Major Achievements & Performance Report
(MES-PMCL Project)
Al-fareen Engeneering & Consultants (Pvt) LTD
 Zero Outage count (Karachi) S1
 Less repeated Outage (cable installation)
 ProlongedT-prime/DC issues rectified
Al-fareen Engeneering & Consultants (Pvt) LTD
 Being Quality Solution provider AFES
strives for cost effective and consistent
rectification, Keeping above policy Below
mentioned Sites may be lead as a role
model ,since some of them were running
prime fro, 3 yrs.
Al-fareen Engeneering & Consultants (Pvt) LTD
 Timely Ho-To
 Swift SLA obedience under given
conditions
 Additional recommendations/Proposals
 Cost effective ,Consistent rectification
 Certified electrical Staff for PMT (Wapda)
 24/7 NOC availability
 Transparency in reporting & client Comfort
Level
Al-fareen Engeneering & Consultants (Pvt) LTD
Al-fareen Engeneering & Consultants (Pvt) LTD
Summery
Cable InstallationTeam-3
Persons
Korangi – 1 person
Malir , Shahfaisal – 3 person
Orangi– 1 person
Baldia -1 person
Lyari – 1 person
Defence – 1 person
Garden – 2 person
Laandhi ,Gulsha e hadeed – 2
persons
Bahadurabad ,Nazimabad - 2
Total =
Logistics Details
No Of Bikes –
No Of Utility van – 03
Cable installation - 3person
Korangi – 1 person
Malir , Shahfaisal – 3 person
Orangi -1 Baldia-
1,Lyari1,Defence1,Garden2
Laandhi ,Gulsha e hadeed – 2
persons
Bahadurabad-Nazimabad -2
Al-fareen Engeneering & Consultants (Pvt) LTD
Cable
Installation, 3
Korangi, 1
Laandhi, 1
Orangi, 1
Baldia, 1
Gulshan-e-
Hadeed, 1Bahadurabad, 1Nazimabad, 1
Lyari, 1
Defence, 1
Garden, 2
Malir-
Shahfaisal, 3
Al-fareen Engeneering & Consultants (Pvt) LTD
May, 80
June, 210
July, 181
August, 177
September, 334
October, 219
November, 183
December, 204
 Cable Installation Jobs @
-KHI5013__S_Near_Korangi_Crossing - 50
meters 16mm 4 core
-KHI0665__P_KDA_Employees_Krngi - 190
meter 16mm 4 core
-KHI0656__H_Korangi_5_Township - 115 meter
16mm4core
-KHI0910__S_BhainsColonyMor - 120 meter 16
mm4core
-KHI5437__S_KgiRes10Sector50B -35 meter 16
mm4core
-KHI5328__s_future_colony_blocke - 15 meter
LT-Meter
Al-fareen Engeneering & Consultants (Pvt) LTD
 Site Rectification @
Al-fareen Engeneering & Consultants (Pvt) LTD
Al-fareen Engeneering & Consultants (Pvt) LTD
Summary Karachi
Total Under process = 05
Cases Pending PMCL end = 02
Pending at MES End including approvals = 01
KESC issues = 02
T-Prime Count Karachi
Day 2-Jan-13 3-Jan-13 4-Jan-13 5-Jan-13 6-Jan-13 7-Jan-13 8-Jan-13 9-Jan-13 10-Jan-13 11-Jan-13 12-Jan-13 13-Jan-13 14-Jan-13 15-Jan-13 16-Jan-13 17-Jan-13
Count 2 4 4 4 4 7 6 6 6 6 4 4 4 4 4 5
2
4 4 4 4
7
6 6 6 6
4 4 4 4 4
5
0
1
2
3
4
5
6
7
8
2-Jan-13
3-Jan-13
4-Jan-13
5-Jan-13
6-Jan-13
7-Jan-13
8-Jan-13
9-Jan-13
10-Jan-13
11-Jan-13
12-Jan-13
13-Jan-13
14-Jan-13
15-Jan-13
16-Jan-13
17-Jan-13
T-PrimeTrend Karachi (MES)
Al-fareen Engeneering & Consultants (Pvt) LTD
Summary Hyderabad
Total Under process = 16
CP DC cases Pending at PMCL end = 06
Pending at myson End including approvals = 07
