MANAGEMENT

           Drs. Broto M.P.,MM




04/19/13       uph/broto/management   1
MANAGEMENT ( OUTLINE 1)

1.   Introduction
       Views of Management
       Historical of Management Science
2.   The Manager Environment
       Environment of Organization
       SWOT Analyze
       Competitive Advantage
3.   Planning
       Planning Process
       Strategic Plan & Operational Plan
       Strategic Management
       Decision Making & Problem Solving
       Management By Objective
04/19/13              uph/broto/management   2
Outline management (2)
    Organizing
       Organization Principles
       Organization Structure
       Types of organization
       Human Resources Management

    Leading
       Coordination
       Communication
       Motivation
       Leadership
       Management Conflict

    Controlling
       The Controlling process
       Types of Control
       The method of control


04/19/13                 uph/broto/management   3
Bibliography
  James A Stoner – Management
  Stephen P Robins, Mary Coulter – Management
  John R Schemerhorn Jr – Management
  Heinz Weihrich, Harold Koontz – Management A Global Perspective
  Straub & Attner - Introduction To Business
  Frank M.Go, Mary L Monachello, Tom Braun -Human Resource
  Management in the Hospitality Industry
  T.Hani Handoko - Manajemen




04/19/13             uph/broto/management        4
04/19/13   uph/broto/management   5
04/19/13   uph/broto/management   6
Management
   Management is the process of coordinating work
    activities so that they are completed efficiently
    and effectively with and through other people
   Manajemen adalah proses pengkoordinasian kegiatan-
    kegiatan pekerjaan sehingga pekerjaan tersebut
    terselesaikan secara efisien dan efektif dengan dan
    melalui orang lain
   Management is the process of setting and
    achieving goals through and with other people

04/19/13           uph/broto/management    7
Management & Human
         Resources
  Management is the process of
  planning,organizing,leading,and
  controlling the use of resources to
  accomplish performance goals
  Human resources are the
  people,individuals, and groups that help
  organizations produce goods or services.

04/19/13      uph/broto/management   8
Management is a science and
               art
   Managing as practice is an art, the organized knowledge
    underlying the practice is a science
   Seni adalah ketrampilan/skill yang dapat dikuasai seseorang karena
    latihan,bakat kodrati atau pengalaman
   Sebagai seni para manajer perlu memiliki manajerial skill yang
    diperoleh dari pembawaan kodrati, pelatihan, pengalaman atau
    ketiga-tiganya dan mampu memilih cara yang tepat sesuai situasi
    yang dibutuhkan, berdasarkan pertimbangan instuisi
   Sebagai ilmu, manajemen telah diakui sebagai ilmu pengetahuan
    yang memenuhi persyaratan penyusunan secara ilmiah ( scientific
    method ) dan bekerja secara sistematis berdasarkan teori-teori ilmu
    pengetahuan dan dapat diterima akal




04/19/13                uph/broto/management          9
Resources of firm
       Man ( People)
       Money ( capital)
       Materials
       Machine
       Method
       Market




04/19/13         uph/broto/management   10
04/19/13   uph/broto/management   11
Tugas
  Bagi seluruh kelas menjadi 6 kelompok, diminta setiap
  kelompok mengamati kegiatan yang terjadi di :

  Kelompok A   : Supermarket
  Kelompok B   : Restoran
  Kelompok C   : Toko Buku
  Kelompok D   : Salon
  Kelompok E   : Manufacture (Produksi)
  Kelompok F   : Perpustakaan

  Buat presentasi bagaimana mereka beroperasi, bila
  perlu tampilkan foto/rekaman kegiatan dimaksud

04/19/13          uph/broto/management     12
EFFICIENCY &
           EFFECTIVENESS
   Efficiency : Getting the most output from the least
    amount of input
    ( Doing things right )
    Memperoleh hasil terbesar dengan masukan
    yang terkecil
   Effectiveness : Completing activities so that
    organizational goal are attained ( Doing the right
    things)
     Menyelesaikan kegiatan-kegiatan dengan
    benar sehingga tujuan organisasi dapat
    tercapai

04/19/13            uph/broto/management    13
Contoh penerapan
                 Efisiensi



  Sebuah manufaktur sukucadang peralatan ruang angkasa di Grand
  Praire, Texas berhasil mengurangi waktu yang dibutuhkan untuk
  menghasilkan sepatu-rem untuk pesawat transportasi militer
  Lockheed C-130, salah satu suku cadang yang telah dikerjakan
  oleh pabrik ini selama 25 tahun, dari 31/2 jam menjadi kurang
  dari 1 jam dengan cara bekerjasama untuk merencanakan dan
  mengimplementaskan efisensi-efisiensi baru dalam proses
  manufaktur

04/19/13            uph/broto/management        14
04/19/13   uph/broto/management   15
Produktivitas

  Perbandingan antara hasil yang dicapai (output)
  dengan seluruh sumberdaya yang dipergunakan
  (input) per satuan waktu
                     Output
  Produktivitas =     ------------
                      Input
  Peningkatan produktivitas :
      Penghematan input untuk output yang sama atau lebih besar
      Menggunakan input yang sama untuk output lebih besar
      Menggunakan inut yang sama atau lebih minim untuk memperoleh peningkatan
       kualitas output

04/19/13                  uph/broto/management              16
Organization
   An organization is a structured
    process in which persons
    interact for objectives
   An organization is a collection
    of people working together in a
    division of labor to achieve a
    common purpose
   Goals / objectives:
    The purpose that an
    organization strives to achieve




