Page 1 of 2 Job Description - Proposal Manager Revised: 09/06/2009
Job Description – Proposal Manager
1.0 Purpose:
Job Descriptions are part of Company Quality Policies and Procedures.
This standard defines the tasks and responsibilities of Proposal Manager. The
standard is valid for all employees performing in this role.
2.0 General:
The Proposal Manager is responsible for the preparation of all assigned proposals,
from concept through presentation to the customer. The proposal shall meet the
requirements of the customer and clearly define the scope of work and services to
both the client and the internal execution group. The Proposal shall be prepared in
a timely manner to comply with internal review requirements and customer
requirements.
3.0 Tasks and Responsibilities:
The Proposal Manager shall be responsible for, but not limited to, the following:
• Work with the Business Unit Manager and Account Manager to prepare a
proposal plan that meets the objectives of the proposal budget and timeline.
• Review the inquiry documents for special requirements.
• Distribute inquiry documents to others involved in the proposal and estimate
preparation as required.
• Obtain assistance from other departments (Engineering, Estimating, Contract
Administration, Construction, etc.) as required to prepare the proposal.
• Primary responsibility for preparation/review of the proposal write-ups.
• Prepare initial assessment of the technical, financial, schedule or any other
unusual risks associated with a proposal.
• Clearly define the Scope of Work and Services offered to the Customer and
identify any clarifications or exceptions to the Customer’s inquiry.
• Maintain knowledge of approved company vendors, estimating methods as well
as project execution procedures.
• Obtain feed back from projects for “lessons learned” to incorporate in future
proposals.
• Prepare and lead the Proposal Turnover meeting with supporting documentation.
• Conform the Cost Book for all successful Proposals.
4.0 Education and Experience Required:
• B.S. Engineering degree or equivalent work experience.
• Five years of industry experience with a minimum of three years in project
engineering/ project management or process engineering.
• Working knowledge and experience with preparation of budgets, schedules and
cost estimates.
Page 2 of 2 Job Description - Proposal Manager Revised: 09/06/2009
5.0 Skills Required:
• Organizational skills and time management.
• Effective communications skills both written and verbal for interface with Clients
and co-workers.
• Able to work in a team environment (Engineering, Purchasing, Estimating,
Construction, etc.).
• Effective computer skills: Microsoft Office Software, Lotus Notes, and other
Company and discipline specific software applications. Excel skills required.
6.0 Travel Percentage:
• Minimal, 10%.
7.0 Physical Requirements:
• While performing the duties of this job, the employee is regularly required to
talk or hear. The employee frequently is required to sit. The employee is
occasionally required to stand; walk; use hands to finger, handle or feel; reach
with hands and arms; climb or balance; and stoop, kneel, crouch, or crawl. The
employee must frequently lift and/or move up to 10 pounds and occasionally lift
and or move up to 40 pounds. Specific vision abilities required by this job
include close vision, color vision, and ability to adjust focus.
8.0 Department:
• Proposal Development
9.0 Reports To:
• Vice President – Technology and Sales
10.0 FLSA Status:
• Exempt
11.0 Direct Reports:
• None
12.0 Salary Grade:
• Range: Based on experience and skill level: 10-13
13.0 Approval:
• Manager: Date:
• Employee: Date:

More Related Content

What's hot

Analyst Resume
Analyst ResumeAnalyst Resume
Analyst ResumeSahil Khan
 
Resume_SueJames
Resume_SueJamesResume_SueJames
Resume_SueJamesSue James
 
Curriculum Vitae-Indira Devi
Curriculum Vitae-Indira DeviCurriculum Vitae-Indira Devi
Curriculum Vitae-Indira DeviIndira Devi
 
May_CV FORM
May_CV FORMMay_CV FORM
May_CV FORM
May Oo
 
Dhiraj_Suri_CV_sai
Dhiraj_Suri_CV_saiDhiraj_Suri_CV_sai
Dhiraj_Suri_CV_saiDhiraj Suri
 
Odoo Jobs for erp functional Consultants
Odoo Jobs for erp functional ConsultantsOdoo Jobs for erp functional Consultants
Odoo Jobs for erp functional Consultants
Gaurav Kumar
 

What's hot (20)

