SlideShare a Scribd company logo
SAMIKANNU THIRUNAVUKKARASU
Mobile: +65-83550858 ,
E-Mail: sam_arasu@yahoo.com.sg
Senior level assignments in Project Management
Executive Summary
 Mechanical Engineer with over 25 years of experience in Project Management, Maintenance, Installation &
Commissioning and Operationsof Marine and Off Shore Facilities.
 Deft at planning, organizing, scheduling, staffing & control, drawing updates, making checklist amendments, budget &
inventory control, training & presentation, handling experience in Offshore / Marine Facility Equipment & Building Maintenance
such as HVAC, ACMV, Chilling Plant, Air Handling unit, FCU, High Pressure Boiler, Water Treatment, Air compressors,
Cooling Towers, Generators, Clean room utilities, Vacuum pumps, Piping, Building automation system (BAS) & Fire Safety
device, Marine & Offshore works in mechanical equipmentinstallation,especiallyin semi and jack up rigs,Pipe lay barge.
 Adept at installation and commissioning with demonstrated abilities in working on initiatives, thereby bringing down plant
breakdown & achieving annual costs savings.
 Knowledge in analysing processes, identifying improvement areas and implementing techniques for reducing rejection level,
rework and consumption ofresources.
 Exposure in identifying areas of obstruction/ breakdowns and take steps to rectify the equipment through application of
troubleshooting tools.Possess an analytical mind with the ability to think clearly.
 Possess extensive knowledge ofSugar Mill installation and running it.
Career Contour
Siemens Oil and Gas-Batam Construction Manager April’2014 Untill todate
. Fabrication and insatallation ofYamal LNG modules Grillage and Sea fastening
. Load in and load out module for transhipment
ASL Shipyard, Indonesia – Batam, (Singapore) Project Manager Jan’09 ~Oct’2014
Major work:New Build:Larsen and Toubro, Sapura Crest, JV161.53M, LTS 3000 Pipe lay / Derrick Vessel, Dredging vessel
1.AlJarraf, (DEME), Amazone, (DEME), Repair Vessels :Swiber Conquest ( Crane Barge), Atlantic London ( Conversion Oil rig to
Accommodation Rig),Swiber Victorious and WINTERMAR AHTS.
Job Description
 Prepare the variation orders / revised work orders for submitto commercial for claim ofmoney.
 Clear the punch listby the clients for their satisfaction
 Clear off the class remarks and punch listfor issuance ofthe clas s certificates in time
 Pre arrival meeting with departmentin charge/supervisors/work preparators
 Confirmation ofJob scope with the Owner representative
 Preparing detailed Schedule on the job spec
 Coordinating with movementmaster/agents for allocating and berthing ofthe vessel.
 Briefing the vessel crew regarding safe work procedures and rules of the yard and ensuring safe working practices are been
implemented & monitored.
 To ensure critical jobs has been closelymonitored and proper attention been paid.
 Conducteveryday Safety &production meeting onboard the vessel & ensuring jobs done in righttime with the sources.
 Updating the Schedules and percentage completion of the jobs to the expectation of the clients on weekly basis/to his
requirement.
 Highlighting Non Compliances on the Schedules/technical matters to the applicable members of the management and follow -
up till the remedial action has been taken.
 Monitor Contract Management (Technical) and ensure Change orders are raised and finalized in time wi th agreement with the
customer.
 Monitor preparation of Quality document Index, Collection of quality documents from respective departments and formulation
of quality documentpackage.
 Updating SummaryProjectSchedule for weekly meeting.
Britoil Offshore Services Pte Ltd.,Singapore Project Superintendent Jun’08 – Dec’08
Major work: Gulmar Pelican -98 M long pipe lay barge
 In-charge for the whole project in production and quality issues ,if there is any issues to be reporting to the PM
Keppel Fels ltd. Singapore Superintendent (Mechanical) Jul’06 – May’08
Major work:Sea drill co. - New Semi Submersible oil rig,GDI Co. - New Jack up oil rig, Jindal Co.New jack up oil rig.,