04/19/13                uph/broto/management   17
HIERARCHI OF GOALS

                  1.   ORGANIZATIONAL
                       GOAL
                  2.   DEPARTMENT GOAL
                  3.   SUB DEPARTMENT
                       GOAL
                  4.   GROUP GOAL
                  5.   INDIVIDUAL GOAL



04/19/13   uph/broto/management   18
Vision
                        Vision is a term used to
                         describe a clear sense
                         of the future and an
                         understanding of the
                         actions needed to get
                         there – successfully
                        Visi suatu gambaran mental
                         mengenai keadaan, proses (impian)
                         yang ingin dicapai oleh seseorang
                         atau organuisasi/perusahaan di
                         masa depan
                        Misi adalah pernyataan abadi dari
                         suatu perusahaan sebagai
                         implementasidari visinya dan
                         bagimana usaha-usaha
                         mencapainya, yang membedakan
                         dengan perusahaan lain, misalnya
                         ruang lingkup organisasi,
                         produk/jasa, pelangan




04/19/13   uph/broto/management         19
Visi & Misi
     Universitas Pelita Harapan & STPPH
    Visi UPH : Menjadi sumber utama pemberdayaan
     pemimpin masa depan secara seimbang dalam
     kualitas intelektualnya, memiliki karakter dan perilaku
     yang baik serta selalu memuliakan nama Tuhan
    Misi : Menyiapkan mahasiswa dalam keahlian
     masing-masing yang berperilaku etis, dan memiliki
     strategi yang baik dalam menghadapai tantangan
     masa depan, dan mampu mengatasi permasalahan
     secara kreatif, serta proaktif menangkap peluang
     untuk kepentingan dirinya, masyarakat, bangsa dan
     negara .


04/19/13             uph/broto/management      20
MANAGEMENT
              PROCESS

           The set of ongoing decisions
           and work activities in which
           managers engage as they
           plan, organize, lead, and
           control


04/19/13     uph/broto/management   21
THE UNIVERSALITY OF MANAGEMENT


  The reality that management is needed in all types and
  sizes of organizations, at all organizational levels, in all
  organizational areas, and in all organizations in all
  countries around the globe
  Management is needed in organizations :
  - Small and large
  - Areas : Manufacturing, Marketing, Accounting,
             Human Resources, etc
  - Profit or Non-profit
  - Bottom and Top

04/19/13            uph/broto/management        22
History of Management Theory
    The Classical approaches ( FW Taylor,Henry Fayol,Marry Parker Follet)
         Focus on developing universal principles for use in various management situations
         Memusatkan pada pengembangan prinsip universal yang dapat dipergunakan dalam
          berbagai situasi manajemen
    The Human Resources approaches (Elton Mayo, Hugo Munsterberg)
         Focus on human needs, the work group,and the role of social factors n the workplace
         Memusatkan pada kebutuhan manusia, kerja kelompok, serta peranan faktor2 sosial
          di tempat kerja
    The Quantitative/ Management Science approaches (Chris Argyris,
     A.Maslow)
        Focus on the use of mathematiccal-techniques for management poblem solving
        Memusatkan pada penggunaan teknik-teknik matematuis dalam pemecahan masalah
         manajemen
    Modern approaches ( Peter Drucker, Ernest Dale,Robert Blake & Jane Mouton)
         Focus on the systems view and contingency thinking wih aa awareness of current
          commitments to quality and high perforance
         Memusatkan pada pandangan dan sistem kontingensi, dengan kesadaran akan
          komitment terhadap mutu dan kinerja yang tinggi



04/19/13                      uph/broto/management                       23
Taylor’s four principles of
           scientific management
    Develop “science” for every job,including rules of motion, standardized work
     implements,and proper working condition
         Pengembangan metode-metode ilmiah dalam manajemen,agar dapat ditemukan
          metode paling baik untuk setiap pekerjaan
    Carefully select workers with the right abilities for the job
         Seleksi ilmiah untuk karyawan agar dapat diberi tanggung jawab/tugas sesuai dengan
          kemampuannya
    Carefully train these workers to do the job and give them proper incentives to
     cooperate with the job science
         Pendidikan dan pengembanan ilmiah para karyawan
    Support these workers by planning their work and by smoothing the way as they
     go about their jobs
         Kerjasama yang baik antara manajemen dan tenaga kerja




04/19/13                      uph/broto/management                     24
Henry Fayol’s principles of
                 management
1.   Division of work
2.   Authority
3.   Discipline
4.   Unity of Command
5.   Unity of direction          9.    Scalar chain
6.   Subordination of the        10.   Order
     individual to the general   11.   Equity
     interest                    12.   Stability of tenure
7.   Remuneration of                   personnel
     personnel                   13.   Initiative
8.   Centralization              14.   Esprit de corps

04/19/13             uph/broto/management        25
Prinsip-prinsip manajemen
                 Fayol
1.   Pembagian kerja          9.    Hirarki, garis wewenang
2.   Wewenang                 10.   Keteraturan
3.   Disiplin                 11.   Persamaan
4.   Kesatuan komando         12.   Stabilitas staf
                              13.   Inisiatif
5.   Kesatuan pengarahan
                              14.   Kerjasama Tim
6.   Kepentingan individu
     harus tunduk pada
     kepentingan organisasi
7.   Penggajian
8.   Sentralisasi

04/19/13           uph/broto/management        26
Management functions
                   ( What kind organization to do :)

              Planning
                  Defining goals, establishing strategy,and
                   developing sub plans to coordinate activities
              Organizing
                  Determining what needs to be done, how it will be
                   done, and who is to do it
              Leading
                  Directing and motivating all involved parties and
                   resolving conflicts
              Controlling
                  Monitoring activities to ensure that they are
                   accomplished as planned

