The document discusses fire safety and fire extinguisher guidelines for a mass rapid transit project in Malaysia. It provides information on the appropriate placement of fire extinguishers, types of fire extinguishers including their uses and limitations, fire classifications and extinguishing methods, inspection procedures, and proper usage techniques. Key recommendations include regularly inspecting and maintaining extinguishers, matching extinguisher types to fire classes, and standing upwind when using one to extinguish small fires.
The document discusses project S210 to construct elevated stations and associated works at Cyberjaya City Centre and Putrajaya Sentral on the Mass Rapid Transit Line 2 from Sungai Buloh to Serdang to Putrajaya. It includes contract details and discusses safe forklift operation procedures such as pre-operation checks, fueling, loading, unloading, and trailer operations to prevent accidents and injuries.
Mohd Izudin Bin Ghazali is a Malaysian civil engineer with over 10 years of experience working in the oil and gas industry as a field engineer. He holds an MSc in Civil and Structural Engineering from the University of Bradford and has worked on offshore projects in Malaysia and Vietnam for companies such as SapuraKencana, Petrofac, ExxonMobil, and Murphy Oil. His experience includes jacket and pipeline installations, remote offshore work, and engineering roles. Azahar Abdul Wahab is provided as a reference.
Mohd Nasir Bin Awang is an electrical and instrument supervising expert with over 20 years of experience in Malaysia and overseas. He has supervised numerous projects for companies such as Petronas, Shell, and Sime Darby. Currently, he is a supervising the electrical and instrument construction and commissioning for the New BFW Project at the MLNG Dua plant in Bintulu, Sarawak.
The document discusses the demolition of a 4-storey UKM hostel located at Lot 1901 that is within the alignment of tunnels being constructed for the Sungai Buloh-Serdang-Putrajaya MRT Line between the Hospital Kuala Lumpur and Ampang Park stations. Several columns of the hostel building fall within the right-of-way of the tunnel boring machine route. The demolition will remove the first bay structure to avoid any potential issues during tunneling works. Precise measurements will be taken to determine the boundary limits and ensure all supporting structures within 1-2 meters of the tunnel edge are removed.
INFORME FINAL DE LIQUIDACION DE OBRA POR CONTRATAeleorojasrua
This document provides details of the liquidation report for the contract to improve transitability in Anchihuay district, Ayacucho, Peru. It summarizes the project details such as location, budget, execution modality, supervisor, contractor, advances, additional works, execution period and current progress. The project aims to improve roads connecting Miraflores, Iran and Coll Papampa communities and experienced suspensions due to weather and COVID-19 that extended the completion date to April 13, 2021 with works now 100% finished.
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of Octob...Das A. K.
The document is a DSM (Deviation Settlement Mechanism) account statement from the State Load Despatch Centre (SLDC) of Madhya Pradesh Power Transmission Company Limited for wind and solar pooling stations in Madhya Pradesh for the month of October 2018. It provides details of scheduled and actual generation for various pooling stations, deviation charges payable or receivable, and requests payment to be made to the SLDC pool account within 10 days. It also notes issues like missing meter data, non-submission of forecasting data, and time unsynchronized meters that affected the DSM calculations.
The monthly progress report summarizes the progress of 6 road construction projects in Assam funded by the Asian Infrastructure Investment Bank. It provides details of total length, cost, construction period and milestones for each project. Physical progress is reported at 0.10% of the targeted work with financial progress at 0% as construction is yet to begin for most projects. Culvert construction has started for one project with 0.60% progress. Overall, construction is in the preliminary stage with no progress achieved for most items of work across the different projects during the reported month of October 2022.
The document discusses project S210 to construct elevated stations and associated works at Cyberjaya City Centre and Putrajaya Sentral on the Mass Rapid Transit Line 2 from Sungai Buloh to Serdang to Putrajaya. It includes contract details and discusses safe forklift operation procedures such as pre-operation checks, fueling, loading, unloading, and trailer operations to prevent accidents and injuries.
Mohd Izudin Bin Ghazali is a Malaysian civil engineer with over 10 years of experience working in the oil and gas industry as a field engineer. He holds an MSc in Civil and Structural Engineering from the University of Bradford and has worked on offshore projects in Malaysia and Vietnam for companies such as SapuraKencana, Petrofac, ExxonMobil, and Murphy Oil. His experience includes jacket and pipeline installations, remote offshore work, and engineering roles. Azahar Abdul Wahab is provided as a reference.
Mohd Nasir Bin Awang is an electrical and instrument supervising expert with over 20 years of experience in Malaysia and overseas. He has supervised numerous projects for companies such as Petronas, Shell, and Sime Darby. Currently, he is a supervising the electrical and instrument construction and commissioning for the New BFW Project at the MLNG Dua plant in Bintulu, Sarawak.
The document discusses the demolition of a 4-storey UKM hostel located at Lot 1901 that is within the alignment of tunnels being constructed for the Sungai Buloh-Serdang-Putrajaya MRT Line between the Hospital Kuala Lumpur and Ampang Park stations. Several columns of the hostel building fall within the right-of-way of the tunnel boring machine route. The demolition will remove the first bay structure to avoid any potential issues during tunneling works. Precise measurements will be taken to determine the boundary limits and ensure all supporting structures within 1-2 meters of the tunnel edge are removed.
INFORME FINAL DE LIQUIDACION DE OBRA POR CONTRATAeleorojasrua
This document provides details of the liquidation report for the contract to improve transitability in Anchihuay district, Ayacucho, Peru. It summarizes the project details such as location, budget, execution modality, supervisor, contractor, advances, additional works, execution period and current progress. The project aims to improve roads connecting Miraflores, Iran and Coll Papampa communities and experienced suspensions due to weather and COVID-19 that extended the completion date to April 13, 2021 with works now 100% finished.
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of Octob...Das A. K.
The document is a DSM (Deviation Settlement Mechanism) account statement from the State Load Despatch Centre (SLDC) of Madhya Pradesh Power Transmission Company Limited for wind and solar pooling stations in Madhya Pradesh for the month of October 2018. It provides details of scheduled and actual generation for various pooling stations, deviation charges payable or receivable, and requests payment to be made to the SLDC pool account within 10 days. It also notes issues like missing meter data, non-submission of forecasting data, and time unsynchronized meters that affected the DSM calculations.
