Managing Electrical Hazards
Module Two – 26501-12
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Managing Electrical Hazards
Module 26501-12
National Center
for Construction
Education and
Research
Slide 1
Slide 1
Upon completion of this module, you will be able to do the following:
1. Identify electrical hazard types and locations, and explain related
safety guidelines and terms.
2. Recognize and explain hazard boundaries.
3. Explain employer and employee responsibilities in recognizing and
managing electrical hazards.
4. Identify common factors that lead to electrical incidents and explain
the importance of using good judgment, appropriate procedures,
and safe work practices.
5. Analyze the electrical hazards of a given task, plan the job, and
complete an electrical work permit request.
6. Select, inspect, and maintain personal protective equipment (PPE)
and test equipment used for electrical work.
7. Explain how to create an electrically safe work condition.
Objectives
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Managing Electrical Hazards
Module 26501-12
National Center
for Construction
Education and
Research
Slide 2
Slide 2
Under supervision of the instructor, you should be able to:
1. Given a specific electrical task and circumstances, complete an
energized electrical work permit request.
Performance Tasks
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Managing Electrical Hazards
Module 26501-12
National Center
for Construction
Education and
Research
Slide 3
Slide 3 Figure 1 – Power distribution system
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Managing Electrical Hazards
Module 26501-12
National Center
for Construction
Education and
Research
Slide 4
Slide 4 Figure 2 – Human body typical resistances
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Managing Electrical Hazards
Module 26501-12
National Center
for Construction
Education and
Research
Slide 5
Slide 5 Table 1 – Effects of Current on the Human Body
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Managing Electrical Hazards
Module 26501-12
National Center
for Construction
Education and
Research
Slide 6
Slide 6 Figure 3 – Arc flash
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Managing Electrical Hazards
Module 26501-12
National Center
for Construction
Education and
Research
Slide 7
Slide 7 Figure 4 – Electrical substation
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Managing Electrical Hazards
Module 26501-12
National Center
for Construction
Education and
Research
Slide 8
Slide 8 Figure 5 – Typical substation equipment
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Managing Electrical Hazards
Module 26501-12
National Center
for Construction
Education and
Research
Slide 9
Slide 9 Figure 6 – Pad-mounted service disconnects
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Managing Electrical Hazards
Module 26501-12
National Center
for Construction
Education and
Research
Slide 10
Slide 10 Figure 7 – Service equipment warning label
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Managing Electrical Hazards
Module 26501-12
National Center
for Construction
Education and
Research
Slide 11
Slide 11 Figure 8 – Transformers
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Managing Electrical Hazards
Module 26501-12
National Center
for Construction
Education and
Research
Slide 12
Slide 12 Figure 9 – Switchgear enclosure
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Managing Electrical Hazards
Module 26501-12
National Center
for Construction
Education and
Research
Slide 13
Slide 13 Figure 10 – Equipment damage caused by rodent entry
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Managing Electrical Hazards
Module 26501-12
National Center
for Construction
Education and
Research
Slide 14
Slide 14 Figure 11 – Infrared imaging device
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Managing Electrical Hazards
Module 26501-12
National Center
for Construction
Education and
Research
Slide 15
Slide 15 Figure 12 – Circuit breaker carriage
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Managing Electrical Hazards
Module 26501-12
National Center
for Construction
Education and
Research
Slide 16
Slide 16 Figure 13 – Robotic device used to control a circuit breaker carriage
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Managing Electrical Hazards
Module 26501-12
National Center
for Construction
Education and
Research
Slide 17
Slide 17 Figure 14 – Motor control center
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Managing Electrical Hazards
Module 26501-12
National Center
for Construction
Education and
Research
Slide 18
Slide 18 Figure 15 – Effects of flash between bus and bucket
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Managing Electrical Hazards
Module 26501-12
National Center
for Construction
Education and
Research
Slide 19
Slide 19 Figure 16 – Cable tray
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Managing Electrical Hazards
Module 26501-12
National Center
for Construction
Education and
Research
Slide 20
Slide 20 Figure 17 – Busway
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Managing Electrical Hazards
Module 26501-12
National Center
for Construction
Education and
Research
Slide 21
Slide 21 Figure 18 – Breaker enclosures with covers removed
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Managing Electrical Hazards
Module 26501-12
National Center
for Construction
Education and
Research
Slide 22
Slide 22 Figure 19 – Terminal cabinets and junction boxes
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Managing Electrical Hazards
Module 26501-12
National Center
for Construction
Education and
Research
Slide 23
Slide 23 Figure 20 – Field-mounted safety switches
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Managing Electrical Hazards
Module 26501-12
National Center
for Construction
Education and
Research
Slide 24
Slide 24 Figure 21 – Engine-generator set
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Managing Electrical Hazards
Module 26501-12
National Center
for Construction
Education and
Research
Slide 25
Slide 25 Figure 22 – Transfer switchgear
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Managing Electrical Hazards
Module 26501-12
National Center
for Construction
Education and
Research
Slide 26
Slide 26 Figure 23 – UPS batteries
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Managing Electrical Hazards
Module 26501-12
National Center
for Construction
Education and
Research
Slide 27
Slide 27 Figure 24 – Approach limits
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Managing Electrical Hazards
Module 26501-12
National Center
for Construction
Education and
Research
Slide 28
Slide 28 Figure 25 – Arc flash
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Managing Electrical Hazards
Module 26501-12
