SlideShare a Scribd company logo
• AFES is determined to deliver cost effective solutions in hub/major hub and MSC sites as per below
mentioned SOW.
Preventive maintenance of 11 kva Switchgear (VCB/OCB etc)
• Detailed inspection & checking of 11 kva switch gear of different make I,e siemens ,Alstom ,Areva ,
Medinsha etc ,installed at MSC / MGW locations will be done bi manually
• Checking and greasing of mechanical system
• Cleaning of excitation unit and checking of connection
• Blowing of alternator and greasing
• Checking of Nuts / bolts & bus par tightening
• Checking and testing of oil
• Operational checking & overhauling of circuit breaker
 Checking of relay
 Checking of earth fault and over current
 Meggering of HT incoming and outgoing cable for insulation damages
 Checking of HT termination kits
 Cleaning of transformer parts including bushing ,lightening arrestor ,phase terminal points ,power cable etc by blowers
 Checking of ammeters ,voltmeter ,energy meters etc ,including all equipment installed in 11 KV switchgear cabinets
 Checking of magnetic contactors ,circuit breakers & fuses
 Checking of transformer moisture
 Servicing of VCB ,contacts ,associated trolley
 Operation under simulated service condition to ensure accuracy of wiring ,correctness of control scheme & proper fluctuation of the
equipment
 All wiring and current carrying part shall be given appropriate High Voltage test
 Primary current and voltage shall be applied to all instrument transformers
 Routine test shall be carried out on all equipment such as breaker , instrument transforms , relays ,meters ,transducers
 Picture gallery
Preventive Maintenance of 11KV Switchgear accosiated transformers
 Checking of transformer oil
 Checking of transformer gas kit
 Checking of transformer Nuts / bolts & connection tightening
 Checking of transformer silica gel and replacement necessary
 Checking and testing of transformer and any unbalancing in load
 Checking and testing of transformer Buchloz relay
Preventive Maintenance of LT fuse & Single core 300 mm PVC cable in 11KV
substation
 Cleaning and checking of cable connection
 Checking of cable Nuts & Bolts tightening
 Checking of fuse with Fuse wire
 Testing of earth point for body and transformer Neutral
Preventive Maintenance of LT fuse & Single core 300 mm PVC cable in
11KV substation
 Cleaning and checking of cable connection
 Checking of cable Nuts & Bolts tightening
 Checking of fuse with Fuse wire
 Testing of earth point for body and transformer Neutral
Thank You

More Related Content

What's hot

Operation and maintenance of transformer
Operation and maintenance of transformerOperation and maintenance of transformer
Operation and maintenance of transformer
Kapil Singh
 
Simple Current Transformer (CT) Testing for Switchyard Equipment.
Simple Current Transformer (CT) Testing for Switchyard Equipment.Simple Current Transformer (CT) Testing for Switchyard Equipment.
Simple Current Transformer (CT) Testing for Switchyard Equipment.
SARAVANAN A
 
A2.34+transformer+maintenance+tutorial
A2.34+transformer+maintenance+tutorialA2.34+transformer+maintenance+tutorial
A2.34+transformer+maintenance+tutorial
Jack Duff
 
Power transformer testing and commissioning guidelines r
Power transformer testing and commissioning guidelines rPower transformer testing and commissioning guidelines r
Power transformer testing and commissioning guidelines r
Ashish Patel
 
Distribution Transformer testing, West Bengal, India
Distribution Transformer testing,  West Bengal, IndiaDistribution Transformer testing,  West Bengal, India
Distribution Transformer testing, West Bengal, India
RajuMondal18
 
High voltage testing of electrical transformer
High voltage testing of electrical transformerHigh voltage testing of electrical transformer
High voltage testing of electrical transformer
PraveenKumar5880
 
Variable Pressure Detector
Variable Pressure DetectorVariable Pressure Detector
Variable Pressure Detector
Andrew Schnobrich
 
