Project is -
- A job that has beginning and end time(Time)
- A specified outcome(Scope)
- A stated level of Performance(Quality)
- At a budget(Costs)
Everyone was developing, no one was managing which resulted in:
• Undefined Deadlines
• Decision line was broken
• Milestone structure was hampered
• Developers were not able to concentrate
• Hampered company's revenue
Past Approach in Syscraft
Challenges we faced in absence of PM!
Generalization to Expertise
Now Syscraft has Increased skills and team size to work on multiple
projects simultaneously :)
Various Stages of a Project
How various stages look like in Syscraft!
Presales, 24-48 hrs.
Sales
Signoff
Production
Release/Handoff/
Closure
Post Sales
Maintenance/service
check
Sales Team & Client
Technical In-house team & PM
Sales Team
PM TeamPM Team Connecting Client and BD team
with QA & Production
Now who do we need to execute a
working project in various stages ??
Who can synchronize all the departments
and keep them connected ??
Its Project Manager !!
But how PM is Perceived ??
My project manager
is not technical. He won't
ever understand my
challenges
He just pass on the work
and disappears for the
rest of the day
My Project Manager
takes up all the credit Always finds
a reason to complain
He gives me too
much of work
load.
Meetings &
only meetings :(
But PM is Actually.. Responsible for
PM Responsible for
Integration
Scope
Time
Cost
Quality
Human
Resource
Communi
cation
Risk
Procurement
Document
Change
Challenges at the Documentation level
1) Strong Project scope documents and SRS documents
2) Clearly defined milestones
3) Documented client details
4) Documented Handover
Challenges at the Communication Level
1) Verbal Communication should be avoided
2) Client feedback should be documented instead of
verbally communicated
3) There is no point of writing emails unless and until we
read it
Example of Communication gap
Challenges we face
Timelines
No details on
projects
Project Scope
Milestone
plan
Client
Information
Basic Idea of
project
Technology
Benchmarks
Don't Forget !!!
We are a TEAM,
For all the credits..
and For all the
Loss!
SO WHAT IS THE SOLUTION for these
challenges ???
MBO- Management By Objectives
Objective:Objective: Deliver Quality on Time (DQT)
DQT meansDQT means Happy customer >> Repeated Order >> More referral
KPI:KPI:
RequirementsRequirements
Industry StandardsIndustry Standards
Internal QAInternal QA
Client FeedbackClient Feedback
Our Agenda
Deliver Quality Services/Products on Time within defined Cost
Meeting the above KPI's would result in Happy customer and hence return business and
More sales
To meet the above KPI's we need to make our following areas strong:
1) Presales
2) Sales
3) Handoff
4) Task breakdown
5) Project Plans
6) Strong QA
Management by Objectives is to cut down
the larger task into smaller ones so they
can be managed and worked out easily to
achieve the target goal.
Utility of PM here comes to manage the
smaller task within team
What is MBO and Utility for PM
Achieving smaller goals step by
step helps to get on the Target
Goal !!
Work Breakdown plays major role in setting
Objectives
Example : Getting a project with 500 hours of
estimate will be tough one to complete isn't it???
but if we cut it down in modules and task are
divided for today and tomorrow that would be
helpful to achieve entire Goal. So main objective
will be complete the assignments
Project Management is the discipline of planning, Organizing
and Managing resources to bring about the successful
completion of Project Goals
What is Project Management??
Primary Objectives For PM
•Deliver project objectives within time, resource and
budget constraints.
•Identify and clear project issues.
•Identify innovative solutions and approaches.
•Lead teams to motive and energize talent.
•Sustain a sense of urgency around project critical paths
and issues.
•Generate awareness of projects
