Al-fareed Engineering & Consultants (Pvt) LTD
 Zero Outage count (Karachi) S1
 Less repeated Outage (cable installation)
 Prolonged T-prime/DC issues rectified
Al-fareed Engineering & Consultants (Pvt) LTD
 Being Quality Solution provider AFES strives for
cost effective and consistent rectification,
Keeping above policy Below mentioned Sites may
be lead as a role model ,since some of them were
running prime fro, 3 yrs.
Al-fareed Engineering & Consultants (Pvt) LTD
 Timely Ho-To
 Swift SLA obedience under given conditions
 Additional recommendations/Proposals
 Cost effective ,Consistent rectification
 Certified electrical Staff for PMT (Wapda)
 24/7 NOC availability
 Transparency in reporting & client Comfort Level
Al-fareed Engineering & Consultants (Pvt) LTD
Al-fareed Engineering & Consultants (Pvt) LTD
 Swift Rectification within 3-5 hrs
 Tracking for faulty transformers through KESC
 Low cost Consistent Solution for repeated outages
 Less repeated outage
 ATS fault indication
Karachi
Al-fareed Engineering & Consultants (Pvt) LTD
Current Karachi trend
Zero Count Record In KHI for AFES End
Al-fareed Engineering & Consultants (Pvt) LTD
Summary Karachi
Total Under process = 05
Cases Pending PMCL end = 02
Pending at MES End including approvals = 01
KESC issues = 02
T-Prime Count Karachi
Day 2-Jan-13 3-Jan-13 4-Jan-13 5-Jan-13 6-Jan-13 7-Jan-13 8-Jan-13 9-Jan-13 10-Jan-13 11-Jan-13 12-Jan-13 13-Jan-13 14-Jan-13 15-Jan-13 16-Jan-13 17-Jan-13
Count 2 4 4 4 4 7 6 6 6 6 4 4 4 4 4 5
2
4 4 4 4
7
6 6 6 6
4 4 4 4 4
5
0
1
2
3
4
5
6
7
8
2-Jan-13
3-Jan-13
4-Jan-13
5-Jan-13
6-Jan-13
7-Jan-13
8-Jan-13
9-Jan-13
10-Jan-13
11-Jan-13
12-Jan-13
13-Jan-13
14-Jan-13
15-Jan-13
16-Jan-13
17-Jan-13
T-Prime Trend Karachi (MES)
Al-fareed Engineering & Consultants (Pvt) LTD
Summery
Cable Installation Team-3 Persons
Korangi – 2 person
Shahfaisal /Landhi– 2 person
Orangi– 2 person
Baldia -1 person
Lyari – 2 person
Defence – 1 person
Garden – 2 person
Gulsha e hadeed – 2 persons
Bahadurabad ,Nazimabad - 2
Total = 21
Logistics Details
No Of Bikes – 20
No Of Utility van – 03
Cable installation -
3person
Korangi / – 2 person
Orangi 2
,Baldia1,Lyari2,Defence1,Garden2
Laandhi/Shah faisal
,Gulsha e hadeed – 2
persons
Bahadurabad-Nazimabad -
2
Al-fareed Engineering & Consultants (Pvt) LTD
Summery
Cable Installation Team-3 Persons
Gulistan e johar – 1 person
Surjani– 1 person
Malir– 1 person
Gulistan E Johar-1
Surjani – 1 person
Malir -1
Saddar/Garden -2
Saddar/Garden -2
FB area – 1 person
Gulshan E Iqbal-1
Al-fareed Engineering & Consultants (Pvt) LTD
Cable
Installation, 3
Korangi, 3
Laandhi, 1
Orangi, 1
Baldia, 1
Gulshan-e-
Hadeed, 1Bahadurabad, 1Nazimabad, 1
Lyari, 2
Defence, 1
Saddar/Garden,
2
Malir, 1
Surjani, 1
Gulistan-
e-johar, 1
FB area, 1 Gulshan-e-
Iqbal, 1
Al-fareed Engineering & Consultants (Pvt) LTD
Cable
Installation, 1
Hub, 1
Bela, 1
Uthal, 1
National
Highway , 1
Kathore, 1
Gharo, 1
