STANDARD
INDUSTRI
PEMBINAAN
(CONSTRUCTION INDUSTRY STANDARD)
CIS 10:2020
SAFETY AND HEALTH ASSESSMENT
SYSTEM IN CONSTRUCTION (SHASSIC)
Description: Safety and Health Assessment, Document Check, Workplace Inspection, Employee Interview, Star Ranking
© Copyright
CONSTRUCTION INDUSTRY DEVELOPMENT BOARD
Construction Industry
Development Board Malaysia
LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA
Ibu Pejabat CIDB,
Tingkat 10, Menara Dato’ Onn, Pusat Dagangan Dunia Putra
No 45, Jalan Tun Ismail, 50480 Kuala Lumpur, Malaysia
Tel:603-40477000 Faks:603-40477070
http://www.cidb.gov.my
SIRIM
MS ISO/IEC 17021 : 2011
QS 02121999 CB 01
ACCREDITED CERTIFICATION BODY
MALAYSIA
QUALITY
SYSTEM
074
MANAGEMENT
SYSTEMS
U K A S
QUALITY
SYSTEM
SIRIM
OH&S
SYSTEM
SIRIM
OH&S
SYSTEM
SIRIM
Hasnizam Md Saad
SAFETY AND HEALTH ASSESSMENT SYSTEM
IN CONSTRUCTION
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!"#$%&'$(&(&!#)*+,-$)./$0+)1,2$344+445+.,$#-4,+5$6.$!7.4,89:,67.$
!
;$!7.4,89:,67.$"./94,8-$<+=+17>5+.,$?7)8/$@)1)-46)$(&(&$
$
$
!
$
311$+.A9686+4$8+B)8/6.B$,264$C77D$42791/$C+$*78E)8/+/$,7'$
!
!26+*$FG+:9,6=+$
!7.4,89:,67.$"./94,8-$<+=+17>5+.,$?7)8/$@)1)-46)$
H+=+1$%&I$@+.)8)$<),7J$K..I$
L94),$<)B).B).$<9.6)$L9,8)$
M7$NOI$P)1).$Q9.$"45)61I$
O&NR&$S9)1)$H95>98I$
@)1)-46)T$
!
Q+1$'$U&VWN&NX$X&&&$
Y)G$'$U&VWN&NX$X&X&$
F5)61$'$4,)./)8/Z:6/CTB7=T5-$
[+C46,+$'$EEET:6/CTB7=T5-$
!
M7$>)8,$7*$,264$>9C16:),67.$5)-$C+$8+>87/9:+/$78$,8).456,,+/$6.$).-$*785$78$C-$).-$5+).4I$E2+,2+8$
5+:2).6:)1$78$+1+:,87.6:$6.:19/6.B$>27,7:7>-6.B$)./$8+:78/6.B$E6,279,$,2+$E86,,+.$:7.4+.,$7*$!"<?T$
L+8>94,)D)).$M+B)8)$@)1)-46)$!),)17B96.BW6.WL9C16:),67.$<),)$
"#?M$
!
TABLE OF CONTENTS
Committee Representation .........................................................................................................
Preface .......................................................................................................................................
SECTION 1: GENERAL
Introduction ..................................................................................................................................
Objective of SHASSIC .................................................................................................................
Scope of SHASSIC .....................................................................................................................
Use of SHASSIC .........................................................................................................................
Normative References ..................................................................................................................
Terms and Definitions ..................................................................................................................
Elements .....................................................................................................................................
Assessor ......................................................................................................................................
SECTION 2: ASSESSMENT
Assessment Approach .................................................................................................................
Weightage ...................................................................................................................................
Formula / Score ...........................................................................................................................
Star Ranking ................................................................................................................................
ANNEXES
A. Document Check .............................................................................................................
B. Workplace Inspection .....................................................................................................
C. Personnel Interview ........................................................................................................
SECTION 3: SHASSIC ASSESSOR GUIDE
ANNEXES
D. Document Check - Assessor Guide ................................................................................
E. Workplace Inspection - Assessor Guide .........................................................................
F. Personnel Interview - Assessor Guide ............................................................................
ACKNOWLEDGEMENT …………………………………………………………….…...........….…....
v
vi
1
1
1
2
2
3
5
6
6
7
7
8
9
13
16
22
31
34
38
LIST OF TABLES
Table 1: Priority / Hierarchy of High Risk ....................................................................................
Table 2: The Weightage for Safety and Health Performance ....................................................
Table 3: SHASSIC Formula / Score for Document Check, Workplace Inspection and
Personnel Interview .....................................................................................................
Table 4: SHASSIC Star Ranking Description .............................................................................
6
7
7
8
!
"!
!"00(%%,,)&,/&,$,#%2%("#)
)
Q264$!7.4,89:,67.$"./94,8-$#,)./)8/$c!"#d$E)4$/+=+17>+/$)./$8+=6+E+/$C-$,2+$!7.4,89:,67.$"./94,8-$
<+=+17>5+.,$?7)8/$@)1)-46)$E6,2$,2+$)4464,).:+$7*$,2+$Q+:2.6:)1$!7556,,++$7.$K::9>),67.)1$#)*+,-$
)./$0+)1,2$6.$!7.4,89:,67.$E26:2$:75>864+4$8+>8+4+.,),6=+4$*875$,2+$*7117E6.B$78B).64),67.4'$
$
3447:6),67.$7*$!7.491,6.B$F.B6.++84$@)1)-46)$c3!F@d$
!7.4,89:,67.$+4+)8:2$".4,6,9,+$7*$@)1)-46)$c!F3@d$$
<+>)8,5+.,$7*$K::9>),67.)1$#)*+,-$)./$0+)1,2$@)1)-46)$c<K#0d$
"K"$L87>+8,6+4$a879>$?+82)/$
P)C),).$S+8])$)-)$cPSd$
@)4,+8$?961/+84$3447:6),67.$@)1)-46)$c@?3@d$
@)1)-46).$K::9>),67.)1$#)*+,-$)./$0+)1,2$L8):,6,67.+84$c@K#0L3d$$
@)1)-46).$#7:6+,-$*78$K::9>),67.)1$#)*+,-$e$0+)1,2$c@#K#0d$$
L+8,9C92).$38D6,+D$@)1)-46)$cL3@d$
+)1$F4,),+$e$07946.B$<+=+17>+84J$3447:6),67.$cF0<3d$$
QKSH3M$K#0$#+8=6:+4$$
^.6=+846,6$@)1)-)$c^@d$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
!
!"
v
PREFACE
Safety and Health Assessment System in Construction Industry, or better known as SHASSIC, was first
introduced in 2008 as Construction Industry Standard (CIS 10:2008). This standard was revised 10
years later in 2018 in considering latest development in occupational safety and health practices and
changes made to relevant Regulations. This 2nd revision now focused on additional high risk activities
and to allow for SHASSIC Assessor to determine high risk activities if there are none based on the
proposed hierarchy of high risk activities. Changes were also made to simplify the formulas for
document check, workplace inspection and personnel interview to align with the SHASSIC portal and
towards real time assessment and report generation. The revision was carried out by a Technical
Committee formed by CIDB. The members of the Technical committee were represented by the industry
stakeholders.
It should be noted that compliance with this Construction Industry Standard does not of itself confer
immunity from legal obligations.
vi
vi
vi
References were made to several documents generally used by industry players in managing
construction safety and health, as listed in Section 1 of the CIS 10:2020. This revised version of
SHASSIC document is expected will provide clearer guidance to assessors and contractors in
assessing their safety and health performance at construction sites.
1
SAFETY AND HEALTH ASSESSMENT SYSTEM IN CONSTRUCTION
SECTION 1: GENERAL
1.1 Introduction
Safety and Health Assessment System in Construction, or SHASSIC, is an independent method to
assess and evaluate the safety and health performance of a contractor in construction works / projects.
The assessment shall cover 25% to 75% of a project’s physical progress and shall be inclusive of
construction planning stage and construction stage.
1.2 Objectives of SHASSIC
SHASSIC was designed and developed to enable the user to achieve any, or a combination, of the
following objectives:
i) To establish a standard system on occupational safety and health assessment in the
construction industry
ii) To assess and evaluate the contractor’s occupational safety and health performance-based a
particular project
iii) To evaluate the performance of contractor(s) on the occupational safety and health practices
at the site
iv) As a feedback mechanism to improve and to take necessary corrective and preventive action
on occupational safety and health performance and management at the site
v) To benchmark the level of occupational safety and health performance of the Malaysian
construction industry.
1.3 Scope of SHASSIC
This standard sets out the safety and health management and practices of the contractor for various
aspects of the construction work activities.
Each phase is assessed through three (3) main components of assessment such as document check,
workplace inspection and construction personnel interviews. The components encompass:
i) OSH policy
ii) Leadership and worker participation
iii) Planning, Support, Operation
iv) OSH organization
v) Hazard Identification, Risk Assessment and Control Measures determination
vi) OSH training and promotion
vii) Machinery and equipment management
viii) Materials management
ix) Emergency preparedness
x) Incident and accident investigation and reporting
1
Hasnizam Md Saad
2
xi) Records management and performance monitoring, etc.
1.4 Use of SHASSIC
SHASSIC is intended to assess the OSH performance of a project. Preferably, the assessment shall be
carried out when there are different types of activity that are ongoing at the same time (concurrent
activities) and many workers of different levels (main contractor, main subcontractor and subcontractor)
are involved at the site.
It is not intended to be used independently to decide if the project site or parts of the project site are in
accordance with the requirement of the relevant Acts and Regulations or OSH Management System. It
is the responsibility of all parties involved directly in a project site to ensure that safety and health of the
construction site conform to the legislation's requirement, approved standards, code of practice,
guidelines, specifications and contractual requirements.
1.5 Normative References
The following normative reference is indispensable for the application of this construction industry
standard. For dated reference, only the edition cited applies. For undated references, the latest editions
of the normative references (including any amendments) apply.
2
Application shall cover OSH Management System and practices during construction work activities,
particularly work activities covered under CIDB Act 1994.
Hasn
i) CIS10:2018 (Safety and Health Assessment System in Construction, SHASSIC).
ii) Lembaga Pembangunan Industri Pembinaan Malaysia Act 1994 (Act 520).
iii) Occupational Safety and Health Act (OSHA) 1994 (Act 514).
iv) Occupational Safety and Health (Use and Standards of Exposure of Chemicals Hazardous to
Health [USECHH]) Regulations 2000.
v) Occupational Safety and Health (Safety and Health Committee [SHC]) Regulations 1996.
vi) Occupational Safety and Health (Classification, Labelling and Safety Data Sheet of Hazardous
Chemicals [CLASS]) Regulations 2013.
vii) Occupational Safety and Health (Notification of Accident, Dangerous Occurrence,
Occupational Poisoning and Occupational Disease [NADOPOD]) Regulations 2004.
viii) Department of Occupational Safety and Health (DOSH) - Guidelines for Public Safety and
Health at Construction Site 1994.
ix) Factories and Machinery Act (FMA), 1967 (Act 139).
x) Factories and Machinery (Building Operations and Works of Engineering Construction
[BOWEC]) (Safety) Regulations 1986.
xi) Factories and Machinery (Safety, Health and Welfare [SHW]) Regulations 1970.
xii) Factories and Machinery (Notification, Certificate of Fitness and Inspection [NCFAI]) Regulations,
1970.
xiii) Occupational Health and Safety Management System, ISO 45001:2018.
xiv) Uniform Building by Law (UBBL) 1984.
xv) Registration of Engineers Act (REA) 1967 amended in 2015.
3
1.6 Terms and Definitions
For the purpose of this standard, the following definitions apply.
2. Construction Stage
Construction stage is the start of physical construction work at the site, which takes place after site
mobilisation.
3. Designated Person
4. Document(s)
For the purpose of SHASSIC, document(s) refer to:
 Communication of information
 Evidence of conformity
 Knowledge sharing
 To disseminate and preserve the organisation’s experiences
The medium can be paper, magnetic, electronic, photograph or master sample, or a combination.
5. DOSH
Department of Occupational Safety and Health or also known as Jabatan Keselamatan dan
Kesihatan Pekerjaan (JKKP), an agency under the Ministry of Human Resources, Malaysia
6. Emergency Response and Preparedness (ERP) Facilities
ERP Facilities or provision which includes any emergency preparedness, which include First Aid
provision, firefighting provision, and incident and/or accident reporting provision.
7. Hazard
Hazard means source with a potential to cause injury and ill health; hazard can include sources with
the potential to cause harm or hazardous situations or circumstances with the potential for exposure
leading to injury and ill health.
8. Hazardous Activities
Hazardous activities are considered the situations or activities that have high potential risk that can
cause injury, dead or serious damage to properties such as working at height, lifting exercises, works
associated with temporary works, working at confine area and etc.
9. Hazard Identification
The identification of undesired events that lead to the materialisation of the hazard and the
mechanism by which those undesired events could occur.
10.Hazard Identification, Risk Assessment, and Risk Control (HIRARC) or Hazard Identification,
Risk Assessment and Determining Controls (HIRADC)
A risk management process associated with identifying hazard(s) which may cause harm, assessing
the risk, putting in place control measures and reviewing the outcomes through risk monitoring.
11.Health
The state of being free from illness or injury.
12.High-risk Activities
Activities determined by the SHASSIC assessor as potential and/or high risk towards the safety
and health of workers.
3
1. Approved Professional Engineer (PE) Design
An approved PE design is the design submitted by Professional Engineer with Practicing Certificate
(PEPC) as per Registration of Engineers Act (REA) 1967 amended in 2015.
“Designated person” as defined in Factories and Machinery (Building Operations and Works of
Engineering Construction [BOWEC]) (Safety) Regulations 1986 refers to a competent person
appointed by an employer to carry out any supervision, or inspection, or to perform any task or duty
prescribed by FM [BOWEC] (Safety) Regulations 1986.
4
13.Illumination
14.Managerial Personnel
For the purpose of SHASSIC, managerial personnel are those in the managerial position of the
construction process at the construction site such as Project Manager, Construction Manager, Site
Agent and Project Engineer.
15.Occupational Health and Safety (OH&S) or Occupational Safety and Health (OSH)
For the purpose of SHASSIC, the terms “occupational health and safety” (OH&S) and “occupational
safety and health” (OSH) have the same meaning.
Overall intentions and direction of an organisation related to its OSH performance as formally
expressed by top management.
17.Permit to Work (PTW)
A documented permission derived by the company to meet its specific OSH needs. It aims to ensure
proper OSH planning and consideration is given to a particular work.
18.Personal Protective Equipment (PPE)
Personal Protective Equipment or Personal Protective Clothing and Appliances (as defined in FMA
1967) provision and maintenance are mandatory to be provided for workers who are exposed to
injurious substances which are liable to cause bodily injury. PPE shall include the following (but not
limited to) (FMA 1967, Section 24):
i) Safety hard hat/safety helmet
ii) Safety footwear
iii) Hand protection/hand gloves
iv) Eye protection such as safety glasses or goggles
v) Fall arresters
vi) Self-contained breathing apparatus (SCBA)
vii) Face shield
viii) Hearing protection (e.g. ear plugs, ear muffs)
ix) Protective clothing (especially for chemical hazards)
x) Respirator
xi) Dust mask
xii) Safety vest
19.Record
Document stating results achieved or providing evidence of activities performed.
20.Risk
A combination of the likelihood of an occurrence of a hazardous event with specified period or in
specified circumstances and the severity of injury or damage to the health of people, property,
environment or any combination of these caused by the event.
21.Safe System of Work
A safe system of work is a formal procedure which results from the systematic examination of a task
in order to identify all hazards. It defines safe methods to ensure that hazards are eliminated or risks
minimized.
22.Safe Work Procedure (SWP) or Safe Work Instruction (SWI) or Safe Operating Procedure (SOP)
SWP or SWI or SOP is a risk management tools / a working risk control document developed to
describe the safest and most efficient way to perform certain work. The document is used as a guide
when completing the work at site.
4
Provisions are made to secure and maintain sufficient and suitable lighting, whether
natural or artificial, at the work vicinity, in accordance to FMA 1967, Section 22 / FM [SHW]
Regulations 1970, Regulation 29.
16.Project OSH Policy
5
5
23.Safety
The condition of being protected from or unlikely to cause danger, risks or injury.
25.Safety and Health Officer (SHO)
26.SHASSIC
SHASSIC is the acronym for Safety and Health Assessment System in Construction.
27.Site Safety Supervisors (SSS)
28.Supervisory
For the purpose of SHASSIC, supervisory personnel includes representatives from main contractors,
subcontractors and Designated Person (DP).
29.Welfare
A statutory procedure designed to promote the basic physical and material well-being of workers in
need.
30.Working at Height
For the purpose of SHASSIC, working at height means work in any place where, if there were no
precautions in place, a person could fall from the distance of 2 meters.
31.Working Personnel / Workers
For the purpose of SHASSIC, workers or working personnel are the people carrying out work at site.
It can be divided into skilled and non-skilled workers. Skilled workers mean a person possessing the
accepted level of skill as determined by CIDB. From the total number of nine (9) workers, the
recommended skilled and unskilled workers are three (3) from each of high-risk work activities.
32.Workplace / Working Space
Any physical location in which work-related activities are performed under the construction contract.
33.Work Amenities
Facilities provided for the welfare or personal hygiene need of employees. They include toilets,
restrooms, shelter sheds, seating, dining rooms, change rooms, drinking water, lockers, first-aid box,
first-aid room and washing facilities.
34.Work of Construction Activities
1.7 Elements
As defined in the latest Construction Industry Development Board Act 1994 (Act 520).
35.Ventilation
Natural or mechanical, adequate ventilation must be provided by circulation of fresh air and rendering
harmless gasses, fumes, dust or other impurities that may affect health in the course of work
conducted (FMA 1967, Section 22 / FM [SHW] Regulations 1970, Regulation 25).
The assessment element was derived from Malaysia’s legal requirement such as CIDB Act 1994, OSHA
1994 and its regulations, FMA 1967 and its regulations, code of practices, standard, OSH Management
System, ISO 45001:2018, guidelines and other requirements.
24.Safety and Health Committee (SHC)
Safety and Health Committee established under Section 30 in OSHA 1994, which consist of a chairman,
a secretary, representatives of the employer and representatives of employees. The chairman
shall be an employer or his authorized manager and the secretary shall be the person who is
employed as the safety and health officer at the place of work.
A person who is registered as Safety and Health Officer with DOSH in pursuant to Section 29 (3) in
OSHA 1994 (Act 520).
A person who is competent to perform the duties specified in Regulations 25 of Factories and
Machinery (Building Operations and Works of Engineering Construction [BOWEC]) (Safety)
Regulations 1986.
6
6
1.8 Assessor
An assessor shall be the person who is appointed and possesses qualifications as described below:
i. A person who has attended a one-day SHASSIC course and passed the examination and have
a minimum of 5 years’ experience in the construction industry, or
ii. A person who has attended a one-day SHASSIC course and certified as OSH Lead Auditor with
a minimum of 3 years’ experience in the construction industry (construction project site), or
iii. SHO or SSS who have valid registration with DOSH and CIDB.
SECTION 2: ASSESSMENT
2.1 Assessment Approach
The assessment shall be carried out in 3 (three) different approaches:
i) Document Check
Checking of OSH-related documents and records will enable the assessor to determine the
compliances of the establishment of safety and health programs and activities as listed in Annex
A.
ii) Workplace Inspection
Workplace inspection shall be conducted in order to assess the OSH implementation at the site.
There are 30 items identified for workplace inspection for this component and they are listed in
Annex B. Workplace inspection shall be carried for three (3) high risk activities and the priority
/ hierarchy of the high risk activities shall follow the following order:
Table 1: Priority / Hierarchy of High Risk
Workplace inspection checklist/assessment shall provide the assessor with the valuable visual
comparison evidence on the OSH programs implemented, enforced and practiced at
site/workplace.
1 Working at height
2 Mechanical Lifting
3 Works involving Temporary Structure and Falseworks,
such as concreting works, fixing of building façade, etc
4 Earthworks excavation exceeding two (2) meters in
depth
5 Construction works nearby or adjacent to traffic
movements
6 Working at Confined Space
7 Demolition works above 10 meters in height
8 Any other high risk activities as identified by SHASSIC
Assessor
HIGHEST
PRIORITY
Note: SHASSIC Assessor shall carry out workplace inspection in accordance to the hierarchy of high
risk activities as shown above. The assessor may also discuss with the contractor prior to selection
these high risk activities during the assessment.
HIGHEST
PRIORITY
Working at height
