The document discusses the key steps in creating an event plan, including defining the event concept, determining purpose, goals and objectives, assessing needs and resources. Some key points covered are:
- The event concept should define the purpose, scope and content and be transformed into an event plan through project management.
- Goals and objectives must be determined to define the event scope and ensure the client's needs are met. Objectives should be SMART.
- A needs assessment identifies the purpose, audience, location, resources required, and helps drive decisions.
- Resources like time, money, personnel, space and suppliers must be analyzed to determine feasibility. The event plan should balance needs with available resources.
EVENTS CONCEPT
Stakeholder
From a broad idea that a stakeholder is a person who can affect or will be affected by the event.
The more specific idea that a stakeholder is a person of influence but not directly involved in the work. Clearly, this definition could also include an organisation such as a government.
Getz( 1997) states that stakeholders are those people and groups with a stake in the event and its outcomes, including all groups patrcipating in the event production, sponsors and grant-givers, community representatives and anyone impacted by the event
These stakeholder may include:
Event principal (key person in host organisation or client)
Organising committee
Sponsors, donors
Local community
Local authorities (e.g. Council, emergency services, environmental authority)
Service contractors ( e.g. Staging, cleaning, catering, security)
Suppliers
Performers, entertainers, participants
Spectators, audience
media
Numerous factors need to be considered in developing the event concept
Purpose of the event
Although the purpose is also strongly linked to both the theme and the venue
In some instances defining the purpose is difficult.
Diversify from ML Engineering & Construction which specialized in renovation, interior and exterior works, ML Events is a company that specialized in Event Management and is an Interactive Marketing Component Provider.
ML Events has a team of experience people who are confident to plan, manage and achieve your expectation, meeting your marketing or event objectives.
On other hand, ML Events has the expertise to build or manufacture marketing component for your marketing or advertising purpose.
EVENTS CONCEPT
Stakeholder
From a broad idea that a stakeholder is a person who can affect or will be affected by the event.
The more specific idea that a stakeholder is a person of influence but not directly involved in the work. Clearly, this definition could also include an organisation such as a government.
Getz( 1997) states that stakeholders are those people and groups with a stake in the event and its outcomes, including all groups patrcipating in the event production, sponsors and grant-givers, community representatives and anyone impacted by the event
These stakeholder may include:
Event principal (key person in host organisation or client)
Organising committee
Sponsors, donors
Local community
Local authorities (e.g. Council, emergency services, environmental authority)
Service contractors ( e.g. Staging, cleaning, catering, security)
Suppliers
Performers, entertainers, participants
Spectators, audience
media
Numerous factors need to be considered in developing the event concept
Purpose of the event
Although the purpose is also strongly linked to both the theme and the venue
In some instances defining the purpose is difficult.
Diversify from ML Engineering & Construction which specialized in renovation, interior and exterior works, ML Events is a company that specialized in Event Management and is an Interactive Marketing Component Provider.
ML Events has a team of experience people who are confident to plan, manage and achieve your expectation, meeting your marketing or event objectives.
On other hand, ML Events has the expertise to build or manufacture marketing component for your marketing or advertising purpose.
The subject of this paper are rules governing protection of world heritage (cultural, natural, common heritage of humankind), on the one hand, and sustainable development on the other. Cultural Heritage and The Common Heritage of Humankind are novel legal tools that have been developed and play a key role in the law of tourism and sustainable development. There are many ways that one state can keep another state from benefiting from its cultural heritage, but international law is there to protect the rights of the host state so that the host can provide travel products and seek sustainable financial gains through tourism. When considering tourism and sustainable development, treaty drafters and legislatures have looked carefully at the products that are produced for touristic purposes; how they are utilized, consumed, reproduced and preserved. Both the needs of the host state and people of that state are reflected in Cultural Heritage law along with its rights, duties, and obligations. The greater needs of humanity are reflected in the Common Heritage of Humankind law with its rights, duties and obligations.