Al-fareed Engineering & Consultants (Pvt) LTD
20
12
9
17
11
14
12
15
12
8
10 9
2
Area Wise Outage Trend
Outage Trend
Al-fareed Engineering & Consultants (Pvt) LTD
May, 80
June, 210
July, 181
August, 177
September, 334
October, 219
November, 183
December, 204
 Cable Installation Jobs @
-KHI5013__S_Near_Korangi_Crossing - 50
meters 16mm 4 core
-KHI0665__P_KDA_Employees_Krngi - 190
meter 16mm 4 core
-KHI0656__H_Korangi_5_Township - 115
meter 16mm4core
-KHI0910__S_BhainsColonyMor - 120 meter 16
mm4core
-KHI5437__S_KgiRes10Sector50B -35 meter 16
mm4core
-KHI5328__s_future_colony_blocke - 15 meter
LT-Meter
Al-fareed Engineering & Consultants (Pvt) LTD
Karachi
 HGW0451__P_Malir_Canttr LT Span
theft
 HUB5675 cable installation.pptx
 HUB5675 Jamoot Goth Hub.pptx
 KHI0641__H_Buffalow_Colony.pptx
 KHI0658__P_H_Javdan_Cmnt_Mang.ppt
x
 KHI0669 PMT leads faulty.pptx
 KHI6510__P_Khuda KiBasti lt span.pptx
 KHI6513 N5 Bus Stop separate PMT
Proposal.pptx
Al-fareed Engineering & Consultants (Pvt) LTD
Current Hyderabad trend
Zero Count Record In HYD for AFES End
Al-fareed Engineering & Consultants (Pvt) LTD
Summary Hyderabad
Total Under process = 16
CP DC cases Pending at PMCL end = 06
Pending at myson End including approvals = 07
Contactor Faulty Sites = 02
T-Prime Count HYD
Day 5-Aug-12 6-Aug-12 7-Aug-12 8-Aug-12 9-Aug-12 10-Aug-12 11-Aug-12 12-Aug-12 13-Aug-12
Count 14 15 16 16 15 14 14 14 16
14
15
16 16
15
14 14 14
16
13
14
15
16
17
5-Aug-
12
6-Aug-
12
7-Aug-
12
8-Aug-
12
9-Aug-
12
10-Aug-
12
11-Aug-
12
12-Aug-
12
13-Aug-
12
T-PrimeTrend HYD (MES)
Hyderabad
 BHT6169__MullMakhan PMT Broken
Insulator.pptx
 HGW6018 PMT bush replacement and
tapping done.pptx
 HYD5335__S_Hyderabad2.pptx
 HYD5336__H_Hyderabad3.pptx
 HYD5666__Bilal_Complex cable
requirment.pptx
 HYD5851__Badin_Stop.pptx
 HYD5856__S_Suzuki Cable
requirment.pptx
 HYD6312__S_KaimKhaniHostel PMT
Energization issue wapda payment.pptx
 MRI7070_SarhandiMohallah pole tilt
issue.pptx
Al-fareed Engineering & Consultants (Pvt) LTD
Mirpur Khas
 DDH6669__S_Malkani cable
installation.pptx
 HGW6115 Pole installation.pptx
 JUD6682 PMT tapping.pptx
 KGM6451__S_DTESamara_Naka_KGM
pole requirment.pptx
 MPK5705__S_ChandniChowk PMT
installation.pptx
 MTP5356 PMT Overhauling (1).pptx
 MTP5356 PMT Overhauling.pptx
Al-fareed Engineering & Consultants (Pvt) LTD
Hyderabad
Al-fareed Engineering & Consultants (Pvt) LTD
Al-fareed Engineering & Consultants (Pvt) LTD
S# Region Applicable sites/Available Person
1 Hyd City 145/2 person
2 Badin 50/1 person
3 Sehvan 14/1 person
4 Hala 44/1 person
5 Thatta 29/1 person
6 Sanghar 19/1 person
7 Umarkot 17/1 person
8 Mirpurkhas 23/1 person
9 Degree 31/1 person
10 Tandoallayar 14/1 person
11 Moro 20/1 person
12 Nwabshah/Daddu 88/2 person
Current MPK trend
Zero Count Record In HYD for AFES End
Al-fareed Engineering & Consultants (Pvt) LTD
T-Prime Count MPK
Day 5-Aug-12 6-Aug-12 7-Aug-12 8-Aug-12 9-Aug-12 10-Aug-12 11-Aug-12 12-Aug-12 13-Aug-12
