Concrete Work
Module Eleven – 82204-12
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 1
National Center
for Construction
Education and
Research
Objectives
Upon completion of this module, you will be able to do the following:
1. Describe the properties of concrete.
2. Identify different types of forms.
3. Explain how to install and tie rebar.
4. Describe how to set anchor bolts to proper location and elevation.
5. Describe how to estimate concrete volume.
6. Identify methods used in placing and finishing concrete.
7. Construct a pier form and place anchor bolts.
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 2
National Center
for Construction
Education and
Research
Performance Tasks
Under the supervision of the instructor, you should be able to do the
following:
1. Construct a pier form and place anchor bolts.
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 3
National Center
for Construction
Education and
Research
Figure 1 — Portland cement manufacturing process
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 4
National Center
for Construction
Education and
Research
Figure 2 — Portland cement stored outdoors
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 5
National Center
for Construction
Education and
Research
Figure 3 — Typical control point concrete monument (benchmark)
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 6
National Center
for Construction
Education and
Research
Figure 4 — Typical secondary control point marker (TBM)
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 7
National Center
for Construction
Education and
Research
Figure 5 — Typical working control point marker
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 8
National Center
for Construction
Education and
Research
Figure 6 — Typical builder’s level
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 9
National Center
for Construction
Education and
Research
Figure 7 — Typical laser beam level and detector
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 10
National Center
for Construction
Education and
Research
Figure 8 — Tripod
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 11
National Center
for Construction
Education and
Research
Figure 9 — Leveling rods
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 12
National Center
for Construction
Education and
Research
Figure 10 — Reading a leveling rod
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 13
National Center
for Construction
Education and
Research
Figure 11 — Rod accessories
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 14
National Center
for Construction
Education and
Research
Figure 12 — Measuring horizontal distances
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 15
National Center
for Construction
Education and
Research
Figure 13 — Measuring horizontal distance across a slope
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 16
National Center
for Construction
Education and
Research
Figure 14 — Line level
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 17
National Center
for Construction
Education and
Research
Figure 15 — Using a leveling rod
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 18
National Center
for Construction
Education and
Research
Figure 16 — Using a leveling rod to calculate elevations
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 19
National Center
for Construction
Education and
Research
Figure 17 — Laser transmitter and receiver rod
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 20
National Center
for Construction
Education and
Research
Figure 18 — One-person operation
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 21
National Center
for Construction
Education and
Research
Figure 19 — Rotating lasers sweep multiple sensors
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 22
National Center
for Construction
Education and
Research
Figure 20 — Piers
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 23
National Center
for Construction
Education and
Research
Figure 21 — Establishing a wall line on a footing
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 24
National Center
for Construction
Education and
Research
Figure 22 — Parts of a continuous, or pier, footing form
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 25
National Center
for Construction
Education and
Research
Figure 23 — Parts of a stepped pier footing form
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 26
National Center
for Construction
Education and
Research
Figure 24 — Establishing the slab and equipment locations on site
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 27
National Center
for Construction
Education and
Research
Figure 25 — Establishing building/equipment lines
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 28
National Center
for Construction
Education and
Research
Figure 26 — Transferring a building corner to batter board layout lines
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 29
National Center
for Construction
Education and
Research
Figure 27 — Locating footing corner stakes
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 30
National Center
for Construction
Education and
Research
Figure 28 — Footing form for below grade use
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 31
National Center
for Construction
Education and
Research
Figure 29 — Dowel templates
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 32
National Center
for Construction
Education and
Research
Figure 30 — Types of slabs
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 33
National Center
for Construction
Education and
Research
Figure 31 — Parts of an edge form for a slab without a wall
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 34
National Center
for Construction
Education and
Research
Figure 32 — Parts of an edge form for a slab with a wall
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 35
National Center
for Construction
Education and
Research
Figure 33 — Combination metal and wood edge form
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 36
National Center
for Construction
Education and
Research
Figure 34 — Bulkhead
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 37
National Center
for Construction
Education and
Research
Figure 35 — Screed guides
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 38
National Center
for Construction
Education and
Research
Table 1 — Metric and US Customary Reinforcing Bar Specifications
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 39
National Center
for Construction
Education and
Research
Figure 36 — Reinforcement bar identification
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 40
National Center
for Construction
Education and
Research
Table 2 — Reinforcement Bar Steel Types
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 41
National Center
for Construction
Education and
Research
Table 3 — Reinforcement Bar Grades
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 42
National Center
for Construction
Education and
Research
Figure 37A — Typical bar bends
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 43
National Center
for Construction
Education and
Research
Figure 37B — Typical bar bends
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 44
National Center
for Construction
Education and
Research
Figure 38 — Standard hook details for reinforcing bars
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 45
National Center
for Construction
Education and
Research
Table 4 — Standard Hook Specifications
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 46
National Center
for Construction
Education and
Research
Figure 39 — Sample bar list
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 47
National Center
