4. Being Quality Solution provider AFES strives for
cost effective and consistent rectification,
Keeping above policy Below mentioned Sites may
be lead as a role model ,since some of them were
running prime fro, 3 yrs.
Al-fareed Engineering & Consultants (Pvt) LTD
5. Timely Ho-To
Swift SLA obedience under given conditions
Additional recommendations/Proposals
Cost effective ,Consistent rectification
Certified electrical Staff for PMT (Wapda)
24/7 NOC availability
Transparency in reporting & client Comfort Level
Al-fareed Engineering & Consultants (Pvt) LTD
6. Al-fareed Engineering & Consultants (Pvt) LTD
Swift Rectification within 3-5 hrs
Tracking for faulty transformers through KESC
Low cost Consistent Solution for repeated outages
Less repeated outage
ATS fault indication
8. Current Karachi trend
Zero Count Record In KHI for AFES End
Al-fareed Engineering & Consultants (Pvt) LTD
Summary Karachi
Total Under process = 05
Cases Pending PMCL end = 02
Pending at MES End including approvals = 01
KESC issues = 02
T-Prime Count Karachi
Day 2-Jan-13 3-Jan-13 4-Jan-13 5-Jan-13 6-Jan-13 7-Jan-13 8-Jan-13 9-Jan-13 10-Jan-13 11-Jan-13 12-Jan-13 13-Jan-13 14-Jan-13 15-Jan-13 16-Jan-13 17-Jan-13
Count 2 4 4 4 4 7 6 6 6 6 4 4 4 4 4 5
2
4 4 4 4
7
6 6 6 6
4 4 4 4 4
5
0
1
2
3
4
5
6
7
8
2-Jan-13
3-Jan-13
4-Jan-13
5-Jan-13
6-Jan-13
7-Jan-13
8-Jan-13
9-Jan-13
10-Jan-13
11-Jan-13
12-Jan-13
13-Jan-13
14-Jan-13
15-Jan-13
16-Jan-13
17-Jan-13
T-Prime Trend Karachi (MES)
9. Al-fareed Engineering & Consultants (Pvt) LTD
Summery
Cable Installation Team-3 Persons
Korangi – 2 person
Shahfaisal /Landhi– 2 person
Orangi– 2 person
Baldia -1 person
Lyari – 2 person
Defence – 1 person
Garden – 2 person
Gulsha e hadeed – 2 persons
Bahadurabad ,Nazimabad - 2
Total = 21
Logistics Details
No Of Bikes – 20
No Of Utility van – 03
Cable installation -
3person
Korangi / – 2 person
Orangi 2
,Baldia1,Lyari2,Defence1,Garden2
Laandhi/Shah faisal
,Gulsha e hadeed – 2
persons
Bahadurabad-Nazimabad -
2
10. Al-fareed Engineering & Consultants (Pvt) LTD
Summery
Cable Installation Team-3 Persons
Gulistan e johar – 1 person
Surjani– 1 person
Malir– 1 person
Gulistan E Johar-1
Surjani – 1 person
Malir -1
Saddar/Garden -2
Saddar/Garden -2
FB area – 1 person
Gulshan E Iqbal-1
21. Al-fareed Engineering & Consultants (Pvt) LTD
S# Region Applicable sites/Available Person
1 Hyd City 145/2 person
2 Badin 50/1 person
3 Sehvan 14/1 person
4 Hala 44/1 person
5 Thatta 29/1 person
6 Sanghar 19/1 person
7 Umarkot 17/1 person
8 Mirpurkhas 23/1 person
9 Degree 31/1 person
10 Tandoallayar 14/1 person
11 Moro 20/1 person
12 Nwabshah/Daddu 88/2 person
22. Current MPK trend
Zero Count Record In HYD for AFES End
Al-fareed Engineering & Consultants (Pvt) LTD
T-Prime Count MPK
