WELCOME TO QA/QC
DEPARTMENT
EXPLANATION OF
MECHANICAL ACTIVITY
PIPE RECEIVING AND
HAULING
PRECAUTION OF DURING
AND AFTER PIPE
RECEIVING
DURING PIPE
RECEIVING!!! 1. MILL INSPECTION AND
TEST CERTIFICATE
(MTC)
2. INSPECTION AND
RELEASE CERTIFICATE
(IRC) FROM ARAMCO
or VID
3. COATING REPORTS
DOCUMENT
VERIFICATION.
INPECTION OF MATERIALS
1. MATERIAL GRADE AS PER SCOPE OF
WORK WITH MTO.
2. DIAMETER.
3. THICKNESS.
4. SPECIFICATION.
WHAT IS THE MEANING OF HEAT
NUMBER?
• Heat : The metal produced by a single cycle of a
batch melting process.
• Heat Number : An identifying number assigned
to the product of one melting in an electric arc
furnace: e.g. 1204232. Sometimes, but not
universally, the first digit indicates the furnace
number; the second digit indicates the year in
which the heat was melted. The last three (and
sometimes four or five) digits show that this
was the 04232th heat melted in No. 1 furnace
during 2012.
STORAGE, HANDLING AND
TRANSPORTATION
• The coated pipe shall be handled at all times in a manner
that prevents damage to the pipe walls, beveled ends, and to
the coating (including internal coatings, if applied).
• All equipment, including field bending machines and pipe
cradles, that contact the coated surface of the pipe shall be
padded. Slings shall be nylon or equivalent; steel cables shall
not be used.
• Coated pipes shall not be rolled or dragged on the ground.
Coated pipes shall be protected by wrapping polyethylene
strings near the pipe ends.
• During storage the coated pipes shall be placed at least 150
mm off the ground on either rock-free sand berms covered
with polyethylene sheeting or on padded skids spaced and
leveled so that the pipes are supported without damaging the
coating.
CONTINUE:
• FBE-coated pipes shall not be stacked directly
against each other at any time during storage or
transportation. They shall be separated by full
encirclement, non compressible rubber padding
or equivalent at least 10 mm thick.
• Twelve meter (12 m) joints of pipe shall have at
least 3 full encirclement separation pads. Two (2)
shall be located 1 to 3 m from each end of the pipe
and 1 in the middle.
• Twenty four meter (24 m) double-jointed pipe
lengths shall have at least 5 full encirclement
separation pads placed so that 2 of them are 1 to
3 m from the outer ends of the pipe and 3 of them
support the center section of the pipe. Placement
of the pads should be approximately equidistant
from each other.
CONTINUE:
• Truck beds and sides shall be inspected to
ensure that there are no projections (rivet
heads etc.) that may cause fretting during
transportation.
• Wooden bearing strips shall be used.
• Pipe layers must be separated by wooden
separators or by rubber sheet, at least 6 mm
in thickness or by nylon ropes having a
minimum diameter of 19 mm.
• The packing list for transportation must
include the pipe numbers, relative location
in the truck and the truck number on which
specific pipes are being transported.
STRINGING REQUIREMENTS
• Externally coated line pipe string along the right-
of-way shall be supported on rock-free sand, sand
bags, rubber tires, or similar compressible
material to prevent coating damage. (See also the
general handling requirements in Paragraph
5.1.)
• Coated pipe is handled with soft slings (nylon or
equivalent) and padded supports at all times.
• Slings for lifting pipe shall be nylon or similar
material to prevent damage to the pipe surface.
Wire rope slings shall not be used.
RECEIVING INSPECTION
• Marking on the pipe and on tags, confirmed with the
material description on the P.O. and the physical
properties of the pipe material in terms of the
following:
1. Material type / classification / grade
and class
2.Diameter
3.Thickness or Pipe schedule
( API Spec 5L. Para. 10.3 & 10.4)
CONTINUE:
• Each pipe shall be marked Saudi Aramco,
followed by the destination, Purchase
Order number/Item Number, heat
number,
• Surface of the pipe that will be coated
shall be essentially free of scabs, slivers ,
cold laps, burrs or other surface defects
that would impair the coating.
• Pipe has no OD or ID surface imperfection
that has a depth greater than 12.5% of
the the specified wall thickness.
CONTINUE:
• The pipe shall contain no dents greater than
¼ inch (6.4mm).
• Pipe has no cold-formed dents deeper than
1/8 inch (3.2mm).
• Pipe(s) free from following physical defects:
a. Cracks (all)
b. Lamination or inclusion
c. Arc Burns
d. Undercuts
e. Under fill
CONTINUE:
• Pipe that is to be joined using pipeline Automatic
Welding System is designated in the Purchase Order
as “Suitable for AUTOMATIC WELDING” shall meet
the following additional requirements:
1. Straight seam or spiral welded pipe, outside weld
reinforcement shall be ground flush with the pipe
surface for a minimum longitudinal distance of 130
mm from each end of the pipe
2. The difference in outside diameter, at the ends,
between any two lengths of the same line item shall
not exceed 1.6 mm for 75% of the pipes produced.
CONTINUE:
3. Out of Roundness at the ends shall not exceed
max or min 0.5% of the specified OD. For pipe with
D/t<75, the difference between maximum &
minimum diameters shall not exceed 6 mm.
4. On SAW pipe for automatic welding , local out
of roundness in the form of seam shall not
exceed 1.6 mm.
*Tolerance = now 1% per January 2007 Edition of
01-SAMSS-035.
NEXT WILL BE CONTINUE ABOUT
WELDING

