Mohd Izudin Bin Ghazali is a Malaysian civil engineer with over 10 years of experience working in the oil and gas industry as a field engineer. He holds an MSc in Civil and Structural Engineering from the University of Bradford and has worked on offshore projects in Malaysia and Vietnam for companies such as SapuraKencana, Petrofac, ExxonMobil, and Murphy Oil. His experience includes jacket and pipeline installations, remote offshore work, and engineering roles. Azahar Abdul Wahab is provided as a reference.
CEA Project Logistics Myanmar recently carried out the demobilisation of 14 Gas Powered Generator Sets and accompanying parts and accessories from a Power Plant project in Kyaukpyu, Rakhine State to Yangon and then onwards to Singapore.
CEA Project Logistics Myanmar recently carried out the demobilisation of 14 Gas Powered Generator Sets and accompanying parts and accessories from a Power Plant project in Kyaukpyu, Rakhine State to Yangon and then onwards to Singapore.
I have been working as an Experienced Rigger since 1993 at many locations within Nigeria and around African countries. As a Rigger Foreman and Coating Application Technician, with a dynamically positioned derrick/lay barges, the barge is the ideal barge for pipe lay and construction activities in deep water fields. Equipped with both “S” and “J” configuration & pipe lay capabilities, in excess of 1000 tons and also perform tie – in and support functions. In West Africa, the Gulf of Mexico and Brazil.
The work has ranged from ships and barges. Installation of pipeline in Oil/Gas fields, platforms, decks, jackets, risers. Etc.
Please accept my resume in application for the position of above captioned subject or any appropriate. I am young, enthusiastic but calm in nature, self-motivated, educated, experienced & professional individual capable of managing job successfully and love to learn as a student new techniques & skills for knowledge development and to get the job done. For Personal enhancement purposes, you will find me a totally committed individual with pride in being direct, spontaneous and communicative.
My skills include:
• 7+ years of experience and Knowledge of Associate Engineer (Tunnel & Construction) work.
• Excellent problem Solving ability, Confident, Responsible, Team Player, Industrious and work well under pressure
• Interact with others in a mutually supportive and cooperative manner
• Ability to work independently as well as in a team environment
• Sound decision-making skills
• Good and Fast Learner
• 6 Months experience of Saudi Arabia, Riyadh
• Presently Working as a Civil Inspector-Tunnel with SYSTRA Company in (Riyadh Metro Transit Consultant) Riyadh Saudi Arabia.
I am confident that my knowledge, skills and experience will meet the needs of your company. I am interested in joining a progressive organization like yours, where I can use my analytical and qualitative skills toward making a substantial contribution to its overall success and reputation. I look forward to discussing my qualifications with you in an interview.
Thank you for your time and consideration of my application.
Sincerely,
Syed Waqar Ali
Training project report BSRDCL by Amit KumarAmitKumar7069
Construction of elevated road corridor/Bridge/flyover from AIIMS to Digha at Patna in the state of Bihar for Bihar State Road Development Corporation Ltd.(BSRDCL) By Gammon India Ltd.
I have been working as an Experienced Rigger since 1993 at many locations within Nigeria and around African countries. As a Rigger Foreman and Coating Application Technician, with a dynamically positioned derrick/lay barges, the barge is the ideal barge for pipe lay and construction activities in deep water fields. Equipped with both “S” and “J” configuration & pipe lay capabilities, in excess of 1000 tons and also perform tie – in and support functions. In West Africa, the Gulf of Mexico and Brazil.
The work has ranged from ships and barges. Installation of pipeline in Oil/Gas fields, platforms, decks, jackets, risers. Etc.
Please accept my resume in application for the position of above captioned subject or any appropriate. I am young, enthusiastic but calm in nature, self-motivated, educated, experienced & professional individual capable of managing job successfully and love to learn as a student new techniques & skills for knowledge development and to get the job done. For Personal enhancement purposes, you will find me a totally committed individual with pride in being direct, spontaneous and communicative.
My skills include:
• 7+ years of experience and Knowledge of Associate Engineer (Tunnel & Construction) work.
• Excellent problem Solving ability, Confident, Responsible, Team Player, Industrious and work well under pressure
• Interact with others in a mutually supportive and cooperative manner
• Ability to work independently as well as in a team environment
• Sound decision-making skills
• Good and Fast Learner
• 6 Months experience of Saudi Arabia, Riyadh
• Presently Working as a Civil Inspector-Tunnel with SYSTRA Company in (Riyadh Metro Transit Consultant) Riyadh Saudi Arabia.