Count 2 1 2 1 1 2 3 3 3
2
1
2
1 1
2
3 3 3
0
0.5
1
1.5
2
2.5
3
3.5
5-Aug-12
6-Aug-12
7-Aug-12
8-Aug-12
9-Aug-12
10-Aug-12
11-Aug-12
12-Aug-12
13-Aug-12
T-Prime Trend MPK(MES)
Summary Mirpur khas
Total Under process = 03
CP DC cases pending at PMCL end = 02
Pending at myson End including approvals = 01
Al-fareed Engineering & Consultants (Pvt) LTD
S.No Site name
Site
Code
Status Generic Reason with Remarks (OSV)
CP Restored - Restored
/ Pending
CP Meter Reading DG Reading
1 DAO7071__S_Dando 7071 T-Prime CPRestored Restored N/A N/A
2 HYD5334__S_Hyderabad_1 5334 TPrime CPRestored Restored 19179 6278
3 HGW6108__H_TMK_HYD_Highway_PW6108 T-Prime CPRestored by replacing ofPMT Bush & tapping Restored 311797 3396.25
4 NRP6362__H_nasarpur_Matiari_Rd6362 T-Prime Access Issue Pending N/A N/A
5 MTL5888__H_Digri_Rd_Matli 5888 Stand By (OnePhase) No CPissue found -Allphases OK Restored 157075 13813.11
6 HGW6311__H_Khandu_Hala_MRI6311 T-Prime CPRestored Restored 8368 / 3032 1047.68
7 BUL6168__S_MirpurBathoro 6168 T-Prime CPrestored by installing 16mm4core 5meters cable Restored N/A 2457.56
8 TBG6377__H_Talhar_Tando_Bagho6377 TPrime CPrestored by sagging ofHT jumpers Restored 2425 / 1085 2920.7
9 HYD5856__S_Suzuki 5856 TPrime CPrestored by LT Service Restored N/A N/A
10 BSC_Auto_Bhan_Repeater 6407 TPrime CPDCdue to billing Pending N/A N/A
11 HGW7090__S_Palijani_Station7090 T-Prime CPDCdue to billing Pending N/A N/A
12 RJK7062__S_Rajo_Khanani 7062 T-Prime CPDCdue to billing Pending 2741 / 3287 1167.16
13 HYD5335__S_Hyderabad2 5335 T-Prime CPrestored by sagging ofHT jumpers Restored N/A N/A
14 BER6132__H_Bherani_DTE 6132 T-Prime CPRestored Restored N/A 4905
15 PHK0073__S_Falkara 73 T-Prime CPDCdue to billing Pending 3200 / 383 N/A
16 HYD5666__S_Bilal_Complex5666 T-Prime Approvalreq -Neutralgrounding 300 ft cable Pending 0 0
17 HYD6494__S_Ghumanabad 6494 T-Prime CPRestored Restored 1041 11004
18 NRP6361__S_Akbari_Masjid 6361 T-Prime CPRestored Restored N/A 258.32
19 MRI7070__S_SarhandiMohallah7070 T-Prime CPrestored -Structural& Civilworkrequired at site Restored N/A N/A
20 HYD5853__S_Unit_5_Latifabad5853 T-Prime CPRestored Restored N/A N/A
 Individual visit to all Sites within region
 Highlighting and recommendation of proposals such
as Contactor replacements ,DG auto issue , Meter
Burnt ,Cable Requirements
 Initiation of approvals
 Rectification of snags in view of go ahead
Al-fareed Engineering & Consultants (Pvt) LTD
Sukkur
Al-fareed Engineering & Consultants (Pvt) LTD
Al-fareed Engineering & Consultants (Pvt) LTD
Summary
Rohri 30/1 person
Ghotki 57/1 person
Ranipur 38/1 person
Khairpur 28/1 person
Sukkur 24/1 person
Larkana 53/1 person
Jaccobabad 52/1 person
Shikarpur 26/1 person
Total Site Count 308
Ghotki-57
Ranipur-38
Khairpur-28
Sukkur-24
Larkana-53
Jaccobabad-52
Shikarpur-26
Al-fareed Engineering & Consultants (Pvt) LTD
Al-fareed Engineering & Consultants (Pvt) LTD