More Related Content

What's hot

Polymer Extrusion problems & Defects
Polymer Extrusion problems & DefectsPolymer Extrusion problems & Defects
Polymer Extrusion problems & Defects
Hany G. Amer
 
Mechanical testing and carburising of the automobile parts
Mechanical testing and carburising of the automobile partsMechanical testing and carburising of the automobile parts
Mechanical testing and carburising of the automobile parts
Mihir Patel
 
Pipe gasket. RTJ, Sprial, Metal Jacketed
Pipe gasket. RTJ, Sprial, Metal JacketedPipe gasket. RTJ, Sprial, Metal Jacketed
Pipe gasket. RTJ, Sprial, Metal Jacketed
Varun Patel
 
Piston valve radial sealing-welded design-engineered valve-605n-Guichon valves
Piston valve radial sealing-welded design-engineered valve-605n-Guichon valvesPiston valve radial sealing-welded design-engineered valve-605n-Guichon valves
Piston valve radial sealing-welded design-engineered valve-605n-Guichon valves
GUICHON VALVES
 
CRAP PRESENTATION
CRAP PRESENTATIONCRAP PRESENTATION
CRAP PRESENTATION
Chandan kumar Singh
 
DU pre-insulated-tubing-series-2200
DU pre-insulated-tubing-series-2200DU pre-insulated-tubing-series-2200
DU pre-insulated-tubing-series-2200
Cam Craig
 
Greyhound Chromatography Z Pure Gas Purifiers, Filters & Traps
Greyhound Chromatography Z Pure Gas Purifiers, Filters & TrapsGreyhound Chromatography Z Pure Gas Purifiers, Filters & Traps
Greyhound Chromatography Z Pure Gas Purifiers, Filters & Traps
Greyhound Chromatography and Allied Chemicals
 
1875
18751875
CuNi hsc
CuNi hscCuNi hsc
Extrusion defects
Extrusion defectsExtrusion defects
Extrusion defects
khushbakhat nida
 
Inspection manual for piping
Inspection manual for pipingInspection manual for piping
Inspection manual for piping
Khiem Vo Duy
 
Paper
PaperPaper
Paper
ashokk906
 
Manufacturing and testing of Insulators at BHEL Jagdishpur
Manufacturing and testing of Insulators at BHEL JagdishpurManufacturing and testing of Insulators at BHEL Jagdishpur
Manufacturing and testing of Insulators at BHEL Jagdishpur
Anushreya Gupta
 
Gasket hand book 2012
Gasket hand book 2012Gasket hand book 2012
Gasket hand book 2012
Mouli Edla
 
Tornado 602 self cleaning filter datasheet
Tornado 602 self cleaning filter datasheetTornado 602 self cleaning filter datasheet
Tornado 602 self cleaning filter datasheet
a1-cbiss
 
Pipe Flange Manufacturing, Testing ,Inspection and Marking
Pipe Flange Manufacturing, Testing ,Inspection and MarkingPipe Flange Manufacturing, Testing ,Inspection and Marking
Pipe Flange Manufacturing, Testing ,Inspection and Marking
Varun Patel
 