The monthly progress report summarizes the progress of 6 road construction projects in Assam funded by the Asian Infrastructure Investment Bank. It provides details of total length, cost, construction period and milestones for each project. Physical progress is reported at 0.10% of the targeted work with financial progress at 0% as construction is yet to begin for most projects. Culvert construction has started for one project with 0.60% progress. Overall, construction is in the preliminary stage with no progress achieved for most items of work across the different projects during the reported month of October 2022.
The document lists 11 offshore oil and gas projects successfully completed by the company since March 2013, including the installation of wellhead platforms, topsides, pipelines, bridges, risers, and other offshore structures. The projects involved transportation and installation of these facilities off the coasts of countries like Myanmar, Malaysia, Indonesia, Vietnam, Thailand, and India. Clients for the projects included major oil and gas companies such as PTTEP, Murphy Oil, Shell, ExxonMobil, and ONGC.
Mohd Yunus bin Mohd Nafi is a 27-year-old Malaysian man seeking a career in the oil and gas industry, specifically in pipeline engineering. He has a Bachelor's degree in Mechanical Engineering and over 5 years of experience in pipeline pre-commissioning projects. He is proficient in several engineering software programs and safety certified for both onshore and offshore work.
This document is an addendum to the contract for a highway construction project in Alameda and Contra Costa Counties in California. It provides revisions to various project plans, specifications, and documents. Key revisions include changing the maximum number of working days from 1,450 to 1,550, revising closure schedules and requirements, and adding provisions for safety training, water pollution control, and maintaining traffic. The addendum provides updated or new project information to incorporate into the contract for the highway construction work.
The document provides an overview of SISCO, an ISO-certified Saudi construction company established in 1990, outlining their areas of business in oil, gas, and industrial construction, maintenance, and piping projects. It details SISCO's resources including 2000 employees, 700 vehicles and equipment, facilities, and past clients such as Saudi Aramco, SABIC, and Sadara. The document also includes sections on health, safety and environmental records, credentials, contract features, project organization, and a mobilization plan.
This document provides a resume for Azlan Shah bin Ahmad Suhaimi. It summarizes his personal details, education, qualifications, technical training, work experience, and involved projects. He has over 10 years of experience as a welding inspector and has worked on numerous offshore pipeline projects in Malaysia, inspecting welding and performing non-destructive testing. He holds several relevant certifications from organizations like PCN and has extensive safety and technical training qualifications.
The document discusses a project to construct an elevated road corridor from AIIMS to Digha in Patna, Bihar. Some key details:
- The 11.9km elevated corridor will help reduce traffic congestion and journey times between AIIMS and Digha.
- The project is being executed by Gammon India Ltd on an EPC basis for Bihar State Road Development Corporation.
- The alignment involves both elevated and at-grade sections. Major structures include bridges at Bailey Road and over the railway line.
- Project completion was originally scheduled for October 2016 but has been extended until August 2017 due to changes in scope.
This document is a project proposal for the establishment of a Skybar restaurant and Skypark recreation area at Block E Level 2 of Taylor's University. It includes details of the project such as location, site analysis, design plans, cost estimates, and required approval procedures from local authorities. The total initial investment is estimated at RM250,000, with 95% for building construction. It is expected to create 10 new jobs.
Mohammed Altaf Hussain is applying for the position of Works Preparation Controller. He has over 12 years of experience in Gulf countries working on various oil and gas projects as a welding system operator and document/data/work preparation controller. He has strong technical skills in MS Office applications and operating systems.
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of Novem...Das A. K.
This document from the Madhya Pradesh Power Transmission Company provides a DSM account statement for wind and solar pooling stations in Madhya Pradesh for the month of November 2018. It lists various pooling stations that did not provide meter data, forecasting data, or time synchronization data required to accurately calculate deviation charges. It also notes issues with some solar meter data recording on a sliding window instead of load survey. The document provides bank account details for payment of deviation charges and requests verification of the statement within 15 days.
The document appears to be a curriculum vitae for Muralidharan Krishnaswamy, who is applying for a position as a mechanical engineer. Krishnaswamy has over 30 years of experience working as a mechanical engineer on projects around the world, including installing, maintaining, and repairing machines like gas turbines, compressors, pumps and other mechanical equipment. He provides details on his educational background and qualifications, as well as an extensive work history with various companies where he has specialized in mechanical applications, installation, commissioning, and operations and maintenance of industrial machinery.
The document discusses the Jayakwadi Project located in Paithan, Aurangabad. It provides details of the project such as its location, catchment area, gross storage, dam height and length, spillway details, submergence area, construction details, and power generation. It also discusses reservoir operation schedule (ROS), gate operation schedule (GOS), and emergency action plan (EAP) and how they help ensure safe release of flood waters without damage. The document concludes by noting areas for improvement in ROS and calling for use of modern rainfall prediction techniques.
This curriculum vitae outlines the qualifications and work experience of Safiuddin Sohot, a Malaysian safety officer. He has a diploma in engineering technology from UNIKL-BMI and a bachelor's degree in electrical engineering from UITM. His work experience includes various roles at SapuraKencana Petroleum/TL Offshore from 2010 to present, currently as a safety officer. He has participated in numerous offshore oil and gas projects and has taken several safety-related training courses.
This document outlines the timeline for completion of the Orange Line Metro Train project in Lahore, Pakistan. Key details include a total length of 27.1 km, with 25.4 km as elevated viaduct and 1.71 km as cut-and-cover section. The timeline lists 39 activities from commencement of the project to testing and commissioning, assigning responsibility and planned/expedited/highly accelerated dates. Critical activities that could advance the project if expedited include construction of stations and girders, track laying, and installation of power, signaling and other systems. The planned timeline is 27 months, while expedited is 24 months and highly accelerated is 20.75 months for completion.
This document provides information on FUJI DNDT SDN BHD, including that it is a registered Firma Yang Kompeten specializing in lift and escalator installation, testing, modernization and maintenance. It has over 15 years of experience in mechanical and electrical engineering projects. The document lists the company's licenses, certificates, organizational chart, key personnel, and examples of past project references for lift system works completed for various government and private clients.
