SlideShare a Scribd company logo
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Intermediate Rigging
Module 38201-11
National Center
for Construction
Education and
Research
Intermediate Rigging
Module Thirteen – 38201-11
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Intermediate Rigging
Module 38201-11
National Center
for Construction
Education and
Research
Slide 1 Objectives
1. Describe the basic requirements to lift personnel.
2. Explain how a sling stress is determined.
3. Describe the basic elements of a lift plan.
4. Explain the purpose of a load chart.
5. Calculate and explain how the center of gravity is determined.
6. Given a particular load, select the appropriate sling(s) for a lift.
7. Describe how jacks, hoists, skids, and rollers are used to move a
load laterally.
Upon completion of this module, you will be able to do the
following:
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Intermediate Rigging
Module 38201-11
National Center
for Construction
Education and
Research
Slide 2 Performance Tasks
1. Given a particular load, select the appropriate sling(s) for a lift.
2. Calculate and explain how the center of gravity is determined.
Under the supervision of the instructor, you should be able to do
the following:
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Intermediate Rigging
Module 38201-11
National Center
for Construction
Education and
Research
Slide 3 Figure 1 – Crane requirements for personnel platforms
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Intermediate Rigging
Module 38201-11
National Center
for Construction
Education and
Research
Slide 4 Figure 2 – Crane requirements for suspended personnel platforms
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Intermediate Rigging
Module 38201-11
National Center
for Construction
Education and
Research
Slide 5 Figure 3 – Suspended personnel platform
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Intermediate Rigging
Module 38201-11
National Center
for Construction
Education and
Research
Slide 6 Figure 4 – Bridle sling using a master link
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Intermediate Rigging
Module 38201-11
National Center
for Construction
Education and
Research
Slide 7 Figure 5 – Bridle sling using a shackle
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Intermediate Rigging
Module 38201-11
National Center
for Construction
Education and
Research
Slide 8 Figure 6 – Sling measurement
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Intermediate Rigging
Module 38201-11
National Center
for Construction
Education and
Research
Slide 9 Figure 7 – Sling angle factors
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Intermediate Rigging
Module 38201-11
National Center
for Construction
Education and
Research
Slide 10 Figure 8 – Example of a sling capacity chart
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Intermediate Rigging
Module 38201-11
National Center
for Construction
Education and
Research
Slide 11 Figure 9 – Bridle hitch arrangement
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Intermediate Rigging
Module 38201-11
National Center
for Construction
Education and
Research
Slide 12 Figure 10 – Asymmetrical bridle sling stress arrangement and formula
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Intermediate Rigging
Module 38201-11
National Center
for Construction
Education and
Research
Slide 13 Figure 11 – Choker hitch arrangement
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Intermediate Rigging
Module 38201-11
National Center
for Construction
Education and
Research
Slide 14 Figure 12 – Choker hitch derating factors
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Intermediate Rigging
Module 38201-11
National Center
for Construction
Education and
Research
Slide 15 Figure 13 – Industrial hydraulic crane with rotating boom
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Intermediate Rigging
Module 38201-11
National Center
for Construction
Education and
Research
Slide 16 Figure 14 – Rough-terrain crane
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Intermediate Rigging
Module 38201-11
National Center
for Construction
Education and
Research
Slide 17 Figure 15 – All-terrain crane
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Intermediate Rigging
Module 38201-11
National Center
for Construction
Education and
Research
Slide 18 Figure 16 – Truck-mounted telescopic crane
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Intermediate Rigging
Module 38201-11
National Center
for Construction
Education and
Research
Slide 19 Figure 17 – Truck-mounted and crawler-mounted lattice boom cranes
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Intermediate Rigging
Module 38201-11
National Center
for Construction
Education and
Research
Slide 20 Figure 18 – Crawler- and wheel-mounted crane components
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Intermediate Rigging
Module 38201-11
National Center
for Construction
Education and
Research
Slide 21 Figure 19 – Swing cab, lattice boom truck crane
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Intermediate Rigging
Module 38201-11
National Center
for Construction
Education and
Research
Slide 22 Figure 20 – A heavy-lift crane with counterweights
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Intermediate Rigging
Module 38201-11
National Center
