SlideShare a Scribd company logo
CURRICULUM VITAE
PERSONAL PARTICULARS
Name
MOHD HASSBY BIN MOHD SIDEK
Nationality
MALAYSIAN
NRIC
820211-11-5283
Address
173B KG LAK LOK 22000, JERTEH BESUT TERENGGANU, MALAYSIA
Status
MARRIED
Spouse Address
BLOK B NO.4, TINGKAT 2, FLAT SEKOLAH RENDAH DELIMA 1, JLN MANGGIS 1,
BB4713 , BRUNEI DARUSSALAM
Contact
Mobile : +60109180782 ( Malaysia)
Email : mohasbi_82@yahoo.com
Current Employment
CATHODIC PROTECTION SUPERVISOR AT PETRONAS PENAPISAM MELAKA
Previous Employment(2008-2015)
SENIOR PROJECT COORDINATOR AT MACH3 ENGINEERING SDN BHD- Based In
Brunei.
Certificate
1) NACE CP LEVEL 2 CATHODIC PROTECTION TECHNICIAN # 25066
2) NACE CP LEVEL 1 CATHODIC PROTECTION TESTER # 25066
3) CORROSION TECHNICIAN
4) BASIC CORROSION
5) BOSIET / OPITO
Education
DIPLOMA OF ENGINEERING (MECHANICAL)
UTMKL
WORKING EXPERIENCES & PROJECT INVOLVED ( From 2008 till Present)
Power Plant Industry Project:
1. Kapar Energy Venture - Sultan Salahuddin Abdul Aziz Power Station (Selangor)
 Transformer rectifier trouble shooting
 Install Pt-Ti anode for steel pile (Impressed Current Cathodic Protection
System)
 MMO anode fabrication and assembly
 Maintenance job for Cathodic Protection System
2. Taisei Corporation – Jimah Power Plant (Negeri Sembilan)
 Installation supervision for Denso Seashield 2000FD & 100 HDPE jackets for
West Mooring Dolphin Steel Piles
 Conducted ICCP system maintenance procedure training for Jimah Power
Plant personnel
3. Prai Power Station – CP System
 Design, fabrication and supply Cathodic Protection zinc reference electrode
spare part and mixed metal oxide anode
4. West Mooring Dolphin at 2 x 700MW Coal-Fired Power Plant, Jimah, Negeri
Sembilan (Client : Shriro (Malaysia) Sdn Bhd)
 Installation supervision of 2000FD SeaShield Jacket onto steel piles
 QA/QC & Preparation of reports
5. Panglima CCGT Power Plant – Cathodic Protection System Inspection
(Client: Powertek Berhad)
 Cathodic Protection system inspection during shutdown/turnaround period
 Transformer rectifier unit check, anodes efficiency & visual check, junction box
junction box check & pipeline potential check
 Internal surface corrosion check on condenser water box, cooling water
intake/outlet pipeline & drum screen
 Project management, planning, scheduling & coordination
 QA/QC & preparation of comprehensive inspection reports
Oil & Gas Industry Project:
1. White Nile Petroleum Operating Company (WNPOC), SUDAN
 Surveyor for Cathodic protection system audit survey- Well heads, trunkline
and export pipeline from Tar Jath to Sudan Port
 QA/QC & Preparation of documentation
2. PS Pipeline, Maintenance Services of Cathodic Protection System from MRPP to
KVDT
 Surveyor for Impressed Current Cathodic Protection System including DCGV,
CIPS and maintenance survey.
 Project Management, Planning, and Scheduling
 QA/QC & Preparation of documentation
 Revamps of non-functioning System
3. Petronas Carigali Sdn Bhd – Onshore Gas Terminal Plant, CP System
 Surveyor for Cathodic Protection Evaluation, Maintenance & Audit of CP
System
 Engineering design, documentation & QA/QC document preparation
4. TCOT / OSC Cathodic Protection System
 Surveyor for Cathodic Protection Evaluation, Maintenance & Audit of CP
System
 Engineering design, documentation & QA/QC document preparation