Tamer Abd El-Rhman Elshemy has over 15 years of experience as a Safety Engineer and currently holds the position of Safety Sector Head Engineer at Petroleum Marine Service. He has a degree in Production Mechanics from Specialized Studies Academy and numerous safety certifications. His responsibilities include safety supervision, risk assessment, emergency response, and ensuring compliance with health, safety, and environmental regulations. He has extensive experience working on offshore oil and gas projects in Egypt and Saudi Arabia.
This document provides a curriculum vitae for Mohd Hassby Bin Mohd Sidek, a Malaysian national who currently works as a Cathodic Protection Supervisor at Petronas Penapisan Melaka. The CV details his educational background, which includes a Diploma in Engineering, as well as his extensive work experience over 15 years in cathodic protection roles for the power, oil and gas, and water industries. It lists his technical qualifications and certificates, and provides details on numerous cathodic protection projects he has worked on.
I have a large portfolio of experience maintaining and operating various main and auxiliary plants, I am also fully conversant with the operation and maintenance of Diesel-Electric Power Plant and DP Vessel Power Management Systems. I would like to think my background in marine engineering has enhanced my ability to remain flexible and adaptable to change and the ability to comprehend new systems quickly and effectively.
This document provides a method statement for piping tie-in works for Train C at the West Qurna I Project in Iraq. It outlines the roles and responsibilities, resources, schedule, and procedures for completing the tie-ins, including isolation, preparation, cutting, spool installation, testing, and completion steps. Safety, quality, and environmental requirements are also defined to ensure the work complies with project specifications.
Bakie Anak Udang has over 25 years of experience working in various mechanic and motorman roles on offshore rigs, barges, and vessels. He holds qualifications in automotive courses and has worked for numerous companies, most recently as a rig mechanic for Ocean Vantage Engineering from March to April 2016. Bakie provides contact details for two referees and lists his medical examination, training, and licenses.
Construction of 440 meter Heavy motor vehicle Dobra Chanthi Suspension bridge project over Tehri Dam reservoir in Distt Tehri Garhwal, Uttarakhand, India
Sistem Penilaian Keselamatan dan Kesihatan dalam Pembinaan atau SHASSIC bertujuan menilai prestasi kontraktor dalam pengurusan keselamatan dan kesihatan di tapak pembinaan. Ia terdiri daripada 3 komponen utama: semakan dokumen, pemeriksaan tapak kerja, dan temubual pekerja. SHASSIC memberi manfaat kepada kontraktor untuk mengenal pasti kelemahan dan meningkatkan amalan keselamatan melalui latihan.
This document outlines the agenda and content for a training session on the Safety Health Assessment System in Construction (SHASSIC). The agenda covers an overview of SHASSIC and the construction industry, SHASSIC assessment approaches including document review, workplace inspection, and employee interviews. It also discusses the SHASSIC scoring methodology and provides examples of score calculations. The training aims to guide participants on how to assess construction project safety and health performance using the SHASSIC framework.
The document lists 11 offshore oil and gas projects successfully completed by the company since March 2013, including the installation of wellhead platforms, topsides, pipelines, bridges, risers, and other offshore structures. The projects involved transportation and installation of these facilities off the coasts of countries like Myanmar, Malaysia, Indonesia, Vietnam, Thailand, and India. Clients for the projects included major oil and gas companies such as PTTEP, Murphy Oil, Shell, ExxonMobil, and ONGC.
Mohd Yunus bin Mohd Nafi is a 27-year-old Malaysian man seeking a career in the oil and gas industry, specifically in pipeline engineering. He has a Bachelor's degree in Mechanical Engineering and over 5 years of experience in pipeline pre-commissioning projects. He is proficient in several engineering software programs and safety certified for both onshore and offshore work.
This document is an addendum to the contract for a highway construction project in Alameda and Contra Costa Counties in California. It provides revisions to various project plans, specifications, and documents. Key revisions include changing the maximum number of working days from 1,450 to 1,550, revising closure schedules and requirements, and adding provisions for safety training, water pollution control, and maintaining traffic. The addendum provides updated or new project information to incorporate into the contract for the highway construction work.
The document provides an overview of SISCO, an ISO-certified Saudi construction company established in 1990, outlining their areas of business in oil, gas, and industrial construction, maintenance, and piping projects. It details SISCO's resources including 2000 employees, 700 vehicles and equipment, facilities, and past clients such as Saudi Aramco, SABIC, and Sadara. The document also includes sections on health, safety and environmental records, credentials, contract features, project organization, and a mobilization plan.
This document provides a resume for Azlan Shah bin Ahmad Suhaimi. It summarizes his personal details, education, qualifications, technical training, work experience, and involved projects. He has over 10 years of experience as a welding inspector and has worked on numerous offshore pipeline projects in Malaysia, inspecting welding and performing non-destructive testing. He holds several relevant certifications from organizations like PCN and has extensive safety and technical training qualifications.
The document discusses a project to construct an elevated road corridor from AIIMS to Digha in Patna, Bihar. Some key details:
- The 11.9km elevated corridor will help reduce traffic congestion and journey times between AIIMS and Digha.
- The project is being executed by Gammon India Ltd on an EPC basis for Bihar State Road Development Corporation.
- The alignment involves both elevated and at-grade sections. Major structures include bridges at Bailey Road and over the railway line.
- Project completion was originally scheduled for October 2016 but has been extended until August 2017 due to changes in scope.
This document is a project proposal for the establishment of a Skybar restaurant and Skypark recreation area at Block E Level 2 of Taylor's University. It includes details of the project such as location, site analysis, design plans, cost estimates, and required approval procedures from local authorities. The total initial investment is estimated at RM250,000, with 95% for building construction. It is expected to create 10 new jobs.
Mohammed Altaf Hussain is applying for the position of Works Preparation Controller. He has over 12 years of experience in Gulf countries working on various oil and gas projects as a welding system operator and document/data/work preparation controller. He has strong technical skills in MS Office applications and operating systems.
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of Novem...Das A. K.
This document from the Madhya Pradesh Power Transmission Company provides a DSM account statement for wind and solar pooling stations in Madhya Pradesh for the month of November 2018. It lists various pooling stations that did not provide meter data, forecasting data, or time synchronization data required to accurately calculate deviation charges. It also notes issues with some solar meter data recording on a sliding window instead of load survey. The document provides bank account details for payment of deviation charges and requests verification of the statement within 15 days.
