S No Project Type Location Brief Description of Work Performed / Scope of Work Client
1
Installation of Wellhead
Platforms and Sea lines
Zawtika Field,
Myanmar
Installation of the WP1 (6726 MT), WP2 (8900 MT) and
WP3 (6726 MT) jackets in 140 M water depth.
PTTEP, Thailand
Installation of WP1 (1030 MT), WP2 (1200 MT) and WP3
(1200MT) topsides and boat landing.
Installation of intra-field Sea lines ZPQ- WHP2 and ZPQ-
WHP1 (18” Pipe lay of approx. 21 Kms) in 140 M water
depth.
2
Integrated
Transportation and
Installation of offshore
facilities
SOUTH ACIS
FIELD, Bintulu (East
Malaysia)
SN-PA Topside-2656 MT (01.08.2013)
MURPHY Sarawak
oil. Co. ltd
SN-AA Topside-788 MT (06.08.2013)
Bridge between SN-PA & SN-AA -67MT (08.08.2013) & SA-
PA Flare Boom- 48MT(09.08.13)
SA-PA Topside(WHP) - 205MT (11.08.2013)
3
Transportation and
Installation Of Offshore
Facilities
Laila Field
development, Miri
Malaysia
BEDP-A Cellar Deck Extension (200 MT) (23.08.13)
SHELL SARAWAK
BERHAD
LADR-A Jacket Installation, 4 legs jacket Dry Lift (1548MT)
(13.08.2013)
4
Installation of rotating
tower mooring yoke
structure
Lampung field,
Indonesia
Installation of four legged Jacket
PT Rekayasa
Industry
( REKIND)
Installation of rotating Topside
Installation of floating mooring yoke, fourth of its kind in
the world
5 Topside Installation
Diamond Field,
Vietnam
Installation of Topside-1800 MT PVCL
Installation of SA-PA Flare Boom- 76MT
6 Installation of Bridges Tapis field. Malaysia
TaR-TaQ Bridge(95MtrX 783MT) EXXON
Exploration and
Production
Malaysia Inc.
TaB-TaQ Bridge(84MtrX 466MT)
7 Pipe lay
JDA field
(Thailand-Malaysia) 75.7Km of 24” Pipe lay project
Trans Thai-
Malaysia SDN
BHD(TTMM)
8
Platform installation and
Pipe line project
(23 Dec 2014 to 15 Feb
2015)
Panna field
(Mumbai, India)
6” OD gas lift Pipeline of 5KM from PE to PF platforms
BG Exploration
and Production
India Limited
(BGEPIL)
14” OD Production Pipeline Piggybacked with 5” OD Gas
Lift Pipeline of 25 km from MB to PPA.
14” OD Production Pipeline Piggybacked with 5” OD Gas
Lift Pipeline of 5 km from MA to MB.
Jacket installation of 1709MT and Topside of 1521MT
9
Riser Installation at MA,
PPA, PE and PF
(25 Mar 2015 to 23 May
2015)
Panna field
(Mumbai, India)
Risers for well fluid (14" OD x 19.1mm WT), lift gas
(6.625”OD x 15.9mm WT)
Removal of existing 10.75” I-Tube and 4.5” riser and subsea
spools.
Removal of 2*1.25” subsea spools, etc.
BG Exploration
and Production
India Limited
(BGEPIL)
10
TPA sub- structure,
piles, conductors and
boat landing installation
Phase-3 Development
Project
JDA block B-17 and
B17-01
(Malaysia)
MDF subsea pipe line and offshore installed risers
installation at MDPP platform
Carigali PTTEPI
Operating
Company Sdn
Bhd( CPOC)
1480MT TPA Jacket Piling
C1 to C6 26” dia 36 Conductors installation
5 segments of Pipelines
connecting
BPA to BCPA2 and Two
new conventional Well
Vasai Project,
Vasai East field ,
Heera - Panna -
Basin block
BPA MODULES LIFT for Top side modifications on existing
BPA & BCPA-2 Process Platform
Oil & Natural Gas
Corporation Ltd.
( ONGC)Two new conventional Well platforms VSEB (9 slots) &
VSEC (16 slots). (Two Jackets of 2400 MT and 1950 MT
11 platforms VSEB (9 slots)
& VSEC (16 slots)
Installation Project
and two top sides of 2480MT and 2100MT)
18” x 8.5 Km Well Fluid Pipeline from proposed VSEB to
exiting BPA. No. of risers-2 (one pre-installed and one
external).
18” x 9.5 Km Well Fluid Pipeline from proposed VSEC to
existing BPA Process Platform. No. of risers-2 (one pre-
installed and one external).
8" x 9.5 Km Lift Gas Pipeline from existing BCPA-2 to
proposed VSEC. No. of risers-2 (one pre-installed and one
external).
8" x 5.9 Km Lift Gas Pipeline from proposed VSEC to
proposed VSEB. No. of risers-2 (Both pre-installed).
6"x2.9 Km rigid Water injection Pipeline from existing
VSEA to proposed VSEC.

