Kashif Dada has over 5 years of experience managing projects and facilities in the oil and gas industry. He has expertise in process design, piping design, rotating equipment, and project management. He is a licensed Professional Engineer in Alberta and a certified Project Management Professional. His experience includes managing projects from $500k to $5M and coordinating multi-disciplinary teams of 7-10 people.
Career Objective
Intend to build a career with a leading organization with committed & dedicated people in a challenging and creative environment. Seeking a promising position that offers both a challenge and a good opportunity for growth and to upgrade skills to serve the company better.
Career Objective
Intend to build a career with a leading organization with committed & dedicated people in a challenging and creative environment. Seeking a promising position that offers both a challenge and a good opportunity for growth and to upgrade skills to serve the company better.
A review on techniques and modelling methodologies used for checking electrom...nooriasukmaningtyas
The proper function of the integrated circuit (IC) in an inhibiting electromagnetic environment has always been a serious concern throughout the decades of revolution in the world of electronics, from disjunct devices to today’s integrated circuit technology, where billions of transistors are combined on a single chip. The automotive industry and smart vehicles in particular, are confronting design issues such as being prone to electromagnetic interference (EMI). Electronic control devices calculate incorrect outputs because of EMI and sensors give misleading values which can prove fatal in case of automotives. In this paper, the authors have non exhaustively tried to review research work concerned with the investigation of EMI in ICs and prediction of this EMI using various modelling methodologies and measurement setups.
Water billing management system project report.pdfKamal Acharya
Our project entitled “Water Billing Management System” aims is to generate Water bill with all the charges and penalty. Manual system that is employed is extremely laborious and quite inadequate. It only makes the process more difficult and hard.
The aim of our project is to develop a system that is meant to partially computerize the work performed in the Water Board like generating monthly Water bill, record of consuming unit of water, store record of the customer and previous unpaid record.
We used HTML/PHP as front end and MYSQL as back end for developing our project. HTML is primarily a visual design environment. We can create a android application by designing the form and that make up the user interface. Adding android application code to the form and the objects such as buttons and text boxes on them and adding any required support code in additional modular.
MySQL is free open source database that facilitates the effective management of the databases by connecting them to the software. It is a stable ,reliable and the powerful solution with the advanced features and advantages which are as follows: Data Security.MySQL is free open source database that facilitates the effective management of the databases by connecting them to the software.
Using recycled concrete aggregates (RCA) for pavements is crucial to achieving sustainability. Implementing RCA for new pavement can minimize carbon footprint, conserve natural resources, reduce harmful emissions, and lower life cycle costs. Compared to natural aggregate (NA), RCA pavement has fewer comprehensive studies and sustainability assessments.
TOP 10 B TECH COLLEGES IN JAIPUR 2024.pptxnikitacareer3
Looking for the best engineering colleges in Jaipur for 2024?
Check out our list of the top 10 B.Tech colleges to help you make the right choice for your future career!
1) MNIT
2) MANIPAL UNIV
3) LNMIIT
4) NIMS UNIV
5) JECRC
6) VIVEKANANDA GLOBAL UNIV
7) BIT JAIPUR
8) APEX UNIV
9) AMITY UNIV.
10) JNU
TO KNOW MORE ABOUT COLLEGES, FEES AND PLACEMENT, WATCH THE FULL VIDEO GIVEN BELOW ON "TOP 10 B TECH COLLEGES IN JAIPUR"
https://www.youtube.com/watch?v=vSNje0MBh7g
VISIT CAREER MANTRA PORTAL TO KNOW MORE ABOUT COLLEGES/UNIVERSITITES in Jaipur:
https://careermantra.net/colleges/3378/Jaipur/b-tech
Get all the information you need to plan your next steps in your medical career with Career Mantra!