The document appears to be a curriculum vitae for Muralidharan Krishnaswamy, who is applying for a position as a mechanical engineer. Krishnaswamy has over 30 years of experience working as a mechanical engineer on projects around the world, including installing, maintaining, and repairing machines like gas turbines, compressors, pumps and other mechanical equipment. He provides details on his educational background and qualifications, as well as an extensive work history with various companies where he has specialized in mechanical applications, installation, commissioning, and operations and maintenance of industrial machinery.
The document discusses the Jayakwadi Project located in Paithan, Aurangabad. It provides details of the project such as its location, catchment area, gross storage, dam height and length, spillway details, submergence area, construction details, and power generation. It also discusses reservoir operation schedule (ROS), gate operation schedule (GOS), and emergency action plan (EAP) and how they help ensure safe release of flood waters without damage. The document concludes by noting areas for improvement in ROS and calling for use of modern rainfall prediction techniques.
This curriculum vitae outlines the qualifications and work experience of Safiuddin Sohot, a Malaysian safety officer. He has a diploma in engineering technology from UNIKL-BMI and a bachelor's degree in electrical engineering from UITM. His work experience includes various roles at SapuraKencana Petroleum/TL Offshore from 2010 to present, currently as a safety officer. He has participated in numerous offshore oil and gas projects and has taken several safety-related training courses.
This document outlines the timeline for completion of the Orange Line Metro Train project in Lahore, Pakistan. Key details include a total length of 27.1 km, with 25.4 km as elevated viaduct and 1.71 km as cut-and-cover section. The timeline lists 39 activities from commencement of the project to testing and commissioning, assigning responsibility and planned/expedited/highly accelerated dates. Critical activities that could advance the project if expedited include construction of stations and girders, track laying, and installation of power, signaling and other systems. The planned timeline is 27 months, while expedited is 24 months and highly accelerated is 20.75 months for completion.
This document provides information on FUJI DNDT SDN BHD, including that it is a registered Firma Yang Kompeten specializing in lift and escalator installation, testing, modernization and maintenance. It has over 15 years of experience in mechanical and electrical engineering projects. The document lists the company's licenses, certificates, organizational chart, key personnel, and examples of past project references for lift system works completed for various government and private clients.
Tamer Abd El-Rhman Elshemy has over 15 years of experience as a Safety Engineer and currently holds the position of Safety Sector Head Engineer at Petroleum Marine Service. He has a degree in Production Mechanics from Specialized Studies Academy and numerous safety certifications. His responsibilities include safety supervision, risk assessment, emergency response, and ensuring compliance with health, safety, and environmental regulations. He has extensive experience working on offshore oil and gas projects in Egypt and Saudi Arabia.
This document provides a curriculum vitae for Mohd Hassby Bin Mohd Sidek, a Malaysian national who currently works as a Cathodic Protection Supervisor at Petronas Penapisan Melaka. The CV details his educational background, which includes a Diploma in Engineering, as well as his extensive work experience over 15 years in cathodic protection roles for the power, oil and gas, and water industries. It lists his technical qualifications and certificates, and provides details on numerous cathodic protection projects he has worked on.
I have a large portfolio of experience maintaining and operating various main and auxiliary plants, I am also fully conversant with the operation and maintenance of Diesel-Electric Power Plant and DP Vessel Power Management Systems. I would like to think my background in marine engineering has enhanced my ability to remain flexible and adaptable to change and the ability to comprehend new systems quickly and effectively.
This document provides a method statement for piping tie-in works for Train C at the West Qurna I Project in Iraq. It outlines the roles and responsibilities, resources, schedule, and procedures for completing the tie-ins, including isolation, preparation, cutting, spool installation, testing, and completion steps. Safety, quality, and environmental requirements are also defined to ensure the work complies with project specifications.
Bakie Anak Udang has over 25 years of experience working in various mechanic and motorman roles on offshore rigs, barges, and vessels. He holds qualifications in automotive courses and has worked for numerous companies, most recently as a rig mechanic for Ocean Vantage Engineering from March to April 2016. Bakie provides contact details for two referees and lists his medical examination, training, and licenses.
Construction of 440 meter Heavy motor vehicle Dobra Chanthi Suspension bridge project over Tehri Dam reservoir in Distt Tehri Garhwal, Uttarakhand, India
Sistem Penilaian Keselamatan dan Kesihatan dalam Pembinaan atau SHASSIC bertujuan menilai prestasi kontraktor dalam pengurusan keselamatan dan kesihatan di tapak pembinaan. Ia terdiri daripada 3 komponen utama: semakan dokumen, pemeriksaan tapak kerja, dan temubual pekerja. SHASSIC memberi manfaat kepada kontraktor untuk mengenal pasti kelemahan dan meningkatkan amalan keselamatan melalui latihan.
This document outlines the agenda and content for a training session on the Safety Health Assessment System in Construction (SHASSIC). The agenda covers an overview of SHASSIC and the construction industry, SHASSIC assessment approaches including document review, workplace inspection, and employee interviews. It also discusses the SHASSIC scoring methodology and provides examples of score calculations. The training aims to guide participants on how to assess construction project safety and health performance using the SHASSIC framework.
This document contains a machinery inspection checklist used to inspect various types of construction equipment. The checklist includes items like body structure, hydraulic hoses, leakages, lights, fire extinguishers, brakes, lubrication levels, and safety equipment. Mechanics use this checklist to systematically inspect equipment, note any issues found, and get supervisor approval.
This document contains information relating to a SHASSIC (Safety and Health Assessment System in Construction) assessment for a construction project. It includes an agenda for the assessment activities over one day, which involves document review, questionnaires for different levels of staff, and a site inspection. Forms are provided to record attendance, document checklist results, and collect information on the project and SHASSIC assessment. The document aims to provide structure and records for conducting the SHASSIC assessment of the construction project's safety and health system and performance.
Sistem Penilaian Keselamatan dan Kesihatan dalam Pembinaan atau SHASSIC bertujuan menilai prestasi kontraktor dalam pengurusan keselamatan dan kesihatan di tapak pembinaan. Ia terdiri daripada 3 komponen utama: semakan dokumen, pemeriksaan tapak kerja, dan temubual pekerja. SHASSIC memberi manfaat kepada kontraktor untuk mengenal pasti kelemahan dan meningkatkan amalan keselamatan melalui latihan.
