bits ParalleltoSerial N N SerialtoParallel N-pointFFT N N
  • 23.
    • This worksgreat if channel is AWGN with no multipath, i.e., channel is flat with no frequency selectively • Even the single-carrier case works great with flat channel (no multi-path) without the headache of MCM in multipath fading channel (no multi-path) without the headache of FFT and IFFT • Now, what if there’s multi-path channel?
  • 24.
    MCM in multipathfading • Consider a multipath channel with only 2 paths: A direct path with zero delay and another path with some delay • Focus on the subcarriers 1/N and 2/N • In the next page, the solid curves are the two• In the next page, the solid curves are the two subcarriers of the direct path (no delay) • The dashed curve is the delayed version due to the delayed path • We plot only the delayed path of subcarrier 2/N to avoid crowding
  • 25.
    MCM in multipathfading Now, to get X1, we multiply the whole received signal by the blue signal and integrate (sum) This will cancel out the solid red signal BUT not the dashed red because it’s not a COMPLETE Sinusoidal. So, we will have inter-carrier interference (ICI) from X2 and other subcarriers on X1
  • 26.
    MCM in multipathfading  So, multi-path fading  ICI in OFDM  How to solve that?  Solution is to make the dashed sinusoidal a COMPLETE wave, i.e., Solution is to make the dashed sinusoidal a COMPLETE wave, i.e., have an integer number of periods in the integration (summation) time  This is done using Cyclic prefix, i.e., copy the last portion of the total OFDM symbol and put it before the beginning of the OFDM symbol
  • 27.
    MCM in multipathfading Copy
  • 28.
    MCM in multipathfading Now, the delayed version of subcarrier 2 will have an integer number of periods4 within the OFDM symbol duration (summation interval), so it will be cancelled out when we multiply the received signal by subcarrier 1 and integrate  No ICI
  • 29.
    MCM in multipathfading • How to choose the length of cyclic extension? • It should be chosen such that it’s greater than effective channel length • Cyclic extension converts the linear convolution between Tx signal and channel into Cyclic Convolutionbetween Tx signal and channel into Cyclic Convolution • Cyclic convolution in time-domain is equivalent to multiplication of FFTs in Frequency-domain • FFT of transmitted signal is simply the QAM symbols (Xk) • FFT of the channel is the channel frequency response
  • 30.
    MCM in multipathfading tzthtxty   getweFFTTaking )()()()( signalReceived Circular convolution Thanks to Cyclic extension! Nk H Y X NkZHXY k k k kkkk   1,ˆ knowledge,channelAssuming 1, Here, equalizer is ONLY 1-tap and it’s Maximum Likelihood (ML)  Optimal  ML minimizes error rate
  • 31.
    MCM – CyclicExtension Cyc. Exten IFFT output (N samples) Cyc. Exten IFFT output (N samples) OFDM symbol OFDM symbol ….. time OFDM symbol 1 OFDM symbol 2 • Cyclic extension  Prevents multipath channel from introducing ICI after taking FFT at the receiver • Cyclic extension is also called Cyclic Prefix • Does it have another function ?
  • 32.
    • When OFDMsignal passes through multi-path channel, every symbol will leak into its successor (the symbol coming after it) • To prevent inter-symbol interference (where symbol here refers to OFDM symbol), we need to have Guard Interval between OFDM symbols • Thanks to its position lying between successive OFDM symbols, Cyclic Extension acts also as Guard Interval MCM – Cyclic Extension [Guard Interval] symbols, Cyclic Extension acts also as Guard Interval IFFT output (N samples) IFFT output (N samples) time OFDM symbol 1 OFDM symbol 2 Leakage of OFDM symbol 1 Does NOT reach OFDM symbol 2
  • 33.
    MCM – Pilotand Guard subcarriers Nused  Number of used subcarriersZEROS ZEROS
  • 34.
    OFDM parameters Parameter DefinitionNotes Ts Sampling time Ts = 1/B = 1/bandwidth (seconds) Tcp Guard interval length (Cyclic Prefix length) Tcp = NcpTs > Effective channel length (seconds) T IFFT output length T = NTs = 1/Δf (seconds) Ttot OFDM symbol length Ttot = T+Tcp= (N+Ncp)Ts (seconds)Ttot OFDM symbol length Ttot = T+Tcp= (N+Ncp)Ts (seconds) Δf Subcarriers frequency spacing = frequency of 1st subcarrier Δf = 1/T = B/N (Hz) B OFDM bandwidth B = 1/Ts = N Δf (Hz) N Number of subcarriers (IFFT size) = # samples in IFFT output N = B/Δf = T/Ts Bused Occupied OFDM bandwidth Bused = Nused Δf(Hz) Nused Number of used subcarriers
  • 35.
    OFDM parameters (Cnt’d) ParameterDefinition Notes Bguard Guard subcarriers bandwidth B = Bguard + Bused (Hz) Nguard Number of guard subcarriers N = Nguard + Nused Ncp # samples in cyclic prefix Ncp = Tcp/Ts f Sampling rate f = 1/T = N Δf (Hz)fs Sampling rate fs = 1/Ts = N Δf (Hz) How to choose T = 1 /Δf ? lengthchannel 1 αbandwidthCoherence subcarrieroverchannelFlatbandwidthCoherence )efficiencyr(rate/poweoverheadCPReasonable4 al CP f TT  
  • 36.