More Related Content

What's hot

C.H.Scott Goodwin (2)
C.H.Scott Goodwin (2)C.H.Scott Goodwin (2)
C.H.Scott Goodwin (2)Scott Goodwin
 
33 kV towerline roadcrossing design modification - Final (English)
33 kV towerline roadcrossing design modification - Final (English)33 kV towerline roadcrossing design modification - Final (English)
33 kV towerline roadcrossing design modification - Final (English)Pablo Miguel Jurado
 
Emmanuel Uchenna Isiwu - Acergy Polaris
Emmanuel Uchenna Isiwu - Acergy PolarisEmmanuel Uchenna Isiwu - Acergy Polaris
Emmanuel Uchenna Isiwu - Acergy Polaris
Emmanuel isiwu
 
Power Plant Demobilisation
Power Plant DemobilisationPower Plant Demobilisation
Power Plant Demobilisation
CEA Project Logistics
 
RusselSmith Group Service Portfolio
RusselSmith Group Service PortfolioRusselSmith Group Service Portfolio
RusselSmith Group Service Portfolio
Ryan Gillespie
 
CURRICULUM VITAE Nasir Bagio
CURRICULUM VITAE Nasir BagioCURRICULUM VITAE Nasir Bagio
CURRICULUM VITAE Nasir BagioNASIR BAGIO
 
Pt Sankyu Indonesia International
Pt Sankyu Indonesia InternationalPt Sankyu Indonesia International
Pt Sankyu Indonesia Internationalarmenaldrin
 
DATA2015-12-06 Ashghal Presentation 2
DATA2015-12-06 Ashghal Presentation 2DATA2015-12-06 Ashghal Presentation 2
DATA2015-12-06 Ashghal Presentation 2Ian Kelly
 
GUN-newsletter-2_270815_web
GUN-newsletter-2_270815_webGUN-newsletter-2_270815_web
GUN-newsletter-2_270815_webNitin Naik
 
Part 1 T-Track - Introduction
Part 1 T-Track - IntroductionPart 1 T-Track - Introduction
Part 1 T-Track - IntroductionSean Wilson
 
SDI Kuwait Causeway prj.(kusc)
SDI Kuwait Causeway prj.(kusc)SDI Kuwait Causeway prj.(kusc)
SDI Kuwait Causeway prj.(kusc)
Aquilino Raimundo
 

What's hot (17)

Renovación de Vías
Renovación de VíasRenovación de Vías
Renovación de Vías
 
Yashar Pourang Portfolio
Yashar Pourang Portfolio Yashar Pourang Portfolio
Yashar Pourang Portfolio
 
C.H.Scott Goodwin (2)
C.H.Scott Goodwin (2)C.H.Scott Goodwin (2)
C.H.Scott Goodwin (2)
 
33 kV towerline roadcrossing design modification - Final (English)
33 kV towerline roadcrossing design modification - Final (English)33 kV towerline roadcrossing design modification - Final (English)
33 kV towerline roadcrossing design modification - Final (English)
 
Emmanuel Uchenna Isiwu - Acergy Polaris
Emmanuel Uchenna Isiwu - Acergy PolarisEmmanuel Uchenna Isiwu - Acergy Polaris
Emmanuel Uchenna Isiwu - Acergy Polaris
 
Power Plant Demobilisation
Power Plant DemobilisationPower Plant Demobilisation
Power Plant Demobilisation
 
RusselSmith Group Service Portfolio
RusselSmith Group Service PortfolioRusselSmith Group Service Portfolio
RusselSmith Group Service Portfolio
 
CURRICULUM VITAE Nasir Bagio
CURRICULUM VITAE Nasir BagioCURRICULUM VITAE Nasir Bagio
CURRICULUM VITAE Nasir Bagio
 
Pt Sankyu Indonesia International
Pt Sankyu Indonesia InternationalPt Sankyu Indonesia International
Pt Sankyu Indonesia International
 
SISCO - Presentation
SISCO - PresentationSISCO - Presentation
SISCO - Presentation
 
DATA2015-12-06 Ashghal Presentation 2
DATA2015-12-06 Ashghal Presentation 2DATA2015-12-06 Ashghal Presentation 2
DATA2015-12-06 Ashghal Presentation 2
 
GUN-newsletter-2_270815_web
GUN-newsletter-2_270815_webGUN-newsletter-2_270815_web
GUN-newsletter-2_270815_web
 
C.Bartolo CV-2
C.Bartolo CV-2C.Bartolo CV-2
C.Bartolo CV-2
 
Part 1 T-Track - Introduction
Part 1 T-Track - IntroductionPart 1 T-Track - Introduction
Part 1 T-Track - Introduction
 