Dokumen ini memberikan panduan untuk pengawal bendera dalam mengawal lalulintas di tapak pembinaan. Ia menjelaskan tanggungjawab pengawal bendera untuk mengekalkan kecekapan dan keselamatan lalulintas dengan menggunakan peralatan seperti bendera, baton cahaya dan pakaian reflektif. Dokumen ini juga memberikan panduan untuk tindakan seperti memberi isyarat untuk memperlahankan, menghentikan
Heat stroke is a life-threatening condition caused by the body overheating, usually as a result of prolonged exposure to or physical exertion in high temperatures. It is characterized by an elevated core body temperature above 40°C and alterations in the central nervous system. Left untreated, heat stroke can cause death or permanent disability. Those at highest risk include children, the elderly, those with chronic illnesses, athletes, and outdoor workers. To prevent heat stroke, it is important to stay hydrated, limit strenuous activity during hot weather, wear loose-fitting clothing, and monitor for symptoms in high-risk groups. Immediate cooling of the body and medical help are needed if heat stroke occurs.
This document discusses the health effects of cigarette smoking. It notes that cigarettes contain over 7,000 chemical compounds, including 70 that are carcinogenic. The four worst diseases caused by smoking are heart disease, stroke, COPD, and lung cancer. Quitting smoking is difficult due to nicotine addiction but can significantly improve health outcomes over time by reducing risks of these and other smoking-related diseases. The document also covers the dangers of secondhand and thirdhand smoke exposure.
The document provides information on a training program on Safety Health Assessment System in Construction (SHASSIC). It includes an agenda for the training with topics such as Construction Industry Overview, SHASSIC Overview, Assessors Guide for Document Check, Workplace Inspection and Interview. It also includes formulas and examples for calculating SHASSIC scores based on compliance and non-compliance during the Document Check and Workplace Inspection assessments. Special situations with different number of high risk activities are also covered.
This document presents the Construction Industry Standard (CIS 10:2020) for the Safety and Health Assessment System in Construction (SHASSIC) in Malaysia. SHASSIC provides a standardized method to assess and evaluate contractors' occupational safety and health performance on construction projects. It involves assessing documentation, inspecting workplaces, and interviewing employees. The assessment covers various safety and health aspects such as policies, hazard identification, training, emergency response, and performance monitoring. Compliance with SHASSIC helps contractors improve their safety practices but does not guarantee legal compliance. The standard references several Malaysian occupational safety laws and regulations.
This handbook provides guidance on worker safety for riggers and signalmen. It outlines proper attire and safety equipment, roles and responsibilities, good and bad rigging practices, inspections of lifting equipment, and crane hand signals. The handbook aims to help riggers and signalmen understand their roles to ensure safe lifting operations through correct rigging, inspections, communication and following recommended signals. Maintaining good communication between all parties is emphasized.
The document consists of repetitions of the name "HASNIZAM BIN MD SAAD" appearing on different lines without any other context or information provided.
This document outlines safety requirements and procedures for formwork structures used in concrete construction. It specifies that a professional engineer must design complex or tall formwork structures and provide documentation. Requirements include using sound materials, bracing, fall protection, inspection, and following the engineer's design and dismantling procedures. The formwork must safely support all loads and be constructed, concreted, and dismantled safely according to the engineer's specifications and risk assessments.
The document recommends wearing face masks, using hand sanitizer, practicing social distancing, and maintaining personal space for safety and health. It is signed by Hasnizam Md Saad, an occupational safety and health practitioner, suggesting these are guidelines for protecting against illness.
Dokumen tersebut menyediakan garis panduan langkah pencegahan Covid-19 di tapak pembinaan untuk memastikan keselamatan dan mengurangkan risiko penularan. Ia meliputi langkah-langkah seperti saringan kesihatan, pengangkutan pekerja, amalan di tapak pembinaan seperti penjarakan sosial, dan kebersihan. Dokumen ini bertujuan membantu pihak berkaitan mengambil langkah berjaga-jaga di tapak
This document provides guidance from MRCB Group of Companies on preventing the spread of COVID-19 at construction project sites. It outlines procedures for monitoring the virus situation, producing a business continuity plan, preventing infection through hand hygiene and distancing measures, and certifying sick leave. The guidance is intended to safeguard workers and operations during the COVID-19 outbreak while following the latest advisories from Malaysian health authorities.
Program SoHELP bertujuan untuk meningkatkan tahap kepatuhan terhadap kesihatan pekerjaan terutamanya dalam pengurusan bahan kimia, bunyi dan ergonomi. Ia melibatkan kerjasama antara pihak berkuasa kesihatan dan keselamatan pekerjaan dengan syarikat untuk menilai dan meningkatkan amalan kesihatan pekerjaan melalui lima peringkat pelaksanaan.
The document contains safety guidelines and requirements for working at heights from Hasnizam Md Saad, the Safety & Health Officer at MRCB Learning Development Centre in Kuala Lumpur. It addresses the need to use proper personal protective equipment when working over 3 meters high or on scaffolding. Checklists are provided on roles and responsibilities, competence training, signage requirements, and examples of unsafe conditions like missing guardrails or unstable scaffolding. Contact details for Hasnizam are listed for any safety-related questions.
This document outlines the safe operating procedure for lifting using excavators on the Sungai Besi - Ulu Kelang (SUKE) Highway Project. It lists requirements such as possessing a valid lifting machinery certificate, clearly marking the safe working load, using an original manufacturer lifting hook, deploying a signalman, only travelling with the arm and boom retracted, having loads rigged by trained riggers under supervision, and requiring operators and riggers to be trained and competent. The procedure is part of MRCB Builders' efforts to ensure excavator lifting is done safely according to regulations on the highway construction project.
How to Add Chatter in the odoo 17 ERP ModuleCeline George
In Odoo, the chatter is like a chat tool that helps you work together on records. You can leave notes and track things, making it easier to talk with your team and partners. Inside chatter, all communication history, activity, and changes will be displayed.
This presentation was provided by Steph Pollock of The American Psychological Association’s Journals Program, and Damita Snow, of The American Society of Civil Engineers (ASCE), for the initial session of NISO's 2024 Training Series "DEIA in the Scholarly Landscape." Session One: 'Setting Expectations: a DEIA Primer,' was held June 6, 2024.