Contactor Faulty Sites = 02
T-Prime Count HYD
Day 5-Aug-12 6-Aug-12 7-Aug-12 8-Aug-12 9-Aug-12 10-Aug-12 11-Aug-12 12-Aug-12 13-Aug-12
Count 14 15 16 16 15 14 14 14 16
14
15
16 16
15
14 14 14
16
13
14
15
16
17
5-Aug-
12
6-Aug-
12
7-Aug-
12
8-Aug-
12
9-Aug-
12
10-Aug-
12
11-Aug-
12
12-Aug-
12
13-Aug-
12
T-PrimeTrend HYD (MES)
Al-fareen Engeneering & Consultants (Pvt) LTD
T-Prime Count MPK
Day 5-Aug-12 6-Aug-12 7-Aug-12 8-Aug-12 9-Aug-12 10-Aug-12 11-Aug-12 12-Aug-12 13-Aug-12
Count 2 1 2 1 1 2 3 3 3
2
1
2
1 1
2
3 3 3
0
0.5
1
1.5
2
2.5
3
3.5
5-Aug-12
6-Aug-12
7-Aug-12
8-Aug-12
9-Aug-12
10-Aug-
12
11-Aug-
12
12-Aug-
12
13-Aug-
12
T-PrimeTrend MPK(MES)
Summary Mirpur khas
Total Under process = 03
CP DC cases pending at PMCL end = 02
Pending at myson End including approvals = 01
Al-fareen Engeneering & Consultants (Pvt) LTD
S.No Site name
Site
Code
Status Generic Reason with Remarks (OSV)
CP Restored - Restored
/ Pending
CP Meter Reading DG Reading
1 DAO7071__S_Dando 7071 T-Prime CPRestored Restored N/A N/A
2 HYD5334__S_Hyderabad_1 5334 TPrime CPRestored Restored 19179 6278
3 HGW6108__H_TMK_HYD_Highway_PW6108 T-Prime CPRestored by replacing ofPMT Bush & tapping Restored 311797 3396.25
4 NRP6362__H_nasarpur_Matiari_Rd6362 T-Prime Access Issue Pending N/A N/A
5 MTL5888__H_Digri_Rd_Matli 5888 Stand By (OnePhase) No CPissue found -Allphases OK Restored 157075 13813.11
6 HGW6311__H_Khandu_Hala_MRI6311 T-Prime CPRestored Restored 8368 / 3032 1047.68
7 BUL6168__S_MirpurBathoro 6168 T-Prime CPrestored by installing 16mm4core 5meters cable Restored N/A 2457.56
8 TBG6377__H_Talhar_Tando_Bagho6377 TPrime CPrestored by sagging ofHT jumpers Restored 2425 / 1085 2920.7
9 HYD5856__S_Suzuki 5856 TPrime CPrestored by LT Service Restored N/A N/A
10 BSC_Auto_Bhan_Repeater 6407 TPrime CPDCdue to billing Pending N/A N/A
11 HGW7090__S_Palijani_Station7090 T-Prime CPDCdue to billing Pending N/A N/A
12 RJK7062__S_Rajo_Khanani 7062 T-Prime CPDCdue to billing Pending 2741 / 3287 1167.16
13 HYD5335__S_Hyderabad2 5335 T-Prime CPrestored by sagging ofHT jumpers Restored N/A N/A
14 BER6132__H_Bherani_DTE 6132 T-Prime CPRestored Restored N/A 4905
15 PHK0073__S_Falkara 73 T-Prime CPDCdue to billing Pending 3200 / 383 N/A
16 HYD5666__S_Bilal_Complex5666 T-Prime Approvalreq -Neutralgrounding 300 ft cable Pending 0 0
17 HYD6494__S_Ghumanabad 6494 T-Prime CPRestored Restored 1041 11004
18 NRP6361__S_Akbari_Masjid 6361 T-Prime CPRestored Restored N/A 258.32
19 MRI7070__S_SarhandiMohallah7070 T-Prime CPrestored -Structural& Civilworkrequired at site Restored N/A N/A
20 HYD5853__S_Unit_5_Latifabad5853 T-Prime CPRestored Restored N/A N/A
 Individual visit to all Sites within region
 Highlighting and recommendation of
proposals such as Contactor replacements
,DG auto issue , Meter Burnt ,Cable
Requirements
 Initiation of approvals
 Rectification of snags in view of go ahead
Al-fareen Engeneering & Consultants (Pvt) LTD
Al-fareen Engeneering & Consultants (Pvt) LTD