04/19/13                uph/broto/management         27
Contoh implementasi dari fungsi
         manajemen
   Planning
       Apa yang ingin dicapai, diproduksi
       Kapan dilaksanakan, dimana
       Siapa konsumen kita
   Organizing
       Apa bentuk perusahaan
       Siapa yang akan menjalankan usaha tersebut
       Darimana sumberdaya diperoleh
   Leading
       Bagaimana menjalankan proses produksi
       Usaha untuk memimpin,mengkoordinir, memotivasi karyawan
   Controlling
       Usaha pengendalian/pengawasan agar mencapai hasil sesuai target

04/19/13                   uph/broto/management               28
The Functions of
             Management
  PLANNING
  ORGANIZING
  LEADING
  CONTROLLING



04/19/13      uph/broto/management   29
PLANNING




   The process of establishing goals and
    suitable course of action for achieving
    those goals

04/19/13         uph/broto/management   30
ORGANIZING
   Organizing is the
    process of engaging
    two or more people in
    working together in
    structured way to
    achieve a specific
    goals or set of goals



04/19/13          uph/broto/management   31
TUGAS Management 2
          ( Individual)
  Buatlah Company Profile dari
  salah satu perusahaan yang
  bergerak di bidang pangan
      Nama perusahaan,kapan
       didirikan
      Bergerak di produk/jasa apa?
      Siapa pendiri, pemilik dan
       direksinya sekarang serta
       organisasi dan personalianya
      Bagaimana posisi market share
       nya? Siapa competitornya
      Adakah peluang perusahaan ini
       untuk maju dan berkembang
      Dan lain-lain
       KUMPULKAN PALING LAMBAT
       1 minggu setelah hari ini



04/19/13                 uph/broto/management   32
LEADING
   The process of
    directing and
    influencing the task-
    related activities of
    groups members or
    an entire organization




04/19/13          uph/broto/management   33
CONTROLLING
   The process of
    ensuring that actual
    activities conform to
    planned activities




04/19/13           uph/broto/management   34
Why the result’s implementation of
   management at the firms is different?



  Because :
   The different types of organization

   The different members of organization

   The different culture of organization




04/19/13       uph/broto/management   35
MANAGER
                        WHO IS HE/SHE?
                        WHY HE/SHE SUCCESS?
                        WHAT IS THE CRITERIA
                        OF SUCCESSFUL
                        MANAGER?




04/19/13   uph/broto/management   36
MANAGER
  A manager is someone who works with
  and through other people by coordinating
  their work activities in order to accomplish
  organization goals
      Seseorang yang bekerja dengan atau melalui orang lain dan
       mengkoordinasikan kegiatan kerja mereka agar supaya dapat mencapai
       tujuan perusahaan

  A manager is the person in an
  organization who is responsible for the
  work performance of one or more other
  persons
04/19/13                uph/broto/management           37
What do Manager do?
   Managing individual performance
   Instructing subordinates
   Representing staff/ organization
   Managing group performance
   Planning and allocating resources
   Coordinating interdependent groups
   Monitoring the business environment
04/19/13        uph/broto/management   38
The management process of planning, organizing, leading and controlling



                                            Planning
                                            Planning
                                         Choosing goals and
                                        Choosing goals and
                                       means to achieve them
                                       means to achieve them




          Controlling
          Controlling                                                      Organizing
                                                                           Organizing
      Measuring performances
      Measuring performances                 Manager                       Creating structures
                                                                          Creating structures
       And ensuring results                                                 And work system
                                                                           And work system
        And ensuring results




                                              Leading
                                              Leading
                                             Inspiring people
                                            Inspiring people
                                              To work hard
                                             To work hard




     04/19/13                       uph/broto/management                      39
Tugas 3
   Cari melalui internet, manajer yang kamu kenal dan
    menjadi idola kamu atau kamu kagumi baik tingkat lokal
    maupun global ceritakan tentang profil orang ini
   Contoh :
     Steve Jobs dari Apple Computer melalui
      www.apple.com
     Bill Ford Jr dari Ford Motor Company melalui
      www.ford.com
     Bill Gates melalu www.microsoft.com
     dll

    Kumpulkan minggu depan

04/19/13            uph/broto/management     40
Types of Managers
                           FIRST LINE MANAGER
 LEVEL                     MIDDLE MANAGER
                           TOP MANAGER



                           FUNCTIONAL MANAGER
 FUNCTIONS                 GENERAL MANAGER


04/19/13      uph/broto/management   41
Level of Management
  Top        Managers
        Managers responsible for the overall management of the
         organizations, they establish operating policies and guide he
         organizations interaction with its environment
  Middle           Managers
        Managers in the midrange of organizational hierarchies; They are
         responsible for other managers and sometimes for some operating
         employees; They are also report to more senior managers
  First       Line Managers
        Managers who are responsible for the work of operating
         employees only and do not supervise other managers


04/19/13                uph/broto/management          42
Functional and General
                  Manager
   FUNCTIONAL MANAGERS
       A manager responsible for just one
        organizational activity, such as finance or
        human resources management
   GENERAL MANAGERS
       The individual responsible for all functional
        activities, such as production, sales,
        marketing and finance, for an organization
        such as a company or a subsidiary
04/19/13            uph/broto/management   43
Paul Hawken
           Founder , Smith & Hawken


                            “ Kami dipimpin oleh
                            manusia. Kami tidak
                            dipimpin oleh
                            korporasi,profesional
                            ataupun lembaga”