 TRU check, anode groundbed check, potential survey, insulating flange check
for Terengganu Crude Oil Terminal Plant and Onshore Slug catcher.
5. Petronas Carigali Sdn Bhd- Miri Crude Oil Terminal
 Surveyor to carry out Cathodic Protection System-TRU check and
troubleshooting.
6. Petrofac E&C Sdn Bhd- Mobile offshore Production unit (MOPU) SEPAT
 ICCP system installation for conductors
 Engineering design, documentation & QA/QC document preparation
7. TOTAL E&P Brunei BV
 Cathodic protection system audit survey- 6” Condensate pipeline to SCOT,
OPP underground utilities (tank, fire hydrant pipelines )
 Surveyor - DCVG for 6” condensate line.
 AC interference datalogging
 Final report & QA/QC document preparation
8. Petrofac E&C Sdn Bhd- Mobile offshore Production unit (MOPU) WEST DESARU
 ICCP system installation and commissioning for rig leg.
 Engineering design, documentation & QA/QC document preparation
9. TOTAL E&P Myanmar
 Cathodic protection system audit survey- 36” Yadana Onshore Pipeline from
KP 25 to KP 50.
 Surveyor - DCVG for 36” Yadana Onshore Pipeline from KP25 to KP
 Final report & QA/QC document preparation
10. BRUNEI SHELL PETROLEUM
 Cathodic protection system audit survey- 30 Nos of pipelines – Emphasize on
redbanded pipeline
 Surveyor - DCVG & CIPS survey
 Final report & QA/QC document preparation
11. PETRONAS PENAPISAN MELAKA
 Total Plant Cathodic Protection Rejuvenation
 Melaka Refinary TOTAL Plant Shutdown
Water & Infrastructure:
1. Bukit Barun to Terunjing New pipeline- Cathodic protection system
 Project coordination & execution
 Liaison with Owner and client
 QA/QC & Preparation of final document
 Main focal person at site
2. Bukit Barun Stage 4 & 5, Brunei- Cathodic Protection system
 Project coordination & execution
 Liaison with Owner and client
 QA/QC & Preparation of final document
 Main focal person at site
3. Brunei Naval Base, Brunei
 Overview of progress, schedule, costing, procurement, coordination and
execution
 Liaison with project Owner and client
 Installation supervision of 2000FD SeaShield & SeaShield 100 Jackets onto
steel piles
 Supervision of concrete tuner underwater inspection, underwater I-beam
cutting, seabed inspection, piles inspection and air-lift of mud at seabed level
 Project management, planning, scheduling & coordination
 QA/QC & Preparation of final document
4. Cathodic Protection Audit Survey at KLIA GDC Twin Chilled Water Pipelines (Client:
GDC KLIA Sdn. Bhd)
 Hot spot Cathodic Protection system at SCBC
 Isolating flange check of chilled water supply and return line at chamber E6
 Project management, planning, scheduling & coordination
 QA/QC & Preparation of final document
 Surveyor for DCVG and CIPS survey
5. Tanah Jambu, Brunei- Test point relocation work
 Project coordination & execution
 Liaison with Owner and client
 QA/QC & Preparation of final document
 Main focal person at site
WORKING EXPERIENCES & PROJECT INVOLVED ( From 2003 till 2008)
Oct 2002 to Mar 2003
Company: BP Chemical (M) Sdn Bhd
Position: Maintenance Technician (Industrial Traning)
Activities: waste water treatment area maintenance, utility area maintenance and involve
in other maintenance job (pump, gear box, valve)
June 2003 to July 2003
Client: Petronas Gas Berhad(GPP3)
Position: AWL (Authorised Work Leader)
