SlideShare a Scribd company logo
Salvin Princess
Offshore Support Vessel
DP-2 / 4 PT / FIFI-1
Main Features
• Multipurpose Offshore Support Accommodation Vessel
• DP-2
• 4 Point Mooring System
• FIFI-1
• 100 Ton Crane
• Abt 900 M2 Working Deck Space
• 238 Bed accommodation in existing configuration
• Comfort Class
January 17, 2016 Rev.2
Salvin Princess
General
Operator: Canega OffshoreServices
Flag: Singapore
PortofRegistry: Singapore
Delivered: June2015
LengthOA: 85.00 m
BreadthMoulded: 23.00 m
DepthMoulded: 8.00 m
Draftdesigned: 6.00 m
Draftscantling: 6.20 m
Gross Tonnage: 6464
NetTonnage: 1939
Deadweight: 4336.314
Classification: ABS +A1(E)OffshoreSupportVessel,
(FFV1, SPS), + AMS + ACCU + DPS-2
BWT CRC GP MLC-ACCOM UWILD
Machinery
MainEngines: 2X 3000HP @750rpmc/w
PTO for firepump
AzimuthPropeller& Shaft:2x3000HP inputpower,CPP type
Bow Thruster& VFD starter:2x14ton,CPP type,electricmotordriven
1x500-600kWVFD starter fortwobow
Thrusters.
Maingeneratingset: 5x715kW,440V/3P/60Hz
Emergencydiesel
generator: 1x200kW,440V/3P/60Hz
Deck Equipment
MainCrane: SWL 100T.Powerpack(Dieselengine)
4-PointMooringSystem: Drum Pull(1stLayer):40tx0-10m/min
(lowspeed),10tx0-30m/min(high
speed) Drum Capacity:1500m,
Dia.40mmwireBrake Holding:80t(static)
AnchorWindlass: 10tonat 9m/minfor50mmchain.
Capstan: 2x5ton @ 15m/min
Tugger Winch: 2x5ton @ 12m/min
Aux.DeckCrane: SWL 3t atoutreach12m
DP2: MT
HIPAP Valve: Valve type:Gate valve.Gate valveflange:
500mmGate valvecontrol:automatic,
remotelycontrolledfrom wheelhouseaft
station.HIPAP Systemoptional
Heelingmonitoringsystem
Anti-rollingsystem: 2xwaterballasttanksalsousedasanti-
rolling tank.
Incinerator: 180000Kcal/h
Tank Capacity
Freshwater: 1200m3
Fueloil: 1800m3
(incl.cargoFO lessthan1000me
)
Waterballast(incl.DW): 2500m3
Drill water: 2150m3
Foam: 10m3
Sewage Holding: 50m3
Dirty oil: 15m3
Bilge: 30m3
Workingdeckspace: Abt.900m2
,designload7.5t/m2
Freshwatermaker& UV: 2x60t/day with UV sterilizer
Sewage treatmentplant: 240persons
Safety Equipment
LifeBoat: 2x120men life boatc/wsidelaunchingDavit
FastRescue Boat: 2x6men diesel-water jet boatc/wsingleArm
davit
ExternalFire-fighting: FiFi1pumps2x1850m3/h@125mMonitors
2xx1200m3/h(oneof them isDualbarrel
water/foam)
Navigation & Communication
Navigation& communicationequipmentforGMDSS A3.Auto-pilot,Gyro-
compass, Magneticcompass,radars,echo-sounder,speedlog,Electronicchart,
2xDGPS, navigationlights
HelideckSystem: Helideckpancakemade fromAluminium
LandingnetFoam system Fireextinguisher
Fireman’sequipmentHelidecklighting system
Helideckstatuslight systemHelideckcrash
equipmentlocker
Speed
TrialSpeed: 11knots attrial condition,100%MCR, at 4m
Draftandseastatetwo (2)
Accommodation
8x1-berth cabins: 8men
9x2-berth cabins: 18men
53x4-berth cabins: 212men
Total: 238men
Details contain herein are believed to be correct but not guaranteed and subject to change without notice. Page 2
Salvin Princess
Deck Layout
Details contain herein are believed to be correct but not guaranteed and subject to change without notice. Page 3
D=22.20METERS
X3 6 X1 0
W
9L
Salvin Princess
Deck Layout
P
50 k g
C O2
22 k g
F
F
P
6KG
X2
W W
W
20m
W
20m
DIFFS
FOAM
RM
AHU
P
6KG S
X2 X2
WAITINGRM.
S
65 70 P 75 A 80 85 90 95 100 105 110 115 120
P F
6KG 9L
Spare Spare Spare
X1
L OC AT E O N T HE
PL AT F OR M DE C K
6KG
BATTERY
25
24
DN
A
5
P