Testing of transformer
Testing of transformerTesting of transformer
Testing of transformer
SMRITI KESHARWANI
 
Variable impedance type series compensators
Variable impedance type series compensatorsVariable impedance type series compensators
Variable impedance type series compensators
gundharchougule1
 
Power transformer maintenance
Power transformer maintenancePower transformer maintenance
Power transformer maintenanceLucian Lazar
 
Transformer Site test
Transformer Site testTransformer Site test
Transformer Site test
Vinay Vishwakarma
 
Transformer Failure Due to Circuit Breaker Induced Switching Transients
Transformer Failure Due to Circuit Breaker Induced Switching TransientsTransformer Failure Due to Circuit Breaker Induced Switching Transients
Transformer Failure Due to Circuit Breaker Induced Switching Transients
michaeljmack
 
Transformer testing on sight and off sight
Transformer testing on sight and off sightTransformer testing on sight and off sight
Transformer testing on sight and off sight
DHAVALKUMAR JULASANA
 
Transformers
TransformersTransformers
Transformers
michaeljmack
 
Current meter, propeller type
Current meter, propeller typeCurrent meter, propeller type
Current meter, propeller typehydrologyproject0
 
Energy conservation Activites of thermal power plant
Energy conservation Activites of thermal power plantEnergy conservation Activites of thermal power plant
Energy conservation Activites of thermal power plant
MANOJ KUMAR MAHARANA
 
104980410 control-valve-calibration-procedure-fisher-hc6010
104980410 control-valve-calibration-procedure-fisher-hc6010104980410 control-valve-calibration-procedure-fisher-hc6010
104980410 control-valve-calibration-procedure-fisher-hc6010
Thanh Pham Duc
 
Control valve positioners
Control valve positionersControl valve positioners
Control valve positionersSagar Jathan
 
Tecconex Case Study
Tecconex Case StudyTecconex Case Study
Tecconex Case Study
Sam Hooper
 

What's hot (20)

EIT_Presentation
EIT_PresentationEIT_Presentation
EIT_Presentation
 
Operation and maintenance of transformer
Operation and maintenance of transformerOperation and maintenance of transformer
Operation and maintenance of transformer
 
Simple Current Transformer (CT) Testing for Switchyard Equipment.
Simple Current Transformer (CT) Testing for Switchyard Equipment.Simple Current Transformer (CT) Testing for Switchyard Equipment.
Simple Current Transformer (CT) Testing for Switchyard Equipment.
 
A2.34+transformer+maintenance+tutorial
A2.34+transformer+maintenance+tutorialA2.34+transformer+maintenance+tutorial
A2.34+transformer+maintenance+tutorial
 
Power transformer testing and commissioning guidelines r
Power transformer testing and commissioning guidelines rPower transformer testing and commissioning guidelines r
Power transformer testing and commissioning guidelines r
 
Distribution Transformer testing, West Bengal, India
Distribution Transformer testing,  West Bengal, IndiaDistribution Transformer testing,  West Bengal, India
Distribution Transformer testing, West Bengal, India
 
High voltage testing of electrical transformer
High voltage testing of electrical transformerHigh voltage testing of electrical transformer
High voltage testing of electrical transformer
 
Variable Pressure Detector
Variable Pressure DetectorVariable Pressure Detector
Variable Pressure Detector
 
Testing of transformer
Testing of transformerTesting of transformer
Testing of transformer
 
Variable impedance type series compensators
Variable impedance type series compensatorsVariable impedance type series compensators
Variable impedance type series compensators
 
Power transformer maintenance
Power transformer maintenancePower transformer maintenance
Power transformer maintenance
 
Transformer Site test
Transformer Site testTransformer Site test
Transformer Site test
 
Transformer Failure Due to Circuit Breaker Induced Switching Transients
Transformer Failure Due to Circuit Breaker Induced Switching TransientsTransformer Failure Due to Circuit Breaker Induced Switching Transients
Transformer Failure Due to Circuit Breaker Induced Switching Transients
 
