PMM / Jochen Knecht 01.07.2009
plaster mortar
Types of Mortar
floor screed
shotcrete mortar
fire-proofing mortar
repair mortar
• sand: 0-4mm
• pumpability!
• select binder acc. to setting time,
water & air resistance requirements
• sand: 0-8mm
• pumpability!
• admixtures: fibres -> density
• normal: 1:2,5 to 1:3
( cement : sand
-> volume)
• normal: 1:4
(cement : sand)
• sand: 0-8mm • admixtures: for very quick setting time
• sand: 0-4mm
• pumpability!
• no site-mix
• delivered by RMC
• no site-mix
only ready-mix
• admixtures: for fire-resistance
• mixing time normally >3 min => no MP25!
• sand: 0-4mm
• pumpability!
• no site-mix
only ready-mix
• admixtures: acc. to special requirements
• preferrably with worm pump
PMM / Jochen Knecht 01.07.2009
Types of Plaster Mortars according to binder
++0-pumpability
+++0-finish (interior)
+++0--flexibility
--
(not in wet areas =>
fungal problems)
0+++water resistance
--0+++density
gypsumlimelime/cementcement-> binder
PMM / Jochen Knecht 01.07.2009
Exterior plastering => which plaster type?
lime cement
cement mortar
PMM / Jochen Knecht 01.07.2009
Interior plastering => which plaster type?
gypsum, lime,
lime/cement or
cement based
plaster
READY MIXED
or SITE MIX
PMM / Jochen Knecht 01.07.2009
Ready-mix
Machine plastering material: ready-mix or site-mix?
Site-mix
costs
availability
pumpability
plaster quality
operator errors
special properties,
applications
?
?
plaster
sand (?)
PMM / Jochen Knecht 01.07.2009
Plaster sand – grain size composition
2 - 4 mm
1 - 2 mm
0,5 - 1 mm
0,25 - 0,5 mm
0,125 - 0,25 mm
< 0,125 mm (“dust”) dust is a must in the mixture in order to
receive pumpable material
5 -
10%
5 -
10%
15 -
20%
12 -
18%
10 -
15%
30 -
40%
PMM / Jochen Knecht 01.07.2009
Washed sand
dust particles are missing => mortar is not pumpable!
Washed sand, e.g. river sand
2 - 4 mm
1 - 2 mm
0,5 - 1 mm
0,25 - 0,5 mm
0,125 - 0,25 mm
PMM / Jochen Knecht 01.07.2009
Example for dune sand (single grain sand)
0,5 mm
single grain size
Material with this sand quality is not pumpable without optional:
- stone powder - lime
- fly ash - other chemical admixtures
How to test pumpability?
1. Fill material together with water
into a bucket and mix properly
1. Wait for 10 min. 1. If water separates from material
=> mixture is NOT pumpable!
10 min.
PMM / J. Knecht 29.02.2009
Grain size composition of 4mm plaster sand
The ideal gradiation for mortar machines is between standard curves B4 and C4
0
10
20
30
40
50
60
70
80
90
100
0 0,125 0,150 0,25 0,30 0,50 0,60 1 1,18 2 2,36 4 4,75
Particle Size [mm]
PercentagePassing[%]
B4 C4
the content of fines (filler, clay, dirt) is very important for the
pumpability - the more the better !
The content of the fine particles (fillers, clay, dust) is very important for the
pumpability! But, if it is too much, cracks may occure due to the higher shrinkage.
PMM / J. Knecht 29.02.2009
Grain size composition of shotcrete sand
Shotcrete Aggregate Grading 3/8 inch
0
85
2
10
25
50
80
95
100 100 100
60
30
10
0
10
20
30
40
50
60
70
80
90
100
0 No.100 = 150μm No.50 = 300μm No.30 = 600μm No.16 = 1.18mm No.8 = 2.36mm No.4 = 4.75mm 3/8inch = 9.5mm
Sieve Size
PercentByMassPassingIndividualSieves[%]