Activities: Unfired pressure Vessel Servicing (Plant Turnaround)
Company: GREAT TERMINAL ENGINEERING & SERVICES SDN BHD.
Main contractor: TECHNOTEST ENG. SDN BHD
Sept 2003-October 2003
Client: BASF Petronas Chemicals
Position: supervisor
Activities: Unfired pressure Vessel Servicing (plant Turnaround)
Company: GREAT TERMINAL ENGINEERING & SERVICES SDN BHD.
Main Contractor: GREAT TERMINAL ENGINEERING & SERVICES SDN BHD
Nov 2003-December 2003
Client: Cryovac (M) Sdn Bhd
Position: Supervisor
Activities: Unfired pressure Vessel Servicing (Plant Turnaround)
Company: GREAT TERMINAL ENGINEERING & SERVICES SDN BHD.
Main Contractor : GREAT TERMINAL ENGINEERING & SERVICES SDN BHD
Dec 2003-Jan 2004
Client: Kaneka ( M) Sdn Bhd
Position: Site Supervisor
Activities: Rotating Machinery activities (Plant Shutdown)
Company: GREAT TERMINAL ENGINEERING & SERVICES SDN BHD.
Main Contractor: Semambu Engineering Sdn Bhd
Jan 2004-Nov 2004
Position: Site Supervisor
Activities: Scaffolding erection
Company: BAKTICON ENGINEERING SDN BHD
Main contractor: WARGA HIKMAT KEJURUTERAAN SDN BHD
April 2005 – May 2005
Client: BP Chemical Sdn Bhd
Position: Supervisor
Activities: installation of stiffener ring for PTA(pure terephthalic acid) Dryer
Company: BAKTICON ENGINEERING SDN BHD
Main contractor: WARGA HIKMAT KEJURUTERAAN SDN BHD
Sept 2005-Nov 2005
Client: BASF PETRONAS CHEMICAL SDN BHD
Position: Site Supervisor
Activities: OXO debottlenecking for syngas package(installation of Compressor)
Company: BAKTICON ENGINEERING SDN BHD
Main contractor: WARGA HIKMAT KEJURUTERAAN SDN BHD
March 2006-April 2006
Client: BP Chemicals (M) Sdn Bhd
Position: Site Supervisor
Activities: Baca Rebagging
Company: BAKTICON ENGINEERING SDN BHD
Main Contractor: BAKTICON ENGINEERING SDN BHD
May 2006-August 2006
Client: BP Chemicals (M) Sdn Bhd
Position: Site Supervisor
Activities: Supply and construction of works and installation of 11kv cables
for installation of new transformer(132kV Substation)
Company: BAKTICON ENGINEERING SDN BHD
Main contractor: RANHILL WORLEY
May 2007 – Apr 2008
Client: Jabatan Kerja Raya (JKR Daerah Besut, Terengganu)
Position: Site Agent
Activities: Membina Dan Menyiapkan Satu Blok Bangunan Dua Tingkat Pusat Aktiviti
Perpaduan Daerah Besut, Terengganu.
Jun 2008 – Present
Position: Senior Project Coordinator
Company : Mach3 Engineering Sdn Bhd
Nature of bussines: Cathodic Protection System Services
May 2015 – Present
Position: Cathodic ProtectionSupervisor
Company : FIRCROFT TANJUNG SDN BHD
Working Place: PETRONAS PENAPISAN MELAKA
Current Salary: RM12K
EQUIPMENT / TOOLS / DEVICE AND MATERIAL INVOLVED
1) DCVG MACHINE- PCS 200 / DCVG
2) CIPS QUANTUM DATALOGGER
3) DATALOGGER FOR AC / DC INTERFERENCE
4) HOLIDAY DETECTOR
5) RD 8000 PIPE LOCATOR
6) SOIL RESISTANCE METER / SOIL BOX
7) AG/AgCl / CuCuSo4 / Zinc REFERENCE ELECTRODE
8) DENSO COATING
9) PCS COATING
10) YBM DRILLING MACHINE FOR SOIL INVESTIGATION
11) GPS DEVICE
12) PORTABLE TRANSFORMER RECTIFIER UNIT
13) CADWELDING
14) RADIO FREQUENCY INSULATION TESTER
15) MEGGER TESTER
16) MULTIMETER / AC/DC CLAMPMETER
17) CURRENT INTERRUPTER- DCVG , MC MILLER, TINKER & RASOR
References
1) Ahmad Shamiri Bin Wahab
Technical Manager
Mach3 Engineering Sdn Bhd
Contact No: +60192251570
2) Calvin Kok Keong
Manager
ISBN
Contact No: +60127085338

