SlideShare a Scribd company logo
CURRICULUM VITAE
NAME: WOO - YONG CHO
Date of Birth : October 07, 1963
Location : Ulsan
Education : Feb. 1980,Graduated from Moonil High School,Seoul
Feb.1985, Graduated from INHA University,Incheon
(Major in Mechanical Design Engineering and take a Bachelor's Degree)
Language : English (Spoken & Written : Good): Get a 685 points at TOEIC test.
Employment : Jan. 2014 - Prime4 Inspection Korea
Jan. 2003- Global Inspection Services Co., Ltd
Nov. 2001 - KOCEN Co., Ltd
Mar. 1999 - Hyundai Engineering & Construction Co., Ltd
Nov. 1995 - Daewoo Engineering & Construction Co., Ltd
Mar. 1992 - Samui Engineering Co., Ltd.
Jan. 1985 - Poongsan Metal Corporation
Qualification : - CWI (CERTIFIED Welding Inspector,AWS, Certification No.: 04111661)
- ASNT NDE Level III (RT/UT/MT, Certification No. : 202399)
- NACE International Level II ( CIP No. : 21386 )
- Certified Quality Control Engineer, ClassI(National Technical Certificate Reg. No. 88204030153W) by
Human Resources Development Service of Korea in1988.
- Certified Construction Mechanical Engineer,Class I (National Technical CertificateReg. No.
84306280140V) byHuman Resources Development Service of Korea in1984.
- Certified General Mechanical Engineer,Class I National Technical CertificateReg. No.
84307201247C) byHuman Resources Development Service of Korea in1984.
EXPERIENCE& CAREER:
CURRENT DUTIES AND RESPONSIBILITIES:
Inspection surveys carried out on a wide range of pressurevessels,columns & tower, heat exchangers,materials
(pipes & fittings,etc) and equipments for use in industrial offshoreand marineindustries.
SUMMARY OF EXPERIENCE
31 years in the Static Equipments (Heat Exchanger, Vessel, Column and others), Mechanical Piping and
Welding Field with experiences as a Supervisor and Manager, Inspector experienced in the inspection of
Fabrication, Installation and Hydrostatic Testing of Equipments, Mechanical Piping and Supports, Start-up and
Complete Installation of Mechanical Equipment.
PAGE: 2/4 WOO - YONG CHO
Jan. 2014 – PRESENT PRIME 4 INSPECTION KOREA.
Jan. 2014 ~ PRESENT Inspection / Expediting activities for IOWA,TEMPA ROSSA, SADARA, ERC, PUNTA
CATALINA and ADCO project at DKME / GS Entec / BHI / Sewon / Doosan Mecatec on
behalf of Tecnimont and Tecnimont KT.
Jan. 2003 – Dec. 2013 GLOBAL INSPECTION SERVICES CO., LTD.
Mar. 2013 ~ Dec. 2013 Inspection / Expeditingactivities for Sadara and AGRP KNPC projectat Sewon/
Hantech / KHE on behalf of Tecnimont.
Sep. 2011 ~ Mar. 2013 Inspection / Expeditingactivities for AGRP KNPC projectat TSM-Tech / Hantech /
ILsung/ Sewon / Wonil / Wooyang on behalf of Tecnimont.
Jun. 2010 ~ Aug. 2011 Inspection / Expeditingactivities for HP ABSORBERS ((180+5)t / (139+5)t x 6200 ID x
55,050 L, 1,685/1,005 ton, each 2 ea) at HHI (Hyundai Heavy Industry) and perform
the inspection CoordinatingatHantech / DKT / Doosan Mecatec / S&T in Ulsan /
Changwon area for GASCO Habshan-5 project as Inspection Leader on behalf of
Tecnimont.
May 2009 ~ May 2010 Inspection / Expeditingactivities for OffshorePlatformMain & Cellar Deck and its
Structural Tubular of NR2(North Rankin II) Redevelopment projectordered by
WoodsideEnergy LTD. atHHI (Hyundai Heavy Industry) in Ulsan on behalf of Lloyd’s
Register.
Feb. 2009 ~ Jun. 2010 Inspection / Expeditingactivities for Coal Fired Boiler (4 x 360Mw) of EDP Brazil
project, named PECEM & ITAQUI project, at DHI (Doosan Heavy Industry) & DSM
(Doosan Mecatec) in Changwon on behalf of Tecnimont.
Jan. 2008 ~ Jan. 2009 Inspection / Expeditingactivities including qualifying welders/welding procedureand
evaluating Mech. test & NDT using “Shell DEP and Standards”on BrineEvaporator
(OV-8393A/B/C) and other 5 type equipments (22 ea, Material :N06625 Ni-Cr Alloy
(Inconel 625),N08367 Cr-Ni-Mo Alloy(AL6XN), N08825 Fe-Ni-Cr Alloy (Incolloy 825),
N10276 Ni-Mo Alloy(Hastelloy)) atSungjin Geotec for QATAR GTL projecton behalf of
SAIPEM.
Jan. 2008 ~ Feb. 2009 Inspection / Expeditingactivities for Reactors, PFA coated Vessel at Sungjin Geotec
for Borouge II & Munchsmunster project on behalf of Tecnimont.
Dec. 2007~ Jan. 2008 Inspection / Expeditingactivities for Heaters at JNK in Ulsan for IBN ZAHR OCT project
on behalf of Samsung Engineering.
May 2007 ~ Dec. 2007 Inspection / Expeditingactivities using Tecnimont Specifications on Heat Exchanger,
Pressure Vessel (Material : Duplex Stainless Steel (SA240 S31803), Ø(6000 ~ 3800)x
29650 L), Reactor and Column at Sungjin Geotec, DKME, HHI, ILsung and Hantech in
Ulsan for Q-Chem II, Sahara, Tasnee, Rabigh and NAO Messaieed project on behalf
of Tecnimont.
Sep. 2006 ~ Apr. 2007 Inspection / Expeditingactivities for Heat Exchanger and PressureVessel for SHARQ
