SlideShare a Scribd company logo
HCL Internal
Curriculum Vitae
ASHUTOSH NANDAN Email: nandanashutosh@yahoo.com
B-101, Laxmi aptt, Mobile: 9778894194, 9439802789
New chitragupta nagar
Kankarbagh, Patna, Bihar.(INDIA) 800020
Objective:
Pursuinga challengingandrewardingcareerinthe Industrywhere Icangrow both
personallyandprofessionallythroughcontinuousup-gradationof myskillstomake myself globally
competitive. Having5years of experience inpowersectorandaspire tohandle greater
responsibilitieswhere myknowledge,experience andskillscanbe contributedsignificantlytothe
growthof the organizationandmyself.
Academic Profile:
 Holda Degree [B.E]inMechanical EngineeringfromRGPVUNIVERSITY–GlobusEngineering
College, Bhopal, MP. Secured - 65.06% in 2011.
Profile Summary:
4 Years and 10 month of experience in Power plant Erection and Commissioning,
 Erection and Commissioning activities of Turbo generator 2x165 MW,Bhushan Steel
ltd.plant in Angul, Odisha.
 Erection and Commissioning activities of Turbo generator 3x67.5 MW,TATA STEEL
Plant in jajpur, Odisha.
 Completed for erection LP piping in NTPC-TTPS.Talcher for Thermosystem pvt. Ltd.
 Nowwork going on in NTPC Talcher and NTPC kaniha ,Looking both of the piping project
as a Sr. Engineer.
Experience profile:
 My work role is related to Execution of
Erection ofturbine generator with alignment and Piping work & STG auxiliary
equipments erection and commissioning.Having exp as a site in charge handling three site
at a time an all site related documentation and updating on ERP.
Roles & Responsibilities:
• Erection & Commissioning of Turbine and Auxiliaries like Pumps, Heat
exchangers, H.P, L.P Heaters, Ejectors, De-aerator, connecting piping & valve in line
with the approved drawings.
• Equipments Alignment correction.
• Lube Oil line cleaning (Acid cleaning, caustic soda cleaning, Oil flushing)
• Preparation of Daily, Weekly and Monthly Progress Report as per the Requirement
• Equipments Inspection & Report Submission
• Co-ordination with contractors Engineers to expedite and complete the jobs within
the Time Period.
• Co-ordination with other functional groups regarding interface issues. Ensuring
adherence of safe work practices.
HCL Internal
• Ensuring contractors maintain proper Housekeeping in storage yard and erection
work place.
Siemens ltd through RKS Engineering pvt ltd., Baroda, India
Role Title: Erection & Commissioning Engineer (Power Plant-STG Package)
Duration: July2011 – till
Deputedto BhushanSteelPlant, 2*165 MWpower plant constructions in Angul
Orissa. Able to complete the task on time, through efficient planning and the required technical
knowledge.
Deputed to TATA STEELPlant. 3*67.5 MWpower plant work as same above.
Thermosystem Pvt. Ltd.
Role Title: Erection and commissioning of FIREDETECTIONAND
PROTECTION SYSTEM with connected Piping.
Deputed to NTPC-TTPS Talcher and NTPCkaniha (ODISHA,INDIA) for Erection and
Commissioning of FDPS.
Handling three projects at a time with all documentation as a site in charge and update on ERP.
Erection:
 Erection of Turbo-Generator and Auxiliary equipments like Surface Tube Bundle
condenser, Boiler feed pumps, Condenser Extraction pump, and Steam jet air Ejector,
Gland Steam Condenser, PHE,Deaerator,Main oil tank, auxiliary and emergency oil
Pump, Oil cooler and Filter, Jacking Oil pump, squeeze oil pump, Hand pump and,
alternator and turbine Overhead Oil Tank, Oil Purifier, collecting oil tank, etc..
 Involved in various erection of piping of condensate,steam, drain, oil systems in TG and
Auxiliaries.
 Involved in Heavy fabrication of piping and all types of welding process.
 Job allocation to the workmen basing on the manpower available and the work load, i.e.,
optimum utilization of man power & machine power.
 Preparation of Material requisition and follow with client.
 Preparing field & design change notes.
 Co-ordination with the various departments such as QC, Planning, TSS (Technical Support
Service), Safety, P&M departments for obtaining optimum production without interruption.
 Conducted daily safety pep talks to concerned work force, implemented all safe working methods.
 Following the Safety rules & regulations to create the working zone as a Hazard free zone, and
achieving the aim “TARGET ZERO ACCIDENTS”.
Commissioning activities:
 Involved in Oil flushing for oil systems, hydro test for condensate pipe lines, acid pickling
and alkali flushing for pipelines, charging for all systems.
 Involved in turbine rolling, turbine ESV & HPCV turning gear supply from control oil skid
and hp by-pass oil skid.
 Involved in Various piping fabrication for all systems C.W and A.C.W (piping-
Fabrication), Inside TG Deck & welding DP, RT, Inspecting all IBR Pipes.
HCL Internal
Project Management Mechanical - BTG & BOP
1. Having Good Knowledge of Mechanical – Erection and Commissioning
2. Ability to interpret the practical implications of standard engineering and erection
practices in a thermal power plant
3. Ability to carry out erection independently, in accordance with the established
procedures, processes and ensure their proper documentations.
4. Understanding of practices and costing procedures.
5. Ability to develop processes for value engineering and cost optimization.
6. Ability to resolve erection related site issues, checks for quality and compliances.
A. Turbine Technology
1. Ability to understand TG Cycle
2. Ability to read Thermal Balance Sheet, heaters,HP and LP and different stage
extractions
3. Capable of Optimizing TG Cycle parameters
4. Knowledge of selection of boiler pumps etc.
5. Ability to identify Materials and Quality Control
B. Generator Technology
1. Capable of selecting materials
2. Knowledge in current capability, optimization of generator size with respect to speed
3. Knowledge in Generator Cooling systems and Excitation systems etc.
4. Ability to understand transformers / bus bars / switch yard layout
5. Capable of executing inspection and testing .
PROJECT WORKINTHECOLLEGE
Title of the main Project -“MODIFIEDWELDINGTORCH”
Description
Developed a welding torch by the help of which it is easy to weld in different position .
The torch has on/off switch which helps while welding sudden control.
Software Proficiency:
Microsoft Applications/Operating Systems- MS- Office, MS –Excel/ FoxPro, Win XP.
Hobbies:
 Reading Books, Browsing, Music listening, Poem read/write.
Personal Profile:
Name : ASHUTOSH NANDAN
Age /DOB : 27Years/25-02-1988
Sex : Male
Marital Status : Single
Nationality : Indian
Languages Known : English and Hindi
I hereby declare that the above furnished details are true to my knowledge. I hope I can serve
with utmost sincerity for the growth of your Organization.
Thanking you!
Yours Sincerely,
HCL Internal
Place: Angul (Odisha)
Date: 2015 (ASHUTOSH NANDAN)