Deepak_Bhivandikar
Deepak_BhivandikarDeepak_Bhivandikar
Deepak_Bhivandikar
 
Analyst Resume
Analyst ResumeAnalyst Resume
Analyst Resume
 
maheshresume
maheshresumemaheshresume
maheshresume
 
ProjectEngineer_Construction
ProjectEngineer_ConstructionProjectEngineer_Construction
ProjectEngineer_Construction
 
Resume_SueJames
Resume_SueJamesResume_SueJames
Resume_SueJames
 
Azhar-cv
Azhar-cvAzhar-cv
Azhar-cv
 
Jordan Behan
Jordan BehanJordan Behan
Jordan Behan
 
Sharansh Gupta CV
Sharansh Gupta CVSharansh Gupta CV
Sharansh Gupta CV
 
Ambuj_Chaudhary_C.V
Ambuj_Chaudhary_C.VAmbuj_Chaudhary_C.V
Ambuj_Chaudhary_C.V
 
Curriculum Vitae-Indira Devi
Curriculum Vitae-Indira DeviCurriculum Vitae-Indira Devi
Curriculum Vitae-Indira Devi
 
BHUPINDER
BHUPINDERBHUPINDER
BHUPINDER
 
May_CV FORM
May_CV FORMMay_CV FORM
May_CV FORM
 
Nitin Sethi^
Nitin Sethi^Nitin Sethi^
Nitin Sethi^
 
Proposal
ProposalProposal
Proposal
 
Diana_CV
Diana_CV Diana_CV
Diana_CV
 
Sanjay Malik
Sanjay MalikSanjay Malik
Sanjay Malik
 
Dhiraj_Suri_CV_sai
Dhiraj_Suri_CV_saiDhiraj_Suri_CV_sai
Dhiraj_Suri_CV_sai
 
Pradeep Asalkar
Pradeep AsalkarPradeep Asalkar
Pradeep Asalkar
 
asma_cv
asma_cvasma_cv
asma_cv
 
Odoo Jobs for erp functional Consultants
Odoo Jobs for erp functional ConsultantsOdoo Jobs for erp functional Consultants
Odoo Jobs for erp functional Consultants
 

Viewers also liked

Linear Programming Problems {Operation Research}
Linear Programming Problems {Operation Research}Linear Programming Problems {Operation Research}
Linear Programming Problems {Operation Research}
FellowBuddy.com
 
Qm assignment problem slides
Qm assignment problem slidesQm assignment problem slides
Qm assignment problem slidesAmit Pai
 
Assgnment=hungarian method
Assgnment=hungarian methodAssgnment=hungarian method
Assgnment=hungarian methodJoseph Konnully
 
Operations Research
Operations ResearchOperations Research
Operations Researchajithsrc
 
Lesson 33: The Assignment Problem
Lesson 33: The Assignment  ProblemLesson 33: The Assignment  Problem
Lesson 33: The Assignment Problem
Matthew Leingang
 
Simplex method - Maximisation Case
Simplex method - Maximisation CaseSimplex method - Maximisation Case
Simplex method - Maximisation CaseJoseph Konnully
 
Assignment problem
Assignment problemAssignment problem
Assignment problemAbu Bashar
 
Assignment problem ppt
Assignment problem ppt Assignment problem ppt
Assignment problem ppt
Babasab Patil
 
LINEAR PROGRAMMING
LINEAR PROGRAMMINGLINEAR PROGRAMMING
LINEAR PROGRAMMING
rashi9
 
Operation research
Operation research Operation research
Operation research
Bimbashree K.G
 
Linear programming ppt
Linear programming pptLinear programming ppt
Linear programming ppt
Meenakshi Tripathi
 
Linear programing
Linear programingLinear programing
Linear programing
Aniruddh Tiwari
 
Linear Programming
Linear ProgrammingLinear Programming
Linear Programming
Pulchowk Campus
 
Linear programming - Model formulation, Graphical Method
Linear programming  - Model formulation, Graphical MethodLinear programming  - Model formulation, Graphical Method
Linear programming - Model formulation, Graphical MethodJoseph Konnully
 

Viewers also liked (16)

Linear Programming Problems {Operation Research}
Linear Programming Problems {Operation Research}Linear Programming Problems {Operation Research}
Linear Programming Problems {Operation Research}
 