Maersk Company-Newjack up oil rig 2 projects
 Install the marine and drilling machineryas per the drawing and call the clients and class for witness.
 Handover the equipment and supporting for commissioning upon installation with client satisfaction for deliver the vessel as per
schedule.
Murata Electronics, Singapore Ltd., Singapore Pte Ltd, Singapore Associate Engineer –Facility Feb’01- Jul’06
Perambalur Sugar Mills Ltd.,Perambalur, Tamil Nadu Senior Engineer (Mechanical) Jun’97 – Jan’01
N.P.K.R.R.Co-Operative Sugar Mills, Mayiladuthurai, Tamil Nadu Senior Engineer (Mechanical) Jun’89 – Jun’97
KEY DELIVERABLES:
Project Management:
 Formulating standard operating and safe working procedures.
 Preparing drawings & vendor certified documents/installation instruction manuals for ensuring correctprocedure are followed.
 Ensuring storage and preservation procedures as stipulated by the equipment manufacture is followed until installed
machineries commissioned.
 Performing inventory control and ordering of spares ifany.
 Coordinating material/ spare parts planning related activities encompassing identification of vendors, requirement specification
and offer evaluation.
Operations & Maintenance:
 Performing the troubleshooting job order,counter measure and reportsubmitting.
 Planning and effecting preventive/ predictive/ breakdown maintenance schedules of various machineries and equipment to
increase machine up time/reliability.
 Reviewing preventive / breakdown maintenance as well as repair process checklist,plan and frequency.
 Identifying areas of obstruction/breakdowns and taking steps for rectifying equipment.
 Performing the installation and commissioning ofmachines for capacity improvements & technologyupgradation.
Quality/ Health & Safety:
 Identifying EHS at various workplaces therebyimplementing safetyparameters, controlling and following up the activities.
 Working as the coordinator for small group activity and safety.
Relationship Management:
 Liaising with contractors & Coordinating in Design Approval,Erection & Commission Projects.
 Validating the progress claims submitted bythe contractors.
 Coordinating with the vendors for effective Mechanical Completion (MC) as per the laid down procedure and as p er class
requirements.
Team Management:
 Providing on the job training to Technician,Budgeting,Spare parts ordering & Inventory control.
 Liaising with staffin case & upgrading project.
 Conducting meetings with engineering department as and when any Interference is noticed in the Mechanical Installation
drawings and resolve the issues.
Highlights:
 Actively managing a projectworth 350 Million US$.
 Proactively managed the construction of vessel (pipe lying barge) as the In-charge, and planning, scheduling and executing
the erection and installation ofall Piping Systems and Mechanical equipments and Machineries fitted on Board.
Academic Credentials
2000 MBA in Annamalai University,Tamil nadu india
1999 Boiler Operation Engineer from Governmentof TamilNadu,India (Certificate No.: 1123)
1989 PostGraduate Diploma (Plastic Engineering) from CIPET, Chennai,TamilNadu.
1987 B.E. (Mechanical Engineering) from Bharathiar University,TamilNadu,India.
Certifications
 Certificate of Competency:Second Class Boiler Attendantfrom Ministry of Manpower, Singapore
(Certificate Number:BD – 01075 – R).
 Basic Shipping Offshore Programfrom Ngee Ann Polytechnic,Singapore.
 Shipyard Safety Supervisor from Ministry of Manpower, Singapore.
Technical Skills
 ISO 9001 & 14001 Documentation & Audit.
 TPM Implementation.
 Energy Conservation.
 Hazard Identification & Risk Management.
Trainings Undergone
 Fire & Safety
 ISO 9000 & 14000
 Listening and Oral communication
 Problem solving and creativity
 Basic of Ships and Offshore Production (BSOP)
Personal Dossier
Date of Birth: 10th
June 1965
Address: BLK 577#10-570,Woodlands Dr 16,Singapore - 730577
Nationality: Singapore
Passport Number: E 2317744E (Valid till: Jan 2016)