More Related Content

What's hot

Cv ejaz ahmad
Cv ejaz ahmadCv ejaz ahmad
Cv ejaz ahmad
diwanazadkhankhan
 
Amit resume
Amit resumeAmit resume
Amit resume
amit kumar singh
 
Firoz Babu K - Sr. Mechanical Engineer - CV
Firoz Babu K - Sr. Mechanical Engineer - CVFiroz Babu K - Sr. Mechanical Engineer - CV
Firoz Babu K - Sr. Mechanical Engineer - CVFiroz Babu Kodaniyil
 
Rizwan Javed Mech_Engr_Cv
Rizwan Javed Mech_Engr_CvRizwan Javed Mech_Engr_Cv
Rizwan Javed Mech_Engr_CvRizwan Javed
 
Elvis joy cv- mechanical engineer, primavera p6 hvac
Elvis joy  cv- mechanical engineer, primavera p6 hvacElvis joy  cv- mechanical engineer, primavera p6 hvac
Elvis joy cv- mechanical engineer, primavera p6 hvac
Elvis Joy
 
hariom gupta cv for maintenance and project
hariom gupta cv for maintenance and projecthariom gupta cv for maintenance and project
hariom gupta cv for maintenance and projecthariom gupta
 
Executive Engineer with 5 Years Exp. in Maintenance & PPC
Executive Engineer with 5 Years Exp. in Maintenance & PPC Executive Engineer with 5 Years Exp. in Maintenance & PPC
Executive Engineer with 5 Years Exp. in Maintenance & PPC
Makarand Pachpande
 
Maintenance Manager - CV
Maintenance Manager - CVMaintenance Manager - CV
Maintenance Manager - CVSrinivas Ch
 
vishwas_Ghan_Resume
vishwas_Ghan_Resumevishwas_Ghan_Resume
vishwas_Ghan_ResumeVishwas Ghan
 

What's hot (20)