EG projectat DKME in Ulsan on behalf of Samsung Engineering.
Apr. 2005 ~ Sep. 2006 Inspection / Expeditingactivities for Columns,Tower and Vessels at HHI, Hantech and
DKTC for Dolphin project on behalf of Dolphin Energy LTD. as Germanischer Lloyd
Inspector (Sus Overlay Column (AGR Amine Absorber) 4 sets : t114(93+5) x 4000 x
43,750 and CS Tower & Vessel 17 sets : t12(14) x 2500 x 35,980,t50 x 3400 x 11000,
etc)
PAGE: 3/4 WOO - YONG CHO
Nov. 2004 ~ Apr. 2005 Inspection / Expeditingactivities for Tower and Heat Exchangers in accordancewith
ASME VIII DIV. 1 (2001 ED. with 2003 add.) at Hantech Co. LTD in Ulsan for TOC EO/EG
Petrochemical projecton behalf of Samsung Engineering & Const. Co. LTD (Sus Tower
T-220 & other 11 sets : t12(14/16/18) x 3500 x 61500,t15(13) x 4800 x 36400,
t14(12) ) x 4200 x 30350,t20(18) x 5600 x 29500,etc / C/S & Sus H/Ex E-115 & other
16 sets : t18(18) x 1650 x 7500,t27(13) x 1730 x 11380,t21(16) x 1900 x 9100,etc )
Sep. 2004 ~ Jan. 2005 Inspection / Expeditingactivities for PressureVessels in accordancewith GB 150-1998
(National Standards of the People’s Republic of China about Steel PressureVessels) at
Daekyung Technos Co. LTD in Ulsan for CSPC Nanhai Petrochemical Projecton behalf
of Tecnimont ( Sus & CS (Jacket type) Vessels V-7610 & other 7 sets : t65(55) x 4700 x
13700,t20(18) x 4400 x 15300, t60(42) x 2300 x 14200,etc)
Nov. 2003~ Aug. 2004 Inspection activities for Columns in accordancewith ASME VIII DIV. 2 (2001 ED. WITH
2002 ADD.) at HHI (Hyundai Heavy Industry) in Ulsan for Western Libya Gas Project–
NC41 Mellitah Planton behalf of HDEC (Hyundai Eng. & Construction Co. LTD) (Sus
Clad Column (HP Absorber 51/52/53-330-VE-001) 3 sets : t90(88) x 6600 x 47100,Sus
& CS H/Ex 17 sets : t60(20) x 1600 x 11550,t13(19) ) x 2300 x 13700, etc)
Jul. 2003 ~ Oct. 2003 Inspection activities for PressureVessel & Heat Exchanger in accordancewith ASME
VIII Div.1 for BASF-YPC (CAN, IPS project) at Hantech Co. LTD on behalf of Toyo-Korea
(Sus & CS H/Ex E-1400 and other 17 sets : t8 x 1060 x 8080,t8 x 1100 x 9228, etc / Sus
Reactor R-7110 & R-7550 : t14 x 3200 x 7010 / COLUMN C-7100 & C-7300 : t10 x 2400
x 21740)
Jan. 2003 ~ Jun. 2003 Inspection activities for PressureVessel & Heat Exchanger for JUEG projectat
Daekyung Co., LTD on behalf of Toyo-Korea (Sus Gas-Gas H/Ex E-2111 & 2121 : t30(52)
x 3000 x 12494,CS & SUS H/EX E-2117A/B and other 32 sets, CS & Sus Vessel V-2140
and other 14 sets : t9 x 2300 x 8650,etc)
Nov. 2001 ~ Dec. 2002 KOCEN CO. LTD.
Supported the classification of Mechanical Industry named “ EMK21” in “MIRAE”
Foundation that affiliated organization of Kyungnam Provincial Government.
Mar. 1999 ~ Aug. 2001 HYUNDAI ENGINEERING & CONSTRUCTION CO., LTD.
As a QC engineer,
* Performed the inspection activities and quality surveillance for the installation
and welds of the equipments, pipes and the supports for Youngkwang Nuclear
Power Plant #5&6 (Fuel Building, Radwaste Building and Yard Building (CCW, ESW,
CST)
* Review and control ITP, WPS/PQR and training and certify welders & NDE
inspector
* Perform the inspection activities of the hydrostatic test for the equipments, pipes
and supports as above
* Perform the completion of the CDP (Construction Document Package) as above
Nov. 1995 ~ Sep. 1998 DAEWOO ENGINEERING & CONSTRUCTION CO., LTD.
As a QC engineer,
* Performed the inspection activities and quality surveillance for the installation and
welds of the equipments, pipes and the supports for Wolsung Nuclear Power Plant
# 3&4. (Reactor Building,ServiceBuilding,TurbineBuilding and Yard)
PAGE: 4/4 WOO - YONG CHO
* Performed the inspection activities and quality surveillance for the installation
and welds of the equipments, pipes and the supports for Turbine Building of
Wolsung NPP # 3&4.
* Review and control ITP, WPS/PQR and training and certify welders & NDE
inspector
* Perform the inspection activities of the hydrostatic test for the equipments,
pipes and supports as above
* Perform the completion of the CDP (Construction Document Package) as above
Mar. 1992 ~ Nov. 1995 SAMUI ENGINEERING CO., LTD.
As a piping supervisor, surveyed the piping installation and responsible for the
isometric drawing according to the AECL (Automic Energy of Canada Limited)
basic plan of Mechanical Piping and review the field change of pipe installation
during the construction of Wolsong NPP #2.
Jan. 1985 ~ Aug. 1990 POONGSAN METAL CORPORATION AT ONSAN PLANT IN ULSAN CITY
Experienced as a mechanical engineer for the complete installation and
start-up of the equipments – Rolling Mill, Welded Tube Machine, Bell Furnace,
125 ton Cupping Machine, Drawing Machine, etc – of the construction of the
Expansion Plant

