1
Mohammed Ahmed Mohammed Moustafa
Eng.m.maka@gmail.com
+20128 99 33 781 - +201098495824
40 maka St, EL Zhour St, EL Hadra EL Gadida,Sedi Gaber, Alexandria, Egypt.
PERSONAL STATEMENT
I’m looking to develop my expertise in new concept development, simulation and validation within a forward
thinking company.
EDUCATION
o Alexandria University, EGYPT.
B.Sc. in Mechanical Engineering
o Graduation date:Jul 2008
o Grade: Good
o I study currently to obtain the master degree from Alexandria University.
EMPLOYMENT HISTORY
Turbo machinery engineer
Rashpetco (Shell-JV)
2016>current
Achievements
 PGT25+, SGT 300&SGT400 turbines operations &maintenance.
 Perform advanced maintenance management, troubleshooting,field activities, and maintenance activities for
all gas turbines including all auxiliary systems,particularly PGT25+ GE gas turbines,Siemens SGT-300
and SGT-400.
 Execute all maintenance routines in time. Participate in condition monitoring checks on gas turbines, notify
any abnormality or malfunction.
 Monitors the operational performance of the gas turbines, running parameters and auxiliaries operations
using the condition monitoring techniques.
 Perform assigned duties in accordance to the HSE system.
 Perform tool box and task risk assessment meeting to establish scope of work, safety requirement, and
permit to work, special tools and material.
 Review maintenance procedures,job plans, standing instruction, operating manuals, and to update manuals
for safe maintenance and operation.
 Provide daily status reports and final reports.

Operation Engineer
Sidi Krir Generation Company |Alexandria | www.powertek.com
Sidi-Krir Thermal Power plant units 3& 4 (BOOT) (2* 340 MW – Natural gas & Mazout oil fire)
2014>current
Achievements
 Power plant Control Room Operator (DCS).
2
 Operation Engineer for Steam generators (2*1032 ton steam/hr.), Steam turbine (2*340 Mw)
 Plant utilities (Water Treatment Plant (RO), Mazout Oil System, auxiliary boiler, Re-boiler, Hydrogen plant,
Fire Fighting System, Compressors & Emergencies systems).
 Make periodical tests for all standby and emergency equipment’s.
 Preparing work orders following the Lock out Tag Out isolation procedures (JD Edward program).
 Follow the maintenance and operation procedures and helping in modifying and updating these procedures
to comply with IMS system(integrated management system).
 Responsible for the shift to shift safe operations of all equipment associated with the power generation
facility, excluding the Water Treatment area.
 Responsible for power generation facility systeminspections and systemalignments during start up and
shutdowns to ensure safe and correct operations of systemequipment, both during normal and emergency
situations.
 Document equipment performance by maintaining complete and accurate log sheets.
 Maintain systemand equipment operations within vendor’s specifications and guidelines.
 Co-ordinate safety with regards to maintenance shift work activities; isolation of equipment and placing
equipment back in service in accordance with facility Lockout and Tag out Procedures.
 Co-ordinate Assistant Plant Operators and Training Operators activities with activities of the facility to
ensure time optimization and utilization.
 Training of staff on Plant Operator position.
 Assist WTO in correcting and maintaining condensate,boiler feed water, and boiler chemistry.
 Participate in some modifications in the power plant by SolidWorks
Mechanical DesignEngineer
Solidworks
ElHODA Company for turning engineering and welding of metals| Alexandria |
2014> current
Part Time
Achievements
 Design and drawing of 2D and 3D for mechanical parts.
 Making Assembly for different machines.
 Evaluate volume, surface area, and mass and all mechanical properties for mechanical parts.
 Make simulation for mechanical moving parts.
 Making Assembly, Sheet metal, Steel structure,Welding, Simulation, Animation by Solidworks
Mechanical Maintenance Engineer
Egyptian German Porcelain | Alexandria | www.egyptianporcelain.com
2012> 2014
Achievements
 Perform Regular Preventive Maintenance.
 Control the spare-parts dispatch and consumption rates.
 Control maintenance tools and equipment.
 Diagnose breakdown problems and rout failures.
 Maintenance of Clay Shaping Machines (Auto cup, Normal Casting, Pressure CUP, Plate Line, Single &
Double Cup Line Machines)
 Maintenance of Pneumatic Systems (Valves, Linear and Rotary Cylinders, Filters, etc…. ”SMC, FESTO” )
 Maintenance of Hydraulic Systems (Busch Rexroth Group)
 Maintenance of Gearboxes (CYCOLIDE Desk, Belt Drive, Gears)
 Executed assembly of Conveyors.
 Exchange Bearings “Ball, deep Groove, Taper, Needle, Spherical, Cylindrical, Linear, and Special
Bearings”
 Maintenance of Vacuum Pumps (Oil Seal Vane Pump "BECKER, LYBOLD, BUSCH” Water Ring Pump,
and Vacuum Blowers).
3
 Maintenance of Dryers, Blowers and Fans.
