SlideShare a Scribd company logo
1 of 47
TESTING,
MAINTENANCE &
PROTECTION OF
DISTRIBUTION
TRANSFORMERS
Presented by
PRASHANT P. NANKAR
TRANS-DELTA ELECTRICALS
WHAT IS A TRANSFORMER?
 TRANSFORMER IS A
STATIC DEVICE WHICH
TRANSFORMS A.C.
ELECTRICAL POWER
FROM ONE VOLTAGE
TO ANOTHER VOLTAGE
KEEPING THE
FREQUENCY SAME BY
ELECTROMAGNETIC
INDUCTION.
TYPES OF TRANSFORMER
BY APPLICATION
 1. DISTRIBUTION TRANSFORMER
 2.POWER TRANSFORMER
 3.CURRENT TRANSFORMER
 4.POTENTIAL TRANSFORMER
 5.FURNACE TRANSFORMER
 6.BOOSTER TRANSFORMER
 7.RECTIFIER TRANSFORMER
 8.LOCOMOTIVE TRANSFORMER
 9.MINING TRANSFORMER
 10.PHASE SHIFTING TRANSFORMER
 11.WELDING TRANSFORMER
 12.HIGH VOLTAGE TESTING/SC TESTING TRF.
 13.GROUNDING TRANSFORMERS
 14.CONVERTER TRANSFORMER
DISTRIBUTION TRANSFORMER
 TRANSFORMER WHICH IS USED FOR
THE PURPOSE OF DISTRIBUTION OF
POWER.
 11KV/433V is the standard voltage rating.
 STANDARD KVA ratings are
25,63,100,160,200,250,315,400,500,630,750 ,
1000 , 1250,1500,2000,2500 KVA.
IS-2026 is the NATIONAL I S STANDARD.
MAIN FEATURES
 OUTDOOR,OIL COOLED, 3 PHASE,50HZ
 PRIMARY IS DELTA CONNECTED AND
SECONDARY IS STAR CONNECTED.
 NATURALY COOLED (ONAN TYPE).
 AMONGST ALL THE TYPES OF
TRANSFORMERS THIS IS THE MOST
REQUIRED AND MOST USED TYPE.
PARTS OF TRANSFORMER
 MAIN TANK
 RADIATORS
 CONSERVATOR
 EXPLOSION VENT
 LIFTING LUGS
 AIR RELEASE PLUG
 OIL LEVEL INDICATOR
 TAP CHANGER
 WHEELS
 HV/LV BUSHINGS
 FILTER VALVES
 OIL FILLING PLUG
 DRAIN PLUG
 CABLE BOX
TESTING OF TRANSFORMER
 TESTING IS CARRIED OUT AS PER IS-2026.
 ROUTINE , TYPE TESTS & SPECIAL TESTS
 ROUTINE TESTS ( TO BE CARRIED OUT ON EACH JOB)
 1.Measurement of winding resistance
 2.Measurement of insulation resistance
 3.Seperate source voltage withstand test (High Voltage tests on HV & LV)
 4.Induced Over voltage Withstand test (DVDF test)
 5.Measurement of voltage ratio
 6.Measurement of NO LOAD LOSS & current.
 7.Measurement of LOAD LOSS & IMPEDENCE.(EFFICIENCY & REGULATION)
 8.Vector Group Verification
 9.Oil BDV test.
 10.Tests on OLTC (if Attached)
TYPE TESTS
THESE TESTS ARE CARRIED OUT
ONLY ON ONE TRANSFORMER OF
THE LOT.
 All routine tests
 Additionally following tests are included in
type tests
1. Lightening Impulse test.
2. Temperature rise test
SPECIAL TESTS
 Additional Impulse test
 Short circuit test
 Measurement of zero Phase sequence
Impedance test.
 Measurement of acoustic noise level.
 Measurement of harmonics of the no load
current.
 Magnetic balance test.
ROUTINE TESTS
 1.Measurement of winding resistance
This test measures the resistance of the HV & LV
winding. The values of resistance should be
balance for all three phases and should match
the designed values.
Equipment used : Digital resistance meter.
ROUTINE TESTS
 2.Measurement of insulation resistance
Measures the insulation resistance of HV & LV
windings with respect to earth (body) and
between LV & HV winding.
INSULATION TESTER OR MEGGER IS
USED.
Recommended Values are
2000Mohms for HV & 500 Mohms for LV.
ROUTINE TESTS
 3.Seperate source voltage withstand test (High Voltage tests on
HV & LV)- This test checks the insulation property between
Primary to earth, Secondary to earth and between Primary &
Secondary.
HV high voltage test : LV winding connected together and earthed.
HV winding connected together and given 28 KV ( for 11KV
transformer) for 1 minute.
LV high Voltage test : HV winding connected together and earthed.
LV winding connected together and given 3 KV for 1 minute.
Equipment used : High Voltage tester ( 100KV & 3KV)
ROUTINE TESTS
 4.Induced Over voltage Withstand test (DVDF test)-
This test checks the inter turn insulation.
For a 11KV/433V transformer,866 Volts are applied at
the 433V winding with the help of a Generator for 1
minute. This induces 22KV on 11KV side. The
frequency of the 866V supply is also increased to
100HZ.
Equipment used : MOTOR GENERATOR SET
ROUTINE TESTS
 5.Measurement of voltage ratio
This test measures the voltage ratio as per the customer’s
requirement.
V1/V2 = N1/N2
The voltage ratio is equal to the turns ratio in a
transformer. Using this principle, the turns ratio is
measured with the help of a turns ratio meter. If it is
correct , then the voltage ratio is assumed to be correct.
Equipment used : Turns Ratiometer
ROUTINE TESTS
 6.Measurement of NO LOAD LOSS & current.
The iron losses and no load current are measured in
this test. The 433V winding is charged at 433V supply
& the 11KV winding is left open .The power consumed
by the transformer at no load is the no load loss in the
transformer.
Effect of actual frequency must be taken into account.
Equipment used : Wattmeters or power analyser.
ROUTINE TESTS
 7.Measurement of LOAD LOSS &
IMPEDENCE.(EFFICIENCY &
REGULATION)
This test measures the power consumed by the