6KG
S 23
HELI
DECK
STORE
P
6KG
W
W
20m
W W
20m
RE C O2
A 22 k g
22
F
F
P
50 k g
COMPASSDECK
W
20m
W
20m
W
Fire
Plan
DN W
22
M
EXHAUST
CASING
P
6KG PE X1
X2 S
CONFERENCE
ROOM
S
S
Fire
Plan
M
X2
A
TRAINING WHEELHOUSE
P
6KG
W
X2
65 70 75 80 85 90 95 100 105 110 115 120
X4
T M W
20m
W
DN
DN
S
S S
8
A A A A A
9 10 11 12 UP
OFFICE1
S
OFFICE2
S
S
X2 X2
23
M
EXHAUST
CASING
P
6KG
SPARE
(6) (2)
W
DN
Fire
Plan
W
20m
W
20m
W
NAV.BRIDGE DECK
Details contain herein are believed to be correct but not guaranteed and subject to change without notice. Page 4
A/C
TRUNK
V.
ESOLC
ESOLC
NEPO
NEPO
ESOLC
NEPO
NEPO
S S
4PAX 4PAX
4CREWS 4CREWS
X4
X4
X1 X1 X1
X1 X1 X1
FAN
4PAX 2PAX4PAXM 6KG
A.H.U.RM2
4PAX4PAX 20m X4
X4
X4 X4
LINEN TRUNK X4
X4
X2 X2
4PAX4PAX 4PAX
4PAX 2PAX
LINEN
S
FAN
Salvin Princess
Deck Layout
X1 X1 X1 X1
X4 X4 X4 X4 X4 X4 X2 X2 X2 X2 S S
S
S S S S S
X1 X1
UP
W
20m W
20
M
4CREWS
EXHAUST
CASING
S
4CREWS
S
4CREWS 2CREWS
S S
2CREWS
S
3RDENGR
S
S
2NDENGR
S
S
S
C.E.
S
PE A
6
A 16
P
6KG
S S
W
S
W
20m
S
M
PE X2
X4 7
A
X4
S S S
4PAXX4 X4 4PAX
STORE
S
P
6KG
5
S
RECR.RM(2)
S
S
S
P
CLIENT
S
S
X1
X1
65
17
A
FCS.
70 75 80 85 90
X4 X4
S S S
S
95 100
S
TRUNK S
105 6KG
110 115 120
S
DN 18
A
P
6KG
X4 X4
P
6KG
S S
UP
S S
UP DN
W
S
W
20m
S
CLIENT
S
S
X1
X1
X6
19
A
S S
21W
M
EXHAUST
CASING
S S S S S
S S
S
CAPT.
S
W
20m
UP 4CREWS S S
2CREWS
S
2CREWS
S
2NDOFF. CH.OFF.
S
S S
X4 X4 X4 X4 X2 X2 X2 X2
3rd DECK
ESOL
C
ES
OL
C
NEPO
NEPO
OPEN
OPEN
CLOSE
CLOSE
X4 X4 X4 X4 X4 X4 X4 X4 X4 X4 X4 X4 X4 X4 X4 X4
X2 X2
S S S S S S S S S
1 X5 9
W
14
W
20m
M
M
14
ROOM
P
6KG 12
EXHAUST
CASING
A
4PAX
S
4PAX
S
4PAX
S
4PAX
S
4PAX
S
4PAX
S
4PAX
S
4PAX
S
2PAX
S
16
M
P
6KG
S S S S S S S S P
6KG 14
A
M
55 60
X4 X4 X4 X4 S
P
S S S S S S S S S S
12
M
W
13
M W
11UP
S
65 70 75 80 85 90 95 S 100 105 110 115 120
P
6KG
S S S S S S S S S S
UP
S
DN DN
W
15
18
W
20m
A
SYSTEM PRES SU RE
PAY OUT
NEU TRA L
HEA VE
M
125 130
19
P S S S S S S S S P
6KG 6KG
2 X5 9
15
M
W
20m
ROOM EXHAUST
CASING S S S S S S S S S
ES
OL
C
ES
OL
C
NEPO
NEPO
OPEN
OPEN
CLOSE
CLOSE
W
15
M
P
6KG
26
13
A
A
4PAX
S
4PAX
S
4PAX
S
4PAX
S
4PAX
S
4PAX
S
4PAX
S
4PAX
S
2PAX
S 17
M
X2 X2
X4 X4 X4 X4 X4 X4 X4 X4 X4 X4 X4 X4 X4 X4 X4 X4
2nd DECK
Details contain herein are believed to be correct but not guaranteed and subject to change without notice. Page 5
Salvin Princess
Recently taken pictures
Details contain herein are believed to be correct but not guaranteed and subject to change without notice. Page 6
Salvin Princess
Recently taken pictures
Details contain herein are believed to be correct but not guaranteed and subject to change without notice. Page 7
Salvin Princess
Recently taken pictures
Details contain herein are believed to be correct but not guaranteed and subject to change without notice. Page 8
Salvin Princess
Recently taken pictures
Details contain herein are believed to be correct but not guaranteed and subject to change without notice. Page 9
Salvin Princess
For further Information, please contact:
SINGAPOROffice
Ramoo Selvam
Managing Director
Salvin princess pte Ltd
Singapore
Email:rselvam@berken.sg
AGENT
Projam Global Engineering Limited
Tell +234 8035512404
Projamglobalyahoo.com
CONSULTANT
Singapore
Tel.-+6598375907
Email: rananthalingam@gmail.com
Details contain herein are believed to be correct but not guaranteed and subject to change without notice. Page 10