Flame Spray Company Profile 2016
Flame Spray Company Profile 2016Flame Spray Company Profile 2016
Flame Spray Company Profile 2016
Andrea Chierichetti
 
Ap 4 presentation
Ap 4 presentationAp 4 presentation
Ap 4 presentation
Satyam Singh
 
Agricultural pipes and Fittings
Agricultural pipes and Fittings Agricultural pipes and Fittings
Agricultural pipes and Fittings
truborepipesindia
 

What's hot (19)

Polymer Extrusion problems & Defects
Polymer Extrusion problems & DefectsPolymer Extrusion problems & Defects
Polymer Extrusion problems & Defects
 
Mechanical testing and carburising of the automobile parts
Mechanical testing and carburising of the automobile partsMechanical testing and carburising of the automobile parts
Mechanical testing and carburising of the automobile parts
 
Pipe gasket. RTJ, Sprial, Metal Jacketed
Pipe gasket. RTJ, Sprial, Metal JacketedPipe gasket. RTJ, Sprial, Metal Jacketed
Pipe gasket. RTJ, Sprial, Metal Jacketed
 
Piston valve radial sealing-welded design-engineered valve-605n-Guichon valves
Piston valve radial sealing-welded design-engineered valve-605n-Guichon valvesPiston valve radial sealing-welded design-engineered valve-605n-Guichon valves
Piston valve radial sealing-welded design-engineered valve-605n-Guichon valves
 
CRAP PRESENTATION
CRAP PRESENTATIONCRAP PRESENTATION
CRAP PRESENTATION
 
DU pre-insulated-tubing-series-2200
DU pre-insulated-tubing-series-2200DU pre-insulated-tubing-series-2200
DU pre-insulated-tubing-series-2200
 
Greyhound Chromatography Z Pure Gas Purifiers, Filters & Traps
Greyhound Chromatography Z Pure Gas Purifiers, Filters & TrapsGreyhound Chromatography Z Pure Gas Purifiers, Filters & Traps
Greyhound Chromatography Z Pure Gas Purifiers, Filters & Traps
 
1875
18751875
1875
 
CuNi hsc
CuNi hscCuNi hsc
CuNi hsc
 
Extrusion defects
Extrusion defectsExtrusion defects
Extrusion defects
 
Inspection manual for piping
Inspection manual for pipingInspection manual for piping
Inspection manual for piping
 
Paper
PaperPaper
Paper
 
Manufacturing and testing of Insulators at BHEL Jagdishpur
Manufacturing and testing of Insulators at BHEL JagdishpurManufacturing and testing of Insulators at BHEL Jagdishpur
Manufacturing and testing of Insulators at BHEL Jagdishpur
 
Gasket hand book 2012
Gasket hand book 2012Gasket hand book 2012
Gasket hand book 2012
 
Tornado 602 self cleaning filter datasheet
Tornado 602 self cleaning filter datasheetTornado 602 self cleaning filter datasheet
Tornado 602 self cleaning filter datasheet
 
Pipe Flange Manufacturing, Testing ,Inspection and Marking
Pipe Flange Manufacturing, Testing ,Inspection and MarkingPipe Flange Manufacturing, Testing ,Inspection and Marking
Pipe Flange Manufacturing, Testing ,Inspection and Marking
 
Flame Spray Company Profile 2016
Flame Spray Company Profile 2016Flame Spray Company Profile 2016
Flame Spray Company Profile 2016
 
Ap 4 presentation
Ap 4 presentationAp 4 presentation
Ap 4 presentation
 
Agricultural pipes and Fittings
Agricultural pipes and Fittings Agricultural pipes and Fittings
Agricultural pipes and Fittings
 

Viewers also liked

All my achievements & duties at KNPC
All my achievements & duties at KNPCAll my achievements & duties at KNPC
All my achievements & duties at KNPC
Rimoun Kameel
 
Pipe
PipePipe
Study of pipe line system in ac
Study of pipe line system in acStudy of pipe line system in ac
Study of pipe line system in ac
Home
 
Line Pipe - steel pipe
Line Pipe - steel pipeLine Pipe - steel pipe
Line Pipe - steel pipe
kidney disease hospital
 
Alternative health therapies
Alternative health therapiesAlternative health therapies
Alternative health therapies
San Diego Continuing Education
 
