NEERAJ NISCHAL
STRUCTURALENGINEER Nationality:Indian
Email:neeraj.nischal08@gmail.com Mob.:+971569239434
Examination University Institute Year CGPA/ %
Graduation IITBombay IITBombay 2013 7.38/10
KEYQUALIFICATIONS
STRUCTURALENGINEERING
Experiencein following aspectsof StructuralEngineering
ď‚· Designand analysis of steel/concrete structuressuchas platforms, Buildings, pipe racks,pipe supports,
sheds, buildings, pits andfoundations forstudy,FEED and EPC projects
 Designof fixedoffshore steel structures –In place,Fatigue,pushover,pre-service,boatimpact,and
blastanalysisusingSACS for conceptual study,FEED and detail engineeringprojects
ď‚· Finite element analysis (FEA) of pipe support shoes and saddles using ANSYS
ď‚· Working knowledge of design codes such as BS 5950, BS 8110, AISC 360, ASCE 7, API RP 2A/2SIM
 Software known – STAAD.Pro, SACS, ANSYS, ETABS, MAT 3D, Foundation 3D, AutoCAD, MathCad
ď‚· Review of drawings and MTOs/BOQs
ď‚· Technical and commercial proposals for high net worth projects with major UAE clients
PROFESSIONALEXPERIENCE
TEBODINMIDDLE EASTLTD.,AbuDhabi,UAE [Nov’13- Present]
StructuralEngineer
ADNOC-MASDAR:EPC of ESI carbon capture facilityandpipelineproject
Scope ofWork:
ď‚· Capture and treatment of CO2 from Emirates Steel Industry (ESI) in Abu Dhabi and its transportation to
ADNOCreservoirsforenhancedoil recovery(EOR)
ď‚· Planning, construction and operation of CO2 dehydration and compression facility (CCF) as well
as transportationof CO2 fromESI-1 and ESI-2to CCF
Responsibilities:
ď‚· Conceptualization and detail design of 3 pipe rack super structures and theirfoundations; supporting air
coolerequipmentwithaccessareas, connectionsandmultiplepipe supports
ď‚· Detail designof RCElectrical substation-switchgearBuildingwithtransformersupportfoundations
ď‚· Detail analysisanddesignof raftfoundationforCompressorhouse usingSTAAD.Pro
ď‚· Analysisanddetail designof 10mhighpipe supportsforsupportingpipeline transportingCO2 fromESI
ď‚· Review andcheckingof drawings, co-ordinationwithTebodinMumbai forvariousdeliverables
ADCO: EPC forAL DABB’IYA surface facilities-Phase III
Scope of Work:
 Increasingproductionbyanadditional 73 MBOPD to achieve atotal Dabb’iyaProductionof 145 MBOPD
by year2018 by drilling114 wellswhichinclude 59oil producersand55 injectors
ď‚· Newclusters/gatheringstationsforproductionandinjection,gasprocessingtrains adjacenttoexisting
CPPfacilities,Oiland Gas exportpipelines,Field gatheringandexport/importnetworksetc.