More Related Content

What's hot

What's hot (6)

Pdo cv approvals
Pdo cv approvalsPdo cv approvals
Pdo cv approvals
 
CV
CVCV
CV
 
Terraserve And Terradrill Presentation R0
Terraserve And Terradrill   Presentation   R0Terraserve And Terradrill   Presentation   R0
Terraserve And Terradrill Presentation R0
 
Resume Corey Dunn 2015
Resume Corey Dunn  2015Resume Corey Dunn  2015
Resume Corey Dunn 2015
 
Tousif_CV__OIL_FIELD.PDF
Tousif_CV__OIL_FIELD.PDFTousif_CV__OIL_FIELD.PDF
Tousif_CV__OIL_FIELD.PDF
 
joshi-CV_design (2)
joshi-CV_design (2)joshi-CV_design (2)
joshi-CV_design (2)
 

Viewers also liked

The Impact of Working Conditions on Academic Staff Turnover at Africa Univers...
The Impact of Working Conditions on Academic Staff Turnover at Africa Univers...The Impact of Working Conditions on Academic Staff Turnover at Africa Univers...
The Impact of Working Conditions on Academic Staff Turnover at Africa Univers...Reason Masengu
 
Slideshare. Insertar videos
Slideshare. Insertar videosSlideshare. Insertar videos
Slideshare. Insertar videosiruneikastaroa
 
Como elaborar una cazuela de caracoles
Como elaborar una cazuela de caracolesComo elaborar una cazuela de caracoles
Como elaborar una cazuela de caracolesiruneikastaroa
 
Como elaborar una cazuela de caracoles
Como elaborar una cazuela de caracolesComo elaborar una cazuela de caracoles
Como elaborar una cazuela de caracolesiruneikastaroa
 
Company_Profile_AFES,2012
Company_Profile_AFES,2012Company_Profile_AFES,2012
Company_Profile_AFES,2012waqar khan
 
AFES Project feasibility for PMCL work
AFES Project feasibility for PMCL workAFES Project feasibility for PMCL work
AFES Project feasibility for PMCL workwaqar khan
 
C.P. Billing Presentation
C.P. Billing PresentationC.P. Billing Presentation
C.P. Billing Presentationwaqar khan
 

Viewers also liked (11)

The Impact of Working Conditions on Academic Staff Turnover at Africa Univers...
The Impact of Working Conditions on Academic Staff Turnover at Africa Univers...The Impact of Working Conditions on Academic Staff Turnover at Africa Univers...
The Impact of Working Conditions on Academic Staff Turnover at Africa Univers...
 
msc U-PHONE
msc U-PHONEmsc U-PHONE
msc U-PHONE
 
MSC SOW
MSC SOWMSC SOW
MSC SOW
 
Slideshare. Insertar videos
Slideshare. Insertar videosSlideshare. Insertar videos
Slideshare. Insertar videos
 
Como elaborar una cazuela de caracoles
Como elaborar una cazuela de caracolesComo elaborar una cazuela de caracoles
Como elaborar una cazuela de caracoles
 
