MARINE BUSINESS UNDER INDONESIAN
UPSTREAM OIL AND GAS BUSINESS AIMED TO
INTEGRATE ALL TYPES VESSEL SUPPORT AND
TRANSPORTATION DURING EXPLORATION AND
EXPLOITATION ACTIVITIES.
UP TO 2015, ABOUT 235 ADDITIONAL VESSEL IS
NEEDED TO SUPPORT INDONESIAN OIL AND GAS
ACTIVITIES. TODAY, THE INDUSTRY IS OPERATING
630 VESSELS FOR OPERATION AND ABOUT 350
VESSEL FOR ENGINEERING, CONSTRUCTION AND
INSTALLATION
MANY VESSEL TYPES WITH INDONESIAN FLAG
SUCH AS SEISMIC SURVEY, SUBSEA PIPELINE
LAYDOWN, AHTS > 8.000 HP IN CAPACITY, PSV DP
INTRODUCTION
3
ADDITIONAL VESSEL UP TO 2015
IS 235 UNITS
ADDITIONAL VESSEL
AHTS - Anchor Handling Tug Supply Vessel
4
To be used in Drilling Project and Deepwater Project
AHTS with morethan 6000 HP in capacity is needed for
anchor handling, towing and safety standby vessel
services.
@2010BPMIGAS.Allrightsreserved
PRIVATE AND CONFIDENTIAL
PSV – Platform Supply Vessels
5
To be used in ERD Drilling and Deepwater Project. These PSVs come with DP-2, which is critical to supporting floating rigs (w/DP) and facilities in DW
operations. These rigs do not allow any non-DP vessels to come alongside the rig. The PSV also has more deck and cargo capacity than AHTSs.
We have only 3 vessel DP 1 with capacity
below 3.500 DWT
@2010BPMIGAS.Allrightsreserved
PRIVATE AND CONFIDENTIAL
3D SEISMIC VESSEL
We have only 2 vessel in Indonesia with 8 -12 streamer
MSV – Multi-purpose Support Vessel
7
MSV - Multi-purpose support vessels are designed to operate in a more specific role whether it be pipe-laying, diving, well intervention, ROV,
stand-by and accommodation vessels to name a few. These vessels are typically outfitted with Dynamic Positioning thrusters (DP-2) so that
they have excellent fail-safe station keeping abilities to assist in the installation of deepwater, subsea development infrastructure . Source:
Horneck Offshore
Completed with DP-2, “pipe-laying” vessel, diving, well intervention, ROV, accomodation
and other function
@2010BPMIGAS.Allrightsreserved
PRIVATE AND CONFIDENTIAL
VESSEL TYPE
NOT AVAILABLE IN INDONESIA
JACK UP RIG
SEMISUBMERSIBLE RIG
BARGE TENDER RIGDEEP SEA DRILL SHIP
CABEL LAYING SHIP
9
DRILL SHIP
10
DSV - Diving Support Vessel
Oil Export Pipeline Spool Installation Saturation Diving -500 ft
To be used in subsea deepwater development project
PRIVATE AND CONFIDENTIAL
LYING STRATEGICALLY IN THE ASIA PACIFIC FASTEST ECONOMIC
GROWING REGION, AND WITH THE BIG POPULATION ALMOST 250
MILLION & THE WORLD’S LARGEST ARCHIPELAGO WITH OVER
17.000 ISLANDS ACROSS THE COUNTRY, INDONESIA IS A HUGE
MARKET THAT WILL ALWAYS REMAIN POTENTIAL AND
FULFILLING INVESTORS TO MEET THE HUGE DEMAND
MARITIME INDUSTRY HAS BECOME A PRIORITY BY GOVERNMENT
OF INDONESIA TO DRIVE THE ECONOMY DEVELOPMENT IN
INDONESIA
IT WAS ESTIMATED THAT THE SHIPYARD INDUSTRY IN INDONESIA
COULD BENEFIT BY UP TO 20 % OF US$ 1,5 BILLION IN AVERAGE
ANNUAL CHARTER COSTS (IPERINDO)
PRESENTLY, MANY INVESTOR ARE PLANNED TO RELOCATE THEIR
SHIPYARD INTO INDONESIA
WITH STRONG SUPPORT FROM MINISTRY OF INDUSTRY, REPUBLIC13
INTRODUCTION
SPECTURM OF MARITIME INDUSTRY
INDONESIA SHIPBUILDING INDUSTRY COULD NOT GROW AS
EXPECTED BECAUSE OF HEAVY DEPENDENCE ON IMPORT
COMPONENTS. LOCAL COMPONENT MAKERS COULD PROVIDE
ONLY 35 % OF COMPONENT NEEDED
INDONESIA HAS 250 SHIPYARDS BUT THEY COULD PRODUCE ONLY
SMALL VESSELS. MOST OF EXISTING VESSEL BUILDERS/SHIPYARD
IN INDONESIA IS LOCATED IN BATAM ISLAND WITH LOW TO MEDIUM
DRY DOCK CAPACITY.