Responsibilities:
ď‚· Studyand verificationof FEED stage documentsand drawings
ď‚· Designand analysisof steel platformsandtheirfoundations
ď‚· Classification,designandanalysesof pipe supports,sleepersandpitsfor22 clusters
ď‚· Designand analysisof crane foundations
ď‚· Preparationand checkingof steel and concrete detail drawings
ADCO: EPC for tie-inworksatsoutheast - Package A
Scope of Work:
ď‚· Conversionof existingOil ProducerstoGasLift WellsandTie-inthemtothe LiftGas Flow linesor
existing/newManifoldsinrespectiveRDSs(27 Nos.),Tie-inandConversionof existingWIwellsinto
PWRI wells(6Nos.),Tie-inandConversion of existingWIwellsintoWAGwells(18Nos.),Supplyand
Installationof newMulti SelectorManifoldsinexistingRDSsnamelyRDS-1(1Nos.),RDS-3(2 Nos.) and
RDS-4 (2 Nos.),SupplyandInstallationof Chemical InjectionPackages(7Nos.) inAL-ASABField
ď‚· Tie-in of new WAG wells (4 Nos.) in SAHIL field
Responsibilities:
ď‚· Designand analysisof civil and structural supportstructures such as access platforms,crossover
platforms,solarpanel support platforms,chemical injectionpackage supportstructure,manifold
supportstructure and instrumentationsupportstructures
ď‚· Preparationand checkingof steel and concrete drawings
GASCO:Consultancyservicesforadequacycheckof existingPipeRacksandStructures(forproposedBPST)
at train 3 & 4 of RuwaisPlant
Scope of Work:
ď‚· Determine andevaluateadequacyof existingplatformstructuresandpiperacksforproposedBPSTproject
ď‚· Recommend suitable modifications wherever required, for steel structures and foundations so that
new pipelinesandequipmentcanbe accommodated
Responsibilities:
ď‚· Studyand verificationof suppliedSTAAD.Promodelswithasbuiltdrawingsfor all the structures
ď‚· Structural integrity,adequacychecksfor steel structures,foundationsandotherstructural components
ď‚· Recommendedmodificationsinline withnew loadsandlatestGASCOdesignstandards
ADMA-OPCO:EPC worksforZK fieldWHT'selectrificationZWSC/ZCSCtopsideelectrical workspackage - "A"
Scope of Work:
ď‚· ZWSC BST-S1:Design,analysisandinstallationof new deckonexistingjacketsto accommodate
containerizedelectrical substationandothersupportequipment
ď‚· ZCSC PGP and UP: Analysisof PGP andUP fornew containerizedsubstationandelectrical equipment
Responsibilities:
ď‚· Study and verificationof FEED stage documentsand drawings,SACSmodel and environmental data
ď‚· ConceptualizationandSACSmodelingof new topside andcontainerizedsubstation
ď‚· Dynamic analysistocalculate natural frequenciesandmode shapesof all the platforms
ď‚· Pre service analysis,consistingof liftandtransportation of new BST-S1 topside andsubstation
ď‚· Environmental pushoveranalysisof BST-S1platformto calculate reserve strengthratios
ď‚· Global and Local Inplace analysis of all 3 platformswithreview andchecking of detaileddrawings
ď‚· Reviewof documentsanddrawingspreparedby sub-contractors
BUNDUQ: LQP expansionstudy
Scope of Work:
ď‚· Studyto increase POBcapacity of BunduqLQP platformin El Bunduqfieldfrom119 to 180
ď‚· Studyto propose locationand detailsforinstallationof new LQPplatformor Jack up Barge
ď‚· Cost estimationforthe installationof new LQP platformand jack up barge
Responsibilities:
ď‚· Collaborationwitharchitectto identifyspace fornew modulesviarearrangementof existingfacilities
and/or deckextension
ď‚· Global and local inplace analysisof LQP aftermodification
ď‚· Studyof alternate barge arrangementfor livingquarterstoverifyspace and utilitiesrequirement
ď‚· Studyof locationfor separate LQP platformin the vicinityof the existingLQP
ď‚· PreliminaryDesignof jacket,pile,topside andcorrespondingdrawings fornew LQP
ď‚· Cost estimationforinstallingnewLQP andleasingof secondhandjack upbarges
ADMA-OPCO:TSR and cinemahall refurbishmentprojectatUSSC
Scope of Work:
ď‚· Detail Engineeringformodificationof CinemaHall-USAAPandMessHall- USEAPforTSR requirements
Responsibilities:
ď‚· IdentifyTSRrequirementsaspercodes andcoordinate withArchitecture andHSEforlayoutpreparation
ď‚· Local analysisof extensions/modificationsonUSEAP,USAAPand global preliminarycheckforpiles
ď‚· Adequacycheckof existingdeckplate andbulkheadsdue tonew loads
ď‚· Blastadequacycheckfor exposed wall andwindows
LEADERSHIPEXPERIENCE
ACTIVITY COMMITTEE MEMBER |Tebodin,AbuDhabi
Elected representativeof discipline for organizing monthly employeeinteraction programme
ď‚· Plannedandorganizedannual office party with budgetof AED 150,000
ď‚· OrganizedmonthlyactivitiessuchasGo-carting, Bowling,Cookingcompetition,desertsafari etc.