More Related Content

Viewers also liked

238 men AWB DP2_2_
238 men AWB DP2_2_238 men AWB DP2_2_
238 men AWB DP2_2_
Jimmy James
 
Andalusia Antar Benua
Andalusia Antar BenuaAndalusia Antar Benua
Andalusia Antar Benua
HCI-IT
 
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
coderweb
 
Mega Maroci Lines
Mega Maroci LinesMega Maroci Lines
Mega Maroci Lines
HCI-IT
 
The true value of a multi-purpose vessel - IHC - July 2014
The true value of a multi-purpose vessel - IHC - July 2014The true value of a multi-purpose vessel - IHC - July 2014
The true value of a multi-purpose vessel - IHC - July 2014
Arnaud van Oers
 
OFFSHORE ACTIVITIES
OFFSHORE ACTIVITIESOFFSHORE ACTIVITIES
OFFSHORE ACTIVITIES
NUR FARHIYAH BASIR
 
Multi-Purpose Barge Design
Multi-Purpose Barge DesignMulti-Purpose Barge Design
Multi-Purpose Barge Design
Murat TOSUN
 
Oficinas alquiler Barcelona. Edificio David
Oficinas alquiler Barcelona. Edificio David Oficinas alquiler Barcelona. Edificio David
Oficinas alquiler Barcelona. Edificio David
Coherentia Consulting
 
Cla correo
Cla correoCla correo
Silabo bioquimica
Silabo bioquimicaSilabo bioquimica
Silabo bioquimica
dennissemayon0
 
Yo como diseñadora
Yo como diseñadoraYo como diseñadora
Yo como diseñadora
Buitrago20
 
Martin Kaltenböck - OGD Linked Open Government Data
Martin Kaltenböck - OGD Linked Open Government DataMartin Kaltenböck - OGD Linked Open Government Data
Martin Kaltenböck - OGD Linked Open Government Data
Danube University Krems, Centre for E-Governance
 
Rima ch
Rima chRima ch
Rima ch
amonlop
 
Procesos tecnológicos de el notebook
Procesos tecnológicos de el notebookProcesos tecnológicos de el notebook
Procesos tecnológicos de el notebook
NGENESIS
 
Teories étiques
Teories étiquesTeories étiques
Teories étiques
Bárbara Esteve
 
Informe de Gestión - Alcaldia - 2012/2015 - Medina - Cundinamarca
Informe de Gestión - Alcaldia - 2012/2015 - Medina - CundinamarcaInforme de Gestión - Alcaldia - 2012/2015 - Medina - Cundinamarca
Informe de Gestión - Alcaldia - 2012/2015 - Medina - Cundinamarca
Medina Digital Tic
 
234
234234
Esri Spain - ArcGIS y el ciclo integral del Agua / 2014
Esri Spain - ArcGIS y el ciclo integral del Agua / 2014Esri Spain - ArcGIS y el ciclo integral del Agua / 2014
Esri Spain - ArcGIS y el ciclo integral del Agua / 2014
Daniel Cardelús
 
