SlideShare a Scribd company logo
NEERAJ NISCHAL
STRUCTURALENGINEER Nationality:Indian
Email:neeraj.nischal08@gmail.com Mob.:+971569239434
Examination University Institute Year CGPA/ %
Graduation IITBombay IITBombay 2013 7.38/10
KEYQUALIFICATIONS
STRUCTURALENGINEERING
Experiencein following aspectsof StructuralEngineering
 Designand analysis of steel/concrete structuressuchas platforms, Buildings, pipe racks,pipe supports,
sheds, buildings, pits andfoundations forstudy,FEED and EPC projects
 Designof fixedoffshore steel structures –In place,Fatigue,pushover,pre-service,boatimpact,and
blastanalysisusingSACS for conceptual study,FEED and detail engineeringprojects
 Finite element analysis (FEA) of pipe support shoes and saddles using ANSYS
 Working knowledge of design codes such as BS 5950, BS 8110, AISC 360, ASCE 7, API RP 2A/2SIM
 Software known – STAAD.Pro, SACS, ANSYS, ETABS, MAT 3D, Foundation 3D, AutoCAD, MathCad
 Review of drawings and MTOs/BOQs
 Technical and commercial proposals for high net worth projects with major UAE clients
PROFESSIONALEXPERIENCE
TEBODINMIDDLE EASTLTD.,AbuDhabi,UAE [Nov’13- Present]
StructuralEngineer
ADNOC-MASDAR:EPC of ESI carbon capture facilityandpipelineproject
Scope ofWork:
 Capture and treatment of CO2 from Emirates Steel Industry (ESI) in Abu Dhabi and its transportation to
ADNOCreservoirsforenhancedoil recovery(EOR)
 Planning, construction and operation of CO2 dehydration and compression facility (CCF) as well
as transportationof CO2 fromESI-1 and ESI-2to CCF
Responsibilities:
 Conceptualization and detail design of 3 pipe rack super structures and theirfoundations; supporting air
coolerequipmentwithaccessareas, connectionsandmultiplepipe supports
 Detail designof RCElectrical substation-switchgearBuildingwithtransformersupportfoundations
 Detail analysisanddesignof raftfoundationforCompressorhouse usingSTAAD.Pro
 Analysisanddetail designof 10mhighpipe supportsforsupportingpipeline transportingCO2 fromESI
 Review andcheckingof drawings, co-ordinationwithTebodinMumbai forvariousdeliverables
ADCO: EPC forAL DABB’IYA surface facilities-Phase III
Scope of Work:
 Increasingproductionbyanadditional 73 MBOPD to achieve atotal Dabb’iyaProductionof 145 MBOPD
by year2018 by drilling114 wellswhichinclude 59oil producersand55 injectors
 Newclusters/gatheringstationsforproductionandinjection,gasprocessingtrains adjacenttoexisting
CPPfacilities,Oiland Gas exportpipelines,Field gatheringandexport/importnetworksetc.
Responsibilities:
 Studyand verificationof FEED stage documentsand drawings
 Designand analysisof steel platformsandtheirfoundations
 Classification,designandanalysesof pipe supports,sleepersandpitsfor22 clusters
 Designand analysisof crane foundations
 Preparationand checkingof steel and concrete detail drawings
ADCO: EPC for tie-inworksatsoutheast - Package A
Scope of Work:
 Conversionof existingOil ProducerstoGasLift WellsandTie-inthemtothe LiftGas Flow linesor
existing/newManifoldsinrespectiveRDSs(27 Nos.),Tie-inandConversionof existingWIwellsinto
PWRI wells(6Nos.),Tie-inandConversion of existingWIwellsintoWAGwells(18Nos.),Supplyand
Installationof newMulti SelectorManifoldsinexistingRDSsnamelyRDS-1(1Nos.),RDS-3(2 Nos.) and
RDS-4 (2 Nos.),SupplyandInstallationof Chemical InjectionPackages(7Nos.) inAL-ASABField
 Tie-in of new WAG wells (4 Nos.) in SAHIL field
Responsibilities:
 Designand analysisof civil and structural supportstructures such as access platforms,crossover