Qm assignment problem slides
Qm assignment problem slidesQm assignment problem slides
Qm assignment problem slides
 
Assgnment=hungarian method
Assgnment=hungarian methodAssgnment=hungarian method
Assgnment=hungarian method
 
Operations Research
Operations ResearchOperations Research
Operations Research
 
Lesson 33: The Assignment Problem
Lesson 33: The Assignment  ProblemLesson 33: The Assignment  Problem
Lesson 33: The Assignment Problem
 
Assignment problems
Assignment problemsAssignment problems
Assignment problems
 
Simplex method - Maximisation Case
Simplex method - Maximisation CaseSimplex method - Maximisation Case
Simplex method - Maximisation Case
 
Assignment problem
Assignment problemAssignment problem
Assignment problem
 
Assignment problem
Assignment problemAssignment problem
Assignment problem
 
Assignment problem ppt
Assignment problem ppt Assignment problem ppt
Assignment problem ppt
 
LINEAR PROGRAMMING
LINEAR PROGRAMMINGLINEAR PROGRAMMING
LINEAR PROGRAMMING
 
Operation research
Operation research Operation research
Operation research
 
Linear programming ppt
Linear programming pptLinear programming ppt
Linear programming ppt
 
Linear programing
Linear programingLinear programing
Linear programing
 
Linear Programming
Linear ProgrammingLinear Programming
Linear Programming
 
Linear programming - Model formulation, Graphical Method
Linear programming  - Model formulation, Graphical MethodLinear programming  - Model formulation, Graphical Method
Linear programming - Model formulation, Graphical Method
 

Similar to Lpp 0274

Hany Hassan - C V
Hany Hassan - C VHany Hassan - C V
Hany Hassan - C VHany Hassan
 
Project Administration Proposal Template PowerPoint Presentation Slides
Project Administration Proposal Template PowerPoint Presentation SlidesProject Administration Proposal Template PowerPoint Presentation Slides
Project Administration Proposal Template PowerPoint Presentation Slides
SlideTeam
 
MOM on BA
MOM on BAMOM on BA
Software Team Roles
Software Team RolesSoftware Team Roles
Software Team Roles
Agusto Sipahutar
 
Cover letter _CV (1)
Cover letter _CV (1)Cover letter _CV (1)
Cover letter _CV (1)Deepa Prabhu
 
Resume - Sohail Ahmed S H
Resume - Sohail Ahmed S HResume - Sohail Ahmed S H
Resume - Sohail Ahmed S HSohail Ahmed
 
MBA Project Report Gideline PPT.pptx
MBA Project Report  Gideline PPT.pptxMBA Project Report  Gideline PPT.pptx
MBA Project Report Gideline PPT.pptx
KunalThigale
 
Ekta_sap_hcm_certified_siemens_mumbai
Ekta_sap_hcm_certified_siemens_mumbaiEkta_sap_hcm_certified_siemens_mumbai
Ekta_sap_hcm_certified_siemens_mumbaiEkta Daryanani
 
01 introductiontoframework
01 introductiontoframework01 introductiontoframework
01 introductiontoframework
Dhamo daran
 
CMGT 410 Week 1 Supporting Activity
CMGT 410 Week 1 Supporting ActivityCMGT 410 Week 1 Supporting Activity
CMGT 410 Week 1 Supporting Activity
tmschaf
 
Sr BA - Sr Professional Consultant
Sr BA - Sr Professional ConsultantSr BA - Sr Professional Consultant
Sr BA - Sr Professional ConsultantMagdalena Gonzalez
 
Business case writing presentation
Business case writing presentationBusiness case writing presentation
Business case writing presentation
Prof. Dimitrios P. Kamsaris PhD
 
The Project Charter Ensuring Quality
The Project Charter Ensuring QualityThe Project Charter Ensuring Quality
The Project Charter Ensuring Quality
Mark Troncone MBA, PMP, CBAP, ITILv3, CSM
 
Sunil George resume may 2018
Sunil George resume   may 2018Sunil George resume   may 2018
Sunil George resume may 2018
Sunil George
 