La minería en el Cabezo de los Perules y San Cristóbal.
La minería en el Cabezo de los Perules y San Cristóbal.La minería en el Cabezo de los Perules y San Cristóbal.
La minería en el Cabezo de los Perules y San Cristóbal.
iesfelipesegundo
 
Geometria en estadios de futbol
Geometria en estadios de futbolGeometria en estadios de futbol
Geometria en estadios de futbol
brandon sanchez
 

Viewers also liked (20)

238 men AWB DP2_2_
238 men AWB DP2_2_238 men AWB DP2_2_
238 men AWB DP2_2_
 
Andalusia Antar Benua
Andalusia Antar BenuaAndalusia Antar Benua
Andalusia Antar Benua
 
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
 
Mega Maroci Lines
Mega Maroci LinesMega Maroci Lines
Mega Maroci Lines
 
The true value of a multi-purpose vessel - IHC - July 2014
The true value of a multi-purpose vessel - IHC - July 2014The true value of a multi-purpose vessel - IHC - July 2014
The true value of a multi-purpose vessel - IHC - July 2014
 
OFFSHORE ACTIVITIES
OFFSHORE ACTIVITIESOFFSHORE ACTIVITIES
OFFSHORE ACTIVITIES
 
Multi-Purpose Barge Design
Multi-Purpose Barge DesignMulti-Purpose Barge Design
Multi-Purpose Barge Design
 
Oficinas alquiler Barcelona. Edificio David
Oficinas alquiler Barcelona. Edificio David Oficinas alquiler Barcelona. Edificio David
Oficinas alquiler Barcelona. Edificio David
 
Cla correo
Cla correoCla correo
Cla correo
 
Silabo bioquimica
Silabo bioquimicaSilabo bioquimica
Silabo bioquimica
 
Yo como diseñadora
Yo como diseñadoraYo como diseñadora
Yo como diseñadora
 
Martin Kaltenböck - OGD Linked Open Government Data
Martin Kaltenböck - OGD Linked Open Government DataMartin Kaltenböck - OGD Linked Open Government Data
Martin Kaltenböck - OGD Linked Open Government Data
 
Rima ch
Rima chRima ch
Rima ch
 
Procesos tecnológicos de el notebook
Procesos tecnológicos de el notebookProcesos tecnológicos de el notebook
Procesos tecnológicos de el notebook
 
Teories étiques
Teories étiquesTeories étiques
Teories étiques
 
Informe de Gestión - Alcaldia - 2012/2015 - Medina - Cundinamarca
Informe de Gestión - Alcaldia - 2012/2015 - Medina - CundinamarcaInforme de Gestión - Alcaldia - 2012/2015 - Medina - Cundinamarca
Informe de Gestión - Alcaldia - 2012/2015 - Medina - Cundinamarca
 
234
234234
234
 
Esri Spain - ArcGIS y el ciclo integral del Agua / 2014
Esri Spain - ArcGIS y el ciclo integral del Agua / 2014Esri Spain - ArcGIS y el ciclo integral del Agua / 2014
Esri Spain - ArcGIS y el ciclo integral del Agua / 2014
 
La minería en el Cabezo de los Perules y San Cristóbal.
La minería en el Cabezo de los Perules y San Cristóbal.La minería en el Cabezo de los Perules y San Cristóbal.
La minería en el Cabezo de los Perules y San Cristóbal.
 
Geometria en estadios de futbol
Geometria en estadios de futbolGeometria en estadios de futbol
Geometria en estadios de futbol
 

Similar to Final Specification Of Salvin Princess DP2 Vessel 123

Havila subsea.pdf
Havila subsea.pdfHavila subsea.pdf
Havila subsea.pdf
Ann Lyubimova
 
Kurt 3800 V Brochure
Kurt 3800 V BrochureKurt 3800 V Brochure
Kurt 3800 V Brochure
Kurt Workholding
 
Modex_Catalogue_Cabins
Modex_Catalogue_CabinsModex_Catalogue_Cabins
Modex_Catalogue_Cabins
CARLO VOLLMER CERVO
 
LeanValueStreamOrg-wKanban-FeketeIstvanPic
LeanValueStreamOrg-wKanban-FeketeIstvanPicLeanValueStreamOrg-wKanban-FeketeIstvanPic
LeanValueStreamOrg-wKanban-FeketeIstvanPic
Istvan Fekete
 