04/19/13        uph/broto/management   44
Managerial skills
 and Competencies


           [Management]
             (Broto MP/UPH)



04/19/13     uph/broto/management   45
The terms / competencies of successful
     LEADERSHIP.   manager
          Ability to influence others to perform tasks
     SELF-OBJECTIVY
          Ability to evaluate one’s self realistically
     ANALITIC-THINKING
          Ability to interpret and explain patterns in information
     BEHAVIORAL FLEXIBILITY
          Ability to modify personal behavior to reach a goal
     ORAL AND WRITTEN COMMUNICATION
          Ability to express ideas clearly both in oral presentation or
           in writing
     PERSONAL IMPACT
          Ability to create a good impression and instill confidence
     RESISTANCE TO STRESS
          Ability to perform under stressful conditions
     TOLERANCE TO UNCERTAINTY
          Ability to perform in ambiguous situation




04/19/13                          uph/broto/management                     46
The terms of successful
              Manager
  JUDGEMENT               EMOTIONAL STABILITY
  INITIATIVE              FAIRNESS
  INTEGRITY               AMBITION
  FORESIGHT               DEDICATION
  ENERGY                  OBJECTIVITY
  DRIVE                   DECISIENNESS
  HUMAN RELATION          CO-OPERATION
  SKILL
  DEPENDABILITY

04/19/13     uph/broto/management   47
MANAGERIAL SKILLS
   TECHNICAL SKILLS
       The ability to apply and perform a special task
        proficiency
   HUMAN SKILLS
       The ability to work well in cooperation with other
        persons
   CONCEPTUAL SKILLS
       The ability to think analytically and achieve integrative
        problem solving


04/19/13               uph/broto/management       48
Level & Skill Manager


                                                        Conceptual
              Top                                         Skill
            Manager

                                           Human Skill
           Middle M


      Lowers Manager
                                 Technical Skill




04/19/13              uph/broto/management         49
THE ROLE OF MANAGERS
                 (Minzberg)
           Interpersonal roles
             Figurehead
             Leader
             Liaison
           Informational roles
             Monitor
             Disseminator
             Spokesperson
           Decisional roles
               Entrepreneur
               Disturbance handle
               Resources allocate
               Negotiator
04/19/13           uph/broto/management   50
Interpersonal roles
   Figurehead
       Symbolic head of the organization, required perform certain legal
        activities and attend to social activities (Sbg tokoh simbolis, melakukan
        kegiatan seremonial, pertemuan entertainment tamu)
   Leader
       Responsible for staffing, training, direction, and motivation of sub-
        ordinates (Bertanggung jawab untuk menggerakkan bawahan,
        penempatan dan pengembangan staf)
       Liaison
       Develops a network outside the organization to gather information



04/19/13                    uph/broto/management               51
Informational roles
   Monitor
       Seek and analyzes a wide variety of outside information (from
        liaison role) and inside information (from leader role) – mencari dan
        menerima berbagai macam informasi bagi kepentingan perusahaan
   Disseminator
       Transmits information received both from outside and inside the
        organization to other members of organization – meneruskan informasi
        dari luar
   Spokesperson
       Transmits information about organization to outsider – memberikan
        informasi keluar / kepada pihak lain




04/19/13                        uph/broto/management                    52
Decisional roles
   Disturbance handle
       Take corrective action whenever organization faces unexpected, non
        routine disturbance
   Entrepreneur
       Looks for ways to change the organization for the better, seeks information from
        internally and externally fro improvement ideas. Initiates and supervises
        improvement projects.

   Resource allocate
       Responsible for allocating all important resources of the organization
   Negotiator
       Responsible for the organization’s major outside negotiations

04/19/13                     uph/broto/management                  53
Organization
                     MANAGER
                       Manager




    INPUT                  PROCESS                    OUTPUT
                       Planning   Organizing           Goal Of
                                                     Organization
 RESOURCES
                                                     (Effective &
                       Leading    Controlling
    6M&I                                              Efficient)



           Manager, Management and Organization

04/19/13            uph/broto/management        54
Pengertian Manajemen
                       SONDANG P SIAGIAN
              Manajemen adalah kemampuan dan ketrampilan untuk
             memperoleh sesuatu hasil dalam rangka pencapaian tujuan
                      melalui kegiatan-kegiatan orang lain.
                            Luther Gulick
              Manajemen adalah suatu bidang ilmu pengetahuan yang
             berusaha secara sistematis untuk memahami mengapa dan
            bagaimana manusia bekerja sama untuk mencapai tujuan dan
             membuat sistem kerjasama tersebut lebih bermanfaat bagi
                                  kemanusiaan.
                         James AF Stoner
             Manajemen adalah proses perencanaan, pengorganisasian,
              pengarahan dan pengawasan usaha-usaha para anggota
           organisasi dan penggunaan sumberdaya organisasi lainnya agar
                  mencapai tujuan organisasi yang telah ditetapkan.


