OBJECTIVE
To understand the concept of Lean
Manufacturing and translate its philosophy to
Petrochemical plants.
LEAN MANUFACTURING
Page 3 of 21Presented by: Sh VRM
Elimination/Reduction of Waste within the system
WHAT IS LEAN MANUFACTURING ?
Identify
Eliminate/Reduce
Input OutputSystem
Waste
Page 4 of 21Presented by: Sh VRM
LEAN MANUFACTURING OVERVIEW
“Lean Manufacturing” incorporates tools and techniques to
Optimize time, human resources and assets
Improve productivity
Improve quality of products and services
Page 5 of 21Presented by: Sh VRM
Lean production focuses on
- Eliminating waste in processes
- Expanding capacity by reducing costs and shortening
cycle time
- Understanding what is important to the customer
Analyze the flow of information and materials for
continual improvement of the process
LEAN MANUFACTURING OVERVIEW
Page 6 of 21Presented by: Sh VRM
There are three types of operations in any process
Non-Value-Adding (NVA)
Necessary but Non-Value-Adding (NNVA)
Value-Adding (VA)
Focus on Value-Adding (VA) operations
WASTE REMOVAL
LEAN MANUFACTURING
Page 7 of 21Presented by: Sh VRM
Kaizen
Focus on eliminating waste, improving productivity and
achieving sustained continual improvement
• Six Sigma
A statistical process control and analytical tool to improve
productivity and quality.
Total Productive Maintenance (TPM)
Basket of Maintenance of Practices which helps in focusing
on elimination losses such as breakdowns, idling and minor
stoppages, reduced defects & rework, spills and process-upset
conditions
LEAN MANUFACTURING
TOOLS
Page 8 of 21Presented by: Sh VRM
Cellular Manufacturing/One-Piece Flow system
Process for connecting the manual and machine processes of
similar operations in order to eliminate non-value adding
activities.
Just-in-time (JIT) Production Systems / Kanban
Inventory strategy to reduce process inventory and it’s
associated costs.
Value Stream Mapping
Created a visual representation of all product and information
flows from raw material to shipping
LEAN MANUFACTURING
TOOLS
Page 9 of 21Presented by: Sh VRM
5S
Reduces waste and optimizes productivity through
maintaining an orderly workplace. Elements of 5S are
Seiri – Sort
Seiton – Set in Order
Seiso – Shine
Seiketsu – Standardize
Shitsuke – Sustain
Place for everything and everything in it’s place.
LEAN MANUFACTURING
TOOLS
Page 10 of 21Presented by: Sh VRM
2nd
Tier
1st
Tier
Toyota
Customer
Demand
Flow of
Information
Flow of
Production
2nd
Tier
1st
Tier
Assembler
Customer
Demand
Flow of
Information
Flow of
Production
Traditional “Buffered”
Supply Chain
Just-In-Time
Supply Chain
TOYOTA PRODUCTION SYSTEM
Page 11 of 21Presented by: Sh VRM
1. Faster Inventory updates
2. Shortening time for generating production forecast
3. Online reporting, cutting down paper
4. ERP
156% ROI
LEAN MANUFACTURING
APPLICATION IN CPC
Page 12 of 21Presented by: Sh VRM
Waste within the Toyota Production
System
Waste within the Petrochemical Plant
Overproduction
Waiting
Transportation
Inappropriate Processing
Unnecessary Inventory
Unnecessary Motion
Defects
Inappropriate feed stock
Lost by-product credit
Quality give away
Off spec generation/reprocessing
Equipment idling
High energy cost
LEAN MANUFACTURING
APPLICATION TO PETROCHEMICAL PLANT
Page 13 of 21Presented by: Sh VRM
1. Understanding waste in the form of loss of contribution at