Como elaborar una cazuela de caracoles
Como elaborar una cazuela de caracolesComo elaborar una cazuela de caracoles
Como elaborar una cazuela de caracoles
 
Company_Profile_AFES,2012
Company_Profile_AFES,2012Company_Profile_AFES,2012
Company_Profile_AFES,2012
 
AFES Project feasibility for PMCL work
AFES Project feasibility for PMCL workAFES Project feasibility for PMCL work
AFES Project feasibility for PMCL work
 
BARQ MSC
BARQ MSCBARQ MSC
BARQ MSC
 
C.P. Billing Presentation
C.P. Billing PresentationC.P. Billing Presentation
C.P. Billing Presentation
 
Algae Oil Extraction presentation
Algae Oil Extraction presentationAlgae Oil Extraction presentation
Algae Oil Extraction presentation
 

Similar to AFES Progress Evaluation

Stockley Xmas 14 - Possession Workshop 25092014
Stockley Xmas 14 - Possession Workshop 25092014Stockley Xmas 14 - Possession Workshop 25092014
Stockley Xmas 14 - Possession Workshop 25092014Thomas Ingrey
 
Enmas o_&_m_presentation
Enmas  o_&_m_presentationEnmas  o_&_m_presentation
Enmas o_&_m_presentationlvsamy
 
mahaprabu resume 18.10.2016
mahaprabu resume 18.10.2016mahaprabu resume 18.10.2016
mahaprabu resume 18.10.2016Mahaprabu A.S.
 
CV_Somnath Das - 22.06.2015
CV_Somnath Das - 22.06.2015CV_Somnath Das - 22.06.2015
CV_Somnath Das - 22.06.2015Somnath Das
 
Webinar presentation-Planning-7-4-2020.pptx
Webinar presentation-Planning-7-4-2020.pptxWebinar presentation-Planning-7-4-2020.pptx
Webinar presentation-Planning-7-4-2020.pptxMohammedJazeel2549
 
A Successful Case Study Presentation on Visionary SME Programme by Anand Aut...
A Successful Case Study Presentation on Visionary SME Programme by  Anand Aut...A Successful Case Study Presentation on Visionary SME Programme by  Anand Aut...
A Successful Case Study Presentation on Visionary SME Programme by Anand Aut...Confederation of Indian Industry
 
Michiel Frederik Botha Resume
Michiel Frederik Botha ResumeMichiel Frederik Botha Resume
Michiel Frederik Botha ResumeFrikkie Botha
 
Project Review Meeting - 14.02.23.ppt
Project Review Meeting - 14.02.23.pptProject Review Meeting - 14.02.23.ppt
Project Review Meeting - 14.02.23.pptAkdDeshmukh
 
resume krishna electrical engineer
resume krishna electrical engineerresume krishna electrical engineer
resume krishna electrical engineerKRISHNAMOORTHY A
 
PARESH KUMAR DASH-RESUME-BOILER (1)
PARESH KUMAR   DASH-RESUME-BOILER (1)PARESH KUMAR   DASH-RESUME-BOILER (1)
PARESH KUMAR DASH-RESUME-BOILER (1)PARESH DASH
 
ASHISH GUPTA CN3343 THT2(WEAVING)
ASHISH GUPTA CN3343 THT2(WEAVING)ASHISH GUPTA CN3343 THT2(WEAVING)
ASHISH GUPTA CN3343 THT2(WEAVING)Ashish Gupta
 

Similar to AFES Progress Evaluation (20)

Vmp cv_ june` 2018
Vmp  cv_ june` 2018Vmp  cv_ june` 2018
Vmp cv_ june` 2018
 
Vmp cv_ june` 2018
Vmp  cv_ june` 2018Vmp  cv_ june` 2018
Vmp cv_ june` 2018
 
Vmp cv_ june` 2018
Vmp  cv_ june` 2018Vmp  cv_ june` 2018
Vmp cv_ june` 2018
 
c v2016 (1)
c v2016 (1)c v2016 (1)
c v2016 (1)
 