Opportunities in Oil & Gas
Opportunities in Oil & GasOpportunities in Oil & Gas
Opportunities in Oil & Gas
U.S.-Saudi Arabian Business Council
 
Internal quality mgmt system audit checklist (iso 9000 2000)
Internal quality mgmt system audit checklist (iso 9000   2000)Internal quality mgmt system audit checklist (iso 9000   2000)
Internal quality mgmt system audit checklist (iso 9000 2000)
Carlos Serra
 
Pipeline hydraulic calculation
Pipeline hydraulic calculationPipeline hydraulic calculation
Pipeline hydraulic calculation
Mostafa Khosravyelhossaini, P.Eng, PhD
 
Pakistan & Iran Gas Pipeline Project
Pakistan & Iran Gas Pipeline ProjectPakistan & Iran Gas Pipeline Project
Pakistan & Iran Gas Pipeline Project
Fahad Ali
 
Oil and gas pipeline conflicts
Oil and gas pipeline conflictsOil and gas pipeline conflicts
Oil and gas pipeline conflicts
Qarib Raza
 
Sport & Weight management brochure Nov'2016- Forever Living Products
Sport & Weight management brochure Nov'2016- Forever Living ProductsSport & Weight management brochure Nov'2016- Forever Living Products
Sport & Weight management brochure Nov'2016- Forever Living Products
Mas ForeverLiving
 
Nader Al Otaibi - Managing SCC in Gas Pipelines
Nader Al Otaibi  - Managing SCC in Gas PipelinesNader Al Otaibi  - Managing SCC in Gas Pipelines
Nader Al Otaibi - Managing SCC in Gas Pipelines
Ramy Saboungui
 
23104790 pipeline-laying-proceedure
23104790 pipeline-laying-proceedure23104790 pipeline-laying-proceedure
23104790 pipeline-laying-proceedure
marina nandyal
 
pipe line inspection robot ppt
pipe line inspection robot pptpipe line inspection robot ppt
pipe line inspection robot ppt
Suchit Moon
 
Aramco inspection handbook
Aramco inspection handbookAramco inspection handbook
Aramco inspection handbook
ram111eg
 

Viewers also liked (15)

All my achievements & duties at KNPC
All my achievements & duties at KNPCAll my achievements & duties at KNPC
All my achievements & duties at KNPC
 
Pipe
PipePipe
Pipe
 
Study of pipe line system in ac
Study of pipe line system in acStudy of pipe line system in ac
Study of pipe line system in ac
 
Line Pipe - steel pipe
Line Pipe - steel pipeLine Pipe - steel pipe
Line Pipe - steel pipe
 
Alternative health therapies
Alternative health therapiesAlternative health therapies
Alternative health therapies
 
Opportunities in Oil & Gas
Opportunities in Oil & GasOpportunities in Oil & Gas
Opportunities in Oil & Gas
 
Internal quality mgmt system audit checklist (iso 9000 2000)
Internal quality mgmt system audit checklist (iso 9000   2000)Internal quality mgmt system audit checklist (iso 9000   2000)
Internal quality mgmt system audit checklist (iso 9000 2000)
 
Pipeline hydraulic calculation
Pipeline hydraulic calculationPipeline hydraulic calculation
Pipeline hydraulic calculation
 
Pakistan & Iran Gas Pipeline Project
Pakistan & Iran Gas Pipeline ProjectPakistan & Iran Gas Pipeline Project
Pakistan & Iran Gas Pipeline Project
 
Oil and gas pipeline conflicts
Oil and gas pipeline conflictsOil and gas pipeline conflicts
Oil and gas pipeline conflicts
 
Sport & Weight management brochure Nov'2016- Forever Living Products
Sport & Weight management brochure Nov'2016- Forever Living ProductsSport & Weight management brochure Nov'2016- Forever Living Products
Sport & Weight management brochure Nov'2016- Forever Living Products
 
Nader Al Otaibi - Managing SCC in Gas Pipelines
Nader Al Otaibi  - Managing SCC in Gas PipelinesNader Al Otaibi  - Managing SCC in Gas Pipelines
Nader Al Otaibi - Managing SCC in Gas Pipelines
 