every stage of operation.
2. Understanding the impact of HSE incidence on
contribution.
3. Understanding all components of cost of production.
4. Understanding of value added activities and non-value
added activities.
5. Understanding Process intensification.
6. Understanding EPS and Marketing functions.
LEAN MANUFACTURING
APPLICATION TO PETROCHEMICAL PLANT
Page 14 of 21Presented by: Sh VRM
Best Lean Manufacturing Practices:
Kaizan
Epsilon/Depsilon reports
Daily contribution reports
Daily feed stock & by-product analysis
Daily energy consumption report
Daily stream analysis for quality give away
E-mfg Practices
Structural Capital
5S for Safe work place
LEAN MANUFACTURING
Aromatics Plant
Page 15 of 21Presented by: Sh VRM
5°C increase in Platformer feed EP – loss 16.5 MUSD/yr
1% lowering of PX/C8A – loss is 12 MUSD/yr
High RVP of ED Raffinate – 10 MUSD/yr
200MTD C8A blending in Gasoline – Loss is 5.6 MUSD/yr
2% loss in heater efficiency – loss is 3.2 MUSD/yr
C10A conversion in Tatoray vs blend in Diesel/Gasoline – 2.1 MUSD/yr
1% reduction in PX recovery – Loss is 7 MUSD/yr
LEAN MANUFACTURING
Aromatics Plant - Opportunities
Page 16 of 21Presented by: Sh VRM
71.0
27.2
0.2 1.4
0.2
Net RM Cat Chem Utilities Manpower Maint
LEAN MANUFACTURING
PARAXYLENE COST STRUCTURE
•By product credit is 60% of Raw Material cost
•Conversion cost is 27% of operating cost
Page 17 of 21Presented by: Sh VRM
By Product Value
Maximization
 Maximize production of OX, BZ, Hydrogen
 Recovery of Hydrogen from gases to Sat/Unsat header
 Recovery of BZ from low value streams
 Up-gradation of low value streams to high value streams (ED raffinate)
BYPRODUCT
Yield
(wt% Plat feed)
Price
HIGH VALUE
H2 2.17 44259
OX 10.36 26818
BZ 11.12 29351
HAR 2.29 22109
LPG 4.24 17075
LOW VALUE
ED Raffinate 9.68 15573
Fuel Gas 14.05 10050
AHE 1.16 9137
FEED STOCK ANALYSIS
LEAN MANUFACTURING
Page 18 of 21Presented by: Sh VRM
• Conversion cost for Aromatic plant at Jamnagar is 27% of the
operating cost.
• 60% of conversion cost is fuel cost.
• Optimize Heater and Columns operation
28.9
12.3
58.8
Power Fuel Net Steam
LEAN MANUFACTURING
CONVERSION COST
Page 19 of 21Presented by: Sh VRM
• Business Case: 1
Market Interface: Based on Market scenario HASC production is
optimized
• Business Case: 2
Product Development: Renine was introduced in market which won
Golden Peacock Award for Techno-commercial innovation
• Business Case: 3
Byproduct Optimization: C10A conversion across Tatoray
• Business Case: 4
Opportunity in Adversity: Blending of C7A, Mix Xylene, C10A in
Gasoline
LEAN MANUFACTURING
EXAMPLES OF BUSINESS CASES
Page 20 of 21Presented by: Sh VRM
• Business Case: 5
Waste Elimination: Recovering Hydrogen going to Sat/Unsat
• Business Case: 6
Waste Elimination/Change in mindset: Reduction of BZ drag
• Business Case: 7
Quality giveaway: C2 loading in LPG product
• Business Case: 8
Human Resource : Enhancing Human Skill – Prepare for
tomorrow. Eliminate positions.
LEAN MANUFACTURING
EXAMPLES OF BUSINESS CASES
Page 21 of 21Presented by: Sh VRM
We are what we repeatedly do,
Excellence then is not an Act but
A Habit
THANKING YOU
Page 22 of 21Presented by: Sh VRM
Innovation
Knowledge
Known Things -
Productivity
Unknown Things -
Page 23 of 21Presented by: Sh VRM
KAIZEN
Plant Manager
Production mgr
Worker
Normal operation
Innovation
Supervisor