More Related Content

What's hot

THINAKARAN.R
THINAKARAN.RTHINAKARAN.R
THINAKARAN.R
Rajagopal Thinakaran
 
Cv ardiansyah t.a cswip 3.1
Cv ardiansyah t.a cswip 3.1Cv ardiansyah t.a cswip 3.1
Cv ardiansyah t.a cswip 3.1
Ardiansyah Teuku Agam
 
Mostogl Martin
Mostogl MartinMostogl Martin
Mostogl Martin
Marty Mostogl
 
Project tailor welding blanks crack analysis & cm
Project   tailor welding blanks  crack analysis & cmProject   tailor welding blanks  crack analysis & cm
Project tailor welding blanks crack analysis & cm
HarshVardhan856629
 
CB CV 2015
CB CV 2015CB CV 2015
CB CV 2015
Chris Bryan
 
mohamed daowod cv
mohamed daowod cvmohamed daowod cv
mohamed daowod cv
MOHAMED DAOWOD
 
Shafiq CV
Shafiq CVShafiq CV
haitham abdelaal CV
haitham abdelaal CVhaitham abdelaal CV
haitham abdelaal CV
haitham abdelaal
 
Ganesan Plant Inspector_CV
Ganesan Plant Inspector_CVGanesan Plant Inspector_CV
Ganesan Plant Inspector_CV
Ganesan Chinnadurai
 
Certified Welding Inspector - LAWAL IDRIS DARAMOLA CV
Certified Welding Inspector - LAWAL IDRIS DARAMOLA CVCertified Welding Inspector - LAWAL IDRIS DARAMOLA CV
Certified Welding Inspector - LAWAL IDRIS DARAMOLA CV
idris lawal
 
QA&QC Welding Inspector (R)
QA&QC Welding Inspector (R)QA&QC Welding Inspector (R)
QA&QC Welding Inspector (R)
arjunan saravanan
 
2016 Resume of Rajeev Kumar, Inspection Engineer (Surveyor-1)
2016 Resume of Rajeev Kumar, Inspection Engineer (Surveyor-1)2016 Resume of Rajeev Kumar, Inspection Engineer (Surveyor-1)
2016 Resume of Rajeev Kumar, Inspection Engineer (Surveyor-1)
Rajeev Kumar
 
CV Herwandi
CV HerwandiCV Herwandi
CV Herwandi
Andi Herwandi
 
Arafat Syed Rashid Latest Updated 20.04.2015
Arafat Syed Rashid  Latest Updated 20.04.2015Arafat Syed Rashid  Latest Updated 20.04.2015
Arafat Syed Rashid Latest Updated 20.04.2015
rashid Arafat
 
Qa qc mechanical engineer ,api 510,api 570 ,api 653 & cwi welding inspector
Qa qc mechanical engineer ,api 510,api 570 ,api 653 & cwi  welding inspectorQa qc mechanical engineer ,api 510,api 570 ,api 653 & cwi  welding inspector
Qa qc mechanical engineer ,api 510,api 570 ,api 653 & cwi welding inspector
Wael Mahmoud alkilany
 