    4G LTE OFDMparameters (N) Licensed BW 3 MHz = B (OFDM BW) IFFT output length (T) = 1 /subcarrier spacing (Δf) = 1/ 15000 = 67 us Nused = Bused/Δf 72+1(DC) 180+1 300+1 600+1 900+1 1200+1 Nguard = N-Nused 55 75 211 423 535 847 Bused = Nused Δf (MHz) 1.08 2.7 4.5 9 13.5 18 BW efficiency = Bused /licensed BW x 100 % 86 % 90 %
  • 37.
    4G LTE spectrum Usedsubcarriers Left Guard Subcarriers Right Guard Subcarriers freq Licensed BW  Purchased spectrum Used BW (Bused) ZEROSZEROS Licensed BW  Purchased spectrum We transmit zeros on part of licensed BW  In air, it accommodates side lopes of used subcarriers  side lopes will not get outside licensed BW  So we do not interfere with neighboring bands We transmit outside licensed BW but we just transmit zeros  No interference on neighboring bands B = fs = sampling frequency
  • 38.
    4G LTE spectrum Sidelopes of modulated subcarriers
  • 39.
    WiFi OFDM parameters IFFTsize (N) = 64 (52 used subcarriers + 1 DC + 11 guard subaccreirs) IFFT output duration (T) = 1 / subcarrier spacing = 1/(312.5x103)= 3.2 us Cyclic prefix length = Tg = 0.8us = T/4 Sample time (Ts) = 1/(20x106) = 0.05 us Used BW (Bused)= 53 (52 + 1 DC) subcarriers x 312.5 kHz = 16.6 MHz = OBW = Occupied BW
  • 40.
    Comments on OFDMparameters • Cyclic prefix (CP) length in LTE > CP in WiFi, why? • Because WiFi works in indoor environment while LTE works outdoor. • In outdoor, channel paths can be reflected from far objects so will come to Rx after long delay  Need longer cyclic prefix • What if we use too long CP, much longer than channel length? • Then, we need IFFT output length (T > 4Tcp) to be very long as well – Channel can vary during OFDM symbol (because it’s too long in duration)  Doppler effect  ICI See slide – Channel can vary during OFDM symbol (because it’s too long in duration)  Doppler effect  ICI See slide – Large latency  receiver will need to wait too long before it can receive OFDM symbol  OFDM detection cannot start before the whole OFDM symbol is received  Large latency not suitable for real-time applications (voice/video chatting, gaming, …) • What if we use too short CP, shorter than channel length? • Interference between successive OFDM symbols (every OFDM symbol will leak into its successor)  ISI • Subcarriers orthogonality will be destroyed leading to Inter-Carrier interference (ICI)
  • 41.
    • What aboutsubcarriers with DEEP fading? • What if a Narrow-Band Interference (NBI) hits OFDM signal? (e.g., BLUETOOTH into WLAN) MCM – Deep fading and NBI …… Deep Fading Narrow-band Interference (NBI) OFDM signal
  • 42.
    • In caseof deep fading, Hk is very small, so dividing by it will amplify the noise  Gives wrong QAM symbol after dividing by Hk • In case of NBI, noise power seen at impacted subcarriers is high  Gives wrong QAM symbol after dividing by Hk MCM – Deep fading and NBI NkZHXY kkkk  1, Large in case of NBISmall in case of Deep fading k k k k k k H Z X H Y X ˆˆ ˆ  Large in deep fading and NBI WRONG detection kk XX ˆ Channel estimate
  • 43.
    • How tosolve this problem? • Answer : Channel coding • Channel coding: Introduce redundancy of information bits (e.g., Repetition code, Convolutional code, Turbo code) • Then, distribute the resulting bits over subcarriers • If a subcarrier is hit by deep fading or NBI, we lose its bits but Bit-Interleaved Coded OFDM • If a subcarrier is hit by deep fading or NBI, we lose its bits but we use the redundancy bits distributed to other subcarriers to correctly decode information bits Channel Coding Interleaver QAM modulation SerialtoParallel N-pointIFFT N ParalleltoSerial Nbits AddCyclicPrefix
  • 44.
    • Example, Userepetition code, every information bit is repeated 3 times Bit-Interleaved Coded OFDM 1 0 1 1 1 1 0 0 0 1 1 1 Channel Coding Interleaver 1 0 1 1 0 1 1 0 1 BPSK modulation NBI 1 0 1 1 0 1 1 0 1 freq NBI Subcarrier 1 Subcarrier 4 Subcarrier 6
  • 45.
    • Subcarriers 4-6are hit by NBI  their data is wrongly detected • We can still detect the original information bits after decoding Bit-Interleaved Coded OFDM 1 0 1 1 0 1 1 0 1 NBINBI freqAfter detection 1 0 1 00 11 00 1 0 1 1 00 1 0 11 0 1 00 1 After De-Interleaving After Decoding (Majority Rule) 1 0 1 WRONG! CORRECT!
  • 46.