More Related Content

Similar to AFES Project feasibility for PMCL work

AFES Progress Evaluation
AFES Progress EvaluationAFES Progress Evaluation
AFES Progress Evaluation
waqar khan
 
CV_SAMAT RAM-2015
CV_SAMAT RAM-2015CV_SAMAT RAM-2015
CV_SAMAT RAM-2015
Samat Ram
 
CV-Basu Sujit 6th July 2016
CV-Basu Sujit 6th July 2016CV-Basu Sujit 6th July 2016
CV-Basu Sujit 6th July 2016
Sujit Basu
 
Railway Projects In Andhra pradesh : What is pending and What is Proposed
Railway Projects In Andhra pradesh : What is pending and What is ProposedRailway Projects In Andhra pradesh : What is pending and What is Proposed
Railway Projects In Andhra pradesh : What is pending and What is Proposed
Prof. K.Nageshwar
 
Kaizen_ABB_IT_18Nov13
Kaizen_ABB_IT_18Nov13Kaizen_ABB_IT_18Nov13
Kaizen_ABB_IT_18Nov13
Munj Bhatt
 
Maintenance and Utility Engineer
Maintenance and Utility EngineerMaintenance and Utility Engineer
Maintenance and Utility Engineer
Ashish Sojaliya
 
nathan_resume(2)
nathan_resume(2)nathan_resume(2)
nathan_resume(2)
Sri Nathan
 
Kaizen_ Electrical Unit saving fhgdgutfhfhgh
Kaizen_ Electrical Unit saving fhgdgutfhfhghKaizen_ Electrical Unit saving fhgdgutfhfhgh
Kaizen_ Electrical Unit saving fhgdgutfhfhgh
GaneshKulal4
 
NAREN RESUME (1)
NAREN RESUME (1)NAREN RESUME (1)
NAREN RESUME (1)
Narendran B
 
Resume- Rahul Bhardwaj
Resume- Rahul BhardwajResume- Rahul Bhardwaj
Resume- Rahul Bhardwaj
Rahul Bhardwaj
 

Similar to AFES Project feasibility for PMCL work (20)

AFES Progress Evaluation
AFES Progress EvaluationAFES Progress Evaluation
AFES Progress Evaluation
 
Karjan-2 Site Report.pptx
Karjan-2 Site Report.pptxKarjan-2 Site Report.pptx
Karjan-2 Site Report.pptx
 
CV_SAMAT RAM-2015
CV_SAMAT RAM-2015CV_SAMAT RAM-2015
CV_SAMAT RAM-2015
 
Guruprasad electricals profile 25.7.2014
Guruprasad  electricals profile 25.7.2014Guruprasad  electricals profile 25.7.2014
Guruprasad electricals profile 25.7.2014
 
