This resume is for Abdalla Ahmed Abdalla Ghanem, an Egyptian national currently working as a Reliability Engineer in UAE. He has over 20 years of experience in oil and gas, including 19 years at Gasco in UAE and 11 years previously at Gulf Of Suez Petroleum Company in Egypt. His experience includes roles in reliability engineering, condition monitoring, rotating equipment maintenance, and special projects. He holds a BSc in Mechanical Engineering from Suez Canal University and various technical certifications.
00 resume of site supervisor (Pipeline & welding)Mohammad Khan
Result-oriented with a fast-learning curve and an ability to take calculated risks, defining business mission and integrating resource strengths to deliver impeccable performances aligned to overall objectives .A dynamic professional offering over 15 years in the field of Site Supervisory position for (Pipeline), Erection in Pipeline, in Oil & Gas, Refinery, Petrochemicals, & Power Plant in Saudi Arabia, U.A.E, Kuwait & India for Various Eng. Construction Projects.
00 resume of site supervisor (Pipeline & welding)Mohammad Khan
Result-oriented with a fast-learning curve and an ability to take calculated risks, defining business mission and integrating resource strengths to deliver impeccable performances aligned to overall objectives .A dynamic professional offering over 15 years in the field of Site Supervisory position for (Pipeline), Erection in Pipeline, in Oil & Gas, Refinery, Petrochemicals, & Power Plant in Saudi Arabia, U.A.E, Kuwait & India for Various Eng. Construction Projects.
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningMohamed Mustafa
Highly ambitious and self-motivated Project Management Professional with over 10 years in the Oil & Gas Industry in the fields of Project Construction & Commissioning. All experience enhanced by multi-functional business trips in United Arab Emirates, Oman, Algeria and Egypt for large scale EPC projects with Major EPC and Petroleum companies’ region.
Dear Sir,
I'm Subramanian Narayanasamy from saudi arabia working in NES Global Ltd Client SADARA PETROCHEMICAL COMPANY and I have 14 years experiences in oil & gas company Maintenances field.
MY CONTRACT END OF THIS MONTH JANUARY-31-2018 PLEASE ANY VACANCES IN OUR CONCERN
PLEASE CONSIDER MY CV .
Dear Sir/Madam,
I am Anas M. H, a Mechanical Engineer by qualification working in Cochin Shipyard Limited INDIA as Piping Engineer. I have more than 6 years of experience in Ship Building & Ship Repair.I had 3 months work Experience in DRYDOCKS WORLD DUBAI.Due to some health problems,I resigned from there..
I am looking forward to the next challenge that draws on my professional experience. Attached herewith is my resume for your kind reference. If my qualification and experience suits for any vacancy in your reputed organization, kindly arrange for a face to face or phone in interview.
Looking forward to hear from you soon in this regard.
Thanks & Best regards,
Anas M. H
Skype ID: anasmanganattu1@skype.com
INDIA:+919747265577,+919037066990
Senior Supervisor Piping & Mechanical
Piping &Pipe Line Fabrication/Erection&/ Hydro test /Mechanical Completion Pre-Commissioning
I have around17+, years ‘work experience I have done three years diploma inMechanical engineering,
I have worked as a Piping supervisor in Oil, Gas, power plant & Petro-chemical.
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningMohamed Mustafa
Highly ambitious and self-motivated Project Management Professional with over 10 years in the Oil & Gas Industry in the fields of Project Construction & Commissioning. All experience enhanced by multi-functional business trips in United Arab Emirates, Oman, Algeria and Egypt for large scale EPC projects with Major EPC and Petroleum companies’ region.
Dear Sir,
I'm Subramanian Narayanasamy from saudi arabia working in NES Global Ltd Client SADARA PETROCHEMICAL COMPANY and I have 14 years experiences in oil & gas company Maintenances field.
MY CONTRACT END OF THIS MONTH JANUARY-31-2018 PLEASE ANY VACANCES IN OUR CONCERN
PLEASE CONSIDER MY CV .
Dear Sir/Madam,
I am Anas M. H, a Mechanical Engineer by qualification working in Cochin Shipyard Limited INDIA as Piping Engineer. I have more than 6 years of experience in Ship Building & Ship Repair.I had 3 months work Experience in DRYDOCKS WORLD DUBAI.Due to some health problems,I resigned from there..