More Related Content

What's hot

lean management- case study on jaguar
lean management- case study on jaguarlean management- case study on jaguar
lean management- case study on jaguar
Rachita Kochhar
 
Lean Manufacturing - Toyota Production System
Lean Manufacturing - Toyota Production SystemLean Manufacturing - Toyota Production System
Lean Manufacturing - Toyota Production System
Mohammed Hamed Ahmed Soliman
 
Lean production System - TPS
Lean production System - TPSLean production System - TPS
Lean production System - TPS
Prakash Prakash
 
lean production
lean productionlean production
lean production
Amit Sengar
 
Lean, Just-in-time, and Toyota Production System
Lean, Just-in-time,and Toyota Production SystemLean, Just-in-time,and Toyota Production System
Lean, Just-in-time, and Toyota Production System
jasonhian
 
IMPROVEMENT OF MANUFACTURING OPERATIONS THROUGH A LEAN MANAGEMENT APPROACH A...
IMPROVEMENT OF MANUFACTURING OPERATIONS  THROUGH A LEAN MANAGEMENT APPROACH A...IMPROVEMENT OF MANUFACTURING OPERATIONS  THROUGH A LEAN MANAGEMENT APPROACH A...
IMPROVEMENT OF MANUFACTURING OPERATIONS THROUGH A LEAN MANAGEMENT APPROACH A...
sanobar77
 
Applications of lean manufacturing tools
Applications of lean manufacturing toolsApplications of lean manufacturing tools
Applications of lean manufacturing tools
Ishmam Ahmed
 
Jit In Toyota
Jit In ToyotaJit In Toyota
Jit In Toyota
rushin202003
 
Lean Production With Jaguar Example
Lean Production With Jaguar ExampleLean Production With Jaguar Example
Lean Production With Jaguar Exampleshekhar619
 
Lean Fundamentals Overview Webinar
Lean Fundamentals Overview WebinarLean Fundamentals Overview Webinar
Lean Fundamentals Overview Webinar
Michael E. Parker
 
LEAN MANUFACTURING
LEAN MANUFACTURINGLEAN MANUFACTURING
LEAN MANUFACTURING
arunkumar6836
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
Mythili Srinivasan
 
Basic Elements of Lean
Basic Elements of LeanBasic Elements of Lean
Basic Elements of Lean
Thanushreepandikumari
 
Just in time (jit), lean, and toyota production system (tps)
Just in time (jit), lean, and toyota production system (tps)Just in time (jit), lean, and toyota production system (tps)
Just in time (jit), lean, and toyota production system (tps)
Dr. Mahmoud Al-Naimi
 
Lean manufacturing ppt download link: http://www.vpresentationslides.com/lean...
Lean manufacturing ppt download link: http://www.vpresentationslides.com/lean...Lean manufacturing ppt download link: http://www.vpresentationslides.com/lean...
Lean manufacturing ppt download link: http://www.vpresentationslides.com/lean...
shreyas desai
 
Just In Time and Lean Management
Just In Time and Lean ManagementJust In Time and Lean Management
Just In Time and Lean ManagementRuhi Beri
 
TOYOTA PRODUCTION SYSTEM (TPS)
TOYOTA PRODUCTION SYSTEM (TPS)TOYOTA PRODUCTION SYSTEM (TPS)
TOYOTA PRODUCTION SYSTEM (TPS)
Prasanna3804
 

What's hot (20)

lean management- case study on jaguar
lean management- case study on jaguarlean management- case study on jaguar
lean management- case study on jaguar
 
Lean Manufacturing - Toyota Production System
Lean Manufacturing - Toyota Production SystemLean Manufacturing - Toyota Production System
Lean Manufacturing - Toyota Production System
 
0201B Lean Production
0201B Lean Production0201B Lean Production
0201B Lean Production
 
Lean production System - TPS
Lean production System - TPSLean production System - TPS
Lean production System - TPS
 
Lean Production
Lean ProductionLean Production
Lean Production
 
lean production
lean productionlean production
lean production
 
Lean, Just-in-time, and Toyota Production System
Lean, Just-in-time,and Toyota Production SystemLean, Just-in-time,and Toyota Production System
Lean, Just-in-time, and Toyota Production System
 
IMPROVEMENT OF MANUFACTURING OPERATIONS THROUGH A LEAN MANAGEMENT APPROACH A...
IMPROVEMENT OF MANUFACTURING OPERATIONS  THROUGH A LEAN MANAGEMENT APPROACH A...IMPROVEMENT OF MANUFACTURING OPERATIONS  THROUGH A LEAN MANAGEMENT APPROACH A...
IMPROVEMENT OF MANUFACTURING OPERATIONS THROUGH A LEAN MANAGEMENT APPROACH A...
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Applications of lean manufacturing tools
Applications of lean manufacturing toolsApplications of lean manufacturing tools
Applications of lean manufacturing tools
 
Jit In Toyota
Jit In ToyotaJit In Toyota
Jit In Toyota
 
Lean Production With Jaguar Example
Lean Production With Jaguar ExampleLean Production With Jaguar Example
Lean Production With Jaguar Example
 
Lean Fundamentals Overview Webinar
Lean Fundamentals Overview WebinarLean Fundamentals Overview Webinar
Lean Fundamentals Overview Webinar
 