    • Note theimportance of the Interleaver! • It distribute code bits among subcarriers, so code bits corresponding to any information bit are assigned to NON- ADJACENT subcarriers, so if one is lost, others are not lost • One possible Interleaver design: Matrix Interleaver • Write code bits row by row in a matrix and read them out Interleaver design • Write code bits row by row in a matrix and read them out column by column c1 c2 c3 ……. c10 c11 c12 c13 ……. c20 c21 c22 c23 ……. c30 . . c91 c92 c93 ……. c100 {c1 c11 c21 …… c91 c2 c12 c22 …… c92 c3 c13 c23 …… c93 ….….…. .…. c100} {c1 c2 c3 …… c10 c11 c12 c13 …… c20 c21 c22 c23 …… c30 ….….…. .…. c100} c1 And c2 separated by 10 bits!
  • 47.
    OFDM Transmitter andReceiver Channel Coding Interleaver QAM modulation SerialtoParallel N-pointIFFT N ParalleltoSerial Nbits AddCyclicPrefix Channel decoding De- Interleaver QAM demod ParalleltoSerial N-pointFFT SerialtoParallel Nbits RemoveCyclicPrefix . . . . Freq domain Channel equalization (1 tap/subcarrier) Channel is estimated using pilots 1 ˆ/1 H kHˆ/1 NHˆ/1
  • 48.
  • 49.
    Subcarrier Loading • Ifthe channel has slow variation over time (e.g., in xDSL) • We can adapt the modulation of each subcarrier • Subcarriers with deep fades  loaded with few bits (e.g., BPSK or QPSK)  Low poweror QPSK)  Low power • Subcarriers with good channel  loaded with many bits (e.g., 64-QAM)  High power • We can design the loading of every subcarrier to maximize overall throughput (bit rate)  Use waterfilling technique
  • 50.
    Subcarrier Loading Subcarrier With bad Channel Not assigned Any bits (not used) Subcarrier With good Channel  Assigned many bits (high QAM)  Large power
  • 51.
    Subcarrier Loading • Canwe use adaptive loading in Single-Carrier systems? • No because by definition adaptive loading is used in multi- carrier systems • This is one advantage of OFDM over Single-Carrier• This is one advantage of OFDM over Single-Carrier
  • 52.
    Peak-to-Average Power Ratio(PAPR) • One disadvantage of OFDM is that it has high PAPR • This means that the peak power is much higher than the average power Peak power Average power time OFDM symbol power
  • 53.
    Peak-to-Average Power Ratio(PAPR) • OFDM has high PAPR, so what? • After generating OFDM signal, we feed it into Power Amplifier (PA) to amplify it • Any PA has a linear region and a saturation (non-linear) region • To avoid saturation and generation of non-linear components, we need to work in the linear region • Hence, we need to push the OFDM signal such that both its peak and average are within the linear region • This means that most of the time (where average power lies), we will work in low gain  Low efficiency of PA
  • 54.
    Peak-to-Average Power Ratio(PAPR) Output signal power Non-linear (Saturation) region Linear region Input signal power Most Of time, We work In low Gain region High gain region is rarely utilized!
  • 55.
    Peak-to-Average Power Ratio(PAPR) • Why does OFDM have high PAPR? • OFDM signal = Summation of N random variables Nn N kn jXnx N k k         0, 2 exp)( 1  Random variable • OFDM signal = Summation of N random variables • Central Limit Theory  Summation of many random variables has a Gaussian PDF regardless of PDF of every random variable • x(n) is Gaussian distributed for large N (number of subcarriers) • Gaussian random variables have high PAPR, why?
  • 56.
    Peak-to-Average Power Ratio(PAPR) Peak Power (rare!) Average power (Most of time) Peak power is much higher than average power for large variance Peak power is less likely to happen than average power
  • 57.
    • What aboutPAPR of Single-Carrier systems? • It’s actually lower than OFDM! Why? • In single-carrier (SC), transmitted signal = modulated Peak-to-Average Power Ratio (PAPR) • In single-carrier (SC), transmitted signal = modulated QAM signal directly  No IFFT • Hence, PAPR of SC = PAPR of QAM symbol • Consider QPSK  What’s PAPR?
  • 58.
    Peak-to-Average Power Ratio(PAPR) PAPR of QPSK QPSK Constellation Inphase Quadrature A A s1 s2 s s4 d1d2 d3 d4 PAPR of QPSK s3 s4 M  Number of QAM symbols   dB0 PowerAverage PowerPeak log10dBinPAPR 1 2 2 PowerAverage PowerPeak PAPR 2maxmaxPowerMaximumPowerPeak 22 4 111 PowerAverage 10 2 2 22 2 4 1 2 1 2 1       A A AdP AAd M P M i i i i i M i i M i i
  • 59.
    Peak-to-Average Power Ratio(PAPR) PAPR of SC with QPSK = 0 dB  Very good for PA efficiency If we used OFDM with QPSK, PAPR will be much higher In terms of PAPR, Single Carrier is better than OFDM! Exercise: Compute PAPR of Single Carrier with 16-QAM
  • 60.
    OFDM UNDER RFIMPAIRMENTS
  • 61.
    OFDM under RFimpairments • Effect of Carrier Frequency Offset (CFO) • Effect of Phase Noise (PN) • Effect of Doppler [Not RF impairment but has similar impact]similar impact] • Effect of I/Q imbalance (IQI)
  • 62.