I am looking forward to the next challenge that draws on my professional experience. Attached herewith is my resume for your kind reference. If my qualification and experience suits for any vacancy in your reputed organization, kindly arrange for a face to face or phone in interview.
Looking forward to hear from you soon in this regard.
Thanks & Best regards,
Anas M. H
Skype ID: anasmanganattu1@skype.com
INDIA:+919747265577,+919037066990
Senior Supervisor Piping & Mechanical
Piping &Pipe Line Fabrication/Erection&/ Hydro test /Mechanical Completion Pre-Commissioning
I have around17+, years ‘work experience I have done three years diploma inMechanical engineering,
I have worked as a Piping supervisor in Oil, Gas, power plant & Petro-chemical.
A post graduate of petroleum Engineer (from PME) with 10 years of experience in project engineering and project management from conception to commissioning of multi-discipline EPC contracts related to chemical, refinery, oil & gas and LNG sectors including Egypt, Qatar, Abu Dhabi and Oman.
Working in Arabian Industries (AI) LLC for nearly 6 years in feasibility, detailed engineering, EPC, EMC and IMC Projects for PDO (Petroleum Development Oman) and ORPIC.
I’m a petroleum Engineer with an Excellent experience In Oil & Gas Projects and industries such as exploration ,drilling ,work over , Oil & Gas well drilling & ALS Production services and Projects in oil & Gas Energy field section ,My experience in the Drilling , Well control & wellhead equipment Inspection ,Refurbishment , Maintenance , Testing , Recertification and Installation As per API(6A , 6D , 16A , 16D, 16C & 7K ) Specification. Oil & Gas artificial lift production technology and solution. Maintenance, Installation and Overhaul of well head and well control tools and equipment; furthermore, many projects for new rigs (on shore) and offshore rig (ST-Bahari1- Jack up), Prove leadership skills involving managing, developing and motivating teams to achieve their objectives. Reliable, trustworthy and meticulous, gained a good understanding of what is required of Oil & Gas engineering.
Abdalla Ghanem CV.. rotating, reliability and mechanical engineering, and planning manager
1. Resume
Abdalla Ahmed Abdalla Ghanem مممم ممممممم مممم ممممممم
In UAE GASCO ASAB مممممم ممممم ممممم مممممممم ممممممم
In Egypt-Ismailia Hy Elsalam – مممممممممممممممم-مممممم ممم
ممممممممممم
Abo Obida Bn Elgrah St. No.38 م مممممم مم ممممم ممم مممم مممممم مممم38
(Intersection of Abo Obida st. with Damnhor st.) (مممممم م مم مممممممم م )ممممم
PERSONAL DATA ;
Name : Abdalla Ahmed Abdalla Ghanem.
KIND : MALE.
Birth Date : Sept. 5, 1971.
BIRTH PLACE : EGYPT- ISMAILIA.
NATIONALITY : EGYPTIAN.
RELIGION : MOSLEM.
SOCIAL STATUS : MARRIED
MILITARY SERVICE : EXEMPTED.
TELEPHONE NO.IN EGYPT : 002064-3362966, 0020643328992
MOBILE : 002011192704302
TELEPHONE NO. IN UAE. 00971504161083
ADDRESS : Egypt-Ismailia Hy Elsalam – Abo Obida Bn Elgrah
St. No.38 (Intersection of Abo Obida st. with Damnhor st.)
E-MAIL. : abdahgh@hotmail.com or
aghanen@gasco.ae
EDUCATION:-
UNIVERSITY : SUEZ CANAL UNIVERSITY- EGYPT.
QUALIFICATION : B.S.c OF MECHANICAL ENGINEERING
MAY 1993.
GRADE : GOOD (71.27%) & EXCELLENT IN PROJECT.
CURRENT POSITION:-
Reliability Engineer in Asab Site “ GASCO“ . UAE
18b914b9-af5e-48a9-a709-1be484f3b736-160507025306.doc - 1 -
Target career: Maintenance Management (Mechanical
Engineer, Reliability, Rotating Equipment, Condition
Monitoring and Project)
CURRENT JOB: Reliability Engineer in Asab Site “ GASCO“ . UAE
Curriculum vitae
2. Experience: more than (20) Years
3 Years in PowerStation Plus 19 Years in Oil and Gas
• More than 19 Years in Oil & Gas Field
(From Apr. 08, 2008 up to now) in Abu Dhabi Gas Industries
“Gasco“Asab & Bu Hasa Sites UAE.
