The document discusses project management and provides information on key concepts. It begins by defining a project and the goals of project management. It then covers the project life cycle, knowledge areas, and reasons for project failure. The document emphasizes that project management ensures projects are delivered on time, within budget, and meet requirements to provide value. It summarizes several approaches, methodologies, and principles for effective project management.
Software Project Management | An Overview of the Software Project ManagementAhsan Rahim
Management is the process of getting things done through others, it is the process of coordinating people & other resources to achieve the goals of the organization. A project is a set of related tasks that are coordinated to achieve a specific objective in a given time limit. A project is well-defined task, which is a collection of several operations done in order to achieve a goal. Software is the program & all associated documentation & configuration data which is needed to make these programs operate correctly.
A Software Project is the complete procedure of software development from requirement gathering to testing & maintenance, carried out according to the execution methodologies, in a specified period of time to achieve intended software product.
This Presentation create a basic information and Idea about the Project Management Practices. The data was compiled from the reputed sources for better understanding.
Software Project Management | An Overview of the Software Project ManagementAhsan Rahim
Management is the process of getting things done through others, it is the process of coordinating people & other resources to achieve the goals of the organization. A project is a set of related tasks that are coordinated to achieve a specific objective in a given time limit. A project is well-defined task, which is a collection of several operations done in order to achieve a goal. Software is the program & all associated documentation & configuration data which is needed to make these programs operate correctly.
A Software Project is the complete procedure of software development from requirement gathering to testing & maintenance, carried out according to the execution methodologies, in a specified period of time to achieve intended software product.
This Presentation create a basic information and Idea about the Project Management Practices. The data was compiled from the reputed sources for better understanding.
What is a project & Project management
Organization for industrial projects
The role of people at different positions,
Project environment
Project classification
Anyone playing a leadership role, formally or informally, on any kind of project, they act as a project managers. So in order to manage our projects effectively project management plays an essential role
What is a project & Project management
Organization for industrial projects
The role of people at different positions,
Project environment
Project classification
Anyone playing a leadership role, formally or informally, on any kind of project, they act as a project managers. So in order to manage our projects effectively project management plays an essential role
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxR&R Consult
CFD analysis is incredibly effective at solving mysteries and improving the performance of complex systems!
Here's a great example: At a large natural gas-fired power plant, where they use waste heat to generate steam and energy, they were puzzled that their boiler wasn't producing as much steam as expected.
R&R and Tetra Engineering Group Inc. were asked to solve the issue with reduced steam production.
An inspection had shown that a significant amount of hot flue gas was bypassing the boiler tubes, where the heat was supposed to be transferred.
R&R Consult conducted a CFD analysis, which revealed that 6.3% of the flue gas was bypassing the boiler tubes without transferring heat. The analysis also showed that the flue gas was instead being directed along the sides of the boiler and between the modules that were supposed to capture the heat. This was the cause of the reduced performance.
Based on our results, Tetra Engineering installed covering plates to reduce the bypass flow. This improved the boiler's performance and increased electricity production.
It is always satisfying when we can help solve complex challenges like this. Do your systems also need a check-up or optimization? Give us a call!
Work done in cooperation with James Malloy and David Moelling from Tetra Engineering.
More examples of our work https://www.r-r-consult.dk/en/cases-en/
Welcome to WIPAC Monthly the magazine brought to you by the LinkedIn Group Water Industry Process Automation & Control.
In this month's edition, along with this month's industry news to celebrate the 13 years since the group was created we have articles including
A case study of the used of Advanced Process Control at the Wastewater Treatment works at Lleida in Spain
A look back on an article on smart wastewater networks in order to see how the industry has measured up in the interim around the adoption of Digital Transformation in the Water Industry.
Final project report on grocery store management system..pdfKamal Acharya
In today’s fast-changing business environment, it’s extremely important to be able to respond to client needs in the most effective and timely manner. If your customers wish to see your business online and have instant access to your products or services.
Online Grocery Store is an e-commerce website, which retails various grocery products. This project allows viewing various products available enables registered users to purchase desired products instantly using Paytm, UPI payment processor (Instant Pay) and also can place order by using Cash on Delivery (Pay Later) option. This project provides an easy access to Administrators and Managers to view orders placed using Pay Later and Instant Pay options.
In order to develop an e-commerce website, a number of Technologies must be studied and understood. These include multi-tiered architecture, server and client-side scripting techniques, implementation technologies, programming language (such as PHP, HTML, CSS, JavaScript) and MySQL relational databases. This is a project with the objective to develop a basic website where a consumer is provided with a shopping cart website and also to know about the technologies used to develop such a website.
This document will discuss each of the underlying technologies to create and implement an e- commerce website.
