 Zero Outage count (Karachi) S1
 Less repeated Outage (cable installation)
 ProlongedT-prime/DC issues rectified
Al-fareen Engeneering & Consultants (Pvt) LTD
 Being Quality Solution provider AFES
strives for cost effective and consistent
rectification, Keeping above policy Below
mentioned Sites may be lead as a role
model ,since some of them were running
prime fro, 3 yrs.
Al-fareen Engeneering & Consultants (Pvt) LTD
 Timely Ho-To
 Swift SLA obedience under given
conditions
 Additional recommendations/Proposals
 Cost effective ,Consistent rectification
 Certified electrical Staff for PMT (Wapda)
 24/7 NOC availability
 Transparency in reporting & client Comfort
Level
Al-fareen Engeneering & Consultants (Pvt) LTD
Al-fareen Engeneering & Consultants (Pvt) LTD
Summery
Cable InstallationTeam-3
Persons
Korangi – 1 person
Malir , Shahfaisal – 3 person
Orangi– 1 person
Baldia -1 person
Lyari – 1 person
Defence – 1 person
Garden – 2 person
Laandhi ,Gulsha e hadeed – 2
persons
Bahadurabad ,Nazimabad - 2
Total =
Logistics Details
No Of Bikes –
No Of Utility van – 03
Cable installation - 3person
Korangi – 1 person
Malir , Shahfaisal – 3 person
Orangi -1 Baldia-
1,Lyari1,Defence1,Garden2
Laandhi ,Gulsha e hadeed – 2
persons
Bahadurabad-Nazimabad -2
Al-fareen Engeneering & Consultants (Pvt) LTD
Cable
Installation, 3
Korangi, 1
Laandhi, 1
Orangi, 1
Baldia, 1
Gulshan-e-
Hadeed, 1Bahadurabad, 1Nazimabad, 1
Lyari, 1
Defence, 1
Garden, 2
Malir-
Shahfaisal, 3
Al-fareen Engeneering & Consultants (Pvt) LTD
May, 80
June, 210
July, 181
August, 177
September, 334
October, 219
November, 183
December, 204
 Cable Installation Jobs @
-KHI5013__S_Near_Korangi_Crossing - 50
meters 16mm 4 core
-KHI0665__P_KDA_Employees_Krngi - 190
meter 16mm 4 core
-KHI0656__H_Korangi_5_Township - 115 meter
16mm4core
-KHI0910__S_BhainsColonyMor - 120 meter 16
mm4core
-KHI5437__S_KgiRes10Sector50B -35 meter 16
mm4core
-KHI5328__s_future_colony_blocke - 15 meter
LT-Meter
Al-fareen Engeneering & Consultants (Pvt) LTD
 Site Rectification @
Al-fareen Engeneering & Consultants (Pvt) LTD
Al-fareen Engeneering & Consultants (Pvt) LTD
Summary Karachi
Total Under process = 05
Cases Pending PMCL end = 02
Pending at MES End including approvals = 01
KESC issues = 02
T-Prime Count Karachi
Day 2-Jan-13 3-Jan-13 4-Jan-13 5-Jan-13 6-Jan-13 7-Jan-13 8-Jan-13 9-Jan-13 10-Jan-13 11-Jan-13 12-Jan-13 13-Jan-13 14-Jan-13 15-Jan-13 16-Jan-13 17-Jan-13
Count 2 4 4 4 4 7 6 6 6 6 4 4 4 4 4 5
2
4 4 4 4
7
6 6 6 6
4 4 4 4 4
5
0
1
2
3
4
5
6
7
8
2-Jan-13
3-Jan-13
4-Jan-13
5-Jan-13
6-Jan-13
7-Jan-13
8-Jan-13
9-Jan-13
10-Jan-13
11-Jan-13
12-Jan-13
13-Jan-13
14-Jan-13
15-Jan-13
16-Jan-13
17-Jan-13
T-PrimeTrend Karachi (MES)
Al-fareen Engeneering & Consultants (Pvt) LTD
Summary Hyderabad
Total Under process = 16
CP DC cases Pending at PMCL end = 06
Pending at myson End including approvals = 07
Contactor Faulty Sites = 02
T-Prime Count HYD