•Implement strategies to achieve project objectives.
•Deliver to commitments.
Scope Management
•Determine project approaches.
•Define client needs.
•Identify project objectives and benefits.
•Subdivide a large project scope into into manageable
project phases or subprojects.
•Develop work breakdown structures and define tasks,
components and dependencies.
•Define project roles and responsibilities.
•Define project tasks and deliverables.
•Develop time, cost and resource estimates.
•Ensure that project activities are aligned with client
objectives.
Time Management
•Prepare a baseline project schedule.
•Estimate effort and time.
•Identify resource requirements.
•Schedule project work, gates and milestones.
•Calculate probabilities of meeting project dates.
•Control project schedule.
•Control scope changes and impact to schedule.
•Manage change and revise schedule as required.
•Manage resource utilization.
Cost Management
•Manage budget approvals.
•Control project budget.
•Manage project cash flow.
•Assess impact of scope changes to budget.
•Control changes to project budget.
•Calculate probabilities of cost variances.
•Account for costs by task, time period and cost
account.
•Report cost performance using methods such as
earned value.
•Communicate costs and manage stakeholder cost
expectations.
Quality Management
•Identify quality control standards
•Ensure project complies with quality control
standards.
•Develop a quality management plan.
•Manage quality assurance and Meet Industry
Standards
•Measure and report quality of project deliverables.
Risk Management
•Identify risks with stakeholders.
•Compare identified risks with lists of well known project risks to
ensure completeness.
•Evaluate risk probabilities and impacts.
•Evaluate risk interactions and assess possible risk outcomes.
•Prioritize risks based on probability, impact and stakeholder
priorities.
•Identify risk controls.
Ideal Project Methodologies
IT project management methodologies are all about
specifying the best way to initiate, plan and execute
IT projects.
- Waterfall Methodology
- Agile Methodology
The waterfall model
The waterfall model is a sequential design
process, used in software development processes,
in which progress is seen as flowing steadily
downwards (like a waterfall) through different
phases.
It includes:
- Conception,
- Initiation,
- Analysis,
- Design,
- Construction,
- Testing,
- Production/Implementation and Maintenance.
The waterfall model
One of the main ideas of Waterfall is that by investing time in the early
stages of a project to ensure the proper design and requirements have
been met ultimately saves significant time and effort correcting
problems later on.
This is accomplished by ensuring that one phase of a project is 100-
percent successfully completed before moving onto the next phase.
Agile Methodology
Agile methodology is described as
“iterative” and “incremental.”
It involves regular cadences of work, known as
Sprints or iterations.
Comparison:
In waterfall, development teams only have one
chance to get each aspect of a project right.
In an agile paradigm, every aspect of
development — requirements, design, etc. —
is continually revisited.
Agile Methodology
Agile development provides opportunities to assess the direction throughout the
development lifecycle.
This is achieved through regular cadences of work, known as Sprints or iterations, at
the end of which teams must present a potentially shippable product increment. By
focusing on the repetition of abbreviated work cycles as well as the functional
product they yield, agile methodology is described as “iterative” and “incremental
601, MAHASAGAR CORPORATE, 10/1
MANORAMAGANJ, INDORE (M.P.),
INDIA – 452001
India. +91 731 4090138
USA. +91 731 4090138
Call
Aman +91 9039229250
Avnish +91 9826041566
sales@syscraftonline,com
www.syscraftonline.com
THANK YOU