QA QC Inspector.doc 1
QA QC Inspector.doc 1QA QC Inspector.doc 1
QA QC Inspector.doc 1
Gurusamy Selvan
 
PG Thesis Presentation
PG Thesis PresentationPG Thesis Presentation
PG Thesis Presentation
Kannan Paramasivan
 
Saad_CV Senior QA&QC Engineer
Saad_CV Senior QA&QC EngineerSaad_CV Senior QA&QC Engineer
Saad_CV Senior QA&QC Engineer
Saad mohamed gad
 
JesseRasorResume.1.20.15
JesseRasorResume.1.20.15JesseRasorResume.1.20.15
JesseRasorResume.1.20.15
Jesse Rasor
 
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Chandra ABS IV
 

What's hot (20)

THINAKARAN.R
THINAKARAN.RTHINAKARAN.R
THINAKARAN.R
 
Cv ardiansyah t.a cswip 3.1
Cv ardiansyah t.a cswip 3.1Cv ardiansyah t.a cswip 3.1
Cv ardiansyah t.a cswip 3.1
 
Mostogl Martin
Mostogl MartinMostogl Martin
Mostogl Martin
 
Project tailor welding blanks crack analysis & cm
Project   tailor welding blanks  crack analysis & cmProject   tailor welding blanks  crack analysis & cm
Project tailor welding blanks crack analysis & cm
 
CB CV 2015
CB CV 2015CB CV 2015
CB CV 2015
 
mohamed daowod cv
mohamed daowod cvmohamed daowod cv
mohamed daowod cv
 
Shafiq CV
Shafiq CVShafiq CV
Shafiq CV
 
haitham abdelaal CV
haitham abdelaal CVhaitham abdelaal CV
haitham abdelaal CV
 
Ganesan Plant Inspector_CV
Ganesan Plant Inspector_CVGanesan Plant Inspector_CV
Ganesan Plant Inspector_CV
 
Certified Welding Inspector - LAWAL IDRIS DARAMOLA CV
Certified Welding Inspector - LAWAL IDRIS DARAMOLA CVCertified Welding Inspector - LAWAL IDRIS DARAMOLA CV
Certified Welding Inspector - LAWAL IDRIS DARAMOLA CV
 
QA&QC Welding Inspector (R)
QA&QC Welding Inspector (R)QA&QC Welding Inspector (R)
QA&QC Welding Inspector (R)
 
2016 Resume of Rajeev Kumar, Inspection Engineer (Surveyor-1)
2016 Resume of Rajeev Kumar, Inspection Engineer (Surveyor-1)2016 Resume of Rajeev Kumar, Inspection Engineer (Surveyor-1)
2016 Resume of Rajeev Kumar, Inspection Engineer (Surveyor-1)
 
CV Herwandi
CV HerwandiCV Herwandi
CV Herwandi
 
Arafat Syed Rashid Latest Updated 20.04.2015
Arafat Syed Rashid  Latest Updated 20.04.2015Arafat Syed Rashid  Latest Updated 20.04.2015
Arafat Syed Rashid Latest Updated 20.04.2015
 
Qa qc mechanical engineer ,api 510,api 570 ,api 653 & cwi welding inspector
Qa qc mechanical engineer ,api 510,api 570 ,api 653 & cwi  welding inspectorQa qc mechanical engineer ,api 510,api 570 ,api 653 & cwi  welding inspector
Qa qc mechanical engineer ,api 510,api 570 ,api 653 & cwi welding inspector
 
QA QC Inspector.doc 1
QA QC Inspector.doc 1QA QC Inspector.doc 1
QA QC Inspector.doc 1
 
PG Thesis Presentation
PG Thesis PresentationPG Thesis Presentation
PG Thesis Presentation
 
Saad_CV Senior QA&QC Engineer
Saad_CV Senior QA&QC EngineerSaad_CV Senior QA&QC Engineer
Saad_CV Senior QA&QC Engineer
 
JesseRasorResume.1.20.15
JesseRasorResume.1.20.15JesseRasorResume.1.20.15
JesseRasorResume.1.20.15
 
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
 

Viewers also liked

2012 BERA IAG paper_KV
2012 BERA IAG paper_KV2012 BERA IAG paper_KV
2012 BERA IAG paper_KV
Katy Vigurs
 
pm2014_issuu_20-final
pm2014_issuu_20-finalpm2014_issuu_20-final
pm2014_issuu_20-final
Diana Mihu
 
vp.cover
vp.covervp.cover
vp.cover
Kate Bridgeman
 
Балансове майно КП "Сім днів" 1
Балансове майно КП "Сім днів" 1Балансове майно КП "Сім днів" 1
Балансове майно КП "Сім днів" 1
Юрій Дюг
 
mostafa(8)
mostafa(8)mostafa(8)
Neetu Resume 27th Feb new
Neetu Resume 27th Feb newNeetu Resume 27th Feb new
Neetu Resume 27th Feb new
Neetu tiwari
 
Consumer durable [washing machine]
Consumer durable [washing machine]Consumer durable [washing machine]
Consumer durable [washing machine]
Tasleem Lucknow
 
Digi-Fridge Marketing Plan
Digi-Fridge Marketing PlanDigi-Fridge Marketing Plan
Digi-Fridge Marketing Plan
Matthew Frappier
 
Us patent cases weekly update february 16th february 23rd 2016
Us patent cases weekly update  february 16th february 23rd 2016Us patent cases weekly update  february 16th february 23rd 2016
Us patent cases weekly update february 16th february 23rd 2016
InvnTree IP Services Pvt. Ltd.
 