Planning an event right from the scratch can be a humongous work. With right planning, visualizing and execution an event can be held without any worries. Through this presentation, you can draw an outline regarding some important aspects of event planning.
EVENTS MANAGEMENT SERVICES NC III powerpoint.pptxGraceAceveda
his includes overall event design, brand building, marketing and communication strategy, audio-visual production, script writing, logistics, budgeting, negotiation, and client service
If your company needs to submit a Event Proposal Template PowerPoint Presentation Slides look no further. Our researchers have analyzed thousands of proposals on this topic for effectiveness and conversion. Just download our template, add your company data and submit to your client for a positive response. https://bit.ly/38tOcAQ
SlideTeam is here to take care of all your event proposal to outline all the services you will provide for an event. Introducing you aesthetically, event proposal PowerPoint presentation slides for your marketing campaign, and your sales pitch all wrapped up into one PPT presentation. Crafted with the graphics of professional work environment, employee, desks, and bulletin, we have covered up topics which cover up, information about you, about the event, sponsorship opportunities, the benefit to sponsors, sponsorship form, event goals, target audience, objective to ensure quality, road map demonstrating, initiation of the event, to chief guest speech and closure of the programme. Various modules of sponsorship opportunities have been scripted here for your personalization. This PowerPoint template has been designed while keeping in mind that the organization has to consider viewers point of view and have to communicate with the executives through this scheme. Give your business and marketing related presentations a dauntless edge. Proceed now and download today. Impress the sponsors and get them on board with you using Event Proposal PowerPoint Presentation Slides.
MICE - Meeting Incentive Conference ExhibitionAkash P
Meetings, incentives, conferences and exhibitions, or Meetings, Incentives, Conferences, and Events (MICE) is a type of tourism in which large groups, usually planned well in advance, are brought together for a particular purpose.
The subject of this paper are rules governing protection of world heritage (cultural, natural, common heritage of humankind), on the one hand, and sustainable development on the other. Cultural Heritage and The Common Heritage of Humankind are novel legal tools that have been developed and play a key role in the law of tourism and sustainable development. There are many ways that one state can keep another state from benefiting from its cultural heritage, but international law is there to protect the rights of the host state so that the host can provide travel products and seek sustainable financial gains through tourism. When considering tourism and sustainable development, treaty drafters and legislatures have looked carefully at the products that are produced for touristic purposes; how they are utilized, consumed, reproduced and preserved. Both the needs of the host state and people of that state are reflected in Cultural Heritage law along with its rights, duties, and obligations. The greater needs of humanity are reflected in the Common Heritage of Humankind law with its rights, duties and obligations.
Planning an event right from the scratch can be a humongous work. With right planning, visualizing and execution an event can be held without any worries. Through this presentation, you can draw an outline regarding some important aspects of event planning.
EVENTS MANAGEMENT SERVICES NC III powerpoint.pptxGraceAceveda
his includes overall event design, brand building, marketing and communication strategy, audio-visual production, script writing, logistics, budgeting, negotiation, and client service
If your company needs to submit a Event Proposal Template PowerPoint Presentation Slides look no further. Our researchers have analyzed thousands of proposals on this topic for effectiveness and conversion. Just download our template, add your company data and submit to your client for a positive response. https://bit.ly/38tOcAQ
SlideTeam is here to take care of all your event proposal to outline all the services you will provide for an event. Introducing you aesthetically, event proposal PowerPoint presentation slides for your marketing campaign, and your sales pitch all wrapped up into one PPT presentation. Crafted with the graphics of professional work environment, employee, desks, and bulletin, we have covered up topics which cover up, information about you, about the event, sponsorship opportunities, the benefit to sponsors, sponsorship form, event goals, target audience, objective to ensure quality, road map demonstrating, initiation of the event, to chief guest speech and closure of the programme. Various modules of sponsorship opportunities have been scripted here for your personalization. This PowerPoint template has been designed while keeping in mind that the organization has to consider viewers point of view and have to communicate with the executives through this scheme. Give your business and marketing related presentations a dauntless edge. Proceed now and download today. Impress the sponsors and get them on board with you using Event Proposal PowerPoint Presentation Slides.