National Center
for Construction
Education and
Research
Slide 29
Slide 29 Table 2 – Approach Boundaries to Energized Electrical Conductors or Circuit Parts for
Shock Protection for Alternating-Current Systems [Data from 70E Table 130.4(C)(a)]
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Managing Electrical Hazards
Module 26501-12
National Center
for Construction
Education and
Research
Slide 30
Slide 30 Figure 26 – Worker using appropriate PPE
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Managing Electrical Hazards
Module 26501-12
National Center
for Construction
Education and
Research
Slide 31
Slide 31 Figure 27 – Electrical hazard warning label
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Managing Electrical Hazards
Module 26501-12
National Center
for Construction
Education and
Research
Slide 32
Slide 32 Figure 28 – Various types of PPE
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Managing Electrical Hazards
Module 26501-12
National Center
for Construction
Education and
Research
Slide 33
Slide 33 Figure 29 – Balaclava (sock hood)
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Managing Electrical Hazards
Module 26501-12
National Center
for Construction
Education and
Research
Slide 34
Slide 34 Figure 30 – Newer arc hoods offer improved comfort and visibility
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Managing Electrical Hazards
Module 26501-12
National Center
for Construction
Education and
Research
Slide 35
Slide 35 Figure 31 – Voltage rating codes of gloves
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Managing Electrical Hazards
Module 26501-12
National Center
for Construction
Education and
Research
Slide 36
Slide 36 Figure 32 – Glove inspection
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Managing Electrical Hazards
Module 26501-12
National Center
for Construction
Education and
Research
Slide 37
Slide 37 Figure 33 – Rubber glove on a glove inflator
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Managing Electrical Hazards
Module 26501-12
National Center
for Construction
Education and
Research
Slide 38
Slide 38 Figure 34 – Rubber blanket
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Managing Electrical Hazards
Module 26501-12
National Center
for Construction
Education and
Research
Slide 39
Slide 39 Figure 35 – Temporary grounding jumpers in place on incoming feeders
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Managing Electrical Hazards
Module 26501-12
National Center
for Construction
Education and
Research
Slide 40
Slide 40 Figure 36 – Hot stick in use
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Managing Electrical Hazards
Module 26501-12
National Center
for Construction
Education and
Research
Slide 41
Slide 41 Figure 37 – Grounding mat in use
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Managing Electrical Hazards
Module 26501-12
National Center
for Construction
Education and
Research
Slide 42
Slide 42 Figure 38 – Sample energized electrical work permit
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Managing Electrical Hazards
Module 26501-12
National Center
for Construction
Education and
Research
Slide 43
Slide 43 Figure 39 – Simplified version of a single-line power distribution drawing
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Managing Electrical Hazards
Module 26501-12
National Center
for Construction
Education and
Research
Slide 44
Slide 44 Figure 40 – Burn survival probabilities
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Managing Electrical Hazards
Module 26501-12
National Center
for Construction
Education and
Research
Slide 45
Slide 45 Figure 41 – Body percentage areas (Rule of 9s)
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Managing Electrical Hazards
Module 26501-12
National Center
for Construction
Education and
Research
Slide 46
Slide 46 Figure 42 – PPE calorie markings
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Managing Electrical Hazards
Module 26501-12
National Center
for Construction
Education and
Research
Slide 47
Slide 47 Table 3 – Required Available Fault Current
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Managing Electrical Hazards
Module 26501-12
National Center
for Construction
Education and
Research
Slide 48
Slide 48 Figure 43 – Simplified single-line diagram of 480V, three-phase electrical supply
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Managing Electrical Hazards
Module 26501-12
National Center
for Construction
Education and
Research
Slide 49
Slide 49 Figure 44 – Trip settings on a low-voltage power circuit breaker
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Managing Electrical Hazards
Module 26501-12
National Center
for Construction
Education and
Research
Slide 50
Slide 50 Table 4 – Detailed Flash Hazard Analysis for Example Drawing
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Managing Electrical Hazards
Module 26501-12
National Center
for Construction
Education and
Research
Slide 51
Slide 51 Figure 45 – Megohmmeters
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Managing Electrical Hazards
Module 26501-12
National Center
for Construction
Education and
Research
Slide 52
Slide 52 Figure 46 – Self-testing audio/visual voltage detector
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Managing Electrical Hazards
Module 26501-12
National Center
for Construction
Education and
Research
Slide 53
Slide 53 Figure 47 – Clamp-on multimeter with test lead finger guards
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Managing Electrical Hazards
Module 26501-12
National Center
for Construction
Education and
Research
Slide 54
Slide 54 Table 5 – Overvoltage Installation Categories
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Managing Electrical Hazards
Module 26501-12
National Center
for Construction
Education and
Research
Slide 55
Slide 55 Figure 48 – Meter category rating
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Managing Electrical Hazards
Module 26501-12
National Center
for Construction
Education and
Research
Slide 56
Slide 56 Figure 49 – Lockout/tagout devices
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Managing Electrical Hazards
Module 26501-12
National Center
for Construction
Education and
Research
Slide 57
Slide 57 Figure 50 – Insulated rescue hook
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Managing Electrical Hazards
Module 26501-12
National Center
for Construction
Education and
Research
Slide 58
Slide 58
Supplemental Art
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Managing Electrical Hazards
Module 26501-12
National Center
for Construction
Education and
Research
Slide 59
Slide 59 Course Map
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Managing Electrical Hazards
Module 26501-12
National Center
for Construction
Education and
Research
Slide 60
Slide 60

