Power Line Worker Level Two: Substation – Conductor Terminations and Splices
Module 26208-11
National Center
for Construction
Education and
Research
Conductor Terminations and Splices
Module Eight – 26208-11
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Conductor Terminations and Splices
Module 26208-11
National Center
for Construction
Education and
Research
Slide 1
Upon completion of this module, you will be able to do the following:
1. Describe how to make a good conductor termination.
2. Prepare cable ends for terminations and splices and connect using
lugs or connectors.
3. Train cable at termination points.
4. Understand the National Electrical Code® (NEC®) requirements for
making cable terminations and splices.
5. Demonstrate crimping techniques.
6. Select the proper lug or connector for the job.
Objectives
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Conductor Terminations and Splices
Module 26208-11
National Center
for Construction
Education and
Research
Slide 2
Under supervision of the instructor, you should be able to:
1. Terminate conductors using selected crimp-type and mechanical-
type terminals and connectors.
2. Terminate conductors on a terminal strip.
3. Insulate selected types of wire splices and/or install a motor
connection kit.
Performance Tasks
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Conductor Terminations and Splices
Module 26208-11
National Center
for Construction
Education and
Research
Slide 3 Table 1 – Dimensions of Common Wire Sizes
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Conductor Terminations and Splices
Module 26208-11
National Center
for Construction
Education and
Research
Slide 4 Figure 4 – Heavy-duty cable stripper
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Conductor Terminations and Splices
Module 26208-11
National Center
for Construction
Education and
Research
Slide 5 Figure 5 – Types of cable stripping
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Conductor Terminations and Splices
Module 26208-11
National Center
for Construction
Education and
Research
Slide 6 Figure 7 – Chisel point on a conductor
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Conductor Terminations and Splices
Module 26208-11
National Center
for Construction
Education and
Research
Slide 7 Figure 9 – Proper stripping length
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Conductor Terminations and Splices
Module 26208-11
National Center
for Construction
Education and
Research
Slide 8 Figure 11 – Various mechanical compression connectors
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Conductor Terminations and Splices
Module 26208-11
National Center
for Construction
Education and
Research
Slide 9 Figure 12 – Method of installing heat-shrink insulators
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Conductor Terminations and Splices
Module 26208-11
National Center
for Construction
Education and
Research
Slide 10 Table 2 – Tubing Selector Guide
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Conductor Terminations and Splices
Module 26208-11
National Center
for Construction
Education and
Research
Slide 11 Figure 14 – Basic crimp connector structure
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Conductor Terminations and Splices
Module 26208-11
National Center
for Construction
Education and
Research
Slide 12 Figure 15 – Standard tongue styles of crimped connectors
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Conductor Terminations and Splices
Module 26208-11
National Center
for Construction
Education and
Research
Slide 13 Table 3 – Typical Color Codes
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Conductor Terminations and Splices
Module 26208-11
National Center
for Construction
Education and
Research
Slide 14 Figure 16 – Mechanical strength versus electrical
performance of a crimped connector
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Conductor Terminations and Splices
Module 26208-11
National Center
for Construction
Education and
Research
Slide 15 Table 4 – Recommended Tightening Torques for Various Bolt Sizes
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Conductor Terminations and Splices
Module 26208-11
National Center
for Construction
Education and
Research
Slide 16 Figure 24 – Weatherproof connector used with Type MC cable
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Conductor Terminations and Splices
Module 26208-11
National Center
for Construction
Education and
Research
Slide 17 Figure 26 – Indent position
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Conductor Terminations and Splices
Module 26208-11
National Center
for Construction
Education and
Research
Slide 18 Figure 27 – Crimp centering
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Conductor Terminations and Splices
Module 26208-11
National Center
for Construction
Education and
Research
Slide 19 Figure 28 – Conductor positioning
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Conductor Terminations and Splices
Module 26208-11
National Center
for Construction
Education and
Research
Slide 20 Figure 29 – Terminal blocks
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Conductor Terminations and Splices
Module 26208-11
National Center
for Construction
Education and
Research
Slide 21 Figure 30 – Routing cabling
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Conductor Terminations and Splices
Module 26208-11
National Center
for Construction
Education and
Research
Slide 22 Figure 31 – Terminal bend radius
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Conductor Terminations and Splices
Module 26208-11
National Center
for Construction
Education and
Research
Slide 23 Table 5 – Minimum Wire Bending Space for Conductors Not Entering
or Leaving Opposite Wall [Data from NEC Table 312.6(A)]
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Conductor Terminations and Splices
Module 26208-11
National Center
for Construction
Education and
Research
Slide 24 Figure 34 – Bending space at terminals is measured in a straight line
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Conductor Terminations and Splices
Module 26208-11
National Center
for Construction
Education and
Research
Slide 25 Figure 35 – Conductors entering an enclosure opposite the conductor terminals
