JOB SAFETY ANALYSIS
Doc. No.:
Rev.: 00
Date:
Page: 1 of 2
Project: Ajyal international School Project
Project#: Area:Dist Ajyal Dammam Saudi Arabia General Comments: Proper PPE, TBT should be conducted before start the job,
Access control authority would be DEL Site Manager/Site Engineer
Date: Supervisor:
Job Description: Work at Height
Item
Detail of
Activity
Equipment &
Tools used
Risk Involved Control Measure
Responsible
Person
Severity
Rating
1
2
3
4
TRANSPORTING
SCAFFOLDING
MATERIAL AT
SITE.
UNLOADING OF
SCAFFOLDING
MATERIAL.
STORAGE OF
SCAFFOLD
MATERIAL.
ERECTION &
DISMANTLING
OF
SCAFFOLDING.
● VEHICLES.
● SCAFFOLDI
NG
MATERIALS
. (PIPES,
JOINTS,
PLANKS,
BASE
PLATE, TOE
BOARD &
etc.)
● .LEVEL
STRIP,
HAMMER,
METER TAP
& ROPE.
● MATERIAL CAN FALL.
● PERSONAL INJURY.
● UNAUTHORIZED /
UNTRAINED/
INEXPERIENCED
PERSONNEL ON THE JOB
● UNEVEN GROUND
● FAULTY/ POOR
CONDITION SCAFFOLDING
MATERIAL
● IMPROPER
SCAFFOLDING ERECTION
● TAG SYSTEM NOT
FOLLOWED.
● WRONG MATERIAL
HANDLING/ FALLING OBJECT
● PERSONNEL INJURY.
● PERSONNEL FALL.
● OBJECT FALL.
● PROPERTY LOSS
● MATERIAL WILL BE FASTENED PROPERLY BEFORE
TRANSPORTING TO SITE.
● ONLY EXPERIENCED, SKILLED AND TRAINED
PERSON SHOULD BE ALLOWED
● ALL HANDTOOLS SHOULD BE INSPECTED PRIOR TO
START OF JOB
● SCAFFOLDING PIPES WITH CORROSION SHOULD NOT
BE USED.
● MATERIAL WILL BE UNLOADED WITH BOOM TRUCK
● CERTIFIED BOOM TRUCK OPERATOR WILL CARRY
OUT THE TASK.
● MATERIAL WILL BE STORED IN A DESIGNATED AREA.
● MATERIAL WILL BE STORED ON SCAFFOLD RACKS.
● HARD BARRICADE AND SIGNAGE WILL BE PROVIDED
● GROUND SURFACE SHOULD BE LEVELED
● RED TAG MUST BE PLACED/ HANGED AT THE START
OF SCAFFOLDING
● ENSURE VERTICAL PIPES ALLIGNMENT AND CHECK
IT WITH HAND LEVEL
● ENSURE ALL JOINTS ARE PROPERLY TIGHTENED
● USE BRACING PIPES AND OUTERRIGGERS PIPES
WHERE NECESSARY.
● ONLY CERTIFIED SCAFFOLDERS WILL PERFORM THE
JOB.
● SCAFFOLDERS WILL BE TRAINED ON SAFE WORKING
AT HEIGHT.
● ABOVE 1.8M HEIGHT SAFETY HARNESS WILL BE
WITH DOUBLE LANYARD. 100%TIE OFF WILL BE
ENSURED.
● SCAFFOLD PLATFORM WILL NOT BE OVERLOADED.
● HAND RAIL AND TOE BOARDS WILL BE INSTALLED
WITH SCAFFOLDING PLATFORM.
● ALL EMPLOYEES WILL WORK WITH PROPER PPES.
Area I/C
(Authorized
Person).
3
2
3
3
3
2
3
3
3
3
● ELECTRIC SHOCK DUE
TO POWER LINE
● LADDER SHOULD BE CONSTRUCTED AT SUITABLE.
● METAL PLANKS SHOULD BE PROERLY PLACED ON
PIPES WITH HOOKS AND USE BINDING WIRE FOR
BINDIND WHERE NECESSARY
● NO PERSON SHOULD GO IN DROP ZONE.
SCAFFOLDING AREA.
● AREA SHOULD BARRICATED WHILE ERECTION OR
DISMENTLING THE PLATFORM.
● AREA MUST BE CHECKED & FREE FROM ELECTRICAL
WIRES BEFORE ASSEMBLING TO THE CRANE.
OVERHEAD
ELECTRICAL
POWER LINES
● SCAFFOLD
STRUCTUR
E
● PERSONAL INJURY
● PROPERTY LOSS
● ENSURE OVERHEAD CLEARANCE WHILE
OPERATING THE EQUIPMENT
Area
Representative
5 NIGHT WORKING
ACTIVITIES
● LIGHTS
● STANDS
Trdsssssdrttt
● HAND INJURY/EYE
INJURY
● ELECTRIC SHOCK /
ELECTROCUTION
● IMPROPER ILLUMINATION
● PERSONAL INJURY
● PROPERTY LOSS
● ENSURE WORKERS ARE COMPLYING PPE’S
REQUIRED.
● EXTINGUISHER MUST BE PRESENT AT ALL
TIME
● LIGHT SHOULD BE PROPER PRIOR TO START
THE WORK.
● ALL POWER CABLES SHOULD BE INSPECTED
AND INSULATED.
● LIGHTS SHOULD BE INSTALLED OVER HEAD
HEIGHT TO AVOID GLARING TO PERSONAL.
● IF GENERATOR USE FOR ELECTRICITY SHOULD BE
PROPERLY GROUNDED
● ALL TOWER CRANE LIGHTS SHOULD BE CHECKED
AND USE WHEREVER NECESSARY.
Area I/C
(Authorized
Person).
2
3
2
3
6
HOUSEKEEPING MANUAL CLEANING
OF AREA
● HOUSEKEEPING
● AREA BARRICADING
● PPE
● PROPERTY LOSS
● SLIP/TRIP
● FALL FROM HEIGHT
AREA IN-
CHARGE
3
2
3
Severity Rating : (1) First Aid / Minor Property Damage (2) Recordable Accident / Property Damage
(3) Lost Time Accident / Major Property Loss (4) Catastrophic Accident
Are you aware of, and do you have the correct PPE? What are the risks? How do controlled risks?
_______________________________ __________________________
AREA ENGINEER / SUPERVISOR HSE REPRESENTATIVE