Apple Marketing Analysis
Apple Marketing AnalysisApple Marketing Analysis
Apple Marketing Analysis
Merveille Kazimoto
 
The Best Electronics and Marine Electrics Troubleshooting
The Best Electronics and Marine Electrics TroubleshootingThe Best Electronics and Marine Electrics Troubleshooting
The Best Electronics and Marine Electrics Troubleshooting
Julio Domanais
 
CES 2016 new trends & innovations
CES 2016 new trends & innovationsCES 2016 new trends & innovations
CES 2016 new trends & innovations
Kevin Huang
 

Viewers also liked (12)

2012 BERA IAG paper_KV
2012 BERA IAG paper_KV2012 BERA IAG paper_KV
2012 BERA IAG paper_KV
 
pm2014_issuu_20-final
pm2014_issuu_20-finalpm2014_issuu_20-final
pm2014_issuu_20-final
 
vp.cover
vp.covervp.cover
vp.cover
 
Балансове майно КП "Сім днів" 1
Балансове майно КП "Сім днів" 1Балансове майно КП "Сім днів" 1
Балансове майно КП "Сім днів" 1
 
mostafa(8)
mostafa(8)mostafa(8)
mostafa(8)
 
Neetu Resume 27th Feb new
Neetu Resume 27th Feb newNeetu Resume 27th Feb new
Neetu Resume 27th Feb new
 
Consumer durable [washing machine]
Consumer durable [washing machine]Consumer durable [washing machine]
Consumer durable [washing machine]
 
Digi-Fridge Marketing Plan
Digi-Fridge Marketing PlanDigi-Fridge Marketing Plan
Digi-Fridge Marketing Plan
 
Us patent cases weekly update february 16th february 23rd 2016
Us patent cases weekly update  february 16th february 23rd 2016Us patent cases weekly update  february 16th february 23rd 2016
Us patent cases weekly update february 16th february 23rd 2016
 
Apple Marketing Analysis
Apple Marketing AnalysisApple Marketing Analysis
Apple Marketing Analysis
 
The Best Electronics and Marine Electrics Troubleshooting
The Best Electronics and Marine Electrics TroubleshootingThe Best Electronics and Marine Electrics Troubleshooting
The Best Electronics and Marine Electrics Troubleshooting
 
CES 2016 new trends & innovations
CES 2016 new trends & innovationsCES 2016 new trends & innovations
CES 2016 new trends & innovations
 

Similar to CV - Woo Yong Cho

C.V Momen.last update
C.V Momen.last updateC.V Momen.last update
C.V Momen.last updateMomen Mohamed
 
CV's__Komkrit_Choompol 2016(Update)
CV's__Komkrit_Choompol 2016(Update)CV's__Komkrit_Choompol 2016(Update)
CV's__Komkrit_Choompol 2016(Update)
Komkrit Choompol
 
Tin's cv
Tin's cvTin's cv
Tin's cv
Tin Ha Minh
 
cv-ramez-2016 new
cv-ramez-2016 newcv-ramez-2016 new
cv-ramez-2016 new
Ramez Nasr
 
CV - Prasath.V.R
CV - Prasath.V.RCV - Prasath.V.R
CV - Prasath.V.R
Prasath ravanan
 
srini cv latest
srini cv latestsrini cv latest
srini cv latest
Srini vasan
 
Meshak cv
Meshak cv Meshak cv
Meshak cv
Meshak Mathew
 
Meshak cv
Meshak cv Meshak cv
Meshak cv
Meshak Mathew
 
resume pdf
resume  pdfresume  pdf
resume pdf
chalee meekaew
 
Cable Installation Plan - SS-109 to 065.pptx
Cable Installation Plan - SS-109 to 065.pptxCable Installation Plan - SS-109 to 065.pptx
Cable Installation Plan - SS-109 to 065.pptx
PrasetiyoHananto1
 
Saroj CVV
Saroj CVVSaroj CVV
QA-QC ENGINEER
QA-QC ENGINEERQA-QC ENGINEER
QA-QC ENGINEER
nader rizq
 
SELVAM DOSS QAQC CV
SELVAM DOSS QAQC CVSELVAM DOSS QAQC CV
SELVAM DOSS QAQC CV
Sdoss Selvamdoss
 
Hafizan VSI Format CV
Hafizan VSI Format CVHafizan VSI Format CV
Hafizan VSI Format CV
Mohd Hafizan Ahmad
 