for Construction
Education and
Research
Slide 23 Figure 21 – Load chart
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Intermediate Rigging
Module 38201-11
National Center
for Construction
Education and
Research
Slide 24 Figure 22 – Typical deductions for a hydraulic crane
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Intermediate Rigging
Module 38201-11
National Center
for Construction
Education and
Research
Slide 25 Figure 23 – Typical deductions for a lattice boom crane
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Intermediate Rigging
Module 38201-11
National Center
for Construction
Education and
Research
Slide 26 Figure 24 – Boom length, boom angle, load operating radius,
and boom point elevation
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Intermediate Rigging
Module 38201-11
National Center
for Construction
Education and
Research
Slide 27 Figure 25A – Structural strength and stability charts
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Intermediate Rigging
Module 38201-11
National Center
for Construction
Education and
Research
Slide 28 Figure 25B – Structural strength and stability charts
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Intermediate Rigging
Module 38201-11
National Center
for Construction
Education and
Research
Slide 29 Figure 26 – Unlevel and level cranes
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Intermediate Rigging
Module 38201-11
National Center
for Construction
Education and
Research
Slide 30 Figure 27 – Boom length, boom angle, load operating radius,
and boom point elevation measurements
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Intermediate Rigging
Module 38201-11
National Center
for Construction
Education and
Research
Slide 31 Figure 28 – Hoist reeving chart
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Intermediate Rigging
Module 38201-11
National Center
for Construction
Education and
Research
Slide 32 Figure 29 – Heavy-lift crane with ten-part reeving
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Intermediate Rigging
Module 38201-11
National Center
for Construction
Education and
Research
Slide 33 Figure 30 – Typical deductions for a lattice boom crane
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Intermediate Rigging
Module 38201-11
National Center
for Construction
Education and
Research
Slide 34 Figure 31 – Jib off angle set
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Intermediate Rigging
Module 38201-11
National Center
for Construction
Education and
Research
Slide 35 Figure 32 – Teeter-totter demonstrating leverage
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Intermediate Rigging
Module 38201-11
National Center
for Construction
Education and
Research
Slide 36 Figure 33 – Bent lever
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Intermediate Rigging
Module 38201-11
National Center
for Construction
Education and
Research
Slide 37 Figure 34 – Crane-shaped lever
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Intermediate Rigging
Module 38201-11
National Center
for Construction
Education and
Research
Slide 38 Figure 35 – Typical center of gravity and leverage distances for
each position of a truck-mounted crane
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Intermediate Rigging
Module 38201-11
National Center
for Construction
Education and
Research
Slide 39 Figure 36 – Relative tipping force
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Intermediate Rigging
Module 38201-11
National Center
for Construction
Education and
Research
Slide 40 Figure 37 – Hydraulic jacks
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Intermediate Rigging
Module 38201-11
National Center
for Construction
Education and
Research
Slide 41 Figure 38 – Hydraulic cylinders
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Intermediate Rigging
Module 38201-11
National Center
for Construction
Education and
Research
Slide 42 Figure 39 – Hydraulic pumps
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Intermediate Rigging
Module 38201-11
National Center
for Construction
Education and
Research
Slide 43 Figure 40 – Jacking systems
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Intermediate Rigging
Module 38201-11
National Center
for Construction
Education and
Research
Slide 44 Figure 41 – Grip hoist
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Intermediate Rigging
Module 38201-11
National Center
for Construction
Education and
Research
Slide 45 Figure 42 – Use of rollers
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Intermediate Rigging
Module 38201-11
National Center
for Construction
Education and
Research
Slide 46
Supplemental Art
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Intermediate Rigging
Module 38201-11
National Center
for Construction
Education and
Research
Slide 47 Course Map
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Intermediate Rigging
Module 38201-11
National Center
for Construction
Education and
Research
Slide 48 Appendix
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Intermediate Rigging
Module 38201-11
National Center
for Construction
Education and
Research
Slide 49 Appendix
Copyright © by NCCER,
Published by Pearson Education, Inc.
Power Line Worker Level Two: Substation – Intermediate Rigging
Module 38201-11
National Center
for Construction
Education and
Research
Slide 50 Appendix

