Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials
Module 82205-12
Slide 0
National Center
for Construction
Education and
Research
Mechanical Construction Methods and
Materials
Module Twelve – 82205-12
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials
Module 82205-12
Slide 1
National Center
for Construction
Education and
Research
Objectives
Upon completion of this module, you will be able to do the following:
1. Identify the types and materials of steel structures.
2. Identify types of fasteners and torque methods and values.
3. Identify types of bus and connectors.
4. Identify the types of bus supports.
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials
Module 82205-12
Slide 2
National Center
for Construction
Education and
Research
Performance Tasks
Under the supervision of the instructor, you should be able to do the
following:
1. Properly torque fasteners.
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials
Module 82205-12
Slide 3
National Center
for Construction
Education and
Research
Figure 1 — Transmission substation by Oconee Nuclear Generating Station
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials
Module 82205-12
Slide 4
National Center
for Construction
Education and
Research
Figure 2 — Subtransmission and distribution substations
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials
Module 82205-12
Slide 5
National Center
for Construction
Education and
Research
Figure 3 — Construction work high above ground
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials
Module 82205-12
Slide 6
National Center
for Construction
Education and
Research
Figure 4 — Caution and danger signs
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials
Module 82205-12
Slide 7
National Center
for Construction
Education and
Research
Figure 5 — Substation structures
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials
Module 82205-12
Slide 8
National Center
for Construction
Education and
Research
Figure 6 — Detail B of connection with stiffener plates
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials
Module 82205-12
Slide 9
National Center
for Construction
Education and
Research
Figure 7 — Section from erection drawing
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials
Module 82205-12
Slide 10
National Center
for Construction
Education and
Research
Figure 8 — Typical distribution substation support structure
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials
Module 82205-12
Slide 11
National Center
for Construction
Education and
Research
Figure 9 — Steel lattice structure
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials
Module 82205-12
Slide 12
National Center
for Construction
Education and
Research
Figure 10 — Box truss supports
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials
Module 82205-12
Slide 13
National Center
for Construction
Education and
Research
Figure 11 — A-frame dead-end structure
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials
Module 82205-12
Slide 14
National Center
for Construction
Education and
Research
Figure 12 — H-shaped dead-end structure
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials
Module 82205-12
Slide 15
National Center
for Construction
Education and
Research
Figure 13 — Polygonal A-frame structure
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials
Module 82205-12
Slide 16
National Center
for Construction
Education and
Research
Figure 14 — A-frame of angle iron and lattice construction
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials
Module 82205-12
Slide 17
National Center
for Construction
Education and
Research
Figure 15 — Lightning mast tip
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials
Module 82205-12
Slide 18
National Center
for Construction
Education and
Research
Figure 16 — Polygonal lightning mast
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials
Module 82205-12
Slide 19
National Center
for Construction
Education and
Research
Figure 17 — Insulators
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials
Module 82205-12
Slide 20
National Center
for Construction
Education and
Research
Figure 18 — Support insulators
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials
Module 82205-12
Slide 21
National Center
for Construction
Education and
Research
Figure 19 — Suspension insulator
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials
Module 82205-12
Slide 22
National Center
for Construction
Education and
Research
Figure 20 — Suspension insulator bells
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials
Module 82205-12
Slide 23
National Center
for Construction
Education and
Research
Figure 21 — Lightning arresters
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials
Module 82205-12
Slide 24
National Center
for Construction
Education and
Research
Figure 22 — 115kV ground switch
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials
Module 82205-12
Slide 25
National Center
for Construction
Education and
Research
Figure 23 — One phase of a gang-operated transmission line switch
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials
Module 82205-12
Slide 26
National Center
for Construction
Education and
Research
Figure 24 — Circuit breakers
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials
Module 82205-12
Slide 27
National Center
for Construction
Education and
Research
Figure 25 — Threaded fasteners
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials
Module 82205-12
Slide 28
National Center
for Construction
Education and
Research
Figure 26 — Screw thread designations
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials
Module 82205-12
Slide 29