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Conductor Terminations and Splices
Module 26208-11
National Center
for Construction
Education and
Research
Slide 26 Table 6 – Minimum Wire Bending Space for Conductors Entering
or Leaving Opposite Wall [Data from NEC Table 312.6(B)]
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Conductor Terminations and Splices
Module 26208-11
National Center
for Construction
Education and
Research
Slide 27 Figure 37 – MCC fed directly from a transformer secondary
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Conductor Terminations and Splices
Module 26208-11
National Center
for Construction
Education and
Research
Slide 28 Figure 38 – Typical method for taping motor lug connections
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Conductor Terminations and Splices
Module 26208-11
National Center
for Construction
Education and
Research
Slide 29 Figure 39 – Typical method of taping a split-bolt connector
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Conductor Terminations and Splices
Module 26208-11
National Center
for Construction
Education and
Research
Slide 30 Figure 40 – Stub and in-line splice connections
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Conductor Terminations and Splices
Module 26208-11
National Center
for Construction
Education and
Research
Slide 31 Figure 41 – Motor connection kits installed on splices
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Conductor Terminations and Splices
Module 26208-11
National Center
for Construction
Education and
Research
Slide 32
Supplemental Art
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Conductor Terminations and Splices
Module 26208-11
National Center
for Construction
Education and
Research
Slide 33
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Conductor Terminations and Splices
Module 26208-11
National Center
for Construction
Education and
Research
Slide 34 Figure 1 – Wire stripper/crimper
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Conductor Terminations and Splices
Module 26208-11
National Center
for Construction
Education and
Research
Slide 35 Figure 2 – Wire strippers
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Conductor Terminations and Splices
Module 26208-11
National Center
for Construction
Education and
Research
Slide 36 Figure 3 – Ratchet-type cable cutter
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Conductor Terminations and Splices
Module 26208-11
National Center
for Construction
Education and
Research
Slide 37 Figure 6 – Round cable slitting and ringing tool
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Conductor Terminations and Splices
Module 26208-11
National Center
for Construction
Education and
Research
Slide 38 Figure 8 – Cable and wire stripping tools
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Conductor Terminations and Splices
Module 26208-11
National Center
for Construction
Education and
Research
Slide 39 Figure 10 – Crimp-on wire lugs
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Conductor Terminations and Splices
Module 26208-11
National Center
for Construction
Education and
Research
Slide 40 Figure 13 – Fire alarm and instrumentation cable
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Conductor Terminations and Splices
Module 26208-11
National Center
for Construction
Education and
Research
Slide 41 Figure 17 – Hand crimpers
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Conductor Terminations and Splices
Module 26208-11
National Center
for Construction
Education and
Research
Slide 42 Figure 18 – Leveraged crimping tool
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Conductor Terminations and Splices
Module 26208-11
National Center
for Construction
Education and
Research
Slide 43 Figure 19 – Crimping tools used to crimp large connectors
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Conductor Terminations and Splices
Module 26208-11
National Center
for Construction
Education and
Research
Slide 44 Figure 20 – Battery-operated crimping tool
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Conductor Terminations and Splices
Module 26208-11
National Center
for Construction
Education and
Research
Slide 45 Figure 21 – Corded crimping tool
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Conductor Terminations and Splices
Module 26208-11
National Center
for Construction
Education and
Research
Slide 46 Figure 22 – Universal crimping tool
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Conductor Terminations and Splices
Module 26208-11
National Center
for Construction
Education and
Research
Slide 47 Figure 23 – Multiple crimps
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Conductor Terminations and Splices
Module 26208-11
National Center
for Construction
Education and
Research
Slide 48 Figure 25 – Labeled and terminated control cable
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Conductor Terminations and Splices
Module 26208-11
National Center
for Construction
Education and
Research
Slide 49 Figure 32 – Ratchet bender
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Conductor Terminations and Splices
Module 26208-11
National Center
for Construction
Education and
Research
Slide 50 Figure 33 – Hydraulic bender
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Conductor Terminations and Splices
Module 26208-11
National Center
for Construction
Education and
Research
Slide 51 Cable Strippers
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Conductor Terminations and Splices
Module 26208-11
National Center
for Construction
Education and
Research
Slide 52 Cutting Large Power Cable
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Conductor Terminations and Splices
Module 26208-11
National Center
for Construction
Education and
Research
Slide 53 Tightening Compression Connector Screws and Bolts
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Conductor Terminations and Splices
Module 26208-11
National Center
for Construction
Education and
Research
Slide 54 Electrical Tape
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Conductor Terminations and Splices
Module 26208-11
National Center
for Construction
Education and
Research
Slide 55