More Related Content

Similar to Module Thirteen - Intermediate Rigging - NCCER Substation Slides

Module Five - Cable Tray - NCCER Substation Slides
Module Five -  Cable Tray - NCCER Substation SlidesModule Five -  Cable Tray - NCCER Substation Slides
Module Five - Cable Tray - NCCER Substation Slides
Shariq Ayjaz
 
Module Two - Managing Electrical Hazards - NCCER Substation Slides
Module Two - Managing Electrical Hazards - NCCER Substation SlidesModule Two - Managing Electrical Hazards - NCCER Substation Slides
Module Two - Managing Electrical Hazards - NCCER Substation Slides
Shariq Ayjaz
 
Module Three - Alternating Current and Three-Phase Systems - NCCER Substation...
Module Three - Alternating Current and Three-Phase Systems - NCCER Substation...Module Three - Alternating Current and Three-Phase Systems - NCCER Substation...
Module Three - Alternating Current and Three-Phase Systems - NCCER Substation...
Shariq Ayjaz
 
Module Four - Conductors and Cable - NCCER Substation Slides
Module Four - Conductors and Cable - NCCER Substation SlidesModule Four - Conductors and Cable - NCCER Substation Slides
Module Four - Conductors and Cable - NCCER Substation Slides
Shariq Ayjaz
 
BASIC SAFETY 101-09(1) (1).pptx
BASIC SAFETY 101-09(1) (1).pptxBASIC SAFETY 101-09(1) (1).pptx
BASIC SAFETY 101-09(1) (1).pptx
Fredel De Vera
 
Power generation by using railway track\\Final year project
Power generation by using railway track\\Final year projectPower generation by using railway track\\Final year project
Power generation by using railway track\\Final year project
Varun deep singh
 
BATCH 8 - PROJECT PHASE II - SECOND REVIEW.pptx
BATCH 8 - PROJECT PHASE II - SECOND REVIEW.pptxBATCH 8 - PROJECT PHASE II - SECOND REVIEW.pptx
BATCH 8 - PROJECT PHASE II - SECOND REVIEW.pptx
23mu08
 
Unipolar pulse width modulation inverter
Unipolar pulse width modulation inverterUnipolar pulse width modulation inverter
Unipolar pulse width modulation inverter
Web Design & Development
 
Battery swapping project
Battery swapping projectBattery swapping project
Battery swapping project
Nagamohan Burugupalli
 
HOW THEY DO THAT
HOW THEY DO THATHOW THEY DO THAT
HOW THEY DO THAT
Raghavendran Vigneswar
 
Automatic power factor_improvement_and_monitoring_by_using_plc[1]
Automatic power factor_improvement_and_monitoring_by_using_plc[1]Automatic power factor_improvement_and_monitoring_by_using_plc[1]
Automatic power factor_improvement_and_monitoring_by_using_plc[1]
ferozpatowary
 
IRJET- Structural Engineering Aspects of Metro Rail Projects
IRJET- Structural Engineering Aspects of Metro Rail ProjectsIRJET- Structural Engineering Aspects of Metro Rail Projects
IRJET- Structural Engineering Aspects of Metro Rail Projects
IRJET Journal
 
CSTEP BORRERO R poster
CSTEP BORRERO R posterCSTEP BORRERO R poster
CSTEP BORRERO R poster
Raul Martinez Jr.
 