National Center
for Construction
Education and
Research
Figure 27 — Thread types
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials
Module 82205-12
Slide 30
National Center
for Construction
Education and
Research
Figure 28 — Grade markings for steel bolts and screws
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials
Module 82205-12
Slide 31
National Center
for Construction
Education and
Research
Figure 29 — Bolt markings for A325 bolts
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials
Module 82205-12
Slide 32
National Center
for Construction
Education and
Research
Figure 30 — A325 hex nuts
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials
Module 82205-12
Slide 33
National Center
for Construction
Education and
Research
Figure 31 — Type 3 washers
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials
Module 82205-12
Slide 34
National Center
for Construction
Education and
Research
Figure 32 — Proper tightening sequence
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials
Module 82205-12
Slide 35
National Center
for Construction
Education and
Research
Figure 33 — Safety-wired fasteners
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials
Module 82205-12
Slide 36
National Center
for Construction
Education and
Research
Table 1 — Bolt Chart Information
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials
Module 82205-12
Slide 37
National Center
for Construction
Education and
Research
Figure 34 — Torque value charts
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials
Module 82205-12
Slide 38
National Center
for Construction
Education and
Research
Figure 35 — Beam-type torque wrench
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials
Module 82205-12
Slide 39
National Center
for Construction
Education and
Research
Figure 36 — Click-type torque wrench
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials
Module 82205-12
Slide 40
National Center
for Construction
Education and
Research
Figure 37 — Digital torque wrench
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials
Module 82205-12
Slide 41
National Center
for Construction
Education and
Research
Figure 38 — Torque multiplier
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials
Module 82205-12
Slide 42
National Center
for Construction
Education and
Research
Figure 39 — Installation of tension control bolts
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials
Module 82205-12
Slide 43
National Center
for Construction
Education and
Research
Feature — Intelligent Bolts
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials
Module 82205-12
Slide 44
National Center
for Construction
Education and
Research
Figure 40 — Bolt load indicator installation methods
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials
Module 82205-12
Slide 45
National Center
for Construction
Education and
Research
Table 2 — Gap Measurement
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials
Module 82205-12
Slide 46
National Center
for Construction
Education and
Research
Figure 41 — Amount of gap before and after turning
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials
Module 82205-12
Slide 47
National Center
for Construction
Education and
Research
Figure 42 — Belleville washer
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials
Module 82205-12
Slide 48
National Center
for Construction
Education and
Research
Figure 43 — Fastener elastic and plastic ranges
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials
Module 82205-12
Slide 49
National Center
for Construction
Education and
Research
Figure 44 — Torque angle gauge
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials
Module 82205-12
Slide 50
National Center
for Construction
Education and
Research
Figure 45 — Torque angle gauge in use
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials
Module 82205-12
Slide 51
National Center
for Construction
Education and
Research
Figure 46 — Rigid busbar
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials
Module 82205-12
Slide 52
National Center
for Construction
Education and
Research
Figure 47 — Tubular aluminum busbar
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials
Module 82205-12
Slide 53
National Center
for Construction
Education and
Research
Figure 48 — SF6 bus
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials
Module 82205-12
Slide 54
National Center
for Construction
Education and
Research
Figure 49 — Aluminum strain bus conductor
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials
Module 82205-12
Slide 55
National Center
for Construction
Education and
Research
Figure 50 — Tubular bus compression fittings
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials
Module 82205-12
Slide 56
National Center
for Construction
Education and
Research
Figure 51 — Bolted terminal connections
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials
Module 82205-12
Slide 57
National Center
for Construction
Education and
Research
Figure 52 — Dead-end clamp
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials
Module 82205-12
Slide 58
National Center
for Construction
Education and
Research
Figure 53 — Aluminum compression connection
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials
Module 82205-12
Slide 59
National Center
for Construction
Education and
Research
Figure 54 — Welding busbar fittings
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials
Module 82205-12
Slide 60
National Center
for Construction
Education and
Research
Supplemental Art
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials
Module 82205-12
Slide 61
National Center
for Construction
Education and
Research
Course Map