Day 5-Aug-12 6-Aug-12 7-Aug-12 8-Aug-12 9-Aug-12 10-Aug-12 11-Aug-12 12-Aug-12 13-Aug-12
Count 14 15 16 16 15 14 14 14 16
14
15
16 16
15
14 14 14
16
13
14
15
16
17
5-Aug-
12
6-Aug-
12
7-Aug-
12
8-Aug-
12
9-Aug-
12
10-Aug-
12
11-Aug-
12
12-Aug-
12
13-Aug-
12
T-PrimeTrend HYD (MES)
Al-fareen Engeneering & Consultants (Pvt) LTD
T-Prime Count MPK
Day 5-Aug-12 6-Aug-12 7-Aug-12 8-Aug-12 9-Aug-12 10-Aug-12 11-Aug-12 12-Aug-12 13-Aug-12
Count 2 1 2 1 1 2 3 3 3
2
1
2
1 1
2
3 3 3
0
0.5
1
1.5
2
2.5
3
3.5
5-Aug-12
6-Aug-12
7-Aug-12
8-Aug-12
9-Aug-12
10-Aug-
12
11-Aug-
12
12-Aug-
12
13-Aug-
12
T-PrimeTrend MPK(MES)
Summary Mirpur khas
Total Under process = 03
CP DC cases pending at PMCL end = 02
Pending at myson End including approvals = 01
Al-fareen Engeneering & Consultants (Pvt) LTD
S.No Site name
Site
Code
Status Generic Reason with Remarks (OSV)
CP Restored - Restored
/ Pending
CP Meter Reading DG Reading
1 DAO7071__S_Dando 7071 T-Prime CPRestored Restored N/A N/A
2 HYD5334__S_Hyderabad_1 5334 TPrime CPRestored Restored 19179 6278
3 HGW6108__H_TMK_HYD_Highway_PW6108 T-Prime CPRestored by replacing ofPMT Bush & tapping Restored 311797 3396.25
4 NRP6362__H_nasarpur_Matiari_Rd6362 T-Prime Access Issue Pending N/A N/A
5 MTL5888__H_Digri_Rd_Matli 5888 Stand By (OnePhase) No CPissue found -Allphases OK Restored 157075 13813.11
6 HGW6311__H_Khandu_Hala_MRI6311 T-Prime CPRestored Restored 8368 / 3032 1047.68
7 BUL6168__S_MirpurBathoro 6168 T-Prime CPrestored by installing 16mm4core 5meters cable Restored N/A 2457.56
8 TBG6377__H_Talhar_Tando_Bagho6377 TPrime CPrestored by sagging ofHT jumpers Restored 2425 / 1085 2920.7
9 HYD5856__S_Suzuki 5856 TPrime CPrestored by LT Service Restored N/A N/A
10 BSC_Auto_Bhan_Repeater 6407 TPrime CPDCdue to billing Pending N/A N/A
11 HGW7090__S_Palijani_Station7090 T-Prime CPDCdue to billing Pending N/A N/A
12 RJK7062__S_Rajo_Khanani 7062 T-Prime CPDCdue to billing Pending 2741 / 3287 1167.16
13 HYD5335__S_Hyderabad2 5335 T-Prime CPrestored by sagging ofHT jumpers Restored N/A N/A
14 BER6132__H_Bherani_DTE 6132 T-Prime CPRestored Restored N/A 4905
15 PHK0073__S_Falkara 73 T-Prime CPDCdue to billing Pending 3200 / 383 N/A
16 HYD5666__S_Bilal_Complex5666 T-Prime Approvalreq -Neutralgrounding 300 ft cable Pending 0 0
17 HYD6494__S_Ghumanabad 6494 T-Prime CPRestored Restored 1041 11004
18 NRP6361__S_Akbari_Masjid 6361 T-Prime CPRestored Restored N/A 258.32
19 MRI7070__S_SarhandiMohallah7070 T-Prime CPrestored -Structural& Civilworkrequired at site Restored N/A N/A
20 HYD5853__S_Unit_5_Latifabad5853 T-Prime CPRestored Restored N/A N/A
 Individual visit to all Sites within region
 Highlighting and recommendation of
proposals such as Contactor replacements
,DG auto issue , Meter Burnt ,Cable
Requirements
 Initiation of approvals
 Rectification of snags in view of go ahead
Al-fareen Engeneering & Consultants (Pvt) LTD
Al-fareen Engeneering & Consultants (Pvt) LTD

AFES Progress Evaluation

  • 1.