More Related Content

Similar to Module Eight - Conductor Terminations and Splices - NCCER Substation Slides

Module Twelve - Mechanical Construction Methods and Materials - NCCER Substat...
Module Twelve - Mechanical Construction Methods and Materials - NCCER Substat...Module Twelve - Mechanical Construction Methods and Materials - NCCER Substat...
Module Twelve - Mechanical Construction Methods and Materials - NCCER Substat...Shariq Ayjaz
 
Module Nine - Grounding Systems - NCCER Substation Slides
Module Nine - Grounding Systems - NCCER Substation SlidesModule Nine - Grounding Systems - NCCER Substation Slides
Module Nine - Grounding Systems - NCCER Substation SlidesShariq Ayjaz
 
Module Three - Alternating Current and Three-Phase Systems - NCCER Substation...
Module Three - Alternating Current and Three-Phase Systems - NCCER Substation...Module Three - Alternating Current and Three-Phase Systems - NCCER Substation...
Module Three - Alternating Current and Three-Phase Systems - NCCER Substation...Shariq Ayjaz
 
Module Eleven - Concrete Work - NCCER Substation Slides
Module Eleven - Concrete Work - NCCER Substation SlidesModule Eleven - Concrete Work - NCCER Substation Slides
Module Eleven - Concrete Work - NCCER Substation SlidesShariq Ayjaz
 
BUCK converter fed by PV array
BUCK converter fed by PV arrayBUCK converter fed by PV array
BUCK converter fed by PV arrayMonika Rout
 
CW presentation.pptxKKKKKKKKKKKKKKKKKKKKKKKKKKKKKK
CW presentation.pptxKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKCW presentation.pptxKKKKKKKKKKKKKKKKKKKKKKKKKKKKKK
CW presentation.pptxKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKveereshtadasad07
 
when a coil is rotated or turned under a magnetic field, there occurs a force...
when a coil is rotated or turned under a magnetic field, there occurs a force...when a coil is rotated or turned under a magnetic field, there occurs a force...
when a coil is rotated or turned under a magnetic field, there occurs a force...theijes
 
Automatic power factor_improvement_and_monitoring_by_using_plc[1]
Automatic power factor_improvement_and_monitoring_by_using_plc[1]Automatic power factor_improvement_and_monitoring_by_using_plc[1]
Automatic power factor_improvement_and_monitoring_by_using_plc[1]ferozpatowary
 