More Related Content

What's hot

Presentation project management
Presentation project managementPresentation project management
Presentation project management
Flobz Caloy
 
PMP Training - 07 project cost management
PMP Training - 07 project cost managementPMP Training - 07 project cost management
PMP Training - 07 project cost management
ejlp12
 
Avenew Project Management Fundamental
Avenew Project Management FundamentalAvenew Project Management Fundamental
Avenew Project Management Fundamental
AVENEW INDONESIA
 

What's hot (20)

Presentation project management
Presentation project managementPresentation project management
Presentation project management
 
Project Closure Powerpoint Presentation Slides
Project Closure Powerpoint Presentation SlidesProject Closure Powerpoint Presentation Slides
Project Closure Powerpoint Presentation Slides
 
07. Project Integration Management
07. Project Integration Management07. Project Integration Management
07. Project Integration Management
 
Project cost management-slides
Project cost management-slidesProject cost management-slides
Project cost management-slides
 
Project cost control
Project cost controlProject cost control
Project cost control
 
00 Introduction of project scheduling
00 Introduction of project scheduling00 Introduction of project scheduling
00 Introduction of project scheduling
 
Lect-5: Work Breakdown Structure and Project Cost Estimation
Lect-5: Work Breakdown Structure and Project Cost EstimationLect-5: Work Breakdown Structure and Project Cost Estimation
Lect-5: Work Breakdown Structure and Project Cost Estimation
 
Practical Project Cost Control for Large Complex Projects
Practical Project Cost Control for Large Complex ProjectsPractical Project Cost Control for Large Complex Projects
Practical Project Cost Control for Large Complex Projects
 
Work breakdown structures
Work breakdown structures Work breakdown structures
Work breakdown structures
 
Work Breakdown Structure
Work Breakdown StructureWork Breakdown Structure
Work Breakdown Structure
 
What is a Work Breakdown Structure?
What is a Work Breakdown Structure?What is a Work Breakdown Structure?
What is a Work Breakdown Structure?
 
PMP Training - 07 project cost management
PMP Training - 07 project cost managementPMP Training - 07 project cost management
PMP Training - 07 project cost management
 
Work breakdown structure
Work breakdown structureWork breakdown structure
Work breakdown structure
 
Project Closure Process Steps PowerPoint Presentation Slides
Project Closure Process Steps PowerPoint Presentation Slides Project Closure Process Steps PowerPoint Presentation Slides
Project Closure Process Steps PowerPoint Presentation Slides
 
Program governance Structure
Program governance StructureProgram governance Structure
Program governance Structure
 
Project Monitoring And Controlling
Project Monitoring And ControllingProject Monitoring And Controlling
Project Monitoring And Controlling
 
Introduction to Project Management.pdf
Introduction to Project Management.pdfIntroduction to Project Management.pdf
Introduction to Project Management.pdf
 
PROJECT CONTROL PROCESS
PROJECT CONTROL PROCESS PROJECT CONTROL PROCESS
PROJECT CONTROL PROCESS
 
Avenew Project Management Fundamental
Avenew Project Management FundamentalAvenew Project Management Fundamental
Avenew Project Management Fundamental
 
Proposed Project Management Office
Proposed Project Management OfficeProposed Project Management Office
Proposed Project Management Office
 

Viewers also liked

How Health 2.0 is Reshaping Medical Practice and Research
How Health 2.0 is Reshaping Medical Practice and ResearchHow Health 2.0 is Reshaping Medical Practice and Research
How Health 2.0 is Reshaping Medical Practice and Research
Kent State University
 
Project Management
Project ManagementProject Management
Project Management
leen
 
presentation of the project coordination and its objecitives
presentation of the project coordination and its objecitivespresentation of the project coordination and its objecitives
presentation of the project coordination and its objecitives
pfrehe
 
K.Grieser - Trees for Tribs Update
K.Grieser - Trees for Tribs UpdateK.Grieser - Trees for Tribs Update
K.Grieser - Trees for Tribs Update
jgrieser
 
How to choose the right projects to meet your objectives and resources?
How to choose the right projects to meet your objectives and resources?How to choose the right projects to meet your objectives and resources?
How to choose the right projects to meet your objectives and resources?
MakeItRational
 
Emerging distribution models
Emerging distribution modelsEmerging distribution models
Emerging distribution models
Brahm Sharma
 

Viewers also liked (20)

Project Management by Results / by Objectives
Project Management by Results / by ObjectivesProject Management by Results / by Objectives
Project Management by Results / by Objectives
 
Project manager performance appraisal
Project manager performance appraisalProject manager performance appraisal
Project manager performance appraisal
 