More Related Content

What's hot

21 confined space working risk assessment templates
21 confined space working risk assessment templates21 confined space working risk assessment templates
21 confined space working risk assessment templates
Dwarika Bhushan Sharma
 
Lifting plan
Lifting planLifting plan
Lifting plan
tnsv22
 
13 initial project site office set up risk assessment templates
13 initial project site office set up risk assessment templates13 initial project site office set up risk assessment templates
13 initial project site office set up risk assessment templates
Dwarika Bhushan Sharma
 
Ma 029 loading & offloading tubulars from a supply boat
Ma 029 loading & offloading tubulars from a supply boatMa 029 loading & offloading tubulars from a supply boat
Ma 029 loading & offloading tubulars from a supply boatYousif Fikry
 
BANKSMAN TRAINING.ppt
BANKSMAN TRAINING.pptBANKSMAN TRAINING.ppt
BANKSMAN TRAINING.ppt
Kamran Zafar
 
Boom lift training
Boom lift trainingBoom lift training
Boom lift training
sheila bert
 
Work permit system
Work permit systemWork permit system
Work permit systemsmithgeigle
 
20 use of suspended access cradles and platforms (temporary works) risk asses...
20 use of suspended access cradles and platforms (temporary works) risk asses...20 use of suspended access cradles and platforms (temporary works) risk asses...
20 use of suspended access cradles and platforms (temporary works) risk asses...
Dwarika Bhushan Sharma
 
Job safety analysis
Job safety analysis Job safety analysis
Job safety analysis
soumenmakar
 
Portable tools risk assessment
Portable tools risk assessment Portable tools risk assessment
Portable tools risk assessment
Nidhin Sajeevan
 
SCAFFOLDING Safety Training
SCAFFOLDING Safety TrainingSCAFFOLDING Safety Training
SCAFFOLDING Safety TrainingWilliam York
 
22 casting of concrete columns risk assessment templates
22 casting of concrete columns risk assessment templates22 casting of concrete columns risk assessment templates
22 casting of concrete columns risk assessment templates
Dwarika Bhushan Sharma
 
Risk assessment for soil investigation at towers 5,6,7,8 rev01 a.dogani
Risk assessment for soil investigation at towers 5,6,7,8  rev01  a.doganiRisk assessment for soil investigation at towers 5,6,7,8  rev01  a.dogani
Risk assessment for soil investigation at towers 5,6,7,8 rev01 a.dogani
Arber Dogani
 