960-F-101(Modified)
960-F-101(Modified)960-F-101(Modified)
960-F-101(Modified)
Mochammad Nur Cholis
 
Manual Karcher K3390 K 3390 - lista de peças de reposição part number
Manual Karcher K3390 K 3390 - lista de peças de reposição part numberManual Karcher K3390 K 3390 - lista de peças de reposição part number
Manual Karcher K3390 K 3390 - lista de peças de reposição part number
Nome Sobrenome
 
Liquidacion de Equipos
Liquidacion de EquiposLiquidacion de Equipos
Liquidacion de Equipos
hmnava
 
Fadal 104D Wiring Diagram - ITSCNC.com
Fadal 104D Wiring Diagram - ITSCNC.comFadal 104D Wiring Diagram - ITSCNC.com
Fadal 104D Wiring Diagram - ITSCNC.com
Independent Technology Service Inc
 
Masaji Prayasa Cargo
Masaji Prayasa CargoMasaji Prayasa Cargo
Masaji Prayasa Cargo
Heikal .
 
MR418-FEM-Top Slewing Tower Cranes Imperial-.pdf
MR418-FEM-Top Slewing Tower Cranes Imperial-.pdfMR418-FEM-Top Slewing Tower Cranes Imperial-.pdf
MR418-FEM-Top Slewing Tower Cranes Imperial-.pdf
Compass Equipment
 
Potain MR418-FEM-Luffing Tower crane
Potain MR418-FEM-Luffing Tower cranePotain MR418-FEM-Luffing Tower crane
Potain MR418-FEM-Luffing Tower crane
Compass Equipment
 
Covid 19 producten zo hou je de werkvloer veilig
Covid 19 producten zo hou je de werkvloer veiligCovid 19 producten zo hou je de werkvloer veilig
Covid 19 producten zo hou je de werkvloer veilig
Miranda Pas
 
Shafts
ShaftsShafts
Amaia Scapes Twin Pod Housing Plan Design
Amaia Scapes Twin Pod Housing Plan DesignAmaia Scapes Twin Pod Housing Plan Design
Amaia Scapes Twin Pod Housing Plan Design
KathleenFaithMamuad
 
1401-ROYAL-VISTAWAY-A-2.0
1401-ROYAL-VISTAWAY-A-2.01401-ROYAL-VISTAWAY-A-2.0
1401-ROYAL-VISTAWAY-A-2.0
Tessa Hewlett
 
Crane drawing swl 20/5 ton used for hoisting application in rolling mills and...
Crane drawing swl 20/5 ton used for hoisting application in rolling mills and...Crane drawing swl 20/5 ton used for hoisting application in rolling mills and...
Crane drawing swl 20/5 ton used for hoisting application in rolling mills and...
RajeshTammineni1
 
Cooling Tower Modular Design Crossflow Type
Cooling Tower Modular Design Crossflow TypeCooling Tower Modular Design Crossflow Type
Cooling Tower Modular Design Crossflow Type
BENRY APRIANTO HUTAPEA
 
4x16-open-Model.pdf3
4x16-open-Model.pdf34x16-open-Model.pdf3
4x16-open-Model.pdf3
aakash badal
 
Specification Sheet_H924 - 65.5m OSV [Harkand Harmony]
Specification Sheet_H924 - 65.5m OSV [Harkand Harmony]Specification Sheet_H924 - 65.5m OSV [Harkand Harmony]
Specification Sheet_H924 - 65.5m OSV [Harkand Harmony]
Gerald Patrick Soriano
 
Chamchamal passanger st_air conditioning system
Chamchamal passanger st_air conditioning systemChamchamal passanger st_air conditioning system
Chamchamal passanger st_air conditioning system
Attila László Nagy
 

Similar to Final Specification Of Salvin Princess DP2 Vessel 123 (20)

Havila subsea.pdf
Havila subsea.pdfHavila subsea.pdf
Havila subsea.pdf
 
Kurt 3800 V Brochure
Kurt 3800 V BrochureKurt 3800 V Brochure
Kurt 3800 V Brochure
 
Modex_Catalogue_Cabins
Modex_Catalogue_CabinsModex_Catalogue_Cabins
Modex_Catalogue_Cabins
 