LEAN MANUFACTURING
LEAN MANUFACTURINGLEAN MANUFACTURING
LEAN MANUFACTURING
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Basic Elements of Lean
Basic Elements of LeanBasic Elements of Lean
Basic Elements of Lean
 
Just in time (jit), lean, and toyota production system (tps)
Just in time (jit), lean, and toyota production system (tps)Just in time (jit), lean, and toyota production system (tps)
Just in time (jit), lean, and toyota production system (tps)
 
Lean manufacturing ppt download link: http://www.vpresentationslides.com/lean...
Lean manufacturing ppt download link: http://www.vpresentationslides.com/lean...Lean manufacturing ppt download link: http://www.vpresentationslides.com/lean...
Lean manufacturing ppt download link: http://www.vpresentationslides.com/lean...
 
Just In Time and Lean Management
Just In Time and Lean ManagementJust In Time and Lean Management
Just In Time and Lean Management
 
TOYOTA PRODUCTION SYSTEM (TPS)
TOYOTA PRODUCTION SYSTEM (TPS)TOYOTA PRODUCTION SYSTEM (TPS)
TOYOTA PRODUCTION SYSTEM (TPS)
 

Similar to Lean manufacturing

Real-time Data, Site wide Digital Twin, and Proprietary Analytics Cuts into P...
Real-time Data, Site wide Digital Twin, and Proprietary Analytics Cuts into P...Real-time Data, Site wide Digital Twin, and Proprietary Analytics Cuts into P...
Real-time Data, Site wide Digital Twin, and Proprietary Analytics Cuts into P...
Yokogawa1
 
Supply Chain Basic
Supply Chain BasicSupply Chain Basic
Supply Chain Basic
PARTHA DAS, Dip.SCM℗(ITC)
 
BPMA Buyers Guide 2019-20
BPMA Buyers Guide 2019-20 BPMA Buyers Guide 2019-20
BPMA Buyers Guide 2019-20
Gary Wilde
 
Digitalization of Engineering Silos Howell
Digitalization of Engineering Silos HowellDigitalization of Engineering Silos Howell
Digitalization of Engineering Silos Howell
KBC (A Yokogawa Company)
 
Tools of lean mfg
Tools of lean mfgTools of lean mfg
Tools of lean mfg
Jitesh Gaurav
 
Tools of lean mfg
Tools of lean mfgTools of lean mfg
Tools of lean mfg
Jitesh Gaurav
 
ESTIEM Lean Six Sigma Green Belt Project at Continental - Scrap Reduction
ESTIEM Lean Six Sigma Green Belt Project at Continental - Scrap ReductionESTIEM Lean Six Sigma Green Belt Project at Continental - Scrap Reduction
ESTIEM Lean Six Sigma Green Belt Project at Continental - Scrap Reduction
ESTIEM
 
7. 21.10.11-t. zielinski-processes or costs
7. 21.10.11-t. zielinski-processes or costs7. 21.10.11-t. zielinski-processes or costs
7. 21.10.11-t. zielinski-processes or costsICV_eV
 
7. 21.10.11-t. zielinski-processes or costs
7. 21.10.11-t. zielinski-processes or costs7. 21.10.11-t. zielinski-processes or costs
7. 21.10.11-t. zielinski-processes or costsICV_eV
 
Productivity Benchmarking in Spinning Mills
Productivity Benchmarking in Spinning MillsProductivity Benchmarking in Spinning Mills
Productivity Benchmarking in Spinning Mills
Kanthimathinathan Aramvalarthanathan
 
How Productive Are Your Manufacturing Competitors?
How Productive Are Your Manufacturing Competitors?How Productive Are Your Manufacturing Competitors?
How Productive Are Your Manufacturing Competitors?
Sanderson Group
 
APPLICATION OF LEAN PRACTICES FOR IDENTIFICATION OF SOLUTIONS IN REDUCING FUR...
APPLICATION OF LEAN PRACTICES FOR IDENTIFICATION OF SOLUTIONS IN REDUCING FUR...APPLICATION OF LEAN PRACTICES FOR IDENTIFICATION OF SOLUTIONS IN REDUCING FUR...
APPLICATION OF LEAN PRACTICES FOR IDENTIFICATION OF SOLUTIONS IN REDUCING FUR...
IRJET Journal
 