    OFDM under CFO •CFO means that carrier frequency of receiver local oscillator is different from that of the transmitter fc,Tx fc,Rx π/2 π/2 fc,Tx fc,Rx CFO,,  fff TxcRxc CFO ≠0 due to inaccuracies of crystal oscillators used at Tx and Rx
  • 63.
    OFDM under CFO •Frequency of Crystal oscillator (XO) has manufacturing error measured as part per million (ppm) • ppm = error (in Hz) in every 1 million Hz (1 MHz) • Specifications of XO tells its frequency and expected error in ppm • Example: XO has frequency = 2 GHz with 0.1 ppm This means we have 0.1 Hz maximum error in every 1 MHz XO frequency = 2 GHz = 2000 MHz• XO frequency = 2 GHz = 2000 MHz • Maximum error will be 2000*0.1 = 200 Hz • XO frequency = 2 GHz ± 200 Hz • We expect XO frequency to be any where in the range 2 GHz -200 Hz < XO frequency < 2 GHz + 200 Hz • If both Tx and Rx XOs have 0.1 ppm, then maximum carrier frequency offset (CFO) between them is when one of them is 2 GHz -200 Hz while the other is 2 GHz + 200 Hz  Δfmax= 400 Hz
  • 64.
    OFDM under CFO •At Rx, taking FFT of received signal is equivalent to sampling the received signal in frequency-domain at the locations of subcarriers as follows Gives QAM symbol carried by red subcarrier with ZERO contributions of other subcarriers
  • 65.
    OFDM under CFO •If we have CFO, then this sampling is SHIFTED Gives QAM symbol carried by red subcarrier with NON-ZERO contributions of other subcarriers Inter-Carrier Interference (ICI)
  • 66.
    OFDM under CFO •CFO results in  Inter-Carrier Interference • Every carrier sees interference from NEIGHBOURS • Considering any subcarrier, it will see more interference from close subcarriers than from far subcarriers. This isfrom close subcarriers than from far subcarriers. This is clear from previous figure • How to solve this problem? • Use pilots to estimate CFO and compensate it in time- domain BEFORE taking FFT
  • 67.
    OFDM under CFO        kn j n jnxX fNB T fN n jnxnTjnTxnTx fftjtxtx N f s f sfss RxcRxcff                      2 exp 2 exp)( 1ˆ getweRx,@FFTngAfter taki 11 , 2 exp)(2exp)()( ,2exp)()( 1 ,,       j N n jg XgXgX fN nk jnx N X N j fN jnx N X N n N kl llkk f N n k n f k                                        exp 2 exp ˆ , )(2 exp)( 1ˆ 2 expexp)( 1ˆ 1 0 large0 0 1 0 0         N k k N kn jXnx 1 2 exp)( 
  • 68.
    • Effect ofCFO: 1. Desired symbol is rotated by phase = πα 2. ICI from neighboring subcarriers OFDM under CFO Hzinspacingsubcarrier HzinCFO    f f  Rotation effectICI effect
  • 69.
    • For αto be small, we need to choose XO specs such that CFO is small compared to subcarrier spacing • This means that 4G LTE (subcarrier spacing = OFDM under CFO • This means that 4G LTE (subcarrier spacing = 15 kHz) will have tougher spec on XO than WLAN (subcarrier spacing = 312.5 kHz) • To compensate for CFO, we estimate α (and hence δf) using pilots and multiply received signal by exp(jδfTsn), n=0:N-1 BEFORE taking FFT
  • 70.
    OFDM under PhaseNoise • Phase Noise (PN) means that oscillator has a random phase that changes with time π/2 π/2 π/2   ttf txc  2cos   ttf rxc  2cos Tx PN Rx PN fc f Ideal XO No PN fc f Practical XO With PN Linewidth
  • 71.
    OFDM under PhaseNoise • Phase Noise (PN) causes energy to leak around carrier frequency • Good oscillators have their energy leaking in a narrow bandwidth (they have small linewidth)bandwidth (they have small linewidth) • PLL is much better than free-running oscillators in terms of PN • Effect of PN on OFDM (similar to CFO): – Inter-Carrier Interference from neighboring subcarriers – Phase rotation of every subcarrier
  • 72.
    OFDM under PhaseNoise         symbolOFDMoverPNAverage)(exp 1 )(exp 2 exp)( 1ˆ )(exp)()(,)(exp)()( 1 0 0 0 1 0                 nj N g XgXgnj N kn jnx N X nTjnTxnTxtjtxtx N n kl llk N n k sss         ssubcarrierallforsamethesit'becauseCommon (CPE)'ErrorPhaseCommon'Called symbolOFDMinPNAverage)( 1 ,exp over time,variationPNslowwithsoscillatorpracticalFor samehavewillˆAll 0 1 0 avgavg0 01 0        g n N jg gX N N n K kk n 
  • 73.
    OFDM under PhaseNoise • How to solve PN problem? – Estimate PN samples and multiply received signal by exp(jφ(n)), n=0:N-1 BEFORE taking FFT – Difficult solution because PN change from sample to sample and difficult to track • Practical solution• Practical solution – Use pilots to estimate average PN φavg and multiply all subcarriers by conj(g0) = exp(jφavg) to reverse rotation induced by PN – This removes CPE and is called CPE compensation – Here, we ignore ICI caused by PN – Practical oscillators have small PN linewidth  Less leakage  Light ICI that can be ignored
  • 74.