More Related Content

Similar to Module Two - Managing Electrical Hazards - NCCER Substation Slides

Module Twelve - Mechanical Construction Methods and Materials - NCCER Substat...
Module Twelve - Mechanical Construction Methods and Materials - NCCER Substat...Module Twelve - Mechanical Construction Methods and Materials - NCCER Substat...
Module Twelve - Mechanical Construction Methods and Materials - NCCER Substat...
Shariq Ayjaz
 
Module Thirteen - Intermediate Rigging - NCCER Substation Slides
Module Thirteen - Intermediate Rigging - NCCER Substation SlidesModule Thirteen - Intermediate Rigging - NCCER Substation Slides
Module Thirteen - Intermediate Rigging - NCCER Substation Slides
Shariq Ayjaz
 
Module Four - Conductors and Cable - NCCER Substation Slides
Module Four - Conductors and Cable - NCCER Substation SlidesModule Four - Conductors and Cable - NCCER Substation Slides
Module Four - Conductors and Cable - NCCER Substation Slides
Shariq Ayjaz
 
Module Eleven - Concrete Work - NCCER Substation Slides
Module Eleven - Concrete Work - NCCER Substation SlidesModule Eleven - Concrete Work - NCCER Substation Slides
Module Eleven - Concrete Work - NCCER Substation Slides
Shariq Ayjaz
 
Used Basic Electrical Engineering R-20.pdf
Used Basic Electrical Engineering R-20.pdfUsed Basic Electrical Engineering R-20.pdf
Used Basic Electrical Engineering R-20.pdf
jiteshdevarkar05
 
Multiconverter Unified Power Quality Conditioning System Using Artificial Neu...
Multiconverter Unified Power Quality Conditioning System Using Artificial Neu...Multiconverter Unified Power Quality Conditioning System Using Artificial Neu...
Multiconverter Unified Power Quality Conditioning System Using Artificial Neu...
Asoka Technologies
 
SOLAR MPPT, INVERTER AND AUTOSWITCHING
SOLAR MPPT, INVERTER AND AUTOSWITCHINGSOLAR MPPT, INVERTER AND AUTOSWITCHING
SOLAR MPPT, INVERTER AND AUTOSWITCHING
Shailesh kumar
 
THERMAL FAULT DETECTION SYSTEM FOR PV SOLAR MODULES
THERMAL FAULT DETECTION SYSTEM FOR PV SOLAR MODULESTHERMAL FAULT DETECTION SYSTEM FOR PV SOLAR MODULES
THERMAL FAULT DETECTION SYSTEM FOR PV SOLAR MODULES
elelijjournal
 
IRJET - Monitoring & Improving Efficiency of Multiple PV Array using Boost Co...
IRJET - Monitoring & Improving Efficiency of Multiple PV Array using Boost Co...IRJET - Monitoring & Improving Efficiency of Multiple PV Array using Boost Co...
IRJET - Monitoring & Improving Efficiency of Multiple PV Array using Boost Co...
IRJET Journal
 
An Efficient Constant Current Controller for PV Solar Power Generator Integra...
An Efficient Constant Current Controller for PV Solar Power Generator Integra...An Efficient Constant Current Controller for PV Solar Power Generator Integra...
An Efficient Constant Current Controller for PV Solar Power Generator Integra...
Asoka Technologies
 
BASIC SAFETY 101-09(1) (1).pptx
BASIC SAFETY 101-09(1) (1).pptxBASIC SAFETY 101-09(1) (1).pptx
BASIC SAFETY 101-09(1) (1).pptx
Fredel De Vera
 
The International Journal of Engineering and Science (The IJES)
The International Journal of Engineering and Science (The IJES)The International Journal of Engineering and Science (The IJES)
The International Journal of Engineering and Science (The IJES)
theijes
 
Start (ceb) new
Start (ceb) newStart (ceb) new
Unipolar pulse width modulation inverter
Unipolar pulse width modulation inverterUnipolar pulse width modulation inverter
Unipolar pulse width modulation inverter
Web Design & Development
 