Khuznudzan
KhuznudzanKhuznudzan
Khuznudzan
 
How Health 2.0 is Reshaping Medical Practice and Research
How Health 2.0 is Reshaping Medical Practice and ResearchHow Health 2.0 is Reshaping Medical Practice and Research
How Health 2.0 is Reshaping Medical Practice and Research
 
7 Habits of Successful people
7 Habits of Successful people7 Habits of Successful people
7 Habits of Successful people
 
Project Management
Project ManagementProject Management
Project Management
 
Dino Martins - People, plants and pollinators
Dino Martins - People, plants and pollinatorsDino Martins - People, plants and pollinators
Dino Martins - People, plants and pollinators
 
Summary
SummarySummary
Summary
 
cresume
cresumecresume
cresume
 
LinkedIn Resume
LinkedIn ResumeLinkedIn Resume
LinkedIn Resume
 
presentation of the project coordination and its objecitives
presentation of the project coordination and its objecitivespresentation of the project coordination and its objecitives
presentation of the project coordination and its objecitives
 
Recommendations
RecommendationsRecommendations
Recommendations
 
Mid Term Review Report for the DFID Funded CFSL Project in Malindi by Anyona ...
Mid Term Review Report for the DFID Funded CFSL Project in Malindi by Anyona ...Mid Term Review Report for the DFID Funded CFSL Project in Malindi by Anyona ...
Mid Term Review Report for the DFID Funded CFSL Project in Malindi by Anyona ...
 
K.Grieser - Trees for Tribs Update
K.Grieser - Trees for Tribs UpdateK.Grieser - Trees for Tribs Update
K.Grieser - Trees for Tribs Update
 
Anyona S. Gichuru, Value Chain Analysis of Beekeeping Wool Spinning & Ecotour...
Anyona S. Gichuru, Value Chain Analysis of Beekeeping Wool Spinning & Ecotour...Anyona S. Gichuru, Value Chain Analysis of Beekeeping Wool Spinning & Ecotour...
Anyona S. Gichuru, Value Chain Analysis of Beekeeping Wool Spinning & Ecotour...
 
A king for_israel
A king for_israelA king for_israel
A king for_israel
 
How to choose the right projects to meet your objectives and resources?
How to choose the right projects to meet your objectives and resources?How to choose the right projects to meet your objectives and resources?
How to choose the right projects to meet your objectives and resources?
 
Sustainable agriculture development in Ethiopia
Sustainable agriculture development in EthiopiaSustainable agriculture development in Ethiopia
Sustainable agriculture development in Ethiopia
 
Marketing associate job description
Marketing associate job descriptionMarketing associate job description
Marketing associate job description
 
Emerging distribution models
Emerging distribution modelsEmerging distribution models
Emerging distribution models
 

Similar to Management by Objectives from the views of Project Management and Coordination

Lecture 27 Projects (03-11-20).pptx
Lecture 27 Projects (03-11-20).pptxLecture 27 Projects (03-11-20).pptx
Lecture 27 Projects (03-11-20).pptx
chikuverma1
 
Web project management
Web project managementWeb project management
Web project management
beutnagel
 

Similar to Management by Objectives from the views of Project Management and Coordination (20)

Applying both of waterfall and iterative development
Applying both of waterfall and iterative developmentApplying both of waterfall and iterative development
Applying both of waterfall and iterative development
 
PME UNIT-3.pptx
PME UNIT-3.pptxPME UNIT-3.pptx
PME UNIT-3.pptx
 
Northern Finishing School: IT Project Managment
Northern Finishing School: IT Project ManagmentNorthern Finishing School: IT Project Managment
Northern Finishing School: IT Project Managment
 
PM & PM LC.pptx
PM & PM LC.pptxPM & PM LC.pptx
PM & PM LC.pptx
 
6396901
63969016396901
6396901
 
Introduction to Software Project Management
Introduction to Software Project ManagementIntroduction to Software Project Management
Introduction to Software Project Management
 
Session 2 mod 2 proj mgt
Session 2 mod 2 proj mgtSession 2 mod 2 proj mgt
Session 2 mod 2 proj mgt
 