I am confident that my knowledge, skills and experience will meet the needs of your company. I am interested in joining a progressive organization like yours, where I can use my analytical and qualitative skills toward making a substantial contribution to its overall success and reputation. I look forward to discussing my qualifications with you in an interview.
Thank you for your time and consideration of my application.
Sincerely,
Syed Waqar Ali
Training project report BSRDCL by Amit KumarAmitKumar7069
Construction of elevated road corridor/Bridge/flyover from AIIMS to Digha at Patna in the state of Bihar for Bihar State Road Development Corporation Ltd.(BSRDCL) By Gammon India Ltd.
Monitoring and Maintanance of On-shore pipeline ,Off shore pipeline ,Well jacket structure ,Jetty,Platform and storage tanks for the client of BRUNEI SHELL PETROLEUM
1. CURRICULUM VITAE
Name : Mohd Izudin Bin Ghazali
Nationality : Malaysian
Year of Birth : 06th May 1984
Qualification : MSc Civil and Structural Engineering,
University of Bradford, United Kingdom.
Position : Field Engineer
Mobile Number : +60199841118
Email : izzodean@gmail.com
EDUCATION AND QUALIFICATIONS
University of Bradford Average Mark 55% - 60%
MSc Civil and Structural Engineering
2010 – 2011
University of Bradford
BEng (Hons) Civil and Structural Engineering Average Mark (2:2) 50% - 60%
2009 - 2010
Direct entry to 3rd Year
INTI International University College, Malaysia
UK Degree Transfer in Civil Engineering Average Mark 55% - 60%
2007 – 2009
INTI International University College, Malaysia
Diploma in Civil Engineering Average Mark 50% - 55%
2003 – 2007
2. Mohd Izudin Bin Ghazali
Page 2 of 4
_______________________________________________________________________________________________________
WORKING EXPERIENCE
Mar 2016 - Present : SapuraKencana TL Offshore Sdn Bhd (A SapuraKencana
Petroleum Bhd Company)
Engineering & Construction – International Division
Aug 2015 – Mar 2016: CLIENT: VIETSOVPETRO JOINT VENTURE (VSP)
Participate in Free Span Correction Installation for the
Nam Con Son II Fields / DPDSV: Skandi Protector (8
Sept. to 8 Nov., 62 Days).
- Field assignment to install grout bags as Free Span
Correction method for Nam Con Son II pipeline lay
route.
- Field assignment to install SSIV at within 500 meter
from existing platform (BK4A Platform).
Completely prepared CLIENT As Built Documentations
for Nam Con Son II Projects (Jan 2016 – March 2016)
Jan 2015 – Aug 2015: CLIENT: HESS Exploration and Production Malaysia BV
Prepared Loadout Procedure for the Jacket (Bergading-
C, Bergading-D & Kesumba WHP).
Participate in Jacket, Drilling Deck Installation for the
Bergading & Kesumba Fields / MWB: LTS3000 (10
June to 1 July, 22 Days; 23 July to 30 July, 8 Days).
- Field assignment to install Bergading-C, Bergading-
D & Kesumba WHP Jackets and Drilling Decks.
Participate in Bridge Installation for the CHOC Fields /
MWB: LTS3000 (20 July to 22 July, 3 Days).
- Field assignment to install CHOC Bridge for
existing platform (CKP Process Platform to CKX
Booster Platform).
Dec 2013 – Jan 2015: CLIENT: Petrofac Malaysia Limited (PML)
Prepared Cendor Installation Procedure for the Fibre
Optic Cable Pull-in.
Participate in Flexible riser pipeline lay-down at Cendor
Field / DPDSV: Kreuz Installer (1 May – 27 May), 27
Days.
- Field assignment to install and preparation works to
onboard DPDSV Kreuz Installer:
8” x 1.8km FPSO to CDW-B Gas Injection/Line
Flexible Riser Installation.
8” x 3.6km FPSO to CDW-C Water Injection
Flexible Riser Installation.
8” x 3.6km FPSO to CDW-C Gas Injection/Line
Flexible Riser Installation.
8” x 0.2265km FPSO to WD PLET Flexible Riser
Installation.
12” x 3.7km FPSO to CDW-C Production Flowline
No. 1 Installation.
3. Mohd Izudin Bin Ghazali
Page 3 of 4
_______________________________________________________________________________________________________
Participate in remote work at Cendor Field (FPSO @
CDP-A, CDW-B & CDW-C), 27 May – 22 June, 26 Days.
