I have had more than 12 Years experience in Oil & Gas facilities and operations within
international Group of companies as well as in joint venture companies, primarily in LNG.
I have served as Mechanical Rotating Engineer and Mechanical Maintenance Supervisor in
both operating facilities as well as Project Management teams.
I’m currently working as the Mechanical Maintenance Supervisor of an Operating LNG Plant in
Angola.
With a solid background in Mechanical Engineering and I’m experienced in Developing short
and long term maintenance procedures, developing preparation, pre-execution and
execution of maintenance activities and coordinate related Risk register, Tool Box Talk
(TBT), monitors completion of the work carried out and tracking activities with feedback.
Qualification
• Bsc in Power Mechanical – Faculty Of Engineering – Alexandria University, June
2001.
• Graduation project : Test of pipe and fittings.
• Graduation project grade : Very Good.
• Accumulated grade : Good (72.8%).
Training and Employment History
 FROM SEPTEMBER 2015 TILL NOW :
 Company : Egyptian Maintenance Company (EMC).
 Location : Angola Liquefied Natural Gas (ALNG Plant).
 Position : Senior Mechanical Maintenance Supervisor.
 Duties : Supervision and Maintenance within HSE regulations for the following
Equipment ( preventive and corrective Maintenance- Major Overhaul ):
• GT MS 6001 DLN gas turbine combustion inspection
• GT MS 7001 EA gas turbine Hot gas path inspection.
• Centrifugal Pumps (Single Stage – Multi Stage).
• Air fan coolers.
• Air blowers.
• Lean Solvent double -casing centrifugal Sulzer pump seven stages.
• SAP Program
 FROM OCTOBER 2007 TILL SEPTEMBER 2015 :
Company : Egyptian Maintenance Company (EMC)
Location : SEGAS (Spanish Egyptian Gas - LNG Plant).
Position : Senior Mechanical Rotary Maintenance Engineer.
Duties : Supervision and Maintenance within HSE regulations for the following
Equipment (preventive and corrective Maintenance- Major Overhaul ):
• GE MS5002D and HITACHI H25 gas turbine combustion inspection.
• GE MS5002D and HITACHI H25 gas turbine Hot gas path inspection.
• Centrifugal Pumps (Single Stage – Multi Stage).
• Axial Flow Pumps – Vertical Pumps.
• Air fan coolers.
• Air blowers.
• Diaphragm pump (dosing pump).
• Sea water vertically suspended, single casing diffuser with discharge through the
column ENSIVAL pump two stage.
• Fire Sea water vertically suspended, single casing diffuser with discharge through
the column SPP pump Three stages diesel engine drive.
• Propane Double-casing diffuser vertical suspended ENSIVAL pump five stage.
• Lean Solvent double -casing centrifugal POMPE GABBIONETA pump seven stages.
• Familiar with GE and HITACHI gas turbines, NUOVO PIGNONE axial and
centrifugal compressors, IHI reciprocating compressor.
• ENSIVAL, EBARA, KSB, NIKKISO, SPP, POMPE GABBIONETA.
• FLOWSERVE pumps.
• FBM HUDSON fan coolers, JOHNE CRANE mechanical seals, blowers and over
head cranes.
 FROM DECEMBER 2004 TILL OCTOBER 2007
Company : West Delta Electricity Production
Location : Abu Qir, Alexandria.
Position : Maintenance Engineer in Steam Turbine Department.
Duties : Supervision and Maintenance considering HSE regulations for mechanical