23104790 pipeline-laying-proceedure
23104790 pipeline-laying-proceedure23104790 pipeline-laying-proceedure
23104790 pipeline-laying-proceedure
 
pipe line inspection robot ppt
pipe line inspection robot pptpipe line inspection robot ppt
pipe line inspection robot ppt
 
Aramco inspection handbook
Aramco inspection handbookAramco inspection handbook
Aramco inspection handbook
 

Similar to mechanical Presentation

Cswip welding inspection notes and questions
Cswip welding inspection notes and questionsCswip welding inspection notes and questions
Cswip welding inspection notes and questions
Karthik Banari
 
Twi cswip welding inspection notes and questions
Twi cswip welding inspection notes and questionsTwi cswip welding inspection notes and questions
Twi cswip welding inspection notes and questions
Thang Do Minh
 
Mandev Tubes
Mandev TubesMandev Tubes
Mandev Tubes
Mandev Tubes
 
TEK.FS.MED.004-M 1.docx
TEK.FS.MED.004-M 1.docxTEK.FS.MED.004-M 1.docx
TEK.FS.MED.004-M 1.docx
GopalaKrishnan250474
 
Cswip welding-inspection-notes-and-questions-1
Cswip welding-inspection-notes-and-questions-1Cswip welding-inspection-notes-and-questions-1
Cswip welding-inspection-notes-and-questions-1
dhiaa ebadi
 
Gaskets.pptx
Gaskets.pptxGaskets.pptx
Gaskets.pptx
AliJaved963319
 
244737957-Piping-Question-and-Answer.pdf
244737957-Piping-Question-and-Answer.pdf244737957-Piping-Question-and-Answer.pdf
244737957-Piping-Question-and-Answer.pdf
moumo1
 
Piping bv
Piping bvPiping bv
Piping bv
Lorena Barros
 
Tube-to-Tube-Sheet.ppt
Tube-to-Tube-Sheet.pptTube-to-Tube-Sheet.ppt
Tube-to-Tube-Sheet.ppt
ssuserea7ebc
 
KNPC Volume 3B.pdf
KNPC Volume 3B.pdfKNPC Volume 3B.pdf
KNPC Volume 3B.pdf
MohamedElAyoutti
 
Pipelines welding handbook_welding_techn
Pipelines welding handbook_welding_technPipelines welding handbook_welding_techn
Pipelines welding handbook_welding_techn
Ashraf Shaikh
 
API 510 Practice Exam #5 CLOSE BOOK Questions.pdf
API 510 Practice Exam #5 CLOSE BOOK Questions.pdfAPI 510 Practice Exam #5 CLOSE BOOK Questions.pdf
API 510 Practice Exam #5 CLOSE BOOK Questions.pdf
EmmanuelMatutu
 
Steam Reforming - Tube Design
Steam Reforming - Tube DesignSteam Reforming - Tube Design
Steam Reforming - Tube Design
Gerard B. Hawkins
 
ADITYA IS-4984.pptx
ADITYA IS-4984.pptxADITYA IS-4984.pptx
General Specification for Thermofoil Heater, All-Polyimide, Space Applications
General Specification for Thermofoil Heater, All-Polyimide, Space ApplicationsGeneral Specification for Thermofoil Heater, All-Polyimide, Space Applications
General Specification for Thermofoil Heater, All-Polyimide, Space Applications
Belilove Company-Engineers
 
TANK 13042023.pptx
TANK 13042023.pptxTANK 13042023.pptx
TANK 13042023.pptx
Mohamedazam39
 
HDPE LINING - TANKS (002).pptx
HDPE LINING - TANKS (002).pptxHDPE LINING - TANKS (002).pptx
HDPE LINING - TANKS (002).pptx
Ganesh725683
 
10334
1033410334
Final grouting freezing
Final grouting freezingFinal grouting freezing
Final grouting freezing
Safdar Ali
 
PDL’s Construction Development (Technical) Training Session-I_Structural.pptx
PDL’s Construction Development (Technical) Training Session-I_Structural.pptxPDL’s Construction Development (Technical) Training Session-I_Structural.pptx
PDL’s Construction Development (Technical) Training Session-I_Structural.pptx
ChristopherThomas578171
 

Similar to mechanical Presentation (20)

Cswip welding inspection notes and questions
Cswip welding inspection notes and questionsCswip welding inspection notes and questions
Cswip welding inspection notes and questions
 