https://careermantra.net/
Hierarchical Digital Twin of a Naval Power SystemKerry Sado
A hierarchical digital twin of a Naval DC power system has been developed and experimentally verified. Similar to other state-of-the-art digital twins, this technology creates a digital replica of the physical system executed in real-time or faster, which can modify hardware controls. However, its advantage stems from distributing computational efforts by utilizing a hierarchical structure composed of lower-level digital twin blocks and a higher-level system digital twin. Each digital twin block is associated with a physical subsystem of the hardware and communicates with a singular system digital twin, which creates a system-level response. By extracting information from each level of the hierarchy, power system controls of the hardware were reconfigured autonomously. This hierarchical digital twin development offers several advantages over other digital twins, particularly in the field of naval power systems. The hierarchical structure allows for greater computational efficiency and scalability while the ability to autonomously reconfigure hardware controls offers increased flexibility and responsiveness. The hierarchical decomposition and models utilized were well aligned with the physical twin, as indicated by the maximum deviations between the developed digital twin hierarchy and the hardware.
Understanding Inductive Bias in Machine LearningSUTEJAS
This presentation explores the concept of inductive bias in machine learning. It explains how algorithms come with built-in assumptions and preferences that guide the learning process. You'll learn about the different types of inductive bias and how they can impact the performance and generalizability of machine learning models.
The presentation also covers the positive and negative aspects of inductive bias, along with strategies for mitigating potential drawbacks. We'll explore examples of how bias manifests in algorithms like neural networks and decision trees.
By understanding inductive bias, you can gain valuable insights into how machine learning models work and make informed decisions when building and deploying them.
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsVictor Morales
K8sGPT is a tool that analyzes and diagnoses Kubernetes clusters. This presentation was used to share the requirements and dependencies to deploy K8sGPT in a local environment.
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KASHIF DADA, PMP, P.Eng
1. KASHIF DADA PMP, P.Eng Phone: (306) 821 4065
E-mail: kashif.dada@gmail.com
CAREER SUMMARY
I have over 5 years’ experience in managing, operating and debottlenecking facilities, coordinating projects &
facility construction and designing facility processes. I have expertise in designing plant process piping as per
ASME B31.3 & pipelines as per CSA Z-662. I have knowledge in selection & troubleshooting of Rotating
Equipment, Heat Exchangers, Process Vessels and process instrumentation.
PROFESSIONAL MEMBERSHIPS
P.Eng - APEGA (Association of Professional Engineers and Geoscientists of Alberta) Member No. 146327
PMP – PMI (Project Management Institute) Member No. 2854772
RELEVANT SKILLS
Project Engineering Skills
Managing of small (up to $500K) to midsized projects (up to $5M) with average portfolio responsibility of
up to $10M at one time, resulting in continued client business
Leading Inter-Disciplinary Teams of 7-10 people
Sizing & Selection of Vessels, Rotating Equipment, Pumps, Compressors & Heat Exchangers
Sizing & Selection of Control Valves, Flow Meters, PSV’s and process instrumentation
ASME B31.3, B16.5, Section 8, CSA Z-662, B149.3 & Z-245, API 12.1
DBM (Design Basis Memorandum) FEED (Front End Engineering Design)
Project Schedules & Cost Estimates PEP (Project Execution Plan)
P&IDs & Process Piping Regulatory submissions for regulatory boards
Value Engineering analysis Constructability Reviews
Analytical Reports
Cost & Contract Negotiations
HAZOP & LOPA
Project Procurement
Troubleshooting facility operating issues
Commissioning of facilities
Computer Skills
MS Project Pipeflo Aquarius Ivara
AutoCAD SolidWorks ANSYS MS Office
WORK EXPERIENCE
Project Engineer, Integra Engineering, Lloydminster, Alberta
(Refer to attached Projects List for project details)
Coordinated a 7 member team in the design and construction of a unique Heavy Oil Treater
which was successfully able to handle polymers in incoming emulsion for Northern Blizzard.