CV CBK 2015 N
CV CBK 2015 NCV CBK 2015 N
CV CBK 2015 N
Cees Klerk
 
Salakidis Savvas
Salakidis SavvasSalakidis Savvas
Salakidis Savvas
savvas salakidis
 
VEERAPANDIAN CV.doc1
VEERAPANDIAN CV.doc1VEERAPANDIAN CV.doc1
VEERAPANDIAN CV.doc1
i Veerepandian
 
RESUME
RESUMERESUME
RESUME
Edly Omar
 
Thomas vincent cv
Thomas vincent cvThomas vincent cv
Thomas vincent cv
Thomas Vincent
 
CV_Talgat Turekulov_eng
CV_Talgat Turekulov_engCV_Talgat Turekulov_eng
CV_Talgat Turekulov_eng
Talgat Turekulov
 

Similar to CV - Woo Yong Cho (20)

C.V Momen.last update
C.V Momen.last updateC.V Momen.last update
C.V Momen.last update
 
CV's__Komkrit_Choompol 2016(Update)
CV's__Komkrit_Choompol 2016(Update)CV's__Komkrit_Choompol 2016(Update)
CV's__Komkrit_Choompol 2016(Update)
 
Tin's cv
Tin's cvTin's cv
Tin's cv
 
cv-ramez-2016 new
cv-ramez-2016 newcv-ramez-2016 new
cv-ramez-2016 new
 
CV - Prasath.V.R
CV - Prasath.V.RCV - Prasath.V.R
CV - Prasath.V.R
 
srini cv latest
srini cv latestsrini cv latest
srini cv latest
 
Meshak cv
Meshak cv Meshak cv
Meshak cv
 
Meshak cv
Meshak cv Meshak cv
Meshak cv
 
resume pdf
resume  pdfresume  pdf
resume pdf
 
Cable Installation Plan - SS-109 to 065.pptx
Cable Installation Plan - SS-109 to 065.pptxCable Installation Plan - SS-109 to 065.pptx
Cable Installation Plan - SS-109 to 065.pptx
 
Saroj CVV
Saroj CVVSaroj CVV
Saroj CVV
 
QA-QC ENGINEER
QA-QC ENGINEERQA-QC ENGINEER
QA-QC ENGINEER
 
SELVAM DOSS QAQC CV
SELVAM DOSS QAQC CVSELVAM DOSS QAQC CV
SELVAM DOSS QAQC CV
 
Hafizan VSI Format CV
Hafizan VSI Format CVHafizan VSI Format CV
Hafizan VSI Format CV
 
CV CBK 2015 N
CV CBK 2015 NCV CBK 2015 N
CV CBK 2015 N
 
Salakidis Savvas
Salakidis SavvasSalakidis Savvas
Salakidis Savvas
 
VEERAPANDIAN CV.doc1
VEERAPANDIAN CV.doc1VEERAPANDIAN CV.doc1
VEERAPANDIAN CV.doc1
 
RESUME
RESUMERESUME
RESUME
 
Thomas vincent cv
Thomas vincent cvThomas vincent cv
Thomas vincent cv
 
CV_Talgat Turekulov_eng
CV_Talgat Turekulov_engCV_Talgat Turekulov_eng
CV_Talgat Turekulov_eng
 