Equipment as follows:
• Steam Turbine (150 MW).
• Centrifugal Pumps (Single Stage – Multi Stage).
• Axial Flow Pumps – Vertical Pumps.
• Positive Displacement Pumps (Gear – piston).
• Overhauling for multi stag pumps (sulzer) in Abu Qir power station.
• Work in Nondestructive Test (magnetic test and penetration test ) for steam turbine
blades in abu Qir power plant and El Seyouf power plant.
• Air Compressors (Reciprocating) & Dryer.
• Heat Exchangers (Heaters – Coolers).
• All Types of Valves such as Control Valves (Hydraulic – Pneumatic – Electric), Gate
valves, Globe valves and Butterfly Valves.
• Major Overhauling for Unit 5 (Steam Turbine and generator 320 MW) in Abu Qir
power station (ALSTOM).
• Major Overhauling for Unit 2 (Steam Turbine and generator 150 MW) in Abu Qir
power station (ALSTOM).
• Major Overhauling for Unit 3 (Steam Turbine and generator 150 MW) in Abu Qir
power station (ALSTOM).
• Major Overhauling for Unit 4 (Steam Turbine and generator 150 MW) in Abu Qir
power station (ALSTOM).
 Professional alignment skills using dial gauges:
- Face and rim alignment method.
- Reverse alignment method.
- Soft foot treatment.
 Professional alignment skills using Easy Lazer .
 DETAILED DUTIES FOR MAJOR OVERHAULING:
 For Turbine
- Steam Turbine "ALSTOM" (150 MW) from
December 2006 till October 2007.
o Making Complete Dismantling for HIP Casing,
LP Casing (Inner-Outer), HIP & LP Rotors, Gland Seals, Main Stop Valves,
Control Valves, Turning Gear, Journal Bearing, Thrust Bearing, Main Lube Oil
Pump, Auxiliary & Emergency Lube Oil Pumps and Hydraulic Oil Pump.
o Changing HIP Rotor Blades and Sealing Strips.
o Check the Clearance for all Parts of Steam
Turbine.
o Making Flushing for Lub. Oil & Hydraulic Oil
Lines.
o Performing Nondestructive Test for all Parts of
Turbine (Magnetic Test – Penetration Test).
o Making Alignment for Steam Turbine and
Generator.
 For Generator
o Change oil seal and hydrogen seal.
o Inspection for journal bearings.
o Remove the rotor.
o Raise the stator to check the winding.
 FROM JULY 2004 TILL DECEMBER 2004
Company : Administration of Roads and Transport.
Location : Damnhur, El-Behera.
Position : Mechanical Maintenance Engineer.
Duties : Maintaining all mechanical equipment.
Personal Data
Marital status : Married.
Military service state : Completed.
Birth date : 27 November 1978.
Computer Skills
• Operating Systems (all versions of Ms Windows).
• Applications (Ms Office programs, AutoCAD and SAP program).
• Internet.
• SAP Program
Language
• Arabic : Mother Tongue
• English : Good written and oral
o Remove the rotor.
o Raise the stator to check the winding.
 FROM JULY 2004 TILL DECEMBER 2004
Company : Administration of Roads and Transport.
Location : Damnhur, El-Behera.
Position : Mechanical Maintenance Engineer.
Duties : Maintaining all mechanical equipment.
Personal Data
Marital status : Married.
Military service state : Completed.
Birth date : 27 November 1978.
Computer Skills
• Operating Systems (all versions of Ms Windows).
• Applications (Ms Office programs, AutoCAD and SAP program).
• Internet.
• SAP Program
Language
• Arabic : Mother Tongue
• English : Good written and oral