Twi cswip welding inspection notes and questions
Twi cswip welding inspection notes and questionsTwi cswip welding inspection notes and questions
Twi cswip welding inspection notes and questions
 
Mandev Tubes
Mandev TubesMandev Tubes
Mandev Tubes
 
TEK.FS.MED.004-M 1.docx
TEK.FS.MED.004-M 1.docxTEK.FS.MED.004-M 1.docx
TEK.FS.MED.004-M 1.docx
 
Cswip welding-inspection-notes-and-questions-1
Cswip welding-inspection-notes-and-questions-1Cswip welding-inspection-notes-and-questions-1
Cswip welding-inspection-notes-and-questions-1
 
Gaskets.pptx
Gaskets.pptxGaskets.pptx
Gaskets.pptx
 
244737957-Piping-Question-and-Answer.pdf
244737957-Piping-Question-and-Answer.pdf244737957-Piping-Question-and-Answer.pdf
244737957-Piping-Question-and-Answer.pdf
 
Piping bv
Piping bvPiping bv
Piping bv
 
Tube-to-Tube-Sheet.ppt
Tube-to-Tube-Sheet.pptTube-to-Tube-Sheet.ppt
Tube-to-Tube-Sheet.ppt
 
KNPC Volume 3B.pdf
KNPC Volume 3B.pdfKNPC Volume 3B.pdf
KNPC Volume 3B.pdf
 
Pipelines welding handbook_welding_techn
Pipelines welding handbook_welding_technPipelines welding handbook_welding_techn
Pipelines welding handbook_welding_techn
 
API 510 Practice Exam #5 CLOSE BOOK Questions.pdf
API 510 Practice Exam #5 CLOSE BOOK Questions.pdfAPI 510 Practice Exam #5 CLOSE BOOK Questions.pdf
API 510 Practice Exam #5 CLOSE BOOK Questions.pdf
 
Steam Reforming - Tube Design
Steam Reforming - Tube DesignSteam Reforming - Tube Design
Steam Reforming - Tube Design
 
ADITYA IS-4984.pptx
ADITYA IS-4984.pptxADITYA IS-4984.pptx
ADITYA IS-4984.pptx
 
General Specification for Thermofoil Heater, All-Polyimide, Space Applications
General Specification for Thermofoil Heater, All-Polyimide, Space ApplicationsGeneral Specification for Thermofoil Heater, All-Polyimide, Space Applications
General Specification for Thermofoil Heater, All-Polyimide, Space Applications
 
TANK 13042023.pptx
TANK 13042023.pptxTANK 13042023.pptx
TANK 13042023.pptx
 
HDPE LINING - TANKS (002).pptx
HDPE LINING - TANKS (002).pptxHDPE LINING - TANKS (002).pptx
HDPE LINING - TANKS (002).pptx
 
10334
1033410334
10334
 
Final grouting freezing
Final grouting freezingFinal grouting freezing
Final grouting freezing
 
PDL’s Construction Development (Technical) Training Session-I_Structural.pptx
PDL’s Construction Development (Technical) Training Session-I_Structural.pptxPDL’s Construction Development (Technical) Training Session-I_Structural.pptx
PDL’s Construction Development (Technical) Training Session-I_Structural.pptx
 