LeanValueStreamOrg-wKanban-FeketeIstvanPic
LeanValueStreamOrg-wKanban-FeketeIstvanPicLeanValueStreamOrg-wKanban-FeketeIstvanPic
LeanValueStreamOrg-wKanban-FeketeIstvanPic
 
960-F-101(Modified)
960-F-101(Modified)960-F-101(Modified)
960-F-101(Modified)
 
Manual Karcher K3390 K 3390 - lista de peças de reposição part number
Manual Karcher K3390 K 3390 - lista de peças de reposição part numberManual Karcher K3390 K 3390 - lista de peças de reposição part number
Manual Karcher K3390 K 3390 - lista de peças de reposição part number
 
Liquidacion de Equipos
Liquidacion de EquiposLiquidacion de Equipos
Liquidacion de Equipos
 
Fadal 104D Wiring Diagram - ITSCNC.com
Fadal 104D Wiring Diagram - ITSCNC.comFadal 104D Wiring Diagram - ITSCNC.com
Fadal 104D Wiring Diagram - ITSCNC.com
 
Masaji Prayasa Cargo
Masaji Prayasa CargoMasaji Prayasa Cargo
Masaji Prayasa Cargo
 
MR418-FEM-Top Slewing Tower Cranes Imperial-.pdf
MR418-FEM-Top Slewing Tower Cranes Imperial-.pdfMR418-FEM-Top Slewing Tower Cranes Imperial-.pdf
MR418-FEM-Top Slewing Tower Cranes Imperial-.pdf
 
Potain MR418-FEM-Luffing Tower crane
Potain MR418-FEM-Luffing Tower cranePotain MR418-FEM-Luffing Tower crane
Potain MR418-FEM-Luffing Tower crane
 
Covid 19 producten zo hou je de werkvloer veilig
Covid 19 producten zo hou je de werkvloer veiligCovid 19 producten zo hou je de werkvloer veilig
Covid 19 producten zo hou je de werkvloer veilig
 
Shafts
ShaftsShafts
Shafts
 
Amaia Scapes Twin Pod Housing Plan Design
Amaia Scapes Twin Pod Housing Plan DesignAmaia Scapes Twin Pod Housing Plan Design
Amaia Scapes Twin Pod Housing Plan Design
 
1401-ROYAL-VISTAWAY-A-2.0
1401-ROYAL-VISTAWAY-A-2.01401-ROYAL-VISTAWAY-A-2.0
1401-ROYAL-VISTAWAY-A-2.0
 
Crane drawing swl 20/5 ton used for hoisting application in rolling mills and...
Crane drawing swl 20/5 ton used for hoisting application in rolling mills and...Crane drawing swl 20/5 ton used for hoisting application in rolling mills and...
Crane drawing swl 20/5 ton used for hoisting application in rolling mills and...
 
Cooling Tower Modular Design Crossflow Type
Cooling Tower Modular Design Crossflow TypeCooling Tower Modular Design Crossflow Type
Cooling Tower Modular Design Crossflow Type
 
4x16-open-Model.pdf3
4x16-open-Model.pdf34x16-open-Model.pdf3
4x16-open-Model.pdf3
 
Specification Sheet_H924 - 65.5m OSV [Harkand Harmony]
Specification Sheet_H924 - 65.5m OSV [Harkand Harmony]Specification Sheet_H924 - 65.5m OSV [Harkand Harmony]
Specification Sheet_H924 - 65.5m OSV [Harkand Harmony]
 
Chamchamal passanger st_air conditioning system
Chamchamal passanger st_air conditioning systemChamchamal passanger st_air conditioning system
Chamchamal passanger st_air conditioning system
 

