Personal Information Name: Ashraf Moussa Base Country: Egypt
Qualifications: BSc. Mechanical Engineering
Languages : Arabic- English, Urdu
adamnowaa@yahoo.com
Mobile Phone Number: +201002709132 (Egypt)
Table previous job
1 Maintenance Team lead, British Petroleum with (CPECC) - Rumaila Oil Field IRAQ, 2013 up to May 2015.
2 Maintenance Mechanical supervisor, TAKREER (UAE), 2003 up to 2013.
3 Maintenance Mechanical Foreman, ADCO (UAE), 1995 up to 2003.
4 Mechanical Engineer, IMANTS Steel Construction Co. AlTawila project. 1994.
5 Mechanical Engineer, Hidelco Egypt (supervised by EVT Co (GERMANY). 1993.
AREAS OF EXPERIENCE:
1 Have hands on experience for Fabrication, Installation, Pre Commissioning & Commissioning, Construction &
Plant maintenance of Oil & Gas, Power Plant, and Refinery Construction.
2 Capable & having Potential to Manage, Control & Supervise the Fabrication Crews involving in installation of
Piping, Equipment, Structure & Heavy Gas Fired Power Plants, Cooling Towers, Cracking Furnaces & also
involved in preparation of Rigging Study for Lifting of Modules, Stacks, Ducts & Coils.
3 Capable to run the job as per required Task to the satisfaction of my immediate boss. Involved in Preparation of
Bill of Material, Bill of Quantities and Managing the Job as per Design & making all necessary arrangements for
Job.
4 Control and supervise the skilled mechanical fault finding, diagnosis and defect repair of mechanical stationary
and rotating equipment indicated by regular predictive checks, or failures of equipment reported by Operational
personnel
5 Supervise routine, predictive and preventive maintenance checks and tests on running equipment and
machinery. Includes taking correct measurements of clearance, tolerance and alignment within acceptable
limits using a wide range of precision instruments
6 Supervise new installations, modifications and testing of equipment through various stages. Runs offload and
on-stream tests to ensure proper operation. Satisfy himself of correct alignment, checks temperature readings
at each stage and hands over repaired unit to operations personnel.
7 Participates in annual shutdown or major equipment turnarounds in the Plant comply with all safety and fire
rules. And HSE regulations.
Employment History:
1-Current Position:
Company : British Petroleum with China Petroleum Engineering Construction Co (CPECC) -. Rumaila Oil Field
POSITION :Facilities, D&D Maintenance Team Lead
DURATION : December 2013 - May 2015.
Duties and Responsibilities
Schedule and prioritize routine maintenance and TAR (Turn Around = Shutdown) activities based on
operation & project’s needs (current & future).
Optimize/maximize maintenance activities and techniques to reduce TAR durations as much as it’s
practical and in line with operation needs.
Supervise/follow up TAR and project related maintenance activities as per the schedules and records.
Review and approve jobs work packs (completion dossiers) and maintenance routine check lists.
Lead site team and provide needful guidance and support for sub-ordinates on the technical issues.
Page 1 of 4
Review design packages and organize required materials, manpower, equipment and services before,
during and after work.
Identify and evaluate the training needs of site workforce.
Responsible for preparation of Permit to work (PTW)
Ensure that all TAR / Project maintenance activities will meet Procedural requirements, meet the
budget, schedule, manpower, quality, safety and environmental requirements.
Identify scope of work for site team and subcontractors.
Review and approve method statement, risk assessment and other related documents for the scope &
Activity.
Run Shutdown preparation, routine and follow up meetings
Report to Field Manager.
2-Company : Abdu Dhabi Oil Refining Company (TAKREER), Ruwais Refinery Division
POSITION : Mechanical Supervisor
DURATION : October 2003 - October 2013.
Duties and Responsibilities
 Supervise the skilled mechanical fault finding, diagnosis and defect repair of mechanical stationary
and rotating equipment indicated by regular predictive checks, or failures of equipment reported by
Operational personnel
 Assign and supervise the routine, predictive and preventive maintenance checks and tests on running
equipment and machinery. Includes taking correct measurements of clearance, tolerance and
alignment within acceptable limits using a wide range of precision instruments
 Supervise new installations, modifications and testing of equipment through various stages.
 Runs offload and on-stream tests to ensure proper operation, satisfies him of correct alignment,
checks temperature readings at each stage and hands over repaired unit to operations personnel.