Multiconverter Unified Power Quality Conditioning System Using Artificial Neu...
Multiconverter Unified Power Quality Conditioning System Using Artificial Neu...Multiconverter Unified Power Quality Conditioning System Using Artificial Neu...
Multiconverter Unified Power Quality Conditioning System Using Artificial Neu...Asoka Technologies
 
DESIGN AND IMPLEMENTATION OF QUADRATIC BOOST CONVERTER FOR APPLICATION OF BLD...
DESIGN AND IMPLEMENTATION OF QUADRATIC BOOST CONVERTER FOR APPLICATION OF BLD...DESIGN AND IMPLEMENTATION OF QUADRATIC BOOST CONVERTER FOR APPLICATION OF BLD...
DESIGN AND IMPLEMENTATION OF QUADRATIC BOOST CONVERTER FOR APPLICATION OF BLD...IRJET Journal
 
Industrial training report on dlw varanasi for Main Receiving Substation, Tra...
Industrial training report on dlw varanasi for Main Receiving Substation, Tra...Industrial training report on dlw varanasi for Main Receiving Substation, Tra...
Industrial training report on dlw varanasi for Main Receiving Substation, Tra...Devendra Kumar
 
Doc a.7-tlc report
Doc a.7-tlc reportDoc a.7-tlc report
Doc a.7-tlc report9951081577
 
A Self-Balancing Switched Capacitor Multilevel Inverter Structure with Six-fo...
A Self-Balancing Switched Capacitor Multilevel Inverter Structure with Six-fo...A Self-Balancing Switched Capacitor Multilevel Inverter Structure with Six-fo...
A Self-Balancing Switched Capacitor Multilevel Inverter Structure with Six-fo...IRJET Journal
 
BSNL electrical engineering report file
BSNL electrical engineering report fileBSNL electrical engineering report file
BSNL electrical engineering report fileAman singh
 
132 33kv substation documentation
132 33kv substation documentation132 33kv substation documentation
132 33kv substation documentationRajashekar Gurrala
 
Automatic Phase Changer
Automatic Phase ChangerAutomatic Phase Changer
Automatic Phase ChangerBhanu Bhawesh
 
Classification of electric motors
Classification of electric motors Classification of electric motors
Classification of electric motors Sudhanshu Tripathi
 

Similar to Module Eight - Conductor Terminations and Splices - NCCER Substation Slides (20)

Module Twelve - Mechanical Construction Methods and Materials - NCCER Substat...
Module Twelve - Mechanical Construction Methods and Materials - NCCER Substat...Module Twelve - Mechanical Construction Methods and Materials - NCCER Substat...
Module Twelve - Mechanical Construction Methods and Materials - NCCER Substat...
 
Module Nine - Grounding Systems - NCCER Substation Slides
Module Nine - Grounding Systems - NCCER Substation SlidesModule Nine - Grounding Systems - NCCER Substation Slides
Module Nine - Grounding Systems - NCCER Substation Slides
 
Module Three - Alternating Current and Three-Phase Systems - NCCER Substation...
Module Three - Alternating Current and Three-Phase Systems - NCCER Substation...Module Three - Alternating Current and Three-Phase Systems - NCCER Substation...
Module Three - Alternating Current and Three-Phase Systems - NCCER Substation...
 
Module Eleven - Concrete Work - NCCER Substation Slides
Module Eleven - Concrete Work - NCCER Substation SlidesModule Eleven - Concrete Work - NCCER Substation Slides
Module Eleven - Concrete Work - NCCER Substation Slides
 
BUCK converter fed by PV array
BUCK converter fed by PV arrayBUCK converter fed by PV array
BUCK converter fed by PV array
 
Unipolar pulse width modulation inverter
Unipolar pulse width modulation inverterUnipolar pulse width modulation inverter
Unipolar pulse width modulation inverter
 
CW presentation.pptxKKKKKKKKKKKKKKKKKKKKKKKKKKKKKK
CW presentation.pptxKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKCW presentation.pptxKKKKKKKKKKKKKKKKKKKKKKKKKKKKKK
CW presentation.pptxKKKKKKKKKKKKKKKKKKKKKKKKKKKKKK
 
when a coil is rotated or turned under a magnetic field, there occurs a force...
when a coil is rotated or turned under a magnetic field, there occurs a force...when a coil is rotated or turned under a magnetic field, there occurs a force...
when a coil is rotated or turned under a magnetic field, there occurs a force...
 