Resume_Neeraj Nischal

  • 1.
    NEERAJ NISCHAL STRUCTURALENGINEER Nationality:Indian Email:neeraj.nischal08@gmail.comMob.:+971569239434 Examination University Institute Year CGPA/ % Graduation IITBombay IITBombay 2013 7.38/10 KEYQUALIFICATIONS STRUCTURALENGINEERING Experiencein following aspectsof StructuralEngineering  Designand analysis of steel/concrete structuressuchas platforms, Buildings, pipe racks,pipe supports, sheds, buildings, pits andfoundations forstudy,FEED and EPC projects  Designof fixedoffshore steel structures –In place,Fatigue,pushover,pre-service,boatimpact,and blastanalysisusingSACS for conceptual study,FEED and detail engineeringprojects  Finite element analysis (FEA) of pipe support shoes and saddles using ANSYS  Working knowledge of design codes such as BS 5950, BS 8110, AISC 360, ASCE 7, API RP 2A/2SIM  Software known – STAAD.Pro, SACS, ANSYS, ETABS, MAT 3D, Foundation 3D, AutoCAD, MathCad  Review of drawings and MTOs/BOQs  Technical and commercial proposals for high net worth projects with major UAE clients PROFESSIONALEXPERIENCE TEBODINMIDDLE EASTLTD.,AbuDhabi,UAE [Nov’13- Present] StructuralEngineer ADNOC-MASDAR:EPC of ESI carbon capture facilityandpipelineproject Scope ofWork:  Capture and treatment of CO2 from Emirates Steel Industry (ESI) in Abu Dhabi and its transportation to ADNOCreservoirsforenhancedoil recovery(EOR)  Planning, construction and operation of CO2 dehydration and compression facility (CCF) as well as transportationof CO2 fromESI-1 and ESI-2to CCF Responsibilities:  Conceptualization and detail design of 3 pipe rack super structures and theirfoundations; supporting air coolerequipmentwithaccessareas, connectionsandmultiplepipe supports  Detail designof RCElectrical substation-switchgearBuildingwithtransformersupportfoundations  Detail analysisanddesignof raftfoundationforCompressorhouse usingSTAAD.Pro  Analysisanddetail designof 10mhighpipe supportsforsupportingpipeline transportingCO2 fromESI  Review andcheckingof drawings, co-ordinationwithTebodinMumbai forvariousdeliverables ADCO: EPC forAL DABB’IYA surface facilities-Phase III Scope of Work:  Increasingproductionbyanadditional 73 MBOPD to achieve atotal Dabb’iyaProductionof 145 MBOPD by year2018 by drilling114 wellswhichinclude 59oil producersand55 injectors  Newclusters/gatheringstationsforproductionandinjection,gasprocessingtrains adjacenttoexisting CPPfacilities,Oiland Gas exportpipelines,Field gatheringandexport/importnetworksetc. Responsibilities:  Studyand verificationof FEED stage documentsand drawings  Designand analysisof steel platformsandtheirfoundations  Classification,designandanalysesof pipe supports,sleepersandpitsfor22 clusters  Designand analysisof crane foundations  Preparationand checkingof steel and concrete detail drawings ADCO: EPC for tie-inworksatsoutheast - Package A Scope of Work:  Conversionof existingOil ProducerstoGasLift WellsandTie-inthemtothe LiftGas Flow linesor existing/newManifoldsinrespectiveRDSs(27 Nos.),Tie-inandConversionof existingWIwellsinto PWRI wells(6Nos.),Tie-inandConversion of existingWIwellsintoWAGwells(18Nos.),Supplyand Installationof newMulti SelectorManifoldsinexistingRDSsnamelyRDS-1(1Nos.),RDS-3(2 Nos.) and RDS-4 (2 Nos.),SupplyandInstallationof Chemical InjectionPackages(7Nos.) inAL-ASABField  Tie-in of new WAG wells (4 Nos.) in SAHIL field
  • 2.