Reliability engineer in Asab Site “ GASCO“ . UAE.
Reliability
• Prepare monthly operation and machinery availability and reliability report for NGL GAS PLANT
• Estimate Availability, Reliability, Used factor, TSN, TSO, MTBF AND MTTR. For all rotating equipment
• Support Operations Division in resolution of machinery related problems.
• Update and Follow up the bad actors also track the correction and preventive actions.
• Use CMMS Working with MAXIMO ver.5.2 as effective work tool in planning manpower and materials resources.
• Provide technical / reliability input to REM & PMO.
• Measure quality of failure reporting data and analysis.
• Carry out RCA analysis and monitor completion of RCA actions through ORIP.
• Participate in HAZOPs, technical reviews, risk assessment and Safety Audits. Analyze.
• Analyze and update the bad actors.
• Follow up the action tracking items
Condition monitoring
• Analyze and diagnostic vibration For All Rotary Machine in gas plant like (gas turbines ,gas compressors ,pumps, coolers
and air compressors) At Commissioning And normal operations.
• On line monitoring for critical rotating equipment by using (SYSTEM1) from Bently Nevada, 3500 &3300.
• Casing Vibration analysis for all rotating equipment using Data analyzers as SKF Microlog CMVA 65 , SKF Microlog
AX ,SKF Microlog GX and CSI 2140
• Uploading and down loading the vibration data on SKF @Ptitude Analysis Software. And RPM ware.
• Performing one and two plane field balance for low and high speed machines.
• Schedule Baroscopic inspection for all GG turbines in the plant.
• Troubleshoot plant machinery problems, conduct root cause analysis and recommend engineering solutions. Prepare
monthly digest reports for Avon, Dresser & Copper.
• Use CMMS as effective work tool in planning manpower and materials resources.
• Prepare component / equipment repair procedures.
• Liaise with Vendors / Specialists as required to improve machinery reliability.
18b914b9-af5e-48a9-a709-1be484f3b736-160507025306.doc - 2 -
3. • Identify training requirements of site workforce.
• Follow up oil analysis and consumptions reports.
• Execute LLFC (look, listen, feel and correct) predictive maintenance technique.
• Working with MAXIMO ver. 6.2
• Implemented ISO 9001-2008 Quality Management System.
• Certified Vibration analyst cat II from vibration institute (1212-6143A).
Eleven years in Gulf Of Suez Petroleum Company (GUPCO). (From Mar.
6, 1997 to Apr. 07, 2008)
Last title was Eng. Department Head of Trans Gulf Gas Plant
Special Project
o Supervise on going, piping, structural, civil, architectural works and site development Preparing Studies,
Planning & Drawings, to implement any new Projects or Modification In Gas Plant.
o Estimate and prepare materials requirements (pipes, fittings, structural/architectural )
o Prepare construction schedule prior to the completion date required by the owner. Evaluated bid quotations,
coordinated arrangement of equipment with plant layout
o Coordinate the works to sub-contractors to meet the given time table
o Control the manpower and materials usage Participate in HAZOPs, technical reviews, risk assessment and
Safety Audits.
o Prepare weekly & monthly progress report prior to the submittal of billings
o Evaluate the progress accomplishment of sub-contractors.
o Coordinated maintenance projects in gas distribution and transmission.
o Designed replacement gas systems & Familiarized with gas piping and machines standards. (API 5,6,12,610 ,
617… & ASME B31 ,16, SEC VIII …& ASTM )
Condition Monitoring
Checked, analyze and diagnostic vibration For All Rotary Machine in gas plant like (gas turbines ,gas
compressors ,pumps, coolers and air compressors) At Commissioning And normal operations.
- performing one and two plane field balance for low and high speed machines. Collecting and analyzing
vibration data from on line monitoring system of Bently Nevada 7200DP,3500 &3300.
Using Vibration Data Collectors (IRD 980 and enpac1200B) Soft wares (Entek and, Enshare) Thermograph, oil
analysis, equipment trouble shooting, root cause failure analysis, maintenance support, and the continuous
improvement of equipment health monitoring systems
Rotating Equipment
• Follow up of rotating machinery activities in the repair and maintenance of all categories of rotating machinery.
• Execute and administer plant Predictive Maintenance program.
• Use CMMS as effective work tool in planning manpower and materials resources.