More Related Content

What's hot

Marcel - 3 cv Rev 03
Marcel - 3 cv Rev 03Marcel - 3 cv Rev 03
Marcel - 3 cv Rev 03
Marcel Paul
 
Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)
Afaq Ahmad
 
Maintenance Manager - CV
Maintenance Manager - CVMaintenance Manager - CV
Maintenance Manager - CV
Srinivas Ch
 
CV Amine Halimi Oilfield Senior Cementing Supervisor
CV Amine Halimi Oilfield Senior Cementing SupervisorCV Amine Halimi Oilfield Senior Cementing Supervisor
CV Amine Halimi Oilfield Senior Cementing Supervisor
Amine Halimi
 
Cv mechanical supervisor
Cv mechanical supervisorCv mechanical supervisor
Cv mechanical supervisor
James Ct
 
Ariel Awayan CV updated
Ariel Awayan CV updatedAriel Awayan CV updated
Ariel Awayan CV updated
ariel awayan
 
Ummar Shaik Updted CV.DOCX
Ummar Shaik Updted CV.DOCXUmmar Shaik Updted CV.DOCX
Ummar Shaik Updted CV.DOCX
ummar shaik
 
vivek curricullum vitae
vivek curricullum vitaevivek curricullum vitae
vivek curricullum vitae
vivek deushekar
 
Marine Mechanical- Engineer 6+ years 2015
Marine Mechanical- Engineer 6+ years 2015Marine Mechanical- Engineer 6+ years 2015
Marine Mechanical- Engineer 6+ years 2015
Varun Thomas
 
Sean Thompson Resume ATS
Sean Thompson Resume ATSSean Thompson Resume ATS
Sean Thompson Resume ATS
Sean Thompson
 
Jose Joseph Bio data
Jose Joseph Bio dataJose Joseph Bio data
Jose Joseph Bio data
kalathil716
 
Maverick consulting
Maverick consulting Maverick consulting
Maverick consulting
Utpal SenGupta
 
sanjay sharan CV2015
sanjay sharan CV2015sanjay sharan CV2015
sanjay sharan CV2015
SANJAY SHARAN
 
JMK Resume 2
JMK Resume 2JMK Resume 2
JMK Resume 2
John M. Kaufman
 
Madan 0816
Madan 0816Madan 0816
Madan 0816
Madan Gupta
 
M.Saravanan - Resume
M.Saravanan - ResumeM.Saravanan - Resume
M.Saravanan - Resume
Muthusamy Saravanan
 
nsrpcv
nsrpcvnsrpcv
Project engineer C.V.
Project engineer C.V.Project engineer C.V.
Project engineer C.V.
Nikhil Thawkar
 
Offshore shift supervisor cum Offshore Construction Superintendent
Offshore shift supervisor cum Offshore Construction SuperintendentOffshore shift supervisor cum Offshore Construction Superintendent
Offshore shift supervisor cum Offshore Construction Superintendent
Muhammad MuhdKhairul
 
Lionell-Portis. resume update 10-2015
Lionell-Portis. resume update 10-2015Lionell-Portis. resume update 10-2015
Lionell-Portis. resume update 10-2015
Lionell Portis
 

What's hot (20)

Marcel - 3 cv Rev 03
Marcel - 3 cv Rev 03Marcel - 3 cv Rev 03
Marcel - 3 cv Rev 03
 
Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)
 
Maintenance Manager - CV
Maintenance Manager - CVMaintenance Manager - CV
Maintenance Manager - CV
 
CV Amine Halimi Oilfield Senior Cementing Supervisor
CV Amine Halimi Oilfield Senior Cementing SupervisorCV Amine Halimi Oilfield Senior Cementing Supervisor
CV Amine Halimi Oilfield Senior Cementing Supervisor
 
Cv mechanical supervisor
Cv mechanical supervisorCv mechanical supervisor
Cv mechanical supervisor
 
Ariel Awayan CV updated
Ariel Awayan CV updatedAriel Awayan CV updated
Ariel Awayan CV updated
 
Ummar Shaik Updted CV.DOCX
Ummar Shaik Updted CV.DOCXUmmar Shaik Updted CV.DOCX
Ummar Shaik Updted CV.DOCX
 
vivek curricullum vitae
vivek curricullum vitaevivek curricullum vitae
vivek curricullum vitae
 
Marine Mechanical- Engineer 6+ years 2015
Marine Mechanical- Engineer 6+ years 2015Marine Mechanical- Engineer 6+ years 2015
Marine Mechanical- Engineer 6+ years 2015
 
Sean Thompson Resume ATS
Sean Thompson Resume ATSSean Thompson Resume ATS
Sean Thompson Resume ATS
 
Jose Joseph Bio data
Jose Joseph Bio dataJose Joseph Bio data
Jose Joseph Bio data
 
Maverick consulting
Maverick consulting Maverick consulting
Maverick consulting
 
sanjay sharan CV2015
sanjay sharan CV2015sanjay sharan CV2015
sanjay sharan CV2015
 
JMK Resume 2
JMK Resume 2JMK Resume 2
JMK Resume 2
 
Madan 0816
Madan 0816Madan 0816
Madan 0816
 
M.Saravanan - Resume
M.Saravanan - ResumeM.Saravanan - Resume
M.Saravanan - Resume
 
nsrpcv
nsrpcvnsrpcv
nsrpcv
 
Project engineer C.V.
Project engineer C.V.Project engineer C.V.
Project engineer C.V.
 