CV - Woo Yong Cho

  • 1. CURRICULUM VITAE NAME: WOO - YONG CHO Date of Birth : October 07, 1963 Location : Ulsan Education : Feb. 1980,Graduated from Moonil High School,Seoul Feb.1985, Graduated from INHA University,Incheon (Major in Mechanical Design Engineering and take a Bachelor's Degree) Language : English (Spoken & Written : Good): Get a 685 points at TOEIC test. Employment : Jan. 2014 - Prime4 Inspection Korea Jan. 2003- Global Inspection Services Co., Ltd Nov. 2001 - KOCEN Co., Ltd Mar. 1999 - Hyundai Engineering & Construction Co., Ltd Nov. 1995 - Daewoo Engineering & Construction Co., Ltd Mar. 1992 - Samui Engineering Co., Ltd. Jan. 1985 - Poongsan Metal Corporation Qualification : - CWI (CERTIFIED Welding Inspector,AWS, Certification No.: 04111661) - ASNT NDE Level III (RT/UT/MT, Certification No. : 202399) - NACE International Level II ( CIP No. : 21386 ) - Certified Quality Control Engineer, ClassI(National Technical Certificate Reg. No. 88204030153W) by Human Resources Development Service of Korea in1988. - Certified Construction Mechanical Engineer,Class I (National Technical CertificateReg. No. 84306280140V) byHuman Resources Development Service of Korea in1984. - Certified General Mechanical Engineer,Class I National Technical CertificateReg. No. 84307201247C) byHuman Resources Development Service of Korea in1984. EXPERIENCE& CAREER: CURRENT DUTIES AND RESPONSIBILITIES: Inspection surveys carried out on a wide range of pressurevessels,columns & tower, heat exchangers,materials (pipes & fittings,etc) and equipments for use in industrial offshoreand marineindustries. SUMMARY OF EXPERIENCE 31 years in the Static Equipments (Heat Exchanger, Vessel, Column and others), Mechanical Piping and Welding Field with experiences as a Supervisor and Manager, Inspector experienced in the inspection of Fabrication, Installation and Hydrostatic Testing of Equipments, Mechanical Piping and Supports, Start-up and Complete Installation of Mechanical Equipment.
  • 2. PAGE: 2/4 WOO - YONG CHO Jan. 2014 – PRESENT PRIME 4 INSPECTION KOREA. Jan. 2014 ~ PRESENT Inspection / Expediting activities for IOWA,TEMPA ROSSA, SADARA, ERC, PUNTA CATALINA and ADCO project at DKME / GS Entec / BHI / Sewon / Doosan Mecatec on behalf of Tecnimont and Tecnimont KT. Jan. 2003 – Dec. 2013 GLOBAL INSPECTION SERVICES CO., LTD. Mar. 2013 ~ Dec. 2013 Inspection / Expeditingactivities for Sadara and AGRP KNPC projectat Sewon/ Hantech / KHE on behalf of Tecnimont. Sep. 2011 ~ Mar. 2013 Inspection / Expeditingactivities for AGRP KNPC projectat TSM-Tech / Hantech / ILsung/ Sewon / Wonil / Wooyang on behalf of Tecnimont. Jun. 2010 ~ Aug. 2011 Inspection / Expeditingactivities for HP ABSORBERS ((180+5)t / (139+5)t x 6200 ID x 55,050 L, 1,685/1,005 ton, each 2 ea) at HHI (Hyundai Heavy Industry) and perform the inspection CoordinatingatHantech / DKT / Doosan Mecatec / S&T in Ulsan / Changwon area for GASCO Habshan-5 project as Inspection Leader on behalf of Tecnimont. May 2009 ~ May 2010 Inspection / Expeditingactivities for OffshorePlatformMain & Cellar Deck and its Structural Tubular of NR2(North Rankin II) Redevelopment projectordered by WoodsideEnergy LTD. atHHI (Hyundai Heavy Industry) in Ulsan on behalf of Lloyd’s Register. Feb. 2009 ~ Jun. 2010 Inspection / Expeditingactivities for Coal Fired Boiler (4 x 360Mw) of EDP Brazil project, named PECEM & ITAQUI project, at DHI (Doosan Heavy Industry) & DSM (Doosan Mecatec) in Changwon on behalf of Tecnimont. Jan. 2008 ~ Jan. 2009 Inspection / Expeditingactivities including qualifying welders/welding procedureand evaluating Mech. test & NDT using “Shell DEP and Standards”on BrineEvaporator (OV-8393A/B/C) and other 5 type equipments (22 ea, Material :N06625 Ni-Cr Alloy (Inconel 625),N08367 Cr-Ni-Mo Alloy(AL6XN), N08825 Fe-Ni-Cr Alloy (Incolloy 825), N10276 Ni-Mo Alloy(Hastelloy)) atSungjin Geotec for QATAR GTL projecton behalf of SAIPEM. Jan. 2008 ~ Feb. 2009 Inspection / Expeditingactivities for Reactors, PFA coated Vessel at Sungjin Geotec for Borouge II & Munchsmunster project on behalf of Tecnimont. Dec. 2007~ Jan. 2008 Inspection / Expeditingactivities for Heaters at JNK in Ulsan for IBN ZAHR OCT project on behalf of Samsung Engineering. May 2007 ~ Dec. 2007 Inspection / Expeditingactivities using Tecnimont Specifications on Heat Exchanger, Pressure Vessel (Material : Duplex Stainless Steel (SA240 S31803), Ø(6000 ~ 3800)x 29650 L), Reactor and Column at Sungjin Geotec, DKME, HHI, ILsung and Hantech in Ulsan for Q-Chem II, Sahara, Tasnee, Rabigh and NAO Messaieed project on behalf of Tecnimont. Sep. 2006 ~ Apr. 2007 Inspection / Expeditingactivities for Heat Exchanger and PressureVessel for SHARQ EG projectat DKME in Ulsan on behalf of Samsung Engineering. Apr. 2005 ~ Sep. 2006 Inspection / Expeditingactivities for Columns,Tower and Vessels at HHI, Hantech and DKTC for Dolphin project on behalf of Dolphin Energy LTD. as Germanischer Lloyd Inspector (Sus Overlay Column (AGR Amine Absorber) 4 sets : t114(93+5) x 4000 x 43,750 and CS Tower & Vessel 17 sets : t12(14) x 2500 x 35,980,t50 x 3400 x 11000, etc)