DELPHI METHOD (COST ESTIMATION MODELT)
DELPHI METHOD (COST ESTIMATION MODELT)DELPHI METHOD (COST ESTIMATION MODELT)
DELPHI METHOD (COST ESTIMATION MODELT)
Arsalan Ghaffar
 
APPENDIX 1 Project Brief Approval FormHousingProperty M.docx
APPENDIX 1 Project Brief Approval FormHousingProperty M.docxAPPENDIX 1 Project Brief Approval FormHousingProperty M.docx
APPENDIX 1 Project Brief Approval FormHousingProperty M.docx
rossskuddershamus
 
APPENDIX 1 Project Brief Approval FormHousingProperty M.docx
APPENDIX 1 Project Brief Approval FormHousingProperty M.docxAPPENDIX 1 Project Brief Approval FormHousingProperty M.docx
APPENDIX 1 Project Brief Approval FormHousingProperty M.docx
armitageclaire49
 
Best Practices For Business Analyst - Part 3
Best Practices For Business Analyst - Part 3Best Practices For Business Analyst - Part 3
Best Practices For Business Analyst - Part 3
Moutasm Tamimi
 

Similar to Lpp 0274 (20)

Hany Hassan - C V
Hany Hassan - C VHany Hassan - C V
Hany Hassan - C V
 
Project Administration Proposal Template PowerPoint Presentation Slides
Project Administration Proposal Template PowerPoint Presentation SlidesProject Administration Proposal Template PowerPoint Presentation Slides
Project Administration Proposal Template PowerPoint Presentation Slides
 
MOM on BA
MOM on BAMOM on BA
MOM on BA
 
Software Team Roles
Software Team RolesSoftware Team Roles
Software Team Roles
 
Trusha_Kanani_CV
Trusha_Kanani_CVTrusha_Kanani_CV
Trusha_Kanani_CV
 
Cover letter _CV (1)
Cover letter _CV (1)Cover letter _CV (1)
Cover letter _CV (1)
 
Resume - Sohail Ahmed S H
Resume - Sohail Ahmed S HResume - Sohail Ahmed S H
Resume - Sohail Ahmed S H
 
MBA Project Report Gideline PPT.pptx
MBA Project Report  Gideline PPT.pptxMBA Project Report  Gideline PPT.pptx
MBA Project Report Gideline PPT.pptx
 
Satyajeet Kumar Dubey
Satyajeet Kumar DubeySatyajeet Kumar Dubey
Satyajeet Kumar Dubey
 
Ekta_sap_hcm_certified_siemens_mumbai
Ekta_sap_hcm_certified_siemens_mumbaiEkta_sap_hcm_certified_siemens_mumbai
Ekta_sap_hcm_certified_siemens_mumbai
 
01 introductiontoframework
01 introductiontoframework01 introductiontoframework
01 introductiontoframework
 
CMGT 410 Week 1 Supporting Activity
CMGT 410 Week 1 Supporting ActivityCMGT 410 Week 1 Supporting Activity
CMGT 410 Week 1 Supporting Activity
 
Sr BA - Sr Professional Consultant
Sr BA - Sr Professional ConsultantSr BA - Sr Professional Consultant
Sr BA - Sr Professional Consultant
 
Business case writing presentation
Business case writing presentationBusiness case writing presentation
Business case writing presentation
 
The Project Charter Ensuring Quality
The Project Charter Ensuring QualityThe Project Charter Ensuring Quality
The Project Charter Ensuring Quality
 
Sunil George resume may 2018
Sunil George resume   may 2018Sunil George resume   may 2018
Sunil George resume may 2018
 
DELPHI METHOD (COST ESTIMATION MODELT)
DELPHI METHOD (COST ESTIMATION MODELT)DELPHI METHOD (COST ESTIMATION MODELT)
DELPHI METHOD (COST ESTIMATION MODELT)
 
APPENDIX 1 Project Brief Approval FormHousingProperty M.docx
APPENDIX 1 Project Brief Approval FormHousingProperty M.docxAPPENDIX 1 Project Brief Approval FormHousingProperty M.docx
APPENDIX 1 Project Brief Approval FormHousingProperty M.docx
 