More Related Content

What's hot

Camless engines
Camless enginesCamless engines
Camless engines
AKHIL SL
 
khiva resume
khiva resumekhiva resume
khiva resume
JaSpReEt KhIvA
 
WaltJohnson
WaltJohnsonWaltJohnson
WaltJohnson
walt johnson
 
Resume
ResumeResume
Soil sieve analysis
Soil sieve analysisSoil sieve analysis
Soil sieve analysis
pankajjangir19
 
Automatic Pneumatic Double Bumper
Automatic Pneumatic Double BumperAutomatic Pneumatic Double Bumper
Automatic Pneumatic Double Bumper
SandeepIlangovan
 
Rotap sieve shaker
Rotap sieve shakerRotap sieve shaker
Rotap sieve shaker
Acmas Technologies Pvt. Ltd.
 
Camless Engines
Camless EnginesCamless Engines
Camless Engines
Seminar Links
 
W.O. Place (CV)
W.O. Place (CV)W.O. Place (CV)
W.O. Place (CV)
W O Place
 
Hallin Marine
Hallin MarineHallin Marine
Hallin Marine
ian_huggins
 
CV_Madhukar Kashyap
CV_Madhukar KashyapCV_Madhukar Kashyap
CV_Madhukar Kashyap
Madhukar Kashyap
 
Freevalve share
Freevalve shareFreevalve share
Freevalve share
Len Sequeira
 
Process control presentation on Final Control Element, components, types, val...
Process control presentation on Final Control Element, components, types, val...Process control presentation on Final Control Element, components, types, val...
Process control presentation on Final Control Element, components, types, val...
Hassan ElBanhawi
 
++++byanar cv
++++byanar cv++++byanar cv
++++byanar cv
Bahattin Yanar
 
MYRESUME7
MYRESUME7MYRESUME7
MYRESUME7
Mark Gianopoulos
 
Mini loader HQ908 with CE and perkins engine
Mini loader HQ908 with CE and perkins engineMini loader HQ908 with CE and perkins engine
Mini loader HQ908 with CE and perkins engine
Jacky (Loader-Haiqin Machinery)
 
STS Product Sheet Final
STS Product Sheet FinalSTS Product Sheet Final
STS Product Sheet Final
Kevin J. Lord
 
GTS Brochure
GTS BrochureGTS Brochure
GTS Brochure
John Hansen
 
Cam-Less Engines
Cam-Less EnginesCam-Less Engines
Cam-Less Engines
SandeshJogdand
 
Water pumps ppt made for susan20160711
Water pumps ppt made for susan20160711Water pumps ppt made for susan20160711
Water pumps ppt made for susan20160711
susan yao
 

What's hot (20)

Camless engines
Camless enginesCamless engines
Camless engines
 
khiva resume
khiva resumekhiva resume
khiva resume
 
WaltJohnson
WaltJohnsonWaltJohnson
WaltJohnson
 
Resume
ResumeResume
Resume
 
Soil sieve analysis
Soil sieve analysisSoil sieve analysis
Soil sieve analysis
 
Automatic Pneumatic Double Bumper
Automatic Pneumatic Double BumperAutomatic Pneumatic Double Bumper
Automatic Pneumatic Double Bumper
 
Rotap sieve shaker
Rotap sieve shakerRotap sieve shaker
Rotap sieve shaker
 
Camless Engines
Camless EnginesCamless Engines
Camless Engines
 
W.O. Place (CV)
W.O. Place (CV)W.O. Place (CV)
W.O. Place (CV)
 
Hallin Marine
Hallin MarineHallin Marine
Hallin Marine
 
CV_Madhukar Kashyap
CV_Madhukar KashyapCV_Madhukar Kashyap
CV_Madhukar Kashyap
 
Freevalve share
Freevalve shareFreevalve share
Freevalve share
 
Process control presentation on Final Control Element, components, types, val...
Process control presentation on Final Control Element, components, types, val...Process control presentation on Final Control Element, components, types, val...
Process control presentation on Final Control Element, components, types, val...
 
++++byanar cv
++++byanar cv++++byanar cv
++++byanar cv
 
MYRESUME7
MYRESUME7MYRESUME7
MYRESUME7
 
Mini loader HQ908 with CE and perkins engine
Mini loader HQ908 with CE and perkins engineMini loader HQ908 with CE and perkins engine
Mini loader HQ908 with CE and perkins engine
 
STS Product Sheet Final
STS Product Sheet FinalSTS Product Sheet Final
STS Product Sheet Final
 
GTS Brochure
GTS BrochureGTS Brochure
GTS Brochure
 
Cam-Less Engines
Cam-Less EnginesCam-Less Engines
Cam-Less Engines
 
Water pumps ppt made for susan20160711
Water pumps ppt made for susan20160711Water pumps ppt made for susan20160711
Water pumps ppt made for susan20160711
 

Viewers also liked

Antigua and Barbuda - IBC Act Cap. 222
Antigua and Barbuda - IBC Act Cap. 222Antigua and Barbuda - IBC Act Cap. 222
Antigua and Barbuda - IBC Act Cap. 222
ParaisosFiscales.net
 
cv-sammy
cv-sammycv-sammy
cv-sammy
sammy buaku
 
Cv samar
Cv samarCv samar
Cv samar
Jaafar Ismail
 
Willem Vorster CV
Willem Vorster CVWillem Vorster CV
Willem Vorster CV
Awie Vorster
 