Mechanical Lifting
Works involving Temporary Structure and Falseworks,
such as concreting works, fixing of building façade, etc
Earthworks excavation exceeding two (2) meters in depth
Construction works nearby or adjacent to traffic movements
Working at Confined Space
Demolition works above 10 meters in height
Any other high risk activities as identified by SHASSIC Assessor
1
2
3
4
5
6
7
8
7
7
iii) Personnel Interview
Construction personnel shall be randomly selected from all levels of occupation so that they could
be interviewed by the assessor using the standard questionnaires developed in this document.
The Construction personnel are divided into three (3) categories as follows:
 Category A - One (1) managerial personnel either Project Director, Project Manager,
Construction Manager, Site Agent, Project Engineer or Quantity Surveyor.
 Category B - Three (3) supervisory personnel (Site Supervisor, Designated Person (DP),
OSH committee members and/or a combination of both, Safety and Health Officer (SHO)
and Site Safety Supervisor (SSS).
 Category C - Nine (9) employees from working personnel - preferably three people from
each high-risk construction work activities.
2.2 Weightage
The weightage for safety and health performance are allocated in accordance to three (3) components, as
shown in Table 1.
Table 2: The Weightage for Safety and Health Performance
The weightage system is aimed at making the quantified score in representing the occupational safety and
health performance of a project site.
2.3 Formula / Score
The formulas for respective components are as follows:
Table 3: SHASSIC Formula / Score for Document Check,
Workplace Inspection and Personnel Interview
where,
C - total number of Compliance
NC - total number of Non-compliance
NA - total number of items that are Not Applicable
The total SHASSIC score in Document Check (A) plus (+) total SHASSIC score in Workplace
Inspection (B) plus (+) total score in Personnel Interview (C) components shall justify the star
ranking. The stars awarded ranges from 1 star to 5 stars, as per Table 5. However, should the
contractor fail to meet the minimum conformance level, the project may be given a certificate of
participation.
NO. COMPONENTS WEIGHTAGE (%)
1 Document Check 20
2 Workplace Inspection 60
3 Personnel Interview 20
COMPONENT FORMULA
Document Check
Total Number C Scored
(57 – Number of NA)
x 20%
Workplace Inspection
Total Number C Scored
(72 – Number of NA)
x 60%
Personnel Interview
Total Number C Scored
(186– Number of NA)
x 20%
8
8
2.4 SHASSIC Star Ranking Description
Table 4: SHASSIC Star Ranking Description
TOTAL SHASSIC
(SCORE %)
STAR(S) AWARDED DESCRIPTION
90 to 100
Excellent OSH management system
planned and implemented with proactive
commitment from top management to
manage OSH at all times
80 to 89.9
Very good OSH management system
planned and implemented with evidence
of good commitment from top
management to manage OSH at all time
70 to 79.9
Good OSH management system
planned and need commitment from top
management but need improvement in
system implementation
60 to 69.9
Satisfactory OSH management with
minimum plan and implementation, and
need commitment from top management
50 to 59.9
Basic OSH management system with
basic plan and implementation and
required commitment from top
management
49 and below Certificate of Participation
ONLY
Fail to meet the minimum requirement
and poor in OSH performance and
management.
Note : CIDB may award CCD point for the projects scored with star rankings
9
9
ANNEX A
DOCUMENT CHECK
ITEM CHECKLIST C NC NA REMARKS
A
PROJECT OSH POLICY
(NOTE: Project OSH Policy is only applicable to organisations with more than five (5)
employees)
1
Whether there is a written Project OSH Policy
Statement?
2
Has the SHC conducted a review to ensure
suitability of Project OSH Policy Statement?
3
Whether Project OSH Policy Statement was written
in Bahasa Malaysia?
4
Whether Project OSH Policy Statement was written
in English?
5
Whether Project OSH Policy is signed by the top
management?
6 Whether the Project OSH Policy is dated?
7
Whether there is any evidences Project OSH
Policy being communicated to workers?
B HIRARC
1 Are there documented HIRARC?
2 Whether HIRARC has been reviewed and updated?
C DETERMINATION OF LEGAL REQUIREMENTS AND OTHER REQUIREMENTS
1
Are there documented legal requirements and other
requirements Action Plan?
2
Is there a Legal Compliance Checklist & updated
accordingly?
3 Is there a valid CIDB Registration Certificate?
4
Whether construction personnel registered with
CIDB and holding a valid CIDB’s Personnel
Registration Card?
D OCCUPATIONAL HEALTH & SAFETY OBJECTIVES
1
Whether OH&S objectives evaluated from time
to time?
2
OH&S objectives are integrated in other work
activities or procurement process?
TOTAL SCORE
9
5 Whether project site registered with DOSH?
Hasnizam Md Saad
10
10
ITEM CHECKLIST C NC NA REMARKS
E OH&S ROLES AND RESPONSIBILITIES
1
Whether the roles and responsibilities of all project’s
personnel documented?
2
Whether the roles and responsibilities of all
project’s personnel communicated to them?
3
Whether the project SHC is established in
4 Whether there is SSS appointed on site?
5
Designated Persons (DP) are assigned for
respective BOWEC work activities.
6
There is a SHO employed for the project, which the
contract sum is RM20 million and above.
F COMPETENCE TRAINING AND AWARENESS
1
There is appropriate documented information on
employee’s competency.
2 There is OSH Induction Training conducted.
3
Necessary competency and training required for
employees have been identified.
4
There is Competence, Training and Awareness
Action Plan.
5
Requirement on Competency, Training and
Awareness is made known to employees.
G COMMUNICATION, PARTICIPATION AND CONSULTATION
1
There is proof of communication related to OH&S
Management System.
2
There is proof of workers’ participation and
consultation.
3
Safety and Health Committee is established and
meeting conducted on monthly basis.
4
Safety and Health Committee is involved for
improvement of the OH&S Management
System.
ANNEX A (continued)
DOCUMENT CHECK
10
accordance with OSH [SHC] Regulations 1996?
Hasnizam Md Saad
11
$$"
$
%))"6'%'@ABCDECFGHI'
,21*#").'18"19'
+."#' 18"19!+-.' 1' )1' )%' /"#%/9-'
8' D.8<VG>CGD!$>L.AV7C$.>!
%$
Q2+8+$ 64$ )$ E86,,+.$ /68+:,6=+$ *78$ :8+),6.B$ )./$
9>/),6.B$/7:95+.,+/$6.*785),67.T$
$ $ $ $
($
Q2+8+$ 64$ )$ 8+B64,+8$ _$ 17B$ *78$ )11$ )=)61)C1+$ K0e#$
@).)B+5+.,$#-4,+5T$
$ $ $ $
V$
Q2+8+$ 64$ 3:,67.$ L1).$ *78$ 4,78)B+I$ >87,+:,67.I$
8+,86+=)1I$8+,+.,67.$)./$/64>74)1$7*$8+:78/4T$
$ $ $ $
+' .EGA7C$.>7_!E_7>>$>b!7>D!8.>CA._!
%$
Q2+8+$)8+$/7:95+.,$7.$2)g)8/$+1656.),67.$)./$864D$
8+/9:,67.$946.B$06+8)8:2-$7*$!7.,871T$
$ $ $ $
($
Q2+8+$)8+$#[L$78$#["$78$#KL$*78$ ,28++$cVd$26B2W
864D$E78D$):,6=6,6+4T$
$ $ $ $
V$
Q2+8+$ 64$ 3:,67.$ L1).$ 7.$ :7.,87116.B$ ,+5>78)8-$ 78$
>+85).+.,$:2).B+4$7*$E78D$>87:+44+4T$
$ $ $ $
>' GVGAbG>8c!EAGE7AGD>G55!7>D!AG5E.>5G!
%$
Q2+8+$ 64$ /7:95+.,c4d$ 6.$ >7,+.,6)1$ +5+8B+.:-$
46,9),67.$6/+.,6*6:),67.$)./$6.6,6)1$+=)19),67.T$
$ $ $ $
($
Q2+8+$ 64$ )$ >87]+:,$ F5+8B+.:-$ +4>7.4+$ L1).$
/+=+17>+/T$
$ $ $ $
V$
Q2+8+$ 64$ )$ >87]+:,$ F5+8B+.:-$ +4>7.4+$ Q+)5$
+4,)C1642+/$)./$,8)6.+/T$
$ $ $ $
9' EGAL.AV7>8G!VG75<AGVG>C!7>D!V.>$C.A$>b!
%$
Q2+8+$ 64$ ).$ 3:,67.$ L1).$ /+=+17>+/$ ,7$ 57.6,78I$
5+)498+I$ ).)1-4+$ )./$ +=)19),+$ K0e#$
>+8*785).:+T$
$ $ $ $
($
+>78,4$7.$57.6,786.BI$5+)4986.BI$).)1-46.B$)./$
+=)19),6.B$ K0e#$ >+8*785).:+$ )8+$ 8+=6+E+/$ C-$
>87]+:,$,7>$5).)B+5+.,T$
$ $ $ $
V$
Q2+8+$ 64$ ).$ 3:,67.$ L1).$ /+=+17>+/$ ,7$ +=)19),+$
1+B)1$ 8+A968+5+.,4$ )./$ 7,2+8$ 8+A968+5+.,4$
:75>16).:+4T$
$ $ $ $
!' $>8$DG>CR!>.>8.>L.AV$Cc!7>D!8.AAG8C$[G!78C$.>!
%$
Q2+8+$64$).$3:,67.$L1).$*78$8+>78,6.BI$6.=+4,6B),6.B$
)./$ ,)D6.B$ ):,67.$ 8+1),+/$ ,7$ 6.:6/+.,$ )./$
M7.:7.*7856,-$/+,+856.),67.$)./$5).)B6.BT$
$ $ $ $
($ ".:6/+.,$8+:78/$_$17BC77D$_$8+B64,+8$64$+4,)C1642+/T$ $ $ $ $
$$"
Hasnizam Md Saad
12
12
ANNEX A (continued)
DOCUMENT CHECK
ITEM CHECKLIST C NC NA REMARKS
M INTERNAL AUDIT PROGRAMME
1
There is an Action Plan for Internal Audit program
established, implemented and maintained.
2
DOSH Site Visit or Inspection Log Book is
maintained.
3
Audit Report is reported to relevant managers for
their further action.
4
There is action taken to address Nonconformity and
continual improvement of OH&S performance.
N CONSTRUCTION WORK ACTIVITIES
1
2 Site preparation - Safe Work Procedures
3 Certificate of Fitness (PMA)
4 Certificate of Fitness (PMT)
5 Machinery maintenance record
6
Local authorities’ approval to clear bush, remove top
soil or felling of trees
7 Hoarding erection
8 Fogging
TOTAL SCORE
12
Hasnizam Md Saad
Records on temporary structure are checked and
approved prior to use.
(SWP)
13
13
ANNEX B
WORKPLACE INSPECTION
ITEM CHECKLIST C NC NA REMARKS
A SITE OSH MANAGEMENT
1
There is displayed Project Safety OH&S Policy and
communicated to all employees.
2
Project site
site.
3
Are there any OSH Site Rules displayed on project
site?
B MOVEMENT OF VEHICULAR TRAFFIC
1 Whether traffic movement plan developed?
C SIGNAGE AND COLOUR CODE
1 Mandatory Signage in BLUE
2 Prohibition Signage in RED
3 Warning Signage in YELLOW
4 Safe Signage in GREEN
SUB SCORE
13
5 Assembly point with safety signage
Hasnizam Md Saad
DOSH registration number displayed at
14
ANNEX
B
(continued)
WORKPLACE
INSPECTION
(CONSTRUCTION
WORK
ACTIVITIES)
ITEM
CHECKLIST
HIGH
RISK
1
HIGH
RISK
2
HIGH
RISK
3
REMARKS
C
NC
NA
C
NC
NA
C
NC
NA
D
DESIGNATED
PERSON
APPOINTED
1
Competent
and
Trained
Person
E
EQUIPMENT/MACHINERY
1
Approved
2
Certificate
of
Fitness
(PMA
/
PMT)
3
Competent/Trained
Operator
4
Machinery
Guarding/Fencing
5
Trained
rigger
assigned?
F
MATERIAL
1
Material
Handling
Arrangement
2
Material
Storage
Arrangement
3
Safety
Data
Sheet
(SDS)
4
Waste
Material
are
disposed
as
planned
G
WORKING
ENVIRONMENT
1
Safety/Notices
Signage
displayed
2
Permit
to
Work
issued
for
high-risk
activities?
3
Safe
Access
and
Egress
4
Ventilation
5
Fall
protection
against
falling
from
height
(2
meter
and
more)
available
during
construction
activities.
14
Hasnizam Md Saad
PEPC
Designed
15
ANNEX
B
(continued)
WORKPLACE
INSPECTION
(CONSTRUCTION
WORK
ACTIVITIES)
ITEM
CHECKLIST
HIGH
RISK
1
HIGH
RISK
2
HIGH
RISK
3
REMARKS
C
NC
NA
C
NC
NA
C
NC
NA
6
Adequate
Illumination
7
Movement
of
Vehicular
Traffic
is
in
order
8
9
Workers
are
using
appropriate
PPE
10
Standing
supervision
by
SSS
/
DP
for
hazardous
activities
e.g.
working
at
height,
mechanical
lifting
or
etc.
11
Openings
inside
building
are
properly
guarded
and
secured
from
falling
of
objects
/
worker.
SUB
SCORE
TOTAL
SCORE
FOR
WORKPLACE
INSPECTION
=
SUB-SCORE
(A+B+C)
+
SUB-SCORE
(D+E+F+G)
15
Hasnizam Md Saad
Hasnizam Md Saad
Hasnizam
Has
Temporary
structure
are
installed,
fixed
and
constructed
as
per
the
intended
purpose
/
or
as
per
PEPC
design.
16
ANNEX
C
PERSONNEL
INTERVIEW
(CATEGORY
A
-
MANAGERIAL)
ITEM
QUESTIONNAIRE
MANAGEMENT
REMARKS
C
NC
NA
1
Are
prevention
of
work
related
injury
and/or
health
and
the
provision
of
safety
and
health
workplaces
and
activities
are
committed
/
demonstrated
by
top
management?
2
Are
workers
consultation
and
participation
in
OH&S
program
and
activities
assured
by
top
management?
3
Who
are
the
chairman
and
secretary
for
SHC
meeting?
4
There
is
an
organisational
culture
that
supports
the
expected
results
of
the
OH&S
MS?
5
What
do
you
know
about
HIRARC?
6
Have
you
ever
been
involved
in
HIRARC
exercise?
7
What
is
NADOPOD
Regulations
2004?
9
Are
you
personally
involved
in
OH&S
management
review
and
continual
improvement
for
this
project?
SUB
SCORE
16
8
How
is
the
project
OH&S
performance
being
evaluated?
Hasnizam Md Saad
17
ANNEX
C
(continued)
PERSONNEL
INTERVIEW
(CATEGORY
B
-
SUPERVISORY)
ITEM
QUESTIONNAIRE
PERSONNEL
1
PERSONNEL
2
PERSONNEL
3
REMARKS
C
NC
NA
C
NC
NA
C
NC
NA
1
What
do
you
know
about
work
hazard,
risk
evaluation
and
control?
2
When
do
you
review
your
risk
control
measure?
3
How
often
is
the
SHC
meeting
conducted?
5
Have
you
attended
any
related
safety
and
health
training
during
the
project
period?
6
Have
you
attended
any
accident
investigation
training?
7
Are
you
involved
in
the
safety
training
/
promotion
at
the
site?
8
Do
you
check
the
temporary
structures
are
installed
and
fixed
according
to
its
intended
use
or
SUB
SCORE
17
4
Who
is
the
chairman
of
the
committee?
Hasnizam Md Saad
PEPC
design?
18
ANNEX
C
(continued)
PERSONNEL
INTERVIEW
(CATEGORY
C
-
WORKERS)
ITEM
QUESTIONNAIRE
WORKER
1
WORKER
2
WORKER
3
WORKER
4
WORKER
5
REMARKS
C
NC
NA
C
NC
NA
C
NC
NA
C
NC
NA
C
NC
NA
1
Project
OSH
Policy
is
communicated
to
you?
2
Hazard
and
prevention
of
your
work
is
communicated
to
you?
3
Do
you
know
who
is
the
Safety
and
Health
Officer
/
Site
Safety
Supervisor?
4
Have
you
ever
heard
about
workplace
SHC?
5
Do
you
hold
CIDB’s
Personnel
Registration
Card?
6
Have
you
undergone
specific
workplace
induction
course?
7
Have
you
ever
attended
a
toolbox
meeting?
8
Have
you
participated
in
any
Safety
Campaign?
9
Are
you
a
competent
operator
with
valid
license
/
authorised
to
operate
this
machinery
/
equipment
/
vehicle?
10
Is
there
a
safety
checklist
for
you
to
fill
up
prior
to
operating
the
machinery?
11
How
do
you
handle
chemicals
/
hazardous
materials
at
the
site?
18
19
ANNEX
C
(continued)
PERSONNEL
INTERVIEW
(CATEGORY
C
–WORKERS)
ITEM
QUESTIONNAIRE
WORKER
1
WORKER
2
WORKER
3
WORKER
4
WORKER
5
REMARKS
C
NC
NA
C
NC
NA
C
NC
NA
C
NC
NA
C
NC
NA
12
Do
you
know
what
to
do
during
an
emergency/accident?
13
What
would
you
do
if
you
witness
someone
injured?
14
Can
you
show
me
the
assembly
point?
15
Can
you
identify
your
First
Aider?
16
Where
is
the
location
of
the
First-Aid
Box?
17
Where
is
the
nearest
Fire
Extinguisher?
SUB
SCORE
19
Hasnizam Md Saad
20
ANNEX
C
(continued)
PERSONNEL
INTERVIEW
(CATEGORY
C
-
WORKERS)
ITEM
QUESTIONNAIRE
WORKER
6
WORKER
7
WORKER
8
WORKER
9
REMARKS
C
NC
NA
C
NC
NA
C
NC
NA
C
NC
NA
1
Project
OSH
Policy
is
communicated
to
you?
2
Hazard
and
prevention
of
your
work
is
communicated
to
you?
3
Do
you
know
who
is
the
Safety
and
Health
Officer
/
Site
Safety
Supervisor?
4
Have
you
ever
heard
about
workplace
SHC?
5
Do
you
hold
CIDB’s
Personnel
Registration
Card?
6
Have
you
undergone
specific
workplace
induction
course?
7
Have
you
ever
attended
a
toolbox
meeting?
8
Have
you
participated
in
any
Safety
Campaign?
9
Are
you
a
competent
operator
with
valid
license
/
authorised
to
operate
this
machinery/
equipment/vehicle?
10
Is
there
a
safety
checklist
for
you
to
fill
up
prior
to
operating
the
machinery?
11
How
do
you
handle
chemicals
/
hazardous
materials
at
the
site?
20
Hasnizam Md Saad
21
ANNEX
C
(continued)
PERSONNEL
INTERVIEW
(CATEGORY
C
-
WORKERS)
ITEM
QUESTIONNAIRE
WORKER
6
WORKER
7
WORKER
8
WORKER
9
REMARKS
C
NC
NA
C
NC
NA
C
NC
NA
C
NC
NA
12
Do
you
know
what
to
do
during
an
emergency/accident?
13
What
would
you
do
if
you
witness
someone
injured?
14
Can
you
show
me
the
assembly
point?
15
Can
you
identify
your
First
Aider?
16
Where
is
the
location
of
the
First-Aid
Box?
17
Where
is
the
nearest
Fire
Extinguisher?
SUB
SCORE
TOTAL
SCORE
FOR
PERSONNEL
INTERVIEW
=
SUB-SCORE
(MANAGERIAL)
+
SUB-SCORE
(SUPERVISORY)
+
SUB
SCORE
(WORKERS)
21
Hasnizam Md Saad
22
SECTION 3: SHASSIC ASSESSOR GUIDE
ANNEX D
DOCUMENT CHECK - ASSESSOR GUIDE
ITEM CHECKLIST GUIDE
A
PROJECT OSH POLICY
(NOTE: OSH Policy is only applicable to organisations with more than five (5) employees)
1
Whether there is a written Project OSH
Policy Statement?
2
Has the SHC conducted a review to
ensure suitability of Project OSH Policy
Statement?
3
Whether Project OSH Policy Statement
was written in Bahasa Malaysia?
4
Whether Project OSH Policy Statement
was written in English?
5
6
22
To confirm availability of Project OSH Policy
statement during the inspection (OSHA 1994,
Section 16) and Clause 5.2 of ISO 45001:2018
To confirm the policy statement has been
reviewed regularly by SHC and make a
recommendation to the employers in order to
ensure the policy remains relevant and
appropriate (OSH [SHC] Regulations 1996,
Regulation 11 (d))
To confirm availability of policy statement
written in Bahasa Malaysia
(Clause 5.2 of ISO 45001:2018)
To confirm availability of policy statement
written in English
(Clause 5.2 of ISO 45001:2018)
To check the Policy is signed by current PD or
PM or both with name (s) written on it
(Clause 5.2 of ISO 45001:2018)
To check for the date printed on the Project
OSH Policy statement
(Clause 5.2 of ISO 45001:2018)
7
Whether there is any evidences Project
OSH
workers?
To check on documented evidence(s) on
Project OSH Policy being communicated to
workers
(Clause 7.4 of ISO 45001:2018)
Whether Project OSH Policy is signed by
the top management?
Whether the Project OSH Policy is
dated?
Policy being communicated to
23
B HIRARC
1 Are there documented HIRARC?
6.1.4
 Sub-sub-clauses of 6.1.2.1,
6.1.2.2 and 6.1.2.3.
2
Whether HIRARC has been reviewed and
updated?
a) To check the availability of written
action plan and approved by project top
management.
6.1.4
 Sub-sub-clauses of 6.1.2.1,
6.1.2.2 and 6.1.2.3.
23
1
2
a) To check the availability of written action
plan and approved by project top
management
b) Please refer to:
 ISO 45001:2018, Clause of 6.1
 Sub-clauses of 6.1.2, 6.1.3 and
b) Please refer to:
 ISO 45001:2018, Clause of 6.1
 Sub-Clauses of 6.1.2, 6.1.3 and
Hasnizam Md Saad
24
C DETERMINATION OF LEGAL REQUIREMENTS AND OTHER REQUIREMENTS
1
Are there documented legal requirements
and other requirements Action Plan?
To check the availability of legal registers and
legal requirements and other requirements
Action Plan.
Latest amendments of the following should
be updated in the register as minimum:
a. OSHA 1994 (Act 514) inclusive of
Regulations, Orders, Exemptions,
Prohibition and Schedules
b. FMA 1967 (Act 139) inclusive
of Regulations, Orders, Exemptions,
Prohibition and Schedules
c. DOSH, Code of Practice for Road
Transport Activities, 2010
d. DOSH, Industrial Code of Practice for
Safe Working in Confined Space,
2010
e. Factories and Machinery (Person-in-
Charge) (Amendment) Regulations,
2014
f. Exemption of CF for Hoisting Machine
Order 2015
h. Permits, licenses or other forms of
authorization
i. Judgements of courts or
administrative tribunals
j. Treaties, conventions, protocols
k. Collective bargaining agreements
l. The organisation’s requirements
m. Contractual conditions
n. Employment agreements
o. Agreements with interested parties
p. Agreements with health authorities
q. Non-regulatory standards, consensus
standards and guidelines
r. Voluntary principles, codes of
practice, technical specifications,
charters
s. Public commitments of the
organisation or its parent organisation
2
To check whether the respectively accessibility
are reflected in legal requirements and other
requirements action plan
3
Is there a valid CIDB Registration
Certificate?
24
g. CIDB Act 1407 (Amendment) (Act
2011) inclusive of Regulations,
Orders, Exemptions, Prohibition and
Schedules
(ISO 45001:2018, Sub-clause 6.1.3)
(ISO 45001:2018, Sub-clause 6.1.3)
To check whether the main contractor has a
valid license with CIDB (CIDB Act 1994
(Amendment 2011), Section 25)
Is there a Legal Compliance Checklist &
updated accordingly?
Whether construction personnel registered
with CIDB and holding a valid CIDB’s
Personnel Registration Card?
To check whether the main contractor
employees register /list or has a log book on
CIDB's Personnel Registration Card records
and has declared and submit the awarded
contract to CIDB. (CIDB Act 1994
(Amendment 2011), Section 33 (1))
4
25
D OCCUPATIONAL HEALTH & SAFETY OBJECTIVES
1
2
OH&S objectives are integrated in other
work activities or procurement process?
To check the project OH&S objectives reflected
in project OH&S plan and management & work
procedures
25
5 Wether project site registered with DOSH? To check the availability of form JKJ 103
To obtain report and action plan that are
approved by project top management on
evaluation of project OH&S objectives and
relevant plan to achieve them.
(ISO 45001:2018, Sub-clause 6.2.1 and 6.2.2)
Whether OH&S objectives evaluated from
time to time?
26
ANNEX D (continued)
DOCUMENT CHECK
ITEM CHECKLIST GUIDE
E OH&S ROLES AND RESPONSIBILTIES
1 Whether the roles and responsibilities
of all project’s personnel documented?
2 Whether the roles and responsibilities of
all project’s personnel is communicated
to them?
5
Designated Persons (DP) are assigned
for respective BOWEC work activities.
To check in project organisation chart and
appointment letter of respective DP
6
To check in the project’s organisation chart
and record of registration of the respective
Safety & Health Officer with DOSH
F COMPETENCE TRAINING AND AWARENESS
1
There is appropriate documented
information on employee’s competency.
To check competent employees register or log
book or name list.
2
There is OSH Induction Training
conducted.
3
Necessary competency and training
required for employees have been
identified.
To check OSH Training Need Analysis (TNA)
26
(OSHA 1994, Section 15 and 24) and (ISO
45001:2018, Clause 5.3 and 5.4)
To confirm that the OSH responsibilities are
incorporated in either Safety Induction
Minutes, Training Module Minutes, Toolbox
Meeting Minutes or signed-off evidence, etc.
(OSHA 1994, Section 15 and 24) and (ISO
45001:2018, Clause 5.3 and 5.4)
a) To obtain the project organisation chart
b) To confirm with the Committee
Organisation Chart, minutes of meeting
and meeting attendance name list,
appointment letter (OSHA 1994, Section
30) and (OSH [SHC] Regulations 1996)
(ISO 45001:2018, Sub-clause 7.2)
(ISO 45001:2018, Sub-clause 7.2 and OSHA
1994, Section 15 (2)(c))
To verify OH&S duties and responsibilities,
authority and accountability of employees of
all levels as per the personnel in the project’s
organisation chart and spelled in the Project
OH&S Plan or employees’ Job Description
records
4
3 Whether the project SHC is established
in accordance with OSH [SHC]
Regulations 1996?
To check OSH Induction training record
There is a SHO employed for the project,
which the contract sum is RM20 million
and above.
To check in the project's organisation chart
and record of registration of the respective
Site Safety Supervisor with DOSH
Whether there is SSS appointed on site?
(OSHA 1994, Section 15 (2) (c) and
ISO 45001:2018, Sub-clause 7.2 and 8.1.1 (2))
27
4 There is Competence, Training and
Awareness Action Plan.
5 Requirement
and Awareness is made known to
employees.
G COMMUNICATION, PARTICIPATION AND CONSULTATION
1 There is proof of communication related
to OH&S Management System.
To check minutes of meeting, letter, memo
directive, action plan on communication,
consultant and participation of workers related