SDI Kuwait Causeway prj.(kusc)
SDI Kuwait Causeway prj.(kusc)SDI Kuwait Causeway prj.(kusc)
SDI Kuwait Causeway prj.(kusc)
 
selfcv NEw
selfcv NEwselfcv NEw
selfcv NEw
 
VENKAT RESUME
VENKAT RESUME VENKAT RESUME
VENKAT RESUME
 

Viewers also liked

ICDS - IIIConstruction contract
ICDS - IIIConstruction contract ICDS - IIIConstruction contract
ICDS - IIIConstruction contract Madhuri Devi
 
Mystery or detective waits upon
Mystery or detective waits uponMystery or detective waits upon
Mystery or detective waits upon
subhaprasad79
 
INCOME COMPUTATION AND DISCLOSURE STANDARDS (ICDS)
INCOME COMPUTATION AND DISCLOSURE STANDARDS (ICDS)INCOME COMPUTATION AND DISCLOSURE STANDARDS (ICDS)
INCOME COMPUTATION AND DISCLOSURE STANDARDS (ICDS)
Nihar Jambusaia
 
Reece shots of location
Reece shots of locationReece shots of location
Reece shots of location
demi hollingworth
 
El avance de 5 almacenamientos. pdf
El avance de 5 almacenamientos. pdfEl avance de 5 almacenamientos. pdf
El avance de 5 almacenamientos. pdf
123mother
 
Income computation and disclosure standard
Income computation and disclosure standardIncome computation and disclosure standard
Income computation and disclosure standard
mv91
 
ICDS (an overview).
ICDS (an overview).ICDS (an overview).
ICDS (an overview).
KISHAN KESHRI
 
Bottlenecks of ICDS Programme
Bottlenecks of ICDS ProgrammeBottlenecks of ICDS Programme
Bottlenecks of ICDS Programme
Rajesh Ludam
 
INCOME COMPUTATION AND DISCLOSURE STANDARDS(ICDS
INCOME COMPUTATION AND DISCLOSURE STANDARDS(ICDSINCOME COMPUTATION AND DISCLOSURE STANDARDS(ICDS
INCOME COMPUTATION AND DISCLOSURE STANDARDS(ICDS
CA CMA.SANDEEP JAIN
 
What is a Cardiac Defibrillator?
What is a Cardiac Defibrillator?What is a Cardiac Defibrillator?
What is a Cardiac Defibrillator?
Jose Osorio
 
Integrated child development services final
Integrated child development services finalIntegrated child development services final
Integrated child development services finalShams Patel
 
Періодика 2016 : довідник
Періодика 2016 : довідникПеріодика 2016 : довідник
Періодика 2016 : довідник
tasha3417
 
Icds
IcdsIcds
An overview of ICDS (Income Computation and Disclosure Standards) by Blue Con...
An overview of ICDS (Income Computation and Disclosure Standards) by Blue Con...An overview of ICDS (Income Computation and Disclosure Standards) by Blue Con...
An overview of ICDS (Income Computation and Disclosure Standards) by Blue Con...
Chandan Goyal
 
History of ICDs (Internal Cardiac Defibrillators)
History of ICDs (Internal Cardiac Defibrillators)History of ICDs (Internal Cardiac Defibrillators)
History of ICDs (Internal Cardiac Defibrillators)
Jose Osorio
 

Viewers also liked (20)

ICDS - IIIConstruction contract
ICDS - IIIConstruction contract ICDS - IIIConstruction contract
ICDS - IIIConstruction contract
 
Mystery or detective waits upon
Mystery or detective waits uponMystery or detective waits upon
Mystery or detective waits upon
 
INCOME COMPUTATION AND DISCLOSURE STANDARDS (ICDS)
INCOME COMPUTATION AND DISCLOSURE STANDARDS (ICDS)INCOME COMPUTATION AND DISCLOSURE STANDARDS (ICDS)
INCOME COMPUTATION AND DISCLOSURE STANDARDS (ICDS)
 
Pitch + script
Pitch + scriptPitch + script
Pitch + script
 
Reece shots of location
Reece shots of locationReece shots of location
Reece shots of location
 
El avance de 5 almacenamientos. pdf
El avance de 5 almacenamientos. pdfEl avance de 5 almacenamientos. pdf
El avance de 5 almacenamientos. pdf
 
ICDS - Dayavanti Rana
ICDS - Dayavanti RanaICDS - Dayavanti Rana
ICDS - Dayavanti Rana
 
Income computation and disclosure standard
Income computation and disclosure standardIncome computation and disclosure standard
Income computation and disclosure standard
 
ICDS
ICDSICDS
ICDS
 
ICDS (an overview).
ICDS (an overview).ICDS (an overview).
ICDS (an overview).
 