for Construction
Education and
Research
Table 5 — Maximum Prefabricated Radii
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 48
National Center
for Construction
Education and
Research
Figure 40 — Additional sample bar list
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 49
National Center
for Construction
Education and
Research
Figure 41 — Examples of rebar labels
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 50
National Center
for Construction
Education and
Research
Figure 42 — Typical wire bar supports
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 51
National Center
for Construction
Education and
Research
Figure 43 — Standee support
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 52
National Center
for Construction
Education and
Research
Figure 44 — Miscellaneous accessories
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 53
National Center
for Construction
Education and
Research
Figure 45 — Typical rolled, plain-wire, welded-wire fabric
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 54
National Center
for Construction
Education and
Research
Table 6 — Plain Wire Sizes (ASTM A82)
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 55
National Center
for Construction
Education and
Research
Table 7 — Common Styles of Plain Welded-Wire Fabric
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 56
National Center
for Construction
Education and
Research
Table 8 — Deformed Wire Sizes
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 57
National Center
for Construction
Education and
Research
Figure 46 — Partial wall, footing, and floor slab plan
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 58
National Center
for Construction
Education and
Research
Figure 47 — Portion of a typical concrete table
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 59
National Center
for Construction
Education and
Research
Figure 48 — Typical circular column plan
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 60
National Center
for Construction
Education and
Research
Figure 49 — Website concrete volume calculator
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 61
National Center
for Construction
Education and
Research
Figure 50 — Typical handheld electronic concrete calculator
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 62
National Center
for Construction
Education and
Research
Feature — Slide Rule Concrete Calculator
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 63
National Center
for Construction
Education and
Research
Figure 51 — Front-discharge truck mixer
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 64
National Center
for Construction
Education and
Research
Figure 52 — Volumetric mixer truck
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 65
National Center
for Construction
Education and
Research
Figure 53 — Typical wheelbarrow, cart, and power buggy
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 66
National Center
for Construction
Education and
Research
Figure 54 — Placing concrete
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 67
National Center
for Construction
Education and
Research
Figure 55 — Vibrating concrete
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 68
National Center
for Construction
Education and
Research
Table 9 — Typical Slump Ranges
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 69
National Center
for Construction
Education and
Research
Figure 56 — Slump test cone
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 70
National Center
for Construction
Education and
Research
Figure 57 — Measuring slump
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 71
National Center
for Construction
Education and
Research
Figure 58 — Preparing compression test samples
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 72
National Center
for Construction
Education and
Research
Figure 59 — Typical manual screeds (straightedge)
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 73
National Center
for Construction
Education and
Research
Figure 60 — Small gasoline-driven power screed
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 74
National Center
for Construction
Education and
Research
Figure 61 — Darby floats
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 75
National Center
for Construction
Education and
Research
Figure 62 — Bullfloat
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 76
National Center
for Construction
Education and
Research
Figure 63 — Using a bullfloat
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 77
National Center
for Construction
Education and
Research
Figure 64 — Edger in use
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 78
National Center
for Construction
Education and
Research
Figure 65 — Edgers
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 79
National Center
for Construction
Education and
Research
Figure 66 — Jointers (groovers)
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 80
National Center
for Construction
Education and
Research
Figure 67 — Wet and dry cut floor-type concrete saw
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 81
National Center
for Construction
Education and
Research
Figure 68 — Soft-cut concrete saw
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 82
National Center
for Construction
Education and
Research
Figure 69 — Hand floats
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 83
National Center
for Construction
Education and
Research
Figure 70 — Powered finishing machine
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 84
National Center
for Construction
Education and
Research
Figure 71 — Using a single-rotary finishing machine
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 85
National Center
for Construction
Education and
Research
Figure 72 — Hand trowels
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 86
National Center
for Construction
Education and
Research
Figure 73 — Using hand trowels
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 87
National Center
for Construction
Education and
Research
Figure 74 — Brooming a concrete surface
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 88
National Center
for Construction
Education and
Research
Supplemental Art
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 89
National Center
for Construction
Education and
Research
Course Map
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 90
National Center
for Construction
Education and
Research
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 91
National Center
for Construction
Education and
Research
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 92
National Center
for Construction
Education and
Research
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 93
National Center
for Construction
Education and
Research
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 94
National Center
for Construction
Education and
Research
Appendix B, Part 1
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 95
National Center
for Construction
Education and
Research
Appendix B, Part 2
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 96
National Center
for Construction
Education and
Research
Appendix B
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 97
National Center
for Construction
Education and
Research
Appendix C
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 98
National Center
for Construction
Education and
Research
Appendix C
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 99
National Center
for Construction
Education and
Research
Appendix C
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Concrete Work
Module 82204-12
Slide 100
National Center
for Construction
Education and
Research
Appendix C