platforms,solarpanel support platforms,chemical injectionpackage supportstructure,manifold
supportstructure and instrumentationsupportstructures
 Preparationand checkingof steel and concrete drawings
GASCO:Consultancyservicesforadequacycheckof existingPipeRacksandStructures(forproposedBPST)
at train 3 & 4 of RuwaisPlant
Scope of Work:
 Determine andevaluateadequacyof existingplatformstructuresandpiperacksforproposedBPSTproject
 Recommend suitable modifications wherever required, for steel structures and foundations so that
new pipelinesandequipmentcanbe accommodated
Responsibilities:
 Studyand verificationof suppliedSTAAD.Promodelswithasbuiltdrawingsfor all the structures
 Structural integrity,adequacychecksfor steel structures,foundationsandotherstructural components
 Recommendedmodificationsinline withnew loadsandlatestGASCOdesignstandards
ADMA-OPCO:EPC worksforZK fieldWHT'selectrificationZWSC/ZCSCtopsideelectrical workspackage - "A"
Scope of Work:
 ZWSC BST-S1:Design,analysisandinstallationof new deckonexistingjacketsto accommodate
containerizedelectrical substationandothersupportequipment
 ZCSC PGP and UP: Analysisof PGP andUP fornew containerizedsubstationandelectrical equipment
Responsibilities:
 Study and verificationof FEED stage documentsand drawings,SACSmodel and environmental data
 ConceptualizationandSACSmodelingof new topside andcontainerizedsubstation
 Dynamic analysistocalculate natural frequenciesandmode shapesof all the platforms
 Pre service analysis,consistingof liftandtransportation of new BST-S1 topside andsubstation
 Environmental pushoveranalysisof BST-S1platformto calculate reserve strengthratios
 Global and Local Inplace analysis of all 3 platformswithreview andchecking of detaileddrawings
 Reviewof documentsanddrawingspreparedby sub-contractors
BUNDUQ: LQP expansionstudy
Scope of Work:
 Studyto increase POBcapacity of BunduqLQP platformin El Bunduqfieldfrom119 to 180
 Studyto propose locationand detailsforinstallationof new LQPplatformor Jack up Barge
 Cost estimationforthe installationof new LQP platformand jack up barge
Responsibilities:
 Collaborationwitharchitectto identifyspace fornew modulesviarearrangementof existingfacilities
and/or deckextension
 Global and local inplace analysisof LQP aftermodification
 Studyof alternate barge arrangementfor livingquarterstoverifyspace and utilitiesrequirement
 Studyof locationfor separate LQP platformin the vicinityof the existingLQP
 PreliminaryDesignof jacket,pile,topside andcorrespondingdrawings fornew LQP
 Cost estimationforinstallingnewLQP andleasingof secondhandjack upbarges
ADMA-OPCO:TSR and cinemahall refurbishmentprojectatUSSC
Scope of Work:
 Detail Engineeringformodificationof CinemaHall-USAAPandMessHall- USEAPforTSR requirements
Responsibilities:
 IdentifyTSRrequirementsaspercodes andcoordinate withArchitecture andHSEforlayoutpreparation
 Local analysisof extensions/modificationsonUSEAP,USAAPand global preliminarycheckforpiles
 Adequacycheckof existingdeckplate andbulkheadsdue tonew loads
 Blastadequacycheckfor exposed wall andwindows
LEADERSHIPEXPERIENCE
ACTIVITY COMMITTEE MEMBER |Tebodin,AbuDhabi
Elected representativeof discipline for organizing monthly employeeinteraction programme
 Plannedandorganizedannual office party with budgetof AED 150,000
 OrganizedmonthlyactivitiessuchasGo-carting, Bowling,Cookingcompetition,desertsafari etc.