Web Project Management
Web Project ManagementWeb Project Management
Web Project Management
 
Lecture 27 Projects (03-11-20).pptx
Lecture 27 Projects (03-11-20).pptxLecture 27 Projects (03-11-20).pptx
Lecture 27 Projects (03-11-20).pptx
 
INTRO.pptx
INTRO.pptxINTRO.pptx
INTRO.pptx
 
Projectmanagement 130721095616-phpapp01
Projectmanagement 130721095616-phpapp01Projectmanagement 130721095616-phpapp01
Projectmanagement 130721095616-phpapp01
 
Projectmanagement 130721095616-phpapp01
Projectmanagement 130721095616-phpapp01Projectmanagement 130721095616-phpapp01
Projectmanagement 130721095616-phpapp01
 
Is your project not going well this will help you get it back on track
Is your project not going well this will help you get it back on trackIs your project not going well this will help you get it back on track
Is your project not going well this will help you get it back on track
 
Lets get digital
Lets get digitalLets get digital
Lets get digital
 
Project Plan Development - A FlackVentures Training Example
Project Plan Development - A FlackVentures Training ExampleProject Plan Development - A FlackVentures Training Example
Project Plan Development - A FlackVentures Training Example
 
bingsusu.pptx
bingsusu.pptxbingsusu.pptx
bingsusu.pptx
 
Importance of Adaptive Planning in Agile
Importance of Adaptive Planning in AgileImportance of Adaptive Planning in Agile
Importance of Adaptive Planning in Agile
 
Setting up a project framework phase 1 june 20162
Setting up a project framework phase 1 june 20162Setting up a project framework phase 1 june 20162
Setting up a project framework phase 1 june 20162
 
Project management
Project managementProject management
Project management
 
Web project management
Web project managementWeb project management
Web project management
 

More from Syscraft Information System Pvt. Ltd.

More from Syscraft Information System Pvt. Ltd. (15)

Demystifying AI | A Comprehensive Guide
Demystifying AI | A Comprehensive Guide	Demystifying AI | A Comprehensive Guide
Demystifying AI | A Comprehensive Guide
 
Syscraft: Uber Clone Apps - The Future of On-Demand Services
Syscraft: Uber Clone Apps - The Future of On-Demand ServicesSyscraft: Uber Clone Apps - The Future of On-Demand Services
Syscraft: Uber Clone Apps - The Future of On-Demand Services
 
Uber Clone App Development: Essential Features for Seamless Ride Booking
Uber Clone App Development: Essential Features for Seamless Ride BookingUber Clone App Development: Essential Features for Seamless Ride Booking
Uber Clone App Development: Essential Features for Seamless Ride Booking
 
How Does Cloud-based Machine Learning impact your Business?
How Does Cloud-based Machine Learning impact your Business?How Does Cloud-based Machine Learning impact your Business?
How Does Cloud-based Machine Learning impact your Business?
 
Transforming Customer Service with AI-Powered Chatbots
Transforming Customer Service with AI-Powered ChatbotsTransforming Customer Service with AI-Powered Chatbots
Transforming Customer Service with AI-Powered Chatbots
 
Why Java Is Key to the Future of Big Data and IoT
Why Java Is Key to the Future of Big Data and IoTWhy Java Is Key to the Future of Big Data and IoT
Why Java Is Key to the Future of Big Data and IoT
 
IoT Device Security: Best Practices for Enhanced Protection
IoT Device Security: Best Practices for Enhanced ProtectionIoT Device Security: Best Practices for Enhanced Protection
IoT Device Security: Best Practices for Enhanced Protection
 
Enhancing Guest Experiences: The Future of Hospitality Apps
Enhancing Guest Experiences: The Future of Hospitality AppsEnhancing Guest Experiences: The Future of Hospitality Apps
Enhancing Guest Experiences: The Future of Hospitality Apps
 