More Related Content

Similar to Module Eleven - Concrete Work - NCCER Substation Slides

Module Thirteen - Intermediate Rigging - NCCER Substation Slides
Module Thirteen - Intermediate Rigging - NCCER Substation SlidesModule Thirteen - Intermediate Rigging - NCCER Substation Slides
Module Thirteen - Intermediate Rigging - NCCER Substation Slides
Shariq Ayjaz
 
Module Seven - Conductor Installations - NCCER Substation Slides
Module Seven -  Conductor Installations - NCCER Substation SlidesModule Seven -  Conductor Installations - NCCER Substation Slides
Module Seven - Conductor Installations - NCCER Substation Slides
Shariq Ayjaz
 
Module Two - Managing Electrical Hazards - NCCER Substation Slides
Module Two - Managing Electrical Hazards - NCCER Substation SlidesModule Two - Managing Electrical Hazards - NCCER Substation Slides
Module Two - Managing Electrical Hazards - NCCER Substation Slides
Shariq Ayjaz
 
BASIC SAFETY 101-09(1) (1).pptx
BASIC SAFETY 101-09(1) (1).pptxBASIC SAFETY 101-09(1) (1).pptx
BASIC SAFETY 101-09(1) (1).pptx
Fredel De Vera
 
Module Three - Alternating Current and Three-Phase Systems - NCCER Substation...
Module Three - Alternating Current and Three-Phase Systems - NCCER Substation...Module Three - Alternating Current and Three-Phase Systems - NCCER Substation...
Module Three - Alternating Current and Three-Phase Systems - NCCER Substation...
Shariq Ayjaz
 
Final report
Final reportFinal report
Final report
Anushka Perera
 
Project management report of stadium
Project management report of stadiumProject management report of stadium
Project management report of stadium
SLIIT, Sri Lanka
 
Belihul Oya Mini Hydropower Plant project under LTL holdings (Pvt) Ltd
Belihul Oya Mini Hydropower Plant project under LTL holdings (Pvt) LtdBelihul Oya Mini Hydropower Plant project under LTL holdings (Pvt) Ltd
Belihul Oya Mini Hydropower Plant project under LTL holdings (Pvt) Ltd
Sandeepa Edirisooriya
 
Timothy Yau Project Portfolio
Timothy Yau Project Portfolio Timothy Yau Project Portfolio
Timothy Yau Project Portfolio
Timothy Yau, P.Eng, PMP
 
Arc2625 report file
Arc2625 report fileArc2625 report file
Arc2625 report file
Yen Min Khor
 
Industrial case study report (Final)
Industrial case study report (Final)Industrial case study report (Final)
Industrial case study report (Final)
pranay kumar
 
FORENSIC STRUCTURAL ENGINEERING.pptx
FORENSIC STRUCTURAL ENGINEERING.pptxFORENSIC STRUCTURAL ENGINEERING.pptx
FORENSIC STRUCTURAL ENGINEERING.pptx
PathuZz
 
PROJECT REPORT POLYTECHNIC CIVIL ENGINEE
PROJECT REPORT POLYTECHNIC CIVIL ENGINEEPROJECT REPORT POLYTECHNIC CIVIL ENGINEE
PROJECT REPORT POLYTECHNIC CIVIL ENGINEE
ajay964632
 
Training Report - Brandix Lanka (PVT) Ltd.
Training Report - Brandix Lanka (PVT) Ltd.Training Report - Brandix Lanka (PVT) Ltd.
Training Report - Brandix Lanka (PVT) Ltd.
Ishan Rathnayake
 
D18 cl124 report_8sem
D18 cl124 report_8semD18 cl124 report_8sem
D18 cl124 report_8sem
CHARUSSAT UNIVERSITY
 
mohamed salem cv final
mohamed salem cv finalmohamed salem cv final
mohamed salem cv final
mohamed salem
 