CV-Basu Sujit 6th July 2016
CV-Basu Sujit 6th July 2016CV-Basu Sujit 6th July 2016
CV-Basu Sujit 6th July 2016
 
Webinar presentation-Planning-7-4-2020.pptx
Webinar presentation-Planning-7-4-2020.pptxWebinar presentation-Planning-7-4-2020.pptx
Webinar presentation-Planning-7-4-2020.pptx
 
Vmp cv_ june` 2018
Vmp  cv_ june` 2018Vmp  cv_ june` 2018
Vmp cv_ june` 2018
 
Vmp cv_ june` 2018
Vmp  cv_ june` 2018Vmp  cv_ june` 2018
Vmp cv_ june` 2018
 
Railway Projects In Andhra pradesh : What is pending and What is Proposed
Railway Projects In Andhra pradesh : What is pending and What is ProposedRailway Projects In Andhra pradesh : What is pending and What is Proposed
Railway Projects In Andhra pradesh : What is pending and What is Proposed
 
Kaizen_ABB_IT_18Nov13
Kaizen_ABB_IT_18Nov13Kaizen_ABB_IT_18Nov13
Kaizen_ABB_IT_18Nov13
 
Gujrat.pptx
Gujrat.pptxGujrat.pptx
Gujrat.pptx
 
Maintenance and Utility Engineer
Maintenance and Utility EngineerMaintenance and Utility Engineer
Maintenance and Utility Engineer
 
MP_SLDC_RE_DSM_from-01-01-2019-to-31-01-2019_daily
MP_SLDC_RE_DSM_from-01-01-2019-to-31-01-2019_dailyMP_SLDC_RE_DSM_from-01-01-2019-to-31-01-2019_daily
MP_SLDC_RE_DSM_from-01-01-2019-to-31-01-2019_daily
 
nathan_resume(2)
nathan_resume(2)nathan_resume(2)
nathan_resume(2)
 
Kaizen_ Electrical Unit saving fhgdgutfhfhgh
Kaizen_ Electrical Unit saving fhgdgutfhfhghKaizen_ Electrical Unit saving fhgdgutfhfhgh
Kaizen_ Electrical Unit saving fhgdgutfhfhgh
 
ENERGY STORAGE MARKET LANDSCAPE REPORT.pptx
ENERGY STORAGE MARKET LANDSCAPE REPORT.pptxENERGY STORAGE MARKET LANDSCAPE REPORT.pptx
ENERGY STORAGE MARKET LANDSCAPE REPORT.pptx
 
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of Novem...
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of Novem...MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of Novem...
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of Novem...
 
NAREN RESUME (1)
NAREN RESUME (1)NAREN RESUME (1)
NAREN RESUME (1)
 
Resume- Rahul Bhardwaj
Resume- Rahul BhardwajResume- Rahul Bhardwaj
Resume- Rahul Bhardwaj
 
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of Febru...
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of Febru...MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of Febru...
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of Febru...
 