ARC's Greg Gorbach CPM & Operations Mgmt Presentation @ ARC Industry Forum 2010
ARC's Greg Gorbach CPM & Operations Mgmt Presentation @ ARC Industry Forum 2010ARC's Greg Gorbach CPM & Operations Mgmt Presentation @ ARC Industry Forum 2010
ARC's Greg Gorbach CPM & Operations Mgmt Presentation @ ARC Industry Forum 2010
ARC Advisory Group
 
BQR's apmOptimizer 4_ 2017 Rudy
BQR's apmOptimizer 4_ 2017 RudyBQR's apmOptimizer 4_ 2017 Rudy
BQR's apmOptimizer 4_ 2017 Rudy
Rudy Shainer
 
Just in time Manufacturing
Just in time ManufacturingJust in time Manufacturing
Just in time Manufacturing
Kiran Girase
 
Operational Excellence Consultant
Operational Excellence ConsultantOperational Excellence Consultant
Operational Excellence Consultant
bharat kumar
 
Bmw Lean Manufacturing (Pratik Negi)
Bmw Lean Manufacturing  (Pratik Negi)Bmw Lean Manufacturing  (Pratik Negi)
Bmw Lean Manufacturing (Pratik Negi)pratik negi
 
Asia NOC Bridges Business-wide Performance Objectives and KPIs through an Adv...
Asia NOC Bridges Business-wide Performance Objectives and KPIs through an Adv...Asia NOC Bridges Business-wide Performance Objectives and KPIs through an Adv...
Asia NOC Bridges Business-wide Performance Objectives and KPIs through an Adv...
Yokogawa1
 

Similar to Lean manufacturing (20)

Real-time Data, Site wide Digital Twin, and Proprietary Analytics Cuts into P...
Real-time Data, Site wide Digital Twin, and Proprietary Analytics Cuts into P...Real-time Data, Site wide Digital Twin, and Proprietary Analytics Cuts into P...
Real-time Data, Site wide Digital Twin, and Proprietary Analytics Cuts into P...
 
Supply Chain Basic
Supply Chain BasicSupply Chain Basic
Supply Chain Basic
 
BPMA Buyers Guide 2019-20
BPMA Buyers Guide 2019-20 BPMA Buyers Guide 2019-20
BPMA Buyers Guide 2019-20
 
Digitalization of Engineering Silos Howell
Digitalization of Engineering Silos HowellDigitalization of Engineering Silos Howell
Digitalization of Engineering Silos Howell
 
Ch08
Ch08Ch08
Ch08
 
Tools of lean mfg
Tools of lean mfgTools of lean mfg
Tools of lean mfg
 
Tools of lean mfg
Tools of lean mfgTools of lean mfg
Tools of lean mfg
 
WCM LOGISTICS
WCM LOGISTICSWCM LOGISTICS
WCM LOGISTICS
 
ESTIEM Lean Six Sigma Green Belt Project at Continental - Scrap Reduction
ESTIEM Lean Six Sigma Green Belt Project at Continental - Scrap ReductionESTIEM Lean Six Sigma Green Belt Project at Continental - Scrap Reduction
ESTIEM Lean Six Sigma Green Belt Project at Continental - Scrap Reduction
 
7. 21.10.11-t. zielinski-processes or costs
7. 21.10.11-t. zielinski-processes or costs7. 21.10.11-t. zielinski-processes or costs
7. 21.10.11-t. zielinski-processes or costs
 
7. 21.10.11-t. zielinski-processes or costs
7. 21.10.11-t. zielinski-processes or costs7. 21.10.11-t. zielinski-processes or costs
7. 21.10.11-t. zielinski-processes or costs
 
Productivity Benchmarking in Spinning Mills
Productivity Benchmarking in Spinning MillsProductivity Benchmarking in Spinning Mills
Productivity Benchmarking in Spinning Mills
 
How Productive Are Your Manufacturing Competitors?
How Productive Are Your Manufacturing Competitors?How Productive Are Your Manufacturing Competitors?
How Productive Are Your Manufacturing Competitors?
 
APPLICATION OF LEAN PRACTICES FOR IDENTIFICATION OF SOLUTIONS IN REDUCING FUR...
APPLICATION OF LEAN PRACTICES FOR IDENTIFICATION OF SOLUTIONS IN REDUCING FUR...APPLICATION OF LEAN PRACTICES FOR IDENTIFICATION OF SOLUTIONS IN REDUCING FUR...
APPLICATION OF LEAN PRACTICES FOR IDENTIFICATION OF SOLUTIONS IN REDUCING FUR...
 