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...Amil Baba Dawood bangali
Contact with Dawood Bhai Just call on +92322-6382012 and we'll help you. We'll solve all your problems within 12 to 24 hours and with 101% guarantee and with astrology systematic. If you want to take any personal or professional advice then also you can call us on +92322-6382012 , ONLINE LOVE PROBLEM & Other all types of Daily Life Problem's.Then CALL or WHATSAPP us on +92322-6382012 and Get all these problems solutions here by Amil Baba DAWOOD BANGALI
#vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore#blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #blackmagicforlove #blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #Amilbabainuk #amilbabainspain #amilbabaindubai #Amilbabainnorway #amilbabainkrachi #amilbabainlahore #amilbabaingujranwalan #amilbabainislamabad
About
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Technical Specifications
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
Key Features
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface
• Compatible with MAFI CCR system
• Copatiable with IDM8000 CCR
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
Application
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Democratizing Fuzzing at Scale by Abhishek Aryaabh.arya
Presented at NUS: Fuzzing and Software Security Summer School 2024
This keynote talks about the democratization of fuzzing at scale, highlighting the collaboration between open source communities, academia, and industry to advance the field of fuzzing. It delves into the history of fuzzing, the development of scalable fuzzing platforms, and the empowerment of community-driven research. The talk will further discuss recent advancements leveraging AI/ML and offer insights into the future evolution of the fuzzing landscape.
Event Management System Vb Net Project Report.pdfKamal Acharya
In present era, the scopes of information technology growing with a very fast .We do not see any are untouched from this industry. The scope of information technology has become wider includes: Business and industry. Household Business, Communication, Education, Entertainment, Science, Medicine, Engineering, Distance Learning, Weather Forecasting. Carrier Searching and so on.
My project named “Event Management System” is software that store and maintained all events coordinated in college. It also helpful to print related reports. My project will help to record the events coordinated by faculties with their Name, Event subject, date & details in an efficient & effective ways.
In my system we have to make a system by which a user can record all events coordinated by a particular faculty. In our proposed system some more featured are added which differs it from the existing system such as security.
Automobile Management System Project Report.pdfKamal Acharya
The proposed project is developed to manage the automobile in the automobile dealer company. The main module in this project is login, automobile management, customer management, sales, complaints and reports. The first module is the login. The automobile showroom owner should login to the project for usage. The username and password are verified and if it is correct, next form opens. If the username and password are not correct, it shows the error message.
When a customer search for a automobile, if the automobile is available, they will be taken to a page that shows the details of the automobile including automobile name, automobile ID, quantity, price etc. “Automobile Management System” is useful for maintaining automobiles, customers effectively and hence helps for establishing good relation between customer and automobile organization. It contains various customized modules for effectively maintaining automobiles and stock information accurately and safely.
When the automobile is sold to the customer, stock will be reduced automatically. When a new purchase is made, stock will be increased automatically. While selecting automobiles for sale, the proposed software will automatically check for total number of available stock of that particular item, if the total stock of that particular item is less than 5, software will notify the user to purchase the particular item.
Also when the user tries to sale items which are not in stock, the system will prompt the user that the stock is not enough. Customers of this system can search for a automobile; can purchase a automobile easily by selecting fast. On the other hand the stock of automobiles can be maintained perfectly by the automobile shop manager overcoming the drawbacks of existing system.
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Dr.Costas Sachpazis
Terzaghi's soil bearing capacity theory, developed by Karl Terzaghi, is a fundamental principle in geotechnical engineering used to determine the bearing capacity of shallow foundations. This theory provides a method to calculate the ultimate bearing capacity of soil, which is the maximum load per unit area that the soil can support without undergoing shear failure. The Calculation HTML Code included.
Student information management system project report ii.pdfKamal Acharya
Our project explains about the student management. This project mainly explains the various actions related to student details. This project shows some ease in adding, editing and deleting the student details. It also provides a less time consuming process for viewing, adding, editing and deleting the marks of the students.
7. •1-
•Project Management
•Project management is the application of knowledge, skills, tools, and
techniques to project activities in order to meet or exceed stakeholder
needs and expectations from a project.
– PM is disciple of organizing, staffing, controlling, communicating,
coordinating and managing resources to bring about successful
completion of project.
–Goals of PM
•Optimizing use of available resources- time , money. Scope
•Planning , scheduling and monitoring progress
•Risk management
–Characteristics of PM
–Manager is the head
–Point of convergence
–Integrate all efforts and skills
–Rewards, results and outcomes
–Brings all departments into action
8. •Standish group survey(done in 1994
&updated since then)
•Project success:completed within time &
budget with all functions n feature.
• Project challenged: completed & operational
but over budget & time with fewer feature n
functions.