18 laying blockwork with access scaffolding risk assessment templates
18 laying blockwork with access scaffolding risk assessment templates18 laying blockwork with access scaffolding risk assessment templates
18 laying blockwork with access scaffolding risk assessment templates
Dwarika Bhushan Sharma
 
MOVING FALLING OBJECTS SAFETY
MOVING FALLING OBJECTS SAFETYMOVING FALLING OBJECTS SAFETY
MOVING FALLING OBJECTS SAFETY
Dwarika Bhushan Sharma
 
Lifting & Rigging Safety.pptx
Lifting & Rigging Safety.pptxLifting & Rigging Safety.pptx
Lifting & Rigging Safety.pptx
DrValliammaishanmuga
 
Permit to work
Permit to workPermit to work
Permit to work
Nikhil Barshettiwar
 
Rebar cutting hazards
Rebar cutting hazardsRebar cutting hazards
Rebar cutting hazards
construction
 
Lifting Operation Safety ppt.pptx
Lifting Operation Safety ppt.pptxLifting Operation Safety ppt.pptx
Lifting Operation Safety ppt.pptx
VasudevaRajuDantulur1
 

What's hot (20)

21 confined space working risk assessment templates
21 confined space working risk assessment templates21 confined space working risk assessment templates
21 confined space working risk assessment templates
 
Lifting plan
Lifting planLifting plan
Lifting plan
 
13 initial project site office set up risk assessment templates
13 initial project site office set up risk assessment templates13 initial project site office set up risk assessment templates
13 initial project site office set up risk assessment templates
 
Ma 029 loading & offloading tubulars from a supply boat
Ma 029 loading & offloading tubulars from a supply boatMa 029 loading & offloading tubulars from a supply boat
Ma 029 loading & offloading tubulars from a supply boat
 
BANKSMAN TRAINING.ppt
BANKSMAN TRAINING.pptBANKSMAN TRAINING.ppt
BANKSMAN TRAINING.ppt
 
Boom lift training
Boom lift trainingBoom lift training
Boom lift training
 
Excavation safety
Excavation safetyExcavation safety
Excavation safety
 
Work permit system
Work permit systemWork permit system
Work permit system
 
20 use of suspended access cradles and platforms (temporary works) risk asses...
20 use of suspended access cradles and platforms (temporary works) risk asses...20 use of suspended access cradles and platforms (temporary works) risk asses...
20 use of suspended access cradles and platforms (temporary works) risk asses...
 
Job safety analysis
Job safety analysis Job safety analysis
Job safety analysis
 
Portable tools risk assessment
Portable tools risk assessment Portable tools risk assessment
Portable tools risk assessment
 
SCAFFOLDING Safety Training
SCAFFOLDING Safety TrainingSCAFFOLDING Safety Training
SCAFFOLDING Safety Training
 
22 casting of concrete columns risk assessment templates
22 casting of concrete columns risk assessment templates22 casting of concrete columns risk assessment templates
22 casting of concrete columns risk assessment templates
 
Risk assessment for soil investigation at towers 5,6,7,8 rev01 a.dogani
Risk assessment for soil investigation at towers 5,6,7,8  rev01  a.doganiRisk assessment for soil investigation at towers 5,6,7,8  rev01  a.dogani
Risk assessment for soil investigation at towers 5,6,7,8 rev01 a.dogani
 
18 laying blockwork with access scaffolding risk assessment templates
18 laying blockwork with access scaffolding risk assessment templates18 laying blockwork with access scaffolding risk assessment templates
18 laying blockwork with access scaffolding risk assessment templates
 
MOVING FALLING OBJECTS SAFETY
MOVING FALLING OBJECTS SAFETYMOVING FALLING OBJECTS SAFETY
MOVING FALLING OBJECTS SAFETY
 
Lifting & Rigging Safety.pptx
Lifting & Rigging Safety.pptxLifting & Rigging Safety.pptx
Lifting & Rigging Safety.pptx
 
Permit to work
Permit to workPermit to work
Permit to work
 
Rebar cutting hazards
Rebar cutting hazardsRebar cutting hazards
Rebar cutting hazards
 