IRJET- Study and Analysis of Balanced Cantilever Bridge at Kochi Metro
IRJET- Study and Analysis of Balanced Cantilever Bridge at Kochi MetroIRJET- Study and Analysis of Balanced Cantilever Bridge at Kochi Metro
IRJET- Study and Analysis of Balanced Cantilever Bridge at Kochi Metro
IRJET Journal
 
Multiconverter Unified Power Quality Conditioning System Using Artificial Neu...
Multiconverter Unified Power Quality Conditioning System Using Artificial Neu...Multiconverter Unified Power Quality Conditioning System Using Artificial Neu...
Multiconverter Unified Power Quality Conditioning System Using Artificial Neu...
Asoka Technologies
 
Construction_Cranes_PPT_v.05.18.15.pptx
Construction_Cranes_PPT_v.05.18.15.pptxConstruction_Cranes_PPT_v.05.18.15.pptx
Construction_Cranes_PPT_v.05.18.15.pptx
Camelia5388
 
How to use SIMULINK.pptx
How to use SIMULINK.pptxHow to use SIMULINK.pptx
How to use SIMULINK.pptx
VijayAECE1
 
Start (ceb) new
Start (ceb) newStart (ceb) new
ELECTRICITY GENERATION USING RAILWAY TRACK
ELECTRICITY GENERATION USING RAILWAY TRACKELECTRICITY GENERATION USING RAILWAY TRACK
ELECTRICITY GENERATION USING RAILWAY TRACK
IRJET Journal
 
Used Basic Electrical Engineering R-20.pdf
Used Basic Electrical Engineering R-20.pdfUsed Basic Electrical Engineering R-20.pdf
Used Basic Electrical Engineering R-20.pdf
jiteshdevarkar05
 

Similar to Module Thirteen - Intermediate Rigging - NCCER Substation Slides (20)

Module Five - Cable Tray - NCCER Substation Slides
Module Five -  Cable Tray - NCCER Substation SlidesModule Five -  Cable Tray - NCCER Substation Slides
Module Five - Cable Tray - NCCER Substation Slides
 
Module Two - Managing Electrical Hazards - NCCER Substation Slides
Module Two - Managing Electrical Hazards - NCCER Substation SlidesModule Two - Managing Electrical Hazards - NCCER Substation Slides
Module Two - Managing Electrical Hazards - NCCER Substation Slides
 
Module Three - Alternating Current and Three-Phase Systems - NCCER Substation...
Module Three - Alternating Current and Three-Phase Systems - NCCER Substation...Module Three - Alternating Current and Three-Phase Systems - NCCER Substation...
Module Three - Alternating Current and Three-Phase Systems - NCCER Substation...
 
Module Four - Conductors and Cable - NCCER Substation Slides
Module Four - Conductors and Cable - NCCER Substation SlidesModule Four - Conductors and Cable - NCCER Substation Slides
Module Four - Conductors and Cable - NCCER Substation Slides
 
BASIC SAFETY 101-09(1) (1).pptx
BASIC SAFETY 101-09(1) (1).pptxBASIC SAFETY 101-09(1) (1).pptx
BASIC SAFETY 101-09(1) (1).pptx
 
Power generation by using railway track\\Final year project
Power generation by using railway track\\Final year projectPower generation by using railway track\\Final year project
Power generation by using railway track\\Final year project
 
BATCH 8 - PROJECT PHASE II - SECOND REVIEW.pptx
BATCH 8 - PROJECT PHASE II - SECOND REVIEW.pptxBATCH 8 - PROJECT PHASE II - SECOND REVIEW.pptx
BATCH 8 - PROJECT PHASE II - SECOND REVIEW.pptx
 
Unipolar pulse width modulation inverter
Unipolar pulse width modulation inverterUnipolar pulse width modulation inverter
Unipolar pulse width modulation inverter
 
Battery swapping project
Battery swapping projectBattery swapping project
Battery swapping project
 
HOW THEY DO THAT
HOW THEY DO THATHOW THEY DO THAT
HOW THEY DO THAT
 
Automatic power factor_improvement_and_monitoring_by_using_plc[1]
Automatic power factor_improvement_and_monitoring_by_using_plc[1]Automatic power factor_improvement_and_monitoring_by_using_plc[1]
Automatic power factor_improvement_and_monitoring_by_using_plc[1]
 
IRJET- Structural Engineering Aspects of Metro Rail Projects
IRJET- Structural Engineering Aspects of Metro Rail ProjectsIRJET- Structural Engineering Aspects of Metro Rail Projects
IRJET- Structural Engineering Aspects of Metro Rail Projects
 