More Related Content

What's hot

Consistency test,Initial & Final setting time of Hydraulic Cement specimen
Consistency test,Initial & Final setting time of Hydraulic Cement specimenConsistency test,Initial & Final setting time of Hydraulic Cement specimen
Consistency test,Initial & Final setting time of Hydraulic Cement specimen
MUST,Mirpur AJK,Pakistan
 
Fineness test on cement
Fineness test on cementFineness test on cement
Fineness test on cement
HARISH B A
 
3 setting time of cement
3 setting time of cement3 setting time of cement
3 setting time of cement
University of Salahaddin-Erbil
 
97170708 estimate-of-material-and-labor
97170708 estimate-of-material-and-labor97170708 estimate-of-material-and-labor
97170708 estimate-of-material-and-laborimaduddin91
 
Setting time test
Setting time testSetting time test
Setting time test
Muhammad Saleem
 
Fineness test of Cement
Fineness test of CementFineness test of Cement
Fineness test of Cement
PTUT Lahore
 
How to determine Standard consistency of cement?
How to determine Standard consistency of cement?How to determine Standard consistency of cement?
How to determine Standard consistency of cement?
Civil Insider
 
Experiment no 03 setting time of cement.
Experiment no 03 setting time of cement.Experiment no 03 setting time of cement.
Experiment no 03 setting time of cement.
Sayed Sajid H.Zidani
 
2 standard consistency of cement
2 standard consistency of cement2 standard consistency of cement
2 standard consistency of cement
University of Salahaddin-Erbil
 
Time&temperature of processing eva film laminated glass
Time&temperature of processing eva film laminated glassTime&temperature of processing eva film laminated glass
Time&temperature of processing eva film laminated glass
CNC Glass Interlayer(China)
 
How to determine compressive strength of cement?
How to determine compressive strength of cement?How to determine compressive strength of cement?
How to determine compressive strength of cement?
Civil Insider
 
Cement testing
Cement testingCement testing
Cement testing
sigmatest21
 
Tests on cement
Tests on cementTests on cement
Tests on cement
Deviprasad
 
Job 3
Job 3Job 3
CE244 LAB RAPORU
CE244 LAB RAPORUCE244 LAB RAPORU
CE244 LAB RAPORU
2001211020
 
Normal Consistency and Sitting times of cement paste
Normal Consistency and Sitting times of cement pasteNormal Consistency and Sitting times of cement paste
Normal Consistency and Sitting times of cement paste
Hafizullah Sadat
 
Fineness air permeability final (1)
Fineness air permeability final (1)Fineness air permeability final (1)
Fineness air permeability final (1)
Dave Madhav
 
TESTING OF CEMENT IN LABORATORY
TESTING OF CEMENT IN LABORATORYTESTING OF CEMENT IN LABORATORY
TESTING OF CEMENT IN LABORATORY
pwhite91
 
Standard consistency
Standard consistencyStandard consistency
Standard consistency
HARISH B A
 
Fineness of cement test
Fineness of cement testFineness of cement test
Fineness of cement test
Muhammad Saleem
 

What's hot (20)

Consistency test,Initial & Final setting time of Hydraulic Cement specimen
Consistency test,Initial & Final setting time of Hydraulic Cement specimenConsistency test,Initial & Final setting time of Hydraulic Cement specimen
Consistency test,Initial & Final setting time of Hydraulic Cement specimen
 
Fineness test on cement
Fineness test on cementFineness test on cement
Fineness test on cement
 
3 setting time of cement
3 setting time of cement3 setting time of cement
3 setting time of cement
 
97170708 estimate-of-material-and-labor
97170708 estimate-of-material-and-labor97170708 estimate-of-material-and-labor
97170708 estimate-of-material-and-labor
 
Setting time test
Setting time testSetting time test
Setting time test
 
Fineness test of Cement
Fineness test of CementFineness test of Cement
Fineness test of Cement
 
How to determine Standard consistency of cement?
How to determine Standard consistency of cement?How to determine Standard consistency of cement?
How to determine Standard consistency of cement?
 
