This document provides an introduction to industrial engineering. It defines industrial engineering as training and research to effectively use people, machinery, and materials to increase productivity. It outlines the main courses taught in industrial engineering programs and the required qualifications. It also describes the tools used by industrial engineers, including understanding processes, economics, mathematics, and computer systems. The document discusses using the case study and modeling approaches to teaching. It provides the course plan for an industrial engineering program and lists elective courses. It defines systems and models used in industrial engineering. It discusses using simulation and decision making for dynamic aspects and outlines the historical overview of the field.