More Related Content

What's hot

Mohamed osama cv piping
Mohamed osama cv pipingMohamed osama cv piping
Mohamed osama cv piping
MohamedZidan85
 
Ukeje cv updated
Ukeje cv updatedUkeje cv updated
Ukeje cv updated
Ukeje Ev'rest
 
Sathiyaprabhu Piping Stress Engineer CV 2015
Sathiyaprabhu Piping Stress Engineer CV 2015Sathiyaprabhu Piping Stress Engineer CV 2015
Sathiyaprabhu Piping Stress Engineer CV 2015sathiya prabhu
 
Resume - Wan Sazali, PDMS Piping Designer
Resume - Wan Sazali, PDMS Piping DesignerResume - Wan Sazali, PDMS Piping Designer
Resume - Wan Sazali, PDMS Piping DesignerWan Sazali
 
Warren Tann Resume 2016
Warren Tann Resume 2016Warren Tann Resume 2016
Warren Tann Resume 2016Warren Tann
 
Cad designer resume
Cad designer resumeCad designer resume
Cad designer resume
Brian Cherry
 
CV for Bob Gao 11.2014
CV for Bob Gao 11.2014CV for Bob Gao 11.2014
CV for Bob Gao 11.2014Bob Gao
 
Gary Hall CV 2015
Gary Hall  CV 2015Gary Hall  CV 2015
Gary Hall CV 2015Gary Hall
 
Piping & Pipeline Designer
Piping & Pipeline DesignerPiping & Pipeline Designer
Piping & Pipeline Designerbharath kumar
 
Lead Pipeline Engineer (with 25+ years of relevant job experience in FEED, EP...
Lead Pipeline Engineer (with 25+ years of relevant job experience in FEED, EP...Lead Pipeline Engineer (with 25+ years of relevant job experience in FEED, EP...
Lead Pipeline Engineer (with 25+ years of relevant job experience in FEED, EP...
Dr Orhan Degermenci
 
Cv mr. orhan degermenci (lead pipeline engineer)
Cv   mr. orhan degermenci (lead pipeline engineer)Cv   mr. orhan degermenci (lead pipeline engineer)
Cv mr. orhan degermenci (lead pipeline engineer)
Dr Orhan Degermenci
 
RAJA NARAYANASWAMY__Senior Civil & Structural Designer
RAJA NARAYANASWAMY__Senior Civil & Structural DesignerRAJA NARAYANASWAMY__Senior Civil & Structural Designer
RAJA NARAYANASWAMY__Senior Civil & Structural DesignerRaja IDEA Narayanaswamy
 

What's hot (20)

Mohamed osama cv piping
Mohamed osama cv pipingMohamed osama cv piping
Mohamed osama cv piping
 
Ukeje cv updated
Ukeje cv updatedUkeje cv updated
Ukeje cv updated
 
DE LANGE - CV
DE LANGE - CVDE LANGE - CV
DE LANGE - CV
 
CV_Vijaya Kumar
CV_Vijaya KumarCV_Vijaya Kumar
CV_Vijaya Kumar
 
Sathiyaprabhu Piping Stress Engineer CV 2015
Sathiyaprabhu Piping Stress Engineer CV 2015Sathiyaprabhu Piping Stress Engineer CV 2015
Sathiyaprabhu Piping Stress Engineer CV 2015
 
Resume - Wan Sazali, PDMS Piping Designer
Resume - Wan Sazali, PDMS Piping DesignerResume - Wan Sazali, PDMS Piping Designer
Resume - Wan Sazali, PDMS Piping Designer
 
Warren Tann Resume 2016
Warren Tann Resume 2016Warren Tann Resume 2016
Warren Tann Resume 2016
 
CV_Rahul_Sharma
CV_Rahul_SharmaCV_Rahul_Sharma
CV_Rahul_Sharma
 
Senthil Nathan Senior Piping Stress Engineer
Senthil Nathan Senior Piping Stress EngineerSenthil Nathan Senior Piping Stress Engineer
Senthil Nathan Senior Piping Stress Engineer
 
63089_SEKAR_01_12_14
63089_SEKAR_01_12_1463089_SEKAR_01_12_14
63089_SEKAR_01_12_14
 
Cad designer resume
Cad designer resumeCad designer resume
Cad designer resume
 
CV for Bob Gao 11.2014
CV for Bob Gao 11.2014CV for Bob Gao 11.2014
CV for Bob Gao 11.2014
 