transformer when the 433V winding is short
circuited and The rated current is passed
through the 11KV winding.
Equipment used : Wattmeters or power analyser.
ROUTINE TESTS
 8.Vector Group Verification test
This test verifies the Dyn-11 vector group of a
distribution transformer.
Equipment used : voltmeter.
ROUTINE TESTS
 Oil BDV TEST.
Oil breakdown voltage is checked as per IS-335.
100 mm L X 70 mm B X 80 mm Ht. glass pot.
500ml Oil sample.
Spherical electrodes with gap of 2.5 mm
Recommended value : 60KV
Equipment used : OIL BDV TEST SET.
TYPE TESTS
 LIGHTENING IMPULSE TEST
All the dielectric tests check the insulation level of the job.
Impulse generator is used to produce the specified voltage impulse
wave of 1.2/50 micro seconds wave
One impulse of a reduced voltage between 50 to 75% of the full
test voltage and subsequent three impulses at full voltage.
For a three phase transformer, impulse is carried out on all three
phases in succession.
The voltage is applied on each of the line terminal in succession,
keeping the other terminals earthed.
The current and voltage wave shapes are recorded on the
oscilloscope and any distortion in the wave shape is the criteria
for failure.
SPECIAL TEST
 Short circuit withstand ability test.
This tests measures the ability of the transformer to withstand the mechanical
and thermal stresses caused by the external short circuit.
HV terminals are connected to the supply bus of the testing plant. The LV is
short circuited. The testing plant parameters are such adjusted to give the
rated short circuit current.
Supply is made on and closed after specified duration of short circuit. The record
of current wave form is noted.
There should not be any mechanical distortion, fire to the transformer during
this test. Similarly no wave form distortion. The transformer should also
withstand the routine tests after the short circuit test.
The reactance of the winding measured before and after the S.C. test should not
vary beyond the limits stated in the IS2026.
MAINTENANCE OF
TRANSFORMER
 Transformer is the heart of any power system.
Hence preventive maintenance is always cost
effective and time saving. Any failure to the
transformer can extremely affect the whole
functioning of the organization.
MAINTENANCE PROCEDURE
 OIL :
1. Oil level checking. Leakages to be attended.
2. Oil BDV & acidity checking at regular
intervals. If acidity is between 0.5 to 1mg
KOH, oil should be kept under observation.
3. BDV, Color and smell of oil are indicative.
MAINTENANCE PROCEDURE
1. Sludge, dust, dirt ,moisture can be removed by
filtration.
2. Oil when topped up shall be of the same make. It
may lead to sludge formation and acidic contents.
 Insulation resistance of the transformer should be
checked once in 6 months.
 Megger values along with oil values indicate the
condition of transformer.
 Periodic Dissolved Gas Analysis can be carried out.
MAINTENANCE
 BUSHINGS
Bushings should be cleaned and inspected for any
cracks.
Dust & dirt deposition, Salt or chemical
deposition, cement or acid fumes depositions
should be carefully noted and rectified.
MAINTENANCE
 Periodic checking of any loose connections of the
terminations of HV & LV side.
 Breather examination. Dehydration of Silica gel if
necessary.
 Explosion vent diaphragm examination.
 Conservator to be cleaned from inside after every three
years.
 Regular inspection of OIL & WINDING
TEMPERATURE METER readings.
 Cleanliness in the Substation yard with all nets, vines,
shrubs removed.
PROTECTION OF
TRANSFORMERS
 The best way of protecting a transformer is to
have good preventive maintenance schedule.
 Oil Temperature Indicators.
 Winding Temperature indicators.
 Buchholz Relay.
 Magnetic Oil level Gauge.
 Explosion Vent.
PROTECTION OF
TRANSFORMERS
 HT fuse & D.O. fuse.
 LT circuit breaker.
 HT Circuit breaker with Over load, Earth Fault
relay tripping.
 Oil Surge Relay for OLTC.
 PRV for OLTC.
 HORN GAPS & Lightening Arrestor.
 Breather.
FAILURES & CAUSES
 Insufficient Oil level.
 Seepage of water in oil.
 Prolonged Over loading.
 Single Phase loading.
 Unbalanced loading.
 Faulty Termination (Improper sized lugs etc)
 Power Theft.
 Prolonged Short Circuit.
 Faulty operation of tap changer switch.
 Lack of installation checks.
FAILURES & CAUSES
 Faulty design
 Poor Workmanship
Improper formation of core.
Improper core bolt insulation.
Burr to the lamination blades
Improper brazing of joints.
Burr /sharp edges to the winding conductor.
Incomplete drying.
Bad insulation covering.
Insufficient cooling ducts in the winding.
FAILURES & CAUSES
 Bad Quality of raw material.
 Transit damaged transformers.
 After failure , transformer is removed and
replaced with new/repaired one without
removing the cause of failure which results in
immediate or short time failure.