Bottlenecks of ICDS Programme
Bottlenecks of ICDS ProgrammeBottlenecks of ICDS Programme
Bottlenecks of ICDS Programme
 
INCOME COMPUTATION AND DISCLOSURE STANDARDS(ICDS
INCOME COMPUTATION AND DISCLOSURE STANDARDS(ICDSINCOME COMPUTATION AND DISCLOSURE STANDARDS(ICDS
INCOME COMPUTATION AND DISCLOSURE STANDARDS(ICDS
 
What is a Cardiac Defibrillator?
What is a Cardiac Defibrillator?What is a Cardiac Defibrillator?
What is a Cardiac Defibrillator?
 
Understanding GAAR
Understanding GAARUnderstanding GAAR
Understanding GAAR
 
Gaar ppt
Gaar pptGaar ppt
Gaar ppt
 
Integrated child development services final
Integrated child development services finalIntegrated child development services final
Integrated child development services final
 
Періодика 2016 : довідник
Періодика 2016 : довідникПеріодика 2016 : довідник
Періодика 2016 : довідник
 
Icds
IcdsIcds
Icds
 
An overview of ICDS (Income Computation and Disclosure Standards) by Blue Con...
An overview of ICDS (Income Computation and Disclosure Standards) by Blue Con...An overview of ICDS (Income Computation and Disclosure Standards) by Blue Con...
An overview of ICDS (Income Computation and Disclosure Standards) by Blue Con...
 
History of ICDs (Internal Cardiac Defibrillators)
History of ICDs (Internal Cardiac Defibrillators)History of ICDs (Internal Cardiac Defibrillators)
History of ICDs (Internal Cardiac Defibrillators)
 

Similar to Project details

Nguyen Thanh Dan_Project CV
Nguyen Thanh Dan_Project CVNguyen Thanh Dan_Project CV
Nguyen Thanh Dan_Project CVDan Nguyen Thanh
 
Jamsheer P_CV (1)
Jamsheer P_CV (1)Jamsheer P_CV (1)
Jamsheer P_CV (1)jamsheer p
 
tamer elshimy new cv (1)
tamer elshimy new cv (1)tamer elshimy new cv (1)
tamer elshimy new cv (1)tamer elshimy
 
NORFADZLY NORDIN ( Construction Manager)
NORFADZLY NORDIN ( Construction Manager)NORFADZLY NORDIN ( Construction Manager)
NORFADZLY NORDIN ( Construction Manager)Norfadzly Nordin
 
ALVIN'S CURRICULUM VITAE 2017
ALVIN'S CURRICULUM VITAE 2017ALVIN'S CURRICULUM VITAE 2017
ALVIN'S CURRICULUM VITAE 2017Alvin Chen
 
Resume - MOHD YUNUS BIN MOHD NAFI
Resume - MOHD YUNUS BIN MOHD NAFIResume - MOHD YUNUS BIN MOHD NAFI
Resume - MOHD YUNUS BIN MOHD NAFIMohd Yunus
 
Mike Chapman - Belt Splicer - Feb 2016
Mike Chapman - Belt Splicer - Feb 2016Mike Chapman - Belt Splicer - Feb 2016
Mike Chapman - Belt Splicer - Feb 2016Michael Chapman
 
Lo Xuan Son's CV updated May-2016
Lo Xuan Son's CV updated May-2016Lo Xuan Son's CV updated May-2016
Lo Xuan Son's CV updated May-2016SON LO XUAN
 
CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016Rolando Garcia
 
Adriyala longwall paper
Adriyala  longwall  paperAdriyala  longwall  paper
Adriyala longwall paper
Ulimella Siva Sankar
 
Mrcb forklift training
Mrcb forklift trainingMrcb forklift training
Mrcb forklift training
HASNIZAM BIN MD SAAD
 
ENGINEERING PPT BOX PUSHING ON PUNE DIVISION
ENGINEERING PPT BOX PUSHING ON PUNE DIVISIONENGINEERING PPT BOX PUSHING ON PUNE DIVISION
ENGINEERING PPT BOX PUSHING ON PUNE DIVISION
bridgelc
 
Project Review Meeting - 14.02.23.ppt
Project Review Meeting - 14.02.23.pptProject Review Meeting - 14.02.23.ppt
Project Review Meeting - 14.02.23.ppt
AkdDeshmukh
 
Sirrs Materials Day 2010 - C-Power
Sirrs Materials Day 2010 - C-PowerSirrs Materials Day 2010 - C-Power
Sirrs Materials Day 2010 - C-PowerSirris
 

Similar to Project details (20)

SAFIUDDIN SOHOT CV
SAFIUDDIN SOHOT CV SAFIUDDIN SOHOT CV
SAFIUDDIN SOHOT CV
 
Ghufran Resume 2015 a
Ghufran Resume 2015 aGhufran Resume 2015 a
Ghufran Resume 2015 a
 
Nguyen Thanh Dan_Project CV
Nguyen Thanh Dan_Project CVNguyen Thanh Dan_Project CV
Nguyen Thanh Dan_Project CV
 
Jamsheer P_CV (1)
Jamsheer P_CV (1)Jamsheer P_CV (1)
Jamsheer P_CV (1)
 
tamer elshimy new cv (1)
tamer elshimy new cv (1)tamer elshimy new cv (1)
tamer elshimy new cv (1)
 