Gary Hall CV 2015
Gary Hall  CV 2015Gary Hall  CV 2015
Gary Hall CV 2015
 
Resume for Pipeline Designer
Resume for Pipeline DesignerResume for Pipeline Designer
Resume for Pipeline Designer
 
CV2_DEBASISH
CV2_DEBASISHCV2_DEBASISH
CV2_DEBASISH
 
Piping & Pipeline Designer
Piping & Pipeline DesignerPiping & Pipeline Designer
Piping & Pipeline Designer
 
Lead Pipeline Engineer (with 25+ years of relevant job experience in FEED, EP...
Lead Pipeline Engineer (with 25+ years of relevant job experience in FEED, EP...Lead Pipeline Engineer (with 25+ years of relevant job experience in FEED, EP...
Lead Pipeline Engineer (with 25+ years of relevant job experience in FEED, EP...
 
Cv mr. orhan degermenci (lead pipeline engineer)
Cv   mr. orhan degermenci (lead pipeline engineer)Cv   mr. orhan degermenci (lead pipeline engineer)
Cv mr. orhan degermenci (lead pipeline engineer)
 
RAJA NARAYANASWAMY__Senior Civil & Structural Designer
RAJA NARAYANASWAMY__Senior Civil & Structural DesignerRAJA NARAYANASWAMY__Senior Civil & Structural Designer
RAJA NARAYANASWAMY__Senior Civil & Structural Designer
 
CV_Stress_TaibA
CV_Stress_TaibACV_Stress_TaibA
CV_Stress_TaibA
 

Viewers also liked

Top 8 storage architect resume samples
Top 8 storage architect resume samplesTop 8 storage architect resume samples
Top 8 storage architect resume samplesberijom
 
Top 8 project surveyor resume samples
Top 8 project surveyor resume samplesTop 8 project surveyor resume samples
Top 8 project surveyor resume samplesRobertaFlack234
 
Carlos Betts_Resume
Carlos Betts_ResumeCarlos Betts_Resume
Carlos Betts_Resumecarlos betts
 
Resume: Francine Wolfe 2009
Resume:  Francine Wolfe 2009Resume:  Francine Wolfe 2009
Resume: Francine Wolfe 2009
fswolfe
 
Top 8 staff developer resume samples
Top 8 staff developer resume samplesTop 8 staff developer resume samples
Top 8 staff developer resume samplesTakeThat012
 
Top 8 land developer resume samples
Top 8 land developer resume samplesTop 8 land developer resume samples
Top 8 land developer resume samplesMichaelLearns012
 
Michael payne resume 141215
Michael payne resume 141215Michael payne resume 141215
Michael payne resume 141215
Michael Payne
 
Top 8 general manager of a restaurant resume samples
Top 8 general manager of a restaurant resume samplesTop 8 general manager of a restaurant resume samples
Top 8 general manager of a restaurant resume samplesKimHeechul999
 
Amber_Nelson_community manager resume
Amber_Nelson_community manager resumeAmber_Nelson_community manager resume
Amber_Nelson_community manager resumeLorenzo Pierson
 
Rajendra Resume World Bank format 1
Rajendra Resume World Bank format 1Rajendra Resume World Bank format 1
Rajendra Resume World Bank format 1Rajendra Singh Dangi
 
Cesar Espada - resume 11-2016
Cesar Espada - resume 11-2016Cesar Espada - resume 11-2016
Cesar Espada - resume 11-2016cesar espada
 
HAQ Consulting Resume June 2015 R1
HAQ Consulting Resume  June 2015 R1HAQ Consulting Resume  June 2015 R1
HAQ Consulting Resume June 2015 R1Hamid Qaasim
 
Groshong_Resume 11-18-16
Groshong_Resume 11-18-16Groshong_Resume 11-18-16
Groshong_Resume 11-18-16Todd Groshong
 