- Field assignment to install and preparation works to
assist DPDSV Kreuz Installer:
Work preparation & Fibre Optic Cable (FOC)
Installation at CDW-B, CDW-C & FPSO @ CDP-A.
Work preparation for Installation of Offloading
Floating hose at FPSO @ CDP-A.
Participate in Loadout of CDW-A Bridge structure at
Kencana HL (KHL) Lumut, Perak (19 August – 2
September).
- Field assignment to supervise and liaise with KHL
team regarding loadout of CDW-A Bridge Structure
until sail away to Cendor Field.
Participate in CDW-A Bridge Installation at Cendor
Field / Main Work Barge: SapuraKencana 900, SK900
(8 September – 29 September), 21 Days.
- Field assignment to remove/install and preparation
works to onboard SK900:
Removal of WHSF (39 MT).
Installation of Bridge Bumper (5.3 MT).
Removal of SWLT (35 MT).
Installation of BSF (18 MT).
Installation of CDW-A Bridge Section 2 (168 MT).
May 2013 – Nov 2013: CLIENT: ExxonMobil Exploration and Production Malaysia Inc
(EMEPMI)
Prepared Tapis Pipeline Loadout Coordination Manual
(LCM) for the loadout materials onboard material barge.
Supervise the fabrication works and loadout activities
at KPK yard, Kemaman. (3 July – 20 Aug, 46 Days)
Participate in remote work on Tapis – D Platform to
install 2 nos of air tugger and rigging arrangement to
pull-in the Fibre Optic Cable / Preparation to install
riser guard. (20 Aug – 19 Sept, 29 Days)
Participate in remote work on Telok – A/Telok –
B/Guntong-E Platform to terminate Fibre Optic Cable
& Power Cable on each Platform. (5 Oct – 1 Nov, 28
Days)
Jan 2013 – May 2013: CLIENT: HESS Exploration and Production Malaysia BV
Participate in Jacket, Riser and Topside Installation for
the Kamelia Fields / MWB: QP2000 (28 Feb. – 17 April,
49 Days).
- Field assignment to install Kamelia-A Jacket (740
MT), Riser and Topside (730 MT).
Prepared As-Build report for the Jacket, Riser and
Topside Installation at Kamelia Field.
4. Mohd Izudin Bin Ghazali
Page 4 of 4
_______________________________________________________________________________________________________
Feb 2012 – Dec 2012: CLIENT: Murphy Oil Corporation (MOC), Malaysia – Patricia
and Serendah Development Project
WP-PA Remote Works (21 September – 7 October).
- Responsible to arrange the transportation of the
remote work crews to the WP-PA platform.
- Installed 2 units of 10MT air tugger and removed it
after the completion of Riser Guards Installation.
Pipeline Pre-Commissioning Works / Vessel: DPDSV
AME Allied Conquest (6 September – 18 September)
- Pigging, cleaning, gauging and filling (subsea to
subsea); also
- Hydrotest for:
8” x 13.5km PT-SA to WP-PA Multiphase Oil
Pipeline.
8” x 8.0km SN-PA to WYE1 Crude Pipeline.
20” x 7.6km SN-PA to WYE2 Dry Gas Pipeline.
Supervising fabrication of WYE structure, Loadout
PTSA and SNPA Jacket at KHL Lumut (28 June – 2
September).
Participate in Jacket and Pipeline Pre-Installation
Survey for the Patricia and Serendah Fields / Vessel:
AHT Bima Kurnia 1 (8 June – 22 June).
- As Client Representative to survey the area before
the installation of the jacket and pipeline for:
8” x 13.5km PT-SA to WP-PA Multiphase Oil
Pipeline and PT-SA Jacket.
8” x 8.0km SN-PA to WYE1 Crude Pipeline.
20” x 7.6km SN-PA to WYE2 Dry Gas Pipeline.
COURSES ATTENDED
1. Basic Offshore Induction & Emergency Training (BOSIET) with HUET EBS (with additional OLF
Module, OPITO)
Organizer : MSTS
Date Attended: March 2012
Valid until : 8th March 2016
2. “Vessels for Offshore Field Developments & Floating Production Systems”
Organizer : IBC Asia (S) Pte Ltd
Date Attended: 17th
-18th
April 2012
REFEREE
Azahar Abdul Wahab
Engineering & Projects - Operations Engineering
Engineering & Construction - International
SapuraKencana TL Offshore Sdn Bhd
[m] +6019 2714122
[p] +603 8659 8990
[e] azhar@sapurakencana.com
[e'] azahar.abdulwahab@gmail.com