Walmart Business+ and Spark Good for Nonprofits.pdfTechSoup
"Learn about all the ways Walmart supports nonprofit organizations.
You will hear from Liz Willett, the Head of Nonprofits, and hear about what Walmart is doing to help nonprofits, including Walmart Business and Spark Good. Walmart Business+ is a new offer for nonprofits that offers discounts and also streamlines nonprofits order and expense tracking, saving time and money.
The webinar may also give some examples on how nonprofits can best leverage Walmart Business+.
The event will cover the following::
Walmart Business + (https://business.walmart.com/plus) is a new shopping experience for nonprofits, schools, and local business customers that connects an exclusive online shopping experience to stores. Benefits include free delivery and shipping, a 'Spend Analytics” feature, special discounts, deals and tax-exempt shopping.
Special TechSoup offer for a free 180 days membership, and up to $150 in discounts on eligible orders.
Spark Good (walmart.com/sparkgood) is a charitable platform that enables nonprofits to receive donations directly from customers and associates.
Answers about how you can do more with Walmart!"
A workshop hosted by the South African Journal of Science aimed at postgraduate students and early career researchers with little or no experience in writing and publishing journal articles.
How to Manage Your Lost Opportunities in Odoo 17 CRMCeline George
Odoo 17 CRM allows us to track why we lose sales opportunities with "Lost Reasons." This helps analyze our sales process and identify areas for improvement. Here's how to configure lost reasons in Odoo 17 CRM
Strategies for Effective Upskilling is a presentation by Chinwendu Peace in a Your Skill Boost Masterclass organisation by the Excellence Foundation for South Sudan on 08th and 09th June 2024 from 1 PM to 3 PM on each day.
A review of the growth of the Israel Genealogy Research Association Database Collection for the last 12 months. Our collection is now passed the 3 million mark and still growing. See which archives have contributed the most. See the different types of records we have, and which years have had records added. You can also see what we have for the future.
The simplified electron and muon model, Oscillating Spacetime: The Foundation...RitikBhardwaj56
Discover the Simplified Electron and Muon Model: A New Wave-Based Approach to Understanding Particles delves into a groundbreaking theory that presents electrons and muons as rotating soliton waves within oscillating spacetime. Geared towards students, researchers, and science buffs, this book breaks down complex ideas into simple explanations. It covers topics such as electron waves, temporal dynamics, and the implications of this model on particle physics. With clear illustrations and easy-to-follow explanations, readers will gain a new outlook on the universe's fundamental nature.
Natural birth techniques - Mrs.Akanksha Trivedi Rama University
Mrcb alat pemadam api
1.
2. PROJECT MASS RAPID TRANSIT LALUAN 2 : SUNGAI BULOH-SERDANG-PUTRAJAYA (SSP)
PACKAGE S210 : CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND OTHER ASSOCIATED WORKS
AT CYBERJAYA CITY CENTRE AND PUTRAJAYA SENTRAL
(CONTRACT NO. MRTCORP/KVMRT-SSP/S210/CW/026/09/2017)
PENGENALAN
1. SALAH SATU ALAT PENCEGAHAN KEBAKARAN MUDAH ALIH YANG
PENTING.
2. SATU ALAT PEMADAM KEBAKARAN PERTAHANAN BARISAN HADAPAN
IAITU MEMADAM KEBAKARAN PERINGKAT API PERMULAAN.
3. PROJECT MASS RAPID TRANSIT LALUAN 2 : SUNGAI BULOH-SERDANG-PUTRAJAYA (SSP)
PACKAGE S210 : CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND OTHER ASSOCIATED WORKS
AT CYBERJAYA CITY CENTRE AND PUTRAJAYA SENTRAL
(CONTRACT NO. MRTCORP/KVMRT-SSP/S210/CW/026/09/2017)
FAKTOR KEBERKESANAN PENGGUNAAN ALAT PEMADAM API
1. ALAT PEMADAM API MUDAH ALIH INI HENDAKLAH DILETAKAN DI TEMPAT YANG SESUAI
DAN SENTIASA DALAM KEADAAN BAIK.
2. PENGGUNAAN SATU-SATU JENIS ALAT PEMADAM API MESTILAH SESUAI DENGAN JENIS
KEBAKARAN YANG BERLAKU.
3. API KEBAKARAN YANG DI TEMUI SEMASA KECIL.
4. API KEBAKARAN DI TEMUI OLEH ORANG YANG BERSEDIA , TIDAK PANIK, SANGGUP
MELAKUKAN PEMADAMAN DAN BERKEBOLEHAN MENGGUNAKAN ALAT PEMADAM API.
4. PROJECT MASS RAPID TRANSIT LALUAN 2 : SUNGAI BULOH-SERDANG-PUTRAJAYA (SSP)
PACKAGE S210 : CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND OTHER ASSOCIATED WORKS
AT CYBERJAYA CITY CENTRE AND PUTRAJAYA SENTRAL
(CONTRACT NO. MRTCORP/KVMRT-SSP/S210/CW/026/09/2017)
PENEMPATAN ALAT PEMADAM API
1. GANTUNG PADA DINDING ATAU TIANG
• 1 Meter / 3’.3” DARI PARAS LANTAI
2. LETAK ATAS LANTAI
• HENDAKLAH DITANDAKAN DENGAN PENANDA DI BAHAGIAN ATAS ALAT PEMADAM
API TERSEBUT DENGAN KETINGGIAN 8’ DARI PARAS LANTAI DAN DIALAS TAPAKNYA.
3. JARAK PENEMPATAN ALAT PEMADAM API
• SATU ALAT PEMADAM API BOLEH MENGAWAL SEKELILING DALAM JARAK 75 KAKI
JEJARI. JADI JARAK MAKSIMUM ANTARA SATU ALAT PEMADAM API IALAH 150 KAKI.