Final Specification Of Salvin Princess DP2 Vessel 123

  • 1. Salvin Princess Offshore Support Vessel DP-2 / 4 PT / FIFI-1 Main Features • Multipurpose Offshore Support Accommodation Vessel • DP-2 • 4 Point Mooring System • FIFI-1 • 100 Ton Crane • Abt 900 M2 Working Deck Space • 238 Bed accommodation in existing configuration • Comfort Class January 17, 2016 Rev.2
  • 2. Salvin Princess General Operator: Canega OffshoreServices Flag: Singapore PortofRegistry: Singapore Delivered: June2015 LengthOA: 85.00 m BreadthMoulded: 23.00 m DepthMoulded: 8.00 m Draftdesigned: 6.00 m Draftscantling: 6.20 m Gross Tonnage: 6464 NetTonnage: 1939 Deadweight: 4336.314 Classification: ABS +A1(E)OffshoreSupportVessel, (FFV1, SPS), + AMS + ACCU + DPS-2 BWT CRC GP MLC-ACCOM UWILD Machinery MainEngines: 2X 3000HP @750rpmc/w PTO for firepump AzimuthPropeller& Shaft:2x3000HP inputpower,CPP type Bow Thruster& VFD starter:2x14ton,CPP type,electricmotordriven 1x500-600kWVFD starter fortwobow Thrusters. Maingeneratingset: 5x715kW,440V/3P/60Hz Emergencydiesel generator: 1x200kW,440V/3P/60Hz Deck Equipment MainCrane: SWL 100T.Powerpack(Dieselengine) 4-PointMooringSystem: Drum Pull(1stLayer):40tx0-10m/min (lowspeed),10tx0-30m/min(high speed) Drum Capacity:1500m, Dia.40mmwireBrake Holding:80t(static) AnchorWindlass: 10tonat 9m/minfor50mmchain. Capstan: 2x5ton @ 15m/min Tugger Winch: 2x5ton @ 12m/min Aux.DeckCrane: SWL 3t atoutreach12m DP2: MT HIPAP Valve: Valve type:Gate valve.Gate valveflange: 500mmGate valvecontrol:automatic, remotelycontrolledfrom wheelhouseaft station.HIPAP Systemoptional Heelingmonitoringsystem Anti-rollingsystem: 2xwaterballasttanksalsousedasanti- rolling tank. Incinerator: 180000Kcal/h Tank Capacity Freshwater: 1200m3 Fueloil: 1800m3 (incl.cargoFO lessthan1000me ) Waterballast(incl.DW): 2500m3 Drill water: 2150m3 Foam: 10m3 Sewage Holding: 50m3 Dirty oil: 15m3 Bilge: 30m3 Workingdeckspace: Abt.900m2 ,designload7.5t/m2 Freshwatermaker& UV: 2x60t/day with UV sterilizer Sewage treatmentplant: 240persons Safety Equipment LifeBoat: 2x120men life boatc/wsidelaunchingDavit FastRescue Boat: 2x6men diesel-water jet boatc/wsingleArm davit ExternalFire-fighting: FiFi1pumps2x1850m3/h@125mMonitors 2xx1200m3/h(oneof them isDualbarrel water/foam) Navigation & Communication Navigation& communicationequipmentforGMDSS A3.Auto-pilot,Gyro- compass, Magneticcompass,radars,echo-sounder,speedlog,Electronicchart, 2xDGPS, navigationlights HelideckSystem: Helideckpancakemade fromAluminium LandingnetFoam system Fireextinguisher Fireman’sequipmentHelidecklighting system Helideckstatuslight systemHelideckcrash equipmentlocker Speed TrialSpeed: 11knots attrial condition,100%MCR, at 4m Draftandseastatetwo (2) Accommodation 8x1-berth cabins: 8men 9x2-berth cabins: 18men 53x4-berth cabins: 212men Total: 238men Details contain herein are believed to be correct but not guaranteed and subject to change without notice. Page 2
  • 3. Salvin Princess Deck Layout Details contain herein are believed to be correct but not guaranteed and subject to change without notice. Page 3