to OSH MS
2 There is proof of workers’ participation
and consultation.
To check minutes of meeting, letter, memo
directive, action plan on communication,
consultant and participation of workers related
to OSH MS
3 To check, letter, memo, minutes of meeting,
directive by project top management on
establishment of project SHC
4 To check, letter, memo, minutes of meeting,
directive by project top management on
establishment of project SHC
27
To check with Competency, Training and
Awareness Action Plan.
(ISO 45001:2018, Sub-clause 7.2 and OSHA
1994, Section 15 (2)(c))
To check with Induction, Training module,
Letter or memo to employees, instruction or
directive in action plan
(ISO 45001:2018 Sub-clause 7.2 and
OSHA 1994, Section 15 (2) (c))
(ISO 45001:2018, Sub-clause 7.3)
(ISO 45001:2018, Sub-clause 5.4)
(OSHA 1994, Section 30 and OSH [SHC]
Regulations 1996)
(OSHA 1994 Section 30 and OSH [SHC]
Regulations 1996)
on Competency, Training
Safety and Health Committee is
established and meeting conducted on
monthly basis.
Safety and Health Committee is involved
for improvement of the OH&S
Management System.
28
!
'
'% -2&,$#1"#-%!132/$0"!21%
@' $:575'-0'2'97-6651'D-75.6-=5'<+7'.7526-18'
21D' E3D26-18' D+.E;5165D'
-1<+7;26-+1K'
L' $:575' -0' 2' 758-0657' d' ,+8' <+7' 2,,'
2=2-,24,5' #)f(' W21285;516'
(/065;K'
$+' .:5.P' 6:5' 2=2-,24-,-6/' +<' 758-0657' d' ,+8' <+7' 2,,'
2=2-,24,5' D+.E;5165D' -1<+7;26-+1' +1' #)f('
W21285;516'(/065;'
U' $:575'-0'21'F.6-+1'*,21'<+7'06+7285T'
37+65.6-+1T' 7567-5=2,T' 756516-+1' 21D'
D-03+02,'+<'75.+7D0K'
$+'.:5.P'6:5'2=2-,24-,-6/'F.6-+1'*,21'<+7'06+7285T'
37+65.6-+1'7567-5=2,'756516-+1'21D'D-03+02,'+<'
75.+7D0'
!% 25#/0"!210)%5)011!1+%01-%&21"/2)%
@' $:575' 275' D+.E;5160' +1' :2_27D'
5,-;-126-+1' 21D' 7-0P' 75DE.6-+1' E0-18'
)-5727.:/'+<'J+167+,K'
L' $:575' 275' (A*' +7' (AM' +7' (#*' <+7'
6:755'!U?':-8:Z7-0P'9+7P'2.6-=-6-50K'
$+' .:5.P' (2<5' A+7P' *7+.5DE75' !(A*?' +7' (2<5'
A+7P' M1067E.6-+1' !(AM?' +7' (2<5' #35726-+1'
*7+.5DE75' !(#*?' +<' 6:5' 6:755' !U?' :-8:Z7-0P' 9+7P'
2.6-=-6-50'D5657;-15D'4/'()F((MJ'F00500+7'
U' $:575' -0' F.6-+1' *,21' +1' .+167+,,-18'
65;3+727/' +7' 357;21516' .:21850' +<'
9+7P'37+.50050K'
@' $:575' -0' D+.E;516!0?' -1' 3+6516-2,'
5;57851./'0-6E26-+1'-D516-<-.26-+1'21D'
-1-6-2,'5=2,E26-+1K'
$+'.:5.P'6:26'6:575'-0'D+.E;516d0'+1'216-.-3265D'
5;57851./' 0-6E26-+1' -D516-<-.26-+1' 21D' -1-6-2,'
5=2,E26-+1'
L' $:575' -0' 2' 37+B5.6' %;57851./'
S503+105'*,21'D5=5,+35DK'
$+' .:5.P' 6:26' 6:575' -0' 2' *7+B5.6' %;57851./'
S503+105' *,21' 50624,-0:5DT' -;3,5;5165D' 21D'
;2-162-15D'
U' $:575' -0' 2' 37+B5.6' %;57851./'
S503+105'$52;'50624,-0:5D'21D'
672-15DK'
'
(% 5#/32/$01&#%$#0*,/#$#1"%01-%$21!"2/!1+%
@' $:575'-0'21'F.6-+1'*,21'D5=5,+35D'6+'
;+1-6+7T' ;520E75T' 212,/05' 21D'
5=2,E265'#)f('357<+7;21.5K'
$+' .:5.P' D+.E;516!0?' +7' 75.+7D!0?' -1' 75827D0' 6+'
357<+7;21.5';+1-6+7-18T';520E75;516T'212,/0-18'
21D'5=2,E26-18'2.6-=-6-50K'
LO'
'
'
!
!M(#'H>NN@&LN@O,'(E4Z.,2E05'YK>?'
$+'.:5.P'<+7'6:5'2=2-,24-,-6/'+<'97-6651'D-75.6-=5'<+7'
.7526-18' 21D' E3D26-18' D+.E;5165D' -1<+7;26-+1'
!M(#'H>NN@&LN@O,'(E4Z.,2E05'YK>?'
$+' .:5.P' 9-6:' )MSFSJT' `(F' +7' +6:57' S-0P'
F00500;516' 21D' S-0P' .+167+,' D+.E;5160K'
)-5727.:/'+<'.+167+,'+7'2'.+;4-126-+1'+<':-5727.:/'
+<' .+167+,0' -0' 62P-18' -16+' .+10-D5726-+1' 20'
75.+;;51D5D'.+167+,';520E750
!M(#'H>NN@&LN@O,'(E4Z.,2E05'OK@KL?'
!M(#'H>NN@&'LN@O,'(E4Z.,2E05'OK@KU?
'8% #$#/+#1&7%5/#50/#-1#**%01-%/#*521*#%
$+' .:5.P' 9-6:' D+.E;516' 75,265D' 6+' ;2128-18'
.:21850'+<'9+7P'65.:1+,+8/T'5[E-3;516T'<2.-,-6-50T'
9+7P'372.6-.50'+7'37+.5DE750T'D50-81'035.-<-.26-+1T'
729';2657-2,0T'062<<-18T'0621D27D'+7'758E,26-+10'
!M(#'H>NN@&LN@O,'(E4Z.,2E05'OKL?'
$+' .:5.P' 6:26' 6:575' -0' *7+B5.6' %;57851./'
S503+105' Team' 50624,-0:5DT' -;3,5;5165DT'
;2-162-15D'21D'%S$'672-1-18'75.+7DK'
!M(#'H>NN@&LN@O,'J,2E05'GK@?'
(ISO 45001:2018, Sub-clause 7.5)
(ISO 45001:2018, Sub-clause 8.2)
(ISO 45001:2018, Sub-clause 8.2)
29
2 Reports on monitoring, measuring,
analysing and evaluating OH&S
performance are reviewed by project
top management.
To check report on monitoring, measuring,
analysing and evaluating OH&S performance is
reviewed by project top management.
3 There is an Action Plan developed to
evaluate legal requirements and other
requirements compliances.
L INCIDENT, NONCONFORMITY AND CORRECTIVE ACTION
1 There is an Action Plan for reporting,
investigating and taking action related
to incident and Nonconformity
determination and managing.
To check the availability of documented Action
Plan for reporting, investigating and taking action
related to incident and Nonconformity
determination and managing
2 Incident record / logbook / register is
established.
M INTERNAL AUDIT PROGRAMME
1 There is an Action Plan for Internal
Audit program established,
implemented and maintained.
To checked documented audit plan including
frequency, methods, responsibilities, consultation,
reporting, auditor selection, etc.
2 DOSH Site Visit or Inspection Log
Book is maintained.
To check the availability of DOSH Site Visit or
Inspection Log Book
3 Audit Report is reported to relevant
managers for their further action.
To check audit report transmittal / memo / letter,
etc.
To check with the documented document on
Nonconformity and continual improvement action
taken
N CONSTRUCTION WORK ACTIVITIES
1
29
(ISO 45001:2018, Sub-clause 9.1.1)
To check document or record on the process of
identifying gaps in compliance.
(ISO 45001:2018, Sub-clause 9.1.2)
(ISO 45001:2018, Sub-clause10.2)
(ISO 45001:2018, Sub-clause 10.2)
(ISO 45001:2018, Sub-clause 9.2.2)
To check the availability of documented incident,
Nonconformity and corrective action record /
logbook / register
(ISO 45001:2018, Sub-clause 9.2.2)
4 There is action taken to address
Nonconformity and continual
improvement of OH&S performance.
(ISO 45001:2018, Sub-clause 9.2.2)
2
Assessor to confirm the availability of site
preparation SWP or any similar document
prepared prior to site mobilisation (date and
approved by consultant / PM)
(OSHA 1994, Section 15)
3 Certificate of Fitness (PMA) To check for availability of original and valid
“Perakuan Kelayakan Mesin Angkat” (PMA) and is
visibly displayed on / at the machinery
(FM [NCFAI] Regulations 1970, Regulation 10)
Site preparation - Safe Work
Procedures (SWP)
Hasnizam Md Saad
Records on temporary structure are
checked and approved prior to use.
Assessor to check the availability of Certificate of
Standards Compliance (Perakuan Pematuhan
Standard) / Certificate of Approval for scaffolding
issued by CIDB.
30
4 Certificate of Fitness (PMT)
Factories and machinery (Exemption of certificate
of fitness for unfired pressure vessel) order 2017
6 Local authorities’ approval to clear
bush, remove top soil or felling of
trees.
To check for availability of approval from local
authorities.
7 Hoarding erection Assessor to confirm the availability of a safe work
procedures (SWP) for the erection of hoarding and
observe the condition of hoarding, maintained as
per stated in the SWP, based on approved
drawings (Guideline for Public Safety, DOSH
2007, Section 11.2)
8 Fogging To check records on fogging records on fogging
activities carried out at construction site.
30
5 Machinery maintenance record To check for the availability of warning / safety
notice/tagging on the machinery during
maintenance and servicing
(FMA 1967, Section 18 / OSHA 1994, Section 15)
31
ANNEX E
WORKPLACE INSPECTION - ASSESSOR GUIDE
ITEM CHECKLIST GUIDES
A SITE OSH MANAGEMENT
1 There is displayed Project Safety
OH&S Policy and communicated
to all employees.
Assessor to obtain hard copy of Project Safety
OH&S Policy and observed that policy had been
displayed adequately at various strategic
locations
2 Project site
displayed at site.
Assessor to obtain a copy of Form JKJ 103 as
physical evidence
3 Are there any OSH Site Rules
displayed on project site?
Assessor to observe that there is OSH Site
Rules displayed on project site
(Section 15 of OSHA 1994)
B MOVEMENT OF VEHICULAR TRAFFIC
1 Whether traffic movement plan
developed?
C
SIGNAGE AND COLOUR CODE
(NOTE: Visual inspection to check appropriate usage of international color codes
for signage and location)
1 Mandatory Signage in BLUE
Assessor to observe that there are signages for
PPE usage such as safety helmet, safety
footwear, safety vest, safety eye protection, full
body harness, etc. are displayed adequately
(MS 2558:2014)
2 Prohibition Signage in RED
Assessor to observe that there are prohibition
signage such as No Entry, No Smoking, No
Naked Light, etc. are adequately displayed
(MS 2558:2014)
3 Warning Signage in YELLOW
Assessor to observe that there are warning
signage such as Warning Overhead Load,
Warning Slippery Floor, etc. are adequate
displayed
(MS 2558:2014)
4 Safe Signage in GREEN
Assessor to observe that there are safe signage
5 Assembly point with safety signage Safety sign board placed at identified suitable
location either within the site or off the site clearly
visible by everyone.
31
(ISO 45001:2018, Sub-clause 5.2)
(FMA 1967, Section 35)
Assessor to observe that there is traffic
movement arrangement observed on site
(Traffic signage, Flagman, route indicators, etc.)
(FM [BOWEC] (Safety) Regulations 1986,
Regulation 18)
such as First Aid Box and room locations,
Assembly Point/Area, safe escape route, etc. are
adequately displayed
(MS 2558:2014)
DOSH registration number
32
ANNEX E (continued)
WORKPLACE INSPECTION (continued)
(CONSTRUCTION WORK ACTIVITIES)
ITEM CHECKLIST GUIDES
D DESIGNATED PERSON APPOINTED
1 Competent and Trained Person Assessor to obtain copy of respective
competency or training certificate
1 Approved PEPC Designed
Assessor to obtain Approved PEPC
(Professional Engineer with Practicing
Certificate) Design for respective
equipment/machinery (Chute above 12 meter,
Ramp for vehicle access, Scaffold above 15
meter for frame and modular and 40 meter for
tubular, loading or catch platform, etc.)
2 Certificate of Fitness (PMA / PMT)
To check the availability of original and valid
“Perakuan Kelayakan Mesin Angkat” (PMA) or
“Perakuan Kelayakan Mesin Tekanan” (PMT)
and is visibly displayed on/at the machinery
(FM [NCFAI] Regulations 1970, Regulation 10)
To check whether the rigger has attended
training before assigned to carry out the task.
Pass experience also can be considered.
F MATERIAL
1 Material Handling Arrangement To check the handling of hazardous and non-
hazardous materials as per approved
procedures
(OSH [USECHH] Regulations 2000)
2 Material Storage Arrangement
To check the availability of Safety Data Sheet
for hazardous material or substances
(OSH [CLASS] Regulations 2013)
32
(ISO 45001:2018, Sub-clause 7.2)
E EQUIPMENT / MACHINERY
3 Competent/Trained Operator To check the availability of original and valid
license of machinery operator (FMA 1967,
Section 29 and OSHA 1994, Section 25)
4 Machinery Guarding/Fencing When power-operated tools are designed to
accommodate guards, they shall be equipped
with such guards when in use
(FM [BOWEC] (Safety) Regulations 1986,
Regulation 147)
To observe that all material in bags,
containers, timber or bundles and other
material stored in tier shall be stacked,
blocked, interlocked and limited in height so
that it will be stable and otherwise safe against
sliding and collapse
(FM [BOWEC] (Safety) Regulations 1986,
Regulation 119)
3 Safety Data Sheet (SDS)
5 Trained rigger assigned?
33
4 To comply to approved and documented action
plan
G WORKING ENVIRONMENT
1 Safety/Notices Signage displayed Simple but effective warning notice in national
language shall be placed
2 Permit to Work issued for high risk
activities
To check the availability and usage of permit to
work at site (Hot Work Permit, Working at
Height, Deep Excavation Permit, and Confined
Space Work Permit etc.)
3 Safe Access and Egress To observe for the provision of access/egress,
clearly marked, free from any obstruction.
Stairways, ramps or runways shall be provided
(FM [SHW] Regulations 1970, Regulation 7)
4 Ventilation To check adequate natural/mechanical
ventilation provided at the workplace
5 Fall protection against falling from
height (2 meter and more) available
during construction activities.
To visually observe the guardrails and
handrails, toe boards, safety net and etc.
6 Adequate Illumination To visually observe sufficient light (natural or
powered) at the work vicinity
7 Movement of Vehicular Traffic is in
order
To visually observe the vehicular traffic control
as per approved plan; warning sign,
channelising device, flagman, etc.
8 Temporary
fixed and constructed as per the
intended use / as per PEPC design.
9 Workers are using appropriate PPE
To check on the appropriate use of PPE by
workers.
10 Standing supervision by the SSS / DP
for hazardous activities e.g. working
at height, mechanical lifting or etc.
Site Safety Supervisor / Designated Person
shall present and supervise hazardous
activities.
11 Openings at inside building are
properly guarded and secured from
falling of objects / worker.
To check all openings inside buildings are
properly guarded and secured from falling of
objects / workers.
33
(FM [BOWEC] (Safety) Regulations 1986,
Regulation 104)
(FMA 1967, Section 22 and Regulation 25 of
FM [SHW] Regulations 1970
(FMA 1967, Section 22(e) and Regulation 29 of
FM [SHW] Regulations 1970)
(FM [BOWEC] (Safety) Regulations 1986,
Regulation 18)
To check all temporary works compliance
against PEPC (Professional Engineer with
Practicing Certificate) design.
(FM [BOWEC] (Safety) Regulations 1986)
Hasnizam Md Saad
structure are installed,
Waste Material are disposed as planned
34
ANNEX F
PERSONNEL INTERVIEW - ASSESSOR GUIDE
(CATEGORY A - MANAGERIAL)
ITEM QUESTIONNAIRE GUIDES
1 Are prevention of work related injury
and/or health and the provision of safety
and health workplaces and activities are
committed / demonstrated by top
management?
Interviewee should be able to answer that “we
do oblige and obligation is reflected in our
Project OSH policy statement, OSH objectives
and Project OSH Plan”
2 Are workers consultation and participation
in OH&S program and activities assured
by top management?
Assessor to obtain relevant documents such
as documented instruction or directive,
minutes of meeting, Project OSH Plan, etc.
3 Who is the chairman and secretary for
SHC meeting?
Interviewee shall answer that PM / PD / CM
will chair the site meeting. The secretary shall
be SHO assigned for the project. If the project
is below RM20 million, the chairman may
appoint any one of the members of the SHC’s
4 There is an organisational culture that
supports the expected results of the OH&S
MS?
Assessor to obtain documented instruction or
directive in the regard
6 Have you ever been involved in HIRARC
exercises?
Assessor to obtain documented evidence, i.e.
attendance list, minutes of meeting, etc.
8 How is the project OH&S performance
being evaluated?
9 Are you personally involved in OH&S
management review and continual
improvement for this project?
Assessor to obtain documented evidence, i.e.
attendance list, minutes of meeting, etc.
34
member as secretary.
5 What do you know about HIRARC? Interviewee should be able to explain and
elaborate project health and safety
hazards/risks management processes such as
HI, RA, RC, hierarchy of control, etc.
Assessor to obtain project OH&S performance
report (Internal audit report, inspection report,
etc.)
7 What is NADOPOD Regulations 2004? Notifications and reporting of accident,
dangerous occurrence, occupational
poisoning and occupational disease &
its regulations made under OSHA 1994
(Act 514)
Hasnizam Md Saad
35
ANNEX F (continued)
PERSONNEL INTERVIEW - ASSESSOR GUIDE
(CATEGORY B - SUPERVISORY)
ITEM QUESTIONNAIRE GUIDES
1 What do you know about work
hazard, risk evaluation and control?
Interviewee should be able to elaborate the HI,
RA, RC and hierarchy of control processes
2 When do you review your risk control
measure?
When there are changes in work method,
machinery or equipment used for the work, new
working environment and after every accident.
3 How often is the SHC meeting
conducted?
Assessor to check with project SHC
organisation chart for the answer
5 Have you attended any related safety
and health training during the project
period?
Assessor to check with training record and
attendance
6 Have you attended any
accident investigation training?
Assessor to check with project accident
investigation training attendance list / records
7 Are you involved in the safety training
/ promotion at the site?
Assessor to check with project training and
promotion records, SHC minutes of meeting,
training attendance list / records
8 Do you check the temporary
structures are installed and fixed
according to its intended use or
PEPC design?
Interviewee should be able to elaborate how
does the checking process before allowing the
workers carry out the activities identified in
HIRARC.
35
SHC Meeting being conducted at least once a
month ref Act 139 (FM [BOWEC] (Safety)
Regulations 27(3)) or at least once in 3 months
ref Act 514 (OSH [SHC] Regulations 1996,
Regulation 21 (1))
4 Who is the chairman of the
committee?
36
ANNEX F (continued)
PERSONNEL INTERVIEW - ASSESSOR GUIDE
(CATEGORY C - WORKERS)
ITEM QUESTIONNAIRE GUIDES
1 Interviewee should be able to describe what is
OSH policy and where it was carried out. The
answer ‘yes’ must be elaborated.
2 Hazard and prevention of your work is
communicated to you?
3
Do you know who is the Safety and
Health
Interviewee should be able to mention the
name of Safety and Health Officer or Site
Safety Supervisor
4 Have you ever heard about workplace
SHC?
Interviewee should be able to describe what is
workplace SHC.
5 Do you hold Personnel
Registration Card?
6 Have you undergone specific
workplace induction course?
The interviewee should be able to explain
when he/she underwent the course as these
works may require to undergo specific safety
course prior to commencing with the work at
the site. Assessor to obtain a hard copy of
Safety and Health Induction records prior to
the interview and confirm the attendance
7 Have you ever attended a toolbox
meeting?
8 Have you participated in any Safety
Campaign?
The interviewee should be able to explain the
campaign which he/she had attended
(Assessor to obtain Safety Campaign Records
prior to interview).
9 Are you a competent operator with
valid license / authorised to operate
this
The interviewee should be able to show the
document to confirm valid license or letter of
authority from the employer
10 Is there safety checklist for you to fill
up prior to operating the machinery?
Assessor to confirm reply with safety checklist.
Assessor to obtain safety checklist records
prior to the interview
(OSHA 1994, Section 15)
36
(OSHA 1994, Section 15)
Assessor to confirm the attendance of the
employee by checking the copy of the past
Toolbox Talk attendance list (Assessor to
obtain a copy of the Toolbox Talk attendance
list)
(OSHA 1994, Section 15)
(ISO 45001:2018, Sub-clause 7.2)
To request the employee to show the CIDB's
Personnel Registration Card. Assessor to
check and confirm the validity of the CIDB's
Personnel Registration Card
(CIDB Act 1994 (Amendment 2011),
Section 33(1))
Interviewee should be able to describe
hazards inherent in his work and what are the
relative control measures that are put into
place or provided for him by his employer. The
answer ‘yes’ must be elaborated.
Project OSH Policy is communicated
to you?
Officer / Site Safety Supervisor?
CIDB's
machinery / equipment / vehicle?
37
11 How do you handle chemicals /
hazardous materials at the site?
12 Do you know what to do during an
emergency / accident?
The interviewee should be able to describe
what he/she needs to do during an
emergency, which is described in the
Emergency Preparedness Plan. To confirm
the response with Emergency Preparedness
Plan - Emergency Action Flow Chart
13 What would you do if you witness
someone injured?
14 Can you show me the assembly
point?
The interviewee should be able to show the
nearest assembly point. Assessor to confirm
with Emergency Preparedness Plan for the
location of assembly point
(OSH [CIMAH] Regulations 1996)
15 Can you identify your First Aider? The interviewee should be able to identify the
First Aider. Assessor to confirm with
Emergency Preparedness Plan
(FM [SHW] Regulations 1970, Regulation 38)
16 Where is the location of the First-Aid
Box?
(FM [SHW] Regulations 1970, Regulation 38)
17 Where is the nearest Fire
Extinguisher?
The interviewee should be able to show the
nearest Fire Extinguisher. Assessor to
confirm with Emergency Preparedness Plan
(FMA 1967, Section 13)
37
(ISO 45001:2018, Sub-clause 8.2)
The interviewee should be able to explain his
actions when he witnesses someone who is
injured. Assessor to confirm the response
with AI (Accident Investigation) and RP
(Response Plan)
(ISO 45001:2018, Sub-clause 10.2)
The interviewee should be able to show the
nearest location of the First-Aid Box. To
confirm location with Emergency Preparedness
Plan
The interviewee should be able to describe
the requirements pertaining to OSH
[USECHH] Regulations 2000, and OSH
[CLASS] Regulations 2013 examples
labelling, handling, transporting, storage,
etc.
Hasnizam Md Saad
38
ACKNOWLEDGEMENT
Construction Industry Development Board, Malaysia would like to extend our sincere appreciation to all
those involved in the development of this standard.
Advisor of Construction Industry Standard
Datuk Ir. Ahmad ‘Asri Abdul Hamid Chief Executive, CIDB Malaysia
Chairman of Construction Industry Standard Main Committee
Datuk Ir. Elias Ismail Deputy Chief Executive I, CIDB Malaysia
Technical Committee
Ir. M. Ramuseren (Chairman) Construction Industry Development Board Malaysia
(CIDB)
Secretariat:
Norhidayah Razali /
Atiqah Syahira Rosman Amran
Ir. K. Sundraraj Associate of Consulting Engineers Malaysia (ACEM)
Syed Hazni Abd Ghani / Construction Research Institute of Malaysia (CREAM)
Muhamad Azam Azmai
Ir. Mokhtar Sabtu Department of Occupational Safety and Health Malaysia
(DOSH)
Jayasegaran Karuppiah IOI Properties Group Berhad
Mohd Khairul Najmi Mohd Kamarudin Jabatan Kerja Raya (JKR)
Abd Rahim Senin Master Builder Association Malaysia (MBAM)
She Kok Keong Malaysian Occupational Safety and Health Practitioners
(MOSHPA)
Muhamad Arif Hamzah Malaysian Society for Occupational Safety & Health
(MSOSH)
Ar. Abu Zarim Abu Bakar Pertubuhan Arkitek Malaysia (PAM)
Abdul Karim Mohamad Real Estate & Housing Development Association
(REHDA)
Mazlan Ismail Toklan OSH Services
Dr. Yap Soon Poh Universiti Malaya (UM)
38
ISBN 978-967-0997-93-3
ISBN 978-967-0997-93-3