NORFADZLY NORDIN ( Construction Manager)
NORFADZLY NORDIN ( Construction Manager)NORFADZLY NORDIN ( Construction Manager)
NORFADZLY NORDIN ( Construction Manager)
 
ALVIN'S CURRICULUM VITAE 2017
ALVIN'S CURRICULUM VITAE 2017ALVIN'S CURRICULUM VITAE 2017
ALVIN'S CURRICULUM VITAE 2017
 
Resume - MOHD YUNUS BIN MOHD NAFI
Resume - MOHD YUNUS BIN MOHD NAFIResume - MOHD YUNUS BIN MOHD NAFI
Resume - MOHD YUNUS BIN MOHD NAFI
 
Mike Chapman - Belt Splicer - Feb 2016
Mike Chapman - Belt Splicer - Feb 2016Mike Chapman - Belt Splicer - Feb 2016
Mike Chapman - Belt Splicer - Feb 2016
 
Lo Xuan Son's CV updated May-2016
Lo Xuan Son's CV updated May-2016Lo Xuan Son's CV updated May-2016
Lo Xuan Son's CV updated May-2016
 
CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016
 
Adriyala longwall paper
Adriyala  longwall  paperAdriyala  longwall  paper
Adriyala longwall paper
 
Mrcb forklift training
Mrcb forklift trainingMrcb forklift training
Mrcb forklift training
 
ENGINEERING PPT BOX PUSHING ON PUNE DIVISION
ENGINEERING PPT BOX PUSHING ON PUNE DIVISIONENGINEERING PPT BOX PUSHING ON PUNE DIVISION
ENGINEERING PPT BOX PUSHING ON PUNE DIVISION
 
Project Review Meeting - 14.02.23.ppt
Project Review Meeting - 14.02.23.pptProject Review Meeting - 14.02.23.ppt
Project Review Meeting - 14.02.23.ppt
 
new C.v.update_antonio2
new C.v.update_antonio2new C.v.update_antonio2
new C.v.update_antonio2
 
Leonardo Fortuin Resume.2
Leonardo Fortuin Resume.2Leonardo Fortuin Resume.2
Leonardo Fortuin Resume.2
 
chris's CV
chris's CVchris's CV
chris's CV
 
Sirrs Materials Day 2010 - C-Power
Sirrs Materials Day 2010 - C-PowerSirrs Materials Day 2010 - C-Power
Sirrs Materials Day 2010 - C-Power
 
CV.2016
CV.2016CV.2016
CV.2016
 

Recently uploaded

How to create an effective K-POC tutorial
How to create an effective K-POC tutorialHow to create an effective K-POC tutorial
How to create an effective K-POC tutorial
vencislavkaaa
 
原版制作(RMIT毕业证书)墨尔本皇家理工大学毕业证在读证明一模一样
原版制作(RMIT毕业证书)墨尔本皇家理工大学毕业证在读证明一模一样原版制作(RMIT毕业证书)墨尔本皇家理工大学毕业证在读证明一模一样
原版制作(RMIT毕业证书)墨尔本皇家理工大学毕业证在读证明一模一样
atwvhyhm
 
labb123456789123456789123456789123456789
labb123456789123456789123456789123456789labb123456789123456789123456789123456789
labb123456789123456789123456789123456789
Ghh
 
How to Master LinkedIn for Career and Business
How to Master LinkedIn for Career and BusinessHow to Master LinkedIn for Career and Business
How to Master LinkedIn for Career and Business
ideatoipo
 
Full Sail_Morales_Michael_SMM_2024-05.pptx
Full Sail_Morales_Michael_SMM_2024-05.pptxFull Sail_Morales_Michael_SMM_2024-05.pptx
Full Sail_Morales_Michael_SMM_2024-05.pptx
mmorales2173
 
Transferable Skills - Your Roadmap - Part 1 and 2 - Dirk Spencer Senior Recru...
Transferable Skills - Your Roadmap - Part 1 and 2 - Dirk Spencer Senior Recru...Transferable Skills - Your Roadmap - Part 1 and 2 - Dirk Spencer Senior Recru...
Transferable Skills - Your Roadmap - Part 1 and 2 - Dirk Spencer Senior Recru...
Dirk Spencer Corporate Recruiter LION
 
欧洲杯投注网站-欧洲杯投注网站推荐-欧洲杯投注网站| 立即访问【ac123.net】
欧洲杯投注网站-欧洲杯投注网站推荐-欧洲杯投注网站| 立即访问【ac123.net】欧洲杯投注网站-欧洲杯投注网站推荐-欧洲杯投注网站| 立即访问【ac123.net】
欧洲杯投注网站-欧洲杯投注网站推荐-欧洲杯投注网站| 立即访问【ac123.net】
foismail170
 