mechanical Presentation

  • 2. PIPE RECEIVING AND HAULING PRECAUTION OF DURING AND AFTER PIPE RECEIVING
  • 3. DURING PIPE RECEIVING!!! 1. MILL INSPECTION AND TEST CERTIFICATE (MTC) 2. INSPECTION AND RELEASE CERTIFICATE (IRC) FROM ARAMCO or VID 3. COATING REPORTS DOCUMENT VERIFICATION.
  • 4. INPECTION OF MATERIALS 1. MATERIAL GRADE AS PER SCOPE OF WORK WITH MTO. 2. DIAMETER. 3. THICKNESS. 4. SPECIFICATION.
  • 5.
  • 6.
  • 7. WHAT IS THE MEANING OF HEAT NUMBER? • Heat : The metal produced by a single cycle of a batch melting process. • Heat Number : An identifying number assigned to the product of one melting in an electric arc furnace: e.g. 1204232. Sometimes, but not universally, the first digit indicates the furnace number; the second digit indicates the year in which the heat was melted. The last three (and sometimes four or five) digits show that this was the 04232th heat melted in No. 1 furnace during 2012.
  • 8. STORAGE, HANDLING AND TRANSPORTATION • The coated pipe shall be handled at all times in a manner that prevents damage to the pipe walls, beveled ends, and to the coating (including internal coatings, if applied). • All equipment, including field bending machines and pipe cradles, that contact the coated surface of the pipe shall be padded. Slings shall be nylon or equivalent; steel cables shall not be used. • Coated pipes shall not be rolled or dragged on the ground. Coated pipes shall be protected by wrapping polyethylene strings near the pipe ends. • During storage the coated pipes shall be placed at least 150 mm off the ground on either rock-free sand berms covered with polyethylene sheeting or on padded skids spaced and leveled so that the pipes are supported without damaging the coating.
  • 9. CONTINUE: • FBE-coated pipes shall not be stacked directly against each other at any time during storage or transportation. They shall be separated by full encirclement, non compressible rubber padding or equivalent at least 10 mm thick. • Twelve meter (12 m) joints of pipe shall have at least 3 full encirclement separation pads. Two (2) shall be located 1 to 3 m from each end of the pipe and 1 in the middle. • Twenty four meter (24 m) double-jointed pipe lengths shall have at least 5 full encirclement separation pads placed so that 2 of them are 1 to 3 m from the outer ends of the pipe and 3 of them support the center section of the pipe. Placement of the pads should be approximately equidistant from each other.
  • 10. CONTINUE: • Truck beds and sides shall be inspected to ensure that there are no projections (rivet heads etc.) that may cause fretting during transportation. • Wooden bearing strips shall be used. • Pipe layers must be separated by wooden separators or by rubber sheet, at least 6 mm in thickness or by nylon ropes having a minimum diameter of 19 mm. • The packing list for transportation must include the pipe numbers, relative location in the truck and the truck number on which specific pipes are being transported.
  • 11.
  • 12.
  • 13.
  • 14. STRINGING REQUIREMENTS • Externally coated line pipe string along the right- of-way shall be supported on rock-free sand, sand bags, rubber tires, or similar compressible material to prevent coating damage. (See also the general handling requirements in Paragraph 5.1.) • Coated pipe is handled with soft slings (nylon or equivalent) and padded supports at all times. • Slings for lifting pipe shall be nylon or similar material to prevent damage to the pipe surface. Wire rope slings shall not be used.
  • 15. RECEIVING INSPECTION • Marking on the pipe and on tags, confirmed with the material description on the P.O. and the physical properties of the pipe material in terms of the following: 1. Material type / classification / grade and class 2.Diameter 3.Thickness or Pipe schedule ( API Spec 5L. Para. 10.3 & 10.4)
  • 16.
  • 17. CONTINUE: • Each pipe shall be marked Saudi Aramco, followed by the destination, Purchase Order number/Item Number, heat number, • Surface of the pipe that will be coated shall be essentially free of scabs, slivers , cold laps, burrs or other surface defects that would impair the coating. • Pipe has no OD or ID surface imperfection that has a depth greater than 12.5% of the the specified wall thickness.
  • 18. CONTINUE: • The pipe shall contain no dents greater than ¼ inch (6.4mm). • Pipe has no cold-formed dents deeper than 1/8 inch (3.2mm). • Pipe(s) free from following physical defects: a. Cracks (all) b. Lamination or inclusion c. Arc Burns d. Undercuts e. Under fill
  • 19. CONTINUE: • Pipe that is to be joined using pipeline Automatic Welding System is designated in the Purchase Order as “Suitable for AUTOMATIC WELDING” shall meet the following additional requirements: 1. Straight seam or spiral welded pipe, outside weld reinforcement shall be ground flush with the pipe surface for a minimum longitudinal distance of 130 mm from each end of the pipe 2. The difference in outside diameter, at the ends, between any two lengths of the same line item shall not exceed 1.6 mm for 75% of the pipes produced.
  • 20. CONTINUE: 3. Out of Roundness at the ends shall not exceed max or min 0.5% of the specified OD. For pipe with D/t<75, the difference between maximum & minimum diameters shall not exceed 6 mm. 4. On SAW pipe for automatic welding , local out of roundness in the form of seam shall not exceed 1.6 mm. *Tolerance = now 1% per January 2007 Edition of 01-SAMSS-035.
  • 21. NEXT WILL BE CONTINUE ABOUT WELDING