04/19/13                   uph/broto/management                   55
Tugas 4
   Baca dari textbook atau dapat juga dicari melalui
    internet, lalu buat catatan ringkas sebuah topik
    mengenai The environment of Organization
    ( Lingkungan perusahaan).
   Anda akan diminta membacakan usaha anda
    tersebut di atas di kelas minggu depan dan
    menyebutkan sumbernya ( dari buku karangan
    siapa atau dari homepage mana? ) Bila anda
    tidak mendapat giliran menyajikan hasil
    penemuan anda di kelas, diwajibkan mem
    forward melalui email ke :

04/19/13          uph/broto/management   56
KERAMAHAN
 “ Perlakukan semua orang seakan-akan sedang
        menghadapi tamu pembesar “                   - Confusius

    Orang ramah adalah orang yang                Hospitality
     tidak sulit didekati atau diajak
     bicara karena bawaannya yang
     sopan dan bersahabat
    Seseorang yang ramah bisa
     berhadapan secara enak dengan
     orang lain dari segala tingkat
     sosial
    Suskes terbesar seseorang adalah
     manakala ia memiliki kemampuan
     berkomunikasi dengan segala
     macam orang.
    Keramahan yang dibuat-buat akan
     mengecoh sebagian orang, tetapi
     orang yang cerdas akan dapat
     melihat jelas kepura-puraan itu
     seperti minyak yang mengambang
     di atas air.
    Jika anda sukses jangan menjadi
     angkuh dan mengasingkan diri dari
     orang lain, karena sukses anda
     juga berasal dari konstribusi orang
     lain.
04/19/13                   uph/broto/management         57