Transformer testing on sight and off sight
Transformer testing on sight and off sightTransformer testing on sight and off sight
Transformer testing on sight and off sight
 
Transformers
TransformersTransformers
Transformers
 
Current meter, propeller type
Current meter, propeller typeCurrent meter, propeller type
Current meter, propeller type
 
Energy conservation Activites of thermal power plant
Energy conservation Activites of thermal power plantEnergy conservation Activites of thermal power plant
Energy conservation Activites of thermal power plant
 
104980410 control-valve-calibration-procedure-fisher-hc6010
104980410 control-valve-calibration-procedure-fisher-hc6010104980410 control-valve-calibration-procedure-fisher-hc6010
104980410 control-valve-calibration-procedure-fisher-hc6010
 
Control valve positioners
Control valve positionersControl valve positioners
Control valve positioners
 
Tecconex Case Study
Tecconex Case StudyTecconex Case Study
Tecconex Case Study
 

Similar to MSC SOW

TESTING,MAINTENANCE&PROTECTION.ppt
TESTING,MAINTENANCE&PROTECTION.pptTESTING,MAINTENANCE&PROTECTION.ppt
TESTING,MAINTENANCE&PROTECTION.ppt
ChristinaBoyd12
 
93518813-TESTING-MAINTENANCE-PROTECTION-OF-DISTRIBUTION-TRANSFORMERS.ppt
93518813-TESTING-MAINTENANCE-PROTECTION-OF-DISTRIBUTION-TRANSFORMERS.ppt93518813-TESTING-MAINTENANCE-PROTECTION-OF-DISTRIBUTION-TRANSFORMERS.ppt
93518813-TESTING-MAINTENANCE-PROTECTION-OF-DISTRIBUTION-TRANSFORMERS.ppt
santubanga333
 
TESTING,MAINTENANCE&PROTECTION.ppt
TESTING,MAINTENANCE&PROTECTION.pptTESTING,MAINTENANCE&PROTECTION.ppt
TESTING,MAINTENANCE&PROTECTION.ppt
ssuser1f60f6
 
Testing,maintenance&protection
Testing,maintenance&protectionTesting,maintenance&protection
Testing,maintenance&protection
Rakesh Joshi
 
Appraisal ppt ankur
Appraisal ppt ankurAppraisal ppt ankur
Appraisal ppt ankur
Ankur Mishra
 
tcee-161003100321.pptx
tcee-161003100321.pptxtcee-161003100321.pptx
tcee-161003100321.pptx
Satish Pydimarla
 
Transformer
TransformerTransformer
Transformer
Sandeep Kumar
 
Chapter 5 mukesh gurjar
Chapter 5 mukesh gurjarChapter 5 mukesh gurjar
Chapter 5 mukesh gurjar
Mukesh gurjar
 
INSTALLATION OF 500MVA TRANSFORMER AT PGCIL
INSTALLATION OF 500MVA TRANSFORMER AT PGCIL INSTALLATION OF 500MVA TRANSFORMER AT PGCIL
INSTALLATION OF 500MVA TRANSFORMER AT PGCIL
Rahul Akinapelli
 
Switchgear presentation
Switchgear presentationSwitchgear presentation
Switchgear presentation
Nadir Baloch
 
Transformers pptxx.ppt
Transformers pptxx.pptTransformers pptxx.ppt
Transformers pptxx.ppt
jaajasnjkja
 
Electrical_substation_general_equipments.ppt
Electrical_substation_general_equipments.pptElectrical_substation_general_equipments.ppt
Electrical_substation_general_equipments.ppt
BrijeshKumar33410
 
switchgearpresentation-151030171028-lva1-app6892.pptx
switchgearpresentation-151030171028-lva1-app6892.pptxswitchgearpresentation-151030171028-lva1-app6892.pptx
switchgearpresentation-151030171028-lva1-app6892.pptx
DrNiveditaSingh3
 