 Measuring and Drawing Spare parts and making assembly and simulate it by (Solid Works).
 Making many modification in the machines (drawing them by Solidworks, then make simulation, then
manufactured them at workshop, and applied it in the machines)
Site Engineer
PETROMAINT | Egypt | www.petromaint.net
Jan.2011 > Mars.2012
Achievements
 Renewal and re-installation of solar Pipeline for Gempetco at El Zaffrana Jetty.
 Installation of High Pressure Piston Pump for Gempetco at the Water Station
 Executed main Fire Fighting System for Gempetco at its Camp.
 Executed expansion on Gempetco Platform to installation the Sewage Tank.
 Executed Intelligent Pigging for PPC main lines.
 Executed Painting Projects for WEPCO.
TRAINING
 ALEXANDRIA FOR PETROLEUM Co. July -2007
 ALEXANDRIA PETROLEUM MAINTENANCE Co. PETROMAINT July- 2006
 THERMAL POWER STATION. SIDI KRIER Power Station July- 2005
 PROGRAMMING OF MICRO-CONTROLLER TECHNOPRO 2010
 PUMPS & COMPRESSORS Course OIL & GAS SKILLS OGS 2012
 ENGLISH COURSES. Egyptian American Center 2012
 PNEUMATIC AND ELECTRO-PNEUMATIC CIRCUITS DON BOSCO 2012
 HYDRAULIC AND ELECTRO-HYDRAULIC CIRCUITS DON BOSCO 2012 - 2013
 CLASSIC CONTROL DON BOSCO 2014
 PLC MEHN ARABIA 2014
KEY SKILLS
Language
 Arabic :Mother Tongue
 English :Very Good
Computer knowledge
 MS Word, Excel and PowerPoint.
 AutoCAD (2D & 3D).
 AutoCad 3D Plant(P&Id , Pipig design)
 SolidWorks (Modeling, Assemply, Animation, Simulation, Sheet Metal, Pipe and Tube Routes and
Drawings).
 CFTURBO (Design of TurboMachinary)
 MicroSoft Visio. (draw PFD’s and P&ID’s)
 MATLAB (Programming, Simulink)
 AUTOMOTION STUDIO , Fluid-SIM (Hydraulic and Pneumatic Circuits Simulation)
 C/ C ++ Programming Language & JAVA Programming Language.
4
REFERENCES
Date of Birth : 16th
of May 1985
Place of birth : Alexandria,Egypt.
National ID number : 2 85 05 16 0200456
Military Service : Completed
Marital Status : Married
Nationality : Egyptian
License number : 435665
Passport number : A05636488
References are available on request.

mohamed moustafa resume

  • 1.
    1 Mohammed Ahmed MohammedMoustafa Eng.m.maka@gmail.com +20128 99 33 781 - +201098495824 40 maka St, EL Zhour St, EL Hadra EL Gadida,Sedi Gaber, Alexandria, Egypt. PERSONAL STATEMENT I’m looking to develop my expertise in new concept development, simulation and validation within a forward thinking company. EDUCATION o Alexandria University, EGYPT. B.Sc. in Mechanical Engineering o Graduation date:Jul 2008 o Grade: Good o I study currently to obtain the master degree from Alexandria University. EMPLOYMENT HISTORY Turbo machinery engineer Rashpetco (Shell-JV) 2016>current Achievements  PGT25+, SGT 300&SGT400 turbines operations &maintenance.  Perform advanced maintenance management, troubleshooting,field activities, and maintenance activities for all gas turbines including all auxiliary systems,particularly PGT25+ GE gas turbines,Siemens SGT-300 and SGT-400.  Execute all maintenance routines in time. Participate in condition monitoring checks on gas turbines, notify any abnormality or malfunction.  Monitors the operational performance of the gas turbines, running parameters and auxiliaries operations using the condition monitoring techniques.  Perform assigned duties in accordance to the HSE system.  Perform tool box and task risk assessment meeting to establish scope of work, safety requirement, and permit to work, special tools and material.  Review maintenance procedures,job plans, standing instruction, operating manuals, and to update manuals for safe maintenance and operation.  Provide daily status reports and final reports.  Operation Engineer Sidi Krir Generation Company |Alexandria | www.powertek.com Sidi-Krir Thermal Power plant units 3& 4 (BOOT) (2* 340 MW – Natural gas & Mazout oil fire) 2014>current Achievements  Power plant Control Room Operator (DCS).
  • 2.