More Related Content

Similar to 93518813-TESTING-MAINTENANCE-PROTECTION-OF-DISTRIBUTION-TRANSFORMERS.ppt

Testing of transformer.pptx
Testing of transformer.pptxTesting of transformer.pptx
Testing of transformer.pptxNoorulAmin67
 
Transformers pptxx.ppt
Transformers pptxx.pptTransformers pptxx.ppt
Transformers pptxx.pptjaajasnjkja
 
Power transformer testing and commissioning guidelines r
Power transformer testing and commissioning guidelines rPower transformer testing and commissioning guidelines r
Power transformer testing and commissioning guidelines rAshish Patel
 
Impulse testing of transformer
Impulse testing of transformerImpulse testing of transformer
Impulse testing of transformerPreet_patel
 
High voltage testing of electrical transformer
High voltage testing of electrical transformerHigh voltage testing of electrical transformer
High voltage testing of electrical transformerPraveenKumar5880
 
INSTALLATION OF 500MVA TRANSFORMER AT PGCIL
INSTALLATION OF 500MVA TRANSFORMER AT PGCIL INSTALLATION OF 500MVA TRANSFORMER AT PGCIL
INSTALLATION OF 500MVA TRANSFORMER AT PGCIL Rahul Akinapelli
 
220kv grid wapda town lahore
220kv grid wapda town lahore220kv grid wapda town lahore
220kv grid wapda town lahoresammy9916
 