CSTEP BORRERO R poster
CSTEP BORRERO R posterCSTEP BORRERO R poster
CSTEP BORRERO R poster
 
IRJET- Study and Analysis of Balanced Cantilever Bridge at Kochi Metro
IRJET- Study and Analysis of Balanced Cantilever Bridge at Kochi MetroIRJET- Study and Analysis of Balanced Cantilever Bridge at Kochi Metro
IRJET- Study and Analysis of Balanced Cantilever Bridge at Kochi Metro
 
Multiconverter Unified Power Quality Conditioning System Using Artificial Neu...
Multiconverter Unified Power Quality Conditioning System Using Artificial Neu...Multiconverter Unified Power Quality Conditioning System Using Artificial Neu...
Multiconverter Unified Power Quality Conditioning System Using Artificial Neu...
 
Construction_Cranes_PPT_v.05.18.15.pptx
Construction_Cranes_PPT_v.05.18.15.pptxConstruction_Cranes_PPT_v.05.18.15.pptx
Construction_Cranes_PPT_v.05.18.15.pptx
 
How to use SIMULINK.pptx
How to use SIMULINK.pptxHow to use SIMULINK.pptx
How to use SIMULINK.pptx
 
Start (ceb) new
Start (ceb) newStart (ceb) new
Start (ceb) new
 
ELECTRICITY GENERATION USING RAILWAY TRACK
ELECTRICITY GENERATION USING RAILWAY TRACKELECTRICITY GENERATION USING RAILWAY TRACK
ELECTRICITY GENERATION USING RAILWAY TRACK
 
Used Basic Electrical Engineering R-20.pdf
Used Basic Electrical Engineering R-20.pdfUsed Basic Electrical Engineering R-20.pdf
Used Basic Electrical Engineering R-20.pdf
 

Recently uploaded

5G Radio Network Througput Problem Analysis HCIA.pdf
5G Radio Network Througput Problem Analysis HCIA.pdf5G Radio Network Througput Problem Analysis HCIA.pdf
5G Radio Network Througput Problem Analysis HCIA.pdf
AlvianRamadhani5
 
Generative AI Use cases applications solutions and implementation.pdf
Generative AI Use cases applications solutions and implementation.pdfGenerative AI Use cases applications solutions and implementation.pdf
Generative AI Use cases applications solutions and implementation.pdf
mahaffeycheryld
 
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
DharmaBanothu
 
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
PriyankaKilaniya
 
一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理
uqyfuc
 
openshift technical overview - Flow of openshift containerisatoin
openshift technical overview - Flow of openshift containerisatoinopenshift technical overview - Flow of openshift containerisatoin
openshift technical overview - Flow of openshift containerisatoin
snaprevwdev
 
P5 Working Drawings.pdf floor plan, civil
P5 Working Drawings.pdf floor plan, civilP5 Working Drawings.pdf floor plan, civil
P5 Working Drawings.pdf floor plan, civil
AnasAhmadNoor
 
This study Examines the Effectiveness of Talent Procurement through the Imple...
This study Examines the Effectiveness of Talent Procurement through the Imple...This study Examines the Effectiveness of Talent Procurement through the Imple...
This study Examines the Effectiveness of Talent Procurement through the Imple...
DharmaBanothu
 
ITSM Integration with MuleSoft.pptx
ITSM  Integration with MuleSoft.pptxITSM  Integration with MuleSoft.pptx
ITSM Integration with MuleSoft.pptx
VANDANAMOHANGOUDA
 
Open Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surfaceOpen Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surface
Indrajeet sahu
 
SCALING OF MOS CIRCUITS m .pptx
SCALING OF MOS CIRCUITS m                 .pptxSCALING OF MOS CIRCUITS m                 .pptx
SCALING OF MOS CIRCUITS m .pptx
harshapolam10
 
Levelised Cost of Hydrogen (LCOH) Calculator Manual
Levelised Cost of Hydrogen  (LCOH) Calculator ManualLevelised Cost of Hydrogen  (LCOH) Calculator Manual
Levelised Cost of Hydrogen (LCOH) Calculator Manual
Massimo Talia
 