Lifting Operation Safety ppt.pptx
Lifting Operation Safety ppt.pptxLifting Operation Safety ppt.pptx
Lifting Operation Safety ppt.pptx
 

Similar to JSA For Work at Height.docx

MS False Ceiling Rolling shutter & Door,Window Fixing_RA.doc
MS False Ceiling Rolling shutter & Door,Window Fixing_RA.docMS False Ceiling Rolling shutter & Door,Window Fixing_RA.doc
MS False Ceiling Rolling shutter & Door,Window Fixing_RA.doc
RajuBiswas41
 
Methodstatement welding
Methodstatement weldingMethodstatement welding
Methodstatement welding
Aanand Subi
 
Excavation & Back filling work 02.docx
Excavation & Back filling work 02.docxExcavation & Back filling work 02.docx
Excavation & Back filling work 02.docx
nrphsebarauni
 
Job safety Analysis
Job safety Analysis Job safety Analysis
Job safety Analysis Deepu Rajan
 
Fire Risk Assessment.pdf
Fire Risk Assessment.pdfFire Risk Assessment.pdf
Fire Risk Assessment.pdf
HSEXINYIPROJECT
 
Ct2 presentation
Ct2 presentationCt2 presentation
Ct2 presentation
qayyum23
 
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdfJSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
JESUSBASILIOANTONIO
 
BUILDING CONSTRUCTION REPORT
BUILDING CONSTRUCTION REPORTBUILDING CONSTRUCTION REPORT
BUILDING CONSTRUCTION REPORT
emily9199
 
Building Industrial Training report for CIVIL ENGINEERING
Building Industrial Training report for CIVIL ENGINEERINGBuilding Industrial Training report for CIVIL ENGINEERING
Building Industrial Training report for CIVIL ENGINEERING
CESatvirSingh1
 
LPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdfLPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdf
JESUSBASILIOANTONIO
 
hot works for construction of temporary facilities
hot works for construction of temporary facilitieshot works for construction of temporary facilities
hot works for construction of temporary facilities
Fãrük Ñäzmî
 
Job Safety Analyses For Energization of Substation..doc
Job Safety Analyses For Energization of Substation..docJob Safety Analyses For Energization of Substation..doc
Job Safety Analyses For Energization of Substation..doc
Atif767782
 
2 IMPORTANCE OCC SFTY & H.ppt
2 IMPORTANCE OCC SFTY & H.ppt2 IMPORTANCE OCC SFTY & H.ppt
2 IMPORTANCE OCC SFTY & H.ppt
Fredel De Vera
 
HIRARC FORM (skylift).pdf
HIRARC FORM (skylift).pdfHIRARC FORM (skylift).pdf
HIRARC FORM (skylift).pdf
MuhammadAdliHamdan
 
TS-1 - PPT - VISHNURAJ G.ppt
TS-1 - PPT - VISHNURAJ G.pptTS-1 - PPT - VISHNURAJ G.ppt
TS-1 - PPT - VISHNURAJ G.ppt
ajith30276
 
JHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdf
JHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdfJHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdf
JHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdf
JESUSBASILIOANTONIO
 
Overhead crane
Overhead crane Overhead crane
Overhead crane
simonslater16
 
osha3252.pdf
osha3252.pdfosha3252.pdf
osha3252.pdf
RajkumarArikumar
 

Similar to JSA For Work at Height.docx (20)

MS False Ceiling Rolling shutter & Door,Window Fixing_RA.doc
MS False Ceiling Rolling shutter & Door,Window Fixing_RA.docMS False Ceiling Rolling shutter & Door,Window Fixing_RA.doc
MS False Ceiling Rolling shutter & Door,Window Fixing_RA.doc
 
Methodstatement welding
Methodstatement weldingMethodstatement welding
Methodstatement welding
 
Excavation & Back filling work 02.docx
Excavation & Back filling work 02.docxExcavation & Back filling work 02.docx
Excavation & Back filling work 02.docx
 
Job safety Analysis
Job safety Analysis Job safety Analysis
Job safety Analysis
 
Fire Risk Assessment.pdf
Fire Risk Assessment.pdfFire Risk Assessment.pdf
Fire Risk Assessment.pdf
 
Ct2 presentation
Ct2 presentationCt2 presentation
Ct2 presentation
 
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdfJSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
 