Understanding Artificial Intelligence: A Comprehensive Guide
Understanding Artificial Intelligence: A Comprehensive GuideUnderstanding Artificial Intelligence: A Comprehensive Guide
Understanding Artificial Intelligence: A Comprehensive Guide
 
Top 5 PHP Frameworks to Consider in 2023 for Web Development
Top 5 PHP Frameworks to Consider in 2023 for Web DevelopmentTop 5 PHP Frameworks to Consider in 2023 for Web Development
Top 5 PHP Frameworks to Consider in 2023 for Web Development
 
Rapid Advancements in AI are revolutionalizing industries.pdf
Rapid Advancements in AI are revolutionalizing industries.pdfRapid Advancements in AI are revolutionalizing industries.pdf
Rapid Advancements in AI are revolutionalizing industries.pdf
 
Top 15 Mobile Application Development Trends to Follow in 2023
Top 15 Mobile Application Development Trends to Follow in 2023Top 15 Mobile Application Development Trends to Follow in 2023
Top 15 Mobile Application Development Trends to Follow in 2023
 
ChatGPT: How does this AI-Language Model Work?
ChatGPT: How does this AI-Language Model Work? ChatGPT: How does this AI-Language Model Work?
ChatGPT: How does this AI-Language Model Work?
 
Mobile Application Trends in 2018
Mobile Application Trends in 2018Mobile Application Trends in 2018
Mobile Application Trends in 2018
 
HR Objectives and Plans for 2015 in ‪#‎Syscraft‬ as a unit
HR Objectives and Plans for 2015 in ‪#‎Syscraft‬ as a unitHR Objectives and Plans for 2015 in ‪#‎Syscraft‬ as a unit
HR Objectives and Plans for 2015 in ‪#‎Syscraft‬ as a unit
 

Recently uploaded

Search and Society: Reimagining Information Access for Radical Futures
Search and Society: Reimagining Information Access for Radical FuturesSearch and Society: Reimagining Information Access for Radical Futures
Search and Society: Reimagining Information Access for Radical Futures
Bhaskar Mitra
 

Recently uploaded (20)

FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdfFIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
 
Search and Society: Reimagining Information Access for Radical Futures
Search and Society: Reimagining Information Access for Radical FuturesSearch and Society: Reimagining Information Access for Radical Futures
Search and Society: Reimagining Information Access for Radical Futures
 
In-Depth Performance Testing Guide for IT Professionals
In-Depth Performance Testing Guide for IT ProfessionalsIn-Depth Performance Testing Guide for IT Professionals
In-Depth Performance Testing Guide for IT Professionals
 
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
 
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
 
Exploring UiPath Orchestrator API: updates and limits in 2024 🚀
Exploring UiPath Orchestrator API: updates and limits in 2024 🚀Exploring UiPath Orchestrator API: updates and limits in 2024 🚀
Exploring UiPath Orchestrator API: updates and limits in 2024 🚀
 
UiPath Test Automation using UiPath Test Suite series, part 1
UiPath Test Automation using UiPath Test Suite series, part 1UiPath Test Automation using UiPath Test Suite series, part 1
UiPath Test Automation using UiPath Test Suite series, part 1
 
ODC, Data Fabric and Architecture User Group
ODC, Data Fabric and Architecture User GroupODC, Data Fabric and Architecture User Group
ODC, Data Fabric and Architecture User Group
 
UiPath Test Automation using UiPath Test Suite series, part 3
UiPath Test Automation using UiPath Test Suite series, part 3UiPath Test Automation using UiPath Test Suite series, part 3
UiPath Test Automation using UiPath Test Suite series, part 3
 
The Future of Platform Engineering
The Future of Platform EngineeringThe Future of Platform Engineering
The Future of Platform Engineering
 
When stars align: studies in data quality, knowledge graphs, and machine lear...
When stars align: studies in data quality, knowledge graphs, and machine lear...When stars align: studies in data quality, knowledge graphs, and machine lear...
When stars align: studies in data quality, knowledge graphs, and machine lear...
 