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
Gino153088
 
Unit -II Spectroscopy - EC I B.Tech.pdf
Unit -II Spectroscopy - EC  I B.Tech.pdfUnit -II Spectroscopy - EC  I B.Tech.pdf
Unit -II Spectroscopy - EC I B.Tech.pdf
TeluguBadi
 
Digital Twins Computer Networking Paper Presentation.pptx
Digital Twins Computer Networking Paper Presentation.pptxDigital Twins Computer Networking Paper Presentation.pptx
Digital Twins Computer Networking Paper Presentation.pptx
aryanpankaj78
 
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
ecqow
 
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
Transcat
 
Accident detection system project report.pdf
Accident detection system project report.pdfAccident detection system project report.pdf
Accident detection system project report.pdf
Kamal Acharya
 
Null Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAMNull Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAM
Divyanshu
 
Object Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOADObject Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOAD
PreethaV16
 

Recently uploaded (20)

5G Radio Network Througput Problem Analysis HCIA.pdf
5G Radio Network Througput Problem Analysis HCIA.pdf5G Radio Network Througput Problem Analysis HCIA.pdf
5G Radio Network Througput Problem Analysis HCIA.pdf
 
Generative AI Use cases applications solutions and implementation.pdf
Generative AI Use cases applications solutions and implementation.pdfGenerative AI Use cases applications solutions and implementation.pdf
Generative AI Use cases applications solutions and implementation.pdf
 
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
 
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
 
一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理
 
openshift technical overview - Flow of openshift containerisatoin
openshift technical overview - Flow of openshift containerisatoinopenshift technical overview - Flow of openshift containerisatoin
openshift technical overview - Flow of openshift containerisatoin
 
P5 Working Drawings.pdf floor plan, civil
P5 Working Drawings.pdf floor plan, civilP5 Working Drawings.pdf floor plan, civil
P5 Working Drawings.pdf floor plan, civil
 
This study Examines the Effectiveness of Talent Procurement through the Imple...
This study Examines the Effectiveness of Talent Procurement through the Imple...This study Examines the Effectiveness of Talent Procurement through the Imple...
This study Examines the Effectiveness of Talent Procurement through the Imple...
 
ITSM Integration with MuleSoft.pptx
ITSM  Integration with MuleSoft.pptxITSM  Integration with MuleSoft.pptx
ITSM Integration with MuleSoft.pptx
 
Open Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surfaceOpen Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surface
 
SCALING OF MOS CIRCUITS m .pptx
SCALING OF MOS CIRCUITS m                 .pptxSCALING OF MOS CIRCUITS m                 .pptx
SCALING OF MOS CIRCUITS m .pptx
 
Levelised Cost of Hydrogen (LCOH) Calculator Manual
Levelised Cost of Hydrogen  (LCOH) Calculator ManualLevelised Cost of Hydrogen  (LCOH) Calculator Manual
Levelised Cost of Hydrogen (LCOH) Calculator Manual
 
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
 
Unit -II Spectroscopy - EC I B.Tech.pdf
Unit -II Spectroscopy - EC  I B.Tech.pdfUnit -II Spectroscopy - EC  I B.Tech.pdf
Unit -II Spectroscopy - EC I B.Tech.pdf
 
Digital Twins Computer Networking Paper Presentation.pptx
Digital Twins Computer Networking Paper Presentation.pptxDigital Twins Computer Networking Paper Presentation.pptx
Digital Twins Computer Networking Paper Presentation.pptx
 
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
 
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
 
Accident detection system project report.pdf
Accident detection system project report.pdfAccident detection system project report.pdf
Accident detection system project report.pdf
 
Null Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAMNull Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAM
 
Object Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOADObject Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOAD
 