Syed Qanbar Ali Naqvi (CV)
Syed Qanbar Ali Naqvi (CV)Syed Qanbar Ali Naqvi (CV)
Syed Qanbar Ali Naqvi (CV)
 
Cv ejaz ahmad
Cv ejaz ahmadCv ejaz ahmad
Cv ejaz ahmad
 
Amit resume
Amit resumeAmit resume
Amit resume
 
Firoz Babu K - Sr. Mechanical Engineer - CV
Firoz Babu K - Sr. Mechanical Engineer - CVFiroz Babu K - Sr. Mechanical Engineer - CV
Firoz Babu K - Sr. Mechanical Engineer - CV
 
Rizwan Javed Mech_Engr_Cv
Rizwan Javed Mech_Engr_CvRizwan Javed Mech_Engr_Cv
Rizwan Javed Mech_Engr_Cv
 
ME_2017 (1)
ME_2017 (1)ME_2017 (1)
ME_2017 (1)
 
Elvis joy cv- mechanical engineer, primavera p6 hvac
Elvis joy  cv- mechanical engineer, primavera p6 hvacElvis joy  cv- mechanical engineer, primavera p6 hvac
Elvis joy cv- mechanical engineer, primavera p6 hvac
 
CV_Saddam Hussain_mecheng
CV_Saddam Hussain_mechengCV_Saddam Hussain_mecheng
CV_Saddam Hussain_mecheng
 
Swapnil Resume
Swapnil ResumeSwapnil Resume
Swapnil Resume
 
CV
CVCV
CV
 
Piping Engineer CV
Piping Engineer CVPiping Engineer CV
Piping Engineer CV
 
hariom gupta cv for maintenance and project
hariom gupta cv for maintenance and projecthariom gupta cv for maintenance and project
hariom gupta cv for maintenance and project
 
Executive Engineer with 5 Years Exp. in Maintenance & PPC
Executive Engineer with 5 Years Exp. in Maintenance & PPC Executive Engineer with 5 Years Exp. in Maintenance & PPC
Executive Engineer with 5 Years Exp. in Maintenance & PPC
 
Maintenance Manager - CV
Maintenance Manager - CVMaintenance Manager - CV
Maintenance Manager - CV
 
vishwas_Ghan_Resume
vishwas_Ghan_Resumevishwas_Ghan_Resume
vishwas_Ghan_Resume
 
Sasikumar A
Sasikumar ASasikumar A
Sasikumar A
 
Resume- Ram Raj Yadav
Resume- Ram Raj YadavResume- Ram Raj Yadav
Resume- Ram Raj Yadav
 
CV_1
CV_1CV_1
CV_1
 
CV_HVAC_ENGINEER
CV_HVAC_ENGINEERCV_HVAC_ENGINEER
CV_HVAC_ENGINEER
 
CV-uploaded1
CV-uploaded1CV-uploaded1
CV-uploaded1
 

Viewers also liked

Arpita CV New-1 (1)
Arpita CV New-1 (1)Arpita CV New-1 (1)
Arpita CV New-1 (1)Arpita Roy
 
15 pomysłów na Wielkanoc
15 pomysłów na Wielkanoc15 pomysłów na Wielkanoc
15 pomysłów na Wielkanoc
Smaker.pl
 
Entering into the UAE Final Copy (2)
Entering into the UAE Final Copy (2)Entering into the UAE Final Copy (2)
Entering into the UAE Final Copy (2)Alex Wong
 
Contact agosto
Contact agostoContact agosto
Contact agostoLeutherio
 
Astley re kelly study
Astley re kelly studyAstley re kelly study
Astley re kelly studyebredberg
 
Turbó fokozat
Turbó fokozatTurbó fokozat
Turbó fokozat
András Bártházi
 
Aisha Email System
Aisha Email SystemAisha Email System
Aisha Email System
IOSR Journals
 
IINI2004 SOS Strategi for sosiale medier
IINI2004 SOS Strategi for sosiale medierIINI2004 SOS Strategi for sosiale medier
IINI2004 SOS Strategi for sosiale medier
antonare
 
Taulukko väestöstä 3
Taulukko väestöstä 3Taulukko väestöstä 3
Taulukko väestöstä 3
Urskilehto
 
Ppoooer Avellaner Correcte
Ppoooer Avellaner CorrectePpoooer Avellaner Correcte
Ppoooer Avellaner Correcteguest441812
 