ARC's Greg Gorbach CPM & Operations Mgmt Presentation @ ARC Industry Forum 2010
ARC's Greg Gorbach CPM & Operations Mgmt Presentation @ ARC Industry Forum 2010ARC's Greg Gorbach CPM & Operations Mgmt Presentation @ ARC Industry Forum 2010
ARC's Greg Gorbach CPM & Operations Mgmt Presentation @ ARC Industry Forum 2010
 
BQR's apmOptimizer 4_ 2017 Rudy
BQR's apmOptimizer 4_ 2017 RudyBQR's apmOptimizer 4_ 2017 Rudy
BQR's apmOptimizer 4_ 2017 Rudy
 
Just in time Manufacturing
Just in time ManufacturingJust in time Manufacturing
Just in time Manufacturing
 
Operational Excellence Consultant
Operational Excellence ConsultantOperational Excellence Consultant
Operational Excellence Consultant
 
Bmw Lean Manufacturing (Pratik Negi)
Bmw Lean Manufacturing  (Pratik Negi)Bmw Lean Manufacturing  (Pratik Negi)
Bmw Lean Manufacturing (Pratik Negi)
 
Asia NOC Bridges Business-wide Performance Objectives and KPIs through an Adv...
Asia NOC Bridges Business-wide Performance Objectives and KPIs through an Adv...Asia NOC Bridges Business-wide Performance Objectives and KPIs through an Adv...
Asia NOC Bridges Business-wide Performance Objectives and KPIs through an Adv...
 

More from Prem kumar

Safe use of hydra
Safe use of hydraSafe use of hydra
Safe use of hydra
Prem kumar
 
Control valve presentation
Control valve presentationControl valve presentation
Control valve presentation
Prem kumar
 
Crane safety
Crane safetyCrane safety
Crane safety
Prem kumar
 
Tool box talk work at height on scaffold presentation
Tool box talk  work at height on scaffold presentationTool box talk  work at height on scaffold presentation
Tool box talk work at height on scaffold presentation
Prem kumar
 
Presentation on slings
Presentation on slingsPresentation on slings
Presentation on slings
Prem kumar
 
Overview of crane incidents
Overview of crane incidentsOverview of crane incidents
Overview of crane incidents
Prem kumar
 
Basics of crane
Basics of craneBasics of crane
Basics of crane
Prem kumar
 
Earth pit
Earth pitEarth pit
Earth pit
Prem kumar
 
Const statutory
Const statutoryConst statutory
Const statutory
Prem kumar
 
Gas cutting welding
Gas cutting weldingGas cutting welding
Gas cutting welding
Prem kumar
 
Behavior based safety
Behavior based safetyBehavior based safety
Behavior based safety
Prem kumar
 
Personal protective equipment
Personal protective equipmentPersonal protective equipment
Personal protective equipment
Prem kumar
 
Pnematic tools
Pnematic toolsPnematic tools
Pnematic tools
Prem kumar
 
Grinding machine
Grinding machineGrinding machine
Grinding machine
Prem kumar
 
Electrical safety
Electrical safetyElectrical safety
Electrical safety
Prem kumar
 
Mobile crane
Mobile craneMobile crane
Mobile crane
Prem kumar
 
Gas cutting welding
Gas cutting weldingGas cutting welding
Gas cutting welding
Prem kumar
 
Fabrication calculation
Fabrication calculationFabrication calculation
Fabrication calculation
Prem kumar
 
Man riding basket
Man riding basketMan riding basket
Man riding basket
Prem kumar
 
Fire fighting
Fire fightingFire fighting
Fire fighting
Prem kumar
 

More from Prem kumar (20)

Safe use of hydra
Safe use of hydraSafe use of hydra
Safe use of hydra
 
Control valve presentation
Control valve presentationControl valve presentation
Control valve presentation
 
Crane safety
Crane safetyCrane safety
Crane safety
 
Tool box talk work at height on scaffold presentation
Tool box talk  work at height on scaffold presentationTool box talk  work at height on scaffold presentation
Tool box talk work at height on scaffold presentation
 
Presentation on slings
Presentation on slingsPresentation on slings
Presentation on slings
 
Overview of crane incidents
Overview of crane incidentsOverview of crane incidents
Overview of crane incidents
 
Basics of crane
Basics of craneBasics of crane
Basics of crane
 
Earth pit
Earth pitEarth pit
Earth pit
 
Const statutory
Const statutoryConst statutory
Const statutory
 
Gas cutting welding
Gas cutting weldingGas cutting welding
Gas cutting welding
 
Behavior based safety
Behavior based safetyBehavior based safety
Behavior based safety
 