Digital Marketing Training In Bangalore
Digital  Marketing Training In BangaloreDigital  Marketing Training In Bangalore
Digital Marketing Training In Bangalore
nidm599
 
Resumes, Cover Letters, and Applying Online
Resumes, Cover Letters, and Applying OnlineResumes, Cover Letters, and Applying Online
Resumes, Cover Letters, and Applying Online
Bruce Bennett
 
一比一原版(YU毕业证)约克大学毕业证如何办理
一比一原版(YU毕业证)约克大学毕业证如何办理一比一原版(YU毕业证)约克大学毕业证如何办理
一比一原版(YU毕业证)约克大学毕业证如何办理
yuhofha
 
太阳城娱乐-太阳城娱乐推荐-太阳城娱乐官方网站| 立即访问【ac123.net】
太阳城娱乐-太阳城娱乐推荐-太阳城娱乐官方网站| 立即访问【ac123.net】太阳城娱乐-太阳城娱乐推荐-太阳城娱乐官方网站| 立即访问【ac123.net】
太阳城娱乐-太阳城娱乐推荐-太阳城娱乐官方网站| 立即访问【ac123.net】
foismail170
 
The Impact of Artificial Intelligence on Modern Society.pdf
The Impact of Artificial Intelligence on Modern Society.pdfThe Impact of Artificial Intelligence on Modern Society.pdf
The Impact of Artificial Intelligence on Modern Society.pdf
ssuser3e63fc
 
Midterm Contract Law and Adminstration.pptx
Midterm Contract Law and Adminstration.pptxMidterm Contract Law and Adminstration.pptx
Midterm Contract Law and Adminstration.pptx
Sheldon Byron
 
Luke Royak's Personal Brand Exploration!
Luke Royak's Personal Brand Exploration!Luke Royak's Personal Brand Exploration!
Luke Royak's Personal Brand Exploration!
LukeRoyak
 
DIGITAL MARKETING COURSE IN CHENNAI.pptx
DIGITAL MARKETING COURSE IN CHENNAI.pptxDIGITAL MARKETING COURSE IN CHENNAI.pptx
DIGITAL MARKETING COURSE IN CHENNAI.pptx
FarzanaRbcomcs
 
一比一原版(TMU毕业证)多伦多都会大学毕业证如何办理
一比一原版(TMU毕业证)多伦多都会大学毕业证如何办理一比一原版(TMU毕业证)多伦多都会大学毕业证如何办理
一比一原版(TMU毕业证)多伦多都会大学毕业证如何办理
yuhofha
 
Interactive Dictionary AIDS-B.pptx aaaaaaaaaaaaaaaaaaaaaaaaaa
Interactive Dictionary AIDS-B.pptx aaaaaaaaaaaaaaaaaaaaaaaaaaInteractive Dictionary AIDS-B.pptx aaaaaaaaaaaaaaaaaaaaaaaaaa
Interactive Dictionary AIDS-B.pptx aaaaaaaaaaaaaaaaaaaaaaaaaa
23211a7274
 
皇冠体育- 皇冠体育官方网站- CROWN SPORTS| 立即访问【ac123.net】
皇冠体育- 皇冠体育官方网站- CROWN SPORTS| 立即访问【ac123.net】皇冠体育- 皇冠体育官方网站- CROWN SPORTS| 立即访问【ac123.net】
皇冠体育- 皇冠体育官方网站- CROWN SPORTS| 立即访问【ac123.net】
larisashrestha558
 
Brand Identity For A Sportscaster Project and Portfolio I
Brand Identity For A Sportscaster Project and Portfolio IBrand Identity For A Sportscaster Project and Portfolio I
Brand Identity For A Sportscaster Project and Portfolio I
thomasaolson2000
 
一比一原版(UVic毕业证)维多利亚大学毕业证如何办理
一比一原版(UVic毕业证)维多利亚大学毕业证如何办理一比一原版(UVic毕业证)维多利亚大学毕业证如何办理
一比一原版(UVic毕业证)维多利亚大学毕业证如何办理
pxyhy
 

Recently uploaded (20)

How to create an effective K-POC tutorial
How to create an effective K-POC tutorialHow to create an effective K-POC tutorial
How to create an effective K-POC tutorial
 
原版制作(RMIT毕业证书)墨尔本皇家理工大学毕业证在读证明一模一样
原版制作(RMIT毕业证书)墨尔本皇家理工大学毕业证在读证明一模一样原版制作(RMIT毕业证书)墨尔本皇家理工大学毕业证在读证明一模一样
原版制作(RMIT毕业证书)墨尔本皇家理工大学毕业证在读证明一模一样
 
labb123456789123456789123456789123456789
labb123456789123456789123456789123456789labb123456789123456789123456789123456789
labb123456789123456789123456789123456789
 
How to Master LinkedIn for Career and Business
How to Master LinkedIn for Career and BusinessHow to Master LinkedIn for Career and Business
How to Master LinkedIn for Career and Business
 
Full Sail_Morales_Michael_SMM_2024-05.pptx
Full Sail_Morales_Michael_SMM_2024-05.pptxFull Sail_Morales_Michael_SMM_2024-05.pptx
Full Sail_Morales_Michael_SMM_2024-05.pptx
 
Transferable Skills - Your Roadmap - Part 1 and 2 - Dirk Spencer Senior Recru...
Transferable Skills - Your Roadmap - Part 1 and 2 - Dirk Spencer Senior Recru...Transferable Skills - Your Roadmap - Part 1 and 2 - Dirk Spencer Senior Recru...
Transferable Skills - Your Roadmap - Part 1 and 2 - Dirk Spencer Senior Recru...
 