 Participates in annual shutdown or major equipment turnarounds in the Plant
 Complies with all safety and fire rules and Takreer HSE regulations
 Daily contact with Maintenance/Operation staff in his assigned area and up to a manager level.
 Reports to Mechanical Engineer. Works in accordance with specific maintenance procedures and
technical standards. Work accomplishments are subject to spot-check.
List of rotating equipment handled:
 Centrifugal pumps, Boiler fed water pumps (Torishima pump, termomeccanica Italia KSP, Guinard
Energy). Ingersol Wiese.
Reciprocating pumps, Vertical and horizontal and Worthington. Rotary pumps
Centrifugal compressors, Nuovo pignone, Ingersol Rand and Hitachi.
Reciprocating Compressors, Ingersol Rand, NEUMAN & ESSER, STERLING SIHI GMBH.
Gas turbine, Alstom 13 E2 & GE frame- 5 & 6. Steam Turbine, Mitsubishi
Diesel Engine ( Cummins & Muzzy)
Desalination (MSF).
3-COMPANY : Abu Dhabi Company for Onshore Oil Operations ADCO (On Secondment)
POSITION : Mechanical Foreman
DURATION : Feb, 1995 to October 2003.
Duties and Responsibilities
 Maintenance & overhauling of rotating machines
 Supervise machinery shaft alignments jobs by reverse alignment, face & rim and computerized
alignment system.
 Supervise all the repair/lapping and disassembly assembly jobs of various types of mechanical seals
such as tandem/double and single mechanical seal.
Page 2 of 4
 Supervise the periodic maintenance/repair and troubleshooting jobs of all types of the valves
including PSV’s , PCV’s calibration & testing.
 Supervise the periodic maintenance/repair and troubleshooting jobs of Overhead cranes (KONE &
MORRIS). And Carry out The lifting tackles inspection with Emirates Safety Co.
 Supervise the planned maintenance jobs with complete awareness of plant safety regulations.
 Supervise the Planned Maintenance, Corrective Activities In Addition to Troubleshooting Prepare
the request for the Spare Parts required for the job.
List of rotating equipment handled
 frame 5 &6 gas turbine – generating units , RR Avon – GEC Generating units, Nuovo Pignone
Centrifugal Gas Compressors ,
 Multistage water injection pumps (Weir, Ingersol Rand ). Grand Foss pump
 Mobile screw compressor (atlas Copco – airman )
 Diesel generating sets (GEC – Perkins – Dorman, Lister). Diesel Engine Deutz& Petter.
4-COMPANY : IEMANTS Steel Construction Company (Abu Dhabi)
PROJECT : Al Tawila Steam Power Station and Desalination Project
POSITION : Mechanical Engineer
DURATION : Feb, 1994 to Feb, 1995
Duties and Responsibilities:
 Quality Control Section for Monitoring the Conformance of Fabricated Items With Respect To
Engineering Drawings and Welding Stander.
 Responsible For Preparing Delivery Schedule, Controlling Delivery Activities and Coordinating
Between Erection Site and Workshop.
5- COMPANY : High Dam for Electrical & Industrial Projects Co. – Egypt (Supervised by a
German Company, EVT).
POSITION : Mechanical Engineer
DURATION : Feb, 1993 to Feb, 1994
Duties and Responsibilities:
 Modification of the Aged Steam Power Stations to improve Reliability and Efficiency.
CERTIFICATIONS:
 H2S Awareness, GTSE, ADCO. March 1997
 Permit to Work, GTSC, ADCO PTW, E-Learning.
 Effective Safety Meetings, GTSC. ADCO , July 1998
 Scaffolding Estimation, Erection & Inspection, Construction Industry Training Board. (CITB). July 2000.
 3 MS (Maximo), ADCO & Maximo 6.3 & Rooximo, BP.
 PTW. Transitional Training, GTSC, September 2001
 H.D. Gas turbine MS5001 & MS6001B DLN, BBP Turbine services , May 2002
 Advanced Fire Fighting, GTSC, May 2002.
 Safe Rigging & Slinging, SMC, July 2002.
 Interpersonal & communication skills, Spearhead Training, September 2002
 Gas Testing, ADCO, September 2002
 Problem solving & decision making, Spearhead Training, Jun 2003
 New Dynamic English, ADCO, September 2003
 ICDL, TAKREER. 2010.
 Pumps, Compressors & Valves Maintenance. Takreer, Oct. 2011.