Offshore shift supervisor cum Offshore Construction Superintendent
Offshore shift supervisor cum Offshore Construction SuperintendentOffshore shift supervisor cum Offshore Construction Superintendent
Offshore shift supervisor cum Offshore Construction Superintendent
 
Lionell-Portis. resume update 10-2015
Lionell-Portis. resume update 10-2015Lionell-Portis. resume update 10-2015
Lionell-Portis. resume update 10-2015
 

Similar to new pm resume arasu 1 (1)

RAVI CV
RAVI CVRAVI CV
Sathishkumar mechanical engineer - 2016
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016
sathish kumar
 
jayaprakash
jayaprakashjayaprakash
Marcel - 3 cv Rev 03
Marcel - 3 cv Rev 03Marcel - 3 cv Rev 03
Marcel - 3 cv Rev 03
Marcel Paul
 
adrian cv
adrian cvadrian cv
adrian cv
Adrian Andal
 
Diosdado CV (updated)(1)
Diosdado CV (updated)(1)Diosdado CV (updated)(1)
Diosdado CV (updated)(1)
Diosdado Dolocanog
 
GOBINATH SENIOR PROJECT ENGG MANAGER_
GOBINATH SENIOR PROJECT ENGG MANAGER_GOBINATH SENIOR PROJECT ENGG MANAGER_
GOBINATH SENIOR PROJECT ENGG MANAGER_
gobinath gobinath
 
Resume
ResumeResume
Mohamed Abu El enin CV-CM
Mohamed Abu El enin CV-CMMohamed Abu El enin CV-CM
Mohamed Abu El enin CV-CM
mohamed abuelenin
 
MADHU CV
MADHU CVMADHU CV
MADHU CV
Madhu Sridharan
 
Mari cv - office
Mari cv - officeMari cv - office
Mari cv - office
vilwanathan maripitchai
 
CV_RBMerida
CV_RBMeridaCV_RBMerida
CV_RBMerida
Rodel Merida
 
RESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISORRESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISOR
NOORUDDIN SHAIKH
 
Kamal resume
Kamal resumeKamal resume
Kamal resume
kamal wadhwa
 
Resume avinash 142015
Resume avinash 142015Resume avinash 142015
Resume avinash 142015
Avinash Bigbags
 
Scott hammond planning scheduling #2
Scott hammond planning scheduling   #2Scott hammond planning scheduling   #2
Scott hammond planning scheduling #2
Scott Hammond
 
Scott Hammond Planning Scheduling - #2
Scott Hammond Planning Scheduling - #2Scott Hammond Planning Scheduling - #2
Scott Hammond Planning Scheduling - #2
Scott Hammond
 
MADHU CV
MADHU CVMADHU CV
MADHU CV
Madhu Sridharan
 
my cv
my cvmy cv
Murukesh_resume_(_Supervisor_strl_) (1)
Murukesh_resume_(_Supervisor_strl_) (1)Murukesh_resume_(_Supervisor_strl_) (1)
Murukesh_resume_(_Supervisor_strl_) (1)
Janardhanan Murukesh
 

Similar to new pm resume arasu 1 (1) (20)

RAVI CV
RAVI CVRAVI CV
RAVI CV
 
Sathishkumar mechanical engineer - 2016
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016
 
jayaprakash
jayaprakashjayaprakash
jayaprakash
 
Marcel - 3 cv Rev 03
Marcel - 3 cv Rev 03Marcel - 3 cv Rev 03
Marcel - 3 cv Rev 03
 
adrian cv
adrian cvadrian cv
adrian cv
 
Diosdado CV (updated)(1)
Diosdado CV (updated)(1)Diosdado CV (updated)(1)
Diosdado CV (updated)(1)
 
GOBINATH SENIOR PROJECT ENGG MANAGER_
GOBINATH SENIOR PROJECT ENGG MANAGER_GOBINATH SENIOR PROJECT ENGG MANAGER_
GOBINATH SENIOR PROJECT ENGG MANAGER_
 
Resume
ResumeResume
Resume
 
Mohamed Abu El enin CV-CM
Mohamed Abu El enin CV-CMMohamed Abu El enin CV-CM
Mohamed Abu El enin CV-CM
 
MADHU CV
MADHU CVMADHU CV
MADHU CV
 
Mari cv - office
Mari cv - officeMari cv - office
Mari cv - office
 
CV_RBMerida
CV_RBMeridaCV_RBMerida
CV_RBMerida
 
RESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISORRESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISOR
 
Kamal resume
Kamal resumeKamal resume
Kamal resume
 
Resume avinash 142015
Resume avinash 142015Resume avinash 142015
Resume avinash 142015
 
Scott hammond planning scheduling #2
Scott hammond planning scheduling   #2Scott hammond planning scheduling   #2
Scott hammond planning scheduling #2
 
Scott Hammond Planning Scheduling - #2
Scott Hammond Planning Scheduling - #2Scott Hammond Planning Scheduling - #2
Scott Hammond Planning Scheduling - #2
 
MADHU CV
MADHU CVMADHU CV
MADHU CV
 
my cv
my cvmy cv
my cv
 
Murukesh_resume_(_Supervisor_strl_) (1)
Murukesh_resume_(_Supervisor_strl_) (1)Murukesh_resume_(_Supervisor_strl_) (1)
Murukesh_resume_(_Supervisor_strl_) (1)
 

new pm resume arasu 1 (1)

  • 1. SAMIKANNU THIRUNAVUKKARASU Mobile: +65-83550858 , E-Mail: sam_arasu@yahoo.com.sg Senior level assignments in Project Management Executive Summary  Mechanical Engineer with over 25 years of experience in Project Management, Maintenance, Installation & Commissioning and Operationsof Marine and Off Shore Facilities.  Deft at planning, organizing, scheduling, staffing & control, drawing updates, making checklist amendments, budget & inventory control, training & presentation, handling experience in Offshore / Marine Facility Equipment & Building Maintenance such as HVAC, ACMV, Chilling Plant, Air Handling unit, FCU, High Pressure Boiler, Water Treatment, Air compressors, Cooling Towers, Generators, Clean room utilities, Vacuum pumps, Piping, Building automation system (BAS) & Fire Safety device, Marine & Offshore works in mechanical equipmentinstallation,especiallyin semi and jack up rigs,Pipe lay barge.  Adept at installation and commissioning with demonstrated abilities in working on initiatives, thereby bringing down plant breakdown & achieving annual costs savings.  Knowledge in analysing processes, identifying improvement areas and implementing techniques for reducing rejection level, rework and consumption ofresources.  Exposure in identifying areas of obstruction/ breakdowns and take steps to rectify the equipment through application of troubleshooting tools.Possess an analytical mind with the ability to think clearly.  Possess extensive knowledge ofSugar Mill installation and running it. Career Contour Siemens Oil and Gas-Batam Construction Manager April’2014 Untill todate . Fabrication and insatallation ofYamal LNG modules Grillage and Sea fastening . Load in and load out module for transhipment ASL Shipyard, Indonesia – Batam, (Singapore) Project Manager Jan’09 ~Oct’2014 Major work:New Build:Larsen and Toubro, Sapura Crest, JV161.53M, LTS 3000 Pipe lay / Derrick Vessel, Dredging vessel 1.AlJarraf, (DEME), Amazone, (DEME), Repair Vessels :Swiber Conquest ( Crane Barge), Atlantic London ( Conversion Oil rig to Accommodation Rig),Swiber Victorious and WINTERMAR AHTS. Job Description  Prepare the variation orders / revised work orders for submitto commercial for claim ofmoney.  Clear the punch listby the clients for their satisfaction  Clear off the class remarks and punch listfor issuance ofthe clas s certificates in time  Pre arrival meeting with departmentin charge/supervisors/work preparators  Confirmation ofJob scope with the Owner representative  Preparing detailed Schedule on the job spec  Coordinating with movementmaster/agents for allocating and berthing ofthe vessel.  Briefing the vessel crew regarding safe work procedures and rules of the yard and ensuring safe working practices are been implemented & monitored.  To ensure critical jobs has been closelymonitored and proper attention been paid.  Conducteveryday Safety &production meeting onboard the vessel & ensuring jobs done in righttime with the sources.  Updating the Schedules and percentage completion of the jobs to the expectation of the clients on weekly basis/to his requirement.  Highlighting Non Compliances on the Schedules/technical matters to the applicable members of the management and follow - up till the remedial action has been taken.  Monitor Contract Management (Technical) and ensure Change orders are raised and finalized in time wi th agreement with the customer.  Monitor preparation of Quality document Index, Collection of quality documents from respective departments and formulation of quality documentpackage.  Updating SummaryProjectSchedule for weekly meeting. Britoil Offshore Services Pte Ltd.,Singapore Project Superintendent Jun’08 – Dec’08 Major work: Gulmar Pelican -98 M long pipe lay barge  In-charge for the whole project in production and quality issues ,if there is any issues to be reporting to the PM Keppel Fels ltd. Singapore Superintendent (Mechanical) Jul’06 – May’08