Management1

  • 1.
    MANAGEMENT Drs. Broto M.P.,MM 04/19/13 uph/broto/management 1
  • 2.
    MANAGEMENT ( OUTLINE1) 1. Introduction Views of Management Historical of Management Science 2. The Manager Environment Environment of Organization SWOT Analyze Competitive Advantage 3. Planning Planning Process Strategic Plan & Operational Plan Strategic Management Decision Making & Problem Solving Management By Objective 04/19/13 uph/broto/management 2
  • 3.
    Outline management (2) Organizing Organization Principles Organization Structure Types of organization Human Resources Management Leading Coordination Communication Motivation Leadership Management Conflict Controlling The Controlling process Types of Control The method of control 04/19/13 uph/broto/management 3
  • 4.
    Bibliography JamesA Stoner – Management Stephen P Robins, Mary Coulter – Management John R Schemerhorn Jr – Management Heinz Weihrich, Harold Koontz – Management A Global Perspective Straub & Attner - Introduction To Business Frank M.Go, Mary L Monachello, Tom Braun -Human Resource Management in the Hospitality Industry T.Hani Handoko - Manajemen 04/19/13 uph/broto/management 4
  • 5.
    04/19/13 uph/broto/management 5
  • 6.
    04/19/13 uph/broto/management 6
  • 7.
    Management  Management is the process of coordinating work activities so that they are completed efficiently and effectively with and through other people  Manajemen adalah proses pengkoordinasian kegiatan- kegiatan pekerjaan sehingga pekerjaan tersebut terselesaikan secara efisien dan efektif dengan dan melalui orang lain  Management is the process of setting and achieving goals through and with other people 04/19/13 uph/broto/management 7
  • 8.
    Management & Human Resources Management is the process of planning,organizing,leading,and controlling the use of resources to accomplish performance goals Human resources are the people,individuals, and groups that help organizations produce goods or services. 04/19/13 uph/broto/management 8
  • 9.
    Management is ascience and art  Managing as practice is an art, the organized knowledge underlying the practice is a science  Seni adalah ketrampilan/skill yang dapat dikuasai seseorang karena latihan,bakat kodrati atau pengalaman  Sebagai seni para manajer perlu memiliki manajerial skill yang diperoleh dari pembawaan kodrati, pelatihan, pengalaman atau ketiga-tiganya dan mampu memilih cara yang tepat sesuai situasi yang dibutuhkan, berdasarkan pertimbangan instuisi  Sebagai ilmu, manajemen telah diakui sebagai ilmu pengetahuan yang memenuhi persyaratan penyusunan secara ilmiah ( scientific method ) dan bekerja secara sistematis berdasarkan teori-teori ilmu pengetahuan dan dapat diterima akal 04/19/13 uph/broto/management 9
  • 10.
    Resources of firm Man ( People) Money ( capital) Materials Machine Method Market 04/19/13 uph/broto/management 10
  • 11.
    04/19/13 uph/broto/management 11
  • 12.
    Tugas Bagiseluruh kelas menjadi 6 kelompok, diminta setiap kelompok mengamati kegiatan yang terjadi di : Kelompok A : Supermarket Kelompok B : Restoran Kelompok C : Toko Buku Kelompok D : Salon Kelompok E : Manufacture (Produksi) Kelompok F : Perpustakaan Buat presentasi bagaimana mereka beroperasi, bila perlu tampilkan foto/rekaman kegiatan dimaksud 04/19/13 uph/broto/management 12
  • 13.
    EFFICIENCY & EFFECTIVENESS  Efficiency : Getting the most output from the least amount of input ( Doing things right ) Memperoleh hasil terbesar dengan masukan yang terkecil  Effectiveness : Completing activities so that organizational goal are attained ( Doing the right things) Menyelesaikan kegiatan-kegiatan dengan benar sehingga tujuan organisasi dapat tercapai 04/19/13 uph/broto/management 13
  • 14.
    Contoh penerapan Efisiensi Sebuah manufaktur sukucadang peralatan ruang angkasa di Grand Praire, Texas berhasil mengurangi waktu yang dibutuhkan untuk menghasilkan sepatu-rem untuk pesawat transportasi militer Lockheed C-130, salah satu suku cadang yang telah dikerjakan oleh pabrik ini selama 25 tahun, dari 31/2 jam menjadi kurang dari 1 jam dengan cara bekerjasama untuk merencanakan dan mengimplementaskan efisensi-efisiensi baru dalam proses manufaktur 04/19/13 uph/broto/management 14
  • 15.
    04/19/13 uph/broto/management 15
  • 16.
    Produktivitas Perbandinganantara hasil yang dicapai (output) dengan seluruh sumberdaya yang dipergunakan (input) per satuan waktu Output Produktivitas = ------------ Input Peningkatan produktivitas :  Penghematan input untuk output yang sama atau lebih besar  Menggunakan input yang sama untuk output lebih besar  Menggunakan inut yang sama atau lebih minim untuk memperoleh peningkatan kualitas output 04/19/13 uph/broto/management 16
  • 17.
    Organization  An organization is a structured process in which persons interact for objectives  An organization is a collection of people working together in a division of labor to achieve a common purpose  Goals / objectives: The purpose that an organization strives to achieve 04/19/13 uph/broto/management 17
  • 18.
    HIERARCHI OF GOALS 1. ORGANIZATIONAL GOAL 2. DEPARTMENT GOAL 3. SUB DEPARTMENT GOAL 4. GROUP GOAL 5. INDIVIDUAL GOAL 04/19/13 uph/broto/management 18
  • 19.
    Vision  Vision is a term used to describe a clear sense of the future and an understanding of the actions needed to get there – successfully  Visi suatu gambaran mental mengenai keadaan, proses (impian) yang ingin dicapai oleh seseorang atau organuisasi/perusahaan di masa depan  Misi adalah pernyataan abadi dari suatu perusahaan sebagai implementasidari visinya dan bagimana usaha-usaha mencapainya, yang membedakan dengan perusahaan lain, misalnya ruang lingkup organisasi, produk/jasa, pelangan 04/19/13 uph/broto/management 19
  • 20.
    Visi & Misi Universitas Pelita Harapan & STPPH  Visi UPH : Menjadi sumber utama pemberdayaan pemimpin masa depan secara seimbang dalam kualitas intelektualnya, memiliki karakter dan perilaku yang baik serta selalu memuliakan nama Tuhan  Misi : Menyiapkan mahasiswa dalam keahlian masing-masing yang berperilaku etis, dan memiliki strategi yang baik dalam menghadapai tantangan masa depan, dan mampu mengatasi permasalahan secara kreatif, serta proaktif menangkap peluang untuk kepentingan dirinya, masyarakat, bangsa dan negara . 04/19/13 uph/broto/management 20
  • 21.
    MANAGEMENT PROCESS The set of ongoing decisions and work activities in which managers engage as they plan, organize, lead, and control 04/19/13 uph/broto/management 21
  • 22.
    THE UNIVERSALITY OFMANAGEMENT The reality that management is needed in all types and sizes of organizations, at all organizational levels, in all organizational areas, and in all organizations in all countries around the globe Management is needed in organizations : - Small and large - Areas : Manufacturing, Marketing, Accounting, Human Resources, etc - Profit or Non-profit - Bottom and Top 04/19/13 uph/broto/management 22