Experiment no 03 setting time of cement.
Experiment no 03 setting time of cement.Experiment no 03 setting time of cement.
Experiment no 03 setting time of cement.
 
2 standard consistency of cement
2 standard consistency of cement2 standard consistency of cement
2 standard consistency of cement
 
Time&temperature of processing eva film laminated glass
Time&temperature of processing eva film laminated glassTime&temperature of processing eva film laminated glass
Time&temperature of processing eva film laminated glass
 
How to determine compressive strength of cement?
How to determine compressive strength of cement?How to determine compressive strength of cement?
How to determine compressive strength of cement?
 
Cement testing
Cement testingCement testing
Cement testing
 
Tests on cement
Tests on cementTests on cement
Tests on cement
 
Job 3
Job 3Job 3
Job 3
 
CE244 LAB RAPORU
CE244 LAB RAPORUCE244 LAB RAPORU
CE244 LAB RAPORU
 
Normal Consistency and Sitting times of cement paste
Normal Consistency and Sitting times of cement pasteNormal Consistency and Sitting times of cement paste
Normal Consistency and Sitting times of cement paste
 
Fineness air permeability final (1)
Fineness air permeability final (1)Fineness air permeability final (1)
Fineness air permeability final (1)
 
TESTING OF CEMENT IN LABORATORY
TESTING OF CEMENT IN LABORATORYTESTING OF CEMENT IN LABORATORY
TESTING OF CEMENT IN LABORATORY
 
Standard consistency
Standard consistencyStandard consistency
Standard consistency
 
Fineness of cement test
Fineness of cement testFineness of cement test
Fineness of cement test
 

Similar to Motar-Amit Payal

Types Of Motar
Types Of MotarTypes Of Motar
Types Of Motarsandip287
 
Buildingmaterials 131128125947-phpapp01
Buildingmaterials 131128125947-phpapp01Buildingmaterials 131128125947-phpapp01
Buildingmaterials 131128125947-phpapp01
Udit Jain
 
CE_IVSem-Cement__its_types_and_its_tests-Rashi_Chaurasia (1).pdf
CE_IVSem-Cement__its_types_and_its_tests-Rashi_Chaurasia (1).pdfCE_IVSem-Cement__its_types_and_its_tests-Rashi_Chaurasia (1).pdf
CE_IVSem-Cement__its_types_and_its_tests-Rashi_Chaurasia (1).pdf
saurabhkoka99
 
Building materials
Building materialsBuilding materials
Building materialsAlay Desai
 
Mold and mold making
Mold and mold makingMold and mold making
Mold and mold making
Dobariya Gautam
 
Unit i METAL CASTING PROCESSES
Unit   i METAL CASTING PROCESSESUnit   i METAL CASTING PROCESSES
Unit i METAL CASTING PROCESSES
SelvamV17
 
Tutor mortars ppt 1
Tutor mortars ppt 1Tutor mortars ppt 1
Tutor mortars ppt 1
Luke D'Arcy
 
Cement
CementCement
BCE
BCEBCE
CONCRETE TECHNOLOGY an introduction to concrete
CONCRETE TECHNOLOGY an introduction to concreteCONCRETE TECHNOLOGY an introduction to concrete
CONCRETE TECHNOLOGY an introduction to concrete
ARUNKUMARC39
 
Unit i
Unit   iUnit   i
Unit i
dinesh babu
 
Manufacturing Technology unit 1
Manufacturing Technology unit 1Manufacturing Technology unit 1
Manufacturing Technology unit 1
devasishreddy22
 
Tutor mortars ppt 1a
Tutor mortars ppt 1aTutor mortars ppt 1a
Tutor mortars ppt 1a
Luke D'Arcy
 
HIGH FLUID CSA CEMENT - ULTRA FLUX
HIGH FLUID CSA CEMENT - ULTRA FLUX HIGH FLUID CSA CEMENT - ULTRA FLUX
HIGH FLUID CSA CEMENT - ULTRA FLUX
CALTRA BV
 