Automatic power factor_improvement_and_monitoring_by_using_plc[1]
Automatic power factor_improvement_and_monitoring_by_using_plc[1]Automatic power factor_improvement_and_monitoring_by_using_plc[1]
Automatic power factor_improvement_and_monitoring_by_using_plc[1]
ferozpatowary
 
Automatic Power Factor Detection And Correction using Arduino
Automatic Power Factor Detection And Correction using ArduinoAutomatic Power Factor Detection And Correction using Arduino
Automatic Power Factor Detection And Correction using Arduino
Souvik Dutta
 
BUCK converter fed by PV array
BUCK converter fed by PV arrayBUCK converter fed by PV array
BUCK converter fed by PV array
Monika Rout
 
IRJET- Arduino UNO Controlled DC Weaving Machine Powered by Solar Energy
IRJET- Arduino UNO Controlled DC Weaving Machine Powered by Solar EnergyIRJET- Arduino UNO Controlled DC Weaving Machine Powered by Solar Energy
IRJET- Arduino UNO Controlled DC Weaving Machine Powered by Solar Energy
IRJET Journal
 
IRJET - Modeling and Simulation of Fuzzy Logic based Controller with Proposed...
IRJET - Modeling and Simulation of Fuzzy Logic based Controller with Proposed...IRJET - Modeling and Simulation of Fuzzy Logic based Controller with Proposed...
IRJET - Modeling and Simulation of Fuzzy Logic based Controller with Proposed...
IRJET Journal
 
Basic Electric Circuits Session 2
Basic Electric Circuits Session 2Basic Electric Circuits Session 2

Similar to Module Two - Managing Electrical Hazards - NCCER Substation Slides (20)

Module Twelve - Mechanical Construction Methods and Materials - NCCER Substat...
Module Twelve - Mechanical Construction Methods and Materials - NCCER Substat...Module Twelve - Mechanical Construction Methods and Materials - NCCER Substat...
Module Twelve - Mechanical Construction Methods and Materials - NCCER Substat...
 
Module Thirteen - Intermediate Rigging - NCCER Substation Slides
Module Thirteen - Intermediate Rigging - NCCER Substation SlidesModule Thirteen - Intermediate Rigging - NCCER Substation Slides
Module Thirteen - Intermediate Rigging - NCCER Substation Slides
 
Module Four - Conductors and Cable - NCCER Substation Slides
Module Four - Conductors and Cable - NCCER Substation SlidesModule Four - Conductors and Cable - NCCER Substation Slides
Module Four - Conductors and Cable - NCCER Substation Slides
 
Module Eleven - Concrete Work - NCCER Substation Slides
Module Eleven - Concrete Work - NCCER Substation SlidesModule Eleven - Concrete Work - NCCER Substation Slides
Module Eleven - Concrete Work - NCCER Substation Slides
 
Used Basic Electrical Engineering R-20.pdf
Used Basic Electrical Engineering R-20.pdfUsed Basic Electrical Engineering R-20.pdf
Used Basic Electrical Engineering R-20.pdf
 
Multiconverter Unified Power Quality Conditioning System Using Artificial Neu...
Multiconverter Unified Power Quality Conditioning System Using Artificial Neu...Multiconverter Unified Power Quality Conditioning System Using Artificial Neu...
Multiconverter Unified Power Quality Conditioning System Using Artificial Neu...
 
SOLAR MPPT, INVERTER AND AUTOSWITCHING
SOLAR MPPT, INVERTER AND AUTOSWITCHINGSOLAR MPPT, INVERTER AND AUTOSWITCHING
SOLAR MPPT, INVERTER AND AUTOSWITCHING
 
THERMAL FAULT DETECTION SYSTEM FOR PV SOLAR MODULES
THERMAL FAULT DETECTION SYSTEM FOR PV SOLAR MODULESTHERMAL FAULT DETECTION SYSTEM FOR PV SOLAR MODULES
THERMAL FAULT DETECTION SYSTEM FOR PV SOLAR MODULES
 
IRJET - Monitoring & Improving Efficiency of Multiple PV Array using Boost Co...
IRJET - Monitoring & Improving Efficiency of Multiple PV Array using Boost Co...IRJET - Monitoring & Improving Efficiency of Multiple PV Array using Boost Co...
IRJET - Monitoring & Improving Efficiency of Multiple PV Array using Boost Co...
 
An Efficient Constant Current Controller for PV Solar Power Generator Integra...
An Efficient Constant Current Controller for PV Solar Power Generator Integra...An Efficient Constant Current Controller for PV Solar Power Generator Integra...
An Efficient Constant Current Controller for PV Solar Power Generator Integra...
 