Final report design of a pedestrian bridge - fall 2009
Final report   design of a pedestrian bridge - fall 2009Final report   design of a pedestrian bridge - fall 2009
Final report design of a pedestrian bridge - fall 2009
Sanamau Waitogu
 
Experimental Analysis Of High Performance Concrete With Different Case Of Sil...
Experimental Analysis Of High Performance Concrete With Different Case Of Sil...Experimental Analysis Of High Performance Concrete With Different Case Of Sil...
Experimental Analysis Of High Performance Concrete With Different Case Of Sil...
IRJET Journal
 
Cert II in Electrotechnology-expert panel report.
Cert II in Electrotechnology-expert panel report.Cert II in Electrotechnology-expert panel report.
Cert II in Electrotechnology-expert panel report.
Allan McLean
 
Onkar Interntship PPT.pptx
Onkar Interntship PPT.pptxOnkar Interntship PPT.pptx
Onkar Interntship PPT.pptx
shaik saifulla
 

Similar to Module Eleven - Concrete Work - NCCER Substation Slides (20)

Module Thirteen - Intermediate Rigging - NCCER Substation Slides
Module Thirteen - Intermediate Rigging - NCCER Substation SlidesModule Thirteen - Intermediate Rigging - NCCER Substation Slides
Module Thirteen - Intermediate Rigging - NCCER Substation Slides
 
Module Seven - Conductor Installations - NCCER Substation Slides
Module Seven -  Conductor Installations - NCCER Substation SlidesModule Seven -  Conductor Installations - NCCER Substation Slides
Module Seven - Conductor Installations - NCCER Substation Slides
 
Module Two - Managing Electrical Hazards - NCCER Substation Slides
Module Two - Managing Electrical Hazards - NCCER Substation SlidesModule Two - Managing Electrical Hazards - NCCER Substation Slides
Module Two - Managing Electrical Hazards - NCCER Substation Slides
 
BASIC SAFETY 101-09(1) (1).pptx
BASIC SAFETY 101-09(1) (1).pptxBASIC SAFETY 101-09(1) (1).pptx
BASIC SAFETY 101-09(1) (1).pptx
 
Module Three - Alternating Current and Three-Phase Systems - NCCER Substation...
Module Three - Alternating Current and Three-Phase Systems - NCCER Substation...Module Three - Alternating Current and Three-Phase Systems - NCCER Substation...
Module Three - Alternating Current and Three-Phase Systems - NCCER Substation...
 
Final report
Final reportFinal report
Final report
 
Project management report of stadium
Project management report of stadiumProject management report of stadium
Project management report of stadium
 
Belihul Oya Mini Hydropower Plant project under LTL holdings (Pvt) Ltd
Belihul Oya Mini Hydropower Plant project under LTL holdings (Pvt) LtdBelihul Oya Mini Hydropower Plant project under LTL holdings (Pvt) Ltd
Belihul Oya Mini Hydropower Plant project under LTL holdings (Pvt) Ltd
 
Timothy Yau Project Portfolio
Timothy Yau Project Portfolio Timothy Yau Project Portfolio
Timothy Yau Project Portfolio
 
Arc2625 report file
Arc2625 report fileArc2625 report file
Arc2625 report file
 
Industrial case study report (Final)
Industrial case study report (Final)Industrial case study report (Final)
Industrial case study report (Final)
 
FORENSIC STRUCTURAL ENGINEERING.pptx
FORENSIC STRUCTURAL ENGINEERING.pptxFORENSIC STRUCTURAL ENGINEERING.pptx
FORENSIC STRUCTURAL ENGINEERING.pptx
 
PROJECT REPORT POLYTECHNIC CIVIL ENGINEE
PROJECT REPORT POLYTECHNIC CIVIL ENGINEEPROJECT REPORT POLYTECHNIC CIVIL ENGINEE
PROJECT REPORT POLYTECHNIC CIVIL ENGINEE
 
Training Report - Brandix Lanka (PVT) Ltd.
Training Report - Brandix Lanka (PVT) Ltd.Training Report - Brandix Lanka (PVT) Ltd.
Training Report - Brandix Lanka (PVT) Ltd.
 