AFES Project feasibility for PMCL work

  • 1. Al-fareed Engineering & Consultants (Pvt) LTD
  • 2. Al-fareed Engineering & Consultants (Pvt) LTD
  • 3.  Zero Outage count (Karachi) S1  Less repeated Outage (cable installation)  Prolonged T-prime/DC issues rectified Al-fareed Engineering & Consultants (Pvt) LTD
  • 4.  Being Quality Solution provider AFES strives for cost effective and consistent rectification, Keeping above policy Below mentioned Sites may be lead as a role model ,since some of them were running prime fro, 3 yrs. Al-fareed Engineering & Consultants (Pvt) LTD
  • 5.  Timely Ho-To  Swift SLA obedience under given conditions  Additional recommendations/Proposals  Cost effective ,Consistent rectification  Certified electrical Staff for PMT (Wapda)  24/7 NOC availability  Transparency in reporting & client Comfort Level Al-fareed Engineering & Consultants (Pvt) LTD
  • 6. Al-fareed Engineering & Consultants (Pvt) LTD  Swift Rectification within 3-5 hrs  Tracking for faulty transformers through KESC  Low cost Consistent Solution for repeated outages  Less repeated outage  ATS fault indication
  • 7. Karachi Al-fareed Engineering & Consultants (Pvt) LTD
  • 8. Current Karachi trend Zero Count Record In KHI for AFES End Al-fareed Engineering & Consultants (Pvt) LTD Summary Karachi Total Under process = 05 Cases Pending PMCL end = 02 Pending at MES End including approvals = 01 KESC issues = 02 T-Prime Count Karachi Day 2-Jan-13 3-Jan-13 4-Jan-13 5-Jan-13 6-Jan-13 7-Jan-13 8-Jan-13 9-Jan-13 10-Jan-13 11-Jan-13 12-Jan-13 13-Jan-13 14-Jan-13 15-Jan-13 16-Jan-13 17-Jan-13 Count 2 4 4 4 4 7 6 6 6 6 4 4 4 4 4 5 2 4 4 4 4 7 6 6 6 6 4 4 4 4 4 5 0 1 2 3 4 5 6 7 8 2-Jan-13 3-Jan-13 4-Jan-13 5-Jan-13 6-Jan-13 7-Jan-13 8-Jan-13 9-Jan-13 10-Jan-13 11-Jan-13 12-Jan-13 13-Jan-13 14-Jan-13 15-Jan-13 16-Jan-13 17-Jan-13 T-Prime Trend Karachi (MES)
  • 9. Al-fareed Engineering & Consultants (Pvt) LTD Summery Cable Installation Team-3 Persons Korangi – 2 person Shahfaisal /Landhi– 2 person Orangi– 2 person Baldia -1 person Lyari – 2 person Defence – 1 person Garden – 2 person Gulsha e hadeed – 2 persons Bahadurabad ,Nazimabad - 2 Total = 21 Logistics Details No Of Bikes – 20 No Of Utility van – 03 Cable installation - 3person Korangi / – 2 person Orangi 2 ,Baldia1,Lyari2,Defence1,Garden2 Laandhi/Shah faisal ,Gulsha e hadeed – 2 persons Bahadurabad-Nazimabad - 2
  • 10. Al-fareed Engineering & Consultants (Pvt) LTD Summery Cable Installation Team-3 Persons Gulistan e johar – 1 person Surjani– 1 person Malir– 1 person Gulistan E Johar-1 Surjani – 1 person Malir -1 Saddar/Garden -2 Saddar/Garden -2 FB area – 1 person Gulshan E Iqbal-1
  • 11. Al-fareed Engineering & Consultants (Pvt) LTD Cable Installation, 3 Korangi, 3 Laandhi, 1 Orangi, 1 Baldia, 1 Gulshan-e- Hadeed, 1Bahadurabad, 1Nazimabad, 1 Lyari, 2 Defence, 1 Saddar/Garden, 2 Malir, 1 Surjani, 1 Gulistan- e-johar, 1 FB area, 1 Gulshan-e- Iqbal, 1