欧洲杯投注网站-欧洲杯投注网站推荐-欧洲杯投注网站| 立即访问【ac123.net】
欧洲杯投注网站-欧洲杯投注网站推荐-欧洲杯投注网站| 立即访问【ac123.net】欧洲杯投注网站-欧洲杯投注网站推荐-欧洲杯投注网站| 立即访问【ac123.net】
欧洲杯投注网站-欧洲杯投注网站推荐-欧洲杯投注网站| 立即访问【ac123.net】
 
Digital Marketing Training In Bangalore
Digital  Marketing Training In BangaloreDigital  Marketing Training In Bangalore
Digital Marketing Training In Bangalore
 
Resumes, Cover Letters, and Applying Online
Resumes, Cover Letters, and Applying OnlineResumes, Cover Letters, and Applying Online
Resumes, Cover Letters, and Applying Online
 
一比一原版(YU毕业证)约克大学毕业证如何办理
一比一原版(YU毕业证)约克大学毕业证如何办理一比一原版(YU毕业证)约克大学毕业证如何办理
一比一原版(YU毕业证)约克大学毕业证如何办理
 
太阳城娱乐-太阳城娱乐推荐-太阳城娱乐官方网站| 立即访问【ac123.net】
太阳城娱乐-太阳城娱乐推荐-太阳城娱乐官方网站| 立即访问【ac123.net】太阳城娱乐-太阳城娱乐推荐-太阳城娱乐官方网站| 立即访问【ac123.net】
太阳城娱乐-太阳城娱乐推荐-太阳城娱乐官方网站| 立即访问【ac123.net】
 
The Impact of Artificial Intelligence on Modern Society.pdf
The Impact of Artificial Intelligence on Modern Society.pdfThe Impact of Artificial Intelligence on Modern Society.pdf
The Impact of Artificial Intelligence on Modern Society.pdf
 
Midterm Contract Law and Adminstration.pptx
Midterm Contract Law and Adminstration.pptxMidterm Contract Law and Adminstration.pptx
Midterm Contract Law and Adminstration.pptx
 
Luke Royak's Personal Brand Exploration!
Luke Royak's Personal Brand Exploration!Luke Royak's Personal Brand Exploration!
Luke Royak's Personal Brand Exploration!
 
DIGITAL MARKETING COURSE IN CHENNAI.pptx
DIGITAL MARKETING COURSE IN CHENNAI.pptxDIGITAL MARKETING COURSE IN CHENNAI.pptx
DIGITAL MARKETING COURSE IN CHENNAI.pptx
 
一比一原版(TMU毕业证)多伦多都会大学毕业证如何办理
一比一原版(TMU毕业证)多伦多都会大学毕业证如何办理一比一原版(TMU毕业证)多伦多都会大学毕业证如何办理
一比一原版(TMU毕业证)多伦多都会大学毕业证如何办理
 
Interactive Dictionary AIDS-B.pptx aaaaaaaaaaaaaaaaaaaaaaaaaa
Interactive Dictionary AIDS-B.pptx aaaaaaaaaaaaaaaaaaaaaaaaaaInteractive Dictionary AIDS-B.pptx aaaaaaaaaaaaaaaaaaaaaaaaaa
Interactive Dictionary AIDS-B.pptx aaaaaaaaaaaaaaaaaaaaaaaaaa
 
皇冠体育- 皇冠体育官方网站- CROWN SPORTS| 立即访问【ac123.net】
皇冠体育- 皇冠体育官方网站- CROWN SPORTS| 立即访问【ac123.net】皇冠体育- 皇冠体育官方网站- CROWN SPORTS| 立即访问【ac123.net】
皇冠体育- 皇冠体育官方网站- CROWN SPORTS| 立即访问【ac123.net】
 
Brand Identity For A Sportscaster Project and Portfolio I
Brand Identity For A Sportscaster Project and Portfolio IBrand Identity For A Sportscaster Project and Portfolio I
Brand Identity For A Sportscaster Project and Portfolio I
 
一比一原版(UVic毕业证)维多利亚大学毕业证如何办理
一比一原版(UVic毕业证)维多利亚大学毕业证如何办理一比一原版(UVic毕业证)维多利亚大学毕业证如何办理
一比一原版(UVic毕业证)维多利亚大学毕业证如何办理
 