  • 23.
    History of ManagementTheory  The Classical approaches ( FW Taylor,Henry Fayol,Marry Parker Follet)  Focus on developing universal principles for use in various management situations  Memusatkan pada pengembangan prinsip universal yang dapat dipergunakan dalam berbagai situasi manajemen  The Human Resources approaches (Elton Mayo, Hugo Munsterberg)  Focus on human needs, the work group,and the role of social factors n the workplace  Memusatkan pada kebutuhan manusia, kerja kelompok, serta peranan faktor2 sosial di tempat kerja  The Quantitative/ Management Science approaches (Chris Argyris, A.Maslow)  Focus on the use of mathematiccal-techniques for management poblem solving  Memusatkan pada penggunaan teknik-teknik matematuis dalam pemecahan masalah manajemen  Modern approaches ( Peter Drucker, Ernest Dale,Robert Blake & Jane Mouton)  Focus on the systems view and contingency thinking wih aa awareness of current commitments to quality and high perforance  Memusatkan pada pandangan dan sistem kontingensi, dengan kesadaran akan komitment terhadap mutu dan kinerja yang tinggi 04/19/13 uph/broto/management 23
  • 24.
    Taylor’s four principlesof scientific management  Develop “science” for every job,including rules of motion, standardized work implements,and proper working condition  Pengembangan metode-metode ilmiah dalam manajemen,agar dapat ditemukan metode paling baik untuk setiap pekerjaan  Carefully select workers with the right abilities for the job  Seleksi ilmiah untuk karyawan agar dapat diberi tanggung jawab/tugas sesuai dengan kemampuannya  Carefully train these workers to do the job and give them proper incentives to cooperate with the job science  Pendidikan dan pengembanan ilmiah para karyawan  Support these workers by planning their work and by smoothing the way as they go about their jobs  Kerjasama yang baik antara manajemen dan tenaga kerja 04/19/13 uph/broto/management 24
  • 25.
    Henry Fayol’s principlesof management 1. Division of work 2. Authority 3. Discipline 4. Unity of Command 5. Unity of direction 9. Scalar chain 6. Subordination of the 10. Order individual to the general 11. Equity interest 12. Stability of tenure 7. Remuneration of personnel personnel 13. Initiative 8. Centralization 14. Esprit de corps 04/19/13 uph/broto/management 25
  • 26.
    Prinsip-prinsip manajemen Fayol 1. Pembagian kerja 9. Hirarki, garis wewenang 2. Wewenang 10. Keteraturan 3. Disiplin 11. Persamaan 4. Kesatuan komando 12. Stabilitas staf 13. Inisiatif 5. Kesatuan pengarahan 14. Kerjasama Tim 6. Kepentingan individu harus tunduk pada kepentingan organisasi 7. Penggajian 8. Sentralisasi 04/19/13 uph/broto/management 26
  • 27.
    Management functions ( What kind organization to do :)  Planning  Defining goals, establishing strategy,and developing sub plans to coordinate activities  Organizing  Determining what needs to be done, how it will be done, and who is to do it  Leading  Directing and motivating all involved parties and resolving conflicts  Controlling  Monitoring activities to ensure that they are accomplished as planned 04/19/13 uph/broto/management 27
  • 28.
    Contoh implementasi darifungsi manajemen  Planning  Apa yang ingin dicapai, diproduksi  Kapan dilaksanakan, dimana  Siapa konsumen kita  Organizing  Apa bentuk perusahaan  Siapa yang akan menjalankan usaha tersebut  Darimana sumberdaya diperoleh  Leading  Bagaimana menjalankan proses produksi  Usaha untuk memimpin,mengkoordinir, memotivasi karyawan  Controlling  Usaha pengendalian/pengawasan agar mencapai hasil sesuai target 04/19/13 uph/broto/management 28
  • 29.
    The Functions of Management PLANNING ORGANIZING LEADING CONTROLLING 04/19/13 uph/broto/management 29
  • 30.
    PLANNING  The process of establishing goals and suitable course of action for achieving those goals 04/19/13 uph/broto/management 30
  • 31.
    ORGANIZING  Organizing is the process of engaging two or more people in working together in structured way to achieve a specific goals or set of goals 04/19/13 uph/broto/management 31
  • 32.
    TUGAS Management 2 ( Individual) Buatlah Company Profile dari salah satu perusahaan yang bergerak di bidang pangan  Nama perusahaan,kapan didirikan  Bergerak di produk/jasa apa?  Siapa pendiri, pemilik dan direksinya sekarang serta organisasi dan personalianya  Bagaimana posisi market share nya? Siapa competitornya  Adakah peluang perusahaan ini untuk maju dan berkembang  Dan lain-lain KUMPULKAN PALING LAMBAT 1 minggu setelah hari ini 04/19/13 uph/broto/management 32
  • 33.
    LEADING  The process of directing and influencing the task- related activities of groups members or an entire organization 04/19/13 uph/broto/management 33
  • 34.
    CONTROLLING  The process of ensuring that actual activities conform to planned activities 04/19/13 uph/broto/management 34
  • 35.
    Why the result’simplementation of management at the firms is different? Because :  The different types of organization  The different members of organization  The different culture of organization 04/19/13 uph/broto/management 35
  • 36.
    MANAGER WHO IS HE/SHE? WHY HE/SHE SUCCESS? WHAT IS THE CRITERIA OF SUCCESSFUL MANAGER? 04/19/13 uph/broto/management 36
  • 37.
    MANAGER Amanager is someone who works with and through other people by coordinating their work activities in order to accomplish organization goals  Seseorang yang bekerja dengan atau melalui orang lain dan mengkoordinasikan kegiatan kerja mereka agar supaya dapat mencapai tujuan perusahaan A manager is the person in an organization who is responsible for the work performance of one or more other persons 04/19/13 uph/broto/management 37
  • 38.
    What do Managerdo?  Managing individual performance  Instructing subordinates  Representing staff/ organization  Managing group performance  Planning and allocating resources  Coordinating interdependent groups  Monitoring the business environment 04/19/13 uph/broto/management 38
  • 39.
    The management processof planning, organizing, leading and controlling Planning Planning Choosing goals and Choosing goals and means to achieve them means to achieve them Controlling Controlling Organizing Organizing Measuring performances Measuring performances Manager Creating structures Creating structures And ensuring results And work system And work system And ensuring results Leading Leading Inspiring people Inspiring people To work hard To work hard 04/19/13 uph/broto/management 39
  • 40.
    Tugas 3  Cari melalui internet, manajer yang kamu kenal dan menjadi idola kamu atau kamu kagumi baik tingkat lokal maupun global ceritakan tentang profil orang ini  Contoh :  Steve Jobs dari Apple Computer melalui www.apple.com  Bill Ford Jr dari Ford Motor Company melalui www.ford.com  Bill Gates melalu www.microsoft.com  dll Kumpulkan minggu depan 04/19/13 uph/broto/management 40