BUILDING CONSTRUCTION REPORT
BUILDING CONSTRUCTION REPORTBUILDING CONSTRUCTION REPORT
BUILDING CONSTRUCTION REPORT
 
Building Industrial Training report for CIVIL ENGINEERING
Building Industrial Training report for CIVIL ENGINEERINGBuilding Industrial Training report for CIVIL ENGINEERING
Building Industrial Training report for CIVIL ENGINEERING
 
SDV-20253 VALVE MOD 9 lift plan 1
SDV-20253 VALVE MOD 9 lift plan 1SDV-20253 VALVE MOD 9 lift plan 1
SDV-20253 VALVE MOD 9 lift plan 1
 
LPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdfLPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdf
 
hot works for construction of temporary facilities
hot works for construction of temporary facilitieshot works for construction of temporary facilities
hot works for construction of temporary facilities
 
Advance management for civil engineering
Advance management for civil engineeringAdvance management for civil engineering
Advance management for civil engineering
 
Job Safety Analyses For Energization of Substation..doc
Job Safety Analyses For Energization of Substation..docJob Safety Analyses For Energization of Substation..doc
Job Safety Analyses For Energization of Substation..doc
 
2 IMPORTANCE OCC SFTY & H.ppt
2 IMPORTANCE OCC SFTY & H.ppt2 IMPORTANCE OCC SFTY & H.ppt
2 IMPORTANCE OCC SFTY & H.ppt
 
HIRARC FORM (skylift).pdf
HIRARC FORM (skylift).pdfHIRARC FORM (skylift).pdf
HIRARC FORM (skylift).pdf
 
TS-1 - PPT - VISHNURAJ G.ppt
TS-1 - PPT - VISHNURAJ G.pptTS-1 - PPT - VISHNURAJ G.ppt
TS-1 - PPT - VISHNURAJ G.ppt
 
JHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdf
JHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdfJHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdf
JHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdf
 
Overhead crane
Overhead crane Overhead crane
Overhead crane
 
osha3252.pdf
osha3252.pdfosha3252.pdf
osha3252.pdf
 

Recently uploaded

Training- integrated management system (iso)
Training- integrated management system (iso)Training- integrated management system (iso)
Training- integrated management system (iso)
akaash13
 
Case Analysis - The Sky is the Limit | Principles of Management
Case Analysis - The Sky is the Limit | Principles of ManagementCase Analysis - The Sky is the Limit | Principles of Management
Case Analysis - The Sky is the Limit | Principles of Management
A. F. M. Rubayat-Ul Jannat
 
SOCIO-ANTHROPOLOGY FACULTY OF NURSING.....
SOCIO-ANTHROPOLOGY FACULTY OF NURSING.....SOCIO-ANTHROPOLOGY FACULTY OF NURSING.....
SOCIO-ANTHROPOLOGY FACULTY OF NURSING.....
juniourjohnstone
 
Senior Project and Engineering Leader Jim Smith.pdf
Senior Project and Engineering Leader Jim Smith.pdfSenior Project and Engineering Leader Jim Smith.pdf
Senior Project and Engineering Leader Jim Smith.pdf
Jim Smith
 
Founder-Game Director Workshop (Session 1)
Founder-Game Director  Workshop (Session 1)Founder-Game Director  Workshop (Session 1)
Founder-Game Director Workshop (Session 1)
Amir H. Fassihi
 
Leadership Ethics and Change, Purpose to Impact Plan
Leadership Ethics and Change, Purpose to Impact PlanLeadership Ethics and Change, Purpose to Impact Plan
Leadership Ethics and Change, Purpose to Impact Plan
Muhammad Adil Jamil
 
Oprah Winfrey: A Leader in Media, Philanthropy, and Empowerment | CIO Women M...
Oprah Winfrey: A Leader in Media, Philanthropy, and Empowerment | CIO Women M...Oprah Winfrey: A Leader in Media, Philanthropy, and Empowerment | CIO Women M...
Oprah Winfrey: A Leader in Media, Philanthropy, and Empowerment | CIO Women M...
CIOWomenMagazine
 
TCS AI for Business Study – Key Findings
TCS AI for Business Study – Key FindingsTCS AI for Business Study – Key Findings
TCS AI for Business Study – Key Findings
Tata Consultancy Services
 
一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证
一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证
一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证
gcljeuzdu
 
W.H.Bender Quote 65 - The Team Member and Guest Experience
W.H.Bender Quote 65 - The Team Member and Guest ExperienceW.H.Bender Quote 65 - The Team Member and Guest Experience
W.H.Bender Quote 65 - The Team Member and Guest Experience
William (Bill) H. Bender, FCSI
 