Automatic power factor_improvement_and_monitoring_by_using_plc[1]
Automatic power factor_improvement_and_monitoring_by_using_plc[1]Automatic power factor_improvement_and_monitoring_by_using_plc[1]
Automatic power factor_improvement_and_monitoring_by_using_plc[1]
 
Multiconverter Unified Power Quality Conditioning System Using Artificial Neu...
Multiconverter Unified Power Quality Conditioning System Using Artificial Neu...Multiconverter Unified Power Quality Conditioning System Using Artificial Neu...
Multiconverter Unified Power Quality Conditioning System Using Artificial Neu...
 
DESIGN AND IMPLEMENTATION OF QUADRATIC BOOST CONVERTER FOR APPLICATION OF BLD...
DESIGN AND IMPLEMENTATION OF QUADRATIC BOOST CONVERTER FOR APPLICATION OF BLD...DESIGN AND IMPLEMENTATION OF QUADRATIC BOOST CONVERTER FOR APPLICATION OF BLD...
DESIGN AND IMPLEMENTATION OF QUADRATIC BOOST CONVERTER FOR APPLICATION OF BLD...
 
Start (ceb) new
Start (ceb) newStart (ceb) new
Start (ceb) new
 
Industrial training report on dlw varanasi for Main Receiving Substation, Tra...
Industrial training report on dlw varanasi for Main Receiving Substation, Tra...Industrial training report on dlw varanasi for Main Receiving Substation, Tra...
Industrial training report on dlw varanasi for Main Receiving Substation, Tra...
 
Doc a.7-tlc report
Doc a.7-tlc reportDoc a.7-tlc report
Doc a.7-tlc report
 
A Self-Balancing Switched Capacitor Multilevel Inverter Structure with Six-fo...
A Self-Balancing Switched Capacitor Multilevel Inverter Structure with Six-fo...A Self-Balancing Switched Capacitor Multilevel Inverter Structure with Six-fo...
A Self-Balancing Switched Capacitor Multilevel Inverter Structure with Six-fo...
 
BSNL electrical engineering report file
BSNL electrical engineering report fileBSNL electrical engineering report file
BSNL electrical engineering report file
 
132 33kv substation documentation
132 33kv substation documentation132 33kv substation documentation
132 33kv substation documentation
 
Automatic Phase Changer
Automatic Phase ChangerAutomatic Phase Changer
Automatic Phase Changer
 
Beee
BeeeBeee
Beee
 
Classification of electric motors
Classification of electric motors Classification of electric motors
Classification of electric motors
 

Recently uploaded

KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and Clustering
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and ClusteringKIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and Clustering
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and ClusteringDr. Radhey Shyam
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwoodseandesed
 
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptxCloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptxMd. Shahidul Islam Prodhan
 
Peek implant persentation - Copy (1).pdf
Peek implant persentation - Copy (1).pdfPeek implant persentation - Copy (1).pdf
Peek implant persentation - Copy (1).pdfAyahmorsy
 
IT-601 Lecture Notes-UNIT-2.pdf Data Analysis
IT-601 Lecture Notes-UNIT-2.pdf Data AnalysisIT-601 Lecture Notes-UNIT-2.pdf Data Analysis
IT-601 Lecture Notes-UNIT-2.pdf Data AnalysisDr. Radhey Shyam
 
Construction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptxConstruction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptxwendy cai
 
Online resume builder management system project report.pdf
Online resume builder management system project report.pdfOnline resume builder management system project report.pdf
Online resume builder management system project report.pdfKamal Acharya
 