Unpacking Value Delivery - Agile Oxford Meetup - May 2024.pptx
Unpacking Value Delivery - Agile Oxford Meetup - May 2024.pptxUnpacking Value Delivery - Agile Oxford Meetup - May 2024.pptx
Unpacking Value Delivery - Agile Oxford Meetup - May 2024.pptx
 
Key Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdfKey Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdf
 
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdfFIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
 
Speed Wins: From Kafka to APIs in Minutes
Speed Wins: From Kafka to APIs in MinutesSpeed Wins: From Kafka to APIs in Minutes
Speed Wins: From Kafka to APIs in Minutes
 
FIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdfFIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdf
 
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMsTo Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
 
How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...
 
Mission to Decommission: Importance of Decommissioning Products to Increase E...
Mission to Decommission: Importance of Decommissioning Products to Increase E...Mission to Decommission: Importance of Decommissioning Products to Increase E...
Mission to Decommission: Importance of Decommissioning Products to Increase E...
 
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered QualitySoftware Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
 

Management by Objectives from the views of Project Management and Coordination

  • 1. Management by Objectives from the views of Project Management and Coordination CREDENTIALS
  • 2. We Are Following Converting a dream, a vision or a need into reality, that is what we all do Don't you think its great job that we do!! Project is - - A job that has beginning and end time(Time) - A specified outcome(Scope) - A stated level of Performance(Quality) - At a budget(Costs)
  • 3. Everyone was developing, no one was managing which resulted in: • Undefined Deadlines • Decision line was broken • Milestone structure was hampered • Developers were not able to concentrate • Hampered company's revenue Past Approach in Syscraft
  • 4. Challenges we faced in absence of PM!
  • 5. Generalization to Expertise Now Syscraft has Increased skills and team size to work on multiple projects simultaneously :)
  • 6. Various Stages of a Project
  • 7. How various stages look like in Syscraft! Presales, 24-48 hrs. Sales Signoff Production Release/Handoff/ Closure Post Sales Maintenance/service check Sales Team & Client Technical In-house team & PM Sales Team PM TeamPM Team Connecting Client and BD team with QA & Production
  • 8. Now who do we need to execute a working project in various stages ?? Who can synchronize all the departments and keep them connected ??
  • 10. But how PM is Perceived ??
  • 11. My project manager is not technical. He won't ever understand my challenges He just pass on the work and disappears for the rest of the day
  • 12. My Project Manager takes up all the credit Always finds a reason to complain
  • 13. He gives me too much of work load. Meetings & only meetings :(
  • 14. But PM is Actually.. Responsible for PM Responsible for Integration Scope Time Cost Quality Human Resource Communi cation Risk Procurement Document Change
  • 15. Challenges at the Documentation level 1) Strong Project scope documents and SRS documents 2) Clearly defined milestones 3) Documented client details 4) Documented Handover
  • 16. Challenges at the Communication Level 1) Verbal Communication should be avoided 2) Client feedback should be documented instead of verbally communicated 3) There is no point of writing emails unless and until we read it
  • 18. Challenges we face Timelines No details on projects Project Scope Milestone plan Client Information Basic Idea of project Technology Benchmarks
  • 19. Don't Forget !!! We are a TEAM, For all the credits.. and For all the Loss!
  • 20. SO WHAT IS THE SOLUTION for these challenges ??? MBO- Management By Objectives
  • 21. Objective:Objective: Deliver Quality on Time (DQT) DQT meansDQT means Happy customer >> Repeated Order >> More referral KPI:KPI: RequirementsRequirements Industry StandardsIndustry Standards Internal QAInternal QA Client FeedbackClient Feedback
  • 22. Our Agenda Deliver Quality Services/Products on Time within defined Cost Meeting the above KPI's would result in Happy customer and hence return business and More sales To meet the above KPI's we need to make our following areas strong: 1) Presales 2) Sales 3) Handoff 4) Task breakdown 5) Project Plans 6) Strong QA
  • 23. Management by Objectives is to cut down the larger task into smaller ones so they can be managed and worked out easily to achieve the target goal. Utility of PM here comes to manage the smaller task within team What is MBO and Utility for PM