Recently uploaded (10)

Training- integrated management system (iso)
Training- integrated management system (iso)Training- integrated management system (iso)
Training- integrated management system (iso)
 
Case Analysis - The Sky is the Limit | Principles of Management
Case Analysis - The Sky is the Limit | Principles of ManagementCase Analysis - The Sky is the Limit | Principles of Management
Case Analysis - The Sky is the Limit | Principles of Management
 
SOCIO-ANTHROPOLOGY FACULTY OF NURSING.....
SOCIO-ANTHROPOLOGY FACULTY OF NURSING.....SOCIO-ANTHROPOLOGY FACULTY OF NURSING.....
SOCIO-ANTHROPOLOGY FACULTY OF NURSING.....
 
Senior Project and Engineering Leader Jim Smith.pdf
Senior Project and Engineering Leader Jim Smith.pdfSenior Project and Engineering Leader Jim Smith.pdf
Senior Project and Engineering Leader Jim Smith.pdf
 
Founder-Game Director Workshop (Session 1)
Founder-Game Director  Workshop (Session 1)Founder-Game Director  Workshop (Session 1)
Founder-Game Director Workshop (Session 1)
 
Leadership Ethics and Change, Purpose to Impact Plan
Leadership Ethics and Change, Purpose to Impact PlanLeadership Ethics and Change, Purpose to Impact Plan
Leadership Ethics and Change, Purpose to Impact Plan
 
Oprah Winfrey: A Leader in Media, Philanthropy, and Empowerment | CIO Women M...
Oprah Winfrey: A Leader in Media, Philanthropy, and Empowerment | CIO Women M...Oprah Winfrey: A Leader in Media, Philanthropy, and Empowerment | CIO Women M...
Oprah Winfrey: A Leader in Media, Philanthropy, and Empowerment | CIO Women M...
 
TCS AI for Business Study – Key Findings
TCS AI for Business Study – Key FindingsTCS AI for Business Study – Key Findings
TCS AI for Business Study – Key Findings
 
一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证
一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证
一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证
 
W.H.Bender Quote 65 - The Team Member and Guest Experience
W.H.Bender Quote 65 - The Team Member and Guest ExperienceW.H.Bender Quote 65 - The Team Member and Guest Experience
W.H.Bender Quote 65 - The Team Member and Guest Experience
 