18b914b9-af5e-48a9-a709-1be484f3b736-160507025306.doc - 3 -
4. Overhauling Of Rotating Equipment
• Direct supervise mechanical overhauls of gas compressors and power turbines during major shut downs of
Buhasa plant as a mechanical supervisor.(Rolls Royce, Dresser, Delaval, Elliot And Rotofllow)
Statics and Integrity
• Provides expert advice and technical support to Operations in all issues relevant to technical integrity of the
facilities and other related inspection programs.
• Holds technical custodianship of company’s inspection standards and leads/or participates in development,
implementation and maintenance of company-wide Corrosion and Inspection Managements System (CIMS).
• Directs and follow up the execution specialized protection technologies such as (cathode protection, sacrificial
anodes, coupons weight and corrosion inhibitors), inspection technologies such as (Hydraulic test, Die
penetration, UT, XRAY and thermo graphic) and systems carried out by contractor.
• Develops the inspection plans & RBI written schemes of examination, management of field
• Recommends the use of external consultants to meet specific operational requirements.
Special Project
• Supervise on going, piping, structural, civil, architectural works and site development
• Preparing Studies, Planning & Drawings, to implement any new Projects or Modification In Gas Plant.
• Estimate and prepare materials requirements (pipes, fittings, structural/architectural )
• Prepare construction schedule prior to the completion date required by the owner. Evaluated bid quotations,
coordinated arrangement of equipment with plant layout
• Coordinate the works to sub-contractors to meet the given time table
• Control the manpower and materials usage Participate in HAZOPs, technical reviews, risk assessment and
Safety Audits.
• Prepare weekly & monthly progress report prior to the submittal of billings
• Evaluate the progress accomplishment of sub-contractors.
• Coordinated maintenance projects in gas distribution and transmission.
• Designed replacement gas systems & Familiarized with gas piping and machines standards. (API 5,6,12,610 ,
617… & ASME B31 ,16, SEC VIII …& ASTM )
Three Years in PowerStation (From May. 7, 1994 to Mar. 1, 1997) In
Abou Sultan Steam Power Plant Four Units (4 * 150 MW).
• Responsible For work continuity Of [Steam Turbines, Water Tube Boilers, Feed Water
Heater, Different Types Of Pumps (Centrifugal –Axial-Reciprocating -Diaphragm) ,
Condensers ,Air Compressors And Diesel Engines.
18b914b9-af5e-48a9-a709-1be484f3b736-160507025306.doc - 4 -
5. Training Courses
1-Abroad training:
-Emonitor Odyssey condition monitoring software in USA Rockwell automation (Cincinnati,Oh)
-Certified Vibration analyst cat II from vibration institute (1212-6143A)
2-Local Technical Courses:-
- Pressure Vessel Design.
- Pipe Line Design.
- Maximo & Ms project
- Failure analysis & non destructive test
- Safety Awareness.
- Hazop.
- English course
- Introduction to Machinery Vibration and Balancing in Cairo University.
- Balance, Alignment and Vibration Analysis in American University.
- RCA (Root cause analysis) from Universal Knowledge Solution.
- H2S Awareness.
- Advanced Incident Investigation
- Total plant reliability and general maintenance.
-Gas turbine inspection and repair.
3-Computer Courses:-
Windows – Micro Soft Office - Auto Cad 2004- Ms-project.
Another Skills
Write and Speak English Very Well
Have A Driving License.
18b914b9-af5e-48a9-a709-1be484f3b736-160507025306.doc - 5 -
6. Training Courses
1-Abroad training:
-Emonitor Odyssey condition monitoring software in USA Rockwell automation (Cincinnati,Oh)
-Certified Vibration analyst cat II from vibration institute (1212-6143A)
2-Local Technical Courses:-
- Pressure Vessel Design.
- Pipe Line Design.
- Maximo & Ms project
- Failure analysis & non destructive test
- Safety Awareness.
- Hazop.
- English course
- Introduction to Machinery Vibration and Balancing in Cairo University.
- Balance, Alignment and Vibration Analysis in American University.
- RCA (Root cause analysis) from Universal Knowledge Solution.
- H2S Awareness.
- Advanced Incident Investigation
- Total plant reliability and general maintenance.
-Gas turbine inspection and repair.
3-Computer Courses:-
Windows – Micro Soft Office - Auto Cad 2004- Ms-project.
Another Skills
Write and Speak English Very Well
Have A Driving License.
18b914b9-af5e-48a9-a709-1be484f3b736-160507025306.doc - 5 -