    2  Operation Engineerfor Steam generators (2*1032 ton steam/hr.), Steam turbine (2*340 Mw)  Plant utilities (Water Treatment Plant (RO), Mazout Oil System, auxiliary boiler, Re-boiler, Hydrogen plant, Fire Fighting System, Compressors & Emergencies systems).  Make periodical tests for all standby and emergency equipment’s.  Preparing work orders following the Lock out Tag Out isolation procedures (JD Edward program).  Follow the maintenance and operation procedures and helping in modifying and updating these procedures to comply with IMS system(integrated management system).  Responsible for the shift to shift safe operations of all equipment associated with the power generation facility, excluding the Water Treatment area.  Responsible for power generation facility systeminspections and systemalignments during start up and shutdowns to ensure safe and correct operations of systemequipment, both during normal and emergency situations.  Document equipment performance by maintaining complete and accurate log sheets.  Maintain systemand equipment operations within vendor’s specifications and guidelines.  Co-ordinate safety with regards to maintenance shift work activities; isolation of equipment and placing equipment back in service in accordance with facility Lockout and Tag out Procedures.  Co-ordinate Assistant Plant Operators and Training Operators activities with activities of the facility to ensure time optimization and utilization.  Training of staff on Plant Operator position.  Assist WTO in correcting and maintaining condensate,boiler feed water, and boiler chemistry.  Participate in some modifications in the power plant by SolidWorks Mechanical DesignEngineer Solidworks ElHODA Company for turning engineering and welding of metals| Alexandria | 2014> current Part Time Achievements  Design and drawing of 2D and 3D for mechanical parts.  Making Assembly for different machines.  Evaluate volume, surface area, and mass and all mechanical properties for mechanical parts.  Make simulation for mechanical moving parts.  Making Assembly, Sheet metal, Steel structure,Welding, Simulation, Animation by Solidworks Mechanical Maintenance Engineer Egyptian German Porcelain | Alexandria | www.egyptianporcelain.com 2012> 2014 Achievements  Perform Regular Preventive Maintenance.  Control the spare-parts dispatch and consumption rates.  Control maintenance tools and equipment.  Diagnose breakdown problems and rout failures.  Maintenance of Clay Shaping Machines (Auto cup, Normal Casting, Pressure CUP, Plate Line, Single & Double Cup Line Machines)  Maintenance of Pneumatic Systems (Valves, Linear and Rotary Cylinders, Filters, etc…. ”SMC, FESTO” )  Maintenance of Hydraulic Systems (Busch Rexroth Group)  Maintenance of Gearboxes (CYCOLIDE Desk, Belt Drive, Gears)  Executed assembly of Conveyors.  Exchange Bearings “Ball, deep Groove, Taper, Needle, Spherical, Cylindrical, Linear, and Special Bearings”  Maintenance of Vacuum Pumps (Oil Seal Vane Pump "BECKER, LYBOLD, BUSCH” Water Ring Pump, and Vacuum Blowers).
  • 3.
    3  Maintenance ofDryers, Blowers and Fans.  Measuring and Drawing Spare parts and making assembly and simulate it by (Solid Works).  Making many modification in the machines (drawing them by Solidworks, then make simulation, then manufactured them at workshop, and applied it in the machines) Site Engineer PETROMAINT | Egypt | www.petromaint.net Jan.2011 > Mars.2012 Achievements  Renewal and re-installation of solar Pipeline for Gempetco at El Zaffrana Jetty.  Installation of High Pressure Piston Pump for Gempetco at the Water Station  Executed main Fire Fighting System for Gempetco at its Camp.  Executed expansion on Gempetco Platform to installation the Sewage Tank.  Executed Intelligent Pigging for PPC main lines.  Executed Painting Projects for WEPCO. TRAINING  ALEXANDRIA FOR PETROLEUM Co. July -2007  ALEXANDRIA PETROLEUM MAINTENANCE Co. PETROMAINT July- 2006  THERMAL POWER STATION. SIDI KRIER Power Station July- 2005  PROGRAMMING OF MICRO-CONTROLLER TECHNOPRO 2010  PUMPS & COMPRESSORS Course OIL & GAS SKILLS OGS 2012  ENGLISH COURSES. Egyptian American Center 2012  PNEUMATIC AND ELECTRO-PNEUMATIC CIRCUITS DON BOSCO 2012  HYDRAULIC AND ELECTRO-HYDRAULIC CIRCUITS DON BOSCO 2012 - 2013  CLASSIC CONTROL DON BOSCO 2014  PLC MEHN ARABIA 2014 KEY SKILLS Language  Arabic :Mother Tongue  English :Very Good Computer knowledge  MS Word, Excel and PowerPoint.  AutoCAD (2D & 3D).  AutoCad 3D Plant(P&Id , Pipig design)  SolidWorks (Modeling, Assemply, Animation, Simulation, Sheet Metal, Pipe and Tube Routes and Drawings).  CFTURBO (Design of TurboMachinary)  MicroSoft Visio. (draw PFD’s and P&ID’s)  MATLAB (Programming, Simulink)  AUTOMOTION STUDIO , Fluid-SIM (Hydraulic and Pneumatic Circuits Simulation)  C/ C ++ Programming Language & JAVA Programming Language.
  • 4.
    4 REFERENCES Date of Birth: 16th of May 1985 Place of birth : Alexandria,Egypt. National ID number : 2 85 05 16 0200456 Military Service : Completed Marital Status : Married Nationality : Egyptian License number : 435665 Passport number : A05636488 References are available on request.