Project details

  • 1. SUCCESSFULLY HEADED FOLLOWING PROJECTS SINCE MAR 2013 S No Project Type Location Brief Description of Work Performed / Scope of Work Client 1 Installation of Wellhead Platforms and Sea lines Zawtika Field, Myanmar Installation of the WP1 (6726 MT), WP2 (8900 MT) and WP3 (6726 MT) jackets in 140 M water depth. PTTEP, Thailand Installation of WP1 (1030 MT), WP2 (1200 MT) and WP3 (1200MT) topsides and boat landing. Installation of intra-field Sea lines ZPQ- WHP2 and ZPQ- WHP1 (18” Pipe lay of approx. 21 Kms) in 140 M water depth. 2 Integrated Transportation and Installation of offshore facilities SOUTH ACIS FIELD, Bintulu (East Malaysia) SN-PA Topside-2656 MT (01.08.2013) MURPHY Sarawak oil. Co. ltd SN-AA Topside-788 MT (06.08.2013) Bridge between SN-PA & SN-AA -67MT (08.08.2013) & SA- PA Flare Boom- 48MT(09.08.13) SA-PA Topside(WHP) - 205MT (11.08.2013) 3 Transportation and Installation Of Offshore Facilities Laila Field development, Miri Malaysia BEDP-A Cellar Deck Extension (200 MT) (23.08.13) SHELL SARAWAK BERHAD LADR-A Jacket Installation, 4 legs jacket Dry Lift (1548MT) (13.08.2013) 4 Installation of rotating tower mooring yoke structure Lampung field, Indonesia Installation of four legged Jacket PT Rekayasa Industry ( REKIND) Installation of rotating Topside Installation of floating mooring yoke, fourth of its kind in the world 5 Topside Installation Diamond Field, Vietnam Installation of Topside-1800 MT PVCL Installation of SA-PA Flare Boom- 76MT 6 Installation of Bridges Tapis field. Malaysia TaR-TaQ Bridge(95MtrX 783MT) EXXON Exploration and Production Malaysia Inc. TaB-TaQ Bridge(84MtrX 466MT) 7 Pipe lay JDA field (Thailand-Malaysia) 75.7Km of 24” Pipe lay project Trans Thai- Malaysia SDN BHD(TTMM) 8 Platform installation and Pipe line project (23 Dec 2014 to 15 Feb 2015) Panna field (Mumbai, India) 6” OD gas lift Pipeline of 5KM from PE to PF platforms BG Exploration and Production India Limited (BGEPIL) 14” OD Production Pipeline Piggybacked with 5” OD Gas Lift Pipeline of 25 km from MB to PPA. 14” OD Production Pipeline Piggybacked with 5” OD Gas Lift Pipeline of 5 km from MA to MB. Jacket installation of 1709MT and Topside of 1521MT 9 Riser Installation at MA, PPA, PE and PF (25 Mar 2015 to 23 May 2015) Panna field (Mumbai, India) Risers for well fluid (14" OD x 19.1mm WT), lift gas (6.625”OD x 15.9mm WT) Removal of existing 10.75” I-Tube and 4.5” riser and subsea spools. Removal of 2*1.25” subsea spools, etc. BG Exploration and Production India Limited (BGEPIL) 10 TPA sub- structure, piles, conductors and boat landing installation Phase-3 Development Project JDA block B-17 and B17-01 (Malaysia) MDF subsea pipe line and offshore installed risers installation at MDPP platform Carigali PTTEPI Operating Company Sdn Bhd( CPOC) 1480MT TPA Jacket Piling C1 to C6 26” dia 36 Conductors installation 5 segments of Pipelines connecting BPA to BCPA2 and Two new conventional Well Vasai Project, Vasai East field , Heera - Panna - Basin block BPA MODULES LIFT for Top side modifications on existing BPA & BCPA-2 Process Platform Oil & Natural Gas Corporation Ltd. ( ONGC)Two new conventional Well platforms VSEB (9 slots) & VSEC (16 slots). (Two Jackets of 2400 MT and 1950 MT
  • 2. 11 platforms VSEB (9 slots) & VSEC (16 slots) Installation Project and two top sides of 2480MT and 2100MT) 18” x 8.5 Km Well Fluid Pipeline from proposed VSEB to exiting BPA. No. of risers-2 (one pre-installed and one external). 18” x 9.5 Km Well Fluid Pipeline from proposed VSEC to existing BPA Process Platform. No. of risers-2 (one pre- installed and one external). 8" x 9.5 Km Lift Gas Pipeline from existing BCPA-2 to proposed VSEC. No. of risers-2 (one pre-installed and one external). 8" x 5.9 Km Lift Gas Pipeline from proposed VSEC to proposed VSEB. No. of risers-2 (Both pre-installed). 6"x2.9 Km rigid Water injection Pipeline from existing VSEA to proposed VSEC.