BASIC SAFETY 101-09(1) (1).pptx
BASIC SAFETY 101-09(1) (1).pptxBASIC SAFETY 101-09(1) (1).pptx
BASIC SAFETY 101-09(1) (1).pptx
 
The International Journal of Engineering and Science (The IJES)
The International Journal of Engineering and Science (The IJES)The International Journal of Engineering and Science (The IJES)
The International Journal of Engineering and Science (The IJES)
 
Start (ceb) new
Start (ceb) newStart (ceb) new
Start (ceb) new
 
Unipolar pulse width modulation inverter
Unipolar pulse width modulation inverterUnipolar pulse width modulation inverter
Unipolar pulse width modulation inverter
 
Automatic power factor_improvement_and_monitoring_by_using_plc[1]
Automatic power factor_improvement_and_monitoring_by_using_plc[1]Automatic power factor_improvement_and_monitoring_by_using_plc[1]
Automatic power factor_improvement_and_monitoring_by_using_plc[1]
 
Automatic Power Factor Detection And Correction using Arduino
Automatic Power Factor Detection And Correction using ArduinoAutomatic Power Factor Detection And Correction using Arduino
Automatic Power Factor Detection And Correction using Arduino
 
BUCK converter fed by PV array
BUCK converter fed by PV arrayBUCK converter fed by PV array
BUCK converter fed by PV array
 
IRJET- Arduino UNO Controlled DC Weaving Machine Powered by Solar Energy
IRJET- Arduino UNO Controlled DC Weaving Machine Powered by Solar EnergyIRJET- Arduino UNO Controlled DC Weaving Machine Powered by Solar Energy
IRJET- Arduino UNO Controlled DC Weaving Machine Powered by Solar Energy
 
IRJET - Modeling and Simulation of Fuzzy Logic based Controller with Proposed...
IRJET - Modeling and Simulation of Fuzzy Logic based Controller with Proposed...IRJET - Modeling and Simulation of Fuzzy Logic based Controller with Proposed...
IRJET - Modeling and Simulation of Fuzzy Logic based Controller with Proposed...
 
Basic Electric Circuits Session 2
Basic Electric Circuits Session 2Basic Electric Circuits Session 2
Basic Electric Circuits Session 2
 

Recently uploaded

Bituminous road construction project based learning report
Bituminous road construction project based learning reportBituminous road construction project based learning report
Bituminous road construction project based learning report
CE19KaushlendraKumar
 
openshift technical overview - Flow of openshift containerisatoin
openshift technical overview - Flow of openshift containerisatoinopenshift technical overview - Flow of openshift containerisatoin
openshift technical overview - Flow of openshift containerisatoin
snaprevwdev
 
Unit -II Spectroscopy - EC I B.Tech.pdf
Unit -II Spectroscopy - EC  I B.Tech.pdfUnit -II Spectroscopy - EC  I B.Tech.pdf
Unit -II Spectroscopy - EC I B.Tech.pdf
TeluguBadi
 
Levelised Cost of Hydrogen (LCOH) Calculator Manual
Levelised Cost of Hydrogen  (LCOH) Calculator ManualLevelised Cost of Hydrogen  (LCOH) Calculator Manual
Levelised Cost of Hydrogen (LCOH) Calculator Manual
Massimo Talia
 
UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICSUNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
vmspraneeth
 
Assistant Engineer (Chemical) Interview Questions.pdf
Assistant Engineer (Chemical) Interview Questions.pdfAssistant Engineer (Chemical) Interview Questions.pdf
Assistant Engineer (Chemical) Interview Questions.pdf
Seetal Daas
 
5G Radio Network Througput Problem Analysis HCIA.pdf
5G Radio Network Througput Problem Analysis HCIA.pdf5G Radio Network Througput Problem Analysis HCIA.pdf
5G Radio Network Througput Problem Analysis HCIA.pdf
AlvianRamadhani5
 
Blood finder application project report (1).pdf
Blood finder application project report (1).pdfBlood finder application project report (1).pdf
Blood finder application project report (1).pdf
Kamal Acharya
 
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
DharmaBanothu
 
Null Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAMNull Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAM
Divyanshu
 
Digital Twins Computer Networking Paper Presentation.pptx
Digital Twins Computer Networking Paper Presentation.pptxDigital Twins Computer Networking Paper Presentation.pptx
Digital Twins Computer Networking Paper Presentation.pptx
aryanpankaj78
 
Accident detection system project report.pdf
Accident detection system project report.pdfAccident detection system project report.pdf
Accident detection system project report.pdf
Kamal Acharya
 
Open Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surfaceOpen Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surface
Indrajeet sahu
 
Zener Diode and its V-I Characteristics and Applications
Zener Diode and its V-I Characteristics and ApplicationsZener Diode and its V-I Characteristics and Applications
Zener Diode and its V-I Characteristics and Applications
Shiny Christobel
 
ITSM Integration with MuleSoft.pptx
ITSM  Integration with MuleSoft.pptxITSM  Integration with MuleSoft.pptx
ITSM Integration with MuleSoft.pptx
VANDANAMOHANGOUDA
 
Impartiality as per ISO /IEC 17025:2017 Standard
Impartiality as per ISO /IEC 17025:2017 StandardImpartiality as per ISO /IEC 17025:2017 Standard
Impartiality as per ISO /IEC 17025:2017 Standard
MuhammadJazib15
 