    OFDM under Doppler •High Doppler means that channel rapidly changes over time due to Transmitter and/or Receiver movement Received Signal 2fd Transmitted signal Time-varying channel fc f fc f Doppler frequency = fd = v fc/c c  Speed of light = 3x108 m/s v  Relative speed between Tx and Rx If Tx and Rx are not moving (e.g., WiFi), No Doppler spread Doppler increases as carrier frequency and/or velocity increases Doppler spread
  • 75.
    OFDM under Doppler •4G LTE will have mobile phones moving in high speed • LTE has higher Doppler than WiFi • Doppler effect is similar to PN effect  Both• Doppler effect is similar to PN effect  Both have energy leakage in frequency domain • Effect of Doppler on OFDM: –ICI and rotation of every subcarrier
  • 76.
    OFDM under Doppler •Coherence time = 1/Doppler frequency • Coherence time  Time over which channel can be considered static • To avoid Doppler effect, make sure that OFDM symbol duration is smaller than Coherence time • What’s the Coherence time if fc = 2 GHz and v = 300 Km/hr? • Coherence time = 1/fd = c/ (v fc) = 1.8 ms • OFDM symbol duration in LTE = 67 us << 1.8 ms • So, Doppler spread can be safely ignored in LTE
  • 77.
    OFDM under I/Qimbalance • I/Q imbalance (IQI) means  Inphase and Quadrature paths have different gains and non-90 degrees phase differences ε 1 ε hI,tx(t) hI,rx(t) 1 π/2+θt π/2+θr εt εr εt ≠ 1  Gain imbalance @ Tx θt ≠ 0  Phase imbalance @ Tx hI,tx(t) ≠ hQ,tx(t)  Filter imbal @ Tx εr ≠ 1  Gain imbalance @ Rx θr ≠ 0  Phase imbalance @ Rx hI,rx(t) ≠ hQ,rx(t)  Filter imbal @ Rx hQ,tx(t) hQ,rx(t)
  • 78.
    OFDM under I/Qimbalance • Gain and Phase imbalance  Frequency-flat (Frequency- Independent) I/Q imbalance (FI-IQI) • Filter imbalance  Frequency-selective (Frequency- dependent) I/Q imbalance (FD-IQI) • Effect of FI-IQI on baseband signal: y(t)tytyty x(t)txtxtx rrIQIFI ttIQIFI signalRxonIQIRxofEffect)()()( signalTxonIQITxofEffect)()()( * *           1, 2 exp1 1, 2 exp1 * * rr rr r tt tt t j j             If no IQI, ε = 1, θ = 0 α =1, β = 0
  • 79.
    OFDM under I/Qimbalance • FD-IQI has a similar effect except that α and β are filters convolved with y(t) and y*(t), respectively • Assume y(t) = exp(j2πf1t)  1 Complex sinsoid • What’s yFI-IQI (t) ?  α exp(j2πf1t) + β exp(-j2πf1t) Y( f ) 1 ff1 Y( f ) With IQI α ff1 FI-IQIYFI-IQI( f ) 0 0-f1 β IQI creates an image of every subcarrier
  • 80.
    OFDM under I/Qimbalance - Example π/2 εt 1 cos(2πf1t) Let f1 = 1 MHz, fc = 700 MHz Without I/Q imbalance, RF signal x(t) Should be cos(2π(fc+f1)t), i.e., @ 701 MHz x(t) fc =700 MHz sin (2πf1t) x(t) = cos(2πf1t) cos(2πfct)- εt sin(2πf1t) sin(2πfct) = (1+ εt)/2 cos(2π(fc+f1)t) + (1- εt)/2 cos(2π(fc-f1)t) Due to IQI, we get frequency component @ fc-f1=699 MHz in addition to the expected 701 MHz. This 699 MHz is the image of 701 MHz around the carrier frequency fc
  • 81.
    OFDM under I/Qimbalance - Example If εt = 1, i.e., no I/Q imbalance, we see only 701 MHz component and there will be no frequency component @ 699 MHz      ComponentImageComponentOriginal )MHz6992cos( 2 1 )MHz7012cos( 2 1 )(      tttx tt     and there will be no frequency component @ 699 MHz 1 f(MHz)701 Signal analyzer Output (no IQI) fc=700 2 1 t 2 1 t f(MHz)701fc=700699 Signal analyzer Output (With IQI) image
  • 82.
    OFDM under I/Qimbalance • With IQI, subcarrier k will create an image for itself • This image interferes with subcarrier –k • IQI causes Inter-Carrier Interference (ICI) from image subcarriers not neighboring subcarriers as CFO, PN and Doppler • Signal-to-image ratio is called Image Rejection Ratio (IRR) and is defined for a mixer as:is defined for a mixer as: • Good mixers have high IRRs (IRR > 30 dB). IRR = ∞ if no IQI exists • Baseband processing is used to estimate and compensate IQI to increase IRR to +45 dB frequencyimage@Power frequencyoriginal@Power log10IRR 2 10   
  • 83.