Cv tbenjamin
Cv tbenjaminCv tbenjamin
Cv tbenjamin
BENJAMIN ADU ADDO
 
CURRICULUM VITAE ADAMA
CURRICULUM VITAE ADAMA CURRICULUM VITAE ADAMA
CURRICULUM VITAE ADAMA
Issahaku Adama
 

Viewers also liked (6)

Antigua and Barbuda - IBC Act Cap. 222
Antigua and Barbuda - IBC Act Cap. 222Antigua and Barbuda - IBC Act Cap. 222
Antigua and Barbuda - IBC Act Cap. 222
 
cv-sammy
cv-sammycv-sammy
cv-sammy
 
Cv samar
Cv samarCv samar
Cv samar
 
Willem Vorster CV
Willem Vorster CVWillem Vorster CV
Willem Vorster CV
 
Cv tbenjamin
Cv tbenjaminCv tbenjamin
Cv tbenjamin
 
CURRICULUM VITAE ADAMA
CURRICULUM VITAE ADAMA CURRICULUM VITAE ADAMA
CURRICULUM VITAE ADAMA
 

Similar to SAID SAAD ALY CV

C V of Roopesh
C V of RoopeshC V of Roopesh
C V of Roopesh
RoopeshBabu Kalapala
 
Selvan CM Technician CV
Selvan CM Technician CVSelvan CM Technician CV
Selvan CM Technician CV
kalki selvan
 
new_cv-2016
new_cv-2016new_cv-2016
new_cv-2016
Tony Thomas
 
Mechanical Technician
Mechanical TechnicianMechanical Technician
Mechanical Technician
subbu manian
 
M.reda cv
M.reda cvM.reda cv
M.reda cv
Mohammed Reda
 
M.reda cv
M.reda cvM.reda cv
M.reda cv
Mohammed Reda
 
M.Reda CV
M.Reda CVM.Reda CV
M.Reda CV
Mohammed Reda
 
Aqeel cv updated
Aqeel cv updatedAqeel cv updated
Aqeel cv updated
aqeel ahmed
 
FINAL CV
FINAL CVFINAL CV
FINAL CV
RHALF LLAMERA
 
Nasser Rabie Resume
Nasser Rabie ResumeNasser Rabie Resume
Nasser Rabie Resume
Nasser Rabie
 
Resume- N1 M Mokal New
Resume- N1 M Mokal NewResume- N1 M Mokal New
Resume- N1 M Mokal New
nitin mokal
 
New CV
New CVNew CV
New CV
Zahid Bashir
 
Sr Mechanical Technician
Sr Mechanical Technician Sr Mechanical Technician
Sr Mechanical Technician
Jawad Ali
 
Resume technician
Resume technicianResume technician
Resume technician
Raja paul
 
AJI CV
AJI CVAJI CV
AJI CV
Aji Kumar
 
new cv
new cvnew cv
new cv
Tony Thomas
 
Ahmed CV 2016
Ahmed CV 2016Ahmed CV 2016
Ahmed CV 2016
Ahmed Elhamamssy
 
Asirvatharavi Mech
Asirvatharavi MechAsirvatharavi Mech
Asirvatharavi Mech
Asirvatharavi Ravi
 
Adham_CV
Adham_CVAdham_CV
Adham_CV
Adham Makey
 
SENTHIL.BIODATA.1 - Copy
SENTHIL.BIODATA.1 - CopySENTHIL.BIODATA.1 - Copy
SENTHIL.BIODATA.1 - Copy
SENTHILKUMAR RAJENDRAN
 

Similar to SAID SAAD ALY CV (20)

C V of Roopesh
C V of RoopeshC V of Roopesh
C V of Roopesh
 
Selvan CM Technician CV
Selvan CM Technician CVSelvan CM Technician CV
Selvan CM Technician CV
 
new_cv-2016
new_cv-2016new_cv-2016
new_cv-2016
 
Mechanical Technician
Mechanical TechnicianMechanical Technician
Mechanical Technician
 