  • 12. Al-fareed Engineering & Consultants (Pvt) LTD Cable Installation, 1 Hub, 1 Bela, 1 Uthal, 1 National Highway , 1 Kathore, 1 Gharo, 1
  • 13. Al-fareed Engineering & Consultants (Pvt) LTD 20 12 9 17 11 14 12 15 12 8 10 9 2 Area Wise Outage Trend Outage Trend
  • 14. Al-fareed Engineering & Consultants (Pvt) LTD May, 80 June, 210 July, 181 August, 177 September, 334 October, 219 November, 183 December, 204
  • 15.  Cable Installation Jobs @ -KHI5013__S_Near_Korangi_Crossing - 50 meters 16mm 4 core -KHI0665__P_KDA_Employees_Krngi - 190 meter 16mm 4 core -KHI0656__H_Korangi_5_Township - 115 meter 16mm4core -KHI0910__S_BhainsColonyMor - 120 meter 16 mm4core -KHI5437__S_KgiRes10Sector50B -35 meter 16 mm4core -KHI5328__s_future_colony_blocke - 15 meter LT-Meter Al-fareed Engineering & Consultants (Pvt) LTD
  • 16. Karachi  HGW0451__P_Malir_Canttr LT Span theft  HUB5675 cable installation.pptx  HUB5675 Jamoot Goth Hub.pptx  KHI0641__H_Buffalow_Colony.pptx  KHI0658__P_H_Javdan_Cmnt_Mang.ppt x  KHI0669 PMT leads faulty.pptx  KHI6510__P_Khuda KiBasti lt span.pptx  KHI6513 N5 Bus Stop separate PMT Proposal.pptx Al-fareed Engineering & Consultants (Pvt) LTD
  • 17. Current Hyderabad trend Zero Count Record In HYD for AFES End Al-fareed Engineering & Consultants (Pvt) LTD Summary Hyderabad Total Under process = 16 CP DC cases Pending at PMCL end = 06 Pending at myson End including approvals = 07 Contactor Faulty Sites = 02 T-Prime Count HYD Day 5-Aug-12 6-Aug-12 7-Aug-12 8-Aug-12 9-Aug-12 10-Aug-12 11-Aug-12 12-Aug-12 13-Aug-12 Count 14 15 16 16 15 14 14 14 16 14 15 16 16 15 14 14 14 16 13 14 15 16 17 5-Aug- 12 6-Aug- 12 7-Aug- 12 8-Aug- 12 9-Aug- 12 10-Aug- 12 11-Aug- 12 12-Aug- 12 13-Aug- 12 T-PrimeTrend HYD (MES)
  • 18. Hyderabad  BHT6169__MullMakhan PMT Broken Insulator.pptx  HGW6018 PMT bush replacement and tapping done.pptx  HYD5335__S_Hyderabad2.pptx  HYD5336__H_Hyderabad3.pptx  HYD5666__Bilal_Complex cable requirment.pptx  HYD5851__Badin_Stop.pptx  HYD5856__S_Suzuki Cable requirment.pptx  HYD6312__S_KaimKhaniHostel PMT Energization issue wapda payment.pptx  MRI7070_SarhandiMohallah pole tilt issue.pptx Al-fareed Engineering & Consultants (Pvt) LTD
  • 19. Mirpur Khas  DDH6669__S_Malkani cable installation.pptx  HGW6115 Pole installation.pptx  JUD6682 PMT tapping.pptx  KGM6451__S_DTESamara_Naka_KGM pole requirment.pptx  MPK5705__S_ChandniChowk PMT installation.pptx  MTP5356 PMT Overhauling (1).pptx  MTP5356 PMT Overhauling.pptx Al-fareed Engineering & Consultants (Pvt) LTD
  • 20. Hyderabad Al-fareed Engineering & Consultants (Pvt) LTD
  • 21. Al-fareed Engineering & Consultants (Pvt) LTD S# Region Applicable sites/Available Person 1 Hyd City 145/2 person 2 Badin 50/1 person 3 Sehvan 14/1 person 4 Hala 44/1 person 5 Thatta 29/1 person 6 Sanghar 19/1 person 7 Umarkot 17/1 person 8 Mirpurkhas 23/1 person 9 Degree 31/1 person 10 Tandoallayar 14/1 person 11 Moro 20/1 person 12 Nwabshah/Daddu 88/2 person