  • 41.
    Types of Managers  FIRST LINE MANAGER LEVEL  MIDDLE MANAGER  TOP MANAGER  FUNCTIONAL MANAGER FUNCTIONS  GENERAL MANAGER 04/19/13 uph/broto/management 41
  • 42.
    Level of Management  Top Managers  Managers responsible for the overall management of the organizations, they establish operating policies and guide he organizations interaction with its environment  Middle Managers  Managers in the midrange of organizational hierarchies; They are responsible for other managers and sometimes for some operating employees; They are also report to more senior managers  First Line Managers  Managers who are responsible for the work of operating employees only and do not supervise other managers 04/19/13 uph/broto/management 42
  • 43.
    Functional and General Manager  FUNCTIONAL MANAGERS  A manager responsible for just one organizational activity, such as finance or human resources management  GENERAL MANAGERS  The individual responsible for all functional activities, such as production, sales, marketing and finance, for an organization such as a company or a subsidiary 04/19/13 uph/broto/management 43
  • 44.
    Paul Hawken Founder , Smith & Hawken “ Kami dipimpin oleh manusia. Kami tidak dipimpin oleh korporasi,profesional ataupun lembaga” 04/19/13 uph/broto/management 44
  • 45.
    Managerial skills andCompetencies [Management] (Broto MP/UPH) 04/19/13 uph/broto/management 45
  • 46.
    The terms /competencies of successful  LEADERSHIP. manager  Ability to influence others to perform tasks  SELF-OBJECTIVY  Ability to evaluate one’s self realistically  ANALITIC-THINKING  Ability to interpret and explain patterns in information  BEHAVIORAL FLEXIBILITY  Ability to modify personal behavior to reach a goal  ORAL AND WRITTEN COMMUNICATION  Ability to express ideas clearly both in oral presentation or in writing  PERSONAL IMPACT  Ability to create a good impression and instill confidence  RESISTANCE TO STRESS  Ability to perform under stressful conditions  TOLERANCE TO UNCERTAINTY  Ability to perform in ambiguous situation 04/19/13 uph/broto/management 46
  • 47.
    The terms ofsuccessful Manager JUDGEMENT EMOTIONAL STABILITY INITIATIVE FAIRNESS INTEGRITY AMBITION FORESIGHT DEDICATION ENERGY OBJECTIVITY DRIVE DECISIENNESS HUMAN RELATION CO-OPERATION SKILL DEPENDABILITY 04/19/13 uph/broto/management 47
  • 48.
    MANAGERIAL SKILLS  TECHNICAL SKILLS  The ability to apply and perform a special task proficiency  HUMAN SKILLS  The ability to work well in cooperation with other persons  CONCEPTUAL SKILLS  The ability to think analytically and achieve integrative problem solving 04/19/13 uph/broto/management 48
  • 49.
    Level & SkillManager Conceptual Top Skill Manager Human Skill Middle M Lowers Manager Technical Skill 04/19/13 uph/broto/management 49
  • 50.
    THE ROLE OFMANAGERS (Minzberg) Interpersonal roles Figurehead Leader Liaison Informational roles Monitor Disseminator Spokesperson Decisional roles Entrepreneur Disturbance handle Resources allocate Negotiator 04/19/13 uph/broto/management 50
  • 51.
    Interpersonal roles  Figurehead  Symbolic head of the organization, required perform certain legal activities and attend to social activities (Sbg tokoh simbolis, melakukan kegiatan seremonial, pertemuan entertainment tamu)  Leader  Responsible for staffing, training, direction, and motivation of sub- ordinates (Bertanggung jawab untuk menggerakkan bawahan, penempatan dan pengembangan staf)  Liaison  Develops a network outside the organization to gather information 04/19/13 uph/broto/management 51
  • 52.
    Informational roles  Monitor  Seek and analyzes a wide variety of outside information (from liaison role) and inside information (from leader role) – mencari dan menerima berbagai macam informasi bagi kepentingan perusahaan  Disseminator  Transmits information received both from outside and inside the organization to other members of organization – meneruskan informasi dari luar  Spokesperson  Transmits information about organization to outsider – memberikan informasi keluar / kepada pihak lain 04/19/13 uph/broto/management 52
  • 53.
    Decisional roles  Disturbance handle  Take corrective action whenever organization faces unexpected, non routine disturbance  Entrepreneur  Looks for ways to change the organization for the better, seeks information from internally and externally fro improvement ideas. Initiates and supervises improvement projects.  Resource allocate  Responsible for allocating all important resources of the organization  Negotiator  Responsible for the organization’s major outside negotiations 04/19/13 uph/broto/management 53
  • 54.
    Organization MANAGER Manager INPUT PROCESS OUTPUT Planning Organizing Goal Of Organization RESOURCES (Effective & Leading Controlling 6M&I Efficient) Manager, Management and Organization 04/19/13 uph/broto/management 54
  • 55.
    Pengertian Manajemen  SONDANG P SIAGIAN Manajemen adalah kemampuan dan ketrampilan untuk memperoleh sesuatu hasil dalam rangka pencapaian tujuan melalui kegiatan-kegiatan orang lain.  Luther Gulick Manajemen adalah suatu bidang ilmu pengetahuan yang berusaha secara sistematis untuk memahami mengapa dan bagaimana manusia bekerja sama untuk mencapai tujuan dan membuat sistem kerjasama tersebut lebih bermanfaat bagi kemanusiaan.  James AF Stoner Manajemen adalah proses perencanaan, pengorganisasian, pengarahan dan pengawasan usaha-usaha para anggota organisasi dan penggunaan sumberdaya organisasi lainnya agar mencapai tujuan organisasi yang telah ditetapkan. 04/19/13 uph/broto/management 55
  • 56.
    Tugas 4  Baca dari textbook atau dapat juga dicari melalui internet, lalu buat catatan ringkas sebuah topik mengenai The environment of Organization ( Lingkungan perusahaan).  Anda akan diminta membacakan usaha anda tersebut di atas di kelas minggu depan dan menyebutkan sumbernya ( dari buku karangan siapa atau dari homepage mana? ) Bila anda tidak mendapat giliran menyajikan hasil penemuan anda di kelas, diwajibkan mem forward melalui email ke : 04/19/13 uph/broto/management 56
  • 57.
    KERAMAHAN “ Perlakukansemua orang seakan-akan sedang menghadapi tamu pembesar “ - Confusius  Orang ramah adalah orang yang Hospitality tidak sulit didekati atau diajak bicara karena bawaannya yang sopan dan bersahabat  Seseorang yang ramah bisa berhadapan secara enak dengan orang lain dari segala tingkat sosial  Suskes terbesar seseorang adalah manakala ia memiliki kemampuan berkomunikasi dengan segala macam orang.  Keramahan yang dibuat-buat akan mengecoh sebagian orang, tetapi orang yang cerdas akan dapat melihat jelas kepura-puraan itu seperti minyak yang mengambang di atas air.  Jika anda sukses jangan menjadi angkuh dan mengasingkan diri dari orang lain, karena sukses anda juga berasal dari konstribusi orang lain. 04/19/13 uph/broto/management 57