Fruit shop management system project report.pdf
Fruit shop management system project report.pdfFruit shop management system project report.pdf
Fruit shop management system project report.pdfKamal Acharya
 
fundamentals of drawing and isometric and orthographic projection
fundamentals of drawing and isometric and orthographic projectionfundamentals of drawing and isometric and orthographic projection
fundamentals of drawing and isometric and orthographic projectionjeevanprasad8
 
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and Visualization
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and VisualizationKIT-601 Lecture Notes-UNIT-5.pdf Frame Works and Visualization
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and VisualizationDr. Radhey Shyam
 
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringC Sai Kiran
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234AafreenAbuthahir2
 
İTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering WorkshopİTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering WorkshopEmre Günaydın
 
Digital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdfDigital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdfAbrahamGadissa
 
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data StreamKIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data StreamDr. Radhey Shyam
 
Top 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering ScientistTop 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering Scientistgettygaming1
 
2024 DevOps Pro Europe - Growing at the edge
2024 DevOps Pro Europe - Growing at the edge2024 DevOps Pro Europe - Growing at the edge
2024 DevOps Pro Europe - Growing at the edgePaco Orozco
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdfAhmedHussein950959
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdfKamal Acharya
 

Recently uploaded (20)

KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and Clustering
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and ClusteringKIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and Clustering
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and Clustering
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptxCloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
Peek implant persentation - Copy (1).pdf
Peek implant persentation - Copy (1).pdfPeek implant persentation - Copy (1).pdf
Peek implant persentation - Copy (1).pdf
 
IT-601 Lecture Notes-UNIT-2.pdf Data Analysis
IT-601 Lecture Notes-UNIT-2.pdf Data AnalysisIT-601 Lecture Notes-UNIT-2.pdf Data Analysis
IT-601 Lecture Notes-UNIT-2.pdf Data Analysis
 
Construction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptxConstruction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptx
 
Online resume builder management system project report.pdf
Online resume builder management system project report.pdfOnline resume builder management system project report.pdf
Online resume builder management system project report.pdf
 
Fruit shop management system project report.pdf
Fruit shop management system project report.pdfFruit shop management system project report.pdf
Fruit shop management system project report.pdf
 
fundamentals of drawing and isometric and orthographic projection
fundamentals of drawing and isometric and orthographic projectionfundamentals of drawing and isometric and orthographic projection
fundamentals of drawing and isometric and orthographic projection
 
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and Visualization
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and VisualizationKIT-601 Lecture Notes-UNIT-5.pdf Frame Works and Visualization
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and Visualization
 
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
İTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering WorkshopİTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering Workshop
 
Digital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdfDigital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdf
 
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data StreamKIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
 
Top 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering ScientistTop 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering Scientist
 
2024 DevOps Pro Europe - Growing at the edge
2024 DevOps Pro Europe - Growing at the edge2024 DevOps Pro Europe - Growing at the edge
2024 DevOps Pro Europe - Growing at the edge
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 