    Responsibilities: ď‚· Designand analysisofcivil and structural supportstructures such as access platforms,crossover platforms,solarpanel support platforms,chemical injectionpackage supportstructure,manifold supportstructure and instrumentationsupportstructures ď‚· Preparationand checkingof steel and concrete drawings GASCO:Consultancyservicesforadequacycheckof existingPipeRacksandStructures(forproposedBPST) at train 3 & 4 of RuwaisPlant Scope of Work: ď‚· Determine andevaluateadequacyof existingplatformstructuresandpiperacksforproposedBPSTproject ď‚· Recommend suitable modifications wherever required, for steel structures and foundations so that new pipelinesandequipmentcanbe accommodated Responsibilities: ď‚· Studyand verificationof suppliedSTAAD.Promodelswithasbuiltdrawingsfor all the structures ď‚· Structural integrity,adequacychecksfor steel structures,foundationsandotherstructural components ď‚· Recommendedmodificationsinline withnew loadsandlatestGASCOdesignstandards ADMA-OPCO:EPC worksforZK fieldWHT'selectrificationZWSC/ZCSCtopsideelectrical workspackage - "A" Scope of Work: ď‚· ZWSC BST-S1:Design,analysisandinstallationof new deckonexistingjacketsto accommodate containerizedelectrical substationandothersupportequipment ď‚· ZCSC PGP and UP: Analysisof PGP andUP fornew containerizedsubstationandelectrical equipment Responsibilities: ď‚· Study and verificationof FEED stage documentsand drawings,SACSmodel and environmental data ď‚· ConceptualizationandSACSmodelingof new topside andcontainerizedsubstation ď‚· Dynamic analysistocalculate natural frequenciesandmode shapesof all the platforms ď‚· Pre service analysis,consistingof liftandtransportation of new BST-S1 topside andsubstation ď‚· Environmental pushoveranalysisof BST-S1platformto calculate reserve strengthratios ď‚· Global and Local Inplace analysis of all 3 platformswithreview andchecking of detaileddrawings ď‚· Reviewof documentsanddrawingspreparedby sub-contractors BUNDUQ: LQP expansionstudy Scope of Work: ď‚· Studyto increase POBcapacity of BunduqLQP platformin El Bunduqfieldfrom119 to 180 ď‚· Studyto propose locationand detailsforinstallationof new LQPplatformor Jack up Barge ď‚· Cost estimationforthe installationof new LQP platformand jack up barge Responsibilities: ď‚· Collaborationwitharchitectto identifyspace fornew modulesviarearrangementof existingfacilities and/or deckextension ď‚· Global and local inplace analysisof LQP aftermodification ď‚· Studyof alternate barge arrangementfor livingquarterstoverifyspace and utilitiesrequirement ď‚· Studyof locationfor separate LQP platformin the vicinityof the existingLQP ď‚· PreliminaryDesignof jacket,pile,topside andcorrespondingdrawings fornew LQP ď‚· Cost estimationforinstallingnewLQP andleasingof secondhandjack upbarges ADMA-OPCO:TSR and cinemahall refurbishmentprojectatUSSC Scope of Work: ď‚· Detail Engineeringformodificationof CinemaHall-USAAPandMessHall- USEAPforTSR requirements Responsibilities: ď‚· IdentifyTSRrequirementsaspercodes andcoordinate withArchitecture andHSEforlayoutpreparation ď‚· Local analysisof extensions/modificationsonUSEAP,USAAPand global preliminarycheckforpiles ď‚· Adequacycheckof existingdeckplate andbulkheadsdue tonew loads ď‚· Blastadequacycheckfor exposed wall andwindows LEADERSHIPEXPERIENCE ACTIVITY COMMITTEE MEMBER |Tebodin,AbuDhabi Elected representativeof discipline for organizing monthly employeeinteraction programme ď‚· Plannedandorganizedannual office party with budgetof AED 150,000