More Related Content

Similar to Module Twelve - Mechanical Construction Methods and Materials - NCCER Substation Slides

Module Seven - Conductor Installations - NCCER Substation Slides
Module Seven -  Conductor Installations - NCCER Substation SlidesModule Seven -  Conductor Installations - NCCER Substation Slides
Module Seven - Conductor Installations - NCCER Substation Slides
Shariq Ayjaz
 
Module Six - Conduit Bending - NCCER Substation Slides
Module Six -  Conduit Bending - NCCER Substation SlidesModule Six -  Conduit Bending - NCCER Substation Slides
Module Six - Conduit Bending - NCCER Substation Slides
Shariq Ayjaz
 
Module Two - Managing Electrical Hazards - NCCER Substation Slides
Module Two - Managing Electrical Hazards - NCCER Substation SlidesModule Two - Managing Electrical Hazards - NCCER Substation Slides
Module Two - Managing Electrical Hazards - NCCER Substation Slides
Shariq Ayjaz
 
Module Three - Alternating Current and Three-Phase Systems - NCCER Substation...
Module Three - Alternating Current and Three-Phase Systems - NCCER Substation...Module Three - Alternating Current and Three-Phase Systems - NCCER Substation...
Module Three - Alternating Current and Three-Phase Systems - NCCER Substation...
Shariq Ayjaz
 
BASIC SAFETY 101-09(1) (1).pptx
BASIC SAFETY 101-09(1) (1).pptxBASIC SAFETY 101-09(1) (1).pptx
BASIC SAFETY 101-09(1) (1).pptx
Fredel De Vera
 
Battery swapping project
Battery swapping projectBattery swapping project
Battery swapping project
Nagamohan Burugupalli
 
Tlm general electrician
Tlm   general electricianTlm   general electrician
Tlm general electrician
Imtiaz Hussain
 
Timothy Yau Project Portfolio
Timothy Yau Project Portfolio Timothy Yau Project Portfolio
Timothy Yau Project Portfolio
Timothy Yau, P.Eng, PMP
 
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCEVIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCEvijayabaskar v
 
B.Tech_Hons._ME_with_specialization_in_Electric_Vehicles_SCHEME-2022-26-1.pdf
B.Tech_Hons._ME_with_specialization_in_Electric_Vehicles_SCHEME-2022-26-1.pdfB.Tech_Hons._ME_with_specialization_in_Electric_Vehicles_SCHEME-2022-26-1.pdf
B.Tech_Hons._ME_with_specialization_in_Electric_Vehicles_SCHEME-2022-26-1.pdf
PRASENJITMUKHERJEE21
 
B.Tech_Hons._ME_with_specialization_in_Electric_Vehicles_SCHEME-2022-26.pdf
B.Tech_Hons._ME_with_specialization_in_Electric_Vehicles_SCHEME-2022-26.pdfB.Tech_Hons._ME_with_specialization_in_Electric_Vehicles_SCHEME-2022-26.pdf
B.Tech_Hons._ME_with_specialization_in_Electric_Vehicles_SCHEME-2022-26.pdf
PRASENJITMUKHERJEE21
 
Gct larkano
Gct larkanoGct larkano
Gct larkano
Noor Din
 
Domer L. Javier resume_rev.1
Domer L. Javier resume_rev.1Domer L. Javier resume_rev.1
Domer L. Javier resume_rev.1Boytoy Domer
 
Dish position control using Geared Motor
Dish position control using Geared MotorDish position control using Geared Motor
Dish position control using Geared Motor
Laxmikanth Kolukula
 