 Work safe HITRA & work safe PTW. BP March 2014.
Page 3 of 4
Page 4 of 4

Mechanical Engineer CV.1

  • 1.
    Personal Information Name:Ashraf Moussa Base Country: Egypt Qualifications: BSc. Mechanical Engineering Languages : Arabic- English, Urdu adamnowaa@yahoo.com Mobile Phone Number: +201002709132 (Egypt) Table previous job 1 Maintenance Team lead, British Petroleum with (CPECC) - Rumaila Oil Field IRAQ, 2013 up to May 2015. 2 Maintenance Mechanical supervisor, TAKREER (UAE), 2003 up to 2013. 3 Maintenance Mechanical Foreman, ADCO (UAE), 1995 up to 2003. 4 Mechanical Engineer, IMANTS Steel Construction Co. AlTawila project. 1994. 5 Mechanical Engineer, Hidelco Egypt (supervised by EVT Co (GERMANY). 1993. AREAS OF EXPERIENCE: 1 Have hands on experience for Fabrication, Installation, Pre Commissioning & Commissioning, Construction & Plant maintenance of Oil & Gas, Power Plant, and Refinery Construction. 2 Capable & having Potential to Manage, Control & Supervise the Fabrication Crews involving in installation of Piping, Equipment, Structure & Heavy Gas Fired Power Plants, Cooling Towers, Cracking Furnaces & also involved in preparation of Rigging Study for Lifting of Modules, Stacks, Ducts & Coils. 3 Capable to run the job as per required Task to the satisfaction of my immediate boss. Involved in Preparation of Bill of Material, Bill of Quantities and Managing the Job as per Design & making all necessary arrangements for Job. 4 Control and supervise the skilled mechanical fault finding, diagnosis and defect repair of mechanical stationary and rotating equipment indicated by regular predictive checks, or failures of equipment reported by Operational personnel 5 Supervise routine, predictive and preventive maintenance checks and tests on running equipment and machinery. Includes taking correct measurements of clearance, tolerance and alignment within acceptable limits using a wide range of precision instruments 6 Supervise new installations, modifications and testing of equipment through various stages. Runs offload and on-stream tests to ensure proper operation. Satisfy himself of correct alignment, checks temperature readings at each stage and hands over repaired unit to operations personnel. 7 Participates in annual shutdown or major equipment turnarounds in the Plant comply with all safety and fire rules. And HSE regulations. Employment History: 1-Current Position: Company : British Petroleum with China Petroleum Engineering Construction Co (CPECC) -. Rumaila Oil Field POSITION :Facilities, D&D Maintenance Team Lead DURATION : December 2013 - May 2015. Duties and Responsibilities Schedule and prioritize routine maintenance and TAR (Turn Around = Shutdown) activities based on operation & project’s needs (current & future). Optimize/maximize maintenance activities and techniques to reduce TAR durations as much as it’s practical and in line with operation needs. Supervise/follow up TAR and project related maintenance activities as per the schedules and records. Review and approve jobs work packs (completion dossiers) and maintenance routine check lists. Lead site team and provide needful guidance and support for sub-ordinates on the technical issues. Page 1 of 4
  • 2.