More Related Content

What's hot (20)

CV Hasrul Maswandy
CV Hasrul MaswandyCV Hasrul Maswandy
CV Hasrul Maswandy
 
A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)
 
curr. vitae
curr. vitaecurr. vitae
curr. vitae
 
CV 2016
CV 2016CV 2016
CV 2016
 
CV-SC-Shaukat Mahmood Khan(5306) January 08,2017
CV-SC-Shaukat Mahmood Khan(5306) January 08,2017CV-SC-Shaukat Mahmood Khan(5306) January 08,2017
CV-SC-Shaukat Mahmood Khan(5306) January 08,2017
 
CV-PM Ponraj
CV-PM PonrajCV-PM Ponraj
CV-PM Ponraj
 
Resume (engineer)
Resume (engineer)Resume (engineer)
Resume (engineer)
 
Rezume ongky
Rezume ongkyRezume ongky
Rezume ongky
 
Mahmoud Ahmed ElbadawyCV
Mahmoud Ahmed ElbadawyCVMahmoud Ahmed ElbadawyCV
Mahmoud Ahmed ElbadawyCV
 
Latest CV Engr. Zubair
Latest CV Engr. ZubairLatest CV Engr. Zubair
Latest CV Engr. Zubair
 
SHER ZAMAN CV (2)
SHER ZAMAN CV (2)SHER ZAMAN CV (2)
SHER ZAMAN CV (2)
 
Resume MAR
Resume MARResume MAR
Resume MAR
 
Vinoth2016 - CV
Vinoth2016 - CVVinoth2016 - CV
Vinoth2016 - CV
 
CV_Arijanto EP_2016
CV_Arijanto EP_2016CV_Arijanto EP_2016
CV_Arijanto EP_2016
 
Updated CV-Issam
Updated CV-IssamUpdated CV-Issam
Updated CV-Issam
 
K.VIJAYAKUMAR CV FOR FIELD ENGINEER- PAINTING INSULATION FIREPROOFING04122014
K.VIJAYAKUMAR CV FOR FIELD ENGINEER- PAINTING INSULATION FIREPROOFING04122014K.VIJAYAKUMAR CV FOR FIELD ENGINEER- PAINTING INSULATION FIREPROOFING04122014
K.VIJAYAKUMAR CV FOR FIELD ENGINEER- PAINTING INSULATION FIREPROOFING04122014
 
CV
CVCV
CV
 
CV Updated
CV UpdatedCV Updated
CV Updated
 
Resume of ECP
Resume of ECPResume of ECP
Resume of ECP
 
CURRICULAM_VITAE_QC
CURRICULAM_VITAE_QCCURRICULAM_VITAE_QC
CURRICULAM_VITAE_QC
 

Similar to Hassby's CV 2015

Resume - MOHD YUNUS BIN MOHD NAFI
Resume - MOHD YUNUS BIN MOHD NAFIResume - MOHD YUNUS BIN MOHD NAFI
Resume - MOHD YUNUS BIN MOHD NAFI
Mohd Yunus
 
CV Mohd Haffiz latest 2016
CV Mohd Haffiz latest 2016CV Mohd Haffiz latest 2016
CV Mohd Haffiz latest 2016
mohd haffiz
 
Zuraidi Resume update 2016
Zuraidi Resume update 2016Zuraidi Resume update 2016
Zuraidi Resume update 2016
zuraidi Ismail
 
Amjad Hussain Ansari
Amjad Hussain AnsariAmjad Hussain Ansari
Amjad Hussain Ansari
Amjad Hussain
 
MyResume[2015]Latest
MyResume[2015]LatestMyResume[2015]Latest
MyResume[2015]Latest
Rudy Salleh
 