D18 cl124 report_8sem
D18 cl124 report_8semD18 cl124 report_8sem
D18 cl124 report_8sem
 
mohamed salem cv final
mohamed salem cv finalmohamed salem cv final
mohamed salem cv final
 
Final report design of a pedestrian bridge - fall 2009
Final report   design of a pedestrian bridge - fall 2009Final report   design of a pedestrian bridge - fall 2009
Final report design of a pedestrian bridge - fall 2009
 
Experimental Analysis Of High Performance Concrete With Different Case Of Sil...
Experimental Analysis Of High Performance Concrete With Different Case Of Sil...Experimental Analysis Of High Performance Concrete With Different Case Of Sil...
Experimental Analysis Of High Performance Concrete With Different Case Of Sil...
 
Cert II in Electrotechnology-expert panel report.
Cert II in Electrotechnology-expert panel report.Cert II in Electrotechnology-expert panel report.
Cert II in Electrotechnology-expert panel report.
 
Onkar Interntship PPT.pptx
Onkar Interntship PPT.pptxOnkar Interntship PPT.pptx
Onkar Interntship PPT.pptx
 

Recently uploaded

4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
Gino153088
 
UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICSUNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
vmspraneeth
 
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
upoux
 
一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理
uqyfuc
 
Zener Diode and its V-I Characteristics and Applications
Zener Diode and its V-I Characteristics and ApplicationsZener Diode and its V-I Characteristics and Applications
Zener Diode and its V-I Characteristics and Applications
Shiny Christobel
 
5G Radio Network Througput Problem Analysis HCIA.pdf
5G Radio Network Througput Problem Analysis HCIA.pdf5G Radio Network Througput Problem Analysis HCIA.pdf
5G Radio Network Througput Problem Analysis HCIA.pdf
AlvianRamadhani5
 
Determination of Equivalent Circuit parameters and performance characteristic...
Determination of Equivalent Circuit parameters and performance characteristic...Determination of Equivalent Circuit parameters and performance characteristic...
Determination of Equivalent Circuit parameters and performance characteristic...
pvpriya2
 
Ericsson LTE Throughput Troubleshooting Techniques.ppt
Ericsson LTE Throughput Troubleshooting Techniques.pptEricsson LTE Throughput Troubleshooting Techniques.ppt
Ericsson LTE Throughput Troubleshooting Techniques.ppt
wafawafa52
 
Introduction to Computer Networks & OSI MODEL.ppt
Introduction to Computer Networks & OSI MODEL.pptIntroduction to Computer Networks & OSI MODEL.ppt
Introduction to Computer Networks & OSI MODEL.ppt
Dwarkadas J Sanghvi College of Engineering
 
Accident detection system project report.pdf
Accident detection system project report.pdfAccident detection system project report.pdf
Accident detection system project report.pdf
Kamal Acharya
 
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
ecqow
 
Unit -II Spectroscopy - EC I B.Tech.pdf
Unit -II Spectroscopy - EC  I B.Tech.pdfUnit -II Spectroscopy - EC  I B.Tech.pdf
Unit -II Spectroscopy - EC I B.Tech.pdf
TeluguBadi
 
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
MadhavJungKarki
 
OOPS_Lab_Manual - programs using C++ programming language
OOPS_Lab_Manual - programs using C++ programming languageOOPS_Lab_Manual - programs using C++ programming language
OOPS_Lab_Manual - programs using C++ programming language
PreethaV16
 
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
DharmaBanothu
 
smart pill dispenser is designed to improve medication adherence and safety f...
smart pill dispenser is designed to improve medication adherence and safety f...smart pill dispenser is designed to improve medication adherence and safety f...
smart pill dispenser is designed to improve medication adherence and safety f...
um7474492
 
Assistant Engineer (Chemical) Interview Questions.pdf
Assistant Engineer (Chemical) Interview Questions.pdfAssistant Engineer (Chemical) Interview Questions.pdf
Assistant Engineer (Chemical) Interview Questions.pdf
Seetal Daas
 
openshift technical overview - Flow of openshift containerisatoin
openshift technical overview - Flow of openshift containerisatoinopenshift technical overview - Flow of openshift containerisatoin
openshift technical overview - Flow of openshift containerisatoin
snaprevwdev
 
Null Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAMNull Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAM
Divyanshu
 
DESIGN AND MANUFACTURE OF CEILING BOARD USING SAWDUST AND WASTE CARTON MATERI...
DESIGN AND MANUFACTURE OF CEILING BOARD USING SAWDUST AND WASTE CARTON MATERI...DESIGN AND MANUFACTURE OF CEILING BOARD USING SAWDUST AND WASTE CARTON MATERI...
DESIGN AND MANUFACTURE OF CEILING BOARD USING SAWDUST AND WASTE CARTON MATERI...
OKORIE1
 