Kaushik New resume -1 (2)
Kaushik New resume -1 (2)Kaushik New resume -1 (2)
Kaushik New resume -1 (2)Kaushik S
 

Viewers also liked (20)

TRIDIB_resume
TRIDIB_resumeTRIDIB_resume
TRIDIB_resume
 
Naveen_Resume
Naveen_ResumeNaveen_Resume
Naveen_Resume
 
Top 8 storage architect resume samples
Top 8 storage architect resume samplesTop 8 storage architect resume samples
Top 8 storage architect resume samples
 
Susant-Resume_BIM
Susant-Resume_BIMSusant-Resume_BIM
Susant-Resume_BIM
 
Top 8 project surveyor resume samples
Top 8 project surveyor resume samplesTop 8 project surveyor resume samples
Top 8 project surveyor resume samples
 
Farag- Resume
Farag- ResumeFarag- Resume
Farag- Resume
 
Carlos Betts_Resume
Carlos Betts_ResumeCarlos Betts_Resume
Carlos Betts_Resume
 
Resume: Francine Wolfe 2009
Resume:  Francine Wolfe 2009Resume:  Francine Wolfe 2009
Resume: Francine Wolfe 2009
 
Top 8 staff developer resume samples
Top 8 staff developer resume samplesTop 8 staff developer resume samples
Top 8 staff developer resume samples
 
Top 8 land developer resume samples
Top 8 land developer resume samplesTop 8 land developer resume samples
Top 8 land developer resume samples
 
Michael payne resume 141215
Michael payne resume 141215Michael payne resume 141215
Michael payne resume 141215
 
Top 8 general manager of a restaurant resume samples
Top 8 general manager of a restaurant resume samplesTop 8 general manager of a restaurant resume samples
Top 8 general manager of a restaurant resume samples
 
Amber_Nelson_community manager resume
Amber_Nelson_community manager resumeAmber_Nelson_community manager resume
Amber_Nelson_community manager resume
 
Rajendra Resume World Bank format 1
Rajendra Resume World Bank format 1Rajendra Resume World Bank format 1
Rajendra Resume World Bank format 1
 
Cesar Espada - resume 11-2016
Cesar Espada - resume 11-2016Cesar Espada - resume 11-2016
Cesar Espada - resume 11-2016
 
HAQ Consulting Resume June 2015 R1
HAQ Consulting Resume  June 2015 R1HAQ Consulting Resume  June 2015 R1
HAQ Consulting Resume June 2015 R1
 
NEW RESUME KHALED
NEW RESUME KHALEDNEW RESUME KHALED
NEW RESUME KHALED
 
Groshong_Resume 11-18-16
Groshong_Resume 11-18-16Groshong_Resume 11-18-16
Groshong_Resume 11-18-16
 
Sudhan MBB Resume
Sudhan MBB ResumeSudhan MBB Resume
Sudhan MBB Resume
 
Kaushik New resume -1 (2)
Kaushik New resume -1 (2)Kaushik New resume -1 (2)
Kaushik New resume -1 (2)
 

Similar to Resume_Neeraj Nischal

RAMASAMY (NACE CERTIFIED CP LEVEL II ENGINEER)
RAMASAMY  (NACE CERTIFIED   CP LEVEL II ENGINEER)RAMASAMY  (NACE CERTIFIED   CP LEVEL II ENGINEER)
RAMASAMY (NACE CERTIFIED CP LEVEL II ENGINEER)
RAMA SAMY
 
NACE CP LEVEL II ENGINEER
NACE CP LEVEL II ENGINEERNACE CP LEVEL II ENGINEER
NACE CP LEVEL II ENGINEER
RAMA SAMY
 
Cv Piping Engineer
Cv Piping EngineerCv Piping Engineer
Cv Piping Engineer
Padmanabh Dhobale
 
RAMASAMY NACE CP LEVEL II ENGINEER
RAMASAMY NACE CP LEVEL II ENGINEERRAMASAMY NACE CP LEVEL II ENGINEER
RAMASAMY NACE CP LEVEL II ENGINEER
RAMA SAMY
 