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
ecqow
 
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptxSENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
b0754201
 
Determination of Equivalent Circuit parameters and performance characteristic...
Determination of Equivalent Circuit parameters and performance characteristic...Determination of Equivalent Circuit parameters and performance characteristic...
Determination of Equivalent Circuit parameters and performance characteristic...
pvpriya2
 
Supermarket Management System Project Report.pdf
Supermarket Management System Project Report.pdfSupermarket Management System Project Report.pdf
Supermarket Management System Project Report.pdf
Kamal Acharya
 

Recently uploaded (20)

Bituminous road construction project based learning report
Bituminous road construction project based learning reportBituminous road construction project based learning report
Bituminous road construction project based learning report
 
openshift technical overview - Flow of openshift containerisatoin
openshift technical overview - Flow of openshift containerisatoinopenshift technical overview - Flow of openshift containerisatoin
openshift technical overview - Flow of openshift containerisatoin
 
Unit -II Spectroscopy - EC I B.Tech.pdf
Unit -II Spectroscopy - EC  I B.Tech.pdfUnit -II Spectroscopy - EC  I B.Tech.pdf
Unit -II Spectroscopy - EC I B.Tech.pdf
 
Levelised Cost of Hydrogen (LCOH) Calculator Manual
Levelised Cost of Hydrogen  (LCOH) Calculator ManualLevelised Cost of Hydrogen  (LCOH) Calculator Manual
Levelised Cost of Hydrogen (LCOH) Calculator Manual
 
UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICSUNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
 
Assistant Engineer (Chemical) Interview Questions.pdf
Assistant Engineer (Chemical) Interview Questions.pdfAssistant Engineer (Chemical) Interview Questions.pdf
Assistant Engineer (Chemical) Interview Questions.pdf
 
5G Radio Network Througput Problem Analysis HCIA.pdf
5G Radio Network Througput Problem Analysis HCIA.pdf5G Radio Network Througput Problem Analysis HCIA.pdf
5G Radio Network Througput Problem Analysis HCIA.pdf
 
Blood finder application project report (1).pdf
Blood finder application project report (1).pdfBlood finder application project report (1).pdf
Blood finder application project report (1).pdf
 
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
 
Null Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAMNull Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAM
 
Digital Twins Computer Networking Paper Presentation.pptx
Digital Twins Computer Networking Paper Presentation.pptxDigital Twins Computer Networking Paper Presentation.pptx
Digital Twins Computer Networking Paper Presentation.pptx
 
Accident detection system project report.pdf
Accident detection system project report.pdfAccident detection system project report.pdf
Accident detection system project report.pdf
 
Open Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surfaceOpen Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surface
 
Zener Diode and its V-I Characteristics and Applications
Zener Diode and its V-I Characteristics and ApplicationsZener Diode and its V-I Characteristics and Applications
Zener Diode and its V-I Characteristics and Applications
 
ITSM Integration with MuleSoft.pptx
ITSM  Integration with MuleSoft.pptxITSM  Integration with MuleSoft.pptx
ITSM Integration with MuleSoft.pptx
 
Impartiality as per ISO /IEC 17025:2017 Standard
Impartiality as per ISO /IEC 17025:2017 StandardImpartiality as per ISO /IEC 17025:2017 Standard
Impartiality as per ISO /IEC 17025:2017 Standard
 
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
 
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptxSENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
 
Determination of Equivalent Circuit parameters and performance characteristic...
Determination of Equivalent Circuit parameters and performance characteristic...Determination of Equivalent Circuit parameters and performance characteristic...
Determination of Equivalent Circuit parameters and performance characteristic...
 
Supermarket Management System Project Report.pdf
Supermarket Management System Project Report.pdfSupermarket Management System Project Report.pdf
Supermarket Management System Project Report.pdf
 