Recently uploaded (20)

4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
 
UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICSUNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
 
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
 
一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理
 
Zener Diode and its V-I Characteristics and Applications
Zener Diode and its V-I Characteristics and ApplicationsZener Diode and its V-I Characteristics and Applications
Zener Diode and its V-I Characteristics and Applications
 
5G Radio Network Througput Problem Analysis HCIA.pdf
5G Radio Network Througput Problem Analysis HCIA.pdf5G Radio Network Througput Problem Analysis HCIA.pdf
5G Radio Network Througput Problem Analysis HCIA.pdf
 
Determination of Equivalent Circuit parameters and performance characteristic...
Determination of Equivalent Circuit parameters and performance characteristic...Determination of Equivalent Circuit parameters and performance characteristic...
Determination of Equivalent Circuit parameters and performance characteristic...
 
Ericsson LTE Throughput Troubleshooting Techniques.ppt
Ericsson LTE Throughput Troubleshooting Techniques.pptEricsson LTE Throughput Troubleshooting Techniques.ppt
Ericsson LTE Throughput Troubleshooting Techniques.ppt
 
Introduction to Computer Networks & OSI MODEL.ppt
Introduction to Computer Networks & OSI MODEL.pptIntroduction to Computer Networks & OSI MODEL.ppt
Introduction to Computer Networks & OSI MODEL.ppt
 
Accident detection system project report.pdf
Accident detection system project report.pdfAccident detection system project report.pdf
Accident detection system project report.pdf
 
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
 
Unit -II Spectroscopy - EC I B.Tech.pdf
Unit -II Spectroscopy - EC  I B.Tech.pdfUnit -II Spectroscopy - EC  I B.Tech.pdf
Unit -II Spectroscopy - EC I B.Tech.pdf
 
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
 
OOPS_Lab_Manual - programs using C++ programming language
OOPS_Lab_Manual - programs using C++ programming languageOOPS_Lab_Manual - programs using C++ programming language
OOPS_Lab_Manual - programs using C++ programming language
 
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
 
smart pill dispenser is designed to improve medication adherence and safety f...
smart pill dispenser is designed to improve medication adherence and safety f...smart pill dispenser is designed to improve medication adherence and safety f...
smart pill dispenser is designed to improve medication adherence and safety f...
 
Assistant Engineer (Chemical) Interview Questions.pdf
Assistant Engineer (Chemical) Interview Questions.pdfAssistant Engineer (Chemical) Interview Questions.pdf
Assistant Engineer (Chemical) Interview Questions.pdf
 
openshift technical overview - Flow of openshift containerisatoin
openshift technical overview - Flow of openshift containerisatoinopenshift technical overview - Flow of openshift containerisatoin
openshift technical overview - Flow of openshift containerisatoin
 
Null Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAMNull Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAM
 
DESIGN AND MANUFACTURE OF CEILING BOARD USING SAWDUST AND WASTE CARTON MATERI...
DESIGN AND MANUFACTURE OF CEILING BOARD USING SAWDUST AND WASTE CARTON MATERI...DESIGN AND MANUFACTURE OF CEILING BOARD USING SAWDUST AND WASTE CARTON MATERI...
DESIGN AND MANUFACTURE OF CEILING BOARD USING SAWDUST AND WASTE CARTON MATERI...
 