ALVIN'S CURRICULUM VITAE 2017
ALVIN'S CURRICULUM VITAE 2017ALVIN'S CURRICULUM VITAE 2017
ALVIN'S CURRICULUM VITAE 2017
Alvin Chen
 
updated CVlarrybisa
updated CVlarrybisaupdated CVlarrybisa
updated CVlarrybisa
Larry Bisa
 
Sinbery Corporation Sdn Bhd Profile
Sinbery Corporation Sdn Bhd ProfileSinbery Corporation Sdn Bhd Profile
Sinbery Corporation Sdn Bhd Profile
Zairi Zainudin
 
e. mahmoud gaber c.v 8-2015
e. mahmoud gaber c.v 8-2015e. mahmoud gaber c.v 8-2015
e. mahmoud gaber c.v 8-2015
mahmoud gaber
 
CV Updated 8-10-16
CV Updated 8-10-16CV Updated 8-10-16
CV Updated 8-10-16
SHYAM NIKESH
 

Similar to Hassby's CV 2015 (20)

Resume - MOHD YUNUS BIN MOHD NAFI
Resume - MOHD YUNUS BIN MOHD NAFIResume - MOHD YUNUS BIN MOHD NAFI
Resume - MOHD YUNUS BIN MOHD NAFI
 
CV Latest Rosdi PL381
CV Latest Rosdi PL381CV Latest Rosdi PL381
CV Latest Rosdi PL381
 
CV Mohd Haffiz latest 2016
CV Mohd Haffiz latest 2016CV Mohd Haffiz latest 2016
CV Mohd Haffiz latest 2016
 
CV Inesh
CV IneshCV Inesh
CV Inesh
 
Zuraidi Resume update 2016
Zuraidi Resume update 2016Zuraidi Resume update 2016
Zuraidi Resume update 2016
 
Amjad Hussain Ansari
Amjad Hussain AnsariAmjad Hussain Ansari
Amjad Hussain Ansari
 
MyResume[2015]Latest
MyResume[2015]LatestMyResume[2015]Latest
MyResume[2015]Latest
 
ALVIN'S CURRICULUM VITAE 2017
ALVIN'S CURRICULUM VITAE 2017ALVIN'S CURRICULUM VITAE 2017
ALVIN'S CURRICULUM VITAE 2017
 
Update profile 2015
Update profile 2015Update profile 2015
Update profile 2015
 
MCV
MCVMCV
MCV
 
Hanif cv 2015 Project engineer (electrical)
Hanif cv 2015   Project engineer (electrical)Hanif cv 2015   Project engineer (electrical)
Hanif cv 2015 Project engineer (electrical)
 
updated CVlarrybisa
updated CVlarrybisaupdated CVlarrybisa
updated CVlarrybisa
 
Manoj resume
Manoj resumeManoj resume
Manoj resume
 
RAMASAMY NACE CP LEVEL II ENGINEER
RAMASAMY NACE CP LEVEL II ENGINEERRAMASAMY NACE CP LEVEL II ENGINEER
RAMASAMY NACE CP LEVEL II ENGINEER
 
Sinbery Corporation Sdn Bhd Profile
Sinbery Corporation Sdn Bhd ProfileSinbery Corporation Sdn Bhd Profile
Sinbery Corporation Sdn Bhd Profile
 
e. mahmoud gaber c.v 8-2015
e. mahmoud gaber c.v 8-2015e. mahmoud gaber c.v 8-2015
e. mahmoud gaber c.v 8-2015
 
New CV of VRB
New CV of VRBNew CV of VRB
New CV of VRB
 
Hafizan VSI Format CV
Hafizan VSI Format CVHafizan VSI Format CV
Hafizan VSI Format CV
 