Stockley Xmas 14 - Possession Workshop 25092014
Stockley Xmas 14 - Possession Workshop 25092014Stockley Xmas 14 - Possession Workshop 25092014
Stockley Xmas 14 - Possession Workshop 25092014
 
Enmas o_&_m_presentation
Enmas  o_&_m_presentationEnmas  o_&_m_presentation
Enmas o_&_m_presentation
 
mahaprabu resume 18.10.2016
mahaprabu resume 18.10.2016mahaprabu resume 18.10.2016
mahaprabu resume 18.10.2016
 
CV_Somnath Das - 22.06.2015
CV_Somnath Das - 22.06.2015CV_Somnath Das - 22.06.2015
CV_Somnath Das - 22.06.2015
 
Webinar presentation-Planning-7-4-2020.pptx
Webinar presentation-Planning-7-4-2020.pptxWebinar presentation-Planning-7-4-2020.pptx
Webinar presentation-Planning-7-4-2020.pptx
 
A Successful Case Study Presentation on Visionary SME Programme by Anand Aut...
A Successful Case Study Presentation on Visionary SME Programme by  Anand Aut...A Successful Case Study Presentation on Visionary SME Programme by  Anand Aut...
A Successful Case Study Presentation on Visionary SME Programme by Anand Aut...
 
Michiel Frederik Botha Resume
Michiel Frederik Botha ResumeMichiel Frederik Botha Resume
Michiel Frederik Botha Resume
 
profile
profileprofile
profile
 
T.chandramouli O & M_ele
T.chandramouli O & M_eleT.chandramouli O & M_ele
T.chandramouli O & M_ele
 
T.chandramouli O & M_Electrical
T.chandramouli O & M_ElectricalT.chandramouli O & M_Electrical
T.chandramouli O & M_Electrical
 
Project Review Meeting - 14.02.23.ppt
Project Review Meeting - 14.02.23.pptProject Review Meeting - 14.02.23.ppt
Project Review Meeting - 14.02.23.ppt
 
Ht
HtHt
Ht
 
resume krishna electrical engineer
resume krishna electrical engineerresume krishna electrical engineer
resume krishna electrical engineer
 
PARESH KUMAR DASH-RESUME-BOILER (1)
PARESH KUMAR   DASH-RESUME-BOILER (1)PARESH KUMAR   DASH-RESUME-BOILER (1)
PARESH KUMAR DASH-RESUME-BOILER (1)
 
SAGAR RESUME
SAGAR RESUMESAGAR RESUME
SAGAR RESUME
 
ASHISH GUPTA CN3343 THT2(WEAVING)
ASHISH GUPTA CN3343 THT2(WEAVING)ASHISH GUPTA CN3343 THT2(WEAVING)
ASHISH GUPTA CN3343 THT2(WEAVING)
 