  • 4. D=22.20METERS X3 6 X1 0 W 9L Salvin Princess Deck Layout P 50 k g C O2 22 k g F F P 6KG X2 W W W 20m W 20m DIFFS FOAM RM AHU P 6KG S X2 X2 WAITINGRM. S 65 70 P 75 A 80 85 90 95 100 105 110 115 120 P F 6KG 9L Spare Spare Spare X1 L OC AT E O N T HE PL AT F OR M DE C K 6KG BATTERY 25 24 DN A 5 P 6KG S 23 HELI DECK STORE P 6KG W W 20m W W 20m RE C O2 A 22 k g 22 F F P 50 k g COMPASSDECK W 20m W 20m W Fire Plan DN W 22 M EXHAUST CASING P 6KG PE X1 X2 S CONFERENCE ROOM S S Fire Plan M X2 A TRAINING WHEELHOUSE P 6KG W X2 65 70 75 80 85 90 95 100 105 110 115 120 X4 T M W 20m W DN DN S S S 8 A A A A A 9 10 11 12 UP OFFICE1 S OFFICE2 S S X2 X2 23 M EXHAUST CASING P 6KG SPARE (6) (2) W DN Fire Plan W 20m W 20m W NAV.BRIDGE DECK Details contain herein are believed to be correct but not guaranteed and subject to change without notice. Page 4
  • 5. A/C TRUNK V. ESOLC ESOLC NEPO NEPO ESOLC NEPO NEPO S S 4PAX 4PAX 4CREWS 4CREWS X4 X4 X1 X1 X1 X1 X1 X1 FAN 4PAX 2PAX4PAXM 6KG A.H.U.RM2 4PAX4PAX 20m X4 X4 X4 X4 LINEN TRUNK X4 X4 X2 X2 4PAX4PAX 4PAX 4PAX 2PAX LINEN S FAN Salvin Princess Deck Layout X1 X1 X1 X1 X4 X4 X4 X4 X4 X4 X2 X2 X2 X2 S S S S S S S S X1 X1 UP W 20m W 20 M 4CREWS EXHAUST CASING S 4CREWS S 4CREWS 2CREWS S S 2CREWS S 3RDENGR S S 2NDENGR S S S C.E. S PE A 6 A 16 P 6KG S S W S W 20m S M PE X2 X4 7 A X4 S S S 4PAXX4 X4 4PAX STORE S P 6KG 5 S RECR.RM(2) S S S P CLIENT S S X1 X1 65 17 A FCS. 70 75 80 85 90 X4 X4 S S S S 95 100 S TRUNK S 105 6KG 110 115 120 S DN 18 A P 6KG X4 X4 P 6KG S S UP S S UP DN W S W 20m S CLIENT S S X1 X1 X6 19 A S S 21W M EXHAUST CASING S S S S S S S S CAPT. S W 20m UP 4CREWS S S 2CREWS S 2CREWS S 2NDOFF. CH.OFF. S S S X4 X4 X4 X4 X2 X2 X2 X2 3rd DECK ESOL C ES OL C NEPO NEPO OPEN OPEN CLOSE CLOSE X4 X4 X4 X4 X4 X4 X4 X4 X4 X4 X4 X4 X4 X4 X4 X4 X2 X2 S S S S S S S S S 1 X5 9 W 14 W 20m M M 14 ROOM P 6KG 12 EXHAUST CASING A 4PAX S 4PAX S 4PAX S 4PAX S 4PAX S 4PAX S 4PAX S 4PAX S 2PAX S 16 M P 6KG S S S S S S S S P 6KG 14 A M 55 60 X4 X4 X4 X4 S P S S S S S S S S S S 12 M W 13 M W 11UP S 65 70 75 80 85 90 95 S 100 105 110 115 120 P 6KG S S S S S S S S S S UP S DN DN W 15 18 W 20m A SYSTEM PRES SU RE PAY OUT NEU TRA L HEA VE M 125 130 19 P S S S S S S S S P 6KG 6KG 2 X5 9 15 M W 20m ROOM EXHAUST CASING S S S S S S S S S ES OL C ES OL C NEPO NEPO OPEN OPEN CLOSE CLOSE W 15 M P 6KG 26 13 A A 4PAX S 4PAX S 4PAX S 4PAX S 4PAX S 4PAX S 4PAX S 4PAX S 2PAX S 17 M X2 X2 X4 X4 X4 X4 X4 X4 X4 X4 X4 X4 X4 X4 X4 X4 X4 X4 2nd DECK Details contain herein are believed to be correct but not guaranteed and subject to change without notice. Page 5
  • 6. Salvin Princess Recently taken pictures Details contain herein are believed to be correct but not guaranteed and subject to change without notice. Page 6
  • 7. Salvin Princess Recently taken pictures Details contain herein are believed to be correct but not guaranteed and subject to change without notice. Page 7
  • 8. Salvin Princess Recently taken pictures Details contain herein are believed to be correct but not guaranteed and subject to change without notice. Page 8
  • 9. Salvin Princess Recently taken pictures Details contain herein are believed to be correct but not guaranteed and subject to change without notice. Page 9
  • 10. Salvin Princess For further Information, please contact: SINGAPOROffice Ramoo Selvam Managing Director Salvin princess pte Ltd Singapore Email:rselvam@berken.sg AGENT Projam Global Engineering Limited Tell +234 8035512404 Projamglobalyahoo.com CONSULTANT Singapore Tel.-+6598375907 Email: rananthalingam@gmail.com
  • 11. Details contain herein are believed to be correct but not guaranteed and subject to change without notice. Page 10