MICE - Meeting Incentive Conference ExhibitionAkash P
Meetings, incentives, conferences and exhibitions, or Meetings, Incentives, Conferences, and Events (MICE) is a type of tourism in which large groups, usually planned well in advance, are brought together for a particular purpose.
Any organisation that wants to build long-lasting relationships essential for corporate growth must understand how to organise corporate events. By organising a corporate event, you may deepen your relationships with current customers and business partners while fostering sincere relationships and attracting new ones.
Business event planning is a significant operation that calls for almost superhuman levels of planning and attention to detail.
The fundamental components of event management—research, design, planning, coordination, and evaluation—must be understood before you host any event, whether it's a 300-person product launch or a 15-person employee training.
In this deck, you’ll learn how corporate events provide a valuable opportunity to learn and gain insights to help your organisation improve operations, gain a competitive advantage and achieve your overall objective.
You’ll also learn
1. The key strategy to creating an effective corporate event
2. What to watch out for when choosing your venue
3. The basic elements of a corporate event
How to choose your ideal event planner.pptxMasroorAhmed84
Unsure of how to choose your event planner? As an event planner in Singapore, we plan for events. So what do an event planner like us do? And how do you go about choosing an event planner? What kind of events do we do?
Events are one of the most effective ways to generate high quality leads and opportunities but they are also one most expensive, not just in financial terms, but in terms of the time and resource they require. Here are our top tips for maximising the return on your events.
Pearl event management company is one of the best wedding planners in India. They plan, organize, and execute various types and sizes of events. Working with budgets, timelines, and multiple vendors.
If your company needs to submit a Brand Event Management Proposal PowerPoint Presentation Slides look no further. Our researchers have analyzed thousands of proposals on this topic for effectiveness and conversion. Just download our template, add your company data and submit to your client for a positive response. https://bit.ly/3ffjn4A
Business Valuation Principles for EntrepreneursBen Wann
This insightful presentation is designed to equip entrepreneurs with the essential knowledge and tools needed to accurately value their businesses. Understanding business valuation is crucial for making informed decisions, whether you're seeking investment, planning to sell, or simply want to gauge your company's worth.
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s DholeraAvirahi City Dholera
The Tata Group, a titan of Indian industry, is making waves with its advanced talks with Taiwanese chipmakers Powerchip Semiconductor Manufacturing Corporation (PSMC) and UMC Group. The goal? Establishing a cutting-edge semiconductor fabrication unit (fab) in Dholera, Gujarat. This isn’t just any project; it’s a potential game changer for India’s chipmaking aspirations and a boon for investors seeking promising residential projects in dholera sir.
Visit : https://www.avirahi.com/blog/tata-group-dials-taiwan-for-its-chipmaking-ambition-in-gujarats-dholera/
Enterprise Excellence is Inclusive Excellence.pdfKaiNexus
Enterprise excellence and inclusive excellence are closely linked, and real-world challenges have shown that both are essential to the success of any organization. To achieve enterprise excellence, organizations must focus on improving their operations and processes while creating an inclusive environment that engages everyone. In this interactive session, the facilitator will highlight commonly established business practices and how they limit our ability to engage everyone every day. More importantly, though, participants will likely gain increased awareness of what we can do differently to maximize enterprise excellence through deliberate inclusion.
What is Enterprise Excellence?
Enterprise Excellence is a holistic approach that's aimed at achieving world-class performance across all aspects of the organization.
What might I learn?
A way to engage all in creating Inclusive Excellence. Lessons from the US military and their parallels to the story of Harry Potter. How belt systems and CI teams can destroy inclusive practices. How leadership language invites people to the party. There are three things leaders can do to engage everyone every day: maximizing psychological safety to create environments where folks learn, contribute, and challenge the status quo.
Who might benefit? Anyone and everyone leading folks from the shop floor to top floor.
Dr. William Harvey is a seasoned Operations Leader with extensive experience in chemical processing, manufacturing, and operations management. At Michelman, he currently oversees multiple sites, leading teams in strategic planning and coaching/practicing continuous improvement. William is set to start his eighth year of teaching at the University of Cincinnati where he teaches marketing, finance, and management. William holds various certifications in change management, quality, leadership, operational excellence, team building, and DiSC, among others.
What are the main advantages of using HR recruiter services.pdfHumanResourceDimensi1
HR recruiter services offer top talents to companies according to their specific needs. They handle all recruitment tasks from job posting to onboarding and help companies concentrate on their business growth. With their expertise and years of experience, they streamline the hiring process and save time and resources for the company.
Cracking the Workplace Discipline Code Main.pptxWorkforce Group
Cultivating and maintaining discipline within teams is a critical differentiator for successful organisations.
Forward-thinking leaders and business managers understand the impact that discipline has on organisational success. A disciplined workforce operates with clarity, focus, and a shared understanding of expectations, ultimately driving better results, optimising productivity, and facilitating seamless collaboration.
Although discipline is not a one-size-fits-all approach, it can help create a work environment that encourages personal growth and accountability rather than solely relying on punitive measures.
In this deck, you will learn the significance of workplace discipline for organisational success. You’ll also learn
• Four (4) workplace discipline methods you should consider
• The best and most practical approach to implementing workplace discipline.
• Three (3) key tips to maintain a disciplined workplace.
The world of search engine optimization (SEO) is buzzing with discussions after Google confirmed that around 2,500 leaked internal documents related to its Search feature are indeed authentic. The revelation has sparked significant concerns within the SEO community. The leaked documents were initially reported by SEO experts Rand Fishkin and Mike King, igniting widespread analysis and discourse. For More Info:- https://news.arihantwebtech.com/search-disrupted-googles-leaked-documents-rock-the-seo-world/
3.0 Project 2_ Developing My Brand Identity Kit.pptxtanyjahb
A personal brand exploration presentation summarizes an individual's unique qualities and goals, covering strengths, values, passions, and target audience. It helps individuals understand what makes them stand out, their desired image, and how they aim to achieve it.
"𝑩𝑬𝑮𝑼𝑵 𝑾𝑰𝑻𝑯 𝑻𝑱 𝑰𝑺 𝑯𝑨𝑳𝑭 𝑫𝑶𝑵𝑬"
𝐓𝐉 𝐂𝐨𝐦𝐬 (𝐓𝐉 𝐂𝐨𝐦𝐦𝐮𝐧𝐢𝐜𝐚𝐭𝐢𝐨𝐧𝐬) is a professional event agency that includes experts in the event-organizing market in Vietnam, Korea, and ASEAN countries. We provide unlimited types of events from Music concerts, Fan meetings, and Culture festivals to Corporate events, Internal company events, Golf tournaments, MICE events, and Exhibitions.
𝐓𝐉 𝐂𝐨𝐦𝐬 provides unlimited package services including such as Event organizing, Event planning, Event production, Manpower, PR marketing, Design 2D/3D, VIP protocols, Interpreter agency, etc.
Sports events - Golf competitions/billiards competitions/company sports events: dynamic and challenging
⭐ 𝐅𝐞𝐚𝐭𝐮𝐫𝐞𝐝 𝐩𝐫𝐨𝐣𝐞𝐜𝐭𝐬:
➢ 2024 BAEKHYUN [Lonsdaleite] IN HO CHI MINH
➢ SUPER JUNIOR-L.S.S. THE SHOW : Th3ee Guys in HO CHI MINH
➢FreenBecky 1st Fan Meeting in Vietnam
➢CHILDREN ART EXHIBITION 2024: BEYOND BARRIERS
➢ WOW K-Music Festival 2023
➢ Winner [CROSS] Tour in HCM
➢ Super Show 9 in HCM with Super Junior
➢ HCMC - Gyeongsangbuk-do Culture and Tourism Festival
➢ Korean Vietnam Partnership - Fair with LG
➢ Korean President visits Samsung Electronics R&D Center
➢ Vietnam Food Expo with Lotte Wellfood
"𝐄𝐯𝐞𝐫𝐲 𝐞𝐯𝐞𝐧𝐭 𝐢𝐬 𝐚 𝐬𝐭𝐨𝐫𝐲, 𝐚 𝐬𝐩𝐞𝐜𝐢𝐚𝐥 𝐣𝐨𝐮𝐫𝐧𝐞𝐲. 𝐖𝐞 𝐚𝐥𝐰𝐚𝐲𝐬 𝐛𝐞𝐥𝐢𝐞𝐯𝐞 𝐭𝐡𝐚𝐭 𝐬𝐡𝐨𝐫𝐭𝐥𝐲 𝐲𝐨𝐮 𝐰𝐢𝐥𝐥 𝐛𝐞 𝐚 𝐩𝐚𝐫𝐭 𝐨𝐟 𝐨𝐮𝐫 𝐬𝐭𝐨𝐫𝐢𝐞𝐬."
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...BBPMedia1
Grote partijen zijn al een tijdje onderweg met retail media. Ondertussen worden in dit domein ook de kansen zichtbaar voor andere spelers in de markt. Maar met die kansen ontstaan ook vragen: Zelf retail media worden of erop adverteren? In welke fase van de funnel past het en hoe integreer je het in een mediaplan? Wat is nu precies het verschil met marketplaces en Programmatic ads? In dit half uur beslechten we de dilemma's en krijg je antwoorden op wanneer het voor jou tijd is om de volgende stap te zetten.
Discover the innovative and creative projects that highlight my journey throu...dylandmeas
Discover the innovative and creative projects that highlight my journey through Full Sail University. Below, you’ll find a collection of my work showcasing my skills and expertise in digital marketing, event planning, and media production.
Premium MEAN Stack Development Solutions for Modern BusinessesSynapseIndia
Stay ahead of the curve with our premium MEAN Stack Development Solutions. Our expert developers utilize MongoDB, Express.js, AngularJS, and Node.js to create modern and responsive web applications. Trust us for cutting-edge solutions that drive your business growth and success.
Know more: https://www.synapseindia.com/technology/mean-stack-development-company.html
Skye Residences | Extended Stay Residences Near Toronto Airportmarketingjdass
Experience unparalleled EXTENDED STAY and comfort at Skye Residences located just minutes from Toronto Airport. Discover sophisticated accommodations tailored for discerning travelers.
Website Link :
https://skyeresidences.com/
https://skyeresidences.com/about-us/
https://skyeresidences.com/gallery/
https://skyeresidences.com/rooms/
https://skyeresidences.com/near-by-attractions/
https://skyeresidences.com/commute/
https://skyeresidences.com/contact/
https://skyeresidences.com/queen-suite-with-sofa-bed/
https://skyeresidences.com/queen-suite-with-sofa-bed-and-balcony/
https://skyeresidences.com/queen-suite-with-sofa-bed-accessible/
https://skyeresidences.com/2-bedroom-deluxe-queen-suite-with-sofa-bed/
https://skyeresidences.com/2-bedroom-deluxe-king-queen-suite-with-sofa-bed/
https://skyeresidences.com/2-bedroom-deluxe-queen-suite-with-sofa-bed-accessible/
#Skye Residences Etobicoke, #Skye Residences Near Toronto Airport, #Skye Residences Toronto, #Skye Hotel Toronto, #Skye Hotel Near Toronto Airport, #Hotel Near Toronto Airport, #Near Toronto Airport Accommodation, #Suites Near Toronto Airport, #Etobicoke Suites Near Airport, #Hotel Near Toronto Pearson International Airport, #Toronto Airport Suite Rentals, #Pearson Airport Hotel Suites
LA HUG - Video Testimonials with Chynna Morgan - June 2024Lital Barkan
Have you ever heard that user-generated content or video testimonials can take your brand to the next level? We will explore how you can effectively use video testimonials to leverage and boost your sales, content strategy, and increase your CRM data.🤯
We will dig deeper into:
1. How to capture video testimonials that convert from your audience 🎥
2. How to leverage your testimonials to boost your sales 💲
3. How you can capture more CRM data to understand your audience better through video testimonials. 📊
LA HUG - Video Testimonials with Chynna Morgan - June 2024
Lesson 5 event concept
1. Creating theCreating the
Event PlanEvent Plan
HEVENTSCON
From Professional Event Coordination by J.
Silvers , Event Management for Tourism, Sports,
Business and MICE by M. Disimulacion
Presented by Mervyn Maico D. Aldana, Faculty
CHTM
2. Creating the Event Concept
Event coordination is all about “the list”.
To create that list, you as the professional event
manager, must define the purpose of the event and
analyze all the desires, demands, assumptions, and
constraints involved to determine the products, materials,
services, activities and suppliers to be included in the
event project.
3. Event Concepts
Event concepts can be described in three tents – Intent
(purpose), Extent (scope), and Content (program).
This conceptualization is transformed into the event plan
through project management techniques such as scope
definition and project planning.
4. Event Concepts
Scope definition is derived from identified need,
request, or requirement for the event, the product
(event) analysis, and the feasibility analysis.
The output of this becomes the project deliverables
and is then used to shape the project plan that specifies
the structure and scheduling of the tasks required to
deliver the event.
6. SCAMPER TECHNIQUE
Developed by Bob Eberle, SCAMPER is an acronym that
spells out seven ways to create a new idea.
http://www.designorate.com/a-guide-to-the-scamper-
technique-for-creative-thinking/
7. SCAMPER TECHNIQUE
S – Substitute
C – Combine
A – Adapt
M – Modify
P – Put to Another Use
E – Eliminate
R - Reverse
8.
9. Building Blocks
Building Blocks Method emphasizes the content of your
event.
Vertical and Horizontal – helps you expand or contract
the scope of your event.
10. Vertical
The vertical technique is useful when creating events with
specialized products and services targeting a specific
market, function or industry.
12. Research
Scan magazines and google words related to the event
you have in mind,
The internet offers a database of almost every imaginable
topic.
Look for event concepts as well as to fine-tune an idea.
Attend events to get more ideas.
Ask around.
Take notes.
13. Repeatable Event Concept
Coming up with your final concept may take a lot of time
and effort, but it will be worth it.
Remember, you only need one great concept to start
your successful event management career.
You can lucratively run the same event every year, with
minor changes, to adapt to client needs and audience
interest.
15. You must determine expectations so that you can define
the scope and specifications that result in an event that
satisfies the customer’s needs and desires.
It is critical that you work with your client to specify the
goals and objectives for the event and to put them in a
prioritized hierarchy.
16. Setting Objectives
Goals turned into objectives provide you with direction.
Event objectives come from two points of views:
ne is from the clients, the other is from the organizers.
bjectives measure performance. They also convert a
corporate vision into specific targets that are
quantifiable, measurable and deadline driven.
17. Types of Objectives
Strategic
hese objectives focus on improving “competitive vitality
and future business position.”
Financial
hese are directed towards improving financial
performance.
18. Goals vs. Objectives
Goals are broad; objectives are narrow
Goals are general intentions; objectives are precise
Goals are intangible; objectives are tangible
Goals are abstract; objectives are concrete
Goals cannot be validated as is; objectives can be
validated
19. Common Event Goals
To generate revenues
To increase profits
To create or increase awareness
To introduce a new product, service or organization
To develop new customers
To conduct competitive intelligence
To generate ideas
To seek out new distributors, dealers or members
To test the market
To enhance company image and reputation
To build brand equity
To create long-term relationships
To raise funds
To generate memberships
To conduct training
21. SMART Objectives
Examples of SMART Objectives
ring in xx more exhibitors to join the forthcoming
celebrity bazaar in December 2017.
ign up a company to sponsor xx round-trip coach
tickets, Singapore-Manila-Singapore for speakers flying
in for the Tourism and Hospitality Conference at a five-
star hotel in Metro Manila.
ncrease sales by xx percent by participating in two
major trade shows this year.
24. Identifying Needs
Need is a complex term.
Example: You do not buy an airline ticket because
you need an airline ticket, you need it be in Cebu for a
meeting.
Defining needs is a critical component of the ability to
deliver a successful event. Needs, however, are not
always apparent or fully considered.
25. Needs Assessment
Why – the purpose of the event is the foundation that
drives all other decisions about its scope and the event
elements.
Who – the audience or guest profile and volume
Where and When – provide logistical parameters as well
as creative opportunities
How and How Much – specify how much in the way of
resources will be required and how the resources will be
allocated
26. Customers
Know your customers.
There will be clients, users (guests and attendees), and
numerous other stakeholders and influencers to consider.
Each will have an impact on the event elements.
Create a customer profile, include demographics,
lifestyle, and age stage, purchase stimulus, and the
benefits sought. The profile will reveal needs and desires
that should be factored into the event element analysis
and plan.
27. Customers
You may look at generational differences, cultural
differences of customers.
Planning can also encompass things such as scheduling
(holidays, holy days, protocol etc.); dietary needs and
restrictions; the environment (color, personal space,
symbols, emblems) ; and etiquette issues (dress codes,
gestures, interaction) etc.
28. Capabilities
The capabilities you must consider include your ability to
handle the event in its proposed scope and context,
availability of products and services, and the features of
the event site.
Each event context will have its own set of parameters
and a specialized body of knowledge.
You need to be completely honest with yourself and your
client about your ability to deliver the event required and
desired.
29. Competition
Considering the competition includes a determination of
what will be competing with your event for the time,
money, and emotional investment of the attendees or
guests.
31. Analyzing Resources
Once needs are identified and prioritized goals and
objectives established, you must blend creativity with
practicality.
You must identify the resources and any obstacles to
determine the practicality of the project and the potential
for success.
Resources include time, money, personnel,
information, space, and service availability.
32. Analyzing Resources
Management is allocating, directing, and controlling
resources to achieve objectives.
A feasibility analysis shows the viability of achieving
success – the outcome envisioned by the client – by
defining the event elements and requirements and putting
them into the context of the reality of available resources.
The professional event manager must balance the
NEED with the HAVE, making sure that what must be
done can be done with the resources available for the
event project.
33. Time
Of all the resources, time is the one resource that is finite.
When you run out of time, you have run out of time. You
cannot beg, borrow or steal more.
34. Money
Monetary resources must be allocated carefully. It is
important to remember that everything will cost
something.
Nothing is free.
The more limited the budget, the more focused you must
be on the event goals, but a quality event does not
depend on a large budget.
35. Personnel
Your human resources may include full-time or part-time,
casual or temporary labor, and/or volunteers.
You must assess the quality and capabilities of
volunteers and other labor resources.
36. Space
Virtually everything needed to make the event come to
life will have spatial requirements.
The event plan should include a site plan for spatial
needs.
37. Suppliers
Not all products and services are available or affordable
in all parts of the world.
You must know what you can and cannot reasonably
obtain in your area and through your supplier resources.
If suitable products, services, technologies or providers
are not available or affordable, alternate options must be
developed or planned activities must be adjusted.
38. Trends
Customized Activities
here is a growing interest in activities that allow
participants to pick and choose.
Innovative Concepts
oncepts such as anime, online gaming contests, indie
film festivals have entered mass consciousness.