JSA For Work at Height.docx

  • 1. ● JOB SAFETY ANALYSIS Doc. No.: Rev.: 00 Date: Page: 1 of 2 Project: Ajyal international School Project Project#: Area:Dist Ajyal Dammam Saudi Arabia General Comments: Proper PPE, TBT should be conducted before start the job, Access control authority would be DEL Site Manager/Site Engineer Date: Supervisor: Job Description: Work at Height Item Detail of Activity Equipment & Tools used Risk Involved Control Measure Responsible Person Severity Rating 1 2 3 4 TRANSPORTING SCAFFOLDING MATERIAL AT SITE. UNLOADING OF SCAFFOLDING MATERIAL. STORAGE OF SCAFFOLD MATERIAL. ERECTION & DISMANTLING OF SCAFFOLDING. ● VEHICLES. ● SCAFFOLDI NG MATERIALS . (PIPES, JOINTS, PLANKS, BASE PLATE, TOE BOARD & etc.) ● .LEVEL STRIP, HAMMER, METER TAP & ROPE. ● MATERIAL CAN FALL. ● PERSONAL INJURY. ● UNAUTHORIZED / UNTRAINED/ INEXPERIENCED PERSONNEL ON THE JOB ● UNEVEN GROUND ● FAULTY/ POOR CONDITION SCAFFOLDING MATERIAL ● IMPROPER SCAFFOLDING ERECTION ● TAG SYSTEM NOT FOLLOWED. ● WRONG MATERIAL HANDLING/ FALLING OBJECT ● PERSONNEL INJURY. ● PERSONNEL FALL. ● OBJECT FALL. ● PROPERTY LOSS ● MATERIAL WILL BE FASTENED PROPERLY BEFORE TRANSPORTING TO SITE. ● ONLY EXPERIENCED, SKILLED AND TRAINED PERSON SHOULD BE ALLOWED ● ALL HANDTOOLS SHOULD BE INSPECTED PRIOR TO START OF JOB ● SCAFFOLDING PIPES WITH CORROSION SHOULD NOT BE USED. ● MATERIAL WILL BE UNLOADED WITH BOOM TRUCK ● CERTIFIED BOOM TRUCK OPERATOR WILL CARRY OUT THE TASK. ● MATERIAL WILL BE STORED IN A DESIGNATED AREA. ● MATERIAL WILL BE STORED ON SCAFFOLD RACKS. ● HARD BARRICADE AND SIGNAGE WILL BE PROVIDED ● GROUND SURFACE SHOULD BE LEVELED ● RED TAG MUST BE PLACED/ HANGED AT THE START OF SCAFFOLDING ● ENSURE VERTICAL PIPES ALLIGNMENT AND CHECK IT WITH HAND LEVEL ● ENSURE ALL JOINTS ARE PROPERLY TIGHTENED ● USE BRACING PIPES AND OUTERRIGGERS PIPES WHERE NECESSARY. ● ONLY CERTIFIED SCAFFOLDERS WILL PERFORM THE JOB. ● SCAFFOLDERS WILL BE TRAINED ON SAFE WORKING AT HEIGHT. ● ABOVE 1.8M HEIGHT SAFETY HARNESS WILL BE WITH DOUBLE LANYARD. 100%TIE OFF WILL BE ENSURED. ● SCAFFOLD PLATFORM WILL NOT BE OVERLOADED. ● HAND RAIL AND TOE BOARDS WILL BE INSTALLED WITH SCAFFOLDING PLATFORM. ● ALL EMPLOYEES WILL WORK WITH PROPER PPES. Area I/C (Authorized Person). 3 2 3 3 3 2 3 3 3 3
  • 2. ● ELECTRIC SHOCK DUE TO POWER LINE ● LADDER SHOULD BE CONSTRUCTED AT SUITABLE. ● METAL PLANKS SHOULD BE PROERLY PLACED ON PIPES WITH HOOKS AND USE BINDING WIRE FOR BINDIND WHERE NECESSARY ● NO PERSON SHOULD GO IN DROP ZONE. SCAFFOLDING AREA. ● AREA SHOULD BARRICATED WHILE ERECTION OR DISMENTLING THE PLATFORM. ● AREA MUST BE CHECKED & FREE FROM ELECTRICAL WIRES BEFORE ASSEMBLING TO THE CRANE. OVERHEAD ELECTRICAL POWER LINES ● SCAFFOLD STRUCTUR E ● PERSONAL INJURY ● PROPERTY LOSS ● ENSURE OVERHEAD CLEARANCE WHILE OPERATING THE EQUIPMENT Area Representative 5 NIGHT WORKING ACTIVITIES ● LIGHTS ● STANDS Trdsssssdrttt ● HAND INJURY/EYE INJURY ● ELECTRIC SHOCK / ELECTROCUTION ● IMPROPER ILLUMINATION ● PERSONAL INJURY ● PROPERTY LOSS ● ENSURE WORKERS ARE COMPLYING PPE’S REQUIRED. ● EXTINGUISHER MUST BE PRESENT AT ALL TIME ● LIGHT SHOULD BE PROPER PRIOR TO START THE WORK. ● ALL POWER CABLES SHOULD BE INSPECTED AND INSULATED. ● LIGHTS SHOULD BE INSTALLED OVER HEAD HEIGHT TO AVOID GLARING TO PERSONAL. ● IF GENERATOR USE FOR ELECTRICITY SHOULD BE PROPERLY GROUNDED ● ALL TOWER CRANE LIGHTS SHOULD BE CHECKED AND USE WHEREVER NECESSARY. Area I/C (Authorized Person). 2 3 2 3 6 HOUSEKEEPING MANUAL CLEANING OF AREA ● HOUSEKEEPING ● AREA BARRICADING ● PPE ● PROPERTY LOSS ● SLIP/TRIP ● FALL FROM HEIGHT AREA IN- CHARGE 3 2 3
  • 3. Severity Rating : (1) First Aid / Minor Property Damage (2) Recordable Accident / Property Damage (3) Lost Time Accident / Major Property Loss (4) Catastrophic Accident Are you aware of, and do you have the correct PPE? What are the risks? How do controlled risks? _______________________________ __________________________ AREA ENGINEER / SUPERVISOR HSE REPRESENTATIVE