•Project fails: project is cancelled at some
time during PLC
•1-
9. •TCS MAJOR REASONS BEHIND PROJECT FAILURE
1.62% Failed for Schedule
2.49 % Budget Overruns
3.47 % Maintenance cost
4.41 Failed to deliver ROI(return on investment)
10. • Approaches of Improving IT Project Success
1.User involvement
2.Executive management support
3.Clear requirements and Business Objectives
4.Proper Planning
5.Realistic expectations
6.Emotional Maturity-Deliver Bad news, accept Criticism
7.Skilled Resources-Competent staff
8.Project Management Expertise-Hard working focused team
9.Standard tools & infrastructure
10.Agile Process
13. The effective software project management Focuses
on four P’s:
The People
The Product
The Process
The Project
14. People
The following categories of people are involved in the S/W
Process.
Senior Manager
Project Managers
Practitioners
Customers
End Users
15. The Process
Here the important thing is to select an appropriate
process model to develop the software.
There are different process models available.
They are Water fall model, Iterative water fall
model,Prototyping model,Evolutionary
model,RAD(Rapid Application Development) model,
Spiral model.
In practice we may use any one of the above
models or a combination of the above models.
16. The Product
Before a software project is planned, the product
objectives and scope should be established.
Technical and management constraints should be
identified.
Without this information it is impossible to define a
reasonable cost, amount of risk involved, the project
schedule etc.
A software project scope must be unambiguous and
understandable at the management and technical levels.
17. In order to manage a successful software project, we
must understand what can go wrong (so that
problems can be Avoided) and how to do it right.
A project is a series of steps where we need to
make accurate decision.
Project
19. THE W5HH PRINCIPLE
In an excellent paper on software process and projects,
Barry Boehm states:
“you need an organizing principle that scales down to
provide simple plans for simple projects.”
Boehm suggests an approach that addresses project
objectives, milestones, schedules, responsibilities,
management and technical approaches, and required
resources.
20. W5HH Approach
Why is the system being developed?
The answer to this question enables all parties to assess the
validity of business reasons for the software work. Stated in
another way, does the business purpose justify the expenditure of
people, time, and money?
What will be done, by when?
The answers to these questions help the team to establish a
project schedule by identifying key project tasks and the
milestones that are required by the customer.
21. Who is responsible for a function?
We know that the role and responsibility of each member of
the software team must be defined.
Where are they organizationally located?
Not all roles and responsibilities reside within the software
team itself. The customer, users, and other stakeholders also
have responsibilities
22. How will the job be done technically and
managerially?
Management and technical strategy must be
defined.
How much of each resource is needed?
Develop estimation.
The W5HH is applicable to all software
projects regardless of size or complexity.
23. Need for Project Management
Project management is important because it ensures what is
being delivered, is right, and will deliver real value against the
business opportunity.
Leadership. ...
Clear Focus & Objectives. ...
Realistic Project Planning. ...
Quality Control. ...
Risk Management. ...
Orderly Process. ...
Etc..
28. •Project Management
Knowledge Areas
Key Knowledge areas
1.Project integration management
2.Project scope management
3.Project time management
4.Project cost management
5.Project quality management
29. 6. Project human resource mgmt.
7. Project communication mgmt.
8. Project risk management
9. Project procurement mgmt.
Also Project Stake holders mgmt
30. Project Integration management is a collection of
processes required to ensure that the various elements of the
projects are properly coordinated. It involves making trade-
offs among competing objectives and alternatives to meet or
exceed stakeholder needs and expectations.
Project scope management is a process that helps in
determining and documenting the list of all the project goals,
tasks, deliverables, deadlines, and budget as a part of the
planning process.
31. Project time management is about using the amount
of time allocated to a project wisely in order to meet scheduled
deliverables and conclude all work by or before
the project completion date is compulsory for a successful project.
Project cost management is the process of estimating, budgeting
and controlling costs throughout the project life cycle, with the
objective of keeping expenditures within the approved budget, for
a project to be called successful, it's necessary.
Project quality management is the process through
which quality is managed and maintained throughout a PLC. This
responsibility ensures quality expectations are met.
32. Project human resource management involves organizing
and managing a project team. The team is usually made up of
people with specific skills and responsibilities. Project human
resource management processes include human resource planning,
acquiring the project team, developing the project team
and managing the team.
Project communication management is a collection of processes
that helps to make sure the right messages are sent, received, and
understood by the right people
Project Risk management is a process that allows individual risk
events and overall risk to be understood and managed proactively,
optimizing success by minimizing.
33. Project procurement management is to establish and maintain
relationships with vendors of goods and services during
the project life cycle. This unique function is an essential part
of project management, which is concerned with overseeing
designated sets of temporary operations
Project Stakeholder management is the project manager's
responsibility to manage and even influence key stakeholders'
expectations as well as requirements. Suppose if
key stakeholders aren't happy, the project is a failure. This is
why project stakeholder management is crucial for project success.
36. Phase 1: Conceptualize and Initialize
Define Project Goal
Provides business value to organization
How will we know if the project is successful given
the time, money, and resources invested?
⮚Deliverable : Business Case
37. �Business case is a deliverable that documents projects
goal as well several alternatives
�Cost feasibility,benefits, risks
�Organisation funds
�strategic
38. Project Charter: how project organized and how
approved alternative will be implemented.
Project plan is tactical details concerning who will carry
out work n when
who is manager?
team? scope? cost? time? Resources? Technology?
⮚Deliverable : Project Charter and plan
39. �Phase 3: Execute and Control the Project using approach
such as the SDLC
oAnalysis
oDesign
oCoding
oTesting
oMaintenance
�Phase 4: Close Project
�Deliverable :
oFinal project report and documentation
40. �Phase 5: Evaluate Project Success
◦Post mortem by project manager and team of entire project
◦Evaluation of team members by project manager
◦Evaluate project’s organizational value
41. Business Case
⮚It provides the 1st deliverable in the IT Project Life Cycle.
⮚Definition :
• Business Case provides an analysis of the organizational value, feasibility, costs,
benefits and risks of several proposed alternatives.
⮚It is not a budget or project plan.
⮚Attributes of a good Business Case
▪Details all possible impacts, costs, benefits
▪Clearly compares alternatives
▪Objectively includes all pertinent information
▪Systematic in terms of summarizing findings
43. Step I: Select the Core Team
A core team is recruited.
⮚The core team includes:
•Managers
•Business Specialist
•IT Specialist
•Other stakeholders that are affected by the project or involved
in its delivery.
⮚Advantages:
-Credibility
-Alignment with organizational goals
-Access to the real costs
-Ownership
-Agreement
-Bridge building
44. Step II: Define Measurable Organizational
Value (MOV)
⮚The Project’s overall goal and measure of success is referred as
the Project’s overall Measurable Organizational Value .
⮚Aligns IT project with the organization and supports the
Organization’s goal, mission and objectives.
⮚The MOV must:
✔Be measurable
✔Provides value to the organization
✔Must be agreed upon
✔Must be verifiable at the end of the project
45. Step III: Identify Alternatives
⮚Options identified in the Business Case are the strategies
for achieving the MOV.
⮚Base Case Alternatives:
•It describes how the organization would perform if it
maintained the status quo- i.e. if it did not pursue any of the
options described in the business case.
⮚Possible Alternative Strategies
•Change existing process without investing in IT
•Adopt/Adapt systems from other organizational areas
•Reengineer Existing System
•Purchase off-the-shelf Applications package
•Custom Build New Solution
46. Step IV: Define Feasibility and Asses
Risk
Feasibilty:
Focuses on whether a particular alternative is doable and
worth doing.
Types:
i.Economic feasibility:Cost/Benefit Analysis of alternatives
ii.Technical feasibility:Focuses on existing technical
infrastructure
iii.Organizational feasibility:Considers the impact on the
organization
iv.Other feasibilities:Issues like operational,legal and ethical
feasibility
47. Risk:
⮚An uncertain event that has a positive or negative effect
on the project’s objective.
⮚It focuses on what can go wrong and what must go
right.
⮚Risk deals with:
oIdentification: What can go wrong ?What must go
right?
oAssessment: What is the impact of each risk?
oResponse: How to avoid or minimize the risk?
48. Step V: Define Total Cost of
Ownership(TCO)
⮚It refers to the total cost of acquiring ,developing,
maintaining and supporting the application system over its
useful life.
⮚TCO includes costs as:
1.Direct/Up-Front costs- Initial purchase of h/w , s/w &
telecom equipments installation cost etc.
2.Ongoing cost- Salaries ,training,upgrades,maintenance etc.
3.Indirect Cost- time lost by users when the system is
down,quality assurance etc.
⮚TCO goes beyond the original purchase or development
costs.
49. Step VI: Define Total Benefits of
Ownership(TBO)
⮚It should address the benefits of an alternative over the
course of its useful life.
⮚It must include all of the direct,ongoing and indirect
benefits associated with each proposed alternative.
⮚Benefits can arise from:
oIncreasing high-value work
oImproving accuracy and efficiency
oImproving decision-making
oImproving customer service
50. Step VII: Analyze Alternatives using
Financial models and Scoring models
•All the Alternatives are compared with each other consistently.
•The most common ways are :