Module Eight - Conductor Terminations and Splices - NCCER Substation Slides

  • 1. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Conductor Terminations and Splices Module 26208-11 National Center for Construction Education and Research Conductor Terminations and Splices Module Eight – 26208-11
  • 2. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Conductor Terminations and Splices Module 26208-11 National Center for Construction Education and Research Slide 1 Upon completion of this module, you will be able to do the following: 1. Describe how to make a good conductor termination. 2. Prepare cable ends for terminations and splices and connect using lugs or connectors. 3. Train cable at termination points. 4. Understand the National Electrical Code® (NEC®) requirements for making cable terminations and splices. 5. Demonstrate crimping techniques. 6. Select the proper lug or connector for the job. Objectives
  • 3. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Conductor Terminations and Splices Module 26208-11 National Center for Construction Education and Research Slide 2 Under supervision of the instructor, you should be able to: 1. Terminate conductors using selected crimp-type and mechanical- type terminals and connectors. 2. Terminate conductors on a terminal strip. 3. Insulate selected types of wire splices and/or install a motor connection kit. Performance Tasks
  • 4. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Conductor Terminations and Splices Module 26208-11 National Center for Construction Education and Research Slide 3 Table 1 – Dimensions of Common Wire Sizes
  • 5. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Conductor Terminations and Splices Module 26208-11 National Center for Construction Education and Research Slide 4 Figure 4 – Heavy-duty cable stripper
  • 6. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Conductor Terminations and Splices Module 26208-11 National Center for Construction Education and Research Slide 5 Figure 5 – Types of cable stripping
  • 7. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Conductor Terminations and Splices Module 26208-11 National Center for Construction Education and Research Slide 6 Figure 7 – Chisel point on a conductor
  • 8. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Conductor Terminations and Splices Module 26208-11 National Center for Construction Education and Research Slide 7 Figure 9 – Proper stripping length
  • 9. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Conductor Terminations and Splices Module 26208-11 National Center for Construction Education and Research Slide 8 Figure 11 – Various mechanical compression connectors
  • 10. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Conductor Terminations and Splices Module 26208-11 National Center for Construction Education and Research Slide 9 Figure 12 – Method of installing heat-shrink insulators
  • 11. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Conductor Terminations and Splices Module 26208-11 National Center for Construction Education and Research Slide 10 Table 2 – Tubing Selector Guide
  • 12. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Conductor Terminations and Splices Module 26208-11 National Center for Construction Education and Research Slide 11 Figure 14 – Basic crimp connector structure
  • 13. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Conductor Terminations and Splices Module 26208-11 National Center for Construction Education and Research Slide 12 Figure 15 – Standard tongue styles of crimped connectors
  • 14. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Conductor Terminations and Splices Module 26208-11 National Center for Construction Education and Research Slide 13 Table 3 – Typical Color Codes
  • 15. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Conductor Terminations and Splices Module 26208-11 National Center for Construction Education and Research Slide 14 Figure 16 – Mechanical strength versus electrical performance of a crimped connector
  • 16. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Conductor Terminations and Splices Module 26208-11 National Center for Construction Education and Research Slide 15 Table 4 – Recommended Tightening Torques for Various Bolt Sizes
  • 17. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Conductor Terminations and Splices Module 26208-11 National Center for Construction Education and Research Slide 16 Figure 24 – Weatherproof connector used with Type MC cable
  • 18. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Conductor Terminations and Splices Module 26208-11 National Center for Construction Education and Research Slide 17 Figure 26 – Indent position
  • 19. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Conductor Terminations and Splices Module 26208-11 National Center for Construction Education and Research Slide 18 Figure 27 – Crimp centering
  • 20. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Conductor Terminations and Splices Module 26208-11 National Center for Construction Education and Research Slide 19 Figure 28 – Conductor positioning
  • 21. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Conductor Terminations and Splices Module 26208-11 National Center for Construction Education and Research Slide 20 Figure 29 – Terminal blocks
  • 22. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Conductor Terminations and Splices Module 26208-11 National Center for Construction Education and Research Slide 21 Figure 30 – Routing cabling
  • 23. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Conductor Terminations and Splices Module 26208-11 National Center for Construction Education and Research Slide 22 Figure 31 – Terminal bend radius
  • 24. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Conductor Terminations and Splices Module 26208-11 National Center for Construction Education and Research Slide 23 Table 5 – Minimum Wire Bending Space for Conductors Not Entering or Leaving Opposite Wall [Data from NEC Table 312.6(A)]
  • 25. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Conductor Terminations and Splices Module 26208-11 National Center for Construction Education and Research Slide 24 Figure 34 – Bending space at terminals is measured in a straight line