Module Thirteen - Intermediate Rigging - NCCER Substation Slides

  • 1. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Intermediate Rigging Module 38201-11 National Center for Construction Education and Research Intermediate Rigging Module Thirteen – 38201-11
  • 2. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Intermediate Rigging Module 38201-11 National Center for Construction Education and Research Slide 1 Objectives 1. Describe the basic requirements to lift personnel. 2. Explain how a sling stress is determined. 3. Describe the basic elements of a lift plan. 4. Explain the purpose of a load chart. 5. Calculate and explain how the center of gravity is determined. 6. Given a particular load, select the appropriate sling(s) for a lift. 7. Describe how jacks, hoists, skids, and rollers are used to move a load laterally. Upon completion of this module, you will be able to do the following:
  • 3. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Intermediate Rigging Module 38201-11 National Center for Construction Education and Research Slide 2 Performance Tasks 1. Given a particular load, select the appropriate sling(s) for a lift. 2. Calculate and explain how the center of gravity is determined. Under the supervision of the instructor, you should be able to do the following:
  • 4. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Intermediate Rigging Module 38201-11 National Center for Construction Education and Research Slide 3 Figure 1 – Crane requirements for personnel platforms
  • 5. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Intermediate Rigging Module 38201-11 National Center for Construction Education and Research Slide 4 Figure 2 – Crane requirements for suspended personnel platforms
  • 6. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Intermediate Rigging Module 38201-11 National Center for Construction Education and Research Slide 5 Figure 3 – Suspended personnel platform
  • 7. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Intermediate Rigging Module 38201-11 National Center for Construction Education and Research Slide 6 Figure 4 – Bridle sling using a master link
  • 8. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Intermediate Rigging Module 38201-11 National Center for Construction Education and Research Slide 7 Figure 5 – Bridle sling using a shackle
  • 9. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Intermediate Rigging Module 38201-11 National Center for Construction Education and Research Slide 8 Figure 6 – Sling measurement
  • 10. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Intermediate Rigging Module 38201-11 National Center for Construction Education and Research Slide 9 Figure 7 – Sling angle factors
  • 11. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Intermediate Rigging Module 38201-11 National Center for Construction Education and Research Slide 10 Figure 8 – Example of a sling capacity chart
  • 12. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Intermediate Rigging Module 38201-11 National Center for Construction Education and Research Slide 11 Figure 9 – Bridle hitch arrangement
  • 13. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Intermediate Rigging Module 38201-11 National Center for Construction Education and Research Slide 12 Figure 10 – Asymmetrical bridle sling stress arrangement and formula
  • 14. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Intermediate Rigging Module 38201-11 National Center for Construction Education and Research Slide 13 Figure 11 – Choker hitch arrangement
  • 15. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Intermediate Rigging Module 38201-11 National Center for Construction Education and Research Slide 14 Figure 12 – Choker hitch derating factors
  • 16. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Intermediate Rigging Module 38201-11 National Center for Construction Education and Research Slide 15 Figure 13 – Industrial hydraulic crane with rotating boom
  • 17. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Intermediate Rigging Module 38201-11 National Center for Construction Education and Research Slide 16 Figure 14 – Rough-terrain crane
  • 18. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Intermediate Rigging Module 38201-11 National Center for Construction Education and Research Slide 17 Figure 15 – All-terrain crane
  • 19. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Intermediate Rigging Module 38201-11 National Center for Construction Education and Research Slide 18 Figure 16 – Truck-mounted telescopic crane
  • 20. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Intermediate Rigging Module 38201-11 National Center for Construction Education and Research Slide 19 Figure 17 – Truck-mounted and crawler-mounted lattice boom cranes
  • 21. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Intermediate Rigging Module 38201-11 National Center for Construction Education and Research Slide 20 Figure 18 – Crawler- and wheel-mounted crane components
  • 22. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Intermediate Rigging Module 38201-11 National Center for Construction Education and Research Slide 21 Figure 19 – Swing cab, lattice boom truck crane
  • 23. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Intermediate Rigging Module 38201-11 National Center for Construction Education and Research Slide 22 Figure 20 – A heavy-lift crane with counterweights
  • 24. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Intermediate Rigging Module 38201-11 National Center for Construction Education and Research Slide 23 Figure 21 – Load chart