Power-Transformer-Testing-Brochure-ENU.pdf
Power-Transformer-Testing-Brochure-ENU.pdfPower-Transformer-Testing-Brochure-ENU.pdf
Power-Transformer-Testing-Brochure-ENU.pdfNguyenXuanTung12
 
Testing and Condition Monitoring of Substation Equipments
Testing and Condition Monitoring of Substation EquipmentsTesting and Condition Monitoring of Substation Equipments
Testing and Condition Monitoring of Substation EquipmentsSumeet Ratnawat
 
Testing of transformer
Testing of transformerTesting of transformer
Testing of transformervikasgupta1965
 
Presentation OutDoorSwithGear(AIS) .pptx
Presentation OutDoorSwithGear(AIS) .pptxPresentation OutDoorSwithGear(AIS) .pptx
Presentation OutDoorSwithGear(AIS) .pptxRAJKIRANR3
 
REPORT -VALLUR THERMAL POWER PLANT
REPORT -VALLUR THERMAL POWER PLANTREPORT -VALLUR THERMAL POWER PLANT
REPORT -VALLUR THERMAL POWER PLANTRAJPRASAD RS
 
Frequency response analysis (FRA) of transformer
Frequency response analysis (FRA) of transformerFrequency response analysis (FRA) of transformer
Frequency response analysis (FRA) of transformerRaveendranath Macherla
 
Switchgear & Rectifier ppt
Switchgear & Rectifier pptSwitchgear & Rectifier ppt
Switchgear & Rectifier pptvikas kumar
 
Best transformer-test-procedures-en
Best transformer-test-procedures-enBest transformer-test-procedures-en
Best transformer-test-procedures-enSuresh Patil
 

Similar to 93518813-TESTING-MAINTENANCE-PROTECTION-OF-DISTRIBUTION-TRANSFORMERS.ppt (20)

Testing of transformer.pptx
Testing of transformer.pptxTesting of transformer.pptx
Testing of transformer.pptx
 
Transformers pptxx.ppt
Transformers pptxx.pptTransformers pptxx.ppt
Transformers pptxx.ppt
 
Power transformer testing and commissioning guidelines r
Power transformer testing and commissioning guidelines rPower transformer testing and commissioning guidelines r
Power transformer testing and commissioning guidelines r
 
Unit 1-2-b
Unit 1-2-bUnit 1-2-b
Unit 1-2-b
 
Transformer ppt.
Transformer ppt.Transformer ppt.
Transformer ppt.
 
Impulse testing of transformer
Impulse testing of transformerImpulse testing of transformer
Impulse testing of transformer
 
High voltage testing of electrical transformer
High voltage testing of electrical transformerHigh voltage testing of electrical transformer
High voltage testing of electrical transformer
 
INSTALLATION OF 500MVA TRANSFORMER AT PGCIL
INSTALLATION OF 500MVA TRANSFORMER AT PGCIL INSTALLATION OF 500MVA TRANSFORMER AT PGCIL
INSTALLATION OF 500MVA TRANSFORMER AT PGCIL
 
220kv grid wapda town lahore
220kv grid wapda town lahore220kv grid wapda town lahore
220kv grid wapda town lahore
 
Power-Transformer-Testing-Brochure-ENU.pdf
Power-Transformer-Testing-Brochure-ENU.pdfPower-Transformer-Testing-Brochure-ENU.pdf
Power-Transformer-Testing-Brochure-ENU.pdf
 
TRANSFORMER DESIGN.pptx
TRANSFORMER DESIGN.pptxTRANSFORMER DESIGN.pptx
TRANSFORMER DESIGN.pptx
 
Testing and Condition Monitoring of Substation Equipments
Testing and Condition Monitoring of Substation EquipmentsTesting and Condition Monitoring of Substation Equipments
Testing and Condition Monitoring of Substation Equipments
 
Testing of transformer
Testing of transformerTesting of transformer
Testing of transformer
 
Presentation OutDoorSwithGear(AIS) .pptx
Presentation OutDoorSwithGear(AIS) .pptxPresentation OutDoorSwithGear(AIS) .pptx
Presentation OutDoorSwithGear(AIS) .pptx
 