  • 3. PAGE: 3/4 WOO - YONG CHO Nov. 2004 ~ Apr. 2005 Inspection / Expeditingactivities for Tower and Heat Exchangers in accordancewith ASME VIII DIV. 1 (2001 ED. with 2003 add.) at Hantech Co. LTD in Ulsan for TOC EO/EG Petrochemical projecton behalf of Samsung Engineering & Const. Co. LTD (Sus Tower T-220 & other 11 sets : t12(14/16/18) x 3500 x 61500,t15(13) x 4800 x 36400, t14(12) ) x 4200 x 30350,t20(18) x 5600 x 29500,etc / C/S & Sus H/Ex E-115 & other 16 sets : t18(18) x 1650 x 7500,t27(13) x 1730 x 11380,t21(16) x 1900 x 9100,etc ) Sep. 2004 ~ Jan. 2005 Inspection / Expeditingactivities for PressureVessels in accordancewith GB 150-1998 (National Standards of the People’s Republic of China about Steel PressureVessels) at Daekyung Technos Co. LTD in Ulsan for CSPC Nanhai Petrochemical Projecton behalf of Tecnimont ( Sus & CS (Jacket type) Vessels V-7610 & other 7 sets : t65(55) x 4700 x 13700,t20(18) x 4400 x 15300, t60(42) x 2300 x 14200,etc) Nov. 2003~ Aug. 2004 Inspection activities for Columns in accordancewith ASME VIII DIV. 2 (2001 ED. WITH 2002 ADD.) at HHI (Hyundai Heavy Industry) in Ulsan for Western Libya Gas Project– NC41 Mellitah Planton behalf of HDEC (Hyundai Eng. & Construction Co. LTD) (Sus Clad Column (HP Absorber 51/52/53-330-VE-001) 3 sets : t90(88) x 6600 x 47100,Sus & CS H/Ex 17 sets : t60(20) x 1600 x 11550,t13(19) ) x 2300 x 13700, etc) Jul. 2003 ~ Oct. 2003 Inspection activities for PressureVessel & Heat Exchanger in accordancewith ASME VIII Div.1 for BASF-YPC (CAN, IPS project) at Hantech Co. LTD on behalf of Toyo-Korea (Sus & CS H/Ex E-1400 and other 17 sets : t8 x 1060 x 8080,t8 x 1100 x 9228, etc / Sus Reactor R-7110 & R-7550 : t14 x 3200 x 7010 / COLUMN C-7100 & C-7300 : t10 x 2400 x 21740) Jan. 2003 ~ Jun. 2003 Inspection activities for PressureVessel & Heat Exchanger for JUEG projectat Daekyung Co., LTD on behalf of Toyo-Korea (Sus Gas-Gas H/Ex E-2111 & 2121 : t30(52) x 3000 x 12494,CS & SUS H/EX E-2117A/B and other 32 sets, CS & Sus Vessel V-2140 and other 14 sets : t9 x 2300 x 8650,etc) Nov. 2001 ~ Dec. 2002 KOCEN CO. LTD. Supported the classification of Mechanical Industry named “ EMK21” in “MIRAE” Foundation that affiliated organization of Kyungnam Provincial Government. Mar. 1999 ~ Aug. 2001 HYUNDAI ENGINEERING & CONSTRUCTION CO., LTD. As a QC engineer, * Performed the inspection activities and quality surveillance for the installation and welds of the equipments, pipes and the supports for Youngkwang Nuclear Power Plant #5&6 (Fuel Building, Radwaste Building and Yard Building (CCW, ESW, CST) * Review and control ITP, WPS/PQR and training and certify welders & NDE inspector * Perform the inspection activities of the hydrostatic test for the equipments, pipes and supports as above * Perform the completion of the CDP (Construction Document Package) as above Nov. 1995 ~ Sep. 1998 DAEWOO ENGINEERING & CONSTRUCTION CO., LTD. As a QC engineer, * Performed the inspection activities and quality surveillance for the installation and welds of the equipments, pipes and the supports for Wolsung Nuclear Power Plant # 3&4. (Reactor Building,ServiceBuilding,TurbineBuilding and Yard)
  • 4. PAGE: 4/4 WOO - YONG CHO * Performed the inspection activities and quality surveillance for the installation and welds of the equipments, pipes and the supports for Turbine Building of Wolsung NPP # 3&4. * Review and control ITP, WPS/PQR and training and certify welders & NDE inspector * Perform the inspection activities of the hydrostatic test for the equipments, pipes and supports as above * Perform the completion of the CDP (Construction Document Package) as above Mar. 1992 ~ Nov. 1995 SAMUI ENGINEERING CO., LTD. As a piping supervisor, surveyed the piping installation and responsible for the isometric drawing according to the AECL (Automic Energy of Canada Limited) basic plan of Mechanical Piping and review the field change of pipe installation during the construction of Wolsong NPP #2. Jan. 1985 ~ Aug. 1990 POONGSAN METAL CORPORATION AT ONSAN PLANT IN ULSAN CITY Experienced as a mechanical engineer for the complete installation and start-up of the equipments – Rolling Mill, Welded Tube Machine, Bell Furnace, 125 ton Cupping Machine, Drawing Machine, etc – of the construction of the Expansion Plant