Maintenance schedule of Substation.
Maintenance schedule of Substation.Maintenance schedule of Substation.
Maintenance schedule of Substation.
Sheikh Nazmul Islam
 
Substation presentation by ram
Substation presentation by ramSubstation presentation by ram
Substation presentation by ram
GRBabu Naidu
 
Electrical substation general_equipments
Electrical substation general_equipmentsElectrical substation general_equipments
Electrical substation general_equipments
Eman Dacanay
 
REPORT -VALLUR THERMAL POWER PLANT
REPORT -VALLUR THERMAL POWER PLANTREPORT -VALLUR THERMAL POWER PLANT
REPORT -VALLUR THERMAL POWER PLANTRAJPRASAD RS
 
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGHHIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGHShankar Singh
 

Similar to MSC SOW (20)

TESTING,MAINTENANCE&PROTECTION.ppt
TESTING,MAINTENANCE&PROTECTION.pptTESTING,MAINTENANCE&PROTECTION.ppt
TESTING,MAINTENANCE&PROTECTION.ppt
 
93518813-TESTING-MAINTENANCE-PROTECTION-OF-DISTRIBUTION-TRANSFORMERS.ppt
93518813-TESTING-MAINTENANCE-PROTECTION-OF-DISTRIBUTION-TRANSFORMERS.ppt93518813-TESTING-MAINTENANCE-PROTECTION-OF-DISTRIBUTION-TRANSFORMERS.ppt
93518813-TESTING-MAINTENANCE-PROTECTION-OF-DISTRIBUTION-TRANSFORMERS.ppt
 
TESTING,MAINTENANCE&PROTECTION.ppt
TESTING,MAINTENANCE&PROTECTION.pptTESTING,MAINTENANCE&PROTECTION.ppt
TESTING,MAINTENANCE&PROTECTION.ppt
 
Testing,maintenance&protection
Testing,maintenance&protectionTesting,maintenance&protection
Testing,maintenance&protection
 
Appraisal ppt ankur
Appraisal ppt ankurAppraisal ppt ankur
Appraisal ppt ankur
 
tcee-161003100321.pptx
tcee-161003100321.pptxtcee-161003100321.pptx
tcee-161003100321.pptx
 
Transformer
TransformerTransformer
Transformer
 
Chapter 5 mukesh gurjar
Chapter 5 mukesh gurjarChapter 5 mukesh gurjar
Chapter 5 mukesh gurjar
 
INSTALLATION OF 500MVA TRANSFORMER AT PGCIL
INSTALLATION OF 500MVA TRANSFORMER AT PGCIL INSTALLATION OF 500MVA TRANSFORMER AT PGCIL
INSTALLATION OF 500MVA TRANSFORMER AT PGCIL
 
Standards
StandardsStandards
Standards
 
Switchgear presentation
Switchgear presentationSwitchgear presentation
Switchgear presentation
 
Transformers pptxx.ppt
Transformers pptxx.pptTransformers pptxx.ppt
Transformers pptxx.ppt
 
Electrical_substation_general_equipments.ppt
Electrical_substation_general_equipments.pptElectrical_substation_general_equipments.ppt
Electrical_substation_general_equipments.ppt
 
switchgearpresentation-151030171028-lva1-app6892.pptx
switchgearpresentation-151030171028-lva1-app6892.pptxswitchgearpresentation-151030171028-lva1-app6892.pptx
switchgearpresentation-151030171028-lva1-app6892.pptx
 
Maintenance schedule of Substation.
Maintenance schedule of Substation.Maintenance schedule of Substation.
Maintenance schedule of Substation.
 