MSC SOW
MSC SOWMSC SOW
MSC SOW
 
REPORT -VALLUR THERMAL POWER PLANT
REPORT -VALLUR THERMAL POWER PLANTREPORT -VALLUR THERMAL POWER PLANT
REPORT -VALLUR THERMAL POWER PLANT
 
Frequency response analysis (FRA) of transformer
Frequency response analysis (FRA) of transformerFrequency response analysis (FRA) of transformer
Frequency response analysis (FRA) of transformer
 
Switchgear & Rectifier ppt
Switchgear & Rectifier pptSwitchgear & Rectifier ppt
Switchgear & Rectifier ppt
 
ET 5 LESSON 2 TEST EQUIPMENT.pptx
ET 5 LESSON 2 TEST EQUIPMENT.pptxET 5 LESSON 2 TEST EQUIPMENT.pptx
ET 5 LESSON 2 TEST EQUIPMENT.pptx
 
Best transformer-test-procedures-en
Best transformer-test-procedures-enBest transformer-test-procedures-en
Best transformer-test-procedures-en
 

Recently uploaded

MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...Call Girls in Nagpur High Profile
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAbhinavSharma374939
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 

Recently uploaded (20)

Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog Converter
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 

93518813-TESTING-MAINTENANCE-PROTECTION-OF-DISTRIBUTION-TRANSFORMERS.ppt

  • 1. TESTING, MAINTENANCE & PROTECTION OF DISTRIBUTION TRANSFORMERS Presented by PRASHANT P. NANKAR TRANS-DELTA ELECTRICALS
  • 2. WHAT IS A TRANSFORMER?  TRANSFORMER IS A STATIC DEVICE WHICH TRANSFORMS A.C. ELECTRICAL POWER FROM ONE VOLTAGE TO ANOTHER VOLTAGE KEEPING THE FREQUENCY SAME BY ELECTROMAGNETIC INDUCTION.
  • 3. TYPES OF TRANSFORMER BY APPLICATION  1. DISTRIBUTION TRANSFORMER  2.POWER TRANSFORMER  3.CURRENT TRANSFORMER  4.POTENTIAL TRANSFORMER  5.FURNACE TRANSFORMER  6.BOOSTER TRANSFORMER  7.RECTIFIER TRANSFORMER  8.LOCOMOTIVE TRANSFORMER  9.MINING TRANSFORMER  10.PHASE SHIFTING TRANSFORMER  11.WELDING TRANSFORMER  12.HIGH VOLTAGE TESTING/SC TESTING TRF.  13.GROUNDING TRANSFORMERS  14.CONVERTER TRANSFORMER
  • 4. DISTRIBUTION TRANSFORMER  TRANSFORMER WHICH IS USED FOR THE PURPOSE OF DISTRIBUTION OF POWER.  11KV/433V is the standard voltage rating.  STANDARD KVA ratings are 25,63,100,160,200,250,315,400,500,630,750 , 1000 , 1250,1500,2000,2500 KVA. IS-2026 is the NATIONAL I S STANDARD.
  • 5. MAIN FEATURES  OUTDOOR,OIL COOLED, 3 PHASE,50HZ  PRIMARY IS DELTA CONNECTED AND SECONDARY IS STAR CONNECTED.  NATURALY COOLED (ONAN TYPE).  AMONGST ALL THE TYPES OF TRANSFORMERS THIS IS THE MOST REQUIRED AND MOST USED TYPE.
  • 6. PARTS OF TRANSFORMER  MAIN TANK  RADIATORS  CONSERVATOR  EXPLOSION VENT  LIFTING LUGS  AIR RELEASE PLUG  OIL LEVEL INDICATOR  TAP CHANGER  WHEELS  HV/LV BUSHINGS  FILTER VALVES  OIL FILLING PLUG  DRAIN PLUG  CABLE BOX
  • 7.
  • 8.
  • 9.
  • 10.
  • 11.
  • 12.
  • 13.
  • 14.
  • 15.
  • 16.
  • 17.
  • 18. TESTING OF TRANSFORMER  TESTING IS CARRIED OUT AS PER IS-2026.  ROUTINE , TYPE TESTS & SPECIAL TESTS  ROUTINE TESTS ( TO BE CARRIED OUT ON EACH JOB)  1.Measurement of winding resistance  2.Measurement of insulation resistance  3.Seperate source voltage withstand test (High Voltage tests on HV & LV)  4.Induced Over voltage Withstand test (DVDF test)  5.Measurement of voltage ratio  6.Measurement of NO LOAD LOSS & current.  7.Measurement of LOAD LOSS & IMPEDENCE.(EFFICIENCY & REGULATION)  8.Vector Group Verification  9.Oil BDV test.  10.Tests on OLTC (if Attached)
  • 19. TYPE TESTS THESE TESTS ARE CARRIED OUT ONLY ON ONE TRANSFORMER OF THE LOT.  All routine tests  Additionally following tests are included in type tests 1. Lightening Impulse test. 2. Temperature rise test
  • 20. SPECIAL TESTS  Additional Impulse test  Short circuit test  Measurement of zero Phase sequence Impedance test.  Measurement of acoustic noise level.  Measurement of harmonics of the no load current.  Magnetic balance test.