Open Data e Open Data Sicilia
Open Data e Open Data SiciliaOpen Data e Open Data Sicilia
Open Data e Open Data Sicilia
Cristiano Longo
 
iPhone Dev Camp Keynote
iPhone Dev Camp  KeynoteiPhone Dev Camp  Keynote
iPhone Dev Camp Keynote
tristan.woo
 
iPhoneDevCamp Keynote
iPhoneDevCamp KeynoteiPhoneDevCamp Keynote
iPhoneDevCamp Keynote
Phil Wolff
 
What is Your Library Doing about Emerging Technologies?
What is Your Library Doing about Emerging Technologies?What is Your Library Doing about Emerging Technologies?
What is Your Library Doing about Emerging Technologies?
Bohyun Kim
 

Viewers also liked (18)

Arpita CV New-1 (1)
Arpita CV New-1 (1)Arpita CV New-1 (1)
Arpita CV New-1 (1)
 
15 pomysłów na Wielkanoc
15 pomysłów na Wielkanoc15 pomysłów na Wielkanoc
15 pomysłów na Wielkanoc
 
Entering into the UAE Final Copy (2)
Entering into the UAE Final Copy (2)Entering into the UAE Final Copy (2)
Entering into the UAE Final Copy (2)
 
Contact agosto
Contact agostoContact agosto
Contact agosto
 
Astley re kelly study
Astley re kelly studyAstley re kelly study
Astley re kelly study
 
Email
EmailEmail
Email
 
Turbó fokozat
Turbó fokozatTurbó fokozat
Turbó fokozat
 
Varani rv
Varani rvVarani rv
Varani rv
 
Adebayo Adeniran CV
Adebayo Adeniran CVAdebayo Adeniran CV
Adebayo Adeniran CV
 
Alissa Mickelson
Alissa MickelsonAlissa Mickelson
Alissa Mickelson
 
Aisha Email System
Aisha Email SystemAisha Email System
Aisha Email System
 
IINI2004 SOS Strategi for sosiale medier
IINI2004 SOS Strategi for sosiale medierIINI2004 SOS Strategi for sosiale medier
IINI2004 SOS Strategi for sosiale medier
 
Taulukko väestöstä 3
Taulukko väestöstä 3Taulukko väestöstä 3
Taulukko väestöstä 3
 
Ppoooer Avellaner Correcte
Ppoooer Avellaner CorrectePpoooer Avellaner Correcte
Ppoooer Avellaner Correcte
 
Open Data e Open Data Sicilia
Open Data e Open Data SiciliaOpen Data e Open Data Sicilia
Open Data e Open Data Sicilia
 
iPhone Dev Camp Keynote
iPhone Dev Camp  KeynoteiPhone Dev Camp  Keynote
iPhone Dev Camp Keynote
 
iPhoneDevCamp Keynote
iPhoneDevCamp KeynoteiPhoneDevCamp Keynote
iPhoneDevCamp Keynote
 
What is Your Library Doing about Emerging Technologies?
What is Your Library Doing about Emerging Technologies?What is Your Library Doing about Emerging Technologies?
What is Your Library Doing about Emerging Technologies?
 

Similar to Ashutosh CV

Naushad Bhatti (CV) (1)
Naushad Bhatti (CV) (1)Naushad Bhatti (CV) (1)
Naushad Bhatti (CV) (1)Naushad bhatti
 
Instrumentation Engineer Resume
Instrumentation Engineer ResumeInstrumentation Engineer Resume
Instrumentation Engineer Resume
Suresh Selvaraju
 
Cv partha
Cv parthaCv partha
Cv partha
Partha Sahoo
 
Maintenance Engineer
Maintenance EngineerMaintenance Engineer
Maintenance Engineer
DK vikas
 
Cv tapan kumar prusty updated
Cv tapan kumar prusty updatedCv tapan kumar prusty updated
Cv tapan kumar prusty updated
Tapan kumar prusty
 
Amrendra Singh's Resume
Amrendra Singh's ResumeAmrendra Singh's Resume
Amrendra Singh's ResumeAmrendra Singh
 
M.Kamran Resume
M.Kamran ResumeM.Kamran Resume
M.Kamran Resumekami88
 
Avtar_singh CV 2016
Avtar_singh  CV 2016Avtar_singh  CV 2016
Avtar_singh CV 2016Avtar Singh
 
10. Jawahar CV latest on 10.06.2016
10. Jawahar CV latest on 10.06.201610. Jawahar CV latest on 10.06.2016
10. Jawahar CV latest on 10.06.2016M jawahar jawahar
 