KESHAV CAD ENGINEEER
KESHAV CAD ENGINEEERKESHAV CAD ENGINEEER
KESHAV CAD ENGINEEERkeshav rao
 
Mechanical Engineer-Syed Zain Ali
Mechanical Engineer-Syed Zain AliMechanical Engineer-Syed Zain Ali
Mechanical Engineer-Syed Zain AliZain Ali Syed
 
Resume_Pintu Darji_Piping Engr.
Resume_Pintu Darji_Piping Engr.Resume_Pintu Darji_Piping Engr.
Resume_Pintu Darji_Piping Engr.Pintu Darji
 
CV-_SDhiman_27-04-2016
CV-_SDhiman_27-04-2016CV-_SDhiman_27-04-2016
CV-_SDhiman_27-04-2016Subhash Dhiman
 
DRAUGHTSMAN Piping Mechanical_1
DRAUGHTSMAN Piping Mechanical_1DRAUGHTSMAN Piping Mechanical_1
DRAUGHTSMAN Piping Mechanical_1Nasir Mahmood
 
DRAUGHTSMAN Piping Mechanical_1
DRAUGHTSMAN Piping Mechanical_1DRAUGHTSMAN Piping Mechanical_1
DRAUGHTSMAN Piping Mechanical_1Nasir Mahmood
 

Similar to Resume_Neeraj Nischal (20)

RAMASAMY (NACE CERTIFIED CP LEVEL II ENGINEER)
RAMASAMY  (NACE CERTIFIED   CP LEVEL II ENGINEER)RAMASAMY  (NACE CERTIFIED   CP LEVEL II ENGINEER)
RAMASAMY (NACE CERTIFIED CP LEVEL II ENGINEER)
 
NACE CP LEVEL II ENGINEER
NACE CP LEVEL II ENGINEERNACE CP LEVEL II ENGINEER
NACE CP LEVEL II ENGINEER
 
Cv Piping Engineer
Cv Piping EngineerCv Piping Engineer
Cv Piping Engineer
 
RAMASAMY NACE CP LEVEL II ENGINEER
RAMASAMY NACE CP LEVEL II ENGINEERRAMASAMY NACE CP LEVEL II ENGINEER
RAMASAMY NACE CP LEVEL II ENGINEER
 
Nirmal_Resume
Nirmal_ResumeNirmal_Resume
Nirmal_Resume
 
Jai Prakash sharma CV
Jai Prakash sharma CVJai Prakash sharma CV
Jai Prakash sharma CV
 
CV-Padmanabh
CV-PadmanabhCV-Padmanabh
CV-Padmanabh
 
KESHAV CAD ENGINEEER
KESHAV CAD ENGINEEERKESHAV CAD ENGINEEER
KESHAV CAD ENGINEEER
 
Mechanical Engineer-Syed Zain Ali
Mechanical Engineer-Syed Zain AliMechanical Engineer-Syed Zain Ali
Mechanical Engineer-Syed Zain Ali
 
CV_AKSHAY RAJPUT
CV_AKSHAY RAJPUTCV_AKSHAY RAJPUT
CV_AKSHAY RAJPUT
 
CV_Basavanagowda
CV_BasavanagowdaCV_Basavanagowda
CV_Basavanagowda
 
CV for Linkedin
CV for LinkedinCV for Linkedin
CV for Linkedin
 
CV-NKN-09.05.16
CV-NKN-09.05.16CV-NKN-09.05.16
CV-NKN-09.05.16
 
Resume_Pintu Darji_Piping Engr.
Resume_Pintu Darji_Piping Engr.Resume_Pintu Darji_Piping Engr.
Resume_Pintu Darji_Piping Engr.
 