    OFDM under I/Qimbalance • Phase imbalance is given in degrees, e.g., 2o • Gain imbalance is given in dBs or % as follows: dB 1 20Log GainQuad GainInphase 20LogImbalanceGain 1010               • If ε=0.9  Gain imbalance = 0.9 dB or 5% • If ε=1 (No imbalance)  Gain imbalance = 0 dB or 0% • Good mixers have Gain imbalance close to 0 dB or 0% %100 1 1 %100 GainQuadGainInphase GainQuadGainInphase ImbalanceGain        -
  • 84.
    OFDM under I/Qimbalance • An RF mixer has Gain imbalance = 3 % and phase imbalance = 2 degrees, what’s IRR? • ε = 0.94 and θ = 2 *180/pi  Convert from deg to rad   dB29log10IRR 0.01603.01 0.0160.97 2 180 2exp94.01 2 10 *            r r rr r j j j      IRR is the same if we used eqns of αt and βt instead of αr and βr
  • 85.
    OFDM under RxI/Q imbalance Baseband received signal Before Mixer Baseband received signal After IQI-impaired Mixer 1 0.5 0.5α α f0 f0 f0 β β/2 Add both waveforms To get baseband signal under IQI Image conjugated
  • 86.
    Baseband compensation ofI/Q Imbalance Use Calibration to estimate Gain and Phase imbalance Calibration means sending single tone through the mixer and using received samples to estimate ε and θ Baseband I/Q compensation circuit π/2+θr 1 εr hI,rx(t) hQ,rx(t) 1/εr 1/cos(θr) +
  • 87.
  • 88.
    Shortcomings of OFDM •Large PAPR • Vulnerable to RF impairments (CFO, PN, IQI) – These impairments cause ICI which reduces effective SNR of each subcarrier – ICI can cause strong carriers (with good channels) to interfere on weak carriers (with deep fading)interfere on weak carriers (with deep fading) ==causing==> low carrier to noise ratio – Effect of these impairments on Single-Carrier does not include inter-symbol interference (ISI) in AWGN channel. Only symbol rotation and/or scaling but No ISI in AWGN channel – Hence, Single-Carrier is more robust to these impairments than OFDM!
  • 89.
    Shortcomings of OFDM •RF impairments can be compensated in baseband using fairly low-complexity methods • Hence, we can live with RF impairments • However, large PAPR of OFDM is a persistent problem that impacts PA efficiency • High PA efficiency is a key factor for long-lasting battery in• High PA efficiency is a key factor for long-lasting battery in cell phones • 4G LTE standard adopted Single-Carrier for Uplink where cell phone is transmitting • OFDM is chosen for 4G LTE downlink where eNodeB (Base station) is transmitting • There’s no battery constraints in base stations
  • 90.
    Single-Carrier • Single-carrier canbe implemented using OFDM platform but with FFT introduced before IFFT to cancel its effect QAM modulation SerialtoParallel IFFTFFT
  • 91.
    Single-Carrier Frequency-Division Multiple-Access (SC-FDMA) •In 4G LTE uplink, multiple user equipments (UEs) (cell phones) can transmit at the same time but need to be frequency-multiplexed • This is achieved by making FFT and IFFT sizes different • FFT size = M and IFFT size = N where M < N• FFT size = M and IFFT size = N where M < N • User 1  Take FFT output (M entries) and assign to a part of IFFT input and pad remaining part (N-M entries) by zeros • User 2  Assign your FFT output to the part where User 1 put zeros and put zeros in the part where User 1 put its data • See next slides for Two-Users example
  • 92.
    SC-FDMA Transmitters @Cell phones QAM modulation SerialtoParallel N-pointIFFT M-point FFTM QAM symbols M M N-M zerosN-M zeros User 1 Transmitter AddCyclicprefix ParalleltoSerial N N QAM modulation M-point FFTM QAM symbols M M N-M zerosN-M zeros User 2 Transmitter N-pointIFFT N SerialtoParallel AddCyclicprefix ParalleltoSerial N
  • 93.
    SC-FDMA Receiver ateNodeB (Base station) pointFFT RemoveCyclicprefix SerialtoParallel Select U1 subcarriers M-pointIFFT ParalleltoSerialQAM demod 1, ˆ 1 UkH MM User 1 Channel estimate To User 1 decoder N-pointFFT RemoveCyclicprefix SerialtoParallel N N Select U2 subcarriers M-pointIFFT ParalleltoSerial QAM demod Channel estimation MM 2, ˆ 1 UkH User 2 Channel estimateTo User 2 decoder
  • 94.
    SC-FDMA • Different userscan be assigned different number of subcarrier (M1, M2, ….) • Subcarrier allocation  localized (adjacent) or distributed (Interleaved)  • eNodeB tells every user its allocation size M and location (indices) of these subcarriers • Difference between OFDM and SC-FDMA receivers:• Difference between OFDM and SC-FDMA receivers: – In OFDM, we get (QAM symbol x Channel after FFT), so division by channel is Maximum-Likelihood (ML) optimal – In SC-FDMA, we get (FFT of QAM symbols x Channel after FFT), so division by channel is NOT ML-optimal • Subcarriers in OFDM carriers QAM symbols, while in SC-FDMA, they carry FFT of QAM symbols • Cyclic prefix is used in both OFDM and SC-FDMA to prevent ICI and maintain orthogonality among subcarriers
  • 95.