Cert II in Electrotechnology-expert panel report.
Cert II in Electrotechnology-expert panel report.Cert II in Electrotechnology-expert panel report.
Cert II in Electrotechnology-expert panel report.Allan McLean
 
10-10-05_01 Tim Schmitt
10-10-05_01 Tim Schmitt10-10-05_01 Tim Schmitt
10-10-05_01 Tim SchmittDarrell Caron
 
B.E. EEE (2021 reg.pdf syallabus anna university
B.E. EEE (2021 reg.pdf syallabus anna universityB.E. EEE (2021 reg.pdf syallabus anna university
B.E. EEE (2021 reg.pdf syallabus anna university
mageshprabhu
 
Report index part1
Report index part1Report index part1
Report index part1
Omkar Rane
 

Similar to Module Twelve - Mechanical Construction Methods and Materials - NCCER Substation Slides (20)

Module Seven - Conductor Installations - NCCER Substation Slides
Module Seven -  Conductor Installations - NCCER Substation SlidesModule Seven -  Conductor Installations - NCCER Substation Slides
Module Seven - Conductor Installations - NCCER Substation Slides
 
Module Six - Conduit Bending - NCCER Substation Slides
Module Six -  Conduit Bending - NCCER Substation SlidesModule Six -  Conduit Bending - NCCER Substation Slides
Module Six - Conduit Bending - NCCER Substation Slides
 
Module Two - Managing Electrical Hazards - NCCER Substation Slides
Module Two - Managing Electrical Hazards - NCCER Substation SlidesModule Two - Managing Electrical Hazards - NCCER Substation Slides
Module Two - Managing Electrical Hazards - NCCER Substation Slides
 
Module Three - Alternating Current and Three-Phase Systems - NCCER Substation...
Module Three - Alternating Current and Three-Phase Systems - NCCER Substation...Module Three - Alternating Current and Three-Phase Systems - NCCER Substation...
Module Three - Alternating Current and Three-Phase Systems - NCCER Substation...
 
BASIC SAFETY 101-09(1) (1).pptx
BASIC SAFETY 101-09(1) (1).pptxBASIC SAFETY 101-09(1) (1).pptx
BASIC SAFETY 101-09(1) (1).pptx
 
Battery swapping project
Battery swapping projectBattery swapping project
Battery swapping project
 
Tlm general electrician
Tlm   general electricianTlm   general electrician
Tlm general electrician
 
Timothy Yau Project Portfolio
Timothy Yau Project Portfolio Timothy Yau Project Portfolio
Timothy Yau Project Portfolio
 
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCEVIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
 
B.Tech_Hons._ME_with_specialization_in_Electric_Vehicles_SCHEME-2022-26-1.pdf
B.Tech_Hons._ME_with_specialization_in_Electric_Vehicles_SCHEME-2022-26-1.pdfB.Tech_Hons._ME_with_specialization_in_Electric_Vehicles_SCHEME-2022-26-1.pdf
B.Tech_Hons._ME_with_specialization_in_Electric_Vehicles_SCHEME-2022-26-1.pdf
 
B.Tech_Hons._ME_with_specialization_in_Electric_Vehicles_SCHEME-2022-26.pdf
B.Tech_Hons._ME_with_specialization_in_Electric_Vehicles_SCHEME-2022-26.pdfB.Tech_Hons._ME_with_specialization_in_Electric_Vehicles_SCHEME-2022-26.pdf
B.Tech_Hons._ME_with_specialization_in_Electric_Vehicles_SCHEME-2022-26.pdf
 
Gct larkano
Gct larkanoGct larkano
Gct larkano
 
Domer L. Javier resume_rev.1
Domer L. Javier resume_rev.1Domer L. Javier resume_rev.1
Domer L. Javier resume_rev.1
 
Dish position control using Geared Motor
Dish position control using Geared MotorDish position control using Geared Motor
Dish position control using Geared Motor
 
Final report
Final reportFinal report
Final report
 
Cert II in Electrotechnology-expert panel report.
Cert II in Electrotechnology-expert panel report.Cert II in Electrotechnology-expert panel report.
Cert II in Electrotechnology-expert panel report.
 