CV-_SDhiman_27-04-2016
CV-_SDhiman_27-04-2016CV-_SDhiman_27-04-2016
CV-_SDhiman_27-04-2016
 
Atchiraju Batchu_CV (1)
Atchiraju Batchu_CV (1)Atchiraju Batchu_CV (1)
Atchiraju Batchu_CV (1)
 
KANNAN RESUME
KANNAN RESUMEKANNAN RESUME
KANNAN RESUME
 
DRAUGHTSMAN Piping Mechanical_1
DRAUGHTSMAN Piping Mechanical_1DRAUGHTSMAN Piping Mechanical_1
DRAUGHTSMAN Piping Mechanical_1
 
DRAUGHTSMAN Piping Mechanical_1
DRAUGHTSMAN Piping Mechanical_1DRAUGHTSMAN Piping Mechanical_1
DRAUGHTSMAN Piping Mechanical_1
 
SREEJITH_CV
SREEJITH_CVSREEJITH_CV
SREEJITH_CV
 

Resume_Neeraj Nischal

  • 1. NEERAJ NISCHAL STRUCTURALENGINEER Nationality:Indian Email:neeraj.nischal08@gmail.com Mob.:+971569239434 Examination University Institute Year CGPA/ % Graduation IITBombay IITBombay 2013 7.38/10 KEYQUALIFICATIONS STRUCTURALENGINEERING Experiencein following aspectsof StructuralEngineering  Designand analysis of steel/concrete structuressuchas platforms, Buildings, pipe racks,pipe supports, sheds, buildings, pits andfoundations forstudy,FEED and EPC projects  Designof fixedoffshore steel structures –In place,Fatigue,pushover,pre-service,boatimpact,and blastanalysisusingSACS for conceptual study,FEED and detail engineeringprojects  Finite element analysis (FEA) of pipe support shoes and saddles using ANSYS  Working knowledge of design codes such as BS 5950, BS 8110, AISC 360, ASCE 7, API RP 2A/2SIM  Software known – STAAD.Pro, SACS, ANSYS, ETABS, MAT 3D, Foundation 3D, AutoCAD, MathCad  Review of drawings and MTOs/BOQs  Technical and commercial proposals for high net worth projects with major UAE clients PROFESSIONALEXPERIENCE TEBODINMIDDLE EASTLTD.,AbuDhabi,UAE [Nov’13- Present] StructuralEngineer ADNOC-MASDAR:EPC of ESI carbon capture facilityandpipelineproject Scope ofWork:  Capture and treatment of CO2 from Emirates Steel Industry (ESI) in Abu Dhabi and its transportation to ADNOCreservoirsforenhancedoil recovery(EOR)  Planning, construction and operation of CO2 dehydration and compression facility (CCF) as well as transportationof CO2 fromESI-1 and ESI-2to CCF Responsibilities:  Conceptualization and detail design of 3 pipe rack super structures and theirfoundations; supporting air coolerequipmentwithaccessareas, connectionsandmultiplepipe supports  Detail designof RCElectrical substation-switchgearBuildingwithtransformersupportfoundations  Detail analysisanddesignof raftfoundationforCompressorhouse usingSTAAD.Pro  Analysisanddetail designof 10mhighpipe supportsforsupportingpipeline transportingCO2 fromESI  Review andcheckingof drawings, co-ordinationwithTebodinMumbai forvariousdeliverables ADCO: EPC forAL DABB’IYA surface facilities-Phase III Scope of Work:  Increasingproductionbyanadditional 73 MBOPD to achieve atotal Dabb’iyaProductionof 145 MBOPD by year2018 by drilling114 wellswhichinclude 59oil producersand55 injectors  Newclusters/gatheringstationsforproductionandinjection,gasprocessingtrains adjacenttoexisting CPPfacilities,Oiland Gas exportpipelines,Field gatheringandexport/importnetworksetc. Responsibilities:  Studyand verificationof FEED stage documentsand drawings  Designand analysisof steel platformsandtheirfoundations  Classification,designandanalysesof pipe supports,sleepersandpitsfor22 clusters  Designand analysisof crane foundations  Preparationand checkingof steel and concrete detail drawings ADCO: EPC for tie-inworksatsoutheast - Package A Scope of Work:  Conversionof existingOil ProducerstoGasLift WellsandTie-inthemtothe LiftGas Flow linesor existing/newManifoldsinrespectiveRDSs(27 Nos.),Tie-inandConversionof existingWIwellsinto PWRI wells(6Nos.),Tie-inandConversion of existingWIwellsintoWAGwells(18Nos.),Supplyand Installationof newMulti SelectorManifoldsinexistingRDSsnamelyRDS-1(1Nos.),RDS-3(2 Nos.) and RDS-4 (2 Nos.),SupplyandInstallationof Chemical InjectionPackages(7Nos.) inAL-ASABField  Tie-in of new WAG wells (4 Nos.) in SAHIL field