Personal protective equipment
Personal protective equipmentPersonal protective equipment
Personal protective equipment
 
Pnematic tools
Pnematic toolsPnematic tools
Pnematic tools
 
Grinding machine
Grinding machineGrinding machine
Grinding machine
 
Electrical safety
Electrical safetyElectrical safety
Electrical safety
 
Mobile crane
Mobile craneMobile crane
Mobile crane
 
Gas cutting welding
Gas cutting weldingGas cutting welding
Gas cutting welding
 
Fabrication calculation
Fabrication calculationFabrication calculation
Fabrication calculation
 
Man riding basket
Man riding basketMan riding basket
Man riding basket
 
Fire fighting
Fire fightingFire fighting
Fire fighting
 

Recently uploaded

ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
SupreethSP4
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
Kerry Sado
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 

Recently uploaded (20)

ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 

Lean manufacturing

  • 1. Page 1 of 21Presented by: Sh VRM
  • 2. Page 2 of 21Presented by: Sh VRM OBJECTIVE To understand the concept of Lean Manufacturing and translate its philosophy to Petrochemical plants. LEAN MANUFACTURING
  • 3. Page 3 of 21Presented by: Sh VRM Elimination/Reduction of Waste within the system WHAT IS LEAN MANUFACTURING ? Identify Eliminate/Reduce Input OutputSystem Waste
  • 4. Page 4 of 21Presented by: Sh VRM LEAN MANUFACTURING OVERVIEW “Lean Manufacturing” incorporates tools and techniques to Optimize time, human resources and assets Improve productivity Improve quality of products and services
  • 5. Page 5 of 21Presented by: Sh VRM Lean production focuses on - Eliminating waste in processes - Expanding capacity by reducing costs and shortening cycle time - Understanding what is important to the customer Analyze the flow of information and materials for continual improvement of the process LEAN MANUFACTURING OVERVIEW
  • 6. Page 6 of 21Presented by: Sh VRM There are three types of operations in any process Non-Value-Adding (NVA) Necessary but Non-Value-Adding (NNVA) Value-Adding (VA) Focus on Value-Adding (VA) operations WASTE REMOVAL LEAN MANUFACTURING
  • 7. Page 7 of 21Presented by: Sh VRM Kaizen Focus on eliminating waste, improving productivity and achieving sustained continual improvement • Six Sigma A statistical process control and analytical tool to improve productivity and quality. Total Productive Maintenance (TPM) Basket of Maintenance of Practices which helps in focusing on elimination losses such as breakdowns, idling and minor stoppages, reduced defects & rework, spills and process-upset conditions LEAN MANUFACTURING TOOLS
  • 8. Page 8 of 21Presented by: Sh VRM Cellular Manufacturing/One-Piece Flow system Process for connecting the manual and machine processes of similar operations in order to eliminate non-value adding activities. Just-in-time (JIT) Production Systems / Kanban Inventory strategy to reduce process inventory and it’s associated costs. Value Stream Mapping Created a visual representation of all product and information flows from raw material to shipping LEAN MANUFACTURING TOOLS
  • 9. Page 9 of 21Presented by: Sh VRM 5S Reduces waste and optimizes productivity through maintaining an orderly workplace. Elements of 5S are Seiri – Sort Seiton – Set in Order Seiso – Shine Seiketsu – Standardize Shitsuke – Sustain Place for everything and everything in it’s place. LEAN MANUFACTURING TOOLS
  • 10. Page 10 of 21Presented by: Sh VRM 2nd Tier 1st Tier Toyota Customer Demand Flow of Information Flow of Production 2nd Tier 1st Tier Assembler Customer Demand Flow of Information Flow of Production Traditional “Buffered” Supply Chain Just-In-Time Supply Chain TOYOTA PRODUCTION SYSTEM
  • 11. Page 11 of 21Presented by: Sh VRM 1. Faster Inventory updates 2. Shortening time for generating production forecast 3. Online reporting, cutting down paper 4. ERP 156% ROI LEAN MANUFACTURING APPLICATION IN CPC