More Related Content

What's hot

Standard Operating Practices (SOPs) and Standard Maintenance Practices (SMPs)...
Standard Operating Practices (SOPs) and Standard Maintenance Practices (SMPs)...Standard Operating Practices (SOPs) and Standard Maintenance Practices (SMPs)...
Standard Operating Practices (SOPs) and Standard Maintenance Practices (SMPs)...Bimal Chandra Das
 
Work at-height-procedure-aug-2017-v1.3
Work at-height-procedure-aug-2017-v1.3Work at-height-procedure-aug-2017-v1.3
Work at-height-procedure-aug-2017-v1.3sawkariqbal
 
3.2.3 site diary dan lawatan tapak
3.2.3 site diary dan lawatan tapak3.2.3 site diary dan lawatan tapak
3.2.3 site diary dan lawatan tapakNatalie Ulza
 
Safety (Keselamatan Mesin)
Safety (Keselamatan Mesin) Safety (Keselamatan Mesin)
Safety (Keselamatan Mesin) Anisah As
 
JSA Aerial Lift (english) KWW
JSA Aerial Lift (english) KWWJSA Aerial Lift (english) KWW
JSA Aerial Lift (english) KWWKelly Weaver
 
CURSO SOLDADURA Y CORTE NOM 027 STPS 2008
CURSO SOLDADURA Y CORTE NOM 027 STPS 2008CURSO SOLDADURA Y CORTE NOM 027 STPS 2008
CURSO SOLDADURA Y CORTE NOM 027 STPS 2008Rigo Sigala
 
Senarai semak pemeriksaan krselamatan tempat kerja dan healthy setting
Senarai semak pemeriksaan krselamatan tempat kerja dan healthy settingSenarai semak pemeriksaan krselamatan tempat kerja dan healthy setting
Senarai semak pemeriksaan krselamatan tempat kerja dan healthy settingLee Oi Wah
 
PENGENALAN ERT
PENGENALAN ERTPENGENALAN ERT
PENGENALAN ERTMuhd Athir
 
BINAPURI OSH Management System Awareness Training
BINAPURI OSH Management System Awareness TrainingBINAPURI OSH Management System Awareness Training
BINAPURI OSH Management System Awareness Trainingmuss
 
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh RajputJob Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh RajputGaurav Singh Rajput
 
Lecture 1 &_2_-the_osh_act,_standard_and_liability
Lecture 1 &_2_-the_osh_act,_standard_and_liabilityLecture 1 &_2_-the_osh_act,_standard_and_liability
Lecture 1 &_2_-the_osh_act,_standard_and_liabilityShahbani Laa
 
TOWER CRANE INSPECTION CHECKLIST Form # HSEQ - TCI Rev 2 -.docx
TOWER CRANE INSPECTION CHECKLIST Form # HSEQ - TCI  Rev 2 -.docxTOWER CRANE INSPECTION CHECKLIST Form # HSEQ - TCI  Rev 2 -.docx
TOWER CRANE INSPECTION CHECKLIST Form # HSEQ - TCI Rev 2 -.docxDwarika Bhushan Sharma
 
Risk assessment for testing &amp; commissioning of cranes
Risk assessment for  testing &amp; commissioning of cranesRisk assessment for  testing &amp; commissioning of cranes
Risk assessment for testing &amp; commissioning of cranesAzmeel Contracting Company
 
Presentation HIRARC Sem 3
Presentation HIRARC Sem 3Presentation HIRARC Sem 3
Presentation HIRARC Sem 3consist college
 
8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templates8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templatesDwarika Bhushan Sharma
 

What's hot (20)

2
22
2
 
Standard Operating Practices (SOPs) and Standard Maintenance Practices (SMPs)...
Standard Operating Practices (SOPs) and Standard Maintenance Practices (SMPs)...Standard Operating Practices (SOPs) and Standard Maintenance Practices (SMPs)...
Standard Operating Practices (SOPs) and Standard Maintenance Practices (SMPs)...
 
Work at-height-procedure-aug-2017-v1.3
Work at-height-procedure-aug-2017-v1.3Work at-height-procedure-aug-2017-v1.3
Work at-height-procedure-aug-2017-v1.3
 
Jkk di tempat kerja
Jkk di tempat kerjaJkk di tempat kerja
Jkk di tempat kerja
 
3.2.3 site diary dan lawatan tapak
3.2.3 site diary dan lawatan tapak3.2.3 site diary dan lawatan tapak
3.2.3 site diary dan lawatan tapak
 
Shassic Checklist
Shassic ChecklistShassic Checklist
Shassic Checklist
 
Safety (Keselamatan Mesin)
Safety (Keselamatan Mesin) Safety (Keselamatan Mesin)
Safety (Keselamatan Mesin)
 
JSA Aerial Lift (english) KWW
JSA Aerial Lift (english) KWWJSA Aerial Lift (english) KWW
JSA Aerial Lift (english) KWW
 
CURSO SOLDADURA Y CORTE NOM 027 STPS 2008
CURSO SOLDADURA Y CORTE NOM 027 STPS 2008CURSO SOLDADURA Y CORTE NOM 027 STPS 2008
CURSO SOLDADURA Y CORTE NOM 027 STPS 2008
 
Senarai semak pemeriksaan krselamatan tempat kerja dan healthy setting
Senarai semak pemeriksaan krselamatan tempat kerja dan healthy settingSenarai semak pemeriksaan krselamatan tempat kerja dan healthy setting
Senarai semak pemeriksaan krselamatan tempat kerja dan healthy setting
 
PENGENALAN ERT
PENGENALAN ERTPENGENALAN ERT
PENGENALAN ERT
 
BINAPURI OSH Management System Awareness Training
BINAPURI OSH Management System Awareness TrainingBINAPURI OSH Management System Awareness Training
BINAPURI OSH Management System Awareness Training
 
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh RajputJob Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
 
Lecture 1 &_2_-the_osh_act,_standard_and_liability
Lecture 1 &_2_-the_osh_act,_standard_and_liabilityLecture 1 &_2_-the_osh_act,_standard_and_liability
Lecture 1 &_2_-the_osh_act,_standard_and_liability
 
TOWER CRANE INSPECTION CHECKLIST Form # HSEQ - TCI Rev 2 -.docx
TOWER CRANE INSPECTION CHECKLIST Form # HSEQ - TCI  Rev 2 -.docxTOWER CRANE INSPECTION CHECKLIST Form # HSEQ - TCI  Rev 2 -.docx
TOWER CRANE INSPECTION CHECKLIST Form # HSEQ - TCI Rev 2 -.docx
 
Risk assessment for testing &amp; commissioning of cranes
Risk assessment for  testing &amp; commissioning of cranesRisk assessment for  testing &amp; commissioning of cranes
Risk assessment for testing &amp; commissioning of cranes
 
Presentation HIRARC Sem 3
Presentation HIRARC Sem 3Presentation HIRARC Sem 3
Presentation HIRARC Sem 3
 
Bab 2b
Bab 2bBab 2b
Bab 2b
 
8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templates8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templates
 
Aerial and scissor lift safety 2
Aerial and scissor lift safety 2Aerial and scissor lift safety 2
Aerial and scissor lift safety 2
 

Similar to Standard Industri Pembinaan cis 10 2020

Health and Safety Framework Using Analytic Hierarchy Process For Construction...
Health and Safety Framework Using Analytic Hierarchy Process For Construction...Health and Safety Framework Using Analytic Hierarchy Process For Construction...
Health and Safety Framework Using Analytic Hierarchy Process For Construction...IRJET Journal
 
QUALITY MANAGEMENT PRACTICES OF CONTRACTING FIRMS IN BUILDING PROJECT DELIVERY
QUALITY MANAGEMENT PRACTICES OF CONTRACTING FIRMS IN BUILDING PROJECT DELIVERYQUALITY MANAGEMENT PRACTICES OF CONTRACTING FIRMS IN BUILDING PROJECT DELIVERY
QUALITY MANAGEMENT PRACTICES OF CONTRACTING FIRMS IN BUILDING PROJECT DELIVERYIAEME Publication
 
Best practice for risk based inspection
Best practice for risk based inspectionBest practice for risk based inspection
Best practice for risk based inspectionOsama Lari
 
IRJET- Construction Quality Management on Site
IRJET-  	  Construction Quality Management on SiteIRJET-  	  Construction Quality Management on Site
IRJET- Construction Quality Management on SiteIRJET Journal
 
HASNIZAM SHASSIC CIS 10 2020 (CIDB).pdf
HASNIZAM SHASSIC CIS 10 2020 (CIDB).pdfHASNIZAM SHASSIC CIS 10 2020 (CIDB).pdf
HASNIZAM SHASSIC CIS 10 2020 (CIDB).pdfHASNIZAM BIN MD SAAD
 
QUALITY CONTROL AND SAFETY DURING CONSTRUCTIONIjmet 08 03_012
QUALITY CONTROL AND SAFETY DURING CONSTRUCTIONIjmet 08 03_012QUALITY CONTROL AND SAFETY DURING CONSTRUCTIONIjmet 08 03_012
QUALITY CONTROL AND SAFETY DURING CONSTRUCTIONIjmet 08 03_012IAEME Publication
 
IRJET - The impact of Saudi hospital accreditation on occupational safety cul...
IRJET - The impact of Saudi hospital accreditation on occupational safety cul...IRJET - The impact of Saudi hospital accreditation on occupational safety cul...
IRJET - The impact of Saudi hospital accreditation on occupational safety cul...IRJET Journal
 
Construction Safety Management.pdf
Construction Safety Management.pdfConstruction Safety Management.pdf
Construction Safety Management.pdfSudas Duddey
 
The Impact of Skilled and Unskilled Labour in Construction Industry in India
The Impact of Skilled and Unskilled Labour in Construction Industry in IndiaThe Impact of Skilled and Unskilled Labour in Construction Industry in India
The Impact of Skilled and Unskilled Labour in Construction Industry in IndiaIRJET Journal
 
IRJET- The impact of Saudi hospital accreditation on occupational safety cult...
IRJET- The impact of Saudi hospital accreditation on occupational safety cult...IRJET- The impact of Saudi hospital accreditation on occupational safety cult...
IRJET- The impact of Saudi hospital accreditation on occupational safety cult...IRJET Journal
 
Occupational health and safety management system (ohsms) model for constructi...
Occupational health and safety management system (ohsms) model for constructi...Occupational health and safety management system (ohsms) model for constructi...
Occupational health and safety management system (ohsms) model for constructi...eSAT Journals
 
Occupational health and safety management system
Occupational health and safety management systemOccupational health and safety management system
Occupational health and safety management systemeSAT Publishing House
 
Akhbar Issue 33 June 2010
Akhbar Issue 33 June 2010Akhbar Issue 33 June 2010
Akhbar Issue 33 June 2010Nitin Naik
 
Quality management at construction projects: Case study of a stormwater netwo...
Quality management at construction projects: Case study of a stormwater netwo...Quality management at construction projects: Case study of a stormwater netwo...
Quality management at construction projects: Case study of a stormwater netwo...IRJET Journal
 
OHS&E Legal and Other Requirements for Construction Project by Sahil Bhutani ...
OHS&E Legal and Other Requirements for Construction Project by Sahil Bhutani ...OHS&E Legal and Other Requirements for Construction Project by Sahil Bhutani ...
OHS&E Legal and Other Requirements for Construction Project by Sahil Bhutani ...sahil bhutani
 
Appendix T.2 - SACPCMP doc 25 Nov 2014.pdf
Appendix T.2 - SACPCMP doc 25 Nov 2014.pdfAppendix T.2 - SACPCMP doc 25 Nov 2014.pdf
Appendix T.2 - SACPCMP doc 25 Nov 2014.pdfKevinRaman1
 
Presentation on Occupational Health & Safety
Presentation on Occupational Health & SafetyPresentation on Occupational Health & Safety
Presentation on Occupational Health & Safetymanik980318
 
Process Safety Management
Process Safety ManagementProcess Safety Management
Process Safety ManagementMarcep Inc.
 
Plant Safety Audits & Process Safety Management
Plant Safety Audits & Process Safety ManagementPlant Safety Audits & Process Safety Management
Plant Safety Audits & Process Safety ManagementMarcep Inc.
 

Similar to Standard Industri Pembinaan cis 10 2020 (20)

Health and Safety Framework Using Analytic Hierarchy Process For Construction...
Health and Safety Framework Using Analytic Hierarchy Process For Construction...Health and Safety Framework Using Analytic Hierarchy Process For Construction...
Health and Safety Framework Using Analytic Hierarchy Process For Construction...
 
QUALITY MANAGEMENT PRACTICES OF CONTRACTING FIRMS IN BUILDING PROJECT DELIVERY
QUALITY MANAGEMENT PRACTICES OF CONTRACTING FIRMS IN BUILDING PROJECT DELIVERYQUALITY MANAGEMENT PRACTICES OF CONTRACTING FIRMS IN BUILDING PROJECT DELIVERY
QUALITY MANAGEMENT PRACTICES OF CONTRACTING FIRMS IN BUILDING PROJECT DELIVERY
 
USE OF ANDROID TOOL FOR QUALITY CONSTRUCTION
USE OF ANDROID TOOL FOR QUALITY CONSTRUCTIONUSE OF ANDROID TOOL FOR QUALITY CONSTRUCTION
USE OF ANDROID TOOL FOR QUALITY CONSTRUCTION
 
Best practice for risk based inspection
Best practice for risk based inspectionBest practice for risk based inspection
Best practice for risk based inspection
 
IRJET- Construction Quality Management on Site
IRJET-  	  Construction Quality Management on SiteIRJET-  	  Construction Quality Management on Site
IRJET- Construction Quality Management on Site
 
HASNIZAM SHASSIC CIS 10 2020 (CIDB).pdf
HASNIZAM SHASSIC CIS 10 2020 (CIDB).pdfHASNIZAM SHASSIC CIS 10 2020 (CIDB).pdf
HASNIZAM SHASSIC CIS 10 2020 (CIDB).pdf
 
QUALITY CONTROL AND SAFETY DURING CONSTRUCTIONIjmet 08 03_012
QUALITY CONTROL AND SAFETY DURING CONSTRUCTIONIjmet 08 03_012QUALITY CONTROL AND SAFETY DURING CONSTRUCTIONIjmet 08 03_012
QUALITY CONTROL AND SAFETY DURING CONSTRUCTIONIjmet 08 03_012
 
IRJET - The impact of Saudi hospital accreditation on occupational safety cul...
IRJET - The impact of Saudi hospital accreditation on occupational safety cul...IRJET - The impact of Saudi hospital accreditation on occupational safety cul...
IRJET - The impact of Saudi hospital accreditation on occupational safety cul...
 
Construction Safety Management.pdf
Construction Safety Management.pdfConstruction Safety Management.pdf
Construction Safety Management.pdf
 
The Impact of Skilled and Unskilled Labour in Construction Industry in India
The Impact of Skilled and Unskilled Labour in Construction Industry in IndiaThe Impact of Skilled and Unskilled Labour in Construction Industry in India
The Impact of Skilled and Unskilled Labour in Construction Industry in India
 
IRJET- The impact of Saudi hospital accreditation on occupational safety cult...
IRJET- The impact of Saudi hospital accreditation on occupational safety cult...IRJET- The impact of Saudi hospital accreditation on occupational safety cult...
IRJET- The impact of Saudi hospital accreditation on occupational safety cult...
 
Occupational health and safety management system (ohsms) model for constructi...
Occupational health and safety management system (ohsms) model for constructi...Occupational health and safety management system (ohsms) model for constructi...
Occupational health and safety management system (ohsms) model for constructi...
 
Occupational health and safety management system
Occupational health and safety management systemOccupational health and safety management system
Occupational health and safety management system
 
Akhbar Issue 33 June 2010
Akhbar Issue 33 June 2010Akhbar Issue 33 June 2010
Akhbar Issue 33 June 2010
 
Quality management at construction projects: Case study of a stormwater netwo...
Quality management at construction projects: Case study of a stormwater netwo...Quality management at construction projects: Case study of a stormwater netwo...
Quality management at construction projects: Case study of a stormwater netwo...
 
OHS&E Legal and Other Requirements for Construction Project by Sahil Bhutani ...
OHS&E Legal and Other Requirements for Construction Project by Sahil Bhutani ...OHS&E Legal and Other Requirements for Construction Project by Sahil Bhutani ...
OHS&E Legal and Other Requirements for Construction Project by Sahil Bhutani ...
 
Appendix T.2 - SACPCMP doc 25 Nov 2014.pdf
Appendix T.2 - SACPCMP doc 25 Nov 2014.pdfAppendix T.2 - SACPCMP doc 25 Nov 2014.pdf
Appendix T.2 - SACPCMP doc 25 Nov 2014.pdf
 
Presentation on Occupational Health & Safety
Presentation on Occupational Health & SafetyPresentation on Occupational Health & Safety
Presentation on Occupational Health & Safety
 
Process Safety Management
Process Safety ManagementProcess Safety Management
Process Safety Management
 
Plant Safety Audits & Process Safety Management
Plant Safety Audits & Process Safety ManagementPlant Safety Audits & Process Safety Management
Plant Safety Audits & Process Safety Management
 

More from HASNIZAM BIN MD SAAD (20)

SHASSIC KV.pdf
SHASSIC KV.pdfSHASSIC KV.pdf
SHASSIC KV.pdf
 
KV Segamat SHASSIC.pdf
KV Segamat SHASSIC.pdfKV Segamat SHASSIC.pdf
KV Segamat SHASSIC.pdf
 
Machinery Inspection.pdf
Machinery Inspection.pdfMachinery Inspection.pdf
Machinery Inspection.pdf
 
SHASSIC HASNIZAM.pdf
SHASSIC HASNIZAM.pdfSHASSIC HASNIZAM.pdf
SHASSIC HASNIZAM.pdf
 
Latihan Asas Pengawal Bendera
 Latihan Asas Pengawal Bendera Latihan Asas Pengawal Bendera
Latihan Asas Pengawal Bendera
 
Heat Stroke
Heat StrokeHeat Stroke
Heat Stroke
 
HEALTH EFFECTS OF CIGARETTE SMOKING.pdf
HEALTH EFFECTS OF CIGARETTE SMOKING.pdfHEALTH EFFECTS OF CIGARETTE SMOKING.pdf
HEALTH EFFECTS OF CIGARETTE SMOKING.pdf
 
SHASSIC CIS 10 2020
SHASSIC CIS 10 2020SHASSIC CIS 10 2020
SHASSIC CIS 10 2020
 
Handbook for rigger signalman hasnizam
Handbook for rigger signalman hasnizamHandbook for rigger signalman hasnizam
Handbook for rigger signalman hasnizam
 
SHASSIC CIS 10 : 2018
SHASSIC CIS 10 : 2018SHASSIC CIS 10 : 2018
SHASSIC CIS 10 : 2018
 
SAFETY REQUIREMENTS FOR FORMWORK STRUCTURES
SAFETY REQUIREMENTS FOR FORMWORK STRUCTURESSAFETY REQUIREMENTS FOR FORMWORK STRUCTURES
SAFETY REQUIREMENTS FOR FORMWORK STRUCTURES
 
Sila pakai topeng muka
Sila pakai topeng mukaSila pakai topeng muka
Sila pakai topeng muka
 
Prosidur standard operasi (sop) kebenaran pkp
Prosidur standard operasi (sop) kebenaran pkpProsidur standard operasi (sop) kebenaran pkp
Prosidur standard operasi (sop) kebenaran pkp
 
Garispanduan pkp pembinaan
Garispanduan pkp pembinaanGarispanduan pkp pembinaan
Garispanduan pkp pembinaan
 
Covid 19 guidance for the workplace
Covid 19 guidance for the workplaceCovid 19 guidance for the workplace
Covid 19 guidance for the workplace
 
Sohelp
SohelpSohelp
Sohelp
 
Working at height
Working at heightWorking at height
Working at height
 
Mrcb forklift training
Mrcb forklift trainingMrcb forklift training
Mrcb forklift training
 
Lifting using excavator
Lifting using excavatorLifting using excavator
Lifting using excavator
 
Competent person
Competent person Competent person
Competent person
 

Recently uploaded

Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...christianmathematics
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.christianmathematics
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structuredhanjurrannsibayan2
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.pptRamjanShidvankar
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxAreebaZafar22
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...Poonam Aher Patil
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibitjbellavia9
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...ZurliaSoop
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...Nguyen Thanh Tu Collection
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfSherif Taha
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxJisc
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17Celine George
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxDr. Sarita Anand
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxDenish Jangid
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
Dyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptxDyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptxcallscotland1987
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptxMaritesTamaniVerdade
 

Recently uploaded (20)

Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structure
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Dyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptxDyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptx
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 