Day 5-Aug-12 6-Aug-12 7-Aug-12 8-Aug-12 9-Aug-12 10-Aug-12 11-Aug-12 12-Aug-12 13-Aug-12
Count 2 1 2 1 1 2 3 3 3
2
1
2
1 1
2
3 3 3
0
0.5
1
1.5
2
2.5
3
3.5
5-Aug-12
6-Aug-12
7-Aug-12
8-Aug-12
9-Aug-12
10-Aug-12
11-Aug-12
12-Aug-12
13-Aug-12
T-Prime Trend MPK(MES)
Summary Mirpur khas
Total Under process = 03
CP DC cases pending at PMCL end = 02
Pending at myson End including approvals = 01
23. Al-fareed Engineering & Consultants (Pvt) LTD
S.No Site name
Site
Code
Status Generic Reason with Remarks (OSV)
CP Restored - Restored
/ Pending
CP Meter Reading DG Reading
1 DAO7071__S_Dando 7071 T-Prime CPRestored Restored N/A N/A
2 HYD5334__S_Hyderabad_1 5334 TPrime CPRestored Restored 19179 6278
3 HGW6108__H_TMK_HYD_Highway_PW6108 T-Prime CPRestored by replacing ofPMT Bush & tapping Restored 311797 3396.25
4 NRP6362__H_nasarpur_Matiari_Rd6362 T-Prime Access Issue Pending N/A N/A
5 MTL5888__H_Digri_Rd_Matli 5888 Stand By (OnePhase) No CPissue found -Allphases OK Restored 157075 13813.11
6 HGW6311__H_Khandu_Hala_MRI6311 T-Prime CPRestored Restored 8368 / 3032 1047.68
7 BUL6168__S_MirpurBathoro 6168 T-Prime CPrestored by installing 16mm4core 5meters cable Restored N/A 2457.56
8 TBG6377__H_Talhar_Tando_Bagho6377 TPrime CPrestored by sagging ofHT jumpers Restored 2425 / 1085 2920.7
9 HYD5856__S_Suzuki 5856 TPrime CPrestored by LT Service Restored N/A N/A
10 BSC_Auto_Bhan_Repeater 6407 TPrime CPDCdue to billing Pending N/A N/A
11 HGW7090__S_Palijani_Station7090 T-Prime CPDCdue to billing Pending N/A N/A
12 RJK7062__S_Rajo_Khanani 7062 T-Prime CPDCdue to billing Pending 2741 / 3287 1167.16
13 HYD5335__S_Hyderabad2 5335 T-Prime CPrestored by sagging ofHT jumpers Restored N/A N/A
14 BER6132__H_Bherani_DTE 6132 T-Prime CPRestored Restored N/A 4905
15 PHK0073__S_Falkara 73 T-Prime CPDCdue to billing Pending 3200 / 383 N/A
16 HYD5666__S_Bilal_Complex5666 T-Prime Approvalreq -Neutralgrounding 300 ft cable Pending 0 0
17 HYD6494__S_Ghumanabad 6494 T-Prime CPRestored Restored 1041 11004
18 NRP6361__S_Akbari_Masjid 6361 T-Prime CPRestored Restored N/A 258.32
19 MRI7070__S_SarhandiMohallah7070 T-Prime CPrestored -Structural& Civilworkrequired at site Restored N/A N/A
20 HYD5853__S_Unit_5_Latifabad5853 T-Prime CPRestored Restored N/A N/A
24. Individual visit to all Sites within region
Highlighting and recommendation of proposals such
as Contactor replacements ,DG auto issue , Meter
Burnt ,Cable Requirements
Initiation of approvals
Rectification of snags in view of go ahead
Al-fareed Engineering & Consultants (Pvt) LTD
26. Al-fareed Engineering & Consultants (Pvt) LTD
Summary
Rohri 30/1 person
Ghotki 57/1 person
Ranipur 38/1 person
Khairpur 28/1 person
Sukkur 24/1 person
Larkana 53/1 person
Jaccobabad 52/1 person
Shikarpur 26/1 person
Total Site Count 308