Similar to Ashutosh CV (20)

Naushad Bhatti (CV) (1)
Naushad Bhatti (CV) (1)Naushad Bhatti (CV) (1)
Naushad Bhatti (CV) (1)
 
Instrumentation Engineer Resume
Instrumentation Engineer ResumeInstrumentation Engineer Resume
Instrumentation Engineer Resume
 
Cv partha
Cv parthaCv partha
Cv partha
 
Maintenance Engineer
Maintenance EngineerMaintenance Engineer
Maintenance Engineer
 
nazeemres
nazeemresnazeemres
nazeemres
 
Resume
ResumeResume
Resume
 
Balchandra Puranik2002
Balchandra Puranik2002Balchandra Puranik2002
Balchandra Puranik2002
 
Cv tapan kumar prusty updated
Cv tapan kumar prusty updatedCv tapan kumar prusty updated
Cv tapan kumar prusty updated
 
social profile.
social profile.social profile.
social profile.
 
Amrendra Singh's Resume
Amrendra Singh's ResumeAmrendra Singh's Resume
Amrendra Singh's Resume
 
Harsimar CV
Harsimar CVHarsimar CV
Harsimar CV
 
CV
CVCV
CV
 
ResumeFeb2015
ResumeFeb2015ResumeFeb2015
ResumeFeb2015
 
M.Kamran Resume
M.Kamran ResumeM.Kamran Resume
M.Kamran Resume
 
Yashwanth_CV[1]
Yashwanth_CV[1]Yashwanth_CV[1]
Yashwanth_CV[1]
 
Avtar_singh CV 2016
Avtar_singh  CV 2016Avtar_singh  CV 2016
Avtar_singh CV 2016
 
10. Jawahar CV latest on 10.06.2016
10. Jawahar CV latest on 10.06.201610. Jawahar CV latest on 10.06.2016
10. Jawahar CV latest on 10.06.2016
 
resume updated
resume updatedresume updated
resume updated
 
Resume
ResumeResume
Resume
 
ajay cv new (3)
ajay cv new (3)ajay cv new (3)
ajay cv new (3)
 