  • 2. Responsibilities:  Designand analysisof civil and structural supportstructures such as access platforms,crossover platforms,solarpanel support platforms,chemical injectionpackage supportstructure,manifold supportstructure and instrumentationsupportstructures  Preparationand checkingof steel and concrete drawings GASCO:Consultancyservicesforadequacycheckof existingPipeRacksandStructures(forproposedBPST) at train 3 & 4 of RuwaisPlant Scope of Work:  Determine andevaluateadequacyof existingplatformstructuresandpiperacksforproposedBPSTproject  Recommend suitable modifications wherever required, for steel structures and foundations so that new pipelinesandequipmentcanbe accommodated Responsibilities:  Studyand verificationof suppliedSTAAD.Promodelswithasbuiltdrawingsfor all the structures  Structural integrity,adequacychecksfor steel structures,foundationsandotherstructural components  Recommendedmodificationsinline withnew loadsandlatestGASCOdesignstandards ADMA-OPCO:EPC worksforZK fieldWHT'selectrificationZWSC/ZCSCtopsideelectrical workspackage - "A" Scope of Work:  ZWSC BST-S1:Design,analysisandinstallationof new deckonexistingjacketsto accommodate containerizedelectrical substationandothersupportequipment  ZCSC PGP and UP: Analysisof PGP andUP fornew containerizedsubstationandelectrical equipment Responsibilities:  Study and verificationof FEED stage documentsand drawings,SACSmodel and environmental data  ConceptualizationandSACSmodelingof new topside andcontainerizedsubstation  Dynamic analysistocalculate natural frequenciesandmode shapesof all the platforms  Pre service analysis,consistingof liftandtransportation of new BST-S1 topside andsubstation  Environmental pushoveranalysisof BST-S1platformto calculate reserve strengthratios  Global and Local Inplace analysis of all 3 platformswithreview andchecking of detaileddrawings  Reviewof documentsanddrawingspreparedby sub-contractors BUNDUQ: LQP expansionstudy Scope of Work:  Studyto increase POBcapacity of BunduqLQP platformin El Bunduqfieldfrom119 to 180  Studyto propose locationand detailsforinstallationof new LQPplatformor Jack up Barge  Cost estimationforthe installationof new LQP platformand jack up barge Responsibilities:  Collaborationwitharchitectto identifyspace fornew modulesviarearrangementof existingfacilities and/or deckextension  Global and local inplace analysisof LQP aftermodification  Studyof alternate barge arrangementfor livingquarterstoverifyspace and utilitiesrequirement  Studyof locationfor separate LQP platformin the vicinityof the existingLQP  PreliminaryDesignof jacket,pile,topside andcorrespondingdrawings fornew LQP  Cost estimationforinstallingnewLQP andleasingof secondhandjack upbarges ADMA-OPCO:TSR and cinemahall refurbishmentprojectatUSSC Scope of Work:  Detail Engineeringformodificationof CinemaHall-USAAPandMessHall- USEAPforTSR requirements Responsibilities:  IdentifyTSRrequirementsaspercodes andcoordinate withArchitecture andHSEforlayoutpreparation  Local analysisof extensions/modificationsonUSEAP,USAAPand global preliminarycheckforpiles  Adequacycheckof existingdeckplate andbulkheadsdue tonew loads  Blastadequacycheckfor exposed wall andwindows LEADERSHIPEXPERIENCE ACTIVITY COMMITTEE MEMBER |Tebodin,AbuDhabi Elected representativeof discipline for organizing monthly employeeinteraction programme  Plannedandorganizedannual office party with budgetof AED 150,000