This document provides a typical logic diagram of the process for a 132/33kV substation project. The diagram shows the key stages are site preparation, civil works like power transformer foundation and cable installation, equipment delivery and installation, commissioning, and training. It also outlines the design, approval, and review stages including base design submittal, detailed design submittal, and design approval that must occur before construction and installation can begin.