APPENDIX 1 Project Brief Approval FormHousingProperty M.docx
APPENDIX 1 Project Brief Approval FormHousingProperty M.docxAPPENDIX 1 Project Brief Approval FormHousingProperty M.docx
APPENDIX 1 Project Brief Approval FormHousingProperty M.docx
 
Best Practices For Business Analyst - Part 3
Best Practices For Business Analyst - Part 3Best Practices For Business Analyst - Part 3
Best Practices For Business Analyst - Part 3
 

Recently uploaded

Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
SUTEJAS
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
Fundamentals of Induction Motor Drives.pptx
Fundamentals of Induction Motor Drives.pptxFundamentals of Induction Motor Drives.pptx
Fundamentals of Induction Motor Drives.pptx
manasideore6
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABSDESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
itech2017
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
ClaraZara1
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
aqil azizi
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
Kerry Sado
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
manasideore6
 

Recently uploaded (20)

Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
Fundamentals of Induction Motor Drives.pptx
Fundamentals of Induction Motor Drives.pptxFundamentals of Induction Motor Drives.pptx
Fundamentals of Induction Motor Drives.pptx
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABSDESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
 

Lpp 0274

  • 1. LINDE PROCESS PLANTS, INC. Page 1 of 2 Job Description - Proposal Manager Revised: 09/06/2009 Job Description – Proposal Manager 1.0 Purpose: Job Descriptions are part of Company Quality Policies and Procedures. This standard defines the tasks and responsibilities of Proposal Manager. The standard is valid for all employees performing in this role. 2.0 General: The Proposal Manager is responsible for the preparation of all assigned proposals, from concept through presentation to the customer. The proposal shall meet the requirements of the customer and clearly define the scope of work and services to both the client and the internal execution group. The Proposal shall be prepared in a timely manner to comply with internal review requirements and customer requirements. 3.0 Tasks and Responsibilities: The Proposal Manager shall be responsible for, but not limited to, the following: • Work with the Business Unit Manager and Account Manager to prepare a proposal plan that meets the objectives of the proposal budget and timeline. • Review the inquiry documents for special requirements. • Distribute inquiry documents to others involved in the proposal and estimate preparation as required. • Obtain assistance from other departments (Engineering, Estimating, Contract Administration, Construction, etc.) as required to prepare the proposal. • Primary responsibility for preparation/review of the proposal write-ups. • Prepare initial assessment of the technical, financial, schedule or any other unusual risks associated with a proposal. • Clearly define the Scope of Work and Services offered to the Customer and identify any clarifications or exceptions to the Customer’s inquiry. • Maintain knowledge of approved company vendors, estimating methods as well as project execution procedures. • Obtain feed back from projects for “lessons learned” to incorporate in future proposals. • Prepare and lead the Proposal Turnover meeting with supporting documentation. • Conform the Cost Book for all successful Proposals. 4.0 Education and Experience Required: • B.S. Engineering degree or equivalent work experience. • Five years of industry experience with a minimum of three years in project engineering/ project management or process engineering. • Working knowledge and experience with preparation of budgets, schedules and cost estimates.
  • 2. Page 2 of 2 Job Description - Proposal Manager Revised: 09/06/2009 5.0 Skills Required: • Organizational skills and time management. • Effective communications skills both written and verbal for interface with Clients and co-workers. • Able to work in a team environment (Engineering, Purchasing, Estimating, Construction, etc.). • Effective computer skills: Microsoft Office Software, Lotus Notes, and other Company and discipline specific software applications. Excel skills required. 6.0 Travel Percentage: • Minimal, 10%. 7.0 Physical Requirements: • While performing the duties of this job, the employee is regularly required to talk or hear. The employee frequently is required to sit. The employee is occasionally required to stand; walk; use hands to finger, handle or feel; reach with hands and arms; climb or balance; and stoop, kneel, crouch, or crawl. The employee must frequently lift and/or move up to 10 pounds and occasionally lift and or move up to 40 pounds. Specific vision abilities required by this job include close vision, color vision, and ability to adjust focus. 8.0 Department: • Proposal Development 9.0 Reports To: • Vice President – Technology and Sales 10.0 FLSA Status: • Exempt 11.0 Direct Reports: • None 12.0 Salary Grade: • Range: Based on experience and skill level: 10-13 13.0 Approval: • Manager: Date: • Employee: Date: