AABBRRAAJJ AALL--TTAAHHWWIILLIIYYAA PPRROOJJEECCTT
Form Ref : AAT-HIL-SFD-01QA-001 R0
REPORTEREPORTE
Issue to: Arab Engineering Bureau (AEB) - SC From: Hill International (PMCM)
LOCATION: PHOTOS ATTACHED (YES/NO/NA):
SPEC/DRAWING/METHOD STATEMENT/ITP REFERENCE:
RECOMMENDED DISPOSITION:
PMCM ORIGINATOR: (Name / Signature / Date): RECEIVED BY SC: (Name / Signature / Date)
ANALYSIS :
DETAILS :
PREVENTIVE ACTION :
VERIFICATION :
AGREED FOR CLOSURE: (YES / NO)
PMCM :
CLOSURE STATUS - AEB
Date / Time:
SITE OBSERVATION REPORT (SOR)
SOR Ref. No. AAT-HIL-SOR- -
OBSERVATION DESCRIPTION - HILL
ACTION REQUIRED - AEB
Cc : Hill International

Aat sor format - corrected

  • 1.
    AABBRRAAJJ AALL--TTAAHHWWIILLIIYYAA PPRROOJJEECCTT FormRef : AAT-HIL-SFD-01QA-001 R0 REPORTEREPORTE Issue to: Arab Engineering Bureau (AEB) - SC From: Hill International (PMCM) LOCATION: PHOTOS ATTACHED (YES/NO/NA): SPEC/DRAWING/METHOD STATEMENT/ITP REFERENCE: RECOMMENDED DISPOSITION: PMCM ORIGINATOR: (Name / Signature / Date): RECEIVED BY SC: (Name / Signature / Date) ANALYSIS : DETAILS : PREVENTIVE ACTION : VERIFICATION : AGREED FOR CLOSURE: (YES / NO) PMCM : CLOSURE STATUS - AEB Date / Time: SITE OBSERVATION REPORT (SOR) SOR Ref. No. AAT-HIL-SOR- - OBSERVATION DESCRIPTION - HILL ACTION REQUIRED - AEB Cc : Hill International