  • 21. ROUTINE TESTS  1.Measurement of winding resistance This test measures the resistance of the HV & LV winding. The values of resistance should be balance for all three phases and should match the designed values. Equipment used : Digital resistance meter.
  • 22. ROUTINE TESTS  2.Measurement of insulation resistance Measures the insulation resistance of HV & LV windings with respect to earth (body) and between LV & HV winding. INSULATION TESTER OR MEGGER IS USED. Recommended Values are 2000Mohms for HV & 500 Mohms for LV.
  • 23. ROUTINE TESTS  3.Seperate source voltage withstand test (High Voltage tests on HV & LV)- This test checks the insulation property between Primary to earth, Secondary to earth and between Primary & Secondary. HV high voltage test : LV winding connected together and earthed. HV winding connected together and given 28 KV ( for 11KV transformer) for 1 minute. LV high Voltage test : HV winding connected together and earthed. LV winding connected together and given 3 KV for 1 minute. Equipment used : High Voltage tester ( 100KV & 3KV)
  • 24.
  • 25. ROUTINE TESTS  4.Induced Over voltage Withstand test (DVDF test)- This test checks the inter turn insulation. For a 11KV/433V transformer,866 Volts are applied at the 433V winding with the help of a Generator for 1 minute. This induces 22KV on 11KV side. The frequency of the 866V supply is also increased to 100HZ. Equipment used : MOTOR GENERATOR SET
  • 26.
  • 27. ROUTINE TESTS  5.Measurement of voltage ratio This test measures the voltage ratio as per the customer’s requirement. V1/V2 = N1/N2 The voltage ratio is equal to the turns ratio in a transformer. Using this principle, the turns ratio is measured with the help of a turns ratio meter. If it is correct , then the voltage ratio is assumed to be correct. Equipment used : Turns Ratiometer
  • 28. ROUTINE TESTS  6.Measurement of NO LOAD LOSS & current. The iron losses and no load current are measured in this test. The 433V winding is charged at 433V supply & the 11KV winding is left open .The power consumed by the transformer at no load is the no load loss in the transformer. Effect of actual frequency must be taken into account. Equipment used : Wattmeters or power analyser.
  • 29.
  • 30. ROUTINE TESTS  7.Measurement of LOAD LOSS & IMPEDENCE.(EFFICIENCY & REGULATION) This test measures the power consumed by the transformer when the 433V winding is short circuited and The rated current is passed through the 11KV winding. Equipment used : Wattmeters or power analyser.
  • 31.
  • 32. ROUTINE TESTS  8.Vector Group Verification test This test verifies the Dyn-11 vector group of a distribution transformer. Equipment used : voltmeter.
  • 33.
  • 34. ROUTINE TESTS  Oil BDV TEST. Oil breakdown voltage is checked as per IS-335. 100 mm L X 70 mm B X 80 mm Ht. glass pot. 500ml Oil sample. Spherical electrodes with gap of 2.5 mm Recommended value : 60KV Equipment used : OIL BDV TEST SET.
  • 35. TYPE TESTS  LIGHTENING IMPULSE TEST All the dielectric tests check the insulation level of the job. Impulse generator is used to produce the specified voltage impulse wave of 1.2/50 micro seconds wave One impulse of a reduced voltage between 50 to 75% of the full test voltage and subsequent three impulses at full voltage. For a three phase transformer, impulse is carried out on all three phases in succession. The voltage is applied on each of the line terminal in succession, keeping the other terminals earthed. The current and voltage wave shapes are recorded on the oscilloscope and any distortion in the wave shape is the criteria for failure.