Metal casting processes
Metal casting processesMetal casting processes
Metal casting processes
Muthukumar V
 
Mortar mixes for_masonry
Mortar mixes for_masonryMortar mixes for_masonry
Mortar mixes for_masonry
Vecee Khattak
 
Classification, manufacturing & uses of cement
 Classification, manufacturing & uses of cement Classification, manufacturing & uses of cement
Classification, manufacturing & uses of cement
Firoz Mahmud
 
Materials for Repair (part 1) (RR&S)
Materials for Repair (part 1) (RR&S)Materials for Repair (part 1) (RR&S)
Materials for Repair (part 1) (RR&S)
RAMPRASAD KUMAWAT
 
Concrete 3
Concrete 3Concrete 3
Concrete 3
Arslan Abbas
 

Similar to Motar-Amit Payal (20)

Types Of Motar
Types Of MotarTypes Of Motar
Types Of Motar
 
Buildingmaterials 131128125947-phpapp01
Buildingmaterials 131128125947-phpapp01Buildingmaterials 131128125947-phpapp01
Buildingmaterials 131128125947-phpapp01
 
CE_IVSem-Cement__its_types_and_its_tests-Rashi_Chaurasia (1).pdf
CE_IVSem-Cement__its_types_and_its_tests-Rashi_Chaurasia (1).pdfCE_IVSem-Cement__its_types_and_its_tests-Rashi_Chaurasia (1).pdf
CE_IVSem-Cement__its_types_and_its_tests-Rashi_Chaurasia (1).pdf
 
Building materials
Building materialsBuilding materials
Building materials
 
Mold and mold making
Mold and mold makingMold and mold making
Mold and mold making
 
Unit i METAL CASTING PROCESSES
Unit   i METAL CASTING PROCESSESUnit   i METAL CASTING PROCESSES
Unit i METAL CASTING PROCESSES
 
Tutor mortars ppt 1
Tutor mortars ppt 1Tutor mortars ppt 1
Tutor mortars ppt 1
 
Cement & mixes
Cement & mixesCement & mixes
Cement & mixes
 
Cement
CementCement
Cement
 
BCE
BCEBCE
BCE
 
CONCRETE TECHNOLOGY an introduction to concrete
CONCRETE TECHNOLOGY an introduction to concreteCONCRETE TECHNOLOGY an introduction to concrete
CONCRETE TECHNOLOGY an introduction to concrete
 
Unit i
Unit   iUnit   i
Unit i
 
Manufacturing Technology unit 1
Manufacturing Technology unit 1Manufacturing Technology unit 1
Manufacturing Technology unit 1
 
Tutor mortars ppt 1a
Tutor mortars ppt 1aTutor mortars ppt 1a
Tutor mortars ppt 1a
 
HIGH FLUID CSA CEMENT - ULTRA FLUX
HIGH FLUID CSA CEMENT - ULTRA FLUX HIGH FLUID CSA CEMENT - ULTRA FLUX
HIGH FLUID CSA CEMENT - ULTRA FLUX
 
Metal casting processes
Metal casting processesMetal casting processes
Metal casting processes
 
Mortar mixes for_masonry
Mortar mixes for_masonryMortar mixes for_masonry
Mortar mixes for_masonry
 
Classification, manufacturing & uses of cement
 Classification, manufacturing & uses of cement Classification, manufacturing & uses of cement
Classification, manufacturing & uses of cement
 
Materials for Repair (part 1) (RR&S)
Materials for Repair (part 1) (RR&S)Materials for Repair (part 1) (RR&S)
Materials for Repair (part 1) (RR&S)
 
Concrete 3
Concrete 3Concrete 3
Concrete 3
 

More from AMIT PAYAL

Whatisworkofcivilengineeronconstructionsite 190827025839 (9 files merged)
Whatisworkofcivilengineeronconstructionsite 190827025839 (9 files merged)Whatisworkofcivilengineeronconstructionsite 190827025839 (9 files merged)
Whatisworkofcivilengineeronconstructionsite 190827025839 (9 files merged)
AMIT PAYAL
 
Projectplanningandprojectworkplan Amit Payal
Projectplanningandprojectworkplan Amit PayalProjectplanningandprojectworkplan Amit Payal
Projectplanningandprojectworkplan Amit Payal
AMIT PAYAL
 
Projectmanagementconceptscases Amit Payal
Projectmanagementconceptscases Amit PayalProjectmanagementconceptscases Amit Payal
Projectmanagementconceptscases Amit Payal
AMIT PAYAL
 
Wonderful dream home r 1-Amit Payal
Wonderful dream home r 1-Amit PayalWonderful dream home r 1-Amit Payal
Wonderful dream home r 1-Amit Payal
AMIT PAYAL
 
Projectmanagement anupama-Amit Payal
Projectmanagement anupama-Amit PayalProjectmanagement anupama-Amit Payal
Projectmanagement anupama-Amit Payal
AMIT PAYAL
 
Ppt on test certificate-Amit Payal
Ppt on test certificate-Amit PayalPpt on test certificate-Amit Payal
Ppt on test certificate-Amit Payal
AMIT PAYAL
 
PmiprojectmanagementprinciplesAmit Payal
PmiprojectmanagementprinciplesAmit PayalPmiprojectmanagementprinciplesAmit Payal
PmiprojectmanagementprinciplesAmit Payal
AMIT PAYAL
 
Maintenanceandrepairofbuildings Amit Payal
Maintenanceandrepairofbuildings Amit PayalMaintenanceandrepairofbuildings Amit Payal
Maintenanceandrepairofbuildings Amit Payal
AMIT PAYAL
 
Expert for construction-Amit Payal
Expert for construction-Amit PayalExpert for construction-Amit Payal
Expert for construction-Amit Payal
AMIT PAYAL
 
Cracksanushakdv Amit Payal
Cracksanushakdv Amit PayalCracksanushakdv Amit Payal
Cracksanushakdv Amit Payal
AMIT PAYAL
 
Contractor meet ppt slides Amit Payal
Contractor meet ppt slides Amit PayalContractor meet ppt slides Amit Payal
Contractor meet ppt slides Amit Payal
AMIT PAYAL
 
Wonder cement &amp; concrete-Amit Payal
Wonder cement &amp; concrete-Amit PayalWonder cement &amp; concrete-Amit Payal
Wonder cement &amp; concrete-Amit Payal
AMIT PAYAL
 
Contractor meet ppt slides Amit Payal
Contractor meet ppt slides Amit PayalContractor meet ppt slides Amit Payal
Contractor meet ppt slides Amit Payal
AMIT PAYAL
 
Constructionprojectmanagement Amit Payal
Constructionprojectmanagement Amit PayalConstructionprojectmanagement Amit Payal
Constructionprojectmanagement Amit Payal
AMIT PAYAL
 
Wonder cement &amp; concrete ppt april '2020(Amit Payal)
Wonder cement &amp; concrete ppt april '2020(Amit Payal)Wonder cement &amp; concrete ppt april '2020(Amit Payal)
Wonder cement &amp; concrete ppt april '2020(Amit Payal)
AMIT PAYAL
 
Technical services cptp-Amit Payal
Technical services   cptp-Amit PayalTechnical services   cptp-Amit Payal
Technical services cptp-Amit Payal
AMIT PAYAL
 
Building cracks causes &amp; remedies byAmit Payal
Building cracks causes &amp; remedies byAmit PayalBuilding cracks causes &amp; remedies byAmit Payal
Building cracks causes &amp; remedies byAmit Payal
AMIT PAYAL
 
Sikarmktgamit-Amit Payal
Sikarmktgamit-Amit PayalSikarmktgamit-Amit Payal
Sikarmktgamit-Amit Payal
AMIT PAYAL
 
Saathi profile diary-Amit Payal
Saathi profile diary-Amit PayalSaathi profile diary-Amit Payal
Saathi profile diary-Amit Payal
AMIT PAYAL
 
Typesofcracks Amit Payal
Typesofcracks Amit PayalTypesofcracks Amit Payal
Typesofcracks Amit Payal
AMIT PAYAL
 

More from AMIT PAYAL (20)

Whatisworkofcivilengineeronconstructionsite 190827025839 (9 files merged)
Whatisworkofcivilengineeronconstructionsite 190827025839 (9 files merged)Whatisworkofcivilengineeronconstructionsite 190827025839 (9 files merged)
Whatisworkofcivilengineeronconstructionsite 190827025839 (9 files merged)
 
Projectplanningandprojectworkplan Amit Payal
Projectplanningandprojectworkplan Amit PayalProjectplanningandprojectworkplan Amit Payal
Projectplanningandprojectworkplan Amit Payal
 
Projectmanagementconceptscases Amit Payal
Projectmanagementconceptscases Amit PayalProjectmanagementconceptscases Amit Payal
Projectmanagementconceptscases Amit Payal
 
Wonderful dream home r 1-Amit Payal
Wonderful dream home r 1-Amit PayalWonderful dream home r 1-Amit Payal
Wonderful dream home r 1-Amit Payal
 
Projectmanagement anupama-Amit Payal
Projectmanagement anupama-Amit PayalProjectmanagement anupama-Amit Payal
Projectmanagement anupama-Amit Payal
 
Ppt on test certificate-Amit Payal
Ppt on test certificate-Amit PayalPpt on test certificate-Amit Payal
Ppt on test certificate-Amit Payal
 
PmiprojectmanagementprinciplesAmit Payal
PmiprojectmanagementprinciplesAmit PayalPmiprojectmanagementprinciplesAmit Payal
PmiprojectmanagementprinciplesAmit Payal
 
Maintenanceandrepairofbuildings Amit Payal
Maintenanceandrepairofbuildings Amit PayalMaintenanceandrepairofbuildings Amit Payal
Maintenanceandrepairofbuildings Amit Payal
 
Expert for construction-Amit Payal
Expert for construction-Amit PayalExpert for construction-Amit Payal
Expert for construction-Amit Payal
 
Cracksanushakdv Amit Payal
Cracksanushakdv Amit PayalCracksanushakdv Amit Payal
Cracksanushakdv Amit Payal
 
Contractor meet ppt slides Amit Payal
Contractor meet ppt slides Amit PayalContractor meet ppt slides Amit Payal
Contractor meet ppt slides Amit Payal
 
Wonder cement &amp; concrete-Amit Payal
Wonder cement &amp; concrete-Amit PayalWonder cement &amp; concrete-Amit Payal
Wonder cement &amp; concrete-Amit Payal
 
Contractor meet ppt slides Amit Payal
Contractor meet ppt slides Amit PayalContractor meet ppt slides Amit Payal
Contractor meet ppt slides Amit Payal
 
Constructionprojectmanagement Amit Payal
Constructionprojectmanagement Amit PayalConstructionprojectmanagement Amit Payal
Constructionprojectmanagement Amit Payal
 
Wonder cement &amp; concrete ppt april '2020(Amit Payal)
Wonder cement &amp; concrete ppt april '2020(Amit Payal)Wonder cement &amp; concrete ppt april '2020(Amit Payal)
Wonder cement &amp; concrete ppt april '2020(Amit Payal)
 
Technical services cptp-Amit Payal
Technical services   cptp-Amit PayalTechnical services   cptp-Amit Payal
Technical services cptp-Amit Payal
 
Building cracks causes &amp; remedies byAmit Payal
Building cracks causes &amp; remedies byAmit PayalBuilding cracks causes &amp; remedies byAmit Payal
Building cracks causes &amp; remedies byAmit Payal
 
Sikarmktgamit-Amit Payal
Sikarmktgamit-Amit PayalSikarmktgamit-Amit Payal
Sikarmktgamit-Amit Payal
 
Saathi profile diary-Amit Payal
Saathi profile diary-Amit PayalSaathi profile diary-Amit Payal
Saathi profile diary-Amit Payal
 
Typesofcracks Amit Payal
Typesofcracks Amit PayalTypesofcracks Amit Payal
Typesofcracks Amit Payal
 

Motar-Amit Payal

  • 1. PMM / Jochen Knecht 01.07.2009 plaster mortar Types of Mortar floor screed shotcrete mortar fire-proofing mortar repair mortar • sand: 0-4mm • pumpability! • select binder acc. to setting time, water & air resistance requirements • sand: 0-8mm • pumpability! • admixtures: fibres -> density • normal: 1:2,5 to 1:3 ( cement : sand -> volume) • normal: 1:4 (cement : sand) • sand: 0-8mm • admixtures: for very quick setting time • sand: 0-4mm • pumpability! • no site-mix • delivered by RMC • no site-mix only ready-mix • admixtures: for fire-resistance • mixing time normally >3 min => no MP25! • sand: 0-4mm • pumpability! • no site-mix only ready-mix • admixtures: acc. to special requirements • preferrably with worm pump
  • 2. PMM / Jochen Knecht 01.07.2009 Types of Plaster Mortars according to binder ++0-pumpability +++0-finish (interior) +++0--flexibility -- (not in wet areas => fungal problems) 0+++water resistance --0+++density gypsumlimelime/cementcement-> binder
  • 3. PMM / Jochen Knecht 01.07.2009 Exterior plastering => which plaster type? lime cement cement mortar
  • 4. PMM / Jochen Knecht 01.07.2009 Interior plastering => which plaster type? gypsum, lime, lime/cement or cement based plaster READY MIXED or SITE MIX
  • 5. PMM / Jochen Knecht 01.07.2009 Ready-mix Machine plastering material: ready-mix or site-mix? Site-mix costs availability pumpability plaster quality operator errors special properties, applications ? ? plaster sand (?)
  • 6. PMM / Jochen Knecht 01.07.2009 Plaster sand – grain size composition 2 - 4 mm 1 - 2 mm 0,5 - 1 mm 0,25 - 0,5 mm 0,125 - 0,25 mm < 0,125 mm (“dust”) dust is a must in the mixture in order to receive pumpable material 5 - 10% 5 - 10% 15 - 20% 12 - 18% 10 - 15% 30 - 40%
  • 7. PMM / Jochen Knecht 01.07.2009 Washed sand dust particles are missing => mortar is not pumpable! Washed sand, e.g. river sand 2 - 4 mm 1 - 2 mm 0,5 - 1 mm 0,25 - 0,5 mm 0,125 - 0,25 mm
  • 8. PMM / Jochen Knecht 01.07.2009 Example for dune sand (single grain sand) 0,5 mm single grain size Material with this sand quality is not pumpable without optional: - stone powder - lime - fly ash - other chemical admixtures How to test pumpability? 1. Fill material together with water into a bucket and mix properly 1. Wait for 10 min. 1. If water separates from material => mixture is NOT pumpable! 10 min.
  • 9. PMM / J. Knecht 29.02.2009 Grain size composition of 4mm plaster sand The ideal gradiation for mortar machines is between standard curves B4 and C4 0 10 20 30 40 50 60 70 80 90 100 0 0,125 0,150 0,25 0,30 0,50 0,60 1 1,18 2 2,36 4 4,75 Particle Size [mm] PercentagePassing[%] B4 C4 the content of fines (filler, clay, dirt) is very important for the pumpability - the more the better ! The content of the fine particles (fillers, clay, dust) is very important for the pumpability! But, if it is too much, cracks may occure due to the higher shrinkage.
  • 10. PMM / J. Knecht 29.02.2009 Grain size composition of shotcrete sand Shotcrete Aggregate Grading 3/8 inch 0 85 2 10 25 50 80 95 100 100 100 60 30 10 0 10 20 30 40 50 60 70 80 90 100 0 No.100 = 150μm No.50 = 300μm No.30 = 600μm No.16 = 1.18mm No.8 = 2.36mm No.4 = 4.75mm 3/8inch = 9.5mm Sieve Size PercentByMassPassingIndividualSieves[%]