NACE CP LEVEL II ENGINEER
NACE CP LEVEL II ENGINEERNACE CP LEVEL II ENGINEER
NACE CP LEVEL II ENGINEER
 
CV Updated 8-10-16
CV Updated 8-10-16CV Updated 8-10-16
CV Updated 8-10-16
 

Hassby's CV 2015

  • 1. CURRICULUM VITAE PERSONAL PARTICULARS Name MOHD HASSBY BIN MOHD SIDEK Nationality MALAYSIAN NRIC 820211-11-5283 Address 173B KG LAK LOK 22000, JERTEH BESUT TERENGGANU, MALAYSIA Status MARRIED Spouse Address BLOK B NO.4, TINGKAT 2, FLAT SEKOLAH RENDAH DELIMA 1, JLN MANGGIS 1, BB4713 , BRUNEI DARUSSALAM Contact Mobile : +60109180782 ( Malaysia) Email : mohasbi_82@yahoo.com
  • 2. Current Employment CATHODIC PROTECTION SUPERVISOR AT PETRONAS PENAPISAM MELAKA Previous Employment(2008-2015) SENIOR PROJECT COORDINATOR AT MACH3 ENGINEERING SDN BHD- Based In Brunei. Certificate 1) NACE CP LEVEL 2 CATHODIC PROTECTION TECHNICIAN # 25066 2) NACE CP LEVEL 1 CATHODIC PROTECTION TESTER # 25066 3) CORROSION TECHNICIAN 4) BASIC CORROSION 5) BOSIET / OPITO Education DIPLOMA OF ENGINEERING (MECHANICAL) UTMKL WORKING EXPERIENCES & PROJECT INVOLVED ( From 2008 till Present) Power Plant Industry Project: 1. Kapar Energy Venture - Sultan Salahuddin Abdul Aziz Power Station (Selangor)  Transformer rectifier trouble shooting  Install Pt-Ti anode for steel pile (Impressed Current Cathodic Protection System)  MMO anode fabrication and assembly  Maintenance job for Cathodic Protection System
  • 3. 2. Taisei Corporation – Jimah Power Plant (Negeri Sembilan)  Installation supervision for Denso Seashield 2000FD & 100 HDPE jackets for West Mooring Dolphin Steel Piles  Conducted ICCP system maintenance procedure training for Jimah Power Plant personnel 3. Prai Power Station – CP System  Design, fabrication and supply Cathodic Protection zinc reference electrode spare part and mixed metal oxide anode 4. West Mooring Dolphin at 2 x 700MW Coal-Fired Power Plant, Jimah, Negeri Sembilan (Client : Shriro (Malaysia) Sdn Bhd)  Installation supervision of 2000FD SeaShield Jacket onto steel piles  QA/QC & Preparation of reports 5. Panglima CCGT Power Plant – Cathodic Protection System Inspection (Client: Powertek Berhad)  Cathodic Protection system inspection during shutdown/turnaround period  Transformer rectifier unit check, anodes efficiency & visual check, junction box junction box check & pipeline potential check  Internal surface corrosion check on condenser water box, cooling water intake/outlet pipeline & drum screen  Project management, planning, scheduling & coordination  QA/QC & preparation of comprehensive inspection reports
  • 4. Oil & Gas Industry Project: 1. White Nile Petroleum Operating Company (WNPOC), SUDAN  Surveyor for Cathodic protection system audit survey- Well heads, trunkline and export pipeline from Tar Jath to Sudan Port  QA/QC & Preparation of documentation 2. PS Pipeline, Maintenance Services of Cathodic Protection System from MRPP to KVDT  Surveyor for Impressed Current Cathodic Protection System including DCGV, CIPS and maintenance survey.  Project Management, Planning, and Scheduling  QA/QC & Preparation of documentation  Revamps of non-functioning System 3. Petronas Carigali Sdn Bhd – Onshore Gas Terminal Plant, CP System  Surveyor for Cathodic Protection Evaluation, Maintenance & Audit of CP System  Engineering design, documentation & QA/QC document preparation 4. TCOT / OSC Cathodic Protection System  Surveyor for Cathodic Protection Evaluation, Maintenance & Audit of CP System  Engineering design, documentation & QA/QC document preparation  TRU check, anode groundbed check, potential survey, insulating flange check for Terengganu Crude Oil Terminal Plant and Onshore Slug catcher. 5. Petronas Carigali Sdn Bhd- Miri Crude Oil Terminal