TO BUILD FSO, FPSO, OR FPU WITH A CAPACITY OF BETWEEN
300.000-400.000 DEAD WEIGHT TON IS TOO BIG AT THIS TIME. THE
GOI IS PLANNED TO DEVELOP THE SHIPYARD IN EAST JAVA
PROVINCE
NEW SHIPYARD WITH MINIMUM 80 METER IN LENGTH OF DRY
DOCKING MAY NEED FOR SHIP BUILDING, DOCKING, REPAIRING,
OR OTHER PURPOSE
15
INDONESIA SHIPBUILDING
INDONESIA SHIPYARD
SHIPBUILDING CAPACITY
INDONESIA (NEW BUILDING)
95
8
27
119
6
SHIPBUILDING CAPACITY INDONESIA
(REPAIR & MAINTENANCE)
121
6
25
45
7 6
PRODUCTION CAPABILITY OF THE
INDONESIA SHIPYARD
THE LOCAL SHIPBUILDERS ITS CURRENTLY IDLE CAPACITY (REACHED
ABOUT 50 %) TO BE FULLY EXPLOITED UNDER A NEW GOVERNMENT RULES
TO FULFILL OIL AND GAS INDUSTRY NEED
SKKMIGAS AND MINISTRY OF INDUSTRY HAS SIGNED A MEMORANDUM OF
UNDERSTANDING FOR THE IMPLEMENTATION OF THE NEW RULE
SHIPPING EXPENSES IS ELIGIBLE ITEMS AS PARTS OF THE PETROLEUM
COST RECOVERY SCHEME
THE DOMESTIC SHIPBUILDING INDUSTRY WAS ABLE TO BUILD ALMOST
ALL 20 TYPES OF VESSEL ONLY NEEDED BY OIL AND GAS OPERATION
FOREIGN OPERATORS CONTROLLED 90 % OF VESSEL OPERATING IN
INDONESIAN WATERS TO INCLUDE OIL AND GAS OPERATION
CURRENTLY, SINGAPORE, CHINA, JAPAN AND SOUTH KOREA ARE THE
MAIN COUNTRIES ABLE TO BUILD THE SHIPYARD WITH HUGE DRY
DOCKING FACILITIES
20
SHIPYARD FOR OIL & GAS

Mega Maroci Lines

  • 2.
    MARINE BUSINESS UNDERINDONESIAN UPSTREAM OIL AND GAS BUSINESS AIMED TO INTEGRATE ALL TYPES VESSEL SUPPORT AND TRANSPORTATION DURING EXPLORATION AND EXPLOITATION ACTIVITIES. UP TO 2015, ABOUT 235 ADDITIONAL VESSEL IS NEEDED TO SUPPORT INDONESIAN OIL AND GAS ACTIVITIES. TODAY, THE INDUSTRY IS OPERATING 630 VESSELS FOR OPERATION AND ABOUT 350 VESSEL FOR ENGINEERING, CONSTRUCTION AND INSTALLATION MANY VESSEL TYPES WITH INDONESIAN FLAG SUCH AS SEISMIC SURVEY, SUBSEA PIPELINE LAYDOWN, AHTS > 8.000 HP IN CAPACITY, PSV DP INTRODUCTION
  • 3.
    3 ADDITIONAL VESSEL UPTO 2015 IS 235 UNITS ADDITIONAL VESSEL
  • 4.
    AHTS - AnchorHandling Tug Supply Vessel 4 To be used in Drilling Project and Deepwater Project AHTS with morethan 6000 HP in capacity is needed for anchor handling, towing and safety standby vessel services. @2010BPMIGAS.Allrightsreserved PRIVATE AND CONFIDENTIAL
  • 5.
    PSV – PlatformSupply Vessels 5 To be used in ERD Drilling and Deepwater Project. These PSVs come with DP-2, which is critical to supporting floating rigs (w/DP) and facilities in DW operations. These rigs do not allow any non-DP vessels to come alongside the rig. The PSV also has more deck and cargo capacity than AHTSs. We have only 3 vessel DP 1 with capacity below 3.500 DWT @2010BPMIGAS.Allrightsreserved PRIVATE AND CONFIDENTIAL
  • 6.
    3D SEISMIC VESSEL Wehave only 2 vessel in Indonesia with 8 -12 streamer
  • 7.
    MSV – Multi-purposeSupport Vessel 7 MSV - Multi-purpose support vessels are designed to operate in a more specific role whether it be pipe-laying, diving, well intervention, ROV, stand-by and accommodation vessels to name a few. These vessels are typically outfitted with Dynamic Positioning thrusters (DP-2) so that they have excellent fail-safe station keeping abilities to assist in the installation of deepwater, subsea development infrastructure . Source: Horneck Offshore Completed with DP-2, “pipe-laying” vessel, diving, well intervention, ROV, accomodation and other function @2010BPMIGAS.Allrightsreserved PRIVATE AND CONFIDENTIAL
  • 8.