Module Two - Managing Electrical Hazards - NCCER Substation Slides

  • 1. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Managing Electrical Hazards Module 26501-12 National Center for Construction Education and Research Slide 0 Slide 0 Managing Electrical Hazards Module Two – 26501-12
  • 2. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Managing Electrical Hazards Module 26501-12 National Center for Construction Education and Research Slide 1 Slide 1 Upon completion of this module, you will be able to do the following: 1. Identify electrical hazard types and locations, and explain related safety guidelines and terms. 2. Recognize and explain hazard boundaries. 3. Explain employer and employee responsibilities in recognizing and managing electrical hazards. 4. Identify common factors that lead to electrical incidents and explain the importance of using good judgment, appropriate procedures, and safe work practices. 5. Analyze the electrical hazards of a given task, plan the job, and complete an electrical work permit request. 6. Select, inspect, and maintain personal protective equipment (PPE) and test equipment used for electrical work. 7. Explain how to create an electrically safe work condition. Objectives
  • 3. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Managing Electrical Hazards Module 26501-12 National Center for Construction Education and Research Slide 2 Slide 2 Under supervision of the instructor, you should be able to: 1. Given a specific electrical task and circumstances, complete an energized electrical work permit request. Performance Tasks
  • 4. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Managing Electrical Hazards Module 26501-12 National Center for Construction Education and Research Slide 3 Slide 3 Figure 1 – Power distribution system
  • 5. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Managing Electrical Hazards Module 26501-12 National Center for Construction Education and Research Slide 4 Slide 4 Figure 2 – Human body typical resistances
  • 6. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Managing Electrical Hazards Module 26501-12 National Center for Construction Education and Research Slide 5 Slide 5 Table 1 – Effects of Current on the Human Body
  • 7. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Managing Electrical Hazards Module 26501-12 National Center for Construction Education and Research Slide 6 Slide 6 Figure 3 – Arc flash
  • 8. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Managing Electrical Hazards Module 26501-12 National Center for Construction Education and Research Slide 7 Slide 7 Figure 4 – Electrical substation
  • 9. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Managing Electrical Hazards Module 26501-12 National Center for Construction Education and Research Slide 8 Slide 8 Figure 5 – Typical substation equipment
  • 10. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Managing Electrical Hazards Module 26501-12 National Center for Construction Education and Research Slide 9 Slide 9 Figure 6 – Pad-mounted service disconnects
  • 11. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Managing Electrical Hazards Module 26501-12 National Center for Construction Education and Research Slide 10 Slide 10 Figure 7 – Service equipment warning label
  • 12. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Managing Electrical Hazards Module 26501-12 National Center for Construction Education and Research Slide 11 Slide 11 Figure 8 – Transformers
  • 13. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Managing Electrical Hazards Module 26501-12 National Center for Construction Education and Research Slide 12 Slide 12 Figure 9 – Switchgear enclosure
  • 14. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Managing Electrical Hazards Module 26501-12 National Center for Construction Education and Research Slide 13 Slide 13 Figure 10 – Equipment damage caused by rodent entry
  • 15. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Managing Electrical Hazards Module 26501-12 National Center for Construction Education and Research Slide 14 Slide 14 Figure 11 – Infrared imaging device
  • 16. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Managing Electrical Hazards Module 26501-12 National Center for Construction Education and Research Slide 15 Slide 15 Figure 12 – Circuit breaker carriage
  • 17. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Managing Electrical Hazards Module 26501-12 National Center for Construction Education and Research Slide 16 Slide 16 Figure 13 – Robotic device used to control a circuit breaker carriage
  • 18. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Managing Electrical Hazards Module 26501-12 National Center for Construction Education and Research Slide 17 Slide 17 Figure 14 – Motor control center
  • 19. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Managing Electrical Hazards Module 26501-12 National Center for Construction Education and Research Slide 18 Slide 18 Figure 15 – Effects of flash between bus and bucket
  • 20. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Managing Electrical Hazards Module 26501-12 National Center for Construction Education and Research Slide 19 Slide 19 Figure 16 – Cable tray
  • 21. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Managing Electrical Hazards Module 26501-12 National Center for Construction Education and Research Slide 20 Slide 20 Figure 17 – Busway
  • 22. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Managing Electrical Hazards Module 26501-12 National Center for Construction Education and Research Slide 21 Slide 21 Figure 18 – Breaker enclosures with covers removed
  • 23. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Managing Electrical Hazards Module 26501-12 National Center for Construction Education and Research Slide 22 Slide 22 Figure 19 – Terminal cabinets and junction boxes
  • 24. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Managing Electrical Hazards Module 26501-12 National Center for Construction Education and Research Slide 23 Slide 23 Figure 20 – Field-mounted safety switches
  • 25. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Managing Electrical Hazards Module 26501-12 National Center for Construction Education and Research Slide 24 Slide 24 Figure 21 – Engine-generator set
  • 26. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Managing Electrical Hazards Module 26501-12 National Center for Construction Education and Research Slide 25 Slide 25 Figure 22 – Transfer switchgear
  • 27. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Managing Electrical Hazards Module 26501-12 National Center for Construction Education and Research Slide 26 Slide 26 Figure 23 – UPS batteries
  • 28. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Managing Electrical Hazards Module 26501-12 National Center for Construction Education and Research Slide 27 Slide 27 Figure 24 – Approach limits
  • 29. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Managing Electrical Hazards Module 26501-12 National Center for Construction Education and Research Slide 28 Slide 28 Figure 25 – Arc flash