Standard Industri Pembinaan cis 10 2020

  • 1. STANDARD INDUSTRI PEMBINAAN (CONSTRUCTION INDUSTRY STANDARD) CIS 10:2020 SAFETY AND HEALTH ASSESSMENT SYSTEM IN CONSTRUCTION (SHASSIC) Description: Safety and Health Assessment, Document Check, Workplace Inspection, Employee Interview, Star Ranking © Copyright CONSTRUCTION INDUSTRY DEVELOPMENT BOARD Construction Industry Development Board Malaysia LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA Ibu Pejabat CIDB, Tingkat 10, Menara Dato’ Onn, Pusat Dagangan Dunia Putra No 45, Jalan Tun Ismail, 50480 Kuala Lumpur, Malaysia Tel:603-40477000 Faks:603-40477070 http://www.cidb.gov.my SIRIM MS ISO/IEC 17021 : 2011 QS 02121999 CB 01 ACCREDITED CERTIFICATION BODY MALAYSIA QUALITY SYSTEM 074 MANAGEMENT SYSTEMS U K A S QUALITY SYSTEM SIRIM OH&S SYSTEM SIRIM OH&S SYSTEM SIRIM Hasnizam Md Saad
  • 2. SAFETY AND HEALTH ASSESSMENT SYSTEM IN CONSTRUCTION
  • 3. ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !"#$%&'$(&(&!#)*+,-$)./$0+)1,2$344+445+.,$#-4,+5$6.$!7.4,89:,67.$ ! ;$!7.4,89:,67.$"./94,8-$<+=+17>5+.,$?7)8/$@)1)-46)$(&(&$ $ $ ! $ 311$+.A9686+4$8+B)8/6.B$,264$C77D$42791/$C+$*78E)8/+/$,7'$ ! !26+*$FG+:9,6=+$ !7.4,89:,67.$"./94,8-$<+=+17>5+.,$?7)8/$@)1)-46)$ H+=+1$%&I$@+.)8)$<),7J$K..I$ L94),$<)B).B).$<9.6)$L9,8)$ M7$NOI$P)1).$Q9.$"45)61I$ O&NR&$S9)1)$H95>98I$ @)1)-46)T$ ! Q+1$'$U&VWN&NX$X&&&$ Y)G$'$U&VWN&NX$X&X&$ F5)61$'$4,)./)8/Z:6/CTB7=T5-$ [+C46,+$'$EEET:6/CTB7=T5-$ ! M7$>)8,$7*$,264$>9C16:),67.$5)-$C+$8+>87/9:+/$78$,8).456,,+/$6.$).-$*785$78$C-$).-$5+).4I$E2+,2+8$ 5+:2).6:)1$78$+1+:,87.6:$6.:19/6.B$>27,7:7>-6.B$)./$8+:78/6.B$E6,279,$,2+$E86,,+.$:7.4+.,$7*$!"<?T$ L+8>94,)D)).$M+B)8)$@)1)-46)$!),)17B96.BW6.WL9C16:),67.$<),)$ "#?M$ !
  • 4. TABLE OF CONTENTS Committee Representation ......................................................................................................... Preface ....................................................................................................................................... SECTION 1: GENERAL Introduction .................................................................................................................................. Objective of SHASSIC ................................................................................................................. Scope of SHASSIC ..................................................................................................................... Use of SHASSIC ......................................................................................................................... Normative References .................................................................................................................. Terms and Definitions .................................................................................................................. Elements ..................................................................................................................................... Assessor ...................................................................................................................................... SECTION 2: ASSESSMENT Assessment Approach ................................................................................................................. Weightage ................................................................................................................................... Formula / Score ........................................................................................................................... Star Ranking ................................................................................................................................ ANNEXES A. Document Check ............................................................................................................. B. Workplace Inspection ..................................................................................................... C. Personnel Interview ........................................................................................................ SECTION 3: SHASSIC ASSESSOR GUIDE ANNEXES D. Document Check - Assessor Guide ................................................................................ E. Workplace Inspection - Assessor Guide ......................................................................... F. Personnel Interview - Assessor Guide ............................................................................ ACKNOWLEDGEMENT …………………………………………………………….…...........….….... v vi 1 1 1 2 2 3 5 6 6 7 7 8 9 13 16 22 31 34 38
  • 5. LIST OF TABLES Table 1: Priority / Hierarchy of High Risk .................................................................................... Table 2: The Weightage for Safety and Health Performance .................................................... Table 3: SHASSIC Formula / Score for Document Check, Workplace Inspection and Personnel Interview ..................................................................................................... Table 4: SHASSIC Star Ranking Description ............................................................................. 6 7 7 8
  • 6. ! "! !"00(%%,,)&,/&,$,#%2%("#) ) Q264$!7.4,89:,67.$"./94,8-$#,)./)8/$c!"#d$E)4$/+=+17>+/$)./$8+=6+E+/$C-$,2+$!7.4,89:,67.$"./94,8-$ <+=+17>5+.,$?7)8/$@)1)-46)$E6,2$,2+$)4464,).:+$7*$,2+$Q+:2.6:)1$!7556,,++$7.$K::9>),67.)1$#)*+,-$ )./$0+)1,2$6.$!7.4,89:,67.$E26:2$:75>864+4$8+>8+4+.,),6=+4$*875$,2+$*7117E6.B$78B).64),67.4'$ $ 3447:6),67.$7*$!7.491,6.B$F.B6.++84$@)1)-46)$c3!F@d$ !7.4,89:,67.$+4+)8:2$".4,6,9,+$7*$@)1)-46)$c!F3@d$$ <+>)8,5+.,$7*$K::9>),67.)1$#)*+,-$)./$0+)1,2$@)1)-46)$c<K#0d$ "K"$L87>+8,6+4$a879>$?+82)/$ P)C),).$S+8])$)-)$cPSd$ @)4,+8$?961/+84$3447:6),67.$@)1)-46)$c@?3@d$ @)1)-46).$K::9>),67.)1$#)*+,-$)./$0+)1,2$L8):,6,67.+84$c@K#0L3d$$ @)1)-46).$#7:6+,-$*78$K::9>),67.)1$#)*+,-$e$0+)1,2$c@#K#0d$$ L+8,9C92).$38D6,+D$@)1)-46)$cL3@d$ +)1$F4,),+$e$07946.B$<+=+17>+84J$3447:6),67.$cF0<3d$$ QKSH3M$K#0$#+8=6:+4$$ ^.6=+846,6$@)1)-)$c^@d$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ ! !" v
  • 7. PREFACE Safety and Health Assessment System in Construction Industry, or better known as SHASSIC, was first introduced in 2008 as Construction Industry Standard (CIS 10:2008). This standard was revised 10 years later in 2018 in considering latest development in occupational safety and health practices and changes made to relevant Regulations. This 2nd revision now focused on additional high risk activities and to allow for SHASSIC Assessor to determine high risk activities if there are none based on the proposed hierarchy of high risk activities. Changes were also made to simplify the formulas for document check, workplace inspection and personnel interview to align with the SHASSIC portal and towards real time assessment and report generation. The revision was carried out by a Technical Committee formed by CIDB. The members of the Technical committee were represented by the industry stakeholders. It should be noted that compliance with this Construction Industry Standard does not of itself confer immunity from legal obligations. vi vi vi References were made to several documents generally used by industry players in managing construction safety and health, as listed in Section 1 of the CIS 10:2020. This revised version of SHASSIC document is expected will provide clearer guidance to assessors and contractors in assessing their safety and health performance at construction sites.
  • 8. 1 SAFETY AND HEALTH ASSESSMENT SYSTEM IN CONSTRUCTION SECTION 1: GENERAL 1.1 Introduction Safety and Health Assessment System in Construction, or SHASSIC, is an independent method to assess and evaluate the safety and health performance of a contractor in construction works / projects. The assessment shall cover 25% to 75% of a project’s physical progress and shall be inclusive of construction planning stage and construction stage. 1.2 Objectives of SHASSIC SHASSIC was designed and developed to enable the user to achieve any, or a combination, of the following objectives: i) To establish a standard system on occupational safety and health assessment in the construction industry ii) To assess and evaluate the contractor’s occupational safety and health performance-based a particular project iii) To evaluate the performance of contractor(s) on the occupational safety and health practices at the site iv) As a feedback mechanism to improve and to take necessary corrective and preventive action on occupational safety and health performance and management at the site v) To benchmark the level of occupational safety and health performance of the Malaysian construction industry. 1.3 Scope of SHASSIC This standard sets out the safety and health management and practices of the contractor for various aspects of the construction work activities. Each phase is assessed through three (3) main components of assessment such as document check, workplace inspection and construction personnel interviews. The components encompass: i) OSH policy ii) Leadership and worker participation iii) Planning, Support, Operation iv) OSH organization v) Hazard Identification, Risk Assessment and Control Measures determination vi) OSH training and promotion vii) Machinery and equipment management viii) Materials management ix) Emergency preparedness x) Incident and accident investigation and reporting 1 Hasnizam Md Saad
  • 9. 2 xi) Records management and performance monitoring, etc. 1.4 Use of SHASSIC SHASSIC is intended to assess the OSH performance of a project. Preferably, the assessment shall be carried out when there are different types of activity that are ongoing at the same time (concurrent activities) and many workers of different levels (main contractor, main subcontractor and subcontractor) are involved at the site. It is not intended to be used independently to decide if the project site or parts of the project site are in accordance with the requirement of the relevant Acts and Regulations or OSH Management System. It is the responsibility of all parties involved directly in a project site to ensure that safety and health of the construction site conform to the legislation's requirement, approved standards, code of practice, guidelines, specifications and contractual requirements. 1.5 Normative References The following normative reference is indispensable for the application of this construction industry standard. For dated reference, only the edition cited applies. For undated references, the latest editions of the normative references (including any amendments) apply. 2 Application shall cover OSH Management System and practices during construction work activities, particularly work activities covered under CIDB Act 1994. Hasn i) CIS10:2018 (Safety and Health Assessment System in Construction, SHASSIC). ii) Lembaga Pembangunan Industri Pembinaan Malaysia Act 1994 (Act 520). iii) Occupational Safety and Health Act (OSHA) 1994 (Act 514). iv) Occupational Safety and Health (Use and Standards of Exposure of Chemicals Hazardous to Health [USECHH]) Regulations 2000. v) Occupational Safety and Health (Safety and Health Committee [SHC]) Regulations 1996. vi) Occupational Safety and Health (Classification, Labelling and Safety Data Sheet of Hazardous Chemicals [CLASS]) Regulations 2013. vii) Occupational Safety and Health (Notification of Accident, Dangerous Occurrence, Occupational Poisoning and Occupational Disease [NADOPOD]) Regulations 2004. viii) Department of Occupational Safety and Health (DOSH) - Guidelines for Public Safety and Health at Construction Site 1994. ix) Factories and Machinery Act (FMA), 1967 (Act 139). x) Factories and Machinery (Building Operations and Works of Engineering Construction [BOWEC]) (Safety) Regulations 1986. xi) Factories and Machinery (Safety, Health and Welfare [SHW]) Regulations 1970. xii) Factories and Machinery (Notification, Certificate of Fitness and Inspection [NCFAI]) Regulations, 1970. xiii) Occupational Health and Safety Management System, ISO 45001:2018. xiv) Uniform Building by Law (UBBL) 1984. xv) Registration of Engineers Act (REA) 1967 amended in 2015.
  • 10. 3 1.6 Terms and Definitions For the purpose of this standard, the following definitions apply. 2. Construction Stage Construction stage is the start of physical construction work at the site, which takes place after site mobilisation. 3. Designated Person 4. Document(s) For the purpose of SHASSIC, document(s) refer to:  Communication of information  Evidence of conformity  Knowledge sharing  To disseminate and preserve the organisation’s experiences The medium can be paper, magnetic, electronic, photograph or master sample, or a combination. 5. DOSH Department of Occupational Safety and Health or also known as Jabatan Keselamatan dan Kesihatan Pekerjaan (JKKP), an agency under the Ministry of Human Resources, Malaysia 6. Emergency Response and Preparedness (ERP) Facilities ERP Facilities or provision which includes any emergency preparedness, which include First Aid provision, firefighting provision, and incident and/or accident reporting provision. 7. Hazard Hazard means source with a potential to cause injury and ill health; hazard can include sources with the potential to cause harm or hazardous situations or circumstances with the potential for exposure leading to injury and ill health. 8. Hazardous Activities Hazardous activities are considered the situations or activities that have high potential risk that can cause injury, dead or serious damage to properties such as working at height, lifting exercises, works associated with temporary works, working at confine area and etc. 9. Hazard Identification The identification of undesired events that lead to the materialisation of the hazard and the mechanism by which those undesired events could occur. 10.Hazard Identification, Risk Assessment, and Risk Control (HIRARC) or Hazard Identification, Risk Assessment and Determining Controls (HIRADC) A risk management process associated with identifying hazard(s) which may cause harm, assessing the risk, putting in place control measures and reviewing the outcomes through risk monitoring. 11.Health The state of being free from illness or injury. 12.High-risk Activities Activities determined by the SHASSIC assessor as potential and/or high risk towards the safety and health of workers. 3 1. Approved Professional Engineer (PE) Design An approved PE design is the design submitted by Professional Engineer with Practicing Certificate (PEPC) as per Registration of Engineers Act (REA) 1967 amended in 2015. “Designated person” as defined in Factories and Machinery (Building Operations and Works of Engineering Construction [BOWEC]) (Safety) Regulations 1986 refers to a competent person appointed by an employer to carry out any supervision, or inspection, or to perform any task or duty prescribed by FM [BOWEC] (Safety) Regulations 1986.
  • 11. 4 13.Illumination 14.Managerial Personnel For the purpose of SHASSIC, managerial personnel are those in the managerial position of the construction process at the construction site such as Project Manager, Construction Manager, Site Agent and Project Engineer. 15.Occupational Health and Safety (OH&S) or Occupational Safety and Health (OSH) For the purpose of SHASSIC, the terms “occupational health and safety” (OH&S) and “occupational safety and health” (OSH) have the same meaning. Overall intentions and direction of an organisation related to its OSH performance as formally expressed by top management. 17.Permit to Work (PTW) A documented permission derived by the company to meet its specific OSH needs. It aims to ensure proper OSH planning and consideration is given to a particular work. 18.Personal Protective Equipment (PPE) Personal Protective Equipment or Personal Protective Clothing and Appliances (as defined in FMA 1967) provision and maintenance are mandatory to be provided for workers who are exposed to injurious substances which are liable to cause bodily injury. PPE shall include the following (but not limited to) (FMA 1967, Section 24): i) Safety hard hat/safety helmet ii) Safety footwear iii) Hand protection/hand gloves iv) Eye protection such as safety glasses or goggles v) Fall arresters vi) Self-contained breathing apparatus (SCBA) vii) Face shield viii) Hearing protection (e.g. ear plugs, ear muffs) ix) Protective clothing (especially for chemical hazards) x) Respirator xi) Dust mask xii) Safety vest 19.Record Document stating results achieved or providing evidence of activities performed. 20.Risk A combination of the likelihood of an occurrence of a hazardous event with specified period or in specified circumstances and the severity of injury or damage to the health of people, property, environment or any combination of these caused by the event. 21.Safe System of Work A safe system of work is a formal procedure which results from the systematic examination of a task in order to identify all hazards. It defines safe methods to ensure that hazards are eliminated or risks minimized. 22.Safe Work Procedure (SWP) or Safe Work Instruction (SWI) or Safe Operating Procedure (SOP) SWP or SWI or SOP is a risk management tools / a working risk control document developed to describe the safest and most efficient way to perform certain work. The document is used as a guide when completing the work at site. 4 Provisions are made to secure and maintain sufficient and suitable lighting, whether natural or artificial, at the work vicinity, in accordance to FMA 1967, Section 22 / FM [SHW] Regulations 1970, Regulation 29. 16.Project OSH Policy
  • 12. 5 5 23.Safety The condition of being protected from or unlikely to cause danger, risks or injury. 25.Safety and Health Officer (SHO) 26.SHASSIC SHASSIC is the acronym for Safety and Health Assessment System in Construction. 27.Site Safety Supervisors (SSS) 28.Supervisory For the purpose of SHASSIC, supervisory personnel includes representatives from main contractors, subcontractors and Designated Person (DP). 29.Welfare A statutory procedure designed to promote the basic physical and material well-being of workers in need. 30.Working at Height For the purpose of SHASSIC, working at height means work in any place where, if there were no precautions in place, a person could fall from the distance of 2 meters. 31.Working Personnel / Workers For the purpose of SHASSIC, workers or working personnel are the people carrying out work at site. It can be divided into skilled and non-skilled workers. Skilled workers mean a person possessing the accepted level of skill as determined by CIDB. From the total number of nine (9) workers, the recommended skilled and unskilled workers are three (3) from each of high-risk work activities. 32.Workplace / Working Space Any physical location in which work-related activities are performed under the construction contract. 33.Work Amenities Facilities provided for the welfare or personal hygiene need of employees. They include toilets, restrooms, shelter sheds, seating, dining rooms, change rooms, drinking water, lockers, first-aid box, first-aid room and washing facilities. 34.Work of Construction Activities 1.7 Elements As defined in the latest Construction Industry Development Board Act 1994 (Act 520). 35.Ventilation Natural or mechanical, adequate ventilation must be provided by circulation of fresh air and rendering harmless gasses, fumes, dust or other impurities that may affect health in the course of work conducted (FMA 1967, Section 22 / FM [SHW] Regulations 1970, Regulation 25). The assessment element was derived from Malaysia’s legal requirement such as CIDB Act 1994, OSHA 1994 and its regulations, FMA 1967 and its regulations, code of practices, standard, OSH Management System, ISO 45001:2018, guidelines and other requirements. 24.Safety and Health Committee (SHC) Safety and Health Committee established under Section 30 in OSHA 1994, which consist of a chairman, a secretary, representatives of the employer and representatives of employees. The chairman shall be an employer or his authorized manager and the secretary shall be the person who is employed as the safety and health officer at the place of work. A person who is registered as Safety and Health Officer with DOSH in pursuant to Section 29 (3) in OSHA 1994 (Act 520). A person who is competent to perform the duties specified in Regulations 25 of Factories and Machinery (Building Operations and Works of Engineering Construction [BOWEC]) (Safety) Regulations 1986.