5. PROJECT MASS RAPID TRANSIT LALUAN 2 : SUNGAI BULOH-SERDANG-PUTRAJAYA (SSP)
PACKAGE S210 : CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND OTHER ASSOCIATED WORKS
AT CYBERJAYA CITY CENTRE AND PUTRAJAYA SENTRAL
(CONTRACT NO. MRTCORP/KVMRT-SSP/S210/CW/026/09/2017)
JENIS ALAT PEMADAM API
6. PROJECT MASS RAPID TRANSIT LALUAN 2 : SUNGAI BULOH-SERDANG-PUTRAJAYA (SSP)
PACKAGE S210 : CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND OTHER ASSOCIATED WORKS
AT CYBERJAYA CITY CENTRE AND PUTRAJAYA SENTRAL
(CONTRACT NO. MRTCORP/KVMRT-SSP/S210/CW/026/09/2017)
KELAS-KELAS API DAN KAEDAH PEMADAMAN
7. PROJECT MASS RAPID TRANSIT LALUAN 2 : SUNGAI BULOH-SERDANG-PUTRAJAYA (SSP)
PACKAGE S210 : CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND OTHER ASSOCIATED WORKS
AT CYBERJAYA CITY CENTRE AND PUTRAJAYA SENTRAL
(CONTRACT NO. MRTCORP/KVMRT-SSP/S210/CW/026/09/2017)
KELAS-KELAS API DAN KAEDAH PEMADAMAN
8. PROJECT MASS RAPID TRANSIT LALUAN 2 : SUNGAI BULOH-SERDANG-PUTRAJAYA (SSP)
PACKAGE S210 : CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND OTHER ASSOCIATED WORKS
AT CYBERJAYA CITY CENTRE AND PUTRAJAYA SENTRAL
(CONTRACT NO. MRTCORP/KVMRT-SSP/S210/CW/026/09/2017)
KELAS-KELAS API DAN KAEDAH PEMADAMAN
9. PROJECT MASS RAPID TRANSIT LALUAN 2 : SUNGAI BULOH-SERDANG-PUTRAJAYA (SSP)
PACKAGE S210 : CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND OTHER ASSOCIATED WORKS
AT CYBERJAYA CITY CENTRE AND PUTRAJAYA SENTRAL
(CONTRACT NO. MRTCORP/KVMRT-SSP/S210/CW/026/09/2017)
JENIS-JENIS ALAT PEMADAM API
10. PROJECT MASS RAPID TRANSIT LALUAN 2 : SUNGAI BULOH-SERDANG-PUTRAJAYA (SSP)
PACKAGE S210 : CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND OTHER ASSOCIATED WORKS
AT CYBERJAYA CITY CENTRE AND PUTRAJAYA SENTRAL
(CONTRACT NO. MRTCORP/KVMRT-SSP/S210/CW/026/09/2017)
ALAT PEMADAM API JENIS GAS (CO2 STORED PRESSURE)
11. PROJECT MASS RAPID TRANSIT LALUAN 2 : SUNGAI BULOH-SERDANG-PUTRAJAYA (SSP)
PACKAGE S210 : CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND OTHER ASSOCIATED WORKS
AT CYBERJAYA CITY CENTRE AND PUTRAJAYA SENTRAL
(CONTRACT NO. MRTCORP/KVMRT-SSP/S210/CW/026/09/2017)
ALAT PEMADAM API JENIS GAS
(CO2 STORED PRESSURE)
KEBAIKAN
1. MUDAH DI KENDALIKAN.
2. BOLEH MENGAWAL DAN MEMADAM KEBAKARAN DI PERINGKAT AWAL DENGAN
BERKESAN.
3. GASNYA BERSIH TIDAK MEMBANTU KEBAKARAN.
4. GASNYA TIDAK MERBAHAYA PADA KESIHATAN DAN TIDAK MENINGGALKAN KESAN.
5. GASNYA TIDAK MENGALIRKAN LETRIK.
6. BOLEH MENEMBUSI DI TEMPAT-TEMPAT PERMUKAAN YANG KECIL.
12. PROJECT MASS RAPID TRANSIT LALUAN 2 : SUNGAI BULOH-SERDANG-PUTRAJAYA (SSP)
PACKAGE S210 : CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND OTHER ASSOCIATED WORKS
AT CYBERJAYA CITY CENTRE AND PUTRAJAYA SENTRAL
(CONTRACT NO. MRTCORP/KVMRT-SSP/S210/CW/026/09/2017)
ALAT PEMADAM API JENIS GAS (CO2 STORED PRESSURE)
KEBURUKAN
1. HANYA SEKALI GUNA SAHAJA.
2. KEBERATAN SELINDERNYA TIDAK SEPADAN DENGAN KANDUNGAN GAS, BERAT
KESELURUHANNYA 5 KG. TETAPI MENGANDUNGI CUMA 2.2 KG GAS SAHAJA.
3. KANDUNGAN GAS TIDAK DAPAT DI LIHAT DAN PERLU DI TIMBANG DARI MASA KESEMASA
UNTUK MENGELAKKAN KEKURANGAN DARIPADA 10%.
4. TIDAK SESUAI MEMADAM KEBAKARAN API JENIS A,B, DAN D.
5. TIDAK BOLEH MENGAWAL / MEMADAM KEBAKARAN YANG SUDAH BESAR.
13. PROJECT MASS RAPID TRANSIT LALUAN 2 : SUNGAI BULOH-SERDANG-PUTRAJAYA (SSP)
PACKAGE S210 : CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND OTHER ASSOCIATED WORKS
AT CYBERJAYA CITY CENTRE AND PUTRAJAYA SENTRAL
(CONTRACT NO. MRTCORP/KVMRT-SSP/S210/CW/026/09/2017)
ALAT PEMADAM API
JENIS SERBUK KERING ( DRY POWDER )
14. PROJECT MASS RAPID TRANSIT LALUAN 2 : SUNGAI BULOH-SERDANG-PUTRAJAYA (SSP)
PACKAGE S210 : CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND OTHER ASSOCIATED WORKS
AT CYBERJAYA CITY CENTRE AND PUTRAJAYA SENTRAL
(CONTRACT NO. MRTCORP/KVMRT-SSP/S210/CW/026/09/2017)
ALAT PEMADAM API
JENIS SERBUK KERING ( DRY POWDER )
KEBAIKAN
1. MUDAH DAN SENANG DIKENDALIKAN.
2. BOLEH MENGAWAL / MEMADAM KEBAKARAN API KELAS A, B DAN C DENGAN BERKESAN.
3. PEMADAMANYA LEBIH BERKESAN JIKA DIBANDINGKAN DENGAN ALAT PEMADAM API
JENIS AIR, BUIH ATAU CO2.