  • 5.  Surveyor to carry out Cathodic Protection System-TRU check and troubleshooting. 6. Petrofac E&C Sdn Bhd- Mobile offshore Production unit (MOPU) SEPAT  ICCP system installation for conductors  Engineering design, documentation & QA/QC document preparation 7. TOTAL E&P Brunei BV  Cathodic protection system audit survey- 6” Condensate pipeline to SCOT, OPP underground utilities (tank, fire hydrant pipelines )  Surveyor - DCVG for 6” condensate line.  AC interference datalogging  Final report & QA/QC document preparation 8. Petrofac E&C Sdn Bhd- Mobile offshore Production unit (MOPU) WEST DESARU  ICCP system installation and commissioning for rig leg.  Engineering design, documentation & QA/QC document preparation 9. TOTAL E&P Myanmar  Cathodic protection system audit survey- 36” Yadana Onshore Pipeline from KP 25 to KP 50.  Surveyor - DCVG for 36” Yadana Onshore Pipeline from KP25 to KP  Final report & QA/QC document preparation 10. BRUNEI SHELL PETROLEUM  Cathodic protection system audit survey- 30 Nos of pipelines – Emphasize on redbanded pipeline  Surveyor - DCVG & CIPS survey  Final report & QA/QC document preparation 11. PETRONAS PENAPISAN MELAKA  Total Plant Cathodic Protection Rejuvenation  Melaka Refinary TOTAL Plant Shutdown
  • 6. Water & Infrastructure: 1. Bukit Barun to Terunjing New pipeline- Cathodic protection system  Project coordination & execution  Liaison with Owner and client  QA/QC & Preparation of final document  Main focal person at site 2. Bukit Barun Stage 4 & 5, Brunei- Cathodic Protection system  Project coordination & execution  Liaison with Owner and client  QA/QC & Preparation of final document  Main focal person at site 3. Brunei Naval Base, Brunei  Overview of progress, schedule, costing, procurement, coordination and execution  Liaison with project Owner and client  Installation supervision of 2000FD SeaShield & SeaShield 100 Jackets onto steel piles  Supervision of concrete tuner underwater inspection, underwater I-beam cutting, seabed inspection, piles inspection and air-lift of mud at seabed level  Project management, planning, scheduling & coordination  QA/QC & Preparation of final document 4. Cathodic Protection Audit Survey at KLIA GDC Twin Chilled Water Pipelines (Client: GDC KLIA Sdn. Bhd)  Hot spot Cathodic Protection system at SCBC  Isolating flange check of chilled water supply and return line at chamber E6  Project management, planning, scheduling & coordination  QA/QC & Preparation of final document  Surveyor for DCVG and CIPS survey
  • 7. 5. Tanah Jambu, Brunei- Test point relocation work  Project coordination & execution  Liaison with Owner and client  QA/QC & Preparation of final document  Main focal person at site WORKING EXPERIENCES & PROJECT INVOLVED ( From 2003 till 2008) Oct 2002 to Mar 2003 Company: BP Chemical (M) Sdn Bhd Position: Maintenance Technician (Industrial Traning) Activities: waste water treatment area maintenance, utility area maintenance and involve in other maintenance job (pump, gear box, valve) June 2003 to July 2003 Client: Petronas