  • 25. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Intermediate Rigging Module 38201-11 National Center for Construction Education and Research Slide 24 Figure 22 – Typical deductions for a hydraulic crane
  • 26. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Intermediate Rigging Module 38201-11 National Center for Construction Education and Research Slide 25 Figure 23 – Typical deductions for a lattice boom crane
  • 27. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Intermediate Rigging Module 38201-11 National Center for Construction Education and Research Slide 26 Figure 24 – Boom length, boom angle, load operating radius, and boom point elevation
  • 28. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Intermediate Rigging Module 38201-11 National Center for Construction Education and Research Slide 27 Figure 25A – Structural strength and stability charts
  • 29. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Intermediate Rigging Module 38201-11 National Center for Construction Education and Research Slide 28 Figure 25B – Structural strength and stability charts
  • 30. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Intermediate Rigging Module 38201-11 National Center for Construction Education and Research Slide 29 Figure 26 – Unlevel and level cranes
  • 31. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Intermediate Rigging Module 38201-11 National Center for Construction Education and Research Slide 30 Figure 27 – Boom length, boom angle, load operating radius, and boom point elevation measurements
  • 32. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Intermediate Rigging Module 38201-11 National Center for Construction Education and Research Slide 31 Figure 28 – Hoist reeving chart
  • 33. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Intermediate Rigging Module 38201-11 National Center for Construction Education and Research Slide 32 Figure 29 – Heavy-lift crane with ten-part reeving
  • 34. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Intermediate Rigging Module 38201-11 National Center for Construction Education and Research Slide 33 Figure 30 – Typical deductions for a lattice boom crane
  • 35. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Intermediate Rigging Module 38201-11 National Center for Construction Education and Research Slide 34 Figure 31 – Jib off angle set
  • 36. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Intermediate Rigging Module 38201-11 National Center for Construction Education and Research Slide 35 Figure 32 – Teeter-totter demonstrating leverage
  • 37. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Intermediate Rigging Module 38201-11 National Center for Construction Education and Research Slide 36 Figure 33 – Bent lever
  • 38. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Intermediate Rigging Module 38201-11 National Center for Construction Education and Research Slide 37 Figure 34 – Crane-shaped lever
  • 39. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Intermediate Rigging Module 38201-11 National Center for Construction Education and Research Slide 38 Figure 35 – Typical center of gravity and leverage distances for each position of a truck-mounted crane
  • 40. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Intermediate Rigging Module 38201-11 National Center for Construction Education and Research Slide 39 Figure 36 – Relative tipping force
  • 41. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Intermediate Rigging Module 38201-11 National Center for Construction Education and Research Slide 40 Figure 37 – Hydraulic jacks
  • 42. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Intermediate Rigging Module 38201-11 National Center for Construction Education and Research Slide 41 Figure 38 – Hydraulic cylinders
  • 43. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Intermediate Rigging Module 38201-11 National Center for Construction Education and Research Slide 42 Figure 39 – Hydraulic pumps
  • 44. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Intermediate Rigging Module 38201-11 National Center for Construction Education and Research Slide 43 Figure 40 – Jacking systems
  • 45. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Intermediate Rigging Module 38201-11 National Center for Construction Education and Research Slide 44 Figure 41 – Grip hoist
  • 46. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Intermediate Rigging Module 38201-11 National Center for Construction Education and Research Slide 45 Figure 42 – Use of rollers
  • 47. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Intermediate Rigging Module 38201-11 National Center for Construction Education and Research Slide 46 Supplemental Art
  • 48. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Intermediate Rigging Module 38201-11 National Center for Construction Education and Research Slide 47 Course Map
  • 49. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Intermediate Rigging Module 38201-11 National Center for Construction Education and Research Slide 48 Appendix
  • 50. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Intermediate Rigging Module 38201-11 National Center for Construction Education and Research Slide 49 Appendix
  • 51. Copyright © by NCCER, Published by Pearson Education, Inc. Power Line Worker Level Two: Substation – Intermediate Rigging Module 38201-11 National Center for Construction Education and Research Slide 50 Appendix