This resulted in annual cost savings of at least $1 million
Coordinated the process design and construction of CNRL’s first ever drilling mud disposal
facility. The project was successfully completed within the project schedule
Engineered and coordinated construction of a water treatment and injection facility in a
record time of 6 months and within the $4 million project budget for Husky Energy
Coordinated the design and construction with 2 other EPC companies for CNRL’s Water
Truck-in facility and I completed our part of the project one month ahead of schedule &
within budget
Engineered & coordinated construction of a Gas booster compressor site for Husky Energy
within 2 months and 15% below the total budget of $150,000
Voluntarily assisted company management in the design of the new company logo and
managed the design, construction and launch of the new company website
Jan 2012-
May 2015
2. Facility Manager, Cargill AgHorizons, Marwayne, Alberta
Reporting to the Regional Manager, led a 6 member multidisciplinary team in the
operations of a 4,000 ton fertilizer blending plant & a 15,000 sq. ft. chemical warehouse
Promoted to manager after 5 months as Assistant Manager
Was the youngest person in that position for Cargill in the region
Reduced operation downtime for the facility by 30% through comprehensive safety and
equipment overhauls for the facility
Responsible for one of the lowest annual inventory carry-overs of only 15% for the location
Aug-Dec
2011
Assistant Manager, Cargill AgHorizons, Marwayne, Alberta
Performed the duties of Facility Manager & Assistant Manager because the Facility
Manger position was vacant
Safety and ISO-9001 Lead for the facility
Took over management of the facility just 3 months before peak season and ensured
smooth operations through the busy period
Mar-July
2011
Operations Management Trainee, Cargill AgHorizons, North Battleford, Saskatchewan
Monitored the construction progress of the new $2 million Fertilizer Blending plant,
helped commission it, reported and resolved design, timeline, safety and cost issues
Conducted operations of a 32,000 ton capacity grain elevator, a Fertilizer Blending plant
& a 25,000 sq. ft. Chemical Warehouse
Performed maintenance on Grain Elevator and Fertilizer Blending Plant Equipment
Dec 2009-
Feb 2011
EDUCATION
Bachelor of Engineering, McGill University, Montreal, Quebec Graduated 2009
Major in Mechanical Engineering (Specialization: Manufacturing Management),
Minor in Economics
COURSES and CERTIFICATES
Introduction to Geology in the Energy Industry, Canadian Society of Petroleum Geologists,
Edmonton, Alberta
Apr 2015
Applied Project Management Certificate (80% Complete), SAIT Polytechnic, Calgary, Alberta Apr 2014-
Feb 2015
H2S Alive, CanSafe, Lloydminster, Saskatchewan Feb 2015
CPR and First Aid Certification, Astec Safety, Lloydminster, Alberta Sept 2014
ASME B31.3 Introduction to Process Piping Design and Canadian Regulations, CASTI,
Edmonton, Alberta
May 2013
PSV (Pressure Safety Valves): Basics, Selection & Operations, Spartan Controls, Lloydminster,
Alberta
May 2013
Compressors, Fans and Pumps: Basics, Selection & Operations, Global Innovative Campus,
Edmonton, Alberta
Apr 2013
Introduction to Welding, Lakeland College, Vermillion, Alberta Mar 2013
Control Valves: Basics, Selection & Operations, Spartan Controls, Lloydminster, Alberta Nov 2012
CSA Z662 Oil and Gas Pipeline Systems Code, PEICE, Lloydminster, Alberta Feb 2012
VOLUNTEER WORK & EXTRACURRICULAR ACTIVITIES
Treasurer and Vice Chair (since March 2015) for the APEGA Vermillion River Branch
Organized the first Science Olympics in the Region after a gap of 2 years
Organized the annual President’s Visit & AGM with the highest ever turnout of members
June 2012-
Present
Member of the Lloydminster Toastmasters Club
Progressed from Local to Regional & then to the Provincial finals during the 1st
attempt
Mar 2012-
Mar 2013