  • 30. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Managing Electrical Hazards Module 26501-12 National Center for Construction Education and Research Slide 29 Slide 29 Table 2 – Approach Boundaries to Energized Electrical Conductors or Circuit Parts for Shock Protection for Alternating-Current Systems [Data from 70E Table 130.4(C)(a)]
  • 31. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Managing Electrical Hazards Module 26501-12 National Center for Construction Education and Research Slide 30 Slide 30 Figure 26 – Worker using appropriate PPE
  • 32. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Managing Electrical Hazards Module 26501-12 National Center for Construction Education and Research Slide 31 Slide 31 Figure 27 – Electrical hazard warning label
  • 33. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Managing Electrical Hazards Module 26501-12 National Center for Construction Education and Research Slide 32 Slide 32 Figure 28 – Various types of PPE
  • 34. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Managing Electrical Hazards Module 26501-12 National Center for Construction Education and Research Slide 33 Slide 33 Figure 29 – Balaclava (sock hood)
  • 35. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Managing Electrical Hazards Module 26501-12 National Center for Construction Education and Research Slide 34 Slide 34 Figure 30 – Newer arc hoods offer improved comfort and visibility
  • 36. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Managing Electrical Hazards Module 26501-12 National Center for Construction Education and Research Slide 35 Slide 35 Figure 31 – Voltage rating codes of gloves
  • 37. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Managing Electrical Hazards Module 26501-12 National Center for Construction Education and Research Slide 36 Slide 36 Figure 32 – Glove inspection
  • 38. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Managing Electrical Hazards Module 26501-12 National Center for Construction Education and Research Slide 37 Slide 37 Figure 33 – Rubber glove on a glove inflator
  • 39. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Managing Electrical Hazards Module 26501-12 National Center for Construction Education and Research Slide 38 Slide 38 Figure 34 – Rubber blanket
  • 40. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Managing Electrical Hazards Module 26501-12 National Center for Construction Education and Research Slide 39 Slide 39 Figure 35 – Temporary grounding jumpers in place on incoming feeders
  • 41. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Managing Electrical Hazards Module 26501-12 National Center for Construction Education and Research Slide 40 Slide 40 Figure 36 – Hot stick in use
  • 42. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Managing Electrical Hazards Module 26501-12 National Center for Construction Education and Research Slide 41 Slide 41 Figure 37 – Grounding mat in use
  • 43. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Managing Electrical Hazards Module 26501-12 National Center for Construction Education and Research Slide 42 Slide 42 Figure 38 – Sample energized electrical work permit
  • 44. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Managing Electrical Hazards Module 26501-12 National Center for Construction Education and Research Slide 43 Slide 43 Figure 39 – Simplified version of a single-line power distribution drawing
  • 45. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Managing Electrical Hazards Module 26501-12 National Center for Construction Education and Research Slide 44 Slide 44 Figure 40 – Burn survival probabilities
  • 46. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Managing Electrical Hazards Module 26501-12 National Center for Construction Education and Research Slide 45 Slide 45 Figure 41 – Body percentage areas (Rule of 9s)
  • 47. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Managing Electrical Hazards Module 26501-12 National Center for Construction Education and Research Slide 46 Slide 46 Figure 42 – PPE calorie markings
  • 48. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Managing Electrical Hazards Module 26501-12 National Center for Construction Education and Research Slide 47 Slide 47 Table 3 – Required Available Fault Current
  • 49. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Managing Electrical Hazards Module 26501-12 National Center for Construction Education and Research Slide 48 Slide 48 Figure 43 – Simplified single-line diagram of 480V, three-phase electrical supply
  • 50. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Managing Electrical Hazards Module 26501-12 National Center for Construction Education and Research Slide 49 Slide 49 Figure 44 – Trip settings on a low-voltage power circuit breaker
  • 51. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Managing Electrical Hazards Module 26501-12 National Center for Construction Education and Research Slide 50 Slide 50 Table 4 – Detailed Flash Hazard Analysis for Example Drawing
  • 52. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Managing Electrical Hazards Module 26501-12 National Center for Construction Education and Research Slide 51 Slide 51 Figure 45 – Megohmmeters
  • 53. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Managing Electrical Hazards Module 26501-12 National Center for Construction Education and Research Slide 52 Slide 52 Figure 46 – Self-testing audio/visual voltage detector
  • 54. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Managing Electrical Hazards Module 26501-12 National Center for Construction Education and Research Slide 53 Slide 53 Figure 47 – Clamp-on multimeter with test lead finger guards
  • 55. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Managing Electrical Hazards Module 26501-12 National Center for Construction Education and Research Slide 54 Slide 54 Table 5 – Overvoltage Installation Categories
  • 56. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Managing Electrical Hazards Module 26501-12 National Center for Construction Education and Research Slide 55 Slide 55 Figure 48 – Meter category rating
  • 57. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Managing Electrical Hazards Module 26501-12 National Center for Construction Education and Research Slide 56 Slide 56 Figure 49 – Lockout/tagout devices
  • 58. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Managing Electrical Hazards Module 26501-12 National Center for Construction Education and Research Slide 57 Slide 57 Figure 50 – Insulated rescue hook
  • 59. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Managing Electrical Hazards Module 26501-12 National Center for Construction Education and Research Slide 58 Slide 58 Supplemental Art
  • 60. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Managing Electrical Hazards Module 26501-12 National Center for Construction Education and Research Slide 59 Slide 59 Course Map
  • 61. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Managing Electrical Hazards Module 26501-12 National Center for Construction Education and Research Slide 60 Slide 60