Ashutosh CV

  • 1. HCL Internal Curriculum Vitae ASHUTOSH NANDAN Email: nandanashutosh@yahoo.com B-101, Laxmi aptt, Mobile: 9778894194, 9439802789 New chitragupta nagar Kankarbagh, Patna, Bihar.(INDIA) 800020 Objective: Pursuinga challengingandrewardingcareerinthe Industrywhere Icangrow both personallyandprofessionallythroughcontinuousup-gradationof myskillstomake myself globally competitive. Having5years of experience inpowersectorandaspire tohandle greater responsibilitieswhere myknowledge,experience andskillscanbe contributedsignificantlytothe growthof the organizationandmyself. Academic Profile:  Holda Degree [B.E]inMechanical EngineeringfromRGPVUNIVERSITY–GlobusEngineering College, Bhopal, MP. Secured - 65.06% in 2011. Profile Summary: 4 Years and 10 month of experience in Power plant Erection and Commissioning,  Erection and Commissioning activities of Turbo generator 2x165 MW,Bhushan Steel ltd.plant in Angul, Odisha.  Erection and Commissioning activities of Turbo generator 3x67.5 MW,TATA STEEL Plant in jajpur, Odisha.  Completed for erection LP piping in NTPC-TTPS.Talcher for Thermosystem pvt. Ltd.  Nowwork going on in NTPC Talcher and NTPC kaniha ,Looking both of the piping project as a Sr. Engineer. Experience profile:  My work role is related to Execution of Erection ofturbine generator with alignment and Piping work & STG auxiliary equipments erection and commissioning.Having exp as a site in charge handling three site at a time an all site related documentation and updating on ERP. Roles & Responsibilities: • Erection & Commissioning of Turbine and Auxiliaries like Pumps, Heat exchangers, H.P, L.P Heaters, Ejectors, De-aerator, connecting piping & valve in line with the approved drawings. • Equipments Alignment correction. • Lube Oil line cleaning (Acid cleaning, caustic soda cleaning, Oil flushing) • Preparation of Daily, Weekly and Monthly Progress Report as per the Requirement • Equipments Inspection & Report Submission • Co-ordination with contractors Engineers to expedite and complete the jobs within the Time Period. • Co-ordination with other functional groups regarding interface issues. Ensuring adherence of safe work practices.
  • 2. HCL Internal • Ensuring contractors maintain proper Housekeeping in storage yard and erection work place. Siemens ltd through RKS Engineering pvt ltd., Baroda, India Role Title: Erection & Commissioning Engineer (Power Plant-STG Package) Duration: July2011 – till Deputedto BhushanSteelPlant, 2*165 MWpower plant constructions in Angul Orissa. Able to complete the task on time, through efficient planning and the required technical knowledge. Deputed to TATA STEELPlant. 3*67.5 MWpower plant work as same above. Thermosystem Pvt. Ltd. Role Title: Erection and commissioning of FIREDETECTIONAND PROTECTION SYSTEM with connected Piping. Deputed to NTPC-TTPS Talcher and NTPCkaniha (ODISHA,INDIA) for Erection and Commissioning of FDPS. Handling three projects at a time with all documentation as a site in charge and update on ERP. Erection:  Erection of Turbo-Generator and Auxiliary equipments like Surface Tube Bundle condenser, Boiler feed pumps, Condenser Extraction pump, and Steam jet air Ejector, Gland Steam Condenser, PHE,Deaerator,Main oil tank, auxiliary and emergency oil Pump, Oil cooler and Filter, Jacking Oil pump, squeeze oil pump, Hand pump and, alternator and turbine Overhead Oil Tank, Oil Purifier, collecting oil tank, etc..  Involved in various erection of piping of condensate,steam, drain, oil systems in TG and Auxiliaries.  Involved in Heavy fabrication of piping and all types of welding process.  Job allocation to the workmen basing on the manpower available and the work load, i.e., optimum utilization of man power & machine power.  Preparation of Material requisition and follow with client.  Preparing field & design change notes.  Co-ordination with the various departments such as QC, Planning, TSS (Technical Support Service), Safety, P&M departments for obtaining optimum production without interruption.  Conducted daily safety pep talks to concerned work force, implemented all safe working methods.  Following the Safety rules & regulations to create the working zone as a Hazard free zone, and achieving the aim “TARGET ZERO ACCIDENTS”. Commissioning activities:  Involved in Oil flushing for oil systems, hydro test for condensate pipe lines, acid pickling and alkali flushing for pipelines, charging for all systems.  Involved in turbine rolling, turbine ESV & HPCV turning gear supply from control oil skid and hp by-pass oil skid.  Involved in Various piping fabrication for all systems C.W and A.C.W (piping- Fabrication), Inside TG Deck & welding DP, RT, Inspecting all IBR Pipes.
  • 3. HCL Internal Project Management Mechanical - BTG & BOP 1. Having Good Knowledge of Mechanical – Erection and Commissioning 2. Ability to interpret the practical implications of standard engineering and erection practices in a thermal power plant 3. Ability to carry out erection independently, in accordance with the established procedures, processes and ensure their proper documentations. 4. Understanding of practices and costing procedures. 5. Ability to develop processes for value engineering and cost optimization. 6. Ability to resolve erection related site issues, checks for quality and compliances. A. Turbine Technology 1. Ability to understand TG Cycle 2. Ability to read Thermal Balance Sheet, heaters,HP and LP and different stage extractions 3. Capable of Optimizing TG Cycle parameters 4. Knowledge of selection of boiler pumps etc. 5. Ability to identify Materials and Quality Control B. Generator Technology 1. Capable of selecting materials 2. Knowledge in current capability, optimization of generator size with respect to speed 3. Knowledge in Generator Cooling systems and Excitation systems etc. 4. Ability to understand transformers / bus bars / switch yard layout 5. Capable of executing inspection and testing . PROJECT WORKINTHECOLLEGE Title of the main Project -“MODIFIEDWELDINGTORCH” Description Developed a welding torch by the help of which it is easy to weld in different position . The torch has on/off switch which helps while welding sudden control. Software Proficiency: Microsoft Applications/Operating Systems- MS- Office, MS –Excel/ FoxPro, Win XP. Hobbies:  Reading Books, Browsing, Music listening, Poem read/write. Personal Profile: Name : ASHUTOSH NANDAN Age /DOB : 27Years/25-02-1988 Sex : Male Marital Status : Single Nationality : Indian Languages Known : English and Hindi I hereby declare that the above furnished details are true to my knowledge. I hope I can serve with utmost sincerity for the growth of your Organization. Thanking you! Yours Sincerely,
  • 4. HCL Internal Place: Angul (Odisha) Date: 2015 (ASHUTOSH NANDAN)