MujibCV
MujibCVMujibCV
MujibCV
 
10-10-05_01 Tim Schmitt
10-10-05_01 Tim Schmitt10-10-05_01 Tim Schmitt
10-10-05_01 Tim Schmitt
 
B.E. EEE (2021 reg.pdf syallabus anna university
B.E. EEE (2021 reg.pdf syallabus anna universityB.E. EEE (2021 reg.pdf syallabus anna university
B.E. EEE (2021 reg.pdf syallabus anna university
 
Report index part1
Report index part1Report index part1
Report index part1
 

Recently uploaded

Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
Laundry management system project report.pdf
Laundry management system project report.pdfLaundry management system project report.pdf
Laundry management system project report.pdf
Kamal Acharya
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
PrashantGoswami42
 
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptxCloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Md. Shahidul Islam Prodhan
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
Online blood donation management system project.pdf
Online blood donation management system project.pdfOnline blood donation management system project.pdf
Online blood donation management system project.pdf
Kamal Acharya
 
Toll tax management system project report..pdf
Toll tax management system project report..pdfToll tax management system project report..pdf
Toll tax management system project report..pdf
Kamal Acharya
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
Danfoss NeoCharge Technology -A Revolution in 2024.pdf
Danfoss NeoCharge Technology -A Revolution in 2024.pdfDanfoss NeoCharge Technology -A Revolution in 2024.pdf
Danfoss NeoCharge Technology -A Revolution in 2024.pdf
NurvisNavarroSanchez
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
Kamal Acharya
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
Kamal Acharya
 
İTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering WorkshopİTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering Workshop
Emre Günaydın
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
shape functions of 1D and 2 D rectangular elements.pptx
shape functions of 1D and 2 D rectangular elements.pptxshape functions of 1D and 2 D rectangular elements.pptx
shape functions of 1D and 2 D rectangular elements.pptx
VishalDeshpande27
 
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES  INTRODUCTION UNIT-IENERGY STORAGE DEVICES  INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
VigneshvaranMech
 
Explosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdfExplosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdf
884710SadaqatAli
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
ssuser9bd3ba
 

Recently uploaded (20)

Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
Laundry management system project report.pdf
Laundry management system project report.pdfLaundry management system project report.pdf
Laundry management system project report.pdf
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptxCloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
Online blood donation management system project.pdf
Online blood donation management system project.pdfOnline blood donation management system project.pdf
Online blood donation management system project.pdf
 
Toll tax management system project report..pdf
Toll tax management system project report..pdfToll tax management system project report..pdf
Toll tax management system project report..pdf
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
Danfoss NeoCharge Technology -A Revolution in 2024.pdf
Danfoss NeoCharge Technology -A Revolution in 2024.pdfDanfoss NeoCharge Technology -A Revolution in 2024.pdf
Danfoss NeoCharge Technology -A Revolution in 2024.pdf
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
 
İTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering WorkshopİTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering Workshop
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
shape functions of 1D and 2 D rectangular elements.pptx
shape functions of 1D and 2 D rectangular elements.pptxshape functions of 1D and 2 D rectangular elements.pptx
shape functions of 1D and 2 D rectangular elements.pptx
 
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES  INTRODUCTION UNIT-IENERGY STORAGE DEVICES  INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
 
Explosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdfExplosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdf
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
 

Module Twelve - Mechanical Construction Methods and Materials - NCCER Substation Slides