4. PENGELUARANYA BOLEH DIKAWAL OLEH OPERATING LEVER
15. PROJECT MASS RAPID TRANSIT LALUAN 2 : SUNGAI BULOH-SERDANG-PUTRAJAYA (SSP)
PACKAGE S210 : CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND OTHER ASSOCIATED WORKS
AT CYBERJAYA CITY CENTRE AND PUTRAJAYA SENTRAL
(CONTRACT NO. MRTCORP/KVMRT-SSP/S210/CW/026/09/2017)
ALAT PEMADAM API
JENIS SERBUK KERING ( DRY POWDER )
KEBURUKANYA
1. HANYA SEKALI GUNA.
2. TEPUNGNYA BOLEH MENDATANGKAN KEROSAKAN KEPADA BAHAN-BAHAN
TERTENTU - ENJIN KERETA, BAHAN MAKANAN DAN SEBAGAINYA.
3. TIDAK BOLEH MEMADAM KEBAKARAN API LOGAM.
4. TEPUNGNYA BOLEH MENJADI BEKU SEKIRANYA DITEMPATKAN DI TEMPAT
YANG SEJUK.
16. PROJECT MASS RAPID TRANSIT LALUAN 2 : SUNGAI BULOH-SERDANG-PUTRAJAYA (SSP)
PACKAGE S210 : CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND OTHER ASSOCIATED WORKS
AT CYBERJAYA CITY CENTRE AND PUTRAJAYA SENTRAL
(CONTRACT NO. MRTCORP/KVMRT-SSP/S210/CW/026/09/2017)
PEMERIKSAAN ALAT PEMADAM API
1. HENDAKLAH DIPERIKSA 1 BULAN SEKALI.
2. PASTIKAN PRESSURE GAUGE PADA TABUNG MENUNJUKKAN KEPADA KANDUNGAN PENUH.
( HIJAU - PENUH, MERAH – KOSONG ).
3. SEKIRANYA BERLAKU KEKURANGAN TEKANAN HENDAKLAH DIHANTAR KE SERVICE AGEN.
4. PASTIKAN TIADA KEROSAKAN ATAU KEKARATAN DI BAHAGIAN LUAR TABUNG.
5. PASTIKAN SAFETY PIN BERADA PADA KEDUDUKAN YANG BETUL.
6. DISCHARGE NOZEL, HOS DAN OPERATING LEVER DITENTUKAN DALAM KEADAAN BAIK DAN BERSIH.
7. SETAHUN SEKALI DIHANTAR KE SERVICE AGEN YANG BERDAFTAR UNTUK PEMERIKSAAN / UJIAN
MENDAPATKAN KELULUSAN.
17. PROJECT MASS RAPID TRANSIT LALUAN 2 : SUNGAI BULOH-SERDANG-PUTRAJAYA (SSP)
PACKAGE S210 : CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND OTHER ASSOCIATED WORKS
AT CYBERJAYA CITY CENTRE AND PUTRAJAYA SENTRAL
(CONTRACT NO. MRTCORP/KVMRT-SSP/S210/CW/026/09/2017)
PEMERIKSAAN ALAT PEMADAM API
Safety pin
Nozzle
Hose
Pressure
Gauge
Cylinder
18. PROJECT MASS RAPID TRANSIT LALUAN 2 : SUNGAI BULOH-SERDANG-PUTRAJAYA (SSP)
PACKAGE S210 : CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND OTHER ASSOCIATED WORKS
AT CYBERJAYA CITY CENTRE AND PUTRAJAYA SENTRAL
(CONTRACT NO. MRTCORP/KVMRT-SSP/S210/CW/026/09/2017)
PEMERIKSAAN ALAT PEMADAM API
SAFETY PIN
FLAXIBLE HIGH PRESSURE HOSE PRESSURE GAUGE
19. PROJECT MASS RAPID TRANSIT LALUAN 2 : SUNGAI BULOH-SERDANG-PUTRAJAYA (SSP)
PACKAGE S210 : CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND OTHER ASSOCIATED WORKS
AT CYBERJAYA CITY CENTRE AND PUTRAJAYA SENTRAL
(CONTRACT NO. MRTCORP/KVMRT-SSP/S210/CW/026/09/2017)
CARA-CARA PENGGUNAAN ALAT PEMADAM API
Ingat formula P.A.S.S.
20. PROJECT MASS RAPID TRANSIT LALUAN 2 : SUNGAI BULOH-SERDANG-PUTRAJAYA (SSP)
PACKAGE S210 : CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND OTHER ASSOCIATED WORKS
AT CYBERJAYA CITY CENTRE AND PUTRAJAYA SENTRAL
(CONTRACT NO. MRTCORP/KVMRT-SSP/S210/CW/026/09/2017)
CARA-CARA PENGGUNAAN ALAT PEMADAM API
Peringatan !!! Pastikan dibelakang anda ada jalan keluar dan pernafasan anda dilindungi.
1. BERDIRI IKUT ARAH ANGIN.
2. PANCUTKAN MEDIA PEMADAMAN PADA PUNCA API.
3. ALIH-ALIHKAN PANCUTAN PADA TEMPAT YANG TERBAKAR.
4. GUNAKAN BEBERAPA ALAT PEMADAM API SERENTAK KETIKA API MULA MEMBESAR.
5. PASTIKAN API BENAR-BENAR PADAM SEBELUM DI TINGGALKAN.
6. HANTAR ALAT PEMADAM API UNTUK PENYELENGGARAAN DAN PERISIAN SEMULA.
21. MALAYSIAN RESOURCES CORPORATION BERHAD
PROJECT MASS RAPID LALUAN 2 : SUNGAI BULOH-SERDANG-PUTRAJAYA (SSP)
KVMRT SSP PACKAGE S210
SAMSINAR JAUHARI
HSE MANAGER
Mobile : 019-2792217
HASNIZAM MD SAAD
SAFETY & HEALTH OFFICER
Mobile : 012-9835664
PROJECT MASS RAPID TRANSIT LALUAN 2 : SUNGAI BULOH-SERDANG-PUTRAJAYA (SSP)
PACKAGE S210 : CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND OTHER ASSOCIATED WORKS
AT CYBERJAYA CITY CENTRE AND PUTRAJAYA SENTRAL
(CONTRACT NO. MRTCORP/KVMRT-SSP/S210/CW/026/09/2017)