  • 22. Current MPK trend Zero Count Record In HYD for AFES End Al-fareed Engineering & Consultants (Pvt) LTD T-Prime Count MPK Day 5-Aug-12 6-Aug-12 7-Aug-12 8-Aug-12 9-Aug-12 10-Aug-12 11-Aug-12 12-Aug-12 13-Aug-12 Count 2 1 2 1 1 2 3 3 3 2 1 2 1 1 2 3 3 3 0 0.5 1 1.5 2 2.5 3 3.5 5-Aug-12 6-Aug-12 7-Aug-12 8-Aug-12 9-Aug-12 10-Aug-12 11-Aug-12 12-Aug-12 13-Aug-12 T-Prime Trend MPK(MES) Summary Mirpur khas Total Under process = 03 CP DC cases pending at PMCL end = 02 Pending at myson End including approvals = 01
  • 23. Al-fareed Engineering & Consultants (Pvt) LTD S.No Site name Site Code Status Generic Reason with Remarks (OSV) CP Restored - Restored / Pending CP Meter Reading DG Reading 1 DAO7071__S_Dando 7071 T-Prime CPRestored Restored N/A N/A 2 HYD5334__S_Hyderabad_1 5334 TPrime CPRestored Restored 19179 6278 3 HGW6108__H_TMK_HYD_Highway_PW6108 T-Prime CPRestored by replacing ofPMT Bush & tapping Restored 311797 3396.25 4 NRP6362__H_nasarpur_Matiari_Rd6362 T-Prime Access Issue Pending N/A N/A 5 MTL5888__H_Digri_Rd_Matli 5888 Stand By (OnePhase) No CPissue found -Allphases OK Restored 157075 13813.11 6 HGW6311__H_Khandu_Hala_MRI6311 T-Prime CPRestored Restored 8368 / 3032 1047.68 7 BUL6168__S_MirpurBathoro 6168 T-Prime CPrestored by installing 16mm4core 5meters cable Restored N/A 2457.56 8 TBG6377__H_Talhar_Tando_Bagho6377 TPrime CPrestored by sagging ofHT jumpers Restored 2425 / 1085 2920.7 9 HYD5856__S_Suzuki 5856 TPrime CPrestored by LT Service Restored N/A N/A 10 BSC_Auto_Bhan_Repeater 6407 TPrime CPDCdue to billing Pending N/A N/A 11 HGW7090__S_Palijani_Station7090 T-Prime CPDCdue to billing Pending N/A N/A 12 RJK7062__S_Rajo_Khanani 7062 T-Prime CPDCdue to billing Pending 2741 / 3287 1167.16 13 HYD5335__S_Hyderabad2 5335 T-Prime CPrestored by sagging ofHT jumpers Restored N/A N/A 14 BER6132__H_Bherani_DTE 6132 T-Prime CPRestored Restored N/A 4905 15 PHK0073__S_Falkara 73 T-Prime CPDCdue to billing Pending 3200 / 383 N/A 16 HYD5666__S_Bilal_Complex5666 T-Prime Approvalreq -Neutralgrounding 300 ft cable Pending 0 0 17 HYD6494__S_Ghumanabad 6494 T-Prime CPRestored Restored 1041 11004 18 NRP6361__S_Akbari_Masjid 6361 T-Prime CPRestored Restored N/A 258.32 19 MRI7070__S_SarhandiMohallah7070 T-Prime CPrestored -Structural& Civilworkrequired at site Restored N/A N/A 20 HYD5853__S_Unit_5_Latifabad5853 T-Prime CPRestored Restored N/A N/A
  • 24.  Individual visit to all Sites within region  Highlighting and recommendation of proposals such as Contactor replacements ,DG auto issue , Meter Burnt ,Cable Requirements  Initiation of approvals  Rectification of snags in view of go ahead Al-fareed Engineering & Consultants (Pvt) LTD
  • 25. Sukkur Al-fareed Engineering & Consultants (Pvt) LTD
  • 26. Al-fareed Engineering & Consultants (Pvt) LTD Summary Rohri 30/1 person Ghotki 57/1 person Ranipur 38/1 person Khairpur 28/1 person Sukkur 24/1 person Larkana 53/1 person Jaccobabad 52/1 person Shikarpur 26/1 person Total Site Count 308
  • 28. Al-fareed Engineering & Consultants (Pvt) LTD

Editor's Notes

  1. Please Double Click on Icon to open
  2. Please Double Click on Icon to open