AFES Progress Evaluation

  • 1. Major Achievements & Performance Report (MES-PMCL Project) Al-fareen Engeneering & Consultants (Pvt) LTD
  • 2.  Zero Outage count (Karachi) S1  Less repeated Outage (cable installation)  ProlongedT-prime/DC issues rectified Al-fareen Engeneering & Consultants (Pvt) LTD
  • 3.  Being Quality Solution provider AFES strives for cost effective and consistent rectification, Keeping above policy Below mentioned Sites may be lead as a role model ,since some of them were running prime fro, 3 yrs. Al-fareen Engeneering & Consultants (Pvt) LTD
  • 4.  Timely Ho-To  Swift SLA obedience under given conditions  Additional recommendations/Proposals  Cost effective ,Consistent rectification  Certified electrical Staff for PMT (Wapda)  24/7 NOC availability  Transparency in reporting & client Comfort Level Al-fareen Engeneering & Consultants (Pvt) LTD
  • 5. Al-fareen Engeneering & Consultants (Pvt) LTD Summery Cable InstallationTeam-3 Persons Korangi – 1 person Malir , Shahfaisal – 3 person Orangi– 1 person Baldia -1 person Lyari – 1 person Defence – 1 person Garden – 2 person Laandhi ,Gulsha e hadeed – 2 persons Bahadurabad ,Nazimabad - 2 Total = Logistics Details No Of Bikes – No Of Utility van – 03 Cable installation - 3person Korangi – 1 person Malir , Shahfaisal – 3 person Orangi -1 Baldia- 1,Lyari1,Defence1,Garden2 Laandhi ,Gulsha e hadeed – 2 persons Bahadurabad-Nazimabad -2
  • 6. Al-fareen Engeneering & Consultants (Pvt) LTD Cable Installation, 3 Korangi, 1 Laandhi, 1 Orangi, 1 Baldia, 1 Gulshan-e- Hadeed, 1Bahadurabad, 1Nazimabad, 1 Lyari, 1 Defence, 1 Garden, 2 Malir- Shahfaisal, 3
  • 7. Al-fareen Engeneering & Consultants (Pvt) LTD May, 80 June, 210 July, 181 August, 177 September, 334 October, 219 November, 183 December, 204
  • 8.  Cable Installation Jobs @ -KHI5013__S_Near_Korangi_Crossing - 50 meters 16mm 4 core -KHI0665__P_KDA_Employees_Krngi - 190 meter 16mm 4 core -KHI0656__H_Korangi_5_Township - 115 meter 16mm4core -KHI0910__S_BhainsColonyMor - 120 meter 16 mm4core -KHI5437__S_KgiRes10Sector50B -35 meter 16 mm4core -KHI5328__s_future_colony_blocke - 15 meter LT-Meter Al-fareen Engeneering & Consultants (Pvt) LTD
  • 9.  Site Rectification @ Al-fareen Engeneering & Consultants (Pvt) LTD
  • 10. Al-fareen Engeneering & Consultants (Pvt) LTD Summary Karachi Total Under process = 05 Cases Pending PMCL end = 02 Pending at MES End including approvals = 01 KESC issues = 02 T-Prime Count Karachi Day 2-Jan-13 3-Jan-13 4-Jan-13 5-Jan-13 6-Jan-13 7-Jan-13 8-Jan-13 9-Jan-13 10-Jan-13 11-Jan-13 12-Jan-13 13-Jan-13 14-Jan-13 15-Jan-13 16-Jan-13 17-Jan-13 Count 2 4 4 4 4 7 6 6 6 6 4 4 4 4 4 5 2 4 4 4 4 7 6 6 6 6 4 4 4 4 4 5 0 1 2 3 4 5 6 7 8 2-Jan-13 3-Jan-13 4-Jan-13 5-Jan-13 6-Jan-13 7-Jan-13 8-Jan-13 9-Jan-13 10-Jan-13 11-Jan-13 12-Jan-13 13-Jan-13 14-Jan-13 15-Jan-13 16-Jan-13 17-Jan-13 T-PrimeTrend Karachi (MES)
