3. Being Quality Solution provider AFES
strives for cost effective and consistent
rectification, Keeping above policy Below
mentioned Sites may be lead as a role
model ,since some of them were running
prime fro, 3 yrs.
Al-fareen Engeneering & Consultants (Pvt) LTD
4. Timely Ho-To
Swift SLA obedience under given
conditions
Additional recommendations/Proposals
Cost effective ,Consistent rectification
Certified electrical Staff for PMT (Wapda)
24/7 NOC availability
Transparency in reporting & client Comfort
Level
Al-fareen Engeneering & Consultants (Pvt) LTD
5. Al-fareen Engeneering & Consultants (Pvt) LTD
Summery
Cable InstallationTeam-3
Persons
Korangi – 1 person
Malir , Shahfaisal – 3 person
Orangi– 1 person
Baldia -1 person
Lyari – 1 person
Defence – 1 person
Garden – 2 person
Laandhi ,Gulsha e hadeed – 2
persons
Bahadurabad ,Nazimabad - 2
Total =
Logistics Details
No Of Bikes –
No Of Utility van – 03
Cable installation - 3person
Korangi – 1 person
Malir , Shahfaisal – 3 person
Orangi -1 Baldia-
1,Lyari1,Defence1,Garden2
Laandhi ,Gulsha e hadeed – 2
persons
Bahadurabad-Nazimabad -2
11. Al-fareen Engeneering & Consultants (Pvt) LTD
Summary Hyderabad
Total Under process = 16
CP DC cases Pending at PMCL end = 06
Pending at myson End including approvals = 07
Contactor Faulty Sites = 02
T-Prime Count HYD
Day 5-Aug-12 6-Aug-12 7-Aug-12 8-Aug-12 9-Aug-12 10-Aug-12 11-Aug-12 12-Aug-12 13-Aug-12
Count 14 15 16 16 15 14 14 14 16
14
15
16 16
15
14 14 14
16
13
14
15
16
17
5-Aug-
12
6-Aug-
12
7-Aug-
12
8-Aug-
12
9-Aug-
12
10-Aug-
12
11-Aug-
12
12-Aug-
12
13-Aug-
12
T-PrimeTrend HYD (MES)
12. Al-fareen Engeneering & Consultants (Pvt) LTD
T-Prime Count MPK
Day 5-Aug-12 6-Aug-12 7-Aug-12 8-Aug-12 9-Aug-12 10-Aug-12 11-Aug-12 12-Aug-12 13-Aug-12
Count 2 1 2 1 1 2 3 3 3
2
1
2
1 1
2
3 3 3
0
0.5
1
1.5
2
2.5
3
3.5
5-Aug-12
6-Aug-12
7-Aug-12
8-Aug-12
9-Aug-12
10-Aug-
12
11-Aug-
12
12-Aug-
12
13-Aug-
12
T-PrimeTrend MPK(MES)
Summary Mirpur khas
Total Under process = 03
CP DC cases pending at PMCL end = 02
Pending at myson End including approvals = 01
13. Al-fareen Engeneering & Consultants (Pvt) LTD
S.No Site name
Site
Code
Status Generic Reason with Remarks (OSV)
CP Restored - Restored
/ Pending
CP Meter Reading DG Reading
1 DAO7071__S_Dando 7071 T-Prime CPRestored Restored N/A N/A
2 HYD5334__S_Hyderabad_1 5334 TPrime CPRestored Restored 19179 6278
3 HGW6108__H_TMK_HYD_Highway_PW6108 T-Prime CPRestored by replacing ofPMT Bush & tapping Restored 311797 3396.25
4 NRP6362__H_nasarpur_Matiari_Rd6362 T-Prime Access Issue Pending N/A N/A
5 MTL5888__H_Digri_Rd_Matli 5888 Stand By (OnePhase) No CPissue found -Allphases OK Restored 157075 13813.11
6 HGW6311__H_Khandu_Hala_MRI6311 T-Prime CPRestored Restored 8368 / 3032 1047.68
7 BUL6168__S_MirpurBathoro 6168 T-Prime CPrestored by installing 16mm4core 5meters cable Restored N/A 2457.56
8 TBG6377__H_Talhar_Tando_Bagho6377 TPrime CPrestored by sagging ofHT jumpers Restored 2425 / 1085 2920.7
9 HYD5856__S_Suzuki 5856 TPrime CPrestored by LT Service Restored N/A N/A
10 BSC_Auto_Bhan_Repeater 6407 TPrime CPDCdue to billing Pending N/A N/A
11 HGW7090__S_Palijani_Station7090 T-Prime CPDCdue to billing Pending N/A N/A
12 RJK7062__S_Rajo_Khanani 7062 T-Prime CPDCdue to billing Pending 2741 / 3287 1167.16
13 HYD5335__S_Hyderabad2 5335 T-Prime CPrestored by sagging ofHT jumpers Restored N/A N/A
14 BER6132__H_Bherani_DTE 6132 T-Prime CPRestored Restored N/A 4905
15 PHK0073__S_Falkara 73 T-Prime CPDCdue to billing Pending 3200 / 383 N/A
16 HYD5666__S_Bilal_Complex5666 T-Prime Approvalreq -Neutralgrounding 300 ft cable Pending 0 0
17 HYD6494__S_Ghumanabad 6494 T-Prime CPRestored Restored 1041 11004
18 NRP6361__S_Akbari_Masjid 6361 T-Prime CPRestored Restored N/A 258.32
19 MRI7070__S_SarhandiMohallah7070 T-Prime CPrestored -Structural& Civilworkrequired at site Restored N/A N/A
20 HYD5853__S_Unit_5_Latifabad5853 T-Prime CPRestored Restored N/A N/A
14. Individual visit to all Sites within region
Highlighting and recommendation of
proposals such as Contactor replacements
,DG auto issue , Meter Burnt ,Cable
Requirements
Initiation of approvals
Rectification of snags in view of go ahead
Al-fareen Engeneering & Consultants (Pvt) LTD