  • 1. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials Module 82205-12 Slide 0 National Center for Construction Education and Research Mechanical Construction Methods and Materials Module Twelve – 82205-12
  • 2. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials Module 82205-12 Slide 1 National Center for Construction Education and Research Objectives Upon completion of this module, you will be able to do the following: 1. Identify the types and materials of steel structures. 2. Identify types of fasteners and torque methods and values. 3. Identify types of bus and connectors. 4. Identify the types of bus supports.
  • 3. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials Module 82205-12 Slide 2 National Center for Construction Education and Research Performance Tasks Under the supervision of the instructor, you should be able to do the following: 1. Properly torque fasteners.
  • 4. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials Module 82205-12 Slide 3 National Center for Construction Education and Research Figure 1 — Transmission substation by Oconee Nuclear Generating Station
  • 5. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials Module 82205-12 Slide 4 National Center for Construction Education and Research Figure 2 — Subtransmission and distribution substations
  • 6. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials Module 82205-12 Slide 5 National Center for Construction Education and Research Figure 3 — Construction work high above ground
  • 7. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials Module 82205-12 Slide 6 National Center for Construction Education and Research Figure 4 — Caution and danger signs
  • 8. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials Module 82205-12 Slide 7 National Center for Construction Education and Research Figure 5 — Substation structures
  • 9. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials Module 82205-12 Slide 8 National Center for Construction Education and Research Figure 6 — Detail B of connection with stiffener plates
  • 10. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials Module 82205-12 Slide 9 National Center for Construction Education and Research Figure 7 — Section from erection drawing
  • 11. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials Module 82205-12 Slide 10 National Center for Construction Education and Research Figure 8 — Typical distribution substation support structure
  • 12. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials Module 82205-12 Slide 11 National Center for Construction Education and Research Figure 9 — Steel lattice structure
  • 13. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials Module 82205-12 Slide 12 National Center for Construction Education and Research Figure 10 — Box truss supports
  • 14. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials Module 82205-12 Slide 13 National Center for Construction Education and Research Figure 11 — A-frame dead-end structure
  • 15. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials Module 82205-12 Slide 14 National Center for Construction Education and Research Figure 12 — H-shaped dead-end structure
  • 16. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials Module 82205-12 Slide 15 National Center for Construction Education and Research Figure 13 — Polygonal A-frame structure
  • 17. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials Module 82205-12 Slide 16 National Center for Construction Education and Research Figure 14 — A-frame of angle iron and lattice construction
  • 18. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials Module 82205-12 Slide 17 National Center for Construction Education and Research Figure 15 — Lightning mast tip
  • 19. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials Module 82205-12 Slide 18 National Center for Construction Education and Research Figure 16 — Polygonal lightning mast
  • 20. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials Module 82205-12 Slide 19 National Center for Construction Education and Research Figure 17 — Insulators
  • 21. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials Module 82205-12 Slide 20 National Center for Construction Education and Research Figure 18 — Support insulators
  • 22. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials Module 82205-12 Slide 21 National Center for Construction Education and Research Figure 19 — Suspension insulator
  • 23. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials Module 82205-12 Slide 22 National Center for Construction Education and Research Figure 20 — Suspension insulator bells
  • 24. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials Module 82205-12 Slide 23 National Center for Construction Education and Research Figure 21 — Lightning arresters
  • 25. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials Module 82205-12 Slide 24 National Center for Construction Education and Research Figure 22 — 115kV ground switch
  • 26. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials Module 82205-12 Slide 25 National Center for Construction Education and Research Figure 23 — One phase of a gang-operated transmission line switch
  • 27. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials Module 82205-12 Slide 26 National Center for Construction Education and Research Figure 24 — Circuit breakers
  • 28. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials Module 82205-12 Slide 27 National Center for Construction Education and Research Figure 25 — Threaded fasteners
  • 29. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials Module 82205-12 Slide 28 National Center for Construction Education and Research Figure 26 — Screw thread designations
  • 30. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials Module 82205-12 Slide 29 National Center for Construction Education and Research Figure 27 — Thread types