  • 13. 6 6 1.8 Assessor An assessor shall be the person who is appointed and possesses qualifications as described below: i. A person who has attended a one-day SHASSIC course and passed the examination and have a minimum of 5 years’ experience in the construction industry, or ii. A person who has attended a one-day SHASSIC course and certified as OSH Lead Auditor with a minimum of 3 years’ experience in the construction industry (construction project site), or iii. SHO or SSS who have valid registration with DOSH and CIDB. SECTION 2: ASSESSMENT 2.1 Assessment Approach The assessment shall be carried out in 3 (three) different approaches: i) Document Check Checking of OSH-related documents and records will enable the assessor to determine the compliances of the establishment of safety and health programs and activities as listed in Annex A. ii) Workplace Inspection Workplace inspection shall be conducted in order to assess the OSH implementation at the site. There are 30 items identified for workplace inspection for this component and they are listed in Annex B. Workplace inspection shall be carried for three (3) high risk activities and the priority / hierarchy of the high risk activities shall follow the following order: Table 1: Priority / Hierarchy of High Risk Workplace inspection checklist/assessment shall provide the assessor with the valuable visual comparison evidence on the OSH programs implemented, enforced and practiced at site/workplace. 1 Working at height 2 Mechanical Lifting 3 Works involving Temporary Structure and Falseworks, such as concreting works, fixing of building façade, etc 4 Earthworks excavation exceeding two (2) meters in depth 5 Construction works nearby or adjacent to traffic movements 6 Working at Confined Space 7 Demolition works above 10 meters in height 8 Any other high risk activities as identified by SHASSIC Assessor HIGHEST PRIORITY Note: SHASSIC Assessor shall carry out workplace inspection in accordance to the hierarchy of high risk activities as shown above. The assessor may also discuss with the contractor prior to selection these high risk activities during the assessment. HIGHEST PRIORITY Working at height Mechanical Lifting Works involving Temporary Structure and Falseworks, such as concreting works, fixing of building façade, etc Earthworks excavation exceeding two (2) meters in depth Construction works nearby or adjacent to traffic movements Working at Confined Space Demolition works above 10 meters in height Any other high risk activities as identified by SHASSIC Assessor 1 2 3 4 5 6 7 8
  • 14. 7 7 iii) Personnel Interview Construction personnel shall be randomly selected from all levels of occupation so that they could be interviewed by the assessor using the standard questionnaires developed in this document. The Construction personnel are divided into three (3) categories as follows:  Category A - One (1) managerial personnel either Project Director, Project Manager, Construction Manager, Site Agent, Project Engineer or Quantity Surveyor.  Category B - Three (3) supervisory personnel (Site Supervisor, Designated Person (DP), OSH committee members and/or a combination of both, Safety and Health Officer (SHO) and Site Safety Supervisor (SSS).  Category C - Nine (9) employees from working personnel - preferably three people from each high-risk construction work activities. 2.2 Weightage The weightage for safety and health performance are allocated in accordance to three (3) components, as shown in Table 1. Table 2: The Weightage for Safety and Health Performance The weightage system is aimed at making the quantified score in representing the occupational safety and health performance of a project site. 2.3 Formula / Score The formulas for respective components are as follows: Table 3: SHASSIC Formula / Score for Document Check, Workplace Inspection and Personnel Interview where, C - total number of Compliance NC - total number of Non-compliance NA - total number of items that are Not Applicable The total SHASSIC score in Document Check (A) plus (+) total SHASSIC score in Workplace Inspection (B) plus (+) total score in Personnel Interview (C) components shall justify the star ranking. The stars awarded ranges from 1 star to 5 stars, as per Table 5. However, should the contractor fail to meet the minimum conformance level, the project may be given a certificate of participation. NO. COMPONENTS WEIGHTAGE (%) 1 Document Check 20 2 Workplace Inspection 60 3 Personnel Interview 20 COMPONENT FORMULA Document Check Total Number C Scored (57 – Number of NA) x 20% Workplace Inspection Total Number C Scored (72 – Number of NA) x 60% Personnel Interview Total Number C Scored (186– Number of NA) x 20%
  • 15. 8 8 2.4 SHASSIC Star Ranking Description Table 4: SHASSIC Star Ranking Description TOTAL SHASSIC (SCORE %) STAR(S) AWARDED DESCRIPTION 90 to 100 Excellent OSH management system planned and implemented with proactive commitment from top management to manage OSH at all times 80 to 89.9 Very good OSH management system planned and implemented with evidence of good commitment from top management to manage OSH at all time 70 to 79.9 Good OSH management system planned and need commitment from top management but need improvement in system implementation 60 to 69.9 Satisfactory OSH management with minimum plan and implementation, and need commitment from top management 50 to 59.9 Basic OSH management system with basic plan and implementation and required commitment from top management 49 and below Certificate of Participation ONLY Fail to meet the minimum requirement and poor in OSH performance and management. Note : CIDB may award CCD point for the projects scored with star rankings
  • 16. 9 9 ANNEX A DOCUMENT CHECK ITEM CHECKLIST C NC NA REMARKS A PROJECT OSH POLICY (NOTE: Project OSH Policy is only applicable to organisations with more than five (5) employees) 1 Whether there is a written Project OSH Policy Statement? 2 Has the SHC conducted a review to ensure suitability of Project OSH Policy Statement? 3 Whether Project OSH Policy Statement was written in Bahasa Malaysia? 4 Whether Project OSH Policy Statement was written in English? 5 Whether Project OSH Policy is signed by the top management? 6 Whether the Project OSH Policy is dated? 7 Whether there is any evidences Project OSH Policy being communicated to workers? B HIRARC 1 Are there documented HIRARC? 2 Whether HIRARC has been reviewed and updated? C DETERMINATION OF LEGAL REQUIREMENTS AND OTHER REQUIREMENTS 1 Are there documented legal requirements and other requirements Action Plan? 2 Is there a Legal Compliance Checklist & updated accordingly? 3 Is there a valid CIDB Registration Certificate? 4 Whether construction personnel registered with CIDB and holding a valid CIDB’s Personnel Registration Card? D OCCUPATIONAL HEALTH & SAFETY OBJECTIVES 1 Whether OH&S objectives evaluated from time to time? 2 OH&S objectives are integrated in other work activities or procurement process? TOTAL SCORE 9 5 Whether project site registered with DOSH? Hasnizam Md Saad
  • 17. 10 10 ITEM CHECKLIST C NC NA REMARKS E OH&S ROLES AND RESPONSIBILITIES 1 Whether the roles and responsibilities of all project’s personnel documented? 2 Whether the roles and responsibilities of all project’s personnel communicated to them? 3 Whether the project SHC is established in 4 Whether there is SSS appointed on site? 5 Designated Persons (DP) are assigned for respective BOWEC work activities. 6 There is a SHO employed for the project, which the contract sum is RM20 million and above. F COMPETENCE TRAINING AND AWARENESS 1 There is appropriate documented information on employee’s competency. 2 There is OSH Induction Training conducted. 3 Necessary competency and training required for employees have been identified. 4 There is Competence, Training and Awareness Action Plan. 5 Requirement on Competency, Training and Awareness is made known to employees. G COMMUNICATION, PARTICIPATION AND CONSULTATION 1 There is proof of communication related to OH&S Management System. 2 There is proof of workers’ participation and consultation. 3 Safety and Health Committee is established and meeting conducted on monthly basis. 4 Safety and Health Committee is involved for improvement of the OH&S Management System. ANNEX A (continued) DOCUMENT CHECK 10 accordance with OSH [SHC] Regulations 1996? Hasnizam Md Saad
  • 18. 11 $$" $ %))"6'%'@ABCDECFGHI' ,21*#").'18"19' +."#' 18"19!+-.' 1' )1' )%' /"#%/9-' 8' D.8<VG>CGD!$>L.AV7C$.>! %$ Q2+8+$ 64$ )$ E86,,+.$ /68+:,6=+$ *78$ :8+),6.B$ )./$ 9>/),6.B$/7:95+.,+/$6.*785),67.T$ $ $ $ $ ($ Q2+8+$ 64$ )$ 8+B64,+8$ _$ 17B$ *78$ )11$ )=)61)C1+$ K0e#$ @).)B+5+.,$#-4,+5T$ $ $ $ $ V$ Q2+8+$ 64$ 3:,67.$ L1).$ *78$ 4,78)B+I$ >87,+:,67.I$ 8+,86+=)1I$8+,+.,67.$)./$/64>74)1$7*$8+:78/4T$ $ $ $ $ +' .EGA7C$.>7_!E_7>>$>b!7>D!8.>CA._! %$ Q2+8+$)8+$/7:95+.,$7.$2)g)8/$+1656.),67.$)./$864D$ 8+/9:,67.$946.B$06+8)8:2-$7*$!7.,871T$ $ $ $ $ ($ Q2+8+$)8+$#[L$78$#["$78$#KL$*78$ ,28++$cVd$26B2W 864D$E78D$):,6=6,6+4T$ $ $ $ $ V$ Q2+8+$ 64$ 3:,67.$ L1).$ 7.$ :7.,87116.B$ ,+5>78)8-$ 78$ >+85).+.,$:2).B+4$7*$E78D$>87:+44+4T$ $ $ $ $ >' GVGAbG>8c!EAGE7AGD>G55!7>D!AG5E.>5G! %$ Q2+8+$ 64$ /7:95+.,c4d$ 6.$ >7,+.,6)1$ +5+8B+.:-$ 46,9),67.$6/+.,6*6:),67.$)./$6.6,6)1$+=)19),67.T$ $ $ $ $ ($ Q2+8+$ 64$ )$ >87]+:,$ F5+8B+.:-$ +4>7.4+$ L1).$ /+=+17>+/T$ $ $ $ $ V$ Q2+8+$ 64$ )$ >87]+:,$ F5+8B+.:-$ +4>7.4+$ Q+)5$ +4,)C1642+/$)./$,8)6.+/T$ $ $ $ $ 9' EGAL.AV7>8G!VG75<AGVG>C!7>D!V.>$C.A$>b! %$ Q2+8+$ 64$ ).$ 3:,67.$ L1).$ /+=+17>+/$ ,7$ 57.6,78I$ 5+)498+I$ ).)1-4+$ )./$ +=)19),+$ K0e#$ >+8*785).:+T$ $ $ $ $ ($ +>78,4$7.$57.6,786.BI$5+)4986.BI$).)1-46.B$)./$ +=)19),6.B$ K0e#$ >+8*785).:+$ )8+$ 8+=6+E+/$ C-$ >87]+:,$,7>$5).)B+5+.,T$ $ $ $ $ V$ Q2+8+$ 64$ ).$ 3:,67.$ L1).$ /+=+17>+/$ ,7$ +=)19),+$ 1+B)1$ 8+A968+5+.,4$ )./$ 7,2+8$ 8+A968+5+.,4$ :75>16).:+4T$ $ $ $ $ !' $>8$DG>CR!>.>8.>L.AV$Cc!7>D!8.AAG8C$[G!78C$.>! %$ Q2+8+$64$).$3:,67.$L1).$*78$8+>78,6.BI$6.=+4,6B),6.B$ )./$ ,)D6.B$ ):,67.$ 8+1),+/$ ,7$ 6.:6/+.,$ )./$ M7.:7.*7856,-$/+,+856.),67.$)./$5).)B6.BT$ $ $ $ $ ($ ".:6/+.,$8+:78/$_$17BC77D$_$8+B64,+8$64$+4,)C1642+/T$ $ $ $ $ $$" Hasnizam Md Saad
  • 19. 12 12 ANNEX A (continued) DOCUMENT CHECK ITEM CHECKLIST C NC NA REMARKS M INTERNAL AUDIT PROGRAMME 1 There is an Action Plan for Internal Audit program established, implemented and maintained. 2 DOSH Site Visit or Inspection Log Book is maintained. 3 Audit Report is reported to relevant managers for their further action. 4 There is action taken to address Nonconformity and continual improvement of OH&S performance. N CONSTRUCTION WORK ACTIVITIES 1 2 Site preparation - Safe Work Procedures 3 Certificate of Fitness (PMA) 4 Certificate of Fitness (PMT) 5 Machinery maintenance record 6 Local authorities’ approval to clear bush, remove top soil or felling of trees 7 Hoarding erection 8 Fogging TOTAL SCORE 12 Hasnizam Md Saad Records on temporary structure are checked and approved prior to use. (SWP)
  • 20. 13 13 ANNEX B WORKPLACE INSPECTION ITEM CHECKLIST C NC NA REMARKS A SITE OSH MANAGEMENT 1 There is displayed Project Safety OH&S Policy and communicated to all employees. 2 Project site site. 3 Are there any OSH Site Rules displayed on project site? B MOVEMENT OF VEHICULAR TRAFFIC 1 Whether traffic movement plan developed? C SIGNAGE AND COLOUR CODE 1 Mandatory Signage in BLUE 2 Prohibition Signage in RED 3 Warning Signage in YELLOW 4 Safe Signage in GREEN SUB SCORE 13 5 Assembly point with safety signage Hasnizam Md Saad DOSH registration number displayed at
  • 21. 14 ANNEX B (continued) WORKPLACE INSPECTION (CONSTRUCTION WORK ACTIVITIES) ITEM CHECKLIST HIGH RISK 1 HIGH RISK 2 HIGH RISK 3 REMARKS C NC NA C NC NA C NC NA D DESIGNATED PERSON APPOINTED 1 Competent and Trained Person E EQUIPMENT/MACHINERY 1 Approved 2 Certificate of Fitness (PMA / PMT) 3 Competent/Trained Operator 4 Machinery Guarding/Fencing 5 Trained rigger assigned? F MATERIAL 1 Material Handling Arrangement 2 Material Storage Arrangement 3 Safety Data Sheet (SDS) 4 Waste Material are disposed as planned G WORKING ENVIRONMENT 1 Safety/Notices Signage displayed 2 Permit to Work issued for high-risk activities? 3 Safe Access and Egress 4 Ventilation 5 Fall protection against falling from height (2 meter and more) available during construction activities. 14 Hasnizam Md Saad PEPC Designed
  • 23. 16 ANNEX C PERSONNEL INTERVIEW (CATEGORY A - MANAGERIAL) ITEM QUESTIONNAIRE MANAGEMENT REMARKS C NC NA 1 Are prevention of work related injury and/or health and the provision of safety and health workplaces and activities are committed / demonstrated by top management? 2 Are workers consultation and participation in OH&S program and activities assured by top management? 3 Who are the chairman and secretary for SHC meeting? 4 There is an organisational culture that supports the expected results of the OH&S MS? 5 What do you know about HIRARC? 6 Have you ever been involved in HIRARC exercise? 7 What is NADOPOD Regulations 2004? 9 Are you personally involved in OH&S management review and continual improvement for this project? SUB SCORE 16 8 How is the project OH&S performance being evaluated? Hasnizam Md Saad
  • 25. 18 ANNEX C (continued) PERSONNEL INTERVIEW (CATEGORY C - WORKERS) ITEM QUESTIONNAIRE WORKER 1 WORKER 2 WORKER 3 WORKER 4 WORKER 5 REMARKS C NC NA C NC NA C NC NA C NC NA C NC NA 1 Project OSH Policy is communicated to you? 2 Hazard and prevention of your work is communicated to you? 3 Do you know who is the Safety and Health Officer / Site Safety Supervisor? 4 Have you ever heard about workplace SHC? 5 Do you hold CIDB’s Personnel Registration Card? 6 Have you undergone specific workplace induction course? 7 Have you ever attended a toolbox meeting? 8 Have you participated in any Safety Campaign? 9 Are you a competent operator with valid license / authorised to operate this machinery / equipment / vehicle? 10 Is there a safety checklist for you to fill up prior to operating the machinery? 11 How do you handle chemicals / hazardous materials at the site? 18
  • 27. 20 ANNEX C (continued) PERSONNEL INTERVIEW (CATEGORY C - WORKERS) ITEM QUESTIONNAIRE WORKER 6 WORKER 7 WORKER 8 WORKER 9 REMARKS C NC NA C NC NA C NC NA C NC NA 1 Project OSH Policy is communicated to you? 2 Hazard and prevention of your work is communicated to you? 3 Do you know who is the Safety and Health Officer / Site Safety Supervisor? 4 Have you ever heard about workplace SHC? 5 Do you hold CIDB’s Personnel Registration Card? 6 Have you undergone specific workplace induction course? 7 Have you ever attended a toolbox meeting? 8 Have you participated in any Safety Campaign? 9 Are you a competent operator with valid license / authorised to operate this machinery/ equipment/vehicle? 10 Is there a safety checklist for you to fill up prior to operating the machinery? 11 How do you handle chemicals / hazardous materials at the site? 20 Hasnizam Md Saad
  • 29. 22 SECTION 3: SHASSIC ASSESSOR GUIDE ANNEX D DOCUMENT CHECK - ASSESSOR GUIDE ITEM CHECKLIST GUIDE A PROJECT OSH POLICY (NOTE: OSH Policy is only applicable to organisations with more than five (5) employees) 1 Whether there is a written Project OSH Policy Statement? 2 Has the SHC conducted a review to ensure suitability of Project OSH Policy Statement? 3 Whether Project OSH Policy Statement was written in Bahasa Malaysia? 4 Whether Project OSH Policy Statement was written in English? 5 6 22 To confirm availability of Project OSH Policy statement during the inspection (OSHA 1994, Section 16) and Clause 5.2 of ISO 45001:2018 To confirm the policy statement has been reviewed regularly by SHC and make a recommendation to the employers in order to ensure the policy remains relevant and appropriate (OSH [SHC] Regulations 1996, Regulation 11 (d)) To confirm availability of policy statement written in Bahasa Malaysia (Clause 5.2 of ISO 45001:2018) To confirm availability of policy statement written in English (Clause 5.2 of ISO 45001:2018) To check the Policy is signed by current PD or PM or both with name (s) written on it (Clause 5.2 of ISO 45001:2018) To check for the date printed on the Project OSH Policy statement (Clause 5.2 of ISO 45001:2018) 7 Whether there is any evidences Project OSH workers? To check on documented evidence(s) on Project OSH Policy being communicated to workers (Clause 7.4 of ISO 45001:2018) Whether Project OSH Policy is signed by the top management? Whether the Project OSH Policy is dated? Policy being communicated to
  • 30. 23 B HIRARC 1 Are there documented HIRARC? 6.1.4  Sub-sub-clauses of 6.1.2.1, 6.1.2.2 and 6.1.2.3. 2 Whether HIRARC has been reviewed and updated? a) To check the availability of written action plan and approved by project top management. 6.1.4  Sub-sub-clauses of 6.1.2.1, 6.1.2.2 and 6.1.2.3. 23 1 2 a) To check the availability of written action plan and approved by project top management b) Please refer to:  ISO 45001:2018, Clause of 6.1  Sub-clauses of 6.1.2, 6.1.3 and b) Please refer to:  ISO 45001:2018, Clause of 6.1  Sub-Clauses of 6.1.2, 6.1.3 and Hasnizam Md Saad
  • 31. 24 C DETERMINATION OF LEGAL REQUIREMENTS AND OTHER REQUIREMENTS 1 Are there documented legal requirements and other requirements Action Plan? To check the availability of legal registers and legal requirements and other requirements Action Plan. Latest amendments of the following should be updated in the register as minimum: a. OSHA 1994 (Act 514) inclusive of Regulations, Orders, Exemptions, Prohibition and Schedules b. FMA 1967 (Act 139) inclusive of Regulations, Orders, Exemptions, Prohibition and Schedules c. DOSH, Code of Practice for Road Transport Activities, 2010 d. DOSH, Industrial Code of Practice for Safe Working in Confined Space, 2010 e. Factories and Machinery (Person-in- Charge) (Amendment) Regulations, 2014 f. Exemption of CF for Hoisting Machine Order 2015 h. Permits, licenses or other forms of authorization i. Judgements of courts or administrative tribunals j. Treaties, conventions, protocols k. Collective bargaining agreements l. The organisation’s requirements m. Contractual conditions n. Employment agreements o. Agreements with interested parties p. Agreements with health authorities q. Non-regulatory standards, consensus standards and guidelines r. Voluntary principles, codes of practice, technical specifications, charters s. Public commitments of the organisation or its parent organisation 2 To check whether the respectively accessibility are reflected in legal requirements and other requirements action plan 3 Is there a valid CIDB Registration Certificate? 24 g. CIDB Act 1407 (Amendment) (Act 2011) inclusive of Regulations, Orders, Exemptions, Prohibition and Schedules (ISO 45001:2018, Sub-clause 6.1.3) (ISO 45001:2018, Sub-clause 6.1.3) To check whether the main contractor has a valid license with CIDB (CIDB Act 1994 (Amendment 2011), Section 25) Is there a Legal Compliance Checklist & updated accordingly? Whether construction personnel registered with CIDB and holding a valid CIDB’s Personnel Registration Card? To check whether the main contractor employees register /list or has a log book on CIDB's Personnel Registration Card records and has declared and submit the awarded contract to CIDB. (CIDB Act 1994 (Amendment 2011), Section 33 (1)) 4
  • 32. 25 D OCCUPATIONAL HEALTH & SAFETY OBJECTIVES 1 2 OH&S objectives are integrated in other work activities or procurement process? To check the project OH&S objectives reflected in project OH&S plan and management & work procedures 25 5 Wether project site registered with DOSH? To check the availability of form JKJ 103 To obtain report and action plan that are approved by project top management on evaluation of project OH&S objectives and relevant plan to achieve them. (ISO 45001:2018, Sub-clause 6.2.1 and 6.2.2) Whether OH&S objectives evaluated from time to time?
  • 33. 26 ANNEX D (continued) DOCUMENT CHECK ITEM CHECKLIST GUIDE E OH&S ROLES AND RESPONSIBILTIES 1 Whether the roles and responsibilities of all project’s personnel documented? 2 Whether the roles and responsibilities of all project’s personnel is communicated to them? 5 Designated Persons (DP) are assigned for respective BOWEC work activities. To check in project organisation chart and appointment letter of respective DP 6 To check in the project’s organisation chart and record of registration of the respective Safety & Health Officer with DOSH F COMPETENCE TRAINING AND AWARENESS 1 There is appropriate documented information on employee’s competency. To check competent employees register or log book or name list. 2 There is OSH Induction Training conducted. 3 Necessary competency and training required for employees have been identified. To check OSH Training Need Analysis (TNA) 26 (OSHA 1994, Section 15 and 24) and (ISO 45001:2018, Clause 5.3 and 5.4) To confirm that the OSH responsibilities are incorporated in either Safety Induction Minutes, Training Module Minutes, Toolbox Meeting Minutes or signed-off evidence, etc. (OSHA 1994, Section 15 and 24) and (ISO 45001:2018, Clause 5.3 and 5.4) a) To obtain the project organisation chart b) To confirm with the Committee Organisation Chart, minutes of meeting and meeting attendance name list, appointment letter (OSHA 1994, Section 30) and (OSH [SHC] Regulations 1996) (ISO 45001:2018, Sub-clause 7.2) (ISO 45001:2018, Sub-clause 7.2 and OSHA 1994, Section 15 (2)(c)) To verify OH&S duties and responsibilities, authority and accountability of employees of all levels as per the personnel in the project’s organisation chart and spelled in the Project OH&S Plan or employees’ Job Description records 4 3 Whether the project SHC is established in accordance with OSH [SHC] Regulations 1996? To check OSH Induction training record There is a SHO employed for the project, which the contract sum is RM20 million and above. To check in the project's organisation chart and record of registration of the respective Site Safety Supervisor with DOSH Whether there is SSS appointed on site? (OSHA 1994, Section 15 (2) (c) and ISO 45001:2018, Sub-clause 7.2 and 8.1.1 (2))
  • 34. 27 4 There is Competence, Training and Awareness Action Plan. 5 Requirement and Awareness is made known to employees. G COMMUNICATION, PARTICIPATION AND CONSULTATION 1 There is proof of communication related to OH&S Management System. To check minutes of meeting, letter, memo directive, action plan on communication, consultant and participation of workers related to OSH MS 2 There is proof of workers’ participation and consultation. To check minutes of meeting, letter, memo directive, action plan on communication, consultant and participation of workers related to OSH MS 3 To check, letter, memo, minutes of meeting, directive by project top management on establishment of project SHC 4 To check, letter, memo, minutes of meeting, directive by project top management on establishment of project SHC 27 To check with Competency, Training and Awareness Action Plan. (ISO 45001:2018, Sub-clause 7.2 and OSHA 1994, Section 15 (2)(c)) To check with Induction, Training module, Letter or memo to employees, instruction or directive in action plan (ISO 45001:2018 Sub-clause 7.2 and OSHA 1994, Section 15 (2) (c)) (ISO 45001:2018, Sub-clause 7.3) (ISO 45001:2018, Sub-clause 5.4) (OSHA 1994, Section 30 and OSH [SHC] Regulations 1996) (OSHA 1994 Section 30 and OSH [SHC] Regulations 1996) on Competency, Training Safety and Health Committee is established and meeting conducted on monthly basis. Safety and Health Committee is involved for improvement of the OH&S Management System.