  • 24. Achieving smaller goals step by step helps to get on the Target Goal !!
  • 25. Work Breakdown plays major role in setting Objectives
  • 26. Example : Getting a project with 500 hours of estimate will be tough one to complete isn't it??? but if we cut it down in modules and task are divided for today and tomorrow that would be helpful to achieve entire Goal. So main objective will be complete the assignments
  • 27. Project Management is the discipline of planning, Organizing and Managing resources to bring about the successful completion of Project Goals What is Project Management??
  • 28. Primary Objectives For PM •Deliver project objectives within time, resource and budget constraints. •Identify and clear project issues. •Identify innovative solutions and approaches. •Lead teams to motive and energize talent. •Sustain a sense of urgency around project critical paths and issues. •Generate awareness of projects •Implement strategies to achieve project objectives. •Deliver to commitments.
  • 29. Scope Management •Determine project approaches. •Define client needs. •Identify project objectives and benefits. •Subdivide a large project scope into into manageable project phases or subprojects. •Develop work breakdown structures and define tasks, components and dependencies. •Define project roles and responsibilities. •Define project tasks and deliverables. •Develop time, cost and resource estimates. •Ensure that project activities are aligned with client objectives.
  • 30. Time Management •Prepare a baseline project schedule. •Estimate effort and time. •Identify resource requirements. •Schedule project work, gates and milestones. •Calculate probabilities of meeting project dates. •Control project schedule. •Control scope changes and impact to schedule. •Manage change and revise schedule as required. •Manage resource utilization.
  • 31. Cost Management •Manage budget approvals. •Control project budget. •Manage project cash flow. •Assess impact of scope changes to budget. •Control changes to project budget. •Calculate probabilities of cost variances. •Account for costs by task, time period and cost account. •Report cost performance using methods such as earned value. •Communicate costs and manage stakeholder cost expectations.
  • 32. Quality Management •Identify quality control standards •Ensure project complies with quality control standards. •Develop a quality management plan. •Manage quality assurance and Meet Industry Standards •Measure and report quality of project deliverables.
  • 33. Risk Management •Identify risks with stakeholders. •Compare identified risks with lists of well known project risks to ensure completeness. •Evaluate risk probabilities and impacts. •Evaluate risk interactions and assess possible risk outcomes. •Prioritize risks based on probability, impact and stakeholder priorities. •Identify risk controls.
  • 34. Ideal Project Methodologies IT project management methodologies are all about specifying the best way to initiate, plan and execute IT projects. - Waterfall Methodology - Agile Methodology
  • 35. The waterfall model The waterfall model is a sequential design process, used in software development processes, in which progress is seen as flowing steadily downwards (like a waterfall) through different phases. It includes: - Conception, - Initiation, - Analysis, - Design, - Construction, - Testing, - Production/Implementation and Maintenance.
  • 36. The waterfall model One of the main ideas of Waterfall is that by investing time in the early stages of a project to ensure the proper design and requirements have been met ultimately saves significant time and effort correcting problems later on. This is accomplished by ensuring that one phase of a project is 100- percent successfully completed before moving onto the next phase.
  • 37. Agile Methodology Agile methodology is described as “iterative” and “incremental.” It involves regular cadences of work, known as Sprints or iterations. Comparison: In waterfall, development teams only have one chance to get each aspect of a project right. In an agile paradigm, every aspect of development — requirements, design, etc. — is continually revisited.
  • 38. Agile Methodology Agile development provides opportunities to assess the direction throughout the development lifecycle. This is achieved through regular cadences of work, known as Sprints or iterations, at the end of which teams must present a potentially shippable product increment. By focusing on the repetition of abbreviated work cycles as well as the functional product they yield, agile methodology is described as “iterative” and “incremental