  • 31. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials Module 82205-12 Slide 30 National Center for Construction Education and Research Figure 28 — Grade markings for steel bolts and screws
  • 32. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials Module 82205-12 Slide 31 National Center for Construction Education and Research Figure 29 — Bolt markings for A325 bolts
  • 33. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials Module 82205-12 Slide 32 National Center for Construction Education and Research Figure 30 — A325 hex nuts
  • 34. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials Module 82205-12 Slide 33 National Center for Construction Education and Research Figure 31 — Type 3 washers
  • 35. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials Module 82205-12 Slide 34 National Center for Construction Education and Research Figure 32 — Proper tightening sequence
  • 36. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials Module 82205-12 Slide 35 National Center for Construction Education and Research Figure 33 — Safety-wired fasteners
  • 37. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials Module 82205-12 Slide 36 National Center for Construction Education and Research Table 1 — Bolt Chart Information
  • 38. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials Module 82205-12 Slide 37 National Center for Construction Education and Research Figure 34 — Torque value charts
  • 39. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials Module 82205-12 Slide 38 National Center for Construction Education and Research Figure 35 — Beam-type torque wrench
  • 40. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials Module 82205-12 Slide 39 National Center for Construction Education and Research Figure 36 — Click-type torque wrench
  • 41. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials Module 82205-12 Slide 40 National Center for Construction Education and Research Figure 37 — Digital torque wrench
  • 42. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials Module 82205-12 Slide 41 National Center for Construction Education and Research Figure 38 — Torque multiplier
  • 43. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials Module 82205-12 Slide 42 National Center for Construction Education and Research Figure 39 — Installation of tension control bolts
  • 44. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials Module 82205-12 Slide 43 National Center for Construction Education and Research Feature — Intelligent Bolts
  • 45. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials Module 82205-12 Slide 44 National Center for Construction Education and Research Figure 40 — Bolt load indicator installation methods
  • 46. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials Module 82205-12 Slide 45 National Center for Construction Education and Research Table 2 — Gap Measurement
  • 47. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials Module 82205-12 Slide 46 National Center for Construction Education and Research Figure 41 — Amount of gap before and after turning
  • 48. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials Module 82205-12 Slide 47 National Center for Construction Education and Research Figure 42 — Belleville washer
  • 49. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials Module 82205-12 Slide 48 National Center for Construction Education and Research Figure 43 — Fastener elastic and plastic ranges
  • 50. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials Module 82205-12 Slide 49 National Center for Construction Education and Research Figure 44 — Torque angle gauge
  • 51. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials Module 82205-12 Slide 50 National Center for Construction Education and Research Figure 45 — Torque angle gauge in use
  • 52. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials Module 82205-12 Slide 51 National Center for Construction Education and Research Figure 46 — Rigid busbar
  • 53. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials Module 82205-12 Slide 52 National Center for Construction Education and Research Figure 47 — Tubular aluminum busbar
  • 54. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials Module 82205-12 Slide 53 National Center for Construction Education and Research Figure 48 — SF6 bus
  • 55. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials Module 82205-12 Slide 54 National Center for Construction Education and Research Figure 49 — Aluminum strain bus conductor
  • 56. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials Module 82205-12 Slide 55 National Center for Construction Education and Research Figure 50 — Tubular bus compression fittings
  • 57. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials Module 82205-12 Slide 56 National Center for Construction Education and Research Figure 51 — Bolted terminal connections
  • 58. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials Module 82205-12 Slide 57 National Center for Construction Education and Research Figure 52 — Dead-end clamp
  • 59. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials Module 82205-12 Slide 58 National Center for Construction Education and Research Figure 53 — Aluminum compression connection
  • 60. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials Module 82205-12 Slide 59 National Center for Construction Education and Research Figure 54 — Welding busbar fittings
  • 61. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials Module 82205-12 Slide 60 National Center for Construction Education and Research Supplemental Art
  • 62. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Mechanical Construction Methods and Materials Module 82205-12 Slide 61 National Center for Construction Education and Research Course Map