Substation presentation by ram
Substation presentation by ramSubstation presentation by ram
Substation presentation by ram
 
16950
1695016950
16950
 
Electrical substation general_equipments
Electrical substation general_equipmentsElectrical substation general_equipments
Electrical substation general_equipments
 
REPORT -VALLUR THERMAL POWER PLANT
REPORT -VALLUR THERMAL POWER PLANTREPORT -VALLUR THERMAL POWER PLANT
REPORT -VALLUR THERMAL POWER PLANT
 
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGHHIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
 

More from waqar khan

AFES Progress Evaluation
AFES Progress EvaluationAFES Progress Evaluation
AFES Progress Evaluationwaqar khan
 
AFES Project feasibility for PMCL work
AFES Project feasibility for PMCL workAFES Project feasibility for PMCL work
AFES Project feasibility for PMCL workwaqar khan
 
C.P. Billing Presentation
C.P. Billing PresentationC.P. Billing Presentation
C.P. Billing Presentationwaqar khan
 
Company_Profile_AFES,2012
Company_Profile_AFES,2012Company_Profile_AFES,2012
Company_Profile_AFES,2012waqar khan
 

More from waqar khan (6)

BARQ MSC
BARQ MSCBARQ MSC
BARQ MSC
 
AFES Progress Evaluation
AFES Progress EvaluationAFES Progress Evaluation
AFES Progress Evaluation
 
AFES Project feasibility for PMCL work
AFES Project feasibility for PMCL workAFES Project feasibility for PMCL work
AFES Project feasibility for PMCL work
 
C.P. Billing Presentation
C.P. Billing PresentationC.P. Billing Presentation
C.P. Billing Presentation
 
msc U-PHONE
msc U-PHONEmsc U-PHONE
msc U-PHONE
 
Company_Profile_AFES,2012
Company_Profile_AFES,2012Company_Profile_AFES,2012
Company_Profile_AFES,2012
 

MSC SOW

  • 1.
  • 2. • AFES is determined to deliver cost effective solutions in hub/major hub and MSC sites as per below mentioned SOW. Preventive maintenance of 11 kva Switchgear (VCB/OCB etc) • Detailed inspection & checking of 11 kva switch gear of different make I,e siemens ,Alstom ,Areva , Medinsha etc ,installed at MSC / MGW locations will be done bi manually • Checking and greasing of mechanical system • Cleaning of excitation unit and checking of connection • Blowing of alternator and greasing • Checking of Nuts / bolts & bus par tightening • Checking and testing of oil • Operational checking & overhauling of circuit breaker
  • 3.  Checking of relay  Checking of earth fault and over current  Meggering of HT incoming and outgoing cable for insulation damages  Checking of HT termination kits  Cleaning of transformer parts including bushing ,lightening arrestor ,phase terminal points ,power cable etc by blowers  Checking of ammeters ,voltmeter ,energy meters etc ,including all equipment installed in 11 KV switchgear cabinets  Checking of magnetic contactors ,circuit breakers & fuses  Checking of transformer moisture  Servicing of VCB ,contacts ,associated trolley  Operation under simulated service condition to ensure accuracy of wiring ,correctness of control scheme & proper fluctuation of the equipment  All wiring and current carrying part shall be given appropriate High Voltage test  Primary current and voltage shall be applied to all instrument transformers  Routine test shall be carried out on all equipment such as breaker , instrument transforms , relays ,meters ,transducers
  • 5. Preventive Maintenance of 11KV Switchgear accosiated transformers  Checking of transformer oil  Checking of transformer gas kit  Checking of transformer Nuts / bolts & connection tightening  Checking of transformer silica gel and replacement necessary  Checking and testing of transformer and any unbalancing in load  Checking and testing of transformer Buchloz relay
  • 6.
  • 7. Preventive Maintenance of LT fuse & Single core 300 mm PVC cable in 11KV substation  Cleaning and checking of cable connection  Checking of cable Nuts & Bolts tightening  Checking of fuse with Fuse wire  Testing of earth point for body and transformer Neutral
  • 8. Preventive Maintenance of LT fuse & Single core 300 mm PVC cable in 11KV substation  Cleaning and checking of cable connection  Checking of cable Nuts & Bolts tightening  Checking of fuse with Fuse wire  Testing of earth point for body and transformer Neutral
  • 9.