    SC-FDMA • SC-FDMA PAPRdepends on QAM order & subcarrier allocation  Interleaved PAPR < Localized PAPR • In 4G LTE, no pilots are multiplexed with data subcarriers in order to maintain low PAPR as pilots are transmitted in higher power than data • Instead, pilots are transmitted alone in a separate symbol every 6 data symbolsevery 6 data symbols • In WiFi, OFDMA is used at both Tx and Rx. No high PA efficiency is needed because – Tx-Rx distance in WiFi < Tx-Rx distance in LTE – More restrictions on output power in WiFi than in LTE because WiFi transmits in unlicensed bands  To limit interference to others – Hence, WiFi PA gain < LTE PA gain  No high efficiency needed in WiFi
  • 96.
    References (1) 1) J.A. C. Bingham, "Multicarrier modulation for data transmission: an idea whose time has come," in IEEE Communications Magazine, vol. 28, no. 5, pp. 5-14, May 1990 2) Nee, Richard van, and Ramjee Prasad. OFDM for wireless multimedia communications. Artech House, Inc., 2000. 3) Heiskala, Juha, and John Terry Ph D. OFDM wireless LANs: A theoretical and practical guide. Sams, 2001. 4) Van de Beek, J-J., et al. "On channel estimation in OFDM systems." Vehicular Technology Conference, 1995 IEEE 45th. Vol. 2. IEEE, 1995. 5) Wong, Cheong Yui, et al. "Multiuser OFDM with adaptive subcarrier, bit, and power allocation." IEEE Journal on selected areas in communications 17.10 (1999): 1747- 1758. allocation." IEEE Journal on selected areas in communications 17.10 (1999): 1747- 1758. 6) Rhee, Wonjong, and John M. Cioffi. "Increase in capacity of multiuser OFDM system using dynamic subchannel allocation." Vehicular Technology Conference Proceedings, 2000. VTC 2000-Spring Tokyo. 2000 IEEE 51st. Vol. 2. IEEE, 2000. 7) Armstrong, Jean. "Peak-to-average power reduction for OFDM by repeated clipping and frequency domain filtering." Electronics letters 38.5 (2002): 1. 8) Cimini, Leonard J., and Nelson R. Sollenberger. "Peak-to-average power ratio reduction of an OFDM signal using partial transmit sequences." IEEE Communications letters 4.3 (2000): 86-88. 9) Pollet, Thierry, Mark Van Bladel, and Marc Moeneclaey. "BER sensitivity of OFDM systems to carrier frequency offset and Wiener phase noise." IEEE transactions on communications 43.2/3/4 (1995): 191-193.
  • 97.
    References (2) 10) Jang,Jiho, and Kwang Bok Lee. "Transmit power adaptation for multiuser OFDM systems." IEEE Journal on selected areas in communications 21.2 (2003): 171-178. 11) Zhao, Yuping, and S-G. Haggman. "Intercarrier interference self-cancellation scheme for OFDM mobile communication systems." IEEE Transactions on Communications 49.7 (2001): 1185-1191. 12) Li, Ye, and L. J. Cimini. "Bounds on the interchannel interference of OFDM in time- varying impairments." IEEE Transactions on Communications 49.3 (2001): 401-404. 13) Morelli, Michele, and Umberto Mengali. "A comparison of pilot-aided channel estimation methods for OFDM systems." IEEE Transactions on signal processing 49.12 (2001): 3065-3073. 14) Jiang, Tao, and Yiyan Wu. "An overview: peak-to-average power ratio reduction14) Jiang, Tao, and Yiyan Wu. "An overview: peak-to-average power ratio reduction techniques for OFDM signals." IEEE Transactions on broadcasting54.2 (2008): 257. 15) Bahai, Ahmad RS, Burton R. Saltzberg, and Mustafa Ergen. Multi-carrier digital communications: theory and applications of OFDM. Springer Science & Business Media, 2004. 16) Heiskala, Juha, and John Terry Ph D. OFDM wireless LANs: A theoretical and practical guide. Sams, 2001. 17) Morelli, Michele, and Umberto Mengali. "An improved frequency offset estimator for OFDM applications." Communication Theory Mini-Conference, 1999. IEEE, 1999. 18) Falconer, David, et al. "Frequency domain equalization for single-carrier broadband wireless systems." IEEE Communications Magazine 40.4 (2002): 58-66. 19) Horlin, François, and André Bourdoux. Digital compensation for analog front-ends: a new approach to wireless transceiver design. John Wiley & Sons, 2008.
  • 98.