  • 35. 28 ! ' '% -2&,$#1"#-%!132/$0"!21% @' $:575'-0'2'97-6651'D-75.6-=5'<+7'.7526-18' 21D' E3D26-18' D+.E;5165D' -1<+7;26-+1K' L' $:575' -0' 2' 758-0657' d' ,+8' <+7' 2,,' 2=2-,24,5' #)f(' W21285;516' (/065;K' $+' .:5.P' 6:5' 2=2-,24-,-6/' +<' 758-0657' d' ,+8' <+7' 2,,' 2=2-,24,5' D+.E;5165D' -1<+7;26-+1' +1' #)f(' W21285;516'(/065;' U' $:575'-0'21'F.6-+1'*,21'<+7'06+7285T' 37+65.6-+1T' 7567-5=2,T' 756516-+1' 21D' D-03+02,'+<'75.+7D0K' $+'.:5.P'6:5'2=2-,24-,-6/'F.6-+1'*,21'<+7'06+7285T' 37+65.6-+1'7567-5=2,'756516-+1'21D'D-03+02,'+<' 75.+7D0' !% 25#/0"!210)%5)011!1+%01-%&21"/2)% @' $:575' 275' D+.E;5160' +1' :2_27D' 5,-;-126-+1' 21D' 7-0P' 75DE.6-+1' E0-18' )-5727.:/'+<'J+167+,K' L' $:575' 275' (A*' +7' (AM' +7' (#*' <+7' 6:755'!U?':-8:Z7-0P'9+7P'2.6-=-6-50K' $+' .:5.P' (2<5' A+7P' *7+.5DE75' !(A*?' +7' (2<5' A+7P' M1067E.6-+1' !(AM?' +7' (2<5' #35726-+1' *7+.5DE75' !(#*?' +<' 6:5' 6:755' !U?' :-8:Z7-0P' 9+7P' 2.6-=-6-50'D5657;-15D'4/'()F((MJ'F00500+7' U' $:575' -0' F.6-+1' *,21' +1' .+167+,,-18' 65;3+727/' +7' 357;21516' .:21850' +<' 9+7P'37+.50050K' @' $:575' -0' D+.E;516!0?' -1' 3+6516-2,' 5;57851./'0-6E26-+1'-D516-<-.26-+1'21D' -1-6-2,'5=2,E26-+1K' $+'.:5.P'6:26'6:575'-0'D+.E;516d0'+1'216-.-3265D' 5;57851./' 0-6E26-+1' -D516-<-.26-+1' 21D' -1-6-2,' 5=2,E26-+1' L' $:575' -0' 2' 37+B5.6' %;57851./' S503+105'*,21'D5=5,+35DK' $+' .:5.P' 6:26' 6:575' -0' 2' *7+B5.6' %;57851./' S503+105' *,21' 50624,-0:5DT' -;3,5;5165D' 21D' ;2-162-15D' U' $:575' -0' 2' 37+B5.6' %;57851./' S503+105'$52;'50624,-0:5D'21D' 672-15DK' ' (% 5#/32/$01&#%$#0*,/#$#1"%01-%$21!"2/!1+% @' $:575'-0'21'F.6-+1'*,21'D5=5,+35D'6+' ;+1-6+7T' ;520E75T' 212,/05' 21D' 5=2,E265'#)f('357<+7;21.5K' $+' .:5.P' D+.E;516!0?' +7' 75.+7D!0?' -1' 75827D0' 6+' 357<+7;21.5';+1-6+7-18T';520E75;516T'212,/0-18' 21D'5=2,E26-18'2.6-=-6-50K' LO' ' ' ! !M(#'H>NN@&LN@O,'(E4Z.,2E05'YK>?' $+'.:5.P'<+7'6:5'2=2-,24-,-6/'+<'97-6651'D-75.6-=5'<+7' .7526-18' 21D' E3D26-18' D+.E;5165D' -1<+7;26-+1' !M(#'H>NN@&LN@O,'(E4Z.,2E05'YK>?' $+' .:5.P' 9-6:' )MSFSJT' `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eam' 50624,-0:5DT' -;3,5;5165DT' ;2-162-15D'21D'%S$'672-1-18'75.+7DK' !M(#'H>NN@&LN@O,'J,2E05'GK@?' (ISO 45001:2018, Sub-clause 7.5) (ISO 45001:2018, Sub-clause 8.2) (ISO 45001:2018, Sub-clause 8.2)
  • 36. 29 2 Reports on monitoring, measuring, analysing and evaluating OH&S performance are reviewed by project top management. To check report on monitoring, measuring, analysing and evaluating OH&S performance is reviewed by project top management. 3 There is an Action Plan developed to evaluate legal requirements and other requirements compliances. L INCIDENT, NONCONFORMITY AND CORRECTIVE ACTION 1 There is an Action Plan for reporting, investigating and taking action related to incident and Nonconformity determination and managing. To check the availability of documented Action Plan for reporting, investigating and taking action related to incident and Nonconformity determination and managing 2 Incident record / logbook / register is established. M INTERNAL AUDIT PROGRAMME 1 There is an Action Plan for Internal Audit program established, implemented and maintained. To checked documented audit plan including frequency, methods, responsibilities, consultation, reporting, auditor selection, etc. 2 DOSH Site Visit or Inspection Log Book is maintained. To check the availability of DOSH Site Visit or Inspection Log Book 3 Audit Report is reported to relevant managers for their further action. To check audit report transmittal / memo / letter, etc. To check with the documented document on Nonconformity and continual improvement action taken N CONSTRUCTION WORK ACTIVITIES 1 29 (ISO 45001:2018, Sub-clause 9.1.1) To check document or record on the process of identifying gaps in compliance. (ISO 45001:2018, Sub-clause 9.1.2) (ISO 45001:2018, Sub-clause10.2) (ISO 45001:2018, Sub-clause 10.2) (ISO 45001:2018, Sub-clause 9.2.2) To check the availability of documented incident, Nonconformity and corrective action record / logbook / register (ISO 45001:2018, Sub-clause 9.2.2) 4 There is action taken to address Nonconformity and continual improvement of OH&S performance. (ISO 45001:2018, Sub-clause 9.2.2) 2 Assessor to confirm the availability of site preparation SWP or any similar document prepared prior to site mobilisation (date and approved by consultant / PM) (OSHA 1994, Section 15) 3 Certificate of Fitness (PMA) To check for availability of original and valid “Perakuan Kelayakan Mesin Angkat” (PMA) and is visibly displayed on / at the machinery (FM [NCFAI] Regulations 1970, Regulation 10) Site preparation - Safe Work Procedures (SWP) Hasnizam Md Saad Records on temporary structure are checked and approved prior to use. Assessor to check the availability of Certificate of Standards Compliance (Perakuan Pematuhan Standard) / Certificate of Approval for scaffolding issued by CIDB.
  • 37. 30 4 Certificate of Fitness (PMT) Factories and machinery (Exemption of certificate of fitness for unfired pressure vessel) order 2017 6 Local authorities’ approval to clear bush, remove top soil or felling of trees. To check for availability of approval from local authorities. 7 Hoarding erection Assessor to confirm the availability of a safe work procedures (SWP) for the erection of hoarding and observe the condition of hoarding, maintained as per stated in the SWP, based on approved drawings (Guideline for Public Safety, DOSH 2007, Section 11.2) 8 Fogging To check records on fogging records on fogging activities carried out at construction site. 30 5 Machinery maintenance record To check for the availability of warning / safety notice/tagging on the machinery during maintenance and servicing (FMA 1967, Section 18 / OSHA 1994, Section 15)
  • 38. 31 ANNEX E WORKPLACE INSPECTION - ASSESSOR GUIDE ITEM CHECKLIST GUIDES A SITE OSH MANAGEMENT 1 There is displayed Project Safety OH&S Policy and communicated to all employees. Assessor to obtain hard copy of Project Safety OH&S Policy and observed that policy had been displayed adequately at various strategic locations 2 Project site displayed at site. Assessor to obtain a copy of Form JKJ 103 as physical evidence 3 Are there any OSH Site Rules displayed on project site? Assessor to observe that there is OSH Site Rules displayed on project site (Section 15 of OSHA 1994) B MOVEMENT OF VEHICULAR TRAFFIC 1 Whether traffic movement plan developed? C SIGNAGE AND COLOUR CODE (NOTE: Visual inspection to check appropriate usage of international color codes for signage and location) 1 Mandatory Signage in BLUE Assessor to observe that there are signages for PPE usage such as safety helmet, safety footwear, safety vest, safety eye protection, full body harness, etc. are displayed adequately (MS 2558:2014) 2 Prohibition Signage in RED Assessor to observe that there are prohibition signage such as No Entry, No Smoking, No Naked Light, etc. are adequately displayed (MS 2558:2014) 3 Warning Signage in YELLOW Assessor to observe that there are warning signage such as Warning Overhead Load, Warning Slippery Floor, etc. are adequate displayed (MS 2558:2014) 4 Safe Signage in GREEN Assessor to observe that there are safe signage 5 Assembly point with safety signage Safety sign board placed at identified suitable location either within the site or off the site clearly visible by everyone. 31 (ISO 45001:2018, Sub-clause 5.2) (FMA 1967, Section 35) Assessor to observe that there is traffic movement arrangement observed on site (Traffic signage, Flagman, route indicators, etc.) (FM [BOWEC] (Safety) Regulations 1986, Regulation 18) such as First Aid Box and room locations, Assembly Point/Area, safe escape route, etc. are adequately displayed (MS 2558:2014) DOSH registration number
  • 39. 32 ANNEX E (continued) WORKPLACE INSPECTION (continued) (CONSTRUCTION WORK ACTIVITIES) ITEM CHECKLIST GUIDES D DESIGNATED PERSON APPOINTED 1 Competent and Trained Person Assessor to obtain copy of respective competency or training certificate 1 Approved PEPC Designed Assessor to obtain Approved PEPC (Professional Engineer with Practicing Certificate) Design for respective equipment/machinery (Chute above 12 meter, Ramp for vehicle access, Scaffold above 15 meter for frame and modular and 40 meter for tubular, loading or catch platform, etc.) 2 Certificate of Fitness (PMA / PMT) To check the availability of original and valid “Perakuan Kelayakan Mesin Angkat” (PMA) or “Perakuan Kelayakan Mesin Tekanan” (PMT) and is visibly displayed on/at the machinery (FM [NCFAI] Regulations 1970, Regulation 10) To check whether the rigger has attended training before assigned to carry out the task. Pass experience also can be considered. F MATERIAL 1 Material Handling Arrangement To check the handling of hazardous and non- hazardous materials as per approved procedures (OSH [USECHH] Regulations 2000) 2 Material Storage Arrangement To check the availability of Safety Data Sheet for hazardous material or substances (OSH [CLASS] Regulations 2013) 32 (ISO 45001:2018, Sub-clause 7.2) E EQUIPMENT / MACHINERY 3 Competent/Trained Operator To check the availability of original and valid license of machinery operator (FMA 1967, Section 29 and OSHA 1994, Section 25) 4 Machinery Guarding/Fencing When power-operated tools are designed to accommodate guards, they shall be equipped with such guards when in use (FM [BOWEC] (Safety) Regulations 1986, Regulation 147) To observe that all material in bags, containers, timber or bundles and other material stored in tier shall be stacked, blocked, interlocked and limited in height so that it will be stable and otherwise safe against sliding and collapse (FM [BOWEC] (Safety) Regulations 1986, Regulation 119) 3 Safety Data Sheet (SDS) 5 Trained rigger assigned?
  • 40. 33 4 To comply to approved and documented action plan G WORKING ENVIRONMENT 1 Safety/Notices Signage displayed Simple but effective warning notice in national language shall be placed 2 Permit to Work issued for high risk activities To check the availability and usage of permit to work at site (Hot Work Permit, Working at Height, Deep Excavation Permit, and Confined Space Work Permit etc.) 3 Safe Access and Egress To observe for the provision of access/egress, clearly marked, free from any obstruction. Stairways, ramps or runways shall be provided (FM [SHW] Regulations 1970, Regulation 7) 4 Ventilation To check adequate natural/mechanical ventilation provided at the workplace 5 Fall protection against falling from height (2 meter and more) available during construction activities. To visually observe the guardrails and handrails, toe boards, safety net and etc. 6 Adequate Illumination To visually observe sufficient light (natural or powered) at the work vicinity 7 Movement of Vehicular Traffic is in order To visually observe the vehicular traffic control as per approved plan; warning sign, channelising device, flagman, etc. 8 Temporary fixed and constructed as per the intended use / as per PEPC design. 9 Workers are using appropriate PPE To check on the appropriate use of PPE by workers. 10 Standing supervision by the SSS / DP for hazardous activities e.g. working at height, mechanical lifting or etc. Site Safety Supervisor / Designated Person shall present and supervise hazardous activities. 11 Openings at inside building are properly guarded and secured from falling of objects / worker. To check all openings inside buildings are properly guarded and secured from falling of objects / workers. 33 (FM [BOWEC] (Safety) Regulations 1986, Regulation 104) (FMA 1967, Section 22 and Regulation 25 of FM [SHW] Regulations 1970 (FMA 1967, Section 22(e) and Regulation 29 of FM [SHW] Regulations 1970) (FM [BOWEC] (Safety) Regulations 1986, Regulation 18) To check all temporary works compliance against PEPC (Professional Engineer with Practicing Certificate) design. (FM [BOWEC] (Safety) Regulations 1986) Hasnizam Md Saad structure are installed, Waste Material are disposed as planned
  • 41. 34 ANNEX F PERSONNEL INTERVIEW - ASSESSOR GUIDE (CATEGORY A - MANAGERIAL) ITEM QUESTIONNAIRE GUIDES 1 Are prevention of work related injury and/or health and the provision of safety and health workplaces and activities are committed / demonstrated by top management? Interviewee should be able to answer that “we do oblige and obligation is reflected in our Project OSH policy statement, OSH objectives and Project OSH Plan” 2 Are workers consultation and participation in OH&S program and activities assured by top management? Assessor to obtain relevant documents such as documented instruction or directive, minutes of meeting, Project OSH Plan, etc. 3 Who is the chairman and secretary for SHC meeting? Interviewee shall answer that PM / PD / CM will chair the site meeting. The secretary shall be SHO assigned for the project. If the project is below RM20 million, the chairman may appoint any one of the members of the SHC’s 4 There is an organisational culture that supports the expected results of the OH&S MS? Assessor to obtain documented instruction or directive in the regard 6 Have you ever been involved in HIRARC exercises? Assessor to obtain documented evidence, i.e. attendance list, minutes of meeting, etc. 8 How is the project OH&S performance being evaluated? 9 Are you personally involved in OH&S management review and continual improvement for this project? Assessor to obtain documented evidence, i.e. attendance list, minutes of meeting, etc. 34 member as secretary. 5 What do you know about HIRARC? Interviewee should be able to explain and elaborate project health and safety hazards/risks management processes such as HI, RA, RC, hierarchy of control, etc. Assessor to obtain project OH&S performance report (Internal audit report, inspection report, etc.) 7 What is NADOPOD Regulations 2004? Notifications and reporting of accident, dangerous occurrence, occupational poisoning and occupational disease & its regulations made under OSHA 1994 (Act 514) Hasnizam Md Saad
  • 42. 35 ANNEX F (continued) PERSONNEL INTERVIEW - ASSESSOR GUIDE (CATEGORY B - SUPERVISORY) ITEM QUESTIONNAIRE GUIDES 1 What do you know about work hazard, risk evaluation and control? Interviewee should be able to elaborate the HI, RA, RC and hierarchy of control processes 2 When do you review your risk control measure? When there are changes in work method, machinery or equipment used for the work, new working environment and after every accident. 3 How often is the SHC meeting conducted? Assessor to check with project SHC organisation chart for the answer 5 Have you attended any related safety and health training during the project period? Assessor to check with training record and attendance 6 Have you attended any accident investigation training? Assessor to check with project accident investigation training attendance list / records 7 Are you involved in the safety training / promotion at the site? Assessor to check with project training and promotion records, SHC minutes of meeting, training attendance list / records 8 Do you check the temporary structures are installed and fixed according to its intended use or PEPC design? Interviewee should be able to elaborate how does the checking process before allowing the workers carry out the activities identified in HIRARC. 35 SHC Meeting being conducted at least once a month ref Act 139 (FM [BOWEC] (Safety) Regulations 27(3)) or at least once in 3 months ref Act 514 (OSH [SHC] Regulations 1996, Regulation 21 (1)) 4 Who is the chairman of the committee?
  • 43. 36 ANNEX F (continued) PERSONNEL INTERVIEW - ASSESSOR GUIDE (CATEGORY C - WORKERS) ITEM QUESTIONNAIRE GUIDES 1 Interviewee should be able to describe what is OSH policy and where it was carried out. The answer ‘yes’ must be elaborated. 2 Hazard and prevention of your work is communicated to you? 3 Do you know who is the Safety and Health Interviewee should be able to mention the name of Safety and Health Officer or Site Safety Supervisor 4 Have you ever heard about workplace SHC? Interviewee should be able to describe what is workplace SHC. 5 Do you hold Personnel Registration Card? 6 Have you undergone specific workplace induction course? The interviewee should be able to explain when he/she underwent the course as these works may require to undergo specific safety course prior to commencing with the work at the site. Assessor to obtain a hard copy of Safety and Health Induction records prior to the interview and confirm the attendance 7 Have you ever attended a toolbox meeting? 8 Have you participated in any Safety Campaign? The interviewee should be able to explain the campaign which he/she had attended (Assessor to obtain Safety Campaign Records prior to interview). 9 Are you a competent operator with valid license / authorised to operate this The interviewee should be able to show the document to confirm valid license or letter of authority from the employer 10 Is there safety checklist for you to fill up prior to operating the machinery? Assessor to confirm reply with safety checklist. Assessor to obtain safety checklist records prior to the interview (OSHA 1994, Section 15) 36 (OSHA 1994, Section 15) Assessor to confirm the attendance of the employee by checking the copy of the past Toolbox Talk attendance list (Assessor to obtain a copy of the Toolbox Talk attendance list) (OSHA 1994, Section 15) (ISO 45001:2018, Sub-clause 7.2) To request the employee to show the CIDB's Personnel Registration Card. Assessor to check and confirm the validity of the CIDB's Personnel Registration Card (CIDB Act 1994 (Amendment 2011), Section 33(1)) Interviewee should be able to describe hazards inherent in his work and what are the relative control measures that are put into place or provided for him by his employer. The answer ‘yes’ must be elaborated. Project OSH Policy is communicated to you? Officer / Site Safety Supervisor? CIDB's machinery / equipment / vehicle?
  • 44. 37 11 How do you handle chemicals / hazardous materials at the site? 12 Do you know what to do during an emergency / accident? The interviewee should be able to describe what he/she needs to do during an emergency, which is described in the Emergency Preparedness Plan. To confirm the response with Emergency Preparedness Plan - Emergency Action Flow Chart 13 What would you do if you witness someone injured? 14 Can you show me the assembly point? The interviewee should be able to show the nearest assembly point. Assessor to confirm with Emergency Preparedness Plan for the location of assembly point (OSH [CIMAH] Regulations 1996) 15 Can you identify your First Aider? The interviewee should be able to identify the First Aider. Assessor to confirm with Emergency Preparedness Plan (FM [SHW] Regulations 1970, Regulation 38) 16 Where is the location of the First-Aid Box? (FM [SHW] Regulations 1970, Regulation 38) 17 Where is the nearest Fire Extinguisher? The interviewee should be able to show the nearest Fire Extinguisher. Assessor to confirm with Emergency Preparedness Plan (FMA 1967, Section 13) 37 (ISO 45001:2018, Sub-clause 8.2) The interviewee should be able to explain his actions when he witnesses someone who is injured. Assessor to confirm the response with AI (Accident Investigation) and RP (Response Plan) (ISO 45001:2018, Sub-clause 10.2) The interviewee should be able to show the nearest location of the First-Aid Box. To confirm location with Emergency Preparedness Plan The interviewee should be able to describe the requirements pertaining to OSH [USECHH] Regulations 2000, and OSH [CLASS] Regulations 2013 examples labelling, handling, transporting, storage, etc. Hasnizam Md Saad
  • 45. 38 ACKNOWLEDGEMENT Construction Industry Development Board, Malaysia would like to extend our sincere appreciation to all those involved in the development of this standard. Advisor of Construction Industry Standard Datuk Ir. Ahmad ‘Asri Abdul Hamid Chief Executive, CIDB Malaysia Chairman of Construction Industry Standard Main Committee Datuk Ir. Elias Ismail Deputy Chief Executive I, CIDB Malaysia Technical Committee Ir. M. Ramuseren (Chairman) Construction Industry Development Board Malaysia (CIDB) Secretariat: Norhidayah Razali / Atiqah Syahira Rosman Amran Ir. K. Sundraraj Associate of Consulting Engineers Malaysia (ACEM) Syed Hazni Abd Ghani / Construction Research Institute of Malaysia (CREAM) Muhamad Azam Azmai Ir. Mokhtar Sabtu Department of Occupational Safety and Health Malaysia (DOSH) Jayasegaran Karuppiah IOI Properties Group Berhad Mohd Khairul Najmi Mohd Kamarudin Jabatan Kerja Raya (JKR) Abd Rahim Senin Master Builder Association Malaysia (MBAM) She Kok Keong Malaysian Occupational Safety and Health Practitioners (MOSHPA) Muhamad Arif Hamzah Malaysian Society for Occupational Safety & Health (MSOSH) Ar. Abu Zarim Abu Bakar Pertubuhan Arkitek Malaysia (PAM) Abdul Karim Mohamad Real Estate & Housing Development Association (REHDA) Mazlan Ismail Toklan OSH Services Dr. Yap Soon Poh Universiti Malaya (UM) 38