    VESSEL TYPE NOT AVAILABLEIN INDONESIA JACK UP RIG SEMISUBMERSIBLE RIG BARGE TENDER RIGDEEP SEA DRILL SHIP
  • 9.
  • 10.
  • 11.
    DSV - DivingSupport Vessel Oil Export Pipeline Spool Installation Saturation Diving -500 ft To be used in subsea deepwater development project PRIVATE AND CONFIDENTIAL
  • 13.
    LYING STRATEGICALLY INTHE ASIA PACIFIC FASTEST ECONOMIC GROWING REGION, AND WITH THE BIG POPULATION ALMOST 250 MILLION & THE WORLD’S LARGEST ARCHIPELAGO WITH OVER 17.000 ISLANDS ACROSS THE COUNTRY, INDONESIA IS A HUGE MARKET THAT WILL ALWAYS REMAIN POTENTIAL AND FULFILLING INVESTORS TO MEET THE HUGE DEMAND MARITIME INDUSTRY HAS BECOME A PRIORITY BY GOVERNMENT OF INDONESIA TO DRIVE THE ECONOMY DEVELOPMENT IN INDONESIA IT WAS ESTIMATED THAT THE SHIPYARD INDUSTRY IN INDONESIA COULD BENEFIT BY UP TO 20 % OF US$ 1,5 BILLION IN AVERAGE ANNUAL CHARTER COSTS (IPERINDO) PRESENTLY, MANY INVESTOR ARE PLANNED TO RELOCATE THEIR SHIPYARD INTO INDONESIA WITH STRONG SUPPORT FROM MINISTRY OF INDUSTRY, REPUBLIC13 INTRODUCTION
  • 14.
  • 15.
    INDONESIA SHIPBUILDING INDUSTRYCOULD NOT GROW AS EXPECTED BECAUSE OF HEAVY DEPENDENCE ON IMPORT COMPONENTS. LOCAL COMPONENT MAKERS COULD PROVIDE ONLY 35 % OF COMPONENT NEEDED INDONESIA HAS 250 SHIPYARDS BUT THEY COULD PRODUCE ONLY SMALL VESSELS. MOST OF EXISTING VESSEL BUILDERS/SHIPYARD IN INDONESIA IS LOCATED IN BATAM ISLAND WITH LOW TO MEDIUM DRY DOCK CAPACITY. TO BUILD FSO, FPSO, OR FPU WITH A CAPACITY OF BETWEEN 300.000-400.000 DEAD WEIGHT TON IS TOO BIG AT THIS TIME. THE GOI IS PLANNED TO DEVELOP THE SHIPYARD IN EAST JAVA PROVINCE NEW SHIPYARD WITH MINIMUM 80 METER IN LENGTH OF DRY DOCKING MAY NEED FOR SHIP BUILDING, DOCKING, REPAIRING, OR OTHER PURPOSE 15 INDONESIA SHIPBUILDING
  • 16.
  • 17.
    SHIPBUILDING CAPACITY INDONESIA (NEWBUILDING) 95 8 27 119 6
  • 18.
    SHIPBUILDING CAPACITY INDONESIA (REPAIR& MAINTENANCE) 121 6 25 45 7 6
  • 19.
    PRODUCTION CAPABILITY OFTHE INDONESIA SHIPYARD
  • 20.
    THE LOCAL SHIPBUILDERSITS CURRENTLY IDLE CAPACITY (REACHED ABOUT 50 %) TO BE FULLY EXPLOITED UNDER A NEW GOVERNMENT RULES TO FULFILL OIL AND GAS INDUSTRY NEED SKKMIGAS AND MINISTRY OF INDUSTRY HAS SIGNED A MEMORANDUM OF UNDERSTANDING FOR THE IMPLEMENTATION OF THE NEW RULE SHIPPING EXPENSES IS ELIGIBLE ITEMS AS PARTS OF THE PETROLEUM COST RECOVERY SCHEME THE DOMESTIC SHIPBUILDING INDUSTRY WAS ABLE TO BUILD ALMOST ALL 20 TYPES OF VESSEL ONLY NEEDED BY OIL AND GAS OPERATION FOREIGN OPERATORS CONTROLLED 90 % OF VESSEL OPERATING IN INDONESIAN WATERS TO INCLUDE OIL AND GAS OPERATION CURRENTLY, SINGAPORE, CHINA, JAPAN AND SOUTH KOREA ARE THE MAIN COUNTRIES ABLE TO BUILD THE SHIPYARD WITH HUGE DRY DOCKING FACILITIES 20 SHIPYARD FOR OIL & GAS