    References (3) 20) Schenk,Tim. RF imperfections in high-rate wireless systems: impact and digital compensation. Springer Science & Business Media, 2008. 21) Holma, Harri, and Antti Toskala, eds. LTE for UMTS-OFDMA and SC-FDMA based radio access. John Wiley & Sons, 2009. 22) Berardinelli, Gilberto, et al. "OFDMA vs. SC-FDMA: performance comparison in local area IMT-A scenarios." IEEE Wireless Communications 15.5 (2008): 64-72. 23) Myung, Hyung G., Junsung Lim, and David J. Goodman. "Single carrier FDMA for uplink wireless transmission." IEEE Vehicular Technology Magazine 1.3 (2006): 30-38. 24) Myung, Hyung G., Junsung Lim, and David J. Goodman. "Peak-to-average power ratio of24) Myung, Hyung G., Junsung Lim, and David J. Goodman. "Peak-to-average power ratio of single carrier FDMA signals with pulse shaping." 2006 IEEE 17th International Symposium on Personal, Indoor and Mobile Radio Communications. IEEE, 2006. 25) Huang, Gillian, Andrew Nix, and Simon Armour. "Decision feedback equalization in SC- FDMA." 2008 IEEE 19th International Symposium on Personal, Indoor and Mobile Radio Communications. IEEE, 2008. 26) Zhang, Chao, et al. "Frequency domain decision feedback equalization for uplink SC- FDMA." IEEE transactions on broadcasting 56.2 (2010): 253-257. 27) Gomaa, Ahmad, and Naofal Al-Dhahir. "A sparsity-aware approach for NBI estimation in MIMO-OFDM." IEEE Transactions on Wireless Communications10.6 (2011): 1854-1862.
  • 99.
    28) Gomaa, Ahmad,and Naofal Al-Dhahir, "SC-FDMA Performance in Presence of Oscillator Impairments: EVM and Subcarrier Mapping Impact," Global Telecommunications Conference (GLOBECOM 2011), 2011 IEEE, Houston, TX, USA, 2011, pp. 1-5. 29) Gomaa, Ahmad, and Naofal Al-Dhahir. "Multi-user SC-FDMA systems under IQ imbalance: EVM and subcarrier mapping impact." Global Telecommunications Conference (GLOBECOM 2011), 2011 IEEE. IEEE, 2011. 30) Gomaa, Ahmad, and Naofal Al-Dhahir. "Phase noise in asynchronous SC-FDMA systems: Performance analysis and data-aided compensation." IEEE Transactions on Vehicular Technology 63.6 (2014): 2642-2652. 31) Gomaa, Ahmad, and Louay MA Jalloul. "Data-aided I/Q imbalance estimation References (4) 31) Gomaa, Ahmad, and Louay MA Jalloul. "Data-aided I/Q imbalance estimation and compensation in OFDM systems." IEEE Communications Letters 18.3 (2014): 459-462. 32) Gomaa, Ahmad, and Naofal Al-Dhahir. "Blind phase noise compensation for SC- FDMA with application to LTE-uplink." 2012 IEEE International Conference on Communications (ICC). 2012. 33) Gomaa, Ahmad, Ayman Elezabi, and Mohamed Eissa. "A Subspace Method for I/Q Imbalance Estimation in Low-IF Receivers." arXiv preprint arXiv:1411.2199 (2014). 34) Gomaa, Ahmad, and Louay Jalloul. "Receiver Architecture for Frequency Offset Correction and I/Q Imbalance Compensation in Equal Bandwidth Contiguous Carrier Aggregation."
  • 100.
    References (5) 35) Mokhtar,Mohamed, Ahmad Gomaa, and Naofal Al-Dhahir. "OFDM AF relaying under I/Q imbalance: Performance analysis and baseband compensation." IEEE Transactions on Communications 61.4 (2013): 1304-1313. 36) ElSamadouny, Ahmed, Ahmad Gomaa, and Naofal Al-Dhahir. "Likelihood-based spectrum sensing of OFDM signals in the presence of Tx/Rx I/Q imbalance." Global Comm. Conference (GLOBECOM), 2012 IEEE. IEEE, 2012. 37) Priyanto, Basuki E., et al. "Initial performance evaluation of DFT-spread OFDM37) Priyanto, Basuki E., et al. "Initial performance evaluation of DFT-spread OFDM based SC-FDMA for UTRA LTE uplink." 2007 IEEE 65th Vehicular Technology Conference-VTC2007-Spring. IEEE, 2007. 38) Raghunath, K., and A. Chockalingam. "SC-FDMA versus OFDMA: Sensitivity to large carrier frequency and timing offsets on the uplink." Global Telecommunications Conference, 2009. GLOBECOM 2009. IEEE. IEEE, 2009. 39) Berardinelli, Gilberto, et al. "Improving SC-FDMA performance by turbo equalization in UTRA LTE uplink." Vehicular Technology Conference, 2008. VTC Spring 2008. IEEE. IEEE, 2008.
  • 101.
    40) Yoshida, Yuki,et al. "Analysis and compensation of transmitter IQ imbalances in OFDMA and SC-FDMA systems." IEEE Trans on Signal Processing 57.8 (2009): 3119-3129. 41) Tarighat, Alireza, Rahim Bagheri, and Ali H. Sayed. "Compensation schemes and performance analysis of IQ imbalances in OFDM receivers." IEEE Transactions on Signal Processing 53.8 (2005): 3257-3268. 42) Tarighat, Alireza, and Ali H. Sayed. "Joint compensation of References (6) 42) Tarighat, Alireza, and Ali H. Sayed. "Joint compensation of transmitter and receiver impairments in OFDM systems." IEEE Transactions on Wireless Communications 6.1 (2007): 240-247. 43) Zou, Qiyue, Alireza Tarighat, and Ali H. Sayed. "Compensation of phase noise in OFDM wireless systems." IEEE Transactions on Signal Processing 55.11 (2007): 5407-5424.
  • 102.