1. DEMOLITION OF UKM HOSTEL ON LOT 1901
27 APRIL 2018
PROJEK MASS RAPID TRANSIT LEMBAH KELANG LALUAN SUNGAI BULOH – SERDANG –
PUTRAJAYA
UNDERGOUND WORKS PACKAGE: CONSTRUCTION AND COMPLETION OF TUNNELS,
STATIONS AND ASSOCIATED STRUCTURES FROM JALAN IPOH NORTH ESCAPE SHAFT TO DESA
WATERPARK SOUTH PORTAL
1
2. LEGEND:
P
SBK Line
SSP Line - Elevated
SSP Line - Underground
UG Station
KTM
KJ LRT
AG / SP LRT
MONORAIL
ERL
MRT
High Speed Rail
Park & Ride
Interchange Station:
KTM
HSR
DESCRIPTION SSP Line Alignment
- Elev Length (km) 38.7
52.2
- UG Length (km) 13.5
- Elev Station (nos) 26
37
- UG (nos) 11
Notes:
1) Summary excludes 4.6km and 3 stations built
under SBK Line (Kwasa Damansara to Sg Buloh)
that will become part of SSP Line upon
completion.
2) The total UG Station includes 1 no of TRX
station built under SBK Line.
Sg Buloh
Kwasa
Damansara
Bandar Utama
Muzium
Negara
Kajang
Seri Kembangan
KLCC East
Hospital Kuala Lumpur
Titiwangsa
Jalan Ipoh
Sentul West
Kampung Batu
Sri Delima
Metro Prima
Kepong
Baru
Sri Damansara
East
Sri Damansara
West
Damansara
Damai
Ampang Park
Kampung Baru North
Conlay
Taman Universiti
Equine Park
Taman Putra Permai
16 Sierra
Cyberjaya City Centre
MPSepang
Kentonmen
Serdang
Depot
Sg Buloh
Depot
P
P
P
P
P
P
P
P Cyberjaya North PPJ
P
P
Kepong
Sentral
Jinjang
TRX
Taman Connaught
(Plaza Phoenix)
UPM
Putrajaya Sentral
Chan
Sow Lin
Bandar
Malaysia (N)
Bandar
Malaysia (S)
Kuchai
Lama
Taman
Naga Emas
Sungai
Besi
Serdang
Raya North
Serdang Raya
South
Kampung
Selamat
KTM
KTM
HSR
KTM
P
P
P
P
P
P
Technology Park
P
V201
Sunway Construction
Sdn Bhd
Contract Date: 31
March 2016
V202
Ahmad Zaki
Sdn Bhd
Contract
Date: 4 April
2016
V203
IJM Construction
Sdn Bhd
Contract Date: 19
May 2016
UWP
MMC Gamuda (T)
KVMRT
Contract Date: 31
March 2016
V205
Trans Resources
Corporation Sdn
Bhd
Contract Date: 10
March 2017
V204
WCT Berhad
Contract Date: 14
November 2016
V207
Mudajaya Corporation
Berhad
Contract Date: 15
December 2016
V206
Gadang Engineering (M) Sdn Bhd
Contract Date: 10 March 2017
V208
MTD Construction Sdn Bhd
Contract Date: 17 November
2016
V209
Acre Works Sdn Bhd
Contract Date: 10 March 2017
V210
Malaysia Resources
Corporation Berhad
Contract Date: 19 May 2016
SSP LINE / LINE 2
15/06/2023 2
2
8. STRUCTURE TO BE DEMOLISED
8
First bay structure to be
demolished
A B C
1
2
3
4
5
6
7
8
1
2
3
4
5
6
7
8
Demolition boundary limit
P1
P2
P4
P5
P3
2m
1m
9. P2 P3
R.O.W
NB Tunnel Edge
≈ 1m
P4
NB Tunnel Edge
R.O.W
STRUCTURE TO BE DEMOLISED
9
Pile in tunnel horizontal
Possible pile < 1m away . TBC
P1
R.O.W
NB Tunnel Edge
≈ 2m
P5
R.O.W
NB Tunnel Edge
≈ 1m
Stacked twin bored tunnel.
2 nos of 6.68m diameter Variable Density Tunnel Boring Machines.
Dilapidation survey planned to start on May 2018.
TBM 1 expected to arrive at AKLEH by Feb 2019.
Close monitoring where watchman to be stationed on site for monitoring for road condition.
Instruments expected to be installed on April 2018.
Stacked twin bored tunnel.
2 nos of 6.68m diameter Variable Density Tunnel Boring Machines.
Dilapidation survey planned to start on May 2018.
TBM 1 expected to arrive at AKLEH by Feb 2019.
Close monitoring where watchman to be stationed on site for monitoring for road condition.
Instruments expected to be installed on April 2018.