    Major Achievements &Performance Report (MES-PMCL Project) Al-fareen Engeneering & Consultants (Pvt) LTD
  • 2.
     Zero Outagecount (Karachi) S1  Less repeated Outage (cable installation)  ProlongedT-prime/DC issues rectified Al-fareen Engeneering & Consultants (Pvt) LTD
  • 3.
     Being QualitySolution provider AFES strives for cost effective and consistent rectification, Keeping above policy Below mentioned Sites may be lead as a role model ,since some of them were running prime fro, 3 yrs. Al-fareen Engeneering & Consultants (Pvt) LTD
  • 4.
     Timely Ho-To Swift SLA obedience under given conditions  Additional recommendations/Proposals  Cost effective ,Consistent rectification  Certified electrical Staff for PMT (Wapda)  24/7 NOC availability  Transparency in reporting & client Comfort Level Al-fareen Engeneering & Consultants (Pvt) LTD
  • 5.
    Al-fareen Engeneering &Consultants (Pvt) LTD Summery Cable InstallationTeam-3 Persons Korangi – 1 person Malir , Shahfaisal – 3 person Orangi– 1 person Baldia -1 person Lyari – 1 person Defence – 1 person Garden – 2 person Laandhi ,Gulsha e hadeed – 2 persons Bahadurabad ,Nazimabad - 2 Total = Logistics Details No Of Bikes – No Of Utility van – 03 Cable installation - 3person Korangi – 1 person Malir , Shahfaisal – 3 person Orangi -1 Baldia- 1,Lyari1,Defence1,Garden2 Laandhi ,Gulsha e hadeed – 2 persons Bahadurabad-Nazimabad -2
  • 6.
    Al-fareen Engeneering &Consultants (Pvt) LTD Cable Installation, 3 Korangi, 1 Laandhi, 1 Orangi, 1 Baldia, 1 Gulshan-e- Hadeed, 1Bahadurabad, 1Nazimabad, 1 Lyari, 1 Defence, 1 Garden, 2 Malir- Shahfaisal, 3
  • 7.
    Al-fareen Engeneering &Consultants (Pvt) LTD May, 80 June, 210 July, 181 August, 177 September, 334 October, 219 November, 183 December, 204
  • 8.
     Cable InstallationJobs @ -KHI5013__S_Near_Korangi_Crossing - 50 meters 16mm 4 core -KHI0665__P_KDA_Employees_Krngi - 190 meter 16mm 4 core -KHI0656__H_Korangi_5_Township - 115 meter 16mm4core -KHI0910__S_BhainsColonyMor - 120 meter 16 mm4core -KHI5437__S_KgiRes10Sector50B -35 meter 16 mm4core -KHI5328__s_future_colony_blocke - 15 meter LT-Meter Al-fareen Engeneering & Consultants (Pvt) LTD
  • 9.
     Site Rectification@ Al-fareen Engeneering & Consultants (Pvt) LTD
  • 10.
    Al-fareen Engeneering &Consultants (Pvt) LTD Summary Karachi Total Under process = 05 Cases Pending PMCL end = 02 Pending at MES End including approvals = 01 KESC issues = 02 T-Prime Count Karachi Day 2-Jan-13 3-Jan-13 4-Jan-13 5-Jan-13 6-Jan-13 7-Jan-13 8-Jan-13 9-Jan-13 10-Jan-13 11-Jan-13 12-Jan-13 13-Jan-13 14-Jan-13 15-Jan-13 16-Jan-13 17-Jan-13 Count 2 4 4 4 4 7 6 6 6 6 4 4 4 4 4 5 2 4 4 4 4 7 6 6 6 6 4 4 4 4 4 5 0 1 2 3 4 5 6 7 8 2-Jan-13 3-Jan-13 4-Jan-13 5-Jan-13 6-Jan-13 7-Jan-13 8-Jan-13 9-Jan-13 10-Jan-13 11-Jan-13 12-Jan-13 13-Jan-13 14-Jan-13 15-Jan-13 16-Jan-13 17-Jan-13 T-PrimeTrend Karachi (MES)
  • 11.