    Review design packagesand organize required materials, manpower, equipment and services before, during and after work. Identify and evaluate the training needs of site workforce. Responsible for preparation of Permit to work (PTW) Ensure that all TAR / Project maintenance activities will meet Procedural requirements, meet the budget, schedule, manpower, quality, safety and environmental requirements. Identify scope of work for site team and subcontractors. Review and approve method statement, risk assessment and other related documents for the scope & Activity. Run Shutdown preparation, routine and follow up meetings Report to Field Manager. 2-Company : Abdu Dhabi Oil Refining Company (TAKREER), Ruwais Refinery Division POSITION : Mechanical Supervisor DURATION : October 2003 - October 2013. Duties and Responsibilities  Supervise the skilled mechanical fault finding, diagnosis and defect repair of mechanical stationary and rotating equipment indicated by regular predictive checks, or failures of equipment reported by Operational personnel  Assign and supervise the routine, predictive and preventive maintenance checks and tests on running equipment and machinery. Includes taking correct measurements of clearance, tolerance and alignment within acceptable limits using a wide range of precision instruments  Supervise new installations, modifications and testing of equipment through various stages.  Runs offload and on-stream tests to ensure proper operation, satisfies him of correct alignment, checks temperature readings at each stage and hands over repaired unit to operations personnel.  Participates in annual shutdown or major equipment turnarounds in the Plant  Complies with all safety and fire rules and Takreer HSE regulations  Daily contact with Maintenance/Operation staff in his assigned area and up to a manager level.  Reports to Mechanical Engineer. Works in accordance with specific maintenance procedures and technical standards. Work accomplishments are subject to spot-check. List of rotating equipment handled:  Centrifugal pumps, Boiler fed water pumps (Torishima pump, termomeccanica Italia KSP, Guinard Energy). Ingersol Wiese. Reciprocating pumps, Vertical and horizontal and Worthington. Rotary pumps Centrifugal compressors, Nuovo pignone, Ingersol Rand and Hitachi. Reciprocating Compressors, Ingersol Rand, NEUMAN & ESSER, STERLING SIHI GMBH. Gas turbine, Alstom 13 E2 & GE frame- 5 & 6. Steam Turbine, Mitsubishi Diesel Engine ( Cummins & Muzzy) Desalination (MSF). 3-COMPANY : Abu Dhabi Company for Onshore Oil Operations ADCO (On Secondment) POSITION : Mechanical Foreman DURATION : Feb, 1995 to October 2003. Duties and Responsibilities  Maintenance & overhauling of rotating machines  Supervise machinery shaft alignments jobs by reverse alignment, face & rim and computerized alignment system.  Supervise all the repair/lapping and disassembly assembly jobs of various types of mechanical seals such as tandem/double and single mechanical seal. Page 2 of 4
  • 3.
     Supervise theperiodic maintenance/repair and troubleshooting jobs of all types of the valves including PSV’s , PCV’s calibration & testing.  Supervise the periodic maintenance/repair and troubleshooting jobs of Overhead cranes (KONE & MORRIS). And Carry out The lifting tackles inspection with Emirates Safety Co.  Supervise the planned maintenance jobs with complete awareness of plant safety regulations.  Supervise the Planned Maintenance, Corrective Activities In Addition to Troubleshooting Prepare the request for the Spare Parts required for the job. List of rotating equipment handled  frame 5 &6 gas turbine – generating units , RR Avon – GEC Generating units, Nuovo Pignone Centrifugal Gas Compressors ,  Multistage water injection pumps (Weir, Ingersol Rand ). Grand Foss pump  Mobile screw compressor (atlas Copco – airman )  Diesel generating sets (GEC – Perkins – Dorman, Lister). Diesel Engine Deutz& Petter. 4-COMPANY : IEMANTS Steel Construction Company (Abu Dhabi) PROJECT : Al Tawila Steam Power Station and Desalination Project POSITION : Mechanical Engineer DURATION : Feb, 1994 to Feb, 1995 Duties and Responsibilities:  Quality Control Section for Monitoring the Conformance of Fabricated Items With Respect To Engineering Drawings and Welding Stander.  Responsible For Preparing Delivery Schedule, Controlling Delivery Activities and Coordinating Between Erection Site and Workshop. 5- COMPANY : High Dam for Electrical & Industrial Projects Co. – Egypt (Supervised by a German Company, EVT). POSITION : Mechanical Engineer DURATION : Feb, 1993 to Feb, 1994 Duties and Responsibilities:  Modification of the Aged Steam Power Stations to improve Reliability and Efficiency. CERTIFICATIONS:  H2S Awareness, GTSE, ADCO. March 1997  Permit to Work, GTSC, ADCO PTW, E-Learning.  Effective Safety Meetings, GTSC. ADCO , July 1998  Scaffolding Estimation, Erection & Inspection, Construction Industry Training Board. (CITB). July 2000.  3 MS (Maximo), ADCO & Maximo 6.3 & Rooximo, BP.  PTW. Transitional Training, GTSC, September 2001  H.D. Gas turbine MS5001 & MS6001B DLN, BBP Turbine services , May 2002  Advanced Fire Fighting, GTSC, May 2002.  Safe Rigging & Slinging, SMC, July 2002.  Interpersonal & communication skills, Spearhead Training, September 2002  Gas Testing, ADCO, September 2002  Problem solving & decision making, Spearhead Training, Jun 2003  New Dynamic English, ADCO, September 2003  ICDL, TAKREER. 2010.  Pumps, Compressors & Valves Maintenance. Takreer, Oct. 2011.  Work safe HITRA & work safe PTW. BP March 2014. Page 3 of 4
  • 4.