Module Eleven - Concrete Work - NCCER Substation Slides

  • 1. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 0 National Center for Construction Education and Research Concrete Work Module Eleven – 82204-12
  • 2. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 1 National Center for Construction Education and Research Objectives Upon completion of this module, you will be able to do the following: 1. Describe the properties of concrete. 2. Identify different types of forms. 3. Explain how to install and tie rebar. 4. Describe how to set anchor bolts to proper location and elevation. 5. Describe how to estimate concrete volume. 6. Identify methods used in placing and finishing concrete. 7. Construct a pier form and place anchor bolts.
  • 3. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 2 National Center for Construction Education and Research Performance Tasks Under the supervision of the instructor, you should be able to do the following: 1. Construct a pier form and place anchor bolts.
  • 4. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 3 National Center for Construction Education and Research Figure 1 — Portland cement manufacturing process
  • 5. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 4 National Center for Construction Education and Research Figure 2 — Portland cement stored outdoors
  • 6. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 5 National Center for Construction Education and Research Figure 3 — Typical control point concrete monument (benchmark)
  • 7. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 6 National Center for Construction Education and Research Figure 4 — Typical secondary control point marker (TBM)
  • 8. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 7 National Center for Construction Education and Research Figure 5 — Typical working control point marker
  • 9. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 8 National Center for Construction Education and Research Figure 6 — Typical builder’s level
  • 10. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 9 National Center for Construction Education and Research Figure 7 — Typical laser beam level and detector
  • 11. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 10 National Center for Construction Education and Research Figure 8 — Tripod
  • 12. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 11 National Center for Construction Education and Research Figure 9 — Leveling rods
  • 13. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 12 National Center for Construction Education and Research Figure 10 — Reading a leveling rod
  • 14. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 13 National Center for Construction Education and Research Figure 11 — Rod accessories
  • 15. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 14 National Center for Construction Education and Research Figure 12 — Measuring horizontal distances
  • 16. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 15 National Center for Construction Education and Research Figure 13 — Measuring horizontal distance across a slope
  • 17. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 16 National Center for Construction Education and Research Figure 14 — Line level
  • 18. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 17 National Center for Construction Education and Research Figure 15 — Using a leveling rod
  • 19. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 18 National Center for Construction Education and Research Figure 16 — Using a leveling rod to calculate elevations
  • 20. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 19 National Center for Construction Education and Research Figure 17 — Laser transmitter and receiver rod
  • 21. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 20 National Center for Construction Education and Research Figure 18 — One-person operation
  • 22. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 21 National Center for Construction Education and Research Figure 19 — Rotating lasers sweep multiple sensors
  • 23. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 22 National Center for Construction Education and Research Figure 20 — Piers
  • 24. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 23 National Center for Construction Education and Research Figure 21 — Establishing a wall line on a footing
  • 25. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 24 National Center for Construction Education and Research Figure 22 — Parts of a continuous, or pier, footing form
  • 26. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 25 National Center for Construction Education and Research Figure 23 — Parts of a stepped pier footing form
  • 27. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 26 National Center for Construction Education and Research Figure 24 — Establishing the slab and equipment locations on site
  • 28. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 27 National Center for Construction Education and Research Figure 25 — Establishing building/equipment lines
  • 29. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 28 National Center for Construction Education and Research Figure 26 — Transferring a building corner to batter board layout lines
  • 30. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 29 National Center for Construction Education and Research Figure 27 — Locating footing corner stakes
  • 31. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 30 National Center for Construction Education and Research Figure 28 — Footing form for below grade use
  • 32. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 31 National Center for Construction Education and Research Figure 29 — Dowel templates
  • 33. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 32 National Center for Construction Education and Research Figure 30 — Types of slabs
  • 34. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 33 National Center for Construction Education and Research Figure 31 — Parts of an edge form for a slab without a wall
  • 35. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 34 National Center for Construction Education and Research Figure 32 — Parts of an edge form for a slab with a wall
  • 36. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 35 National Center for Construction Education and Research Figure 33 — Combination metal and wood edge form
  • 37. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 36 National Center for Construction Education and Research Figure 34 — Bulkhead
  • 38. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 37 National Center for Construction Education and Research Figure 35 — Screed guides
  • 39. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 38 National Center for Construction Education and Research Table 1 — Metric and US Customary Reinforcing Bar Specifications
  • 40. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 39 National Center for Construction Education and Research Figure 36 — Reinforcement bar identification
  • 41. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 40 National Center for Construction Education and Research Table 2 — Reinforcement Bar Steel Types
  • 42. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 41 National Center for Construction Education and Research Table 3 — Reinforcement Bar Grades
  • 43. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 42 National Center for Construction Education and Research Figure 37A — Typical bar bends
  • 44. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 43 National Center for Construction Education and Research Figure 37B — Typical bar bends
  • 45. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 44 National Center for Construction Education and Research Figure 38 — Standard hook details for reinforcing bars
  • 46. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 45 National Center for Construction Education and Research Table 4 — Standard Hook Specifications
  • 47. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 46 National Center for Construction Education and Research Figure 39 — Sample bar list