M.reda cv
M.reda cvM.reda cv
M.reda cv
 
M.reda cv
M.reda cvM.reda cv
M.reda cv
 
M.Reda CV
M.Reda CVM.Reda CV
M.Reda CV
 
Aqeel cv updated
Aqeel cv updatedAqeel cv updated
Aqeel cv updated
 
FINAL CV
FINAL CVFINAL CV
FINAL CV
 
Nasser Rabie Resume
Nasser Rabie ResumeNasser Rabie Resume
Nasser Rabie Resume
 
Resume- N1 M Mokal New
Resume- N1 M Mokal NewResume- N1 M Mokal New
Resume- N1 M Mokal New
 
New CV
New CVNew CV
New CV
 
Sr Mechanical Technician
Sr Mechanical Technician Sr Mechanical Technician
Sr Mechanical Technician
 
Resume technician
Resume technicianResume technician
Resume technician
 
AJI CV
AJI CVAJI CV
AJI CV
 
new cv
new cvnew cv
new cv
 
Ahmed CV 2016
Ahmed CV 2016Ahmed CV 2016
Ahmed CV 2016
 
Asirvatharavi Mech
Asirvatharavi MechAsirvatharavi Mech
Asirvatharavi Mech
 
Adham_CV
Adham_CVAdham_CV
Adham_CV
 
SENTHIL.BIODATA.1 - Copy
SENTHIL.BIODATA.1 - CopySENTHIL.BIODATA.1 - Copy
SENTHIL.BIODATA.1 - Copy
 

SAID SAAD ALY CV

  • 1. Said El-Sayed Saad Ali Mechanical Maintenance Engineer EL BAHER ST, IDKU, BEHERA, EGYPT Mob: +20 100 2390433 / +20 122 4204883 / +244927125682 E-mail: eng.saieed@yahoo.com Career Summary: I have had more than 12 Years experience in Oil & Gas facilities and operations within international Group of companies as well as in joint venture companies, primarily in LNG. I have served as Mechanical Rotating Engineer and Mechanical Maintenance Supervisor in both operating facilities as well as Project Management teams. I’m currently working as the Mechanical Maintenance Supervisor of an Operating LNG Plant in Angola. With a solid background in Mechanical Engineering and I’m experienced in Developing short and long term maintenance procedures, developing preparation, pre-execution and execution of maintenance activities and coordinate related Risk register, Tool Box Talk (TBT), monitors completion of the work carried out and tracking activities with feedback. Qualification • Bsc in Power Mechanical – Faculty Of Engineering – Alexandria University, June 2001. • Graduation project : Test of pipe and fittings. • Graduation project grade : Very Good. • Accumulated grade : Good (72.8%).
  • 2. Training and Employment History  FROM SEPTEMBER 2015 TILL NOW :  Company : Egyptian Maintenance Company (EMC).  Location : Angola Liquefied Natural Gas (ALNG Plant).  Position : Senior Mechanical Maintenance Supervisor.  Duties : Supervision and Maintenance within HSE regulations for the following Equipment ( preventive and corrective Maintenance- Major Overhaul ): • GT MS 6001 DLN gas turbine combustion inspection • GT MS 7001 EA gas turbine Hot gas path inspection. • Centrifugal Pumps (Single Stage – Multi Stage). • Air fan coolers. • Air blowers. • Lean Solvent double -casing centrifugal Sulzer pump seven stages. • SAP Program  FROM OCTOBER 2007 TILL SEPTEMBER 2015 : Company : Egyptian Maintenance Company (EMC) Location : SEGAS (Spanish Egyptian Gas - LNG Plant). Position : Senior Mechanical Rotary Maintenance Engineer. Duties : Supervision and Maintenance within HSE regulations for the following Equipment (preventive and corrective Maintenance- Major Overhaul ): • GE MS5002D and HITACHI H25 gas turbine combustion inspection. • GE MS5002D and HITACHI H25 gas turbine Hot gas path inspection. • Centrifugal Pumps (Single Stage – Multi Stage). • Axial Flow Pumps – Vertical Pumps. • Air fan coolers. • Air blowers. • Diaphragm pump (dosing pump). • Sea water vertically suspended, single casing diffuser with discharge through the column ENSIVAL pump two stage.