  • 11. Al-fareen Engeneering & Consultants (Pvt) LTD Summary Hyderabad Total Under process = 16 CP DC cases Pending at PMCL end = 06 Pending at myson End including approvals = 07 Contactor Faulty Sites = 02 T-Prime Count HYD Day 5-Aug-12 6-Aug-12 7-Aug-12 8-Aug-12 9-Aug-12 10-Aug-12 11-Aug-12 12-Aug-12 13-Aug-12 Count 14 15 16 16 15 14 14 14 16 14 15 16 16 15 14 14 14 16 13 14 15 16 17 5-Aug- 12 6-Aug- 12 7-Aug- 12 8-Aug- 12 9-Aug- 12 10-Aug- 12 11-Aug- 12 12-Aug- 12 13-Aug- 12 T-PrimeTrend HYD (MES)
  • 12. Al-fareen Engeneering & Consultants (Pvt) LTD T-Prime Count MPK Day 5-Aug-12 6-Aug-12 7-Aug-12 8-Aug-12 9-Aug-12 10-Aug-12 11-Aug-12 12-Aug-12 13-Aug-12 Count 2 1 2 1 1 2 3 3 3 2 1 2 1 1 2 3 3 3 0 0.5 1 1.5 2 2.5 3 3.5 5-Aug-12 6-Aug-12 7-Aug-12 8-Aug-12 9-Aug-12 10-Aug- 12 11-Aug- 12 12-Aug- 12 13-Aug- 12 T-PrimeTrend MPK(MES) Summary Mirpur khas Total Under process = 03 CP DC cases pending at PMCL end = 02 Pending at myson End including approvals = 01
  • 13. Al-fareen Engeneering & Consultants (Pvt) LTD S.No Site name Site Code Status Generic Reason with Remarks (OSV) CP Restored - Restored / Pending CP Meter Reading DG Reading 1 DAO7071__S_Dando 7071 T-Prime CPRestored Restored N/A N/A 2 HYD5334__S_Hyderabad_1 5334 TPrime CPRestored Restored 19179 6278 3 HGW6108__H_TMK_HYD_Highway_PW6108 T-Prime CPRestored by replacing ofPMT Bush & tapping Restored 311797 3396.25 4 NRP6362__H_nasarpur_Matiari_Rd6362 T-Prime Access Issue Pending N/A N/A 5 MTL5888__H_Digri_Rd_Matli 5888 Stand By (OnePhase) No CPissue found -Allphases OK Restored 157075 13813.11 6 HGW6311__H_Khandu_Hala_MRI6311 T-Prime CPRestored Restored 8368 / 3032 1047.68 7 BUL6168__S_MirpurBathoro 6168 T-Prime CPrestored by installing 16mm4core 5meters cable Restored N/A 2457.56 8 TBG6377__H_Talhar_Tando_Bagho6377 TPrime CPrestored by sagging ofHT jumpers Restored 2425 / 1085 2920.7 9 HYD5856__S_Suzuki 5856 TPrime CPrestored by LT Service Restored N/A N/A 10 BSC_Auto_Bhan_Repeater 6407 TPrime CPDCdue to billing Pending N/A N/A 11 HGW7090__S_Palijani_Station7090 T-Prime CPDCdue to billing Pending N/A N/A 12 RJK7062__S_Rajo_Khanani 7062 T-Prime CPDCdue to billing Pending 2741 / 3287 1167.16 13 HYD5335__S_Hyderabad2 5335 T-Prime CPrestored by sagging ofHT jumpers Restored N/A N/A 14 BER6132__H_Bherani_DTE 6132 T-Prime CPRestored Restored N/A 4905 15 PHK0073__S_Falkara 73 T-Prime CPDCdue to billing Pending 3200 / 383 N/A 16 HYD5666__S_Bilal_Complex5666 T-Prime Approvalreq -Neutralgrounding 300 ft cable Pending 0 0 17 HYD6494__S_Ghumanabad 6494 T-Prime CPRestored Restored 1041 11004 18 NRP6361__S_Akbari_Masjid 6361 T-Prime CPRestored Restored N/A 258.32 19 MRI7070__S_SarhandiMohallah7070 T-Prime CPrestored -Structural& Civilworkrequired at site Restored N/A N/A 20 HYD5853__S_Unit_5_Latifabad5853 T-Prime CPRestored Restored N/A N/A
  • 14.  Individual visit to all Sites within region  Highlighting and recommendation of proposals such as Contactor replacements ,DG auto issue , Meter Burnt ,Cable Requirements  Initiation of approvals  Rectification of snags in view of go ahead Al-fareen Engeneering & Consultants (Pvt) LTD
  • 15. Al-fareen Engeneering & Consultants (Pvt) LTD