  • 36.
  • 37. SPECIAL TEST  Short circuit withstand ability test. This tests measures the ability of the transformer to withstand the mechanical and thermal stresses caused by the external short circuit. HV terminals are connected to the supply bus of the testing plant. The LV is short circuited. The testing plant parameters are such adjusted to give the rated short circuit current. Supply is made on and closed after specified duration of short circuit. The record of current wave form is noted. There should not be any mechanical distortion, fire to the transformer during this test. Similarly no wave form distortion. The transformer should also withstand the routine tests after the short circuit test. The reactance of the winding measured before and after the S.C. test should not vary beyond the limits stated in the IS2026.
  • 38. MAINTENANCE OF TRANSFORMER  Transformer is the heart of any power system. Hence preventive maintenance is always cost effective and time saving. Any failure to the transformer can extremely affect the whole functioning of the organization.
  • 39. MAINTENANCE PROCEDURE  OIL : 1. Oil level checking. Leakages to be attended. 2. Oil BDV & acidity checking at regular intervals. If acidity is between 0.5 to 1mg KOH, oil should be kept under observation. 3. BDV, Color and smell of oil are indicative.
  • 40. MAINTENANCE PROCEDURE 1. Sludge, dust, dirt ,moisture can be removed by filtration. 2. Oil when topped up shall be of the same make. It may lead to sludge formation and acidic contents.  Insulation resistance of the transformer should be checked once in 6 months.  Megger values along with oil values indicate the condition of transformer.  Periodic Dissolved Gas Analysis can be carried out.
  • 41. MAINTENANCE  BUSHINGS Bushings should be cleaned and inspected for any cracks. Dust & dirt deposition, Salt or chemical deposition, cement or acid fumes depositions should be carefully noted and rectified.
  • 42. MAINTENANCE  Periodic checking of any loose connections of the terminations of HV & LV side.  Breather examination. Dehydration of Silica gel if necessary.  Explosion vent diaphragm examination.  Conservator to be cleaned from inside after every three years.  Regular inspection of OIL & WINDING TEMPERATURE METER readings.  Cleanliness in the Substation yard with all nets, vines, shrubs removed.
  • 43. PROTECTION OF TRANSFORMERS  The best way of protecting a transformer is to have good preventive maintenance schedule.  Oil Temperature Indicators.  Winding Temperature indicators.  Buchholz Relay.  Magnetic Oil level Gauge.  Explosion Vent.
  • 44. PROTECTION OF TRANSFORMERS  HT fuse & D.O. fuse.  LT circuit breaker.  HT Circuit breaker with Over load, Earth Fault relay tripping.  Oil Surge Relay for OLTC.  PRV for OLTC.  HORN GAPS & Lightening Arrestor.  Breather.
  • 45. FAILURES & CAUSES  Insufficient Oil level.  Seepage of water in oil.  Prolonged Over loading.  Single Phase loading.  Unbalanced loading.  Faulty Termination (Improper sized lugs etc)  Power Theft.  Prolonged Short Circuit.  Faulty operation of tap changer switch.  Lack of installation checks.
  • 46. FAILURES & CAUSES  Faulty design  Poor Workmanship Improper formation of core. Improper core bolt insulation. Burr to the lamination blades Improper brazing of joints. Burr /sharp edges to the winding conductor. Incomplete drying. Bad insulation covering. Insufficient cooling ducts in the winding.
  • 47. FAILURES & CAUSES  Bad Quality of raw material.  Transit damaged transformers.  After failure , transformer is removed and replaced with new/repaired one without removing the cause of failure which results in immediate or short time failure.