  • 12. Page 12 of 21Presented by: Sh VRM Waste within the Toyota Production System Waste within the Petrochemical Plant Overproduction Waiting Transportation Inappropriate Processing Unnecessary Inventory Unnecessary Motion Defects Inappropriate feed stock Lost by-product credit Quality give away Off spec generation/reprocessing Equipment idling High energy cost LEAN MANUFACTURING APPLICATION TO PETROCHEMICAL PLANT
  • 13. Page 13 of 21Presented by: Sh VRM 1. Understanding waste in the form of loss of contribution at every stage of operation. 2. Understanding the impact of HSE incidence on contribution. 3. Understanding all components of cost of production. 4. Understanding of value added activities and non-value added activities. 5. Understanding Process intensification. 6. Understanding EPS and Marketing functions. LEAN MANUFACTURING APPLICATION TO PETROCHEMICAL PLANT
  • 14. Page 14 of 21Presented by: Sh VRM Best Lean Manufacturing Practices: Kaizan Epsilon/Depsilon reports Daily contribution reports Daily feed stock & by-product analysis Daily energy consumption report Daily stream analysis for quality give away E-mfg Practices Structural Capital 5S for Safe work place LEAN MANUFACTURING Aromatics Plant
  • 15. Page 15 of 21Presented by: Sh VRM 5°C increase in Platformer feed EP – loss 16.5 MUSD/yr 1% lowering of PX/C8A – loss is 12 MUSD/yr High RVP of ED Raffinate – 10 MUSD/yr 200MTD C8A blending in Gasoline – Loss is 5.6 MUSD/yr 2% loss in heater efficiency – loss is 3.2 MUSD/yr C10A conversion in Tatoray vs blend in Diesel/Gasoline – 2.1 MUSD/yr 1% reduction in PX recovery – Loss is 7 MUSD/yr LEAN MANUFACTURING Aromatics Plant - Opportunities
  • 16. Page 16 of 21Presented by: Sh VRM 71.0 27.2 0.2 1.4 0.2 Net RM Cat Chem Utilities Manpower Maint LEAN MANUFACTURING PARAXYLENE COST STRUCTURE •By product credit is 60% of Raw Material cost •Conversion cost is 27% of operating cost
  • 17. Page 17 of 21Presented by: Sh VRM By Product Value Maximization  Maximize production of OX, BZ, Hydrogen  Recovery of Hydrogen from gases to Sat/Unsat header  Recovery of BZ from low value streams  Up-gradation of low value streams to high value streams (ED raffinate) BYPRODUCT Yield (wt% Plat feed) Price HIGH VALUE H2 2.17 44259 OX 10.36 26818 BZ 11.12 29351 HAR 2.29 22109 LPG 4.24 17075 LOW VALUE ED Raffinate 9.68 15573 Fuel Gas 14.05 10050 AHE 1.16 9137 FEED STOCK ANALYSIS LEAN MANUFACTURING
  • 18. Page 18 of 21Presented by: Sh VRM • Conversion cost for Aromatic plant at Jamnagar is 27% of the operating cost. • 60% of conversion cost is fuel cost. • Optimize Heater and Columns operation 28.9 12.3 58.8 Power Fuel Net Steam LEAN MANUFACTURING CONVERSION COST
  • 19. Page 19 of 21Presented by: Sh VRM • Business Case: 1 Market Interface: Based on Market scenario HASC production is optimized • Business Case: 2 Product Development: Renine was introduced in market which won Golden Peacock Award for Techno-commercial innovation • Business Case: 3 Byproduct Optimization: C10A conversion across Tatoray • Business Case: 4 Opportunity in Adversity: Blending of C7A, Mix Xylene, C10A in Gasoline LEAN MANUFACTURING EXAMPLES OF BUSINESS CASES
  • 20. Page 20 of 21Presented by: Sh VRM • Business Case: 5 Waste Elimination: Recovering Hydrogen going to Sat/Unsat • Business Case: 6 Waste Elimination/Change in mindset: Reduction of BZ drag • Business Case: 7 Quality giveaway: C2 loading in LPG product • Business Case: 8 Human Resource : Enhancing Human Skill – Prepare for tomorrow. Eliminate positions. LEAN MANUFACTURING EXAMPLES OF BUSINESS CASES
  • 21. Page 21 of 21Presented by: Sh VRM We are what we repeatedly do, Excellence then is not an Act but A Habit THANKING YOU
  • 22. Page 22 of 21Presented by: Sh VRM Innovation Knowledge Known Things - Productivity Unknown Things -
  • 23. Page 23 of 21Presented by: Sh VRM KAIZEN Plant Manager Production mgr Worker Normal operation Innovation Supervisor