  • 26. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Conductor Terminations and Splices Module 26208-11 National Center for Construction Education and Research Slide 25 Figure 35 – Conductors entering an enclosure opposite the conductor terminals
  • 27. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Conductor Terminations and Splices Module 26208-11 National Center for Construction Education and Research Slide 26 Table 6 – Minimum Wire Bending Space for Conductors Entering or Leaving Opposite Wall [Data from NEC Table 312.6(B)]
  • 28. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Conductor Terminations and Splices Module 26208-11 National Center for Construction Education and Research Slide 27 Figure 37 – MCC fed directly from a transformer secondary
  • 29. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Conductor Terminations and Splices Module 26208-11 National Center for Construction Education and Research Slide 28 Figure 38 – Typical method for taping motor lug connections
  • 30. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Conductor Terminations and Splices Module 26208-11 National Center for Construction Education and Research Slide 29 Figure 39 – Typical method of taping a split-bolt connector
  • 31. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Conductor Terminations and Splices Module 26208-11 National Center for Construction Education and Research Slide 30 Figure 40 – Stub and in-line splice connections
  • 32. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Conductor Terminations and Splices Module 26208-11 National Center for Construction Education and Research Slide 31 Figure 41 – Motor connection kits installed on splices
  • 33. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Conductor Terminations and Splices Module 26208-11 National Center for Construction Education and Research Slide 32 Supplemental Art
  • 34. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Conductor Terminations and Splices Module 26208-11 National Center for Construction Education and Research Slide 33
  • 35. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Conductor Terminations and Splices Module 26208-11 National Center for Construction Education and Research Slide 34 Figure 1 – Wire stripper/crimper
  • 36. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Conductor Terminations and Splices Module 26208-11 National Center for Construction Education and Research Slide 35 Figure 2 – Wire strippers
  • 37. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Conductor Terminations and Splices Module 26208-11 National Center for Construction Education and Research Slide 36 Figure 3 – Ratchet-type cable cutter
  • 38. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Conductor Terminations and Splices Module 26208-11 National Center for Construction Education and Research Slide 37 Figure 6 – Round cable slitting and ringing tool
  • 39. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Conductor Terminations and Splices Module 26208-11 National Center for Construction Education and Research Slide 38 Figure 8 – Cable and wire stripping tools
  • 40. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Conductor Terminations and Splices Module 26208-11 National Center for Construction Education and Research Slide 39 Figure 10 – Crimp-on wire lugs
  • 41. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Conductor Terminations and Splices Module 26208-11 National Center for Construction Education and Research Slide 40 Figure 13 – Fire alarm and instrumentation cable
  • 42. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Conductor Terminations and Splices Module 26208-11 National Center for Construction Education and Research Slide 41 Figure 17 – Hand crimpers
  • 43. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Conductor Terminations and Splices Module 26208-11 National Center for Construction Education and Research Slide 42 Figure 18 – Leveraged crimping tool
  • 44. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Conductor Terminations and Splices Module 26208-11 National Center for Construction Education and Research Slide 43 Figure 19 – Crimping tools used to crimp large connectors
  • 45. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Conductor Terminations and Splices Module 26208-11 National Center for Construction Education and Research Slide 44 Figure 20 – Battery-operated crimping tool
  • 46. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Conductor Terminations and Splices Module 26208-11 National Center for Construction Education and Research Slide 45 Figure 21 – Corded crimping tool
  • 47. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Conductor Terminations and Splices Module 26208-11 National Center for Construction Education and Research Slide 46 Figure 22 – Universal crimping tool
  • 48. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Conductor Terminations and Splices Module 26208-11 National Center for Construction Education and Research Slide 47 Figure 23 – Multiple crimps
  • 49. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Conductor Terminations and Splices Module 26208-11 National Center for Construction Education and Research Slide 48 Figure 25 – Labeled and terminated control cable
  • 50. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Conductor Terminations and Splices Module 26208-11 National Center for Construction Education and Research Slide 49 Figure 32 – Ratchet bender
  • 51. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Conductor Terminations and Splices Module 26208-11 National Center for Construction Education and Research Slide 50 Figure 33 – Hydraulic bender
  • 52. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Conductor Terminations and Splices Module 26208-11 National Center for Construction Education and Research Slide 51 Cable Strippers
  • 53. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Conductor Terminations and Splices Module 26208-11 National Center for Construction Education and Research Slide 52 Cutting Large Power Cable
  • 54. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Conductor Terminations and Splices Module 26208-11 National Center for Construction Education and Research Slide 53 Tightening Compression Connector Screws and Bolts