  • 48. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 47 National Center for Construction Education and Research Table 5 — Maximum Prefabricated Radii
  • 49. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 48 National Center for Construction Education and Research Figure 40 — Additional sample bar list
  • 50. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 49 National Center for Construction Education and Research Figure 41 — Examples of rebar labels
  • 51. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 50 National Center for Construction Education and Research Figure 42 — Typical wire bar supports
  • 52. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 51 National Center for Construction Education and Research Figure 43 — Standee support
  • 53. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 52 National Center for Construction Education and Research Figure 44 — Miscellaneous accessories
  • 54. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 53 National Center for Construction Education and Research Figure 45 — Typical rolled, plain-wire, welded-wire fabric
  • 55. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 54 National Center for Construction Education and Research Table 6 — Plain Wire Sizes (ASTM A82)
  • 56. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 55 National Center for Construction Education and Research Table 7 — Common Styles of Plain Welded-Wire Fabric
  • 57. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 56 National Center for Construction Education and Research Table 8 — Deformed Wire Sizes
  • 58. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 57 National Center for Construction Education and Research Figure 46 — Partial wall, footing, and floor slab plan
  • 59. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 58 National Center for Construction Education and Research Figure 47 — Portion of a typical concrete table
  • 60. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 59 National Center for Construction Education and Research Figure 48 — Typical circular column plan
  • 61. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 60 National Center for Construction Education and Research Figure 49 — Website concrete volume calculator
  • 62. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 61 National Center for Construction Education and Research Figure 50 — Typical handheld electronic concrete calculator
  • 63. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 62 National Center for Construction Education and Research Feature — Slide Rule Concrete Calculator
  • 64. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 63 National Center for Construction Education and Research Figure 51 — Front-discharge truck mixer
  • 65. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 64 National Center for Construction Education and Research Figure 52 — Volumetric mixer truck
  • 66. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 65 National Center for Construction Education and Research Figure 53 — Typical wheelbarrow, cart, and power buggy
  • 67. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 66 National Center for Construction Education and Research Figure 54 — Placing concrete
  • 68. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 67 National Center for Construction Education and Research Figure 55 — Vibrating concrete
  • 69. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 68 National Center for Construction Education and Research Table 9 — Typical Slump Ranges
  • 70. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 69 National Center for Construction Education and Research Figure 56 — Slump test cone
  • 71. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 70 National Center for Construction Education and Research Figure 57 — Measuring slump
  • 72. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 71 National Center for Construction Education and Research Figure 58 — Preparing compression test samples
  • 73. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 72 National Center for Construction Education and Research Figure 59 — Typical manual screeds (straightedge)
  • 74. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 73 National Center for Construction Education and Research Figure 60 — Small gasoline-driven power screed
  • 75. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 74 National Center for Construction Education and Research Figure 61 — Darby floats
  • 76. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 75 National Center for Construction Education and Research Figure 62 — Bullfloat
  • 77. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 76 National Center for Construction Education and Research Figure 63 — Using a bullfloat
  • 78. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 77 National Center for Construction Education and Research Figure 64 — Edger in use
  • 79. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 78 National Center for Construction Education and Research Figure 65 — Edgers
  • 80. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 79 National Center for Construction Education and Research Figure 66 — Jointers (groovers)
  • 81. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 80 National Center for Construction Education and Research Figure 67 — Wet and dry cut floor-type concrete saw
  • 82. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 81 National Center for Construction Education and Research Figure 68 — Soft-cut concrete saw
  • 83. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 82 National Center for Construction Education and Research Figure 69 — Hand floats
  • 84. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 83 National Center for Construction Education and Research Figure 70 — Powered finishing machine
  • 85. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 84 National Center for Construction Education and Research Figure 71 — Using a single-rotary finishing machine
  • 86. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 85 National Center for Construction Education and Research Figure 72 — Hand trowels
  • 87. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 86 National Center for Construction Education and Research Figure 73 — Using hand trowels
  • 88. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 87 National Center for Construction Education and Research Figure 74 — Brooming a concrete surface
  • 89. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 88 National Center for Construction Education and Research Supplemental Art
  • 90. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 89 National Center for Construction Education and Research Course Map
  • 91. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 90 National Center for Construction Education and Research
  • 92. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 91 National Center for Construction Education and Research
  • 93. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 92 National Center for Construction Education and Research
  • 94. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 93 National Center for Construction Education and Research
  • 95. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 94 National Center for Construction Education and Research Appendix B, Part 1
  • 96. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 95 National Center for Construction Education and Research Appendix B, Part 2
  • 97. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 96 National Center for Construction Education and Research Appendix B
  • 98. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 97 National Center for Construction Education and Research Appendix C
  • 99. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 98 National Center for Construction Education and Research Appendix C
  • 100. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 99 National Center for Construction Education and Research Appendix C
  • 101. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Concrete Work Module 82204-12 Slide 100 National Center for Construction Education and Research Appendix C