  • 3. • Fire Sea water vertically suspended, single casing diffuser with discharge through the column SPP pump Three stages diesel engine drive. • Propane Double-casing diffuser vertical suspended ENSIVAL pump five stage. • Lean Solvent double -casing centrifugal POMPE GABBIONETA pump seven stages. • Familiar with GE and HITACHI gas turbines, NUOVO PIGNONE axial and centrifugal compressors, IHI reciprocating compressor. • ENSIVAL, EBARA, KSB, NIKKISO, SPP, POMPE GABBIONETA. • FLOWSERVE pumps. • FBM HUDSON fan coolers, JOHNE CRANE mechanical seals, blowers and over head cranes.  FROM DECEMBER 2004 TILL OCTOBER 2007 Company : West Delta Electricity Production Location : Abu Qir, Alexandria. Position : Maintenance Engineer in Steam Turbine Department. Duties : Supervision and Maintenance considering HSE regulations for mechanical Equipment as follows: • Steam Turbine (150 MW). • Centrifugal Pumps (Single Stage – Multi Stage). • Axial Flow Pumps – Vertical Pumps. • Positive Displacement Pumps (Gear – piston). • Overhauling for multi stag pumps (sulzer) in Abu Qir power station. • Work in Nondestructive Test (magnetic test and penetration test ) for steam turbine blades in abu Qir power plant and El Seyouf power plant. • Air Compressors (Reciprocating) & Dryer. • Heat Exchangers (Heaters – Coolers). • All Types of Valves such as Control Valves (Hydraulic – Pneumatic – Electric), Gate valves, Globe valves and Butterfly Valves. • Major Overhauling for Unit 5 (Steam Turbine and generator 320 MW) in Abu Qir power station (ALSTOM). • Major Overhauling for Unit 2 (Steam Turbine and generator 150 MW) in Abu Qir power station (ALSTOM). • Major Overhauling for Unit 3 (Steam Turbine and generator 150 MW) in Abu Qir power station (ALSTOM).
  • 4. • Major Overhauling for Unit 4 (Steam Turbine and generator 150 MW) in Abu Qir power station (ALSTOM).  Professional alignment skills using dial gauges: - Face and rim alignment method. - Reverse alignment method. - Soft foot treatment.  Professional alignment skills using Easy Lazer .  DETAILED DUTIES FOR MAJOR OVERHAULING:  For Turbine - Steam Turbine "ALSTOM" (150 MW) from December 2006 till October 2007. o Making Complete Dismantling for HIP Casing, LP Casing (Inner-Outer), HIP & LP Rotors, Gland Seals, Main Stop Valves, Control Valves, Turning Gear, Journal Bearing, Thrust Bearing, Main Lube Oil Pump, Auxiliary & Emergency Lube Oil Pumps and Hydraulic Oil Pump. o Changing HIP Rotor Blades and Sealing Strips. o Check the Clearance for all Parts of Steam Turbine. o Making Flushing for Lub. Oil & Hydraulic Oil Lines. o Performing Nondestructive Test for all Parts of Turbine (Magnetic Test – Penetration Test). o Making Alignment for Steam Turbine and Generator.  For Generator o Change oil seal and hydrogen seal. o Inspection for journal bearings.
  • 5. o Remove the rotor. o Raise the stator to check the winding.  FROM JULY 2004 TILL DECEMBER 2004 Company : Administration of Roads and Transport. Location : Damnhur, El-Behera. Position : Mechanical Maintenance Engineer. Duties : Maintaining all mechanical equipment. Personal Data Marital status : Married. Military service state : Completed. Birth date : 27 November 1978. Computer Skills • Operating Systems (all versions of Ms Windows). • Applications (Ms Office programs, AutoCAD and SAP program). • Internet. • SAP Program Language • Arabic : Mother Tongue • English : Good written and oral
  • 6. o Remove the rotor. o Raise the stator to check the winding.  FROM JULY 2004 TILL DECEMBER 2004 Company : Administration of Roads and Transport. Location : Damnhur, El-Behera. Position : Mechanical Maintenance Engineer. Duties : Maintaining all mechanical equipment. Personal Data Marital status : Married. Military service state : Completed. Birth date : 27 November 1978. Computer Skills • Operating Systems (all versions of Ms Windows). • Applications (Ms Office programs, AutoCAD and SAP program). • Internet. • SAP Program Language • Arabic : Mother Tongue • English : Good written and oral