  • 2. Major work:Sea drill co. - New Semi Submersible oil rig,GDI Co. - New Jack up oil rig, Jindal Co.New jack up oil rig., Maersk Company-Newjack up oil rig 2 projects  Install the marine and drilling machineryas per the drawing and call the clients and class for witness.  Handover the equipment and supporting for commissioning upon installation with client satisfaction for deliver the vessel as per schedule. Murata Electronics, Singapore Ltd., Singapore Pte Ltd, Singapore Associate Engineer –Facility Feb’01- Jul’06 Perambalur Sugar Mills Ltd.,Perambalur, Tamil Nadu Senior Engineer (Mechanical) Jun’97 – Jan’01 N.P.K.R.R.Co-Operative Sugar Mills, Mayiladuthurai, Tamil Nadu Senior Engineer (Mechanical) Jun’89 – Jun’97 KEY DELIVERABLES: Project Management:  Formulating standard operating and safe working procedures.  Preparing drawings & vendor certified documents/installation instruction manuals for ensuring correctprocedure are followed.  Ensuring storage and preservation procedures as stipulated by the equipment manufacture is followed until installed machineries commissioned.  Performing inventory control and ordering of spares ifany.  Coordinating material/ spare parts planning related activities encompassing identification of vendors, requirement specification and offer evaluation. Operations & Maintenance:  Performing the troubleshooting job order,counter measure and reportsubmitting.  Planning and effecting preventive/ predictive/ breakdown maintenance schedules of various machineries and equipment to increase machine up time/reliability.  Reviewing preventive / breakdown maintenance as well as repair process checklist,plan and frequency.  Identifying areas of obstruction/breakdowns and taking steps for rectifying equipment.  Performing the installation and commissioning ofmachines for capacity improvements & technologyupgradation. Quality/ Health & Safety:  Identifying EHS at various workplaces therebyimplementing safetyparameters, controlling and following up the activities.  Working as the coordinator for small group activity and safety. Relationship Management:  Liaising with contractors & Coordinating in Design Approval,Erection & Commission Projects.  Validating the progress claims submitted bythe contractors.  Coordinating with the vendors for effective Mechanical Completion (MC) as per the laid down procedure and as p er class requirements. Team Management:  Providing on the job training to Technician,Budgeting,Spare parts ordering & Inventory control.  Liaising with staffin case & upgrading project.  Conducting meetings with engineering department as and when any Interference is noticed in the Mechanical Installation drawings and resolve the issues. Highlights:  Actively managing a projectworth 350 Million US$.  Proactively managed the construction of vessel (pipe lying barge) as the In-charge, and planning, scheduling and executing the erection and installation ofall Piping Systems and Mechanical equipments and Machineries fitted on Board. Academic Credentials 2000 MBA in Annamalai University,Tamil nadu india 1999 Boiler Operation Engineer from Governmentof TamilNadu,India (Certificate No.: 1123) 1989 PostGraduate Diploma (Plastic Engineering) from CIPET, Chennai,TamilNadu. 1987 B.E. (Mechanical Engineering) from Bharathiar University,TamilNadu,India. Certifications  Certificate of Competency:Second Class Boiler Attendantfrom Ministry of Manpower, Singapore (Certificate Number:BD – 01075 – R).  Basic Shipping Offshore Programfrom Ngee Ann Polytechnic,Singapore.  Shipyard Safety Supervisor from Ministry of Manpower, Singapore.
  • 3. Technical Skills  ISO 9001 & 14001 Documentation & Audit.  TPM Implementation.  Energy Conservation.  Hazard Identification & Risk Management. Trainings Undergone  Fire & Safety  ISO 9000 & 14000  Listening and Oral communication  Problem solving and creativity  Basic of Ships and Offshore Production (BSOP) Personal Dossier Date of Birth: 10th June 1965 Address: BLK 577#10-570,Woodlands Dr 16,Singapore - 730577 Nationality: Singapore Passport Number: E 2317744E (Valid till: Jan 2016)