    Al-fareen Engeneering &Consultants (Pvt) LTD Summary Hyderabad Total Under process = 16 CP DC cases Pending at PMCL end = 06 Pending at myson End including approvals = 07 Contactor Faulty Sites = 02 T-Prime Count HYD Day 5-Aug-12 6-Aug-12 7-Aug-12 8-Aug-12 9-Aug-12 10-Aug-12 11-Aug-12 12-Aug-12 13-Aug-12 Count 14 15 16 16 15 14 14 14 16 14 15 16 16 15 14 14 14 16 13 14 15 16 17 5-Aug- 12 6-Aug- 12 7-Aug- 12 8-Aug- 12 9-Aug- 12 10-Aug- 12 11-Aug- 12 12-Aug- 12 13-Aug- 12 T-PrimeTrend HYD (MES)
  • 12.
    Al-fareen Engeneering &Consultants (Pvt) LTD T-Prime Count MPK Day 5-Aug-12 6-Aug-12 7-Aug-12 8-Aug-12 9-Aug-12 10-Aug-12 11-Aug-12 12-Aug-12 13-Aug-12 Count 2 1 2 1 1 2 3 3 3 2 1 2 1 1 2 3 3 3 0 0.5 1 1.5 2 2.5 3 3.5 5-Aug-12 6-Aug-12 7-Aug-12 8-Aug-12 9-Aug-12 10-Aug- 12 11-Aug- 12 12-Aug- 12 13-Aug- 12 T-PrimeTrend MPK(MES) Summary Mirpur khas Total Under process = 03 CP DC cases pending at PMCL end = 02 Pending at myson End including approvals = 01
  • 13.
    Al-fareen Engeneering &Consultants (Pvt) LTD S.No Site name Site Code Status Generic Reason with Remarks (OSV) CP Restored - Restored / Pending CP Meter Reading DG Reading 1 DAO7071__S_Dando 7071 T-Prime CPRestored Restored N/A N/A 2 HYD5334__S_Hyderabad_1 5334 TPrime CPRestored Restored 19179 6278 3 HGW6108__H_TMK_HYD_Highway_PW6108 T-Prime CPRestored by replacing ofPMT Bush & tapping Restored 311797 3396.25 4 NRP6362__H_nasarpur_Matiari_Rd6362 T-Prime Access Issue Pending N/A N/A 5 MTL5888__H_Digri_Rd_Matli 5888 Stand By (OnePhase) No CPissue found -Allphases OK Restored 157075 13813.11 6 HGW6311__H_Khandu_Hala_MRI6311 T-Prime CPRestored Restored 8368 / 3032 1047.68 7 BUL6168__S_MirpurBathoro 6168 T-Prime CPrestored by installing 16mm4core 5meters cable Restored N/A 2457.56 8 TBG6377__H_Talhar_Tando_Bagho6377 TPrime CPrestored by sagging ofHT jumpers Restored 2425 / 1085 2920.7 9 HYD5856__S_Suzuki 5856 TPrime CPrestored by LT Service Restored N/A N/A 10 BSC_Auto_Bhan_Repeater 6407 TPrime CPDCdue to billing Pending N/A N/A 11 HGW7090__S_Palijani_Station7090 T-Prime CPDCdue to billing Pending N/A N/A 12 RJK7062__S_Rajo_Khanani 7062 T-Prime CPDCdue to billing Pending 2741 / 3287 1167.16 13 HYD5335__S_Hyderabad2 5335 T-Prime CPrestored by sagging ofHT jumpers Restored N/A N/A 14 BER6132__H_Bherani_DTE 6132 T-Prime CPRestored Restored N/A 4905 15 PHK0073__S_Falkara 73 T-Prime CPDCdue to billing Pending 3200 / 383 N/A 16 HYD5666__S_Bilal_Complex5666 T-Prime Approvalreq -Neutralgrounding 300 ft cable Pending 0 0 17 HYD6494__S_Ghumanabad 6494 T-Prime CPRestored Restored 1041 11004 18 NRP6361__S_Akbari_Masjid 6361 T-Prime CPRestored Restored N/A 258.32 19 MRI7070__S_SarhandiMohallah7070 T-Prime CPrestored -Structural& Civilworkrequired at site Restored N/A N/A 20 HYD5853__S_Unit_5_Latifabad5853 T-Prime CPRestored Restored N/A N/A
  • 14.
     Individual visitto all Sites within region  Highlighting and recommendation of proposals such as Contactor replacements ,DG auto issue , Meter Burnt ,Cable Requirements  Initiation of approvals  Rectification of snags in view of go ahead Al-fareen Engeneering & Consultants (Pvt) LTD
  • 15.
    Al-fareen Engeneering &Consultants (Pvt) LTD