Gas Berhad(GPP3) Position: AWL (Authorised Work Leader) Activities: Unfired pressure Vessel Servicing (Plant Turnaround) Company: GREAT TERMINAL ENGINEERING & SERVICES SDN BHD. Main contractor: TECHNOTEST ENG. SDN BHD Sept 2003-October 2003 Client: BASF Petronas Chemicals Position: supervisor Activities: Unfired pressure Vessel Servicing (plant Turnaround) Company: GREAT TERMINAL ENGINEERING & SERVICES SDN BHD. Main Contractor: GREAT TERMINAL ENGINEERING & SERVICES SDN BHD Nov 2003-December 2003 Client: Cryovac (M) Sdn Bhd
  • 8. Position: Supervisor Activities: Unfired pressure Vessel Servicing (Plant Turnaround) Company: GREAT TERMINAL ENGINEERING & SERVICES SDN BHD. Main Contractor : GREAT TERMINAL ENGINEERING & SERVICES SDN BHD Dec 2003-Jan 2004 Client: Kaneka ( M) Sdn Bhd Position: Site Supervisor Activities: Rotating Machinery activities (Plant Shutdown) Company: GREAT TERMINAL ENGINEERING & SERVICES SDN BHD. Main Contractor: Semambu Engineering Sdn Bhd Jan 2004-Nov 2004 Position: Site Supervisor Activities: Scaffolding erection Company: BAKTICON ENGINEERING SDN BHD Main contractor: WARGA HIKMAT KEJURUTERAAN SDN BHD April 2005 – May 2005 Client: BP Chemical Sdn Bhd Position: Supervisor Activities: installation of stiffener ring for PTA(pure terephthalic acid) Dryer Company: BAKTICON ENGINEERING SDN BHD Main contractor: WARGA HIKMAT KEJURUTERAAN SDN BHD Sept 2005-Nov 2005 Client: BASF PETRONAS CHEMICAL SDN BHD Position: Site Supervisor Activities: OXO debottlenecking for syngas package(installation of Compressor) Company: BAKTICON ENGINEERING SDN BHD Main contractor: WARGA HIKMAT KEJURUTERAAN SDN BHD
  • 9. March 2006-April 2006 Client: BP Chemicals (M) Sdn Bhd Position: Site Supervisor Activities: Baca Rebagging Company: BAKTICON ENGINEERING SDN BHD Main Contractor: BAKTICON ENGINEERING SDN BHD May 2006-August 2006 Client: BP Chemicals (M) Sdn Bhd Position: Site Supervisor Activities: Supply and construction of works and installation of 11kv cables for installation of new transformer(132kV Substation) Company: BAKTICON ENGINEERING SDN BHD Main contractor: RANHILL WORLEY May 2007 – Apr 2008 Client: Jabatan Kerja Raya (JKR Daerah Besut, Terengganu) Position: Site Agent Activities: Membina Dan Menyiapkan Satu Blok Bangunan Dua Tingkat Pusat Aktiviti Perpaduan Daerah Besut, Terengganu. Jun 2008 – Present Position: Senior Project Coordinator Company : Mach3 Engineering Sdn Bhd Nature of bussines: Cathodic Protection System Services May 2015 – Present Position: Cathodic ProtectionSupervisor
  • 10. Company : FIRCROFT TANJUNG SDN BHD Working Place: PETRONAS PENAPISAN MELAKA Current Salary: RM12K EQUIPMENT / TOOLS / DEVICE AND MATERIAL INVOLVED 1) DCVG MACHINE- PCS 200 / DCVG 2) CIPS QUANTUM DATALOGGER 3) DATALOGGER FOR AC / DC INTERFERENCE 4) HOLIDAY DETECTOR 5) RD 8000 PIPE LOCATOR 6) SOIL RESISTANCE METER / SOIL BOX 7) AG/AgCl / CuCuSo4 / Zinc REFERENCE ELECTRODE 8) DENSO COATING 9) PCS COATING 10) YBM DRILLING MACHINE FOR SOIL INVESTIGATION 11) GPS DEVICE 12) PORTABLE TRANSFORMER RECTIFIER UNIT 13) CADWELDING 14) RADIO FREQUENCY INSULATION TESTER 15) MEGGER TESTER 16) MULTIMETER / AC/DC CLAMPMETER 17) CURRENT INTERRUPTER- DCVG , MC MILLER, TINKER & RASOR References
  • 11. 1) Ahmad Shamiri Bin Wahab Technical Manager Mach3 Engineering Sdn Bhd